Hunters Point Shipyard land use plan (1995)

Hunters Point Shipyard land use plan : land use alternatives and proposed draft plan

A plan by the San Francisco Redevelopment Agency for reusing the Hunters Point Shipyard, with land use alternatives and a proposed draft land use plan. Scan on the Internet Archive ↗

Buildings
Over 60 of the 110 buildings occupiedScan 25 ↗
Floor area
More than 2 million square feetScan 25 ↗
Land area
Approximately 500 acresScan 34 ↗
Report recommendations
  • The plan recommends maximum participation of Bayview Hunters Point residents and businesses in the reuse of the Shipyard.Scan 102 ↗
  • The proposed plan combines the best features of the three Preliminary Plans.Scan 12 ↗
  • In all the alternatives the sites requiring the least clean-up are proposed for housing.Scan 63 ↗
25 quotes from the scan

Printed words Quoted from the page as read from the scan.

Findings-2c4f69a64d96

“As a result of public comment and consideration of CAC Master Plan Guidelines, the Arts and Educations Alternative was endorsed for further study.”

Scan 11

Report recommendations-ba8252dde3c2

“This proposed plan provides a rational assembly and design of the best features of the three Preliminary Plans.”

Scan 12

Findings-bba25bc9e598

“The Preliminary Plans are variations of the Preferred Alternative developed during an October 1994 design workshop.”

Scan 12

Findings-044e1a196bd0

“The Shipyard was identified as a federal Superfund site and placed on the Environmental Protection Agency’s National Priorities List in 1989.”

Scan 25

Backgrounds-42ba0718e625

“Investigation of the site is ongoing, and the Navy will be responsible for remediating hazardous waste at the Shipyard.”

Scan 25

Findings-8782d95014ca

“The latest information from the soils investigations identifies a significant amount of developable land area as having the potential to be cleaned and transferred to the City in early phases of the project.”

Scan 25

Findings-961d3c1a74b9

“Over 60 of the 110 buildings are currently occupied and additional buildings are in leasable condition, representing a total of more than 2 million square feet of space.”

Scan 25

Findings-dc55df105a30

“Most of the other buildings, however, are in poor condition and would require costly investment to make them usable for future development.”

Scan 25

Findings-1842c103c141

“Currently, the only Muni line providing direct service to the Shipyard is Route #19 - Polk.”

Scan 26

Findings-4e69275974b1

“The Paul Avenue CalTrain station has limited stops for rail passengers travelling to and from the Peninsula to the downtown San Francisco station at 4th and Townsend Streets.”

Scan 26

Findings-675620b31258

“The South Gate on Crisp Avenue provides southern access, however, this gate is currently closed to traffic.”

Scan 26

Findings-c7cbf7740125

“There are no sidewalks, pedestrian trails or bicycle routes within the Shipyard.”

Scan 26

Report recommendations-a452e1f774f2

“Each contract, including leases, should contain a provision regarding maximizing where practicable employment opportunities for local residents with preference given to Bayview Hunters Point residents.”

Scan 44

Report recommendations-477c7b913fca

“All the alternatives identify a small boat harbor and ferry terminal at the same location.”

Scan 63

Report recommendations-7ebc12c0b526

“Sensitive public facilities, such as educational facilities, are sited on the most seismically stable parts of the Shipyard in each of the Preliminary Alternatives.”

Scan 63

Report recommendations-a8f6dd1c2836

“All four alternatives assume that public transit enhancements, road improvements, water transportation development (including passenger ferry and recreational boating), and the opening up of access at the South Gate will occur.”

Scan 63

Report recommendations-c5be6eba9d3b

“In all the alternatives the sites requiring the least clean-up are proposed for housing.”

Scan 63

Report recommendations-4a5165e717bb

“The artists, their studios, live-work spaces, galleries, and exhibition spaces would be gathered together in a mixed use neighborhood.”

Scan 67

Report recommendations-db8569c67cb7

“Business park development near both the campus and the mixed use neighborhood would provide opportunities to link training and arts uses to multimedia businesses targeted for the site.”

Scan 67

Backgrounds-58ea1540cf1e

“San Francisco’s Master Plan strongly encourages the provision of affordable housing in the City.”

Scan 73

Report recommendations-d33057109362

“Residential development on the site would extend these neighborhoods across the Shipyard.”

Scan 73

Report recommendations-eb938321331d

“Encourage maximum participation of Bayview Hunters Point residents and businesses in the redevelopment, reuse and environmental remediation of Hunters Point Shipyard.”

Scan 102

Report recommendations-4cd23e898c4f

“It is the intent of the Hunters Point Shipyard reuse planning effort to prepare a combined EIS/EIR.”

Scan 131

Report recommendations-e94523d861d5

“The Planning Department and the Redevelopment Agency are the public agency jurisdictions leading the development of these plans, and will operate as co-lead agencies in the preparation of the EIR.”

Scan 131

Backgrounds-f1507e5ed454

“The Hunters Point Shipyard reuse plan is in the form of a redevelopment plan and San Francisco Master Plan Amendments, both of which are considered major planning activities.”