{"note":"Statements read from one scanned government report in the IGS library collection on the Internet Archive. Each statement has a verbatim quote found on its page (quote, page_url). The summary and subject_label of each statement were written by a model (Claude Haiku 5.5) and can be wrong: read the page before quoting. At most 20 selected pages of a report were read. Keys are the column names of the tables igs_reports and igs_claims; a column that is null for a statement is left out, and columns with one value for every statement of this report are given once under same_for_every_statement. \"[name withheld]\" stands where the release withholds a name; the site's page guard withholds a few more in reports after 1951, so a cell here can differ from the table; for a few reports prepared_by and creator are left out. A statement's links to the Board record are under links (show_target_kind: decision, instrument or ballot measure; show_target_id; show_url); they replace the table's decision_id and instrument_id, which are left out. place_id, place_label and place_precision come from a corrected place match where there is one. part, speaker, speaker_role, stance and speaker_evidence say who is speaking: a model (Claude Haiku 5.5) read each page and its context and can be wrong. part: main_text, attachment, appendix, letter, comment, response, table or cover_or_contents; speaker: issuer, another_body, letter_writer or unclear; speaker_role: a role or organisation, never a personal name; stance: own_position, quotes_to_dispute, quotes_to_report, restates_to_reject or unclear. The report page shows a statement only when speaker is issuer, part is main_text or appendix, and stance is own_position or quotes_to_report; hidden gives the part, the speaker or the stance of the others. ","release":"v0.9.2","licence":"CC0-1.0","slug":"c124909173","url":"https://data.qipu.org/usa/san-francisco/reports/c124909173/","statement_url":"https://data.qipu.org/usa/san-francisco/reports/c124909173/#{anchor}","tables":{"igs_reports":"https://tiles.qipu.org/data/releases/v0.9.2/parquet/igs_reports.parquet","igs_claims":"https://tiles.qipu.org/data/releases/v0.9.2/parquet/igs_claims.parquet"},"report":{"report_id":"C124909173","source_id":"C124909173","title":"Airport ferry study 1998 : a feasibility study of water transit service to San Francisco International Airport","year":1998,"n_pages":90,"creator":null,"source_url":"https://archive.org/details/C124909173","issuer":"City and County of San Francisco, Airport Commission","issuer_type":"government","gov_level":"city_county","prepared_by":"Pacific Transit Management Corporation","doc_kind":"study","jurisdiction":"San Francisco","jurisdiction_id":"sf","city":"sf","issuer_by":"model","doc_kind_by":"model","jurisdiction_by":"model","run_id":"igs-labels-rules+haiku55-cli-2026-10-23"},"pages_with_statements":17,"statements_total":49,"statements_by_kind":{"finding":15,"proposal":30,"cites_decision":0,"background":4},"same_for_every_statement":{"source_id":"C124909173","source_url":"https://archive.org/details/C124909173","source_label":"IGS library: Airport ferry study 1998 : a feasibility study of water transit service to San Francisco International Airport","report_year":1998,"issuer":"City and County of San Francisco, Airport Commission","issuer_type":"government","doc_kind":"study","t_precision":"year","status":"extracted","claim_kind":"observation","extraction_table":"igs_claims","run_id":"igs-sf-pages-v2-haiku55-batch-2026-10-23","city":"sf","prompt_version":"igs-page-v2-2026-10-23"},"summary":{"what":"A feasibility study by the Airport Commission of a water transit ferry service linking downtown San Francisco and the airport, including vessel types, routes, costs and sites.","figures":[{"label":"Cost","value":"$12 to $15 million","claim_ids":["c:4568d8dbe66b653c81b33799bbf9d033"]},{"label":"Residents","value":"1,000 and 1,200 passengers daily","claim_ids":["c:43021937e53fa8a86ad2551514fd8d95"]},{"label":"Daily passengers","value":"3,675 downtown","page_url":"https://archive.org/details/C124909173/page/n62","quote":"Estimated Daily Passengers between downtown San Francisco and SFO: 3,675"},{"label":"Vessel capital","value":"about $37 million","claim_ids":["c:b29671360ab03ababfebc68467de49d2"]}],"main_points":["c:733bccd3651ab5088fcb594b65f06eca","c:fd3479aec6794a37c9cd2d4eb9292f5c","c:f30f1c8ff20b42224ff229b22e965f38"],"board_decisions_after":[],"board_decisions_before":[],"made_by":"A model (Claude Haiku 5.5) wrote the lead and picked the figures, main points and later Board decisions from the statements, from a second reading of the report's summary and cost pages, and from Board decisions dated 3 years before to 10 years after the report; every number it wrote was checked against them, and a figure must be about the report's own area or project."},"statements":[{"claim_id":"c:23ab9e0df53bfeb3a5a3fab67ca4c70e","page_id":"C124909173:8","page_url":"https://archive.org/details/C124909173/page/n7","statement_kind":"proposal","subject_label":"Quadmaran vessel","summary":"The Peer Group recommended against the quadmaran because of its experimental status.","property":"recommendation","value_text":"against the quadmaran","t_from":"1998","quote":"The Peer Group recommended against the quadmaran because of its experimental status and lack of commercial","anchor":"s-23ab9e0df53b","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"The Peer Group recommended against the quadmaran"},{"claim_id":"c:43021937e53fa8a86ad2551514fd8d95","page_id":"C124909173:8","page_url":"https://archive.org/details/C124909173/page/n7","statement_kind":"proposal","subject_label":"Moffett Field ferry route","summary":"The study estimates the Moffett Field route would carry 1,000 to 1,200 passengers daily.","property":"other","value_text":"1,000 and 1,200 passengers daily","value_num":1000.0,"unit":"persons","t_from":"1998","quote":"The Moffett Field route is estimated to carry between 1,000 and 1,200 passengers daily and would operate from a new site near the Moffett Field Golf Course.","place_label":"Moffett Field","anchor":"s-43021937e53f","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"The Moffett Field route is estimated to carry"},{"claim_id":"c:6f8bd13c90d927690cc9dda2d7af0d73","page_id":"C124909173:8","page_url":"https://archive.org/details/C124909173/page/n7","statement_kind":"proposal","subject_label":"Moffett Field facility","summary":"The study expects the Moffett Field facility to cost 2 to 3 million dollars.","property":"cost_usd","value_text":"$2-3 million","value_num":2000000.0,"unit":"USD","t_from":"1998","quote":"the Moffett Field facility is expected to cost $2-3 million.","place_label":"Moffett Field","anchor":"s-6f8bd13c90d9","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"the Moffett Field facility is expected to cost"},{"claim_id":"c:7a458d79538184cc14487a1ff79b5c3b","page_id":"C124909173:8","page_url":"https://archive.org/details/C124909173/page/n7","statement_kind":"proposal","subject_label":"Agriculture Building terminal","summary":"The study estimates the Agriculture Building terminal would cost 10 to 11 million dollars.","property":"cost_usd","value_text":"$10 -11 million","value_num":10000000.0,"unit":"USD","t_from":"1998","quote":"The Agriculture Building is estimated to cost $10 -11 million","place_label":"Agriculture Building","anchor":"s-7a458d795381","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"The Agriculture Building is estimated to cost"},{"claim_id":"c:7bcf86320603ab6ec8ffc59365ba986d","page_id":"C124909173:8","page_url":"https://archive.org/details/C124909173/page/n7","statement_kind":"proposal","subject_label":"Airport ferry vessel types","summary":"The Peer Group recommended that only the catamaran and amphibious hovercraft be considered for further study.","property":"recommendation","value_text":"catamaran and amphibious hovercraft","t_from":"1998","quote":"The Peer Group considered all three crafts, and recommended that only the catamaran and amphibious hovercraft be considered for further study.","anchor":"s-7bcf86320603","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"The Peer Group considered all three crafts"},{"claim_id":"c:b29671360ab03ababfebc68467de49d2","page_id":"C124909173:8","page_url":"https://archive.org/details/C124909173/page/n7","statement_kind":"proposal","subject_label":"Vessel capital costs","summary":"The study estimates vessel capital costs at about 37 million dollars.","property":"cost_usd","value_text":"about S 37 million","value_num":37000000.0,"unit":"USD","t_from":"1998","quote":"Vessel capital costs are estimated at about S 37 million.","anchor":"s-b29671360ab0","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Vessel capital costs are estimated at about"},{"claim_id":"c:dc120b4db2232b07f7d79fe2a7addfd6","page_id":"C124909173:8","page_url":"https://archive.org/details/C124909173/page/n7","statement_kind":"proposal","subject_label":"Downtown terminal financing","summary":"The study says downtown terminal costs could be financed through the Port, the Airport, or a franchise arrangement.","property":"other","value_text":"Port, Airport, or long-term franchise","t_from":"1998","quote":"Downtown San Francisco terminal costs could be financed in a vanety of methods, including through the Port, the Airport","place_label":"Downtown San Francisco","anchor":"s-dc120b4db223","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Downtown San Francisco terminal costs could be financed"},{"claim_id":"c:dd4b1b13a5c59155542c443cc0e5b147","page_id":"C124909173:14","page_url":"https://archive.org/details/C124909173/page/n13","statement_kind":"proposal","subject_label":"Airport ferry service ownership","summary":"The Peer Group thought airport ferry service should be a private sector matter with limited capital subsidies.","property":"recommendation","value_text":"private sector matter","t_from":"1998","quote":"The Peer Group thought that airport ferry service should be a private sector matter, with limited subsidies for capital and no subsidies for operations.","anchor":"s-dd4b1b13a5c5","shown":false,"hidden":"another_body","part":"main_text","speaker":"another_body","speaker_role":"another body","stance":"quotes_to_report","speaker_evidence":"The Peer Group thought that airport ferry service should be a private sector matter"},{"claim_id":"c:33fbcae5be4a972569a564914a93e176","page_id":"C124909173:19","page_url":"https://archive.org/details/C124909173/page/n18","statement_kind":"finding","subject_label":"Downtown SF air passengers","summary":"The 1995 estimate counts 21,000 daily SFO air passengers in downtown San Francisco.","property":"finding","value_text":"21,000","value_num":21000.0,"unit":"persons","date_printed":"1995","t_from":"1995","quote":"Area Enplaned and Deplaned Downtown San Francisco 21,000","place_label":"Downtown San Francisco","anchor":"s-33fbcae5be4a","shown":false,"hidden":"table","part":"table","speaker":"issuer","speaker_role":"the issuer","stance":"quotes_to_report","speaker_evidence":"TABLE 3 ESTIMATED 1995 DAILY SFO AIR PASSENGERS"},{"claim_id":"c:6a2663e1ec0083df3c26857ea3825e79","page_id":"C124909173:19","page_url":"https://archive.org/details/C124909173/page/n18","statement_kind":"background","subject_label":"High capacity ferry vessel cost","summary":"A high capacity, high speed ferry vessel generally has a capital cost of about 8 to 10 million dollars.","property":"cost_usd","value_text":"about $8 - $10 million","value_num":8000000.0,"unit":"USD","t_from":"1998","quote":"Generally, a high capacity (300+ passengers), high speed (34+ knots) vessel has a capital cost of about $8 - $10 million.","anchor":"s-6a2663e1ec00","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Generally, a high capacity (300+ passengers), high speed"},{"claim_id":"c:807e9be141807f0c98746449ec6cfd4c","page_id":"C124909173:19","page_url":"https://archive.org/details/C124909173/page/n18","statement_kind":"finding","subject_label":"Harbor Bay ferry vessel","summary":"The Harbor Bay vessel failed in several areas, was docked, and led to lengthy litigation.","property":"other","value_text":"docked; litigation","t_from":"1998","quote":"The experience and the vessel were so unreliable that the vessel was docked and lengthly litigation has ensued.","place_label":"Harbor Bay","anchor":"s-807e9be14180","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"The experience and the vessel were so unreliable"},{"claim_id":"c:cbd3fb0df7293625eb2b47cb8d9626ac","page_id":"C124909173:19","page_url":"https://archive.org/details/C124909173/page/n18","statement_kind":"finding","subject_label":"SFO passenger concentrations","summary":"The MTC 1995 survey indicates high passenger concentrations near possible ferry terminal sites.","property":"finding","date_printed":"1995","t_from":"1995","quote":"MTC’s 1995 survey of SFO passengers indicates high passenger concentrations near possible ferry terminal sites:","place_label":"Downtown San Francisco; Moffett Field","anchor":"s-cbd3fb0df729","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"quotes_to_report","speaker_evidence":"MTC's 1995 survey of SFO passengers indicates"},{"claim_id":"c:02e05b5316e578af524c0682608acc21","page_id":"C124909173:24","page_url":"https://archive.org/details/C124909173/page/n23","statement_kind":"proposal","subject_label":"Parking fee assumption","summary":"The study assumes parking at all ferry sites costs $8 (≈ $16.54 in 2026 dollars) per day.","property":"other","value_text":"$8","value_num":8.0,"unit":"USD","t_from":"1998","quote":"Parking at all sites was assumed to be $8, and as specified by [name withheld] half of the daily parking charge","anchor":"s-02e05b5316e5","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Parking at all sites was assumed to be $8"},{"claim_id":"c:887125c241905ad8d059f9bbcc34e686","page_id":"C124909173:24","page_url":"https://archive.org/details/C124909173/page/n23","statement_kind":"proposal","subject_label":"Ferry fare assumption","summary":"The study models the ferry fare from the Ferry Building and Moffett terminals as $10 (≈ $20.67 in 2026 dollars).","property":"other","value_text":"$10","value_num":10.0,"unit":"USD","t_from":"1998","quote":"The fare to ride the ferry was modeled as $10 from the Ferry Building and Moffett terminals","place_label":"Ferry Building","place_precision":"building","place_id":"qipu:sf/place/landmark/ferry-building","resolved_by":"place links file","anchor":"s-887125c24190","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"The fare to ride the ferry was modeled as $10"},{"claim_id":"c:d17769c66cffa5f92b44f830af582cfc","page_id":"C124909173:24","page_url":"https://archive.org/details/C124909173/page/n23","statement_kind":"finding","subject_label":"Transit share of SFO trips","summary":"The 1995 APS Survey found that less than 2% of trips to SFO were on public transportation.","property":"finding","value_text":"less than 2%","value_num":2.0,"unit":"percent","date_printed":"1995","t_from":"1995","quote":"The 1995 APS Survey found that less than 2% of trips to SFO were on public transportation","place_label":"San Francisco International Airport","anchor":"s-d17769c66cff","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"quotes_to_report","speaker_evidence":"The 1995 APS Survey found that less than 2%"},{"claim_id":"c:db35ba6d4927d68bea24d3d542b1cbf0","page_id":"C124909173:24","page_url":"https://archive.org/details/C124909173/page/n23","statement_kind":"finding","subject_label":"Headway effect on ridership","summary":"The analysis found that reducing headway from 30 to 20 minutes has a relatively small effect on ridership.","property":"finding","value_text":"30 to 20 minutes","value_num":20.0,"t_from":"1998","quote":"Second, reducing the headway from 30 to 20 minutes has a relatively small effect on ridership at any terminal.","anchor":"s-db35ba6d4927","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Second, reducing the headway from 30 to 20 minutes"},{"claim_id":"c:f620b1b172f195f8c0bed8f1572cd9ee","page_id":"C124909173:24","page_url":"https://archive.org/details/C124909173/page/n23","statement_kind":"proposal","subject_label":"Candidate ferry routes","summary":"The study shows travel times and fares for six candidate ferry routes, including the Ferry Building.","property":"proposes","value_text":"six candidate ferry routes","value_num":6.0,"t_from":"1998","quote":"Travel times and fares are shown on pages 22-23 and 27-28 for six candidate ferry routes","place_label":"Ferry Building","place_precision":"building","place_id":"qipu:sf/place/landmark/ferry-building","resolved_by":"place links file","anchor":"s-f620b1b172f1","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Travel times and fares are shown on pages 22-23"},{"claim_id":"c:5bac79ca44df306d08d32b1edd0fdc93","page_id":"C124909173:26","page_url":"https://archive.org/details/C124909173/page/n25","statement_kind":"proposal","subject_label":"Marin ferry ridership","summary":"The study estimates Marin would attract between 200 and 300 riders at the lower bound.","property":"other","value_text":"200 to 300 riders","value_num":200.0,"unit":"persons","t_from":"1998","quote":"Marin would attract between 200 and 300 riders at the lower bound.","place_label":"Marin County","anchor":"s-5bac79ca44df","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"The estimated ridership from the remaining sites"},{"claim_id":"c:5fe3c3ba323edfd1f62c0491fe782cc8","page_id":"C124909173:26","page_url":"https://archive.org/details/C124909173/page/n25","statement_kind":"finding","subject_label":"Moffett Field parking fee test","summary":"The study found a lower Moffett Field parking fee would raise ridership by 30 to 40 percent.","property":"finding","value_text":"30 to 40%","value_num":30.0,"unit":"percent","t_from":"1998","quote":"The parking fee change, which would reduce the cost of riding the ferry from $36 for two days to $28, would produce a ridership increase of between 30 and 40%.","place_label":"Moffett Field","anchor":"s-5fe3c3ba323e","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"The parking fee change, which would reduce the cost"},{"claim_id":"c:6598f7392f2f8bae7f653a8a1b79a67c","page_id":"C124909173:26","page_url":"https://archive.org/details/C124909173/page/n25","statement_kind":"finding","subject_label":"Ferry versus BART travel time","summary":"The analysis finds the ferry significantly faster than BART from zones in and near downtown San Francisco.","property":"finding","value_text":"about 15 minutes","value_num":15.0,"t_from":"1998","quote":"the ferry will be significantly faster from zones in and near downtown San Francisco, the time difference will be on the order of 15 minutes.","place_label":"downtown San Francisco","anchor":"s-6598f7392f2f","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"The result of the analysis suggests that the ferry will be significantly faster"},{"claim_id":"c:733bccd3651ab5088fcb594b65f06eca","page_id":"C124909173:26","page_url":"https://archive.org/details/C124909173/page/n25","statement_kind":"finding","subject_label":"Ferry Building viability","summary":"The study concludes the Ferry Building is clearly the most viable candidate ferry terminal site.","property":"finding","value_text":"most viable candidate","t_from":"1998","quote":"The Ferry Building is clearly the most viable candidate Ferry terminal site.","place_label":"Ferry Building","place_precision":"building","place_id":"qipu:sf/place/landmark/ferry-building","resolved_by":"place links file","anchor":"s-733bccd3651a","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"The Ferry Building is clearly the most viable candidate"},{"claim_id":"c:fb55a9d5803deb36a501af0e1ffd1516","page_id":"C124909173:26","page_url":"https://archive.org/details/C124909173/page/n25","statement_kind":"background","subject_label":"Value of business travel time","summary":"[name withheld] found in 1985 that the value of time for business travelers to SFO was approximately $42 (≈ $132 in 2026 dollars).","property":"other","value_text":"approximately $42","value_num":42.0,"unit":"USD","date_printed":"1985","t_from":"1985","quote":"The value of time for business travelers to SFO found by [name withheld] in 1985 was approximately $42","place_label":"SFO","anchor":"s-fb55a9d5803d","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"quotes_to_report","speaker_evidence":"The value of time for business travelers to SFO found by Harvey in 1985"},{"claim_id":"c:fd3479aec6794a37c9cd2d4eb9292f5c","page_id":"C124909173:26","page_url":"https://archive.org/details/C124909173/page/n25","statement_kind":"proposal","subject_label":"Phase one ferry sites","summary":"The study recommends that the first phase of ferry operations be at the Ferry Building and Moffett Field.","property":"recommendation","value_text":"Ferry Building and Moffett Field","t_from":"1998","quote":"strongly suggest that the candidate sites for the first phase of Ferry operations should be the Ferry Building and Moffett Field","place_label":"Ferry Building","place_precision":"building","place_id":"qipu:sf/place/landmark/ferry-building","resolved_by":"place links file","anchor":"s-fd3479aec679","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"The ridership estimates in Table 4, interpreted in light of the estimated operating costs"},{"claim_id":"c:7e8eec05eb29bf03d3321122027fa0d4","page_id":"C124909173:31","page_url":"https://archive.org/details/C124909173/page/n30","statement_kind":"background","subject_label":"Coast Guard speed rules","summary":"The Coast Guard requires only that vessel speeds be consistent with safe navigation.","property":"other","value_text":"safe navigation","t_from":"1998","quote":"The U. [name withheld] Control Office in San Francisco has, from time to time, discussed possible speed limits in the Bay","place_label":"San Francisco Bay","anchor":"s-7e8eec05eb29","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"quotes_to_report","speaker_evidence":"The U.S. Coast Guard Traffic Control Office in San Francisco has, from time to time, discussed possible speed limits"},{"claim_id":"c:b6ee3789065eb27e20265fe6c465763e","page_id":"C124909173:31","page_url":"https://archive.org/details/C124909173/page/n30","statement_kind":"finding","subject_label":"Realistic scheduling speed","summary":"The study considers speeds of more than 35 knots unrealistic for scheduling purposes.","property":"finding","value_text":"more than 35 knots","value_num":35.0,"t_from":"1998","quote":"speeds of more than 35 knots are considered unrealistic for scheduling purposes","place_label":"Bay Bridge to Alcatraz Island","anchor":"s-b6ee3789065e","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"speeds of more than 35 knots are considered unrealistic for scheduling purposes"},{"claim_id":"c:e913f82a129b7a9b3712871549b08b07","page_id":"C124909173:31","page_url":"https://archive.org/details/C124909173/page/n30","statement_kind":"proposal","subject_label":"Speed range for routes north of Bay Bridge","summary":"The study uses a maximum speed of 35 knots for routes north of the Bay Bridge.","property":"proposes","value_text":"maximum of 35 knots","value_num":35.0,"t_from":"1998","quote":"Routes north of the Bay Bridge: maximum of 35 knots, but no greater than vessel] maximum operating speed.","place_label":"Bay Bridge","anchor":"s-e913f82a129b","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Routes north of the Bay Bridge: maximum of 35 knots"},{"claim_id":"c:fb9ce3d5b745782d3b41ef2e4bf4fe9f","page_id":"C124909173:31","page_url":"https://archive.org/details/C124909173/page/n30","statement_kind":"proposal","subject_label":"Speed range for routes south of Bay Bridge","summary":"The study uses a maximum speed of 40 knots for routes south of the Bay Bridge.","property":"proposes","value_text":"maximum of 40 knots","value_num":40.0,"t_from":"1998","quote":"Routes south of the Bay Bridge (Ferry Terminal to SFO): maximum of 40 knots, but no greater than vessel maximum operating speed.","place_label":"Bay Bridge","anchor":"s-fb9ce3d5b745","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Routes south of the Bay Bridge (Ferry Terminal to SFO): maximum of 40 knots"},{"claim_id":"c:3037bb7ff5e9956a75d1348638f0cc9f","page_id":"C124909173:36","page_url":"https://archive.org/details/C124909173/page/n35","statement_kind":"finding","subject_label":"Hovercraft operating safety","summary":"The study concludes hovercraft can operate safely and reliably in Bay waters.","property":"finding","value_text":"safe and reliable","t_from":"1998","quote":"All risk factors are known, and the craft can operate safely and reliably in Bay waters.","place_label":"Bay waters","anchor":"s-3037bb7ff5e9","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Operational Considerations: Hovercraft have been successfully operated"},{"claim_id":"c:579f07991d7742a46346aaff63fb2450","page_id":"C124909173:36","page_url":"https://archive.org/details/C124909173/page/n35","statement_kind":"finding","subject_label":"Hovercraft noise measurement","summary":"Readings of 96 dBA were recorded at 20 meters from the AP1-88-200 at 35 knots.","property":"finding","value_text":"96 dBA","value_num":96.0,"t_from":"1998","quote":"In the case of the AP1-88-200, readings of 96 dba were recorded at 20 meters abeam the vessel at 35 knots.","anchor":"s-579f07991d77","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"In the case of the AP1-88-200, readings of 96 dba were recorded"},{"claim_id":"c:7b0aa9a909c5cba15ecbfc236918112e","page_id":"C124909173:36","page_url":"https://archive.org/details/C124909173/page/n35","statement_kind":"proposal","subject_label":"Hunter's Point noise","summary":"The study expects beam noise near Hunter's Point to be about 55 dB at the closest approach.","property":"other","value_text":"55 dB","value_num":55.0,"t_from":"1998","quote":"The closest the vessel is likely to get to land while at speed is about 700 meters (2300 feet) at Hunter's Point at which beam noise should be 55 dB.","place_label":"Hunter's Point","place_precision":"area","place_id":"qipu:sf/place/hood/bayview-hunters-point","resolved_by":"place links file","anchor":"s-7b0aa9a909c5","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"The closest the vessel is likely to get to land while at speed"},{"claim_id":"c:e74a8e8e6d8edfa85dd4fa1ca9119c56","page_id":"C124909173:36","page_url":"https://archive.org/details/C124909173/page/n35","statement_kind":"finding","subject_label":"Hovercraft wake","summary":"The study notes hovercraft do not create a wake wash because they travel above the water.","property":"finding","value_text":"no wake wash","t_from":"1998","quote":"Hovercraft travel above the water, and hence do not create a wake wash.","anchor":"s-e74a8e8e6d8e","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Wake Wash: Hovercraft travel above the water, and hence do not create a wake wash."},{"claim_id":"c:340e1c074c62aa167d62c4465d5e87b9","page_id":"C124909173:41","page_url":"https://archive.org/details/C124909173/page/n40","statement_kind":"proposal","subject_label":"Hovercraft downtown to Airport operating cost","summary":"The study estimates hovercraft operating cost between downtown San Francisco and the Airport at about $560 (≈ $1,158 in 2026 dollars) per hour.","property":"cost_usd","value_text":"about $560 per hour","value_num":560.0,"unit":"USD","t_from":"1998","quote":"the total hourly operating cost for hovercraft operating between downtown San Francisco and the Airport is about $560 per hour, based on a 16 to 18 hour operating day","place_label":"downtown San Francisco to the Airport","anchor":"s-340e1c074c62","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"FINANCIAL ANALYSIS A financial analysis for each of the six routes"},{"claim_id":"c:d6f50ee030cb8b69bb30439d410c783d","page_id":"C124909173:41","page_url":"https://archive.org/details/C124909173/page/n40","statement_kind":"proposal","subject_label":"Combined downtown-SFO-Moffett Field hovercraft operation","summary":"The study estimates that a combined downtown-SFO-Moffett Field operation would reduce hourly operating cost to about $489 (≈ $1,011 in 2026 dollars).","property":"cost_usd","value_text":"about $489 per hour","value_num":489.0,"unit":"USD","t_from":"1998","quote":"A combined downtown-SFO-Moffett Field operation would reduce the operating cost to about $489 hour daily.","place_label":"Moffett Field","anchor":"s-d6f50ee030cb","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"As shown in Tables 7, 8 .and 9. the total hourly operating cost"},{"claim_id":"c:f80a784fbc5618f6df4d7f98d8bf7752","page_id":"C124909173:41","page_url":"https://archive.org/details/C124909173/page/n40","statement_kind":"proposal","subject_label":"Hovercraft vessel purchase","summary":"The hovercraft cost model assumes four vessels at a cost of $7,500,000 (≈ $15.5 million in 2026 dollars) each.","property":"cost_usd","value_text":"$7,500,000","value_num":7500000.0,"unit":"USD","t_from":"1998","quote":"Cost of Each Vessel $7,500,000 Assumed Financing Rate 6.0% 20 Year Bond Airport/Hovercraft Landing Fees $0","anchor":"s-f80a784fbc56","shown":false,"hidden":"table","part":"table","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"TABLE 7 AIRPORT HOVERCRAFT (SAN FRANCISCO TO SFO) SYSTEM-- COST AND BUDGETING MODEL"},{"claim_id":"c:eba7bf52725b246eb89af7870ff08ec3","page_id":"C124909173:47","page_url":"https://archive.org/details/C124909173/page/n46","statement_kind":"proposal","subject_label":"Catamaran system total cost model","summary":"The catamaran cost model totals about $8,554,040 (≈ $17.7 million in 2026 dollars) for the system.","property":"cost_usd","value_text":"$8,554,040","value_num":8554040.0,"unit":"USD","t_from":"1998","quote":"Vessel Cost Grand Total $8,554,040 Variable $4,095,946 $4,458,093 Fixed (not includ dep) Total Total check $8,554,040","anchor":"s-eba7bf52725b","shown":false,"hidden":"table","part":"table","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Vessel Cost Grand Total $8,554,040 Variable $4,095,946"},{"claim_id":"c:02647de1d0ad57a7ec6b12e0482b61da","page_id":"C124909173:52","page_url":"https://archive.org/details/C124909173/page/n51","statement_kind":"proposal","subject_label":"Moffett Field as cargo port-pair site","summary":"The study says use of Moffett Field as a port-pair site with SFO should be reviewed.","property":"proposes","value_text":"should be reviewed","t_from":"1998","quote":"Use of Moffett Field as a port-pair site with SFO should be reviewed to possibly serve this market.","place_label":"Moffett Field","anchor":"s-02647de1d0ad","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"OVERVIEW As part of this study, the consultant team analyzed"},{"claim_id":"c:1bd96f394a7a201012a4bfa87a71e596","page_id":"C124909173:52","page_url":"https://archive.org/details/C124909173/page/n51","statement_kind":"finding","subject_label":"Air cargo congestion survey","summary":"The study reports that eighty-three percent of surveyed air cargo respondents cite highway and bridge congestion as an operating problem.","property":"finding","value_text":"Eighty-three percent","value_num":83.0,"unit":"percent","t_from":"1998","quote":"Eighty-three percent of the respondents surveyed cite highway and bridge congestion as an operating problem.","anchor":"s-1bd96f394a7a","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"OVERVIEW As part of this study, the consultant team analyzed"},{"claim_id":"c:a0ef8da8193be013598325221a1d6081","page_id":"C124909173:58","page_url":"https://archive.org/details/C124909173/page/n57","statement_kind":"proposal","subject_label":"Passenger drop-off zone","summary":"The study proposes a passenger drop-off zone on a sidewalk next to the Agricultural Building.","property":"proposes","value_text":"110 feet","value_num":110.0,"unit":"ft","t_from":"1998","quote":"To accommodate both taxi and auto drop-offs, a passenger drop-off zone would be located on a 20 foot sidewalk immediately adjacent to the north side of the Agricultural Building.","place_label":"North side of the Agricultural Building","anchor":"s-a0ef8da8193b","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"To accommodate both taxi and auto drop-offs, a passenger drop-off zone"},{"claim_id":"c:f3e5c95569270a0924092511de2d29ba","page_id":"C124909173:58","page_url":"https://archive.org/details/C124909173/page/n57","statement_kind":"proposal","subject_label":"Passenger pick-up zone","summary":"The study proposes a passenger pick-up zone across from the drop-off zone, on a 30 foot wide driveway.","property":"proposes","value_text":"20 feet wide by 90 feet long","value_num":90.0,"unit":"ft","t_from":"1998","quote":"This pick-up zone would be on a 20 feet wide by 90 feet ong sidewalk area. This zone would allow simultaneous pick-up by about four or five vehicles.","place_label":"Driveway across from the drop-off zone","anchor":"s-f3e5c9556927","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"This pick-up zone would be on a 20 feet wide by 90 feet"},{"claim_id":"c:2ac93b1f4f662c62b3e0e7d6a7cd8dd8","page_id":"C124909173:61","page_url":"https://archive.org/details/C124909173/page/n60","statement_kind":"finding","subject_label":"Driving time from Highway 101 Mathilda Avenue interchange to ferry terminal","summary":"The study estimates that driving time from the Highway 101 Mathilda Avenue interchange to the terminal would be under seven minutes.","property":"finding","value_text":"under seven minutes","value_num":7.0,"t_from":"1998","quote":"Driving time from the Highway 101 Mathilda Avenue interchange to the terminal would be under seven minutes.","place_label":"Highway 101 Mathilda Avenue interchange","anchor":"s-2ac93b1f4f66","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Traffic coming from south of the ferry terminal site on Highway 101 would use the Mathilda Avenue interchange"},{"claim_id":"c:7506f58a90662dfc56bc7c7332905d9f","page_id":"C124909173:61","page_url":"https://archive.org/details/C124909173/page/n60","statement_kind":"background","subject_label":"Tasman Light Rail Project","summary":"The Tasman Light Rail Project is described as now under construction adjacent to Moffett Field and the Lockheed campus.","property":"other","value_text":"under construction","t_from":"1998","quote":"The Tasman Light Rail Project is now under construction adjacent to Moffett Field and the Lockheed campus.","place_label":"Moffett Field and Lockheed campus","anchor":"s-7506f58a9066","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"The Tasman Light Rail Project is now under construction adjacent to Moffett Field"},{"claim_id":"c:375308762dc27730fec91ca622688333","page_id":"C124909173:64","page_url":"https://archive.org/details/C124909173/page/n63","statement_kind":"proposal","subject_label":"Initial hovercraft service","summary":"The study proposes initial hovercraft service between downtown San Francisco and SFO with three trips hourly each direction using a tug escort.","property":"proposes","value_text":"three trips hourly in each direction","value_num":3.0,"t_from":"1998","quote":"The initial hovercraft operation should be between downtown San Francisco and SFO with three trips hourly in each direction using a tug escort.","place_label":"Downtown San Francisco and SFO","anchor":"s-375308762dc2","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"The initial hovercraft operation should be between downtown San Francisco and SFO"},{"claim_id":"c:4568d8dbe66b653c81b33799bbf9d033","page_id":"C124909173:64","page_url":"https://archive.org/details/C124909173/page/n63","statement_kind":"proposal","subject_label":"Terminal construction cost","summary":"The study estimates terminals would cost a total of 12 to 15 million dollars and are not in the financing plan.","property":"cost_usd","value_text":"$12 to $15 million","unit":"USD","t_from":"1998","quote":"Terminals would cost a total of $12 to $15 million and are not included in the financing plan.","anchor":"s-4568d8dbe66b","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Terminals would cost a total of $12 to $15 million and are not included in the financing plan."},{"claim_id":"c:974939480459baf9e9a44785ff562765","page_id":"C124909173:64","page_url":"https://archive.org/details/C124909173/page/n63","statement_kind":"proposal","subject_label":"Project manager","summary":"The study recommends that the Airport Commission appoint a Project Manager for the Airport Ferry Project.","property":"recommendation","value_text":"appoint a Project Manager","t_from":"1998","quote":"The Airport Commission should appoint a Project Manager to oversee and supervise all aspects of the Airport Ferry Project.","anchor":"s-974939480459","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"The Airport Commission should appoint a Project Manager to oversee and supervise"},{"claim_id":"c:f30f1c8ff20b42224ff229b22e965f38","page_id":"C124909173:64","page_url":"https://archive.org/details/C124909173/page/n63","statement_kind":"finding","subject_label":"Operational issues of the ferry service","summary":"The study finds operational issues appear workable but need a demonstration before full-scale commitment by the Airport.","property":"finding","value_text":"workable, requires demonstration","t_from":"1998","quote":"Operational issues appear to be workable, but require a demonstration before full-scale commitment by the Airport.","anchor":"s-f30f1c8ff20b","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Operational issues appear to be workable, but require a demonstration"},{"claim_id":"c:28b93f12b37fe4b2f69d54975c8b1ac1","page_id":"C124909173:74","page_url":"https://archive.org/details/C124909173/page/n73","statement_kind":"proposal","subject_label":"Hovercraft terminal bay entrance door","summary":"The specification says a motorized overhead coiling door will close the hovercraft bay entrance.","property":"proposes","t_from":"1998","quote":"Motorized overhead coiling door, primed and painted will be used to close the hovercraft bay entrance.","place_label":"Port of San Francisco, New Hovercraft Terminal","anchor":"s-28b93f12b37f","shown":true,"part":"appendix","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Port of San Francisco, New Hovercraft Terminal"},{"claim_id":"c:73fb2cc58f1057dbab094530f0e412f1","page_id":"C124909173:75","page_url":"https://archive.org/details/C124909173/page/n74","statement_kind":"proposal","subject_label":"Exterior glazing of the hovercraft terminal","summary":"The specification proposes replacing the existing exterior glass with 1 inch insulated, low-e tinted glazing.","property":"proposes","value_text":"1 inch insulated low-e tinted glazing","t_from":"1998","quote":"Replace the existing exterior glass with 1\" insulated, low-e tinted glazing.","place_label":"Port of San Francisco, New Hovercraft Terminal","anchor":"s-73fb2cc58f10","shown":false,"hidden":"attachment","part":"attachment","speaker":"another_body","speaker_role":"Art Anderson Associates, a Seattle architecture firm (consultant specifications)","stance":"own_position","speaker_evidence":"Port of San Francisco, New Hovercraft Terminal; Art Anderson Associates, 65 Marion Street"},{"claim_id":"c:6d54afdbaccc1220a5f485f6126dc945","page_id":"C124909173:80","page_url":"https://archive.org/details/C124909173/page/n79","statement_kind":"proposal","subject_label":"Electrical and lighting design of the hovercraft terminal","summary":"The specification says the electrical design will be designed to comply with California Energy Code requirements.","property":"proposes","t_from":"1998","quote":"Designed to comply with California Energy Code requirements.","place_label":"Port of San Francisco, New Hovercraft Terminal","anchor":"s-6d54afdbaccc","shown":false,"hidden":"attachment","part":"attachment","speaker":"another_body","speaker_role":"another body","stance":"own_position","speaker_evidence":"Port of San Francisco, New Hovercraft Terminal; Designed to comply with California Energy Code"},{"claim_id":"c:7a66bc2d8cc4b0d9964f4eedf4577af6","page_id":"C124909173:87","page_url":"https://archive.org/details/C124909173/page/n86","statement_kind":"proposal","subject_label":"Fire sprinkler system for the hovercraft terminal","summary":"The specification says a fire sprinkler extinguishing system will be installed throughout the facility.","property":"proposes","t_from":"1998","quote":"A fire sprinkler extinguishing system will be installed throughout the facility.","place_label":"Port of San Francisco, New Hovercraft Terminal","anchor":"s-7a66bc2d8cc4","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"DIVISION 15 - MECHANICAL"}]}