Findings-bb7b60b6e779
“Five plant communities have been identified for long term reforestation in the park.”
Scan 4Records › City reports › Buena Vista Park erosion control plan (1989)
Buena Vista Park erosion control plan
A plan by the Recreation and Park Department to control erosion and reforest slopes across fourteen areas of Buena Vista Park. Scan on the Internet Archive ↗
Printed words Quoted from the page as read from the scan.
Findings-bb7b60b6e779
“Five plant communities have been identified for long term reforestation in the park.”
Scan 4Report recommendations-c859a9697f09
“Erosion Control Recommendations are made for fourteen separate areas within the park.”
Scan 4Findings-f5be751a0395
“In response to community and Buena Vista Park staff suggestions, native plants have been favored for reforestation work*.”
Scan 4Report recommendations-54e5a2fb9bc5
“Selective canopy thinning to be done in sections 6, 7, 13, and 14.”
Scan 6Report recommendations-ad1ec5b52235
“Eucalyptus shall be retained for slope stabilization but new plants shall not be established.”
Scan 6Report recommendations-611d3ba728f2
“Jute netting may be used on shoulders of large gullies to prevent further erosion.”
Scan 8Report recommendations-dfc85031b9c0
“Herbaceous and woody plant material (max. 2’ high) is intended to cover 100% of reforested slopes.”
Scan 8Report recommendations-a8be86e63f71
“LONG TERM. Establish an open oak/madrone woodland. ACCESS: By foot from above and below.”
Scan 12Report recommendations-b950866b4c7c
“Rebuild stairway at eastern edge of area so that it jogs at mid slope before reaching upper path.”
Scan 12Report recommendations-882f216fe5fe
“Plantings on lower 1/5 of es with emphasis on color and drought tolerance.”
Scan 14Report recommendations-8b2cdda63b74
“Wattle a minimum of 20 ’ each side of existing stairways. Begin this wattling from top of slope.”
Scan 16Report recommendations-e81b90ca8fc9
“Bulkhead in deepest gully. Clearing and stabilization to be carried out in sections parallel to slope.”
Scan 18Report recommendations-2a9fb7d9f0f7
“Reroute foot traffic for slope stabilization. LONG TERM. Maintain oak woodland.”
Scan 22
Scan 22Report recommendations-cf84be0329ba
“LONG TERM. Establish coastal coniferous forest. Contain foot trattiic.”
Scan 24Report recommendations-56148c4fffcc
“LONG TERM. Establish low growing coastal chaparral with COLOr: ACCESS: From above by truck, from below by foot.”
Scan 26
Scan 26Report recommendations-42f8ad459238
“GOALS : SHORT TERM. Selective removal of dead material. Establish groundcover. LONG TERM.”
Scan 30Report recommendations-d7b158b77108
“LONG TERM. Establish an open oak/madrone woodland. ACCESS: By truck from below, by foot from above.”
Scan 30Report recommendations-557741e995ad
“Backfill retaining wall and up cliff face to reduce cliff’s angle of repose.”
Scan 32Report recommendations-debacbc9ab40
“STABILIZE: Strengthen and rebuild existing wattling. PLANT: Sow recommended grasses and wildflower mix.”
Scan 34Report recommendations-e4ae69f155bf
“LONG TERM. Establish coastal coniferous forest. Contain foot tratric. ACCESS: From below by truck, above by foot.”
Scan 38Identifier ia:C124907403