Buena Vista Park erosion control plan (1989)

Buena Vista Park erosion control plan

A plan by the Recreation and Park Department to control erosion and reforest slopes across fourteen areas of Buena Vista Park. Scan on the Internet Archive ↗

Reforested slope cover
100% of reforested slopesScan 8 ↗
Report recommendations
  • The plan makes erosion control recommendations for fourteen separate areas within the park.Scan 4 ↗
  • The plan proposes jute netting on shoulders of large gullies to prevent further erosion.Scan 8 ↗
Findings
  • The plan identifies five plant communities for long term reforestation in the park.Scan 4 ↗
22 quotes from the scan

Printed words Quoted from the page as read from the scan.

Findings-bb7b60b6e779

“Five plant communities have been identified for long term reforestation in the park.”

Scan 4

Report recommendations-c859a9697f09

“Erosion Control Recommendations are made for fourteen separate areas within the park.”

Scan 4

Findings-f5be751a0395

“In response to community and Buena Vista Park staff suggestions, native plants have been favored for reforestation work*.”

Scan 4

Report recommendations-54e5a2fb9bc5

“Selective canopy thinning to be done in sections 6, 7, 13, and 14.”

Scan 6

Report recommendations-ad1ec5b52235

“Eucalyptus shall be retained for slope stabilization but new plants shall not be established.”

Scan 6

Report recommendations-611d3ba728f2

“Jute netting may be used on shoulders of large gullies to prevent further erosion.”

Scan 8

Report recommendations-dfc85031b9c0

“Herbaceous and woody plant material (max. 2’ high) is intended to cover 100% of reforested slopes.”

Scan 8

Report recommendations-a8be86e63f71

“LONG TERM. Establish an open oak/madrone woodland. ACCESS: By foot from above and below.”

Scan 12

Report recommendations-b950866b4c7c

“Rebuild stairway at eastern edge of area so that it jogs at mid slope before reaching upper path.”

Scan 12

Report recommendations-882f216fe5fe

“Plantings on lower 1/5 of es with emphasis on color and drought tolerance.”

Scan 14

Report recommendations-8b2cdda63b74

“Wattle a minimum of 20 ’ each side of existing stairways. Begin this wattling from top of slope.”

Scan 16

Report recommendations-e81b90ca8fc9

“Bulkhead in deepest gully. Clearing and stabilization to be carried out in sections parallel to slope.”

Scan 18

Report recommendations-2a9fb7d9f0f7

“Reroute foot traffic for slope stabilization. LONG TERM. Maintain oak woodland.”

Scan 22

Report recommendations-a59ee29bfd99

“REMOVE: Large Cupressus macrocarpa and all Acacia longifolia.”

Scan 22

Report recommendations-cf84be0329ba

“LONG TERM. Establish coastal coniferous forest. Contain foot trattiic.”

Scan 24

Report recommendations-56148c4fffcc

“LONG TERM. Establish low growing coastal chaparral with COLOr: ACCESS: From above by truck, from below by foot.”

Scan 26

Report recommendations-901e6a8d5102

“Provide visual access throughout the area. Remove poison oak.”

Scan 26

Report recommendations-42f8ad459238

“GOALS : SHORT TERM. Selective removal of dead material. Establish groundcover. LONG TERM.”

Scan 30

Report recommendations-d7b158b77108

“LONG TERM. Establish an open oak/madrone woodland. ACCESS: By truck from below, by foot from above.”

Scan 30

Report recommendations-557741e995ad

“Backfill retaining wall and up cliff face to reduce cliff’s angle of repose.”

Scan 32

Report recommendations-debacbc9ab40

“STABILIZE: Strengthen and rebuild existing wattling. PLANT: Sow recommended grasses and wildflower mix.”

Scan 34

Report recommendations-e4ae69f155bf

“LONG TERM. Establish coastal coniferous forest. Contain foot tratric. ACCESS: From below by truck, above by foot.”

Scan 38