{"note":"Statements read from one scanned government report in the IGS library collection on the Internet Archive. Each statement has a verbatim quote found on its page (quote, page_url). The summary and subject_label of each statement were written by a model (Claude Haiku 5.5) and can be wrong: read the page before quoting. At most 20 selected pages of a report were read. Keys are the column names of the tables igs_reports and igs_claims; a column that is null for a statement is left out, and columns with one value for every statement of this report are given once under same_for_every_statement. \"[name withheld]\" stands where the release withholds a name; the site's page guard withholds a few more in reports after 1951, so a cell here can differ from the table; for a few reports prepared_by and creator are left out. A statement's links to the Board record are under links (show_target_kind: decision, instrument or ballot measure; show_target_id; show_url); they replace the table's decision_id and instrument_id, which are left out. place_id, place_label and place_precision come from a corrected place match where there is one. part, speaker, speaker_role, stance and speaker_evidence say who is speaking: a model (Claude Haiku 5.5) read each page and its context and can be wrong. part: main_text, attachment, appendix, letter, comment, response, table or cover_or_contents; speaker: issuer, another_body, letter_writer or unclear; speaker_role: a role or organisation, never a personal name; stance: own_position, quotes_to_dispute, quotes_to_report, restates_to_reject or unclear. The report page shows a statement only when speaker is issuer, part is main_text or appendix, and stance is own_position or quotes_to_report; hidden gives the part, the speaker or the stance of the others. ","release":"v0.9.2","licence":"CC0-1.0","slug":"c124908106","url":"https://data.qipu.org/usa/san-francisco/reports/c124908106/","statement_url":"https://data.qipu.org/usa/san-francisco/reports/c124908106/#{anchor}","tables":{"igs_reports":"https://tiles.qipu.org/data/releases/v0.9.2/parquet/igs_reports.parquet","igs_claims":"https://tiles.qipu.org/data/releases/v0.9.2/parquet/igs_claims.parquet"},"report":{"report_id":"C124908106","source_id":"C124908106","title":"Port of San Francisco : draft waterfront land use plan","year":1994,"n_pages":196,"creator":"San Francisco (Calif.). Waterfront Plan Advisory Board","source_url":"https://archive.org/details/C124908106","issuer":"City and County of San Francisco, Waterfront Plan Advisory Board","issuer_type":"government","gov_level":"city_county","prepared_by":null,"doc_kind":"plan","jurisdiction":"San Francisco","jurisdiction_id":"sf","city":"sf","issuer_by":"meta","doc_kind_by":"meta","jurisdiction_by":"meta","run_id":"igs-labels-rules+haiku55-cli-2026-10-23"},"pages_with_statements":17,"statements_total":39,"statements_by_kind":{"finding":11,"proposal":19,"cites_decision":2,"background":7},"same_for_every_statement":{"source_id":"C124908106","source_url":"https://archive.org/details/C124908106","source_label":"IGS library: Port of San Francisco : draft waterfront land use plan","report_year":1994,"issuer":"City and County of San Francisco, Waterfront Plan Advisory Board","issuer_type":"government","doc_kind":"plan","t_precision":"year","status":"extracted","claim_kind":"observation","extraction_table":"igs_claims","run_id":"igs-sf-pages-v2-haiku55-batch-2026-10-23","city":"sf","prompt_version":"igs-page-v2-2026-10-23"},"summary":{"what":"A draft plan by the Waterfront Plan Advisory Board for the Port of San Francisco's waterfront land use, prepared under Proposition H and needing an environmental impact report before adoption.","next":"The Board passed the waterfront zoning redraw along the Embarcadero in January 1998.","next_decision":"qipu:sf/decision/journalofproceed93sanfrich|2","figures":[{"label":"Area","value":"approximately 15 acres","claim_ids":["c:19f3bbd483d5beea4b374fd949131c69"]},{"label":"Pier 45 repair","value":"$11.6 million","claim_ids":["c:79d6d66eca0f451f5e0b10c71ca3fec0"]},{"label":"Fish handling space","value":"108,000 square feet","claim_ids":["c:fb1e0f03263f05911ff2cfc69849575d"]}],"main_points":["c:6e7cfa27e3fbee1034094bdf5cc17843","c:822899a9dcd37799a038f173fba6189f","c:a3f8f074d2c7712e8ba8f0ddc80b8514"],"board_decisions_after":["qipu:sf/decision/journalofproceed93sanfrich|2","qipu:sf/decision/journalofproceed92septdecsanfrich|156","qipu:sf/decision/hand:bos-1997-fa9be388","qipu:sf/decision/journalofproceedjanapr92sanfrich:46/3","qipu:sf/decision/meetingminutes2004sanf:96/3"],"board_decisions_before":["qipu:sf/decision/journalofjanaprproceed90sanfrich:86/6"],"made_by":"A model (Claude Haiku 5.5) wrote the lead and picked the figures, main points and later Board decisions from the statements, from a second reading of the report's summary and cost pages, and from Board decisions dated 3 years before to 10 years after the report; every number it wrote was checked against them, and a figure must be about the report's own area or project."},"statements":[{"claim_id":"c:822899a9dcd37799a038f173fba6189f","page_id":"C124908106:1","page_url":"https://archive.org/details/C124908106/page/n0","statement_kind":"proposal","subject_label":"Environmental Impact Report for Draft Plan","summary":"An Environmental Impact Report will be prepared for the Draft Plan and is a prerequisite to Port Commission adoption of a final plan.","property":"other","value_text":"EIR prerequisite to adoption","t_from":"1994","quote":"An Environmental Impact Report (EIR) will be prepared for the Draft Plan, which will take approximately 1-1/2 years to complete and is a prerequisite to Port Commission adoption","anchor":"s-822899a9dcd3","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Notice Regarding Further Review of the Draft Waterfront Land Use Plan"},{"claim_id":"c:f145efcedd9b02118d7488b5ae1a44e6","page_id":"C124908106:1","page_url":"https://archive.org/details/C124908106/page/n0","statement_kind":"background","subject_label":"Port Commission receipt of Draft Plan","summary":"The Port Commission formally received the Draft Plan from the Advisory Board on July 26, 1994.","property":"event","value_text":"July 26, 1994","date_printed":"July 26, 1994","t_from":"1994","quote":"The Port Commission formally received the Draft Plan from the Advisory Board on July 26, 1994.","anchor":"s-f145efcedd9b","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"The Port Commission formally received the Draft Plan from the Advisory Board"},{"claim_id":"c:7a833e0c5a657aa1f10b976e6ad2a8a3","page_id":"C124908106:16","page_url":"https://archive.org/details/C124908106/page/n15","statement_kind":"finding","subject_label":"Financial condition of the Port","summary":"Restrictive legal interpretations and complex entitlement requirements have severely limited economic revitalization of the waterfront.","property":"finding","value_text":"severely limited opportunities for economic revitalization","t_from":"1994","quote":"there are a number of increasingly restrictive legal interpretations of existing waterfront regulations and complex entitlement process requirements","place_label":"San Francisco waterfront","anchor":"s-7a833e0c5a65","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the Waterfront Plan Advisory Board (issuer)","stance":"own_position","speaker_evidence":"Executive Summary: there are a number of increasingly restrictive legal interpretations"},{"claim_id":"c:7588adf85d10682ce7ec645704881e16","page_id":"C124908106:29","page_url":"https://archive.org/details/C124908106/page/n28","statement_kind":"background","subject_label":"Proposition H hotel ban","summary":"Proposition H banned hotel development on the piers or within 100 feet of the shoreline.","property":"other","value_text":"ban on hotel development on the piers","date_printed":"November 1990","t_from":"1990","quote":"such as a ban on hotel development on the piers or within 100 feet of the shorelin a","place_label":"Piers and shoreline","anchor":"s-7588adf85d10","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Proposition H ... provided minimum requirements for its contents, such as a ban on hotel development"},{"claim_id":"c:b502d78ce86d5aca61d2b3c8ada12b1d","page_id":"C124908106:29","page_url":"https://archive.org/details/C124908106/page/n28","statement_kind":"background","subject_label":"Proposition H","summary":"In November 1990 San Francisco voters adopted Proposition H, requiring a comprehensive waterfront use plan.","property":"event","value_text":"Proposition H adopted","date_printed":"November 1990","t_from":"1990","quote":"In November 1990, the San Francisco voters fi; ' adopted Proposition H which required preparation of a comprehensive waterfron use plan","place_label":"San Francisco","anchor":"s-b502d78ce86d","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"In November 1990, the San Francisco voters ... adopted Proposition H which required preparation"},{"claim_id":"c:c143927c9307fce617b9f44789338cae","page_id":"C124908106:29","page_url":"https://archive.org/details/C124908106/page/n28","statement_kind":"background","subject_label":"Freeway demolition and Embarcadero redesign","summary":"The City is proceeding with construction of the north and south segments of The Embarcadero projects.","property":"other","value_text":"north and south segments under construction","t_from":"1994","quote":"While this redesign effort is underway, the City is proceeding with construction of the north and south segments of the projects.","place_label":"The Embarcadero","place_precision":"street","place_id":"qipu:sf/place/street/the-embarcadero","resolved_by":"place links file","anchor":"s-c143927c9307","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"While this redesign effort is underway, the City is proceeding with construction"},{"claim_id":"c:d869d55e025eefb501fc7b53e9eac9c2","page_id":"C124908106:33","page_url":"https://archive.org/details/C124908106/page/n32","statement_kind":"proposal","subject_label":"Waterfront mixed-use developments","summary":"The Plan identifies opportunities for new investments, often in the form of mixed-use developments, to provide capital for maritime facilities and public access.","property":"proposes","t_from":"1994","quote":"The Plan identifies opportunities for new investments, often in the form of mixed-use developments, that will provide capital for reinvestment in maritime facilities","anchor":"s-d869d55e025e","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Draft Waterfront Land Use Plan Proposed Port Commission Revisions; The Plan identifies opportunities"},{"claim_id":"c:24f1dfd12ee5fa6e28778fca9d89033a","page_id":"C124908106:72","page_url":"https://archive.org/details/C124908106/page/n71","statement_kind":"finding","subject_label":"Fishing industry at Fisherman's Wharf","summary":"The report states that environmental conditions have greatly reduced available fisheries resources, reducing the fishing industry's economic health.","property":"finding","t_from":"1994","quote":"In recent years, environmental conditions have greatly reduced the available fisheries resources, which in turn has reduced the economic health of the fishing industry.","place_label":"Fisherman's Wharf","place_precision":"site","place_id":"qipu:sf/place/landmark/fishermans-wharf","resolved_by":"place links file","anchor":"s-24f1dfd12ee5","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Fishing industry operations currently take place at Fish Alley"},{"claim_id":"c:79d6d66eca0f451f5e0b10c71ca3fec0","page_id":"C124908106:72","page_url":"https://archive.org/details/C124908106/page/n71","statement_kind":"finding","subject_label":"Pier 45 earthquake repair","summary":"The Port began an $11.6 million (≈ $31.5 million in 2026 dollars) earthquake repair project at Pier 45 after the 1989 Loma Prieta earthquake.","property":"cost_usd","value_text":"$11.6 million","value_num":11600000.0,"unit":"USD","date_printed":"1989","t_from":"1989","quote":"the Port began an $11.6 million earthquake repair project at Pier 45, now in its final construction stage.","place_label":"Pier 45","place_precision":"site","place_id":"qipu:sf/place/landmark/pier-45","resolved_by":"place links file","anchor":"s-79d6d66eca0f","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"the Port began an $11.6 million earthquake repair project at Pier 45"},{"claim_id":"c:cadbecde3f767d851b02b30f01436320","page_id":"C124908106:72","page_url":"https://archive.org/details/C124908106/page/n71","statement_kind":"proposal","subject_label":"Seafood Center project","summary":"The Seafood Center project was proposed by the Port Commission in 1988 to improve the commercial fishing industry at the Wharf.","property":"proposes","value_text":"Seafood Center","date_printed":"1988","t_from":"1988","quote":"In 1988, the Seafood Center project was proposed by the Port Commission to improve the commercial fishing industry at the Wharf.","place_label":"Fisherman's Wharf","place_precision":"site","place_id":"qipu:sf/place/landmark/fishermans-wharf","resolved_by":"place links file","anchor":"s-cadbecde3f76","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"In 1988, the Seafood Center project was proposed by the Port Commission"},{"claim_id":"c:fb1e0f03263f05911ff2cfc69849575d","page_id":"C124908106:72","page_url":"https://archive.org/details/C124908106/page/n71","statement_kind":"proposal","subject_label":"Pier 45 fish handling space","summary":"Upon completion of earthquake repairs at Pier 45 in 1994/95, 108,000 square feet of fish handling space will be available.","property":"other","value_text":"108,000 square feet","value_num":108000.0,"unit":"sqft","date_printed":"1994/95","t_from":"1994","quote":"Upon completion of earthquake repairs at Pier 45 in 1994/95, 108,000 square feet of modern fish off-loading, fish handling, and distribution space will be available.","place_label":"Pier 45","place_precision":"site","place_id":"qipu:sf/place/landmark/pier-45","resolved_by":"place links file","anchor":"s-fb1e0f03263f","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Upon completion of earthquake repairs at Pier 45 in 1994/95"},{"claim_id":"c:afbbad4ec628ae10ed2aab5b0c10b8e2","page_id":"C124908106:85","page_url":"https://archive.org/details/C124908106/page/n84","statement_kind":"proposal","subject_label":"Hyde Street Harbor","summary":"The plan proposes to complete the Hyde Street Harbor as soon as possible.","property":"proposes","value_text":"Complete Hyde Street Harbor","t_from":"1994","quote":"Hyde Street Harbor (future) Development Standards: Complete the Hyde Street Harbor as soon as possible.","place_label":"Hyde Street Harbor","anchor":"s-afbbad4ec628","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Hyde Street Harbor (future) Development Standards: Complete the Hyde Street Harbor"},{"claim_id":"c:e68d00a8cb32a7f4304195a0595119f7","page_id":"C124908106:85","page_url":"https://archive.org/details/C124908106/page/n84","statement_kind":"proposal","subject_label":"Fisherman's Wharf pier","summary":"The plan proposes to operate the existing pier primarily for a Maritime Historical Park and support functions.","property":"proposes","value_text":"Maritime Historical Park","t_from":"1994","quote":"Operate existing pier primarily for a Maritime Historical Park and support functions, including concessions, excursions, related special events and maritime educational programs.","place_label":"Fisherman's Wharf","place_precision":"site","place_id":"qipu:sf/place/landmark/fishermans-wharf","resolved_by":"place links file","anchor":"s-e68d00a8cb32","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Operate existing pier primarily for a Maritime Historical Park and support functions"},{"claim_id":"c:42954ca02f1c37483cf7ec8f7002258f","page_id":"C124908106:98","page_url":"https://archive.org/details/C124908106/page/n97","statement_kind":"proposal","subject_label":"Piers 27-29 cruise terminal","summary":"The document says Piers 27-29 could provide a desirable site for a modern cruise terminal.","property":"alternative","value_text":"modern cruise terminal","t_from":"1994","quote":"Piers 27-29 also could provide a desirable site for a modern cruise terminal.","place_label":"Piers 27-29","anchor":"s-42954ca02f1c","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"Waterfront Plan Advisory Board","stance":"own_position","speaker_evidence":"Chapter 4: The Northeast Waterfront; Piers 27-29 also could provide a desirable site"},{"claim_id":"c:8643e42225c2e3d512aa54d14f880386","page_id":"C124908106:98","page_url":"https://archive.org/details/C124908106/page/n97","statement_kind":"proposal","subject_label":"[name withheld] 15-17","summary":"The plan proposes to operate Piers 15-17 as a cargo-support warehouse facility as long as necessary.","property":"proposes","value_text":"cargo-support warehouse facility","t_from":"1994","quote":"Operate Piers 15-17 as a cargo-support warehouse facility as long as necessary, unless it is possible to relocate this operation to alternate upland locations","place_label":"Piers 15-17","anchor":"s-8643e42225c2","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"Waterfront Plan Advisory Board","stance":"own_position","speaker_evidence":"Development Standards: Operate Piers 15-17 as a cargo-support warehouse facility"},{"claim_id":"c:6e7cfa27e3fbee1034094bdf5cc17843","page_id":"C124908106:104","page_url":"https://archive.org/details/C124908106/page/n103","statement_kind":"proposal","subject_label":"Ferry Building Waterfront","summary":"The plan proposes to restore the Ferry Building Waterfront as a major transit center.","property":"proposes","value_text":"major transit center","t_from":"1994","quote":"Restore the Ferry Building Waterfront as a major transit center by improving transit access and transfers among water and land transportation modes.","place_label":"Ferry Building Waterfront","place_precision":"building","anchor":"s-6e7cfa27e3fb","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Draft Waterfront Land Use Plan; Chapter 4: The Ferry Building Waterfront"},{"claim_id":"c:b969b055e4211b7060e37f3e5834e849","page_id":"C124908106:104","page_url":"https://archive.org/details/C124908106/page/n103","statement_kind":"finding","subject_label":"Ferry trips","summary":"The document reports that commuter and recreational passengers made 2.8 million ferry trips last year.","property":"finding","value_text":"2.8 million ferry trips","value_num":2800000.0,"date_printed":"Last year","t_from":"1994","quote":"Last year, commuter and recreational passengers made 2.8 million ferry trips, and this number is expected to grow to over 4 million during the next decade.","place_label":"Ferry Building Waterfront","place_precision":"building","anchor":"s-b969b055e421","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"The 1989 Loma Prieta earthquake triggered a dramatic increase in the demand"},{"claim_id":"c:4a694ca725bc2a0a68b580b5e115bd14","page_id":"C124908106:105","page_url":"https://archive.org/details/C124908106/page/n104","statement_kind":"proposal","subject_label":"Ferry Building and environs","summary":"The plan proposes to physically and visually integrate the Ferry Building and environs with the City and Bay settings.","property":"proposes","value_text":"physically and visually integrate","t_from":"1994","quote":"Physically and visually integrate the Ferry Building and environs with their spectacular City and Bay settings.","place_label":"Ferry Building","place_precision":"building","place_id":"qipu:sf/place/landmark/ferry-building","resolved_by":"place links file","anchor":"s-4a694ca725bc","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Draft Waterfront Land Use Plan Proposed Port Commission Revisions Chapter 4"},{"claim_id":"c:7280f1dd158985fd8bf02eb4b91f5f2c","page_id":"C124908106:105","page_url":"https://archive.org/details/C124908106/page/n104","statement_kind":"finding","subject_label":"Off-street parking","summary":"The document finds that off-street parking in the area has been significantly reduced since the earthquake and freeway demolition.","property":"finding","value_text":"significantly reduced","t_from":"1994","quote":"Since the earthquake and demolition of The Embarcadero Freeway, the amount of off-street parking in the area has been significantly reduced.","place_label":"Ferry Building area","place_precision":"building","place_id":"qipu:sf/place/landmark/ferry-building","resolved_by":"place links file","anchor":"s-7280f1dd1589","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Since the earthquake and demolition of The Embarcadero Freeway, the amount of off-street parking"},{"claim_id":"c:b028db0b72a4e7d1e40c51d4e0f323fb","page_id":"C124908106:105","page_url":"https://archive.org/details/C124908106/page/n104","statement_kind":"finding","subject_label":"Pier 1 parking","summary":"The document states that Pier 1 is currently used for parking on an interim basis.","property":"use","value_text":"interim parking","t_from":"1994","quote":"Currently Pier 1 is used for parking on an interim basis.","place_label":"Pier 1","anchor":"s-b028db0b72a4","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Currently Pier 1 is used for parking on an interim basis."},{"claim_id":"c:222cf2e55e401170384e78468036ce9e","page_id":"C124908106:114","page_url":"https://archive.org/details/C124908106/page/n113","statement_kind":"proposal","subject_label":"Piers 48, 50 and 54","summary":"The report states Piers 48, 50 and 54 will continue to function as maritime facilities.","property":"proposes","value_text":"continue as maritime facilities","t_from":"1994","quote":"South of China Basin, Piers 48, 50 and 54 will continue to function as impertant maritime facilities.","place_label":"Piers 48, 50 and 54","anchor":"s-222cf2e55e40","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"South of China Basin, Piers 48, 50 and 54 will continue"},{"claim_id":"c:64dc0bd627272fea7f6e33ba6be1599d","page_id":"C124908106:114","page_url":"https://archive.org/details/C124908106/page/n113","statement_kind":"proposal","subject_label":"South Beach/China Basin maritime uses","summary":"The plan's objective is to preserve and rationalize existing industrial maritime activities in the area.","property":"proposes","t_from":"1994","quote":"Preserve and rationalize existing industrial maritime activities in the area.","place_label":"South Beach/China Basin Waterfront","place_precision":"area","place_id":"qipu:sf/place/hood/financial-district-south-beach","resolved_by":"place links file","anchor":"s-64dc0bd62727","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Objectives For The South Beach/China Basin Waterfront"},{"claim_id":"c:94223f74423bd450aa363ad0b8218c6b","page_id":"C124908106:114","page_url":"https://archive.org/details/C124908106/page/n113","statement_kind":"proposal","subject_label":"Mission Bay backland designation","summary":"The Mission Bay Plan designates about six acres adjacent to Piers 48 and 50 as backland for maritime operations.","property":"proposes","value_text":"approximately six acres","value_num":6.0,"unit":"acres","t_from":"1994","quote":"designates approximately six acres adjacent to Piers 48 and 50 as backland for cargo or other maritime operations.","place_label":"Piers 48 and 50, Mission Bay","place_precision":"area","anchor":"s-94223f74423b","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"quotes_to_report","speaker_evidence":"This is reflected in the Mission Bay Plan, which designates"},{"claim_id":"c:a1b357c591ab75ba42a8a264e350f831","page_id":"C124908106:114","page_url":"https://archive.org/details/C124908106/page/n113","statement_kind":"finding","subject_label":"Condemned piers","summary":"Three piers have been condemned over the past 20 years.","property":"other","value_text":"three piers (Piers 24, 34, and 64) condemned","value_num":3.0,"date_printed":"past 20 years","t_from":"1994","quote":"and three piers (Piers 24, 34, and 64) have been condemned.","place_label":"South Beach/China Basin Waterfront","place_precision":"area","place_id":"qipu:sf/place/hood/financial-district-south-beach","resolved_by":"place links file","anchor":"s-a1b357c591ab","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Over the past 20 years, most of the pier facilities have deteriorated"},{"claim_id":"c:43908140e60a6b2fb25c01045f3a8ef0","page_id":"C124908106:127","page_url":"https://archive.org/details/C124908106/page/n126","statement_kind":"proposal","subject_label":"Opportunity Area arena","summary":"The Opportunity Area has been proposed as a site for a new arena.","property":"proposes","value_text":"new arena","t_from":"1994","quote":"this Opportunity Area has been proposed as a site for a new arena","place_label":"South Beach/China Basin Opportunity Area","place_precision":"area","place_id":"qipu:sf/place/hood/financial-district-south-beach","resolved_by":"place links file","anchor":"s-43908140e60a","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"quotes_to_report","speaker_evidence":"this Opportunity Area has been proposed as a site for a new arena"},{"claim_id":"c:6c389e2400a5583293dd4e22c6c806c1","page_id":"C124908106:127","page_url":"https://archive.org/details/C124908106/page/n126","statement_kind":"finding","subject_label":"Arena height limit","summary":"An arena would require an exception to the 40 foot height limit for this area.","property":"height_ft","value_text":"40 foot height limit","value_num":40.0,"unit":"ft","t_from":"1994","quote":"although an arena would require an exception to the 40 foot height limit for this area.","place_label":"South Beach/China Basin Opportunity Area","place_precision":"area","place_id":"qipu:sf/place/hood/financial-district-south-beach","resolved_by":"place links file","anchor":"s-6c389e2400a5","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"although an arena would require an exception to the 40 foot height limit"},{"claim_id":"c:19f3bbd483d5beea4b374fd949131c69","page_id":"C124908106:140","page_url":"https://archive.org/details/C124908106/page/n139","statement_kind":"proposal","subject_label":"Pier 70 Mixed Use Opportunity Area","summary":"About 15 acres near Pier 70 have been identified as a Mixed Use Opportunity Area.","property":"proposes","value_text":"approximately 15 acres","value_num":15.0,"unit":"acres","t_from":"1994","quote":"Approximately 15 acres between 18th street and 21st Street in the vicinity of Pier 70 have been identified as a Mixed Use Opportunity Area.","place_label":"Pier 70, between 18th Street and 21st Street","place_precision":"site","place_id":"qipu:sf/place/landmark/pier-70","resolved_by":"place links file","anchor":"s-19f3bbd483d5","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Draft Waterfront Land Use Plan; Chapter 4: The Southern Waterfront"},{"claim_id":"c:aa0327919739295b6e56444707c1050f","page_id":"C124908106:140","page_url":"https://archive.org/details/C124908106/page/n139","statement_kind":"finding","subject_label":"Union Iron Works buildings","summary":"Two of the historic Union Iron Works structures are unreinforced masonry needing substantial seismic repair.","property":"other","value_text":"unreinforced masonry","value_num":2.0,"t_from":"1994","quote":"Two of the structures are built of unreinforced masonry, requiring substantial repair and seismic re-engineering before they can be reused","place_label":"Pier 70, Union Iron Works buildings","place_precision":"other","anchor":"s-aa0327919739","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Pier 70 Mixed Use Opportunity Area. Approximately 15 acres"},{"claim_id":"c:95c23cf75d0c22e1963234b46b19885d","page_id":"C124908106:147","page_url":"https://archive.org/details/C124908106/page/n146","statement_kind":"cites_decision","subject_label":"Proposition H","summary":"San Francisco voters adopted Proposition H in 1990, calling for a waterfront land use plan.","property":"adopted","value_text":"Proposition H","date_printed":"1990","t_from":"1990","quote":"The legislative process actually began in 1990 when San Francisco voters adopted Proposition H, calling for preparation of a land use plan","decided_by":"San Francisco voters","instrument_kind":"proposition","instrument_printed":"H","instrument_date_printed":"1990","place_label":"San Francisco","anchor":"s-95c23cf75d0c","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"CHAPTER 5: IMPLEMENTATION; The legislative process actually began in 1990"},{"claim_id":"c:5697b812789b84bb20116e5c19c413bc","page_id":"C124908106:153","page_url":"https://archive.org/details/C124908106/page/n152","statement_kind":"background","subject_label":"Attorney General informal opinion on substantial pier repairs","summary":"A 1986 Attorney General opinion concluded that development involving more than routine pier repairs would require case-by-case review.","property":"other","value_text":"case-by-case review","date_printed":"October 8, 1986","t_from":"1986","quote":"In 1986, an opinion was issued, concluding that proposed development that. involves more than routine repairs to the pier or substructure would require case-by-case review.","anchor":"s-5697b812789b","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"quotes_to_report","speaker_evidence":"In 1986, an opinion was issued, concluding that proposed development"},{"claim_id":"c:7df7d095a55a333ce96369e51d8c86bb","page_id":"C124908106:153","page_url":"https://archive.org/details/C124908106/page/n152","statement_kind":"finding","subject_label":"Port amendment to McAteer-Petris Act","summary":"The Port initiated a 1987 amendment to the McAteer-Petris Act to allow repair or reconstruction of piers.","property":"other","value_text":"initiated amendment","date_printed":"1987","t_from":"1987","quote":"In 1987, the Port initiated an amendment to the McAteer-Petris Act to allow repair, replacement or reconstruction of the piers and pier structures, no larger than the pre-existing","anchor":"s-7df7d095a55a","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"In 1987, the Port initiated an amendment to the McAteer-Petris Act"},{"claim_id":"c:86b3e24cd34ac8670c60d29880a4a98a","page_id":"C124908106:153","page_url":"https://archive.org/details/C124908106/page/n152","statement_kind":"finding","subject_label":"Piers and bulkhead buildings designated for reuse","summary":"At that time seven piers and bulkhead buildings, plus the Ferry and Agricultural Buildings, were designated for reuse.","property":"other","value_text":"seven piers and bulkhead buildings","value_num":7.0,"t_from":"1994","quote":"At that time, there were seven piers and bulkhead buildings, in addition to the Ferry Building and the Agricultural Building, that were designated for reuse","anchor":"s-86b3e24cd34a","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"At that time, there were seven piers and bulkhead buildings"},{"claim_id":"c:fb28703e8699adde51aaa7dbd8fec39d","page_id":"C124908106:153","page_url":"https://archive.org/details/C124908106/page/n152","statement_kind":"cites_decision","subject_label":"BCDC Special Area Plan use designations for piers","summary":"BCDC's Special Area Plan was adopted in 1975 and identified uses for several piers.","property":"adopted","value_text":"adopted in 1975","value_num":1975.0,"date_printed":"1975","t_from":"1975","quote":"BCDC’s Special Area Plan, adopted in 1975, identified uses for several of those piers that were not considered","anchor":"s-fb28703e8699","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"quotes_to_report","speaker_evidence":"BCDC's Special Area Plan, adopted in 1975, identified uses"},{"claim_id":"c:144e72b997a0a9f0fbecc304a1fe9e62","page_id":"C124908106:161","page_url":"https://archive.org/details/C124908106/page/n160","statement_kind":"proposal","subject_label":"Design review process for Port sites","summary":"The plan proposes a design review process that avoids sequential review by each agency.","property":"proposes","value_text":"design review process","t_from":"1994","quote":"Establish a design review process that avoids reliance on sequential review by each agency with jurisdiction over the site, in order to 1) minimize delay","anchor":"s-144e72b997a0","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Draft Waterfront Land Use Plan Chapter 5: Implementation"},{"claim_id":"c:8ae3355f7964d597f00aabc606f39f7a","page_id":"C124908106:161","page_url":"https://archive.org/details/C124908106/page/n160","statement_kind":"proposal","subject_label":"Hiring preference for San Francisco residents","summary":"The plan says a policy should be adopted giving San Francisco residents priority hiring preference.","property":"recommendation","value_text":"priority hiring preference","t_from":"1994","quote":"a policy should be adopted whereby San Francisco residents are given priority hiring preference.","anchor":"s-8ae3355f7964","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Chapter 5: Implementation; a policy should be adopted whereby"},{"claim_id":"c:e4e1d88884033c6e7b9832b6f194489e","page_id":"C124908106:161","page_url":"https://archive.org/details/C124908106/page/n160","statement_kind":"background","subject_label":"Conditional use rule north of Pier 24","summary":"Current regulations make every non-maritime use on Port property north of Pier 24 a conditional use requiring Planning Commission authorization.","property":"use","value_text":"conditional use","t_from":"1994","quote":"every non-maritime use on Port property north of Pier 24 is designated a","place_label":"Port property north of Pier 24","anchor":"s-e4e1d8888403","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Site Plan Approval Process; Under the current regulations, every non-maritime use"},{"claim_id":"c:a3f8f074d2c7712e8ba8f0ddc80b8514","page_id":"C124908106:167","page_url":"https://archive.org/details/C124908106/page/n166","statement_kind":"proposal","subject_label":"Restricting transfers of Port funds to the City General Fund","summary":"The plan recommends against any further transfer of Port funds to the City General Fund.","property":"recommendation","value_text":"recommend against transfers","t_from":"1994","quote":"Recommend against.any further transfer (or attempts thereof) of Port funds to the City’s General Fund, such as the State legislation passed in 1992.","anchor":"s-a3f8f074d2c7","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"Waterfront Plan Advisory Board, the issuer's own text in Chapter 5 Implementatio","stance":"own_position","speaker_evidence":"Draft Waterfront Land Use Plan : Proposed Port Commission Revisions Chapter 5: Implementation"},{"claim_id":"c:ccfb8742004ed7cd03d9719cf9681df0","page_id":"C124908106:167","page_url":"https://archive.org/details/C124908106/page/n166","statement_kind":"proposal","subject_label":"Flexible Waterfront Land Use Plan","summary":"The Waterfront Plan should permit a variety of appropriate uses on underutilized or deteriorating Port properties.","property":"proposes","value_text":"variety of appropriate uses","t_from":"1994","quote":"The Waterfront Plan should permit a variety of appropriate uses to be located on Port properties that currently are underutilized or deteriorating.","place_label":"Port properties","anchor":"s-ccfb8742004e","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"The Need for a Flexible Plan"},{"claim_id":"c:bcbf79c335a31b39ec2157b8a5de1cd3","page_id":"C124908106:179","page_url":"https://archive.org/details/C124908106/page/n178","statement_kind":"background","subject_label":"Proposition H findings on the waterfront","summary":"The Proposition H text declares the waterfront an irreplaceable public resource of the highest value.","property":"other","value_text":"irreplaceable public resource","t_from":"1994","quote":"the waterfront of San Francisco is an irreplaceable public resource of the highest value","place_label":"San Francisco waterfront","anchor":"s-bcbf79c335a3","shown":false,"hidden":"unclear","part":"appendix","speaker":"unclear","speaker_role":"the people of San Francisco (Proposition H ordinance text)","stance":"quotes_to_report","speaker_evidence":"APPENDIX B TEXT OF PROPOSITION H ORDINANCE"}]}