{"note":"Statements read from one scanned government report in the IGS library collection on the Internet Archive. Each statement has a verbatim quote found on its page (quote, page_url). The summary and subject_label of each statement were written by a model (Claude Haiku 5.5) and can be wrong: read the page before quoting. At most 20 selected pages of a report were read. Keys are the column names of the tables igs_reports and igs_claims; a column that is null for a statement is left out, and columns with one value for every statement of this report are given once under same_for_every_statement. \"[name withheld]\" stands where the release withholds a name; the site's page guard withholds a few more in reports after 1951, so a cell here can differ from the table; for a few reports prepared_by and creator are left out. A statement's links to the Board record are under links (show_target_kind: decision, instrument or ballot measure; show_target_id; show_url); they replace the table's decision_id and instrument_id, which are left out. place_id, place_label and place_precision come from a corrected place match where there is one. part, speaker, speaker_role, stance and speaker_evidence say who is speaking: a model (Claude Haiku 5.5) read each page and its context and can be wrong. part: main_text, attachment, appendix, letter, comment, response, table or cover_or_contents; speaker: issuer, another_body, letter_writer or unclear; speaker_role: a role or organisation, never a personal name; stance: own_position, quotes_to_dispute, quotes_to_report, restates_to_reject or unclear. The report page shows a statement only when speaker is issuer, part is main_text or appendix, and stance is own_position or quotes_to_report; hidden gives the part, the speaker or the stance of the others. ","release":"v0.9.2","licence":"CC0-1.0","slug":"c124914193","url":"https://data.qipu.org/usa/san-francisco/reports/c124914193/","statement_url":"https://data.qipu.org/usa/san-francisco/reports/c124914193/#{anchor}","tables":{"igs_reports":"https://tiles.qipu.org/data/releases/v0.9.2/parquet/igs_reports.parquet","igs_claims":"https://tiles.qipu.org/data/releases/v0.9.2/parquet/igs_claims.parquet"},"report":{"report_id":"C124914193","source_id":"C124914193","title":"Transbay area plan : background data report","year":1995,"n_pages":176,"creator":null,"source_url":"https://archive.org/details/C124914193","issuer":"City and County of San Francisco, Planning Department","issuer_type":"government","gov_level":"city_county","prepared_by":null,"doc_kind":"plan","jurisdiction":"San Francisco","jurisdiction_id":"sf","city":"sf","issuer_by":"model","doc_kind_by":"meta","jurisdiction_by":"model","run_id":"igs-labels-rules+haiku55-cli-2026-10-23"},"pages_with_statements":13,"statements_total":42,"statements_by_kind":{"finding":17,"proposal":15,"cites_decision":4,"background":6},"same_for_every_statement":{"source_id":"C124914193","source_url":"https://archive.org/details/C124914193","source_label":"IGS library: Transbay area plan : background data report","report_year":1995,"issuer":"City and County of San Francisco, Planning Department","issuer_type":"government","doc_kind":"plan","t_precision":"year","status":"extracted","claim_kind":"observation","extraction_table":"igs_claims","run_id":"igs-sf-pages-v2-haiku55-batch-2026-10-23","city":"sf","prompt_version":"igs-page-v2-2026-10-23"},"summary":{"what":"A 1995 plan by the City and County of San Francisco, Planning Department for Financial District/South Beach, around 1st Street.","figures":[{"label":"Area","value":"87 acres","claim_ids":["c:baf86eda165f1cae65f0be3c64a02d65"]},{"label":"Housing","value":"1,826 units","claim_ids":["c:f0c7a3066937a3932acaf7be65383547"]},{"label":"Cost","value":"$11.9 - 18.3 million (in 1992)","claim_ids":["c:1c5beb665ddbe24cf7c42541723c810f"]}],"main_points":["c:97b0c3c55562fc2cac08286fbe49d635","c:192c46c1cfec712eca139569c63451da","c:476be7fedca0999bb60ca30912f42270"],"board_decisions_after":["qipu:sf/decision/meetingminutesb2005sanf_2:180/2","qipu:sf/decision/meetingminutesb2005sanf_2|137","qipu:sf/decision/map:meetingminutesb2005sanf_2/179/03d485c5","qipu:sf/decision/meetingminutesb2003sanf_1:16/5","qipu:sf/decision/meetingjuneaug2004minutes9917sanfrich:443/2"],"board_decisions_before":[],"made_by":"A model (Claude Haiku 5.5) wrote the lead and picked the figures, main points and later Board decisions from the statements, from a second reading of the report's summary and cost pages, and from Board decisions dated 3 years before to 10 years after the report; every number it wrote was checked against them, and a figure must be about the report's own area or project."},"statements":[{"claim_id":"c:466c2d19f789526cc562e4b85e3c1508","page_id":"C124914193:12","page_url":"https://archive.org/details/C124914193/page/n11","statement_kind":"finding","subject_label":"Vacant land near the Terminal","summary":"The demolition of the Terminal Separator Structure and removal of the Embarcadero Freeway provided additional vacant land.","property":"other","value_text":"additional vacant land","t_from":"1995","quote":"The demolition of the Terminal Separator Structure and the removal of the Embarcadero Freeway have provided additional vacant land with great potential","place_label":"Embarcadero Freeway","place_precision":"area","place_id":"qipu:sf/place/freeway/embarcadero-freeway","resolved_by":"place links file","anchor":"s-466c2d19f789","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"Planning Department","stance":"own_position","speaker_evidence":"This is page 12 of 176; this_page narrative on Terminal area"},{"claim_id":"c:60daf25f9af47a6441c610537c8886d6","page_id":"C124914193:12","page_url":"https://archive.org/details/C124914193/page/n11","statement_kind":"finding","subject_label":"Travel to work mode share","summary":"Outside downtown, autos were the main means of travel to work in San Francisco, with transit at 45 percent.","property":"finding","value_text":"autos 55 percent, transit 45 percent","value_num":55.0,"unit":"percent","t_from":"1995","quote":"Overall (but not downtown), autos dominated as the means of travel to work in San Francisco, 55 percent to 45 percent for transit.","place_label":"San Francisco","anchor":"s-60daf25f9af4","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"Planning Department","stance":"own_position","speaker_evidence":"Existing and Projected Employment section; Journey-to-Work file findings"},{"claim_id":"c:7c1ac02c138e96a4ee1df67c6022fdcd","page_id":"C124914193:12","page_url":"https://archive.org/details/C124914193/page/n11","statement_kind":"finding","subject_label":"Employment and travel to work","summary":"The report finds that the largest group of San Francisco employees also live in San Francisco and has the highest transit mode share.","property":"finding","date_printed":"1990","t_from":"1990","quote":"The major findings from this analysis were that the largest group of San Francisco employees also live in San Francisco, and that this group has the highest transit mode share.","place_label":"San Francisco","anchor":"s-7c1ac02c138e","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"Planning Department","stance":"own_position","speaker_evidence":"The major findings from this analysis were that"},{"claim_id":"c:8df436354902ae83719ab4d2f95d134c","page_id":"C124914193:12","page_url":"https://archive.org/details/C124914193/page/n11","statement_kind":"finding","subject_label":"Transbay Transit Terminal location","summary":"The Transbay Transit Terminal is located between Mission, First, Natoma, and Fremont Streets.","property":"other","value_text":"between Mission, First, Natoma and Fremont Streets","t_from":"1995","quote":"The Transbay Transit Terminal is located between Mission, First, Natoma, and Fremont Streets with ramps that sweep east and westward","place_label":"Transbay Transit Terminal","anchor":"s-8df436354902","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"Planning Department","stance":"own_position","speaker_evidence":"The Transbay Transit Terminal is located between"},{"claim_id":"c:7de2c09bb56084a5fd1d41fb6ebdb2db","page_id":"C124914193:17","page_url":"https://archive.org/details/C124914193/page/n16","statement_kind":"cites_decision","subject_label":"Transbay Area Plan funding","summary":"Caltrans and the City decided to fund the Transbay Area Plan and Implementation Program.","property":"approved","value_text":"fund Transbay Area Plan and Implementation Program","t_from":"1995","quote":"Caltrans and the City decided to fund the Transbay Area Plan and Implementation Program, a more detailed analysis of the Main/Mission/Beale/ Howard site","place_label":"Transbay Area","anchor":"s-7de2c09bb560","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Caltrans and the City decided to fund the Transbay Area Plan"},{"claim_id":"c:dc6ca465cc9587e437879058a7a59ada","page_id":"C124914193:17","page_url":"https://archive.org/details/C124914193/page/n16","statement_kind":"finding","subject_label":"Main/Mission/Beale/Howard terminal site","summary":"The earlier study found that a terminal at Main/Mission/Beale/Howard may be feasible but would need significant redesign.","property":"finding","value_text":"may be feasible","t_from":"1995","quote":"This report showed that a terminal at Main/Mission/ Beale/Howard may be feasible, but it would have to be significantly different from the design investigated in the study.","place_label":"Main/Mission/Beale/Howard","place_precision":"other","anchor":"s-dc6ca465cc95","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"This report showed that a terminal at Main/Mission/ Beale/Howard may be feasible"},{"claim_id":"c:182cf9cff6fbb8e0442b14c20838c8bd","page_id":"C124914193:48","page_url":"https://archive.org/details/C124914193/page/n47","statement_kind":"proposal","subject_label":"SamTrans bus service","summary":"The SamTrans plan calls for increased bus service along the 101 Corridor and to downtown San Francisco.","property":"proposes","value_text":"increased bus service","date_printed":"Fiscal Years 1986/87-1990/91","t_from":"1986","quote":"Plans call for increased bus service along the 101 Corridor in San Mateo County, and to downtown San Francisco (particularly peak-period mainline service).","place_label":"101 Corridor; downtown San Francisco","anchor":"s-182cf9cff6fb","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"quotes_to_report","speaker_evidence":"SAMTRANS FIVE YEAR PLAN Summary: Plans call for increased bus service"},{"claim_id":"c:86acf9f780d6fde201379dcf4b4d54ce","page_id":"C124914193:48","page_url":"https://archive.org/details/C124914193/page/n47","statement_kind":"finding","subject_label":"CalTrain terminal site","summary":"The only downtown terminal site identified for the extension is the Transbay Terminal area.","property":"other","value_text":"Transbay Terminal area","t_from":"1995","quote":"The only downtown terminal site for the extension identified is the Transbay Terminal area.","place_label":"Transbay Terminal area","anchor":"s-86acf9f780d6","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"quotes_to_report","speaker_evidence":"Summary: Plans call for increased bus service along the 101 Corridor"},{"claim_id":"c:b1d26030c5f7b9ee1776374f55594a1b","page_id":"C124914193:48","page_url":"https://archive.org/details/C124914193/page/n47","statement_kind":"proposal","subject_label":"CalTrain extension into downtown San Francisco","summary":"The District supports extending CalTrain into downtown San Francisco.","property":"proposes","value_text":"extend CalTrain into downtown San Francisco","t_from":"1995","quote":"The District supports extending CalTrain into downtown San Francisco, citing higher ridership on the train and buses resulting from the extension.","place_label":"downtown San Francisco","anchor":"s-b1d26030c5f7","shown":false,"hidden":"another_body","part":"main_text","speaker":"another_body","speaker_role":"San Mateo County Transit District (SamTrans)","stance":"quotes_to_report","speaker_evidence":"Summary: The District supports extending CalTrain into downtown San Francisco"},{"claim_id":"c:cbdd1cbb1efc69eab1e34ae10902c3b7","page_id":"C124914193:48","page_url":"https://archive.org/details/C124914193/page/n47","statement_kind":"proposal","subject_label":"CalTrain ridership after extension","summary":"The CalTrain study estimates that the extension would attract 38,000 to 44,000 more riders per day.","property":"other","value_text":"38,000 - 44,000 riders per day","value_num":38000.0,"unit":"persons","t_from":"1995","quote":"The extension, combined with an increase to 136 trains/day in scheduled service, would attract an increase of 38,000 - 44,000 riders per day","place_label":"downtown San Francisco","anchor":"s-cbdd1cbb1efc","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"quotes_to_report","speaker_evidence":"CALTRAIN PENINSULA COMMUTE SERVICE FIVE YEAR PLAN Summary: The extension, combined with an increase"},{"claim_id":"c:1c5beb665ddbe24cf7c42541723c810f","page_id":"C124914193:53","page_url":"https://archive.org/details/C124914193/page/n52","statement_kind":"proposal","subject_label":"Transbay Terminal seismic strengthening","summary":"The three seismic strengthening schemes were estimated to cost between 11.9 and 18.3 million dollars in 1992.","property":"cost_usd","value_text":"$11.9 - 18.3 million (in 1992)","value_num":11900000.0,"unit":"USD","date_printed":"1992","t_from":"1992","quote":"The costs of the three seismic strengthening schemes ranged from $11.9 - 18.3 million (in 1992).","place_label":"Transbay Transit Terminal","anchor":"s-1c5beb665ddb","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"quotes_to_report","speaker_evidence":"Findings: The costs of the three seismic strengthening schemes ranged from $11.9 - 18.3 million"},{"claim_id":"c:644c99c2cbbba0fb6c51d67ce6dab3a3","page_id":"C124914193:53","page_url":"https://archive.org/details/C124914193/page/n52","statement_kind":"proposal","subject_label":"Transbay Terminal renovation","summary":"The report recommends a program to rectify deficiencies and install a more inviting interior layout in the Central Unit.","property":"recommendation","value_text":"renovation program","date_printed":"April 1992","t_from":"1992","quote":"The report recommends a program to rectify deficiencies, and simultaneously install a more inviting interior layout primarily on the street and mezzanine levels of the Central Unit.","place_label":"Transbay Terminal, Central Unit","anchor":"s-644c99c2cbbb","shown":false,"hidden":"another_body","part":"main_text","speaker":"another_body","speaker_role":"another body","stance":"quotes_to_report","speaker_evidence":"TRANSBAY TERMINAL RENOVATION PROJECT STUDY Division of the [name] 1992 Findings: The report recommends"},{"claim_id":"c:97b0c3c55562fc2cac08286fbe49d635","page_id":"C124914193:53","page_url":"https://archive.org/details/C124914193/page/n52","statement_kind":"finding","subject_label":"Transbay Transit Terminal structure","summary":"The terminal is structurally divided into six separate buildings.","property":"other","value_text":"six separate buildings","value_num":6.0,"date_printed":"June 1992","t_from":"1992","quote":"Description of existing facility (which is structurally divided into six separate buildings), testing methods, site seismicity","place_label":"Transbay Transit Terminal","anchor":"s-97b0c3c55562","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"quotes_to_report","speaker_evidence":"Summary: Description of existing facility (which is structurally divided into six separate buildings)"},{"claim_id":"c:192c46c1cfec712eca139569c63451da","page_id":"C124914193:57","page_url":"https://archive.org/details/C124914193/page/n56","statement_kind":"finding","subject_label":"Environmental impact of preferred alternative","summary":"The only impact identified for the preferred alternative is the modification of an historic structure.","property":"finding","value_text":"modification of an historic structure","t_from":"1995","quote":"The only impact -- significant or other -- identified for the preferred alternative would be the modification of an historic structure.","place_label":"Transbay Transit Terminal","anchor":"s-192c46c1cfec","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Summary: The only impact identified for the preferred alternative"},{"claim_id":"c:476be7fedca0999bb60ca30912f42270","page_id":"C124914193:57","page_url":"https://archive.org/details/C124914193/page/n56","statement_kind":"finding","subject_label":"Transbay Transit Terminal historic status","summary":"The Transbay Transit Terminal is considered eligible for the National Register of Historic Places.","property":"historic_rating","value_text":"eligible for National Register","t_from":"1995","quote":"The Transbay Transit Terminal is considered eligible for the national Register of Historic Places.","place_label":"Transbay Transit Terminal","anchor":"s-476be7fedca0","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Summary: The Transbay Transit Terminal is considered eligible"},{"claim_id":"c:9881898b32156f2d87bb2f2855621607","page_id":"C124914193:57","page_url":"https://archive.org/details/C124914193/page/n56","statement_kind":"proposal","subject_label":"Transbay Terminal bus deck strengthening","summary":"The proposed action strengthens the bus deck columns by installing 29 structural braces.","property":"proposes","value_text":"29 structural braces","value_num":29.0,"t_from":"1995","quote":"The proposed action consists of strengthening the vertical columns of the bus deck by installing 29 structural braces to the existing roofing frame.","place_label":"bus deck, Transbay Transit Terminal","anchor":"s-9881898b3215","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Summary: The proposed action consists of strengthening"},{"claim_id":"c:cc008e7017b9bd3041a793bedb411edd","page_id":"C124914193:57","page_url":"https://archive.org/details/C124914193/page/n56","statement_kind":"cites_decision","subject_label":"Transbay Terminal EIR","summary":"The EIR was certified in August 1994 as completed in compliance with CEQA.","property":"other","value_text":"EIR certified","date_printed":"August, 1994","t_from":"1994","quote":"The EIR was certified in August, 1994, as having been completed in compliance with CEQA.","place_label":"Transbay Terminal","anchor":"s-cc008e7017b9","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Status: The EIR was certified in August, 1994"},{"claim_id":"c:133994650468d021792c9be82de1630d","page_id":"C124914193:60","page_url":"https://archive.org/details/C124914193/page/n59","statement_kind":"proposal","subject_label":"SP commuter rail depot at 4th and Townsend","summary":"The study recommends maintaining the existing commuter rail depot at 4th and Townsend.","property":"recommendation","value_text":"maintain existing depot","t_from":"1995","quote":"Maintaining the existing commuter rail (SP at the time) depot at 4th and Townsend was the recommended solution, particularly for its low cost.","place_label":"4th and Townsend","place_precision":"intersection","anchor":"s-133994650468","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"quotes_to_report","speaker_evidence":"Findings: Maintaining the existing commuter rail (SP at the time) depot"},{"claim_id":"c:8925f5a0843319bea196771300ba340b","page_id":"C124914193:60","page_url":"https://archive.org/details/C124914193/page/n59","statement_kind":"finding","subject_label":"Commuter rail survey destinations","summary":"The 1978 survey found 72% of respondents were headed to San Francisco.","property":"finding","value_text":"72%","value_num":72.0,"unit":"percent","date_printed":"Apr 1978","t_from":"1978","quote":"San Francisco was the destination of 72% of the respondents, and the large majority of these riders were headed to the Financial District.","place_label":"San Francisco","anchor":"s-8925f5a08433","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"quotes_to_report","speaker_evidence":"Findings: San Francisco was the destination of 72%"},{"claim_id":"c:b1725346443f1c221ce7f88960aa059b","page_id":"C124914193:60","page_url":"https://archive.org/details/C124914193/page/n59","statement_kind":"background","subject_label":"SP commuter rail extension study","summary":"The 1982 study examined three alternatives extending commuter rail and a terminal into the Transbay Area.","property":"alternative","value_text":"three alternatives","value_num":3.0,"date_printed":"April 1982","t_from":"1982","quote":"three that extend commuter rail service and a terminal in the Transbay Area.","place_label":"Transbay Area","anchor":"s-b1725346443f","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"quotes_to_report","speaker_evidence":"Relationship to the Transbay Area Plan: Four alternatives studied"},{"claim_id":"c:b6c8a239b3a6750369e6303eacde05af","page_id":"C124914193:60","page_url":"https://archive.org/details/C124914193/page/n59","statement_kind":"proposal","subject_label":"Downtown commuter rail terminal alternatives","summary":"The study evaluated downtown alternatives at Rincon Annex, 160 Harrison Street and the Transbay Terminal.","property":"alternative","value_text":"Rincon Annex, 160 Harrison Street, Transbay Terminal","date_printed":"April 1982","t_from":"1982","quote":"The downtown alternatives include a Rincon Annex terminal, a terminal at 160 Harrison Street, and at the Transbay Terminal.","place_label":"Rincon Annex","anchor":"s-b6c8a239b3a6","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"quotes_to_report","speaker_evidence":"Summary: The downtown alternatives include a Rincon Annex terminal"},{"claim_id":"c:d41adea254540d0687e30f24ffd6da18","page_id":"C124914193:60","page_url":"https://archive.org/details/C124914193/page/n59","statement_kind":"finding","subject_label":"Commuter rail ridership","summary":"The 1978 survey reported about 16,000 daily weekday riders on 44 scheduled trains.","property":"other","value_text":"about 16,000/day","value_num":16000.0,"unit":"persons","date_printed":"Apr 1978","t_from":"1978","quote":"Ridership on the 44 trains scheduled daily (weekday) at this time was about 16,000/day.","anchor":"s-d41adea25454","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"quotes_to_report","speaker_evidence":"Summary: Survey results and accompanying Origin-Destination"},{"claim_id":"c:00065cf57f67f8c76cc23e4ad2c3bc73","page_id":"C124914193:84","page_url":"https://archive.org/details/C124914193/page/n83","statement_kind":"proposal","subject_label":"Electrification of bus operation","summary":"The plan proposes promoting the electrification of bus operation.","property":"proposes","value_text":"electrification of bus operation","t_from":"1995","quote":"Policy 10: Promote the electrification of bus operation.","anchor":"s-00065cf57f67","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"MASS TRANSIT Objective 1: Give first priority to improving transit service"},{"claim_id":"c:68f25f41ac207e39e806924171b09128","page_id":"C124914193:84","page_url":"https://archive.org/details/C124914193/page/n83","statement_kind":"proposal","subject_label":"Bridges and freeways transit lanes","summary":"The plan's policy says bridges and freeways should have exclusive transit lanes where significant transit service is provided.","property":"proposes","value_text":"exclusive transit lanes","t_from":"1995","quote":"Policy 7: Bridges and freeways should have exclusive transit lanes where significant transit service is provided by transit.","anchor":"s-68f25f41ac20","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Objective 2: Develop transit as the primary mode of travel"},{"claim_id":"c:252eec191144e8460a6c95a675bbb3f7","page_id":"C124914193:99","page_url":"https://archive.org/details/C124914193/page/n98","statement_kind":"background","subject_label":"South Beach","summary":"South Beach is a Redevelopment Area that encourages mixed use development, primarily residential.","property":"other","value_text":"Redevelopment Area","t_from":"1995","quote":"South Beach, to the south of the Bay Bridge and east of First Street, is a Redevelopment Area that encourages mixed use development, primarily residential.","place_label":"South Beach","place_precision":"area","place_id":"qipu:sf/place/hood/financial-district-south-beach","resolved_by":"place links file","anchor":"s-252eec191144","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"2. Adjacent Areas South Beach ... is a Redevelopment Area"},{"claim_id":"c:82e14e6e0186c1af1a99851a94921f87","page_id":"C124914193:99","page_url":"https://archive.org/details/C124914193/page/n98","statement_kind":"cites_decision","subject_label":"255 King Street office building","summary":"The 255 King Street office building of 365,000 square feet was approved in 1992.","property":"approved","value_text":"365,000 square feet office building","value_num":365000.0,"unit":"sqft","date_printed":"1992","t_from":"1992","quote":"the 255 King Street office building of 365,000 square feet which was approved in 1992.","place_label":"255 King Street","place_precision":"address","place_id":"qipu:sf/place/address/eas-499706","resolved_by":"place links file","anchor":"s-82e14e6e0186","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Mission Bay ... The development of Phase One of the Mission Bay project includes the 255 King Street office building"},{"claim_id":"c:a3981c590673660e3d79ca4ed56a8bbe","page_id":"C124914193:99","page_url":"https://archive.org/details/C124914193/page/n98","statement_kind":"proposal","subject_label":"Mission Bay development plan","summary":"Mission Bay is planned for 4.8 million square feet of office space and 8,700 housing units.","property":"proposes","value_text":"8,700 housing units","value_num":8700.0,"unit":"units","t_from":"1995","quote":"planned for 4.8 million square feet of office space, 900,000 square feet of light industrial and institutional space, and 8,700 housing units","place_label":"Mission Bay","place_precision":"area","place_id":"qipu:sf/place/hood/mission-bay","resolved_by":"place links file","anchor":"s-a3981c590673","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Mission Bay, south of Townsend Street, is the area with one of the highest potentials"},{"claim_id":"c:e7076bab837252dbdf0bf7acd60709ca","page_id":"C124914193:99","page_url":"https://archive.org/details/C124914193/page/n98","statement_kind":"proposal","subject_label":"Mission Bay Office District","summary":"The Mission Bay Office District is proposed to be developed as large floor plate offices with ground floor retail.","property":"proposes","value_text":"large floor plate offices in four to eight story structures","unit":"stories","t_from":"1995","quote":"is zoned as Mission Bay Office District (MB-O) which is proposed to be developed as large floor plate offices with ground floor retail","place_label":"northern Mission Bay, between Third Street, China Basin Channel and Sixth Streets","place_precision":"area","anchor":"s-e7076bab8372","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"The northern portion of Mission Bay ... is zoned as Mission Bay Office District (MB-O)"},{"claim_id":"c:f5c82f368639960eb8ba27094dfde29b","page_id":"C124914193:99","page_url":"https://archive.org/details/C124914193/page/n98","statement_kind":"proposal","subject_label":"Mission Bay employment estimate","summary":"The document estimates that 10,000 new jobs will be located in Mission Bay by 2010.","property":"jobs","value_text":"10,000 new jobs","value_num":10000.0,"unit":"jobs","date_printed":"2010","t_from":"2010","quote":"By 2010, it is estimated that 10,000 new jobs will be located in this area for a variety of activities","place_label":"Mission Bay","place_precision":"area","place_id":"qipu:sf/place/hood/mission-bay","resolved_by":"place links file","anchor":"s-f5c82f368639","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Mission Bay ... By 2010, it is estimated that 10,000 new jobs"},{"claim_id":"c:7df6c7a22516aaeae2c7932b6abf75be","page_id":"C124914193:117","page_url":"https://archive.org/details/C124914193/page/n116","statement_kind":"proposal","subject_label":"Office/residential building at First and Bryant Streets","summary":"There is a proposal for an office/residential building at First and Bryant Streets.","property":"proposes","value_text":"office/residential building","t_from":"1995","quote":"Currently, there is a proposal for an office/residential building at First and Bryant Streets.","place_label":"First and Bryant Streets","place_precision":"intersection","place_id":"qipu:sf/place/street/01st-st","resolved_by":"place links file","anchor":"s-7df6c7a22516","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"2. Redevelopment Plans, Status: Currently, there is a proposal"},{"claim_id":"c:baf86eda165f1cae65f0be3c64a02d65","page_id":"C124914193:117","page_url":"https://archive.org/details/C124914193/page/n116","statement_kind":"background","subject_label":"Yerba Buena Center project area","summary":"The Yerba Buena Center project area is 87 acres.","property":"acreage","value_text":"87 acres","value_num":87.0,"unit":"acres","t_from":"1995","quote":"The total $2 billion project area is 87 acres extending from Market to Harrison Street, Second Street to the west property of Fourth Street.","place_label":"Market to Harrison Street, Second Street to Fourth Street","anchor":"s-baf86eda165f","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"YERBA BUENA CENTER REDEVELOPMENT PLAN, Summary: The total $2 billion project area"},{"claim_id":"c:f0c7a3066937a3932acaf7be65383547","page_id":"C124914193:117","page_url":"https://archive.org/details/C124914193/page/n116","statement_kind":"finding","subject_label":"Yerba Buena Center housing","summary":"Much of the south-central portion of Yerba Buena Center is housing with 1,826 units.","property":"units","value_text":"1,826 units","value_num":1826.0,"unit":"units","t_from":"1995","quote":"much of the south-central portion as housing (1,826 units)","place_label":"Yerba Buena Center","anchor":"s-f0c7a3066937","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Status: The core areas of the Center are substantially built out"},{"claim_id":"c:fc44eb0f2768239c22fad0e8e0a44dd8","page_id":"C124914193:117","page_url":"https://archive.org/details/C124914193/page/n116","statement_kind":"proposal","subject_label":"Rincon Point/South Beach dwelling units","summary":"The Rincon Point/South Beach plan proposes 1,900 to 3,450 dwelling units in these two areas.","property":"proposes","value_text":"1,900-3,450 dwelling units","value_num":1900.0,"unit":"units","date_printed":"October 1992","t_from":"1992","quote":"1,900-3,450 dwelling units are proposed in these two areas.","place_label":"Rincon Point and South Beach Redevelopment Areas","anchor":"s-fc44eb0f2768","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"RINCON POINT/SOUTH BEACH REDEVELOPMENT PLAN, Summary: 1,900-3,450 dwelling units"},{"claim_id":"c:05b2c728200d290e608cf1bc0590c992","page_id":"C124914193:119","page_url":"https://archive.org/details/C124914193/page/n118","statement_kind":"background","subject_label":"Master Plan status","summary":"The report states the Master Plan is an active document used as the basis for all land use decisions.","property":"other","value_text":"active document","t_from":"1995","quote":"The Master Plan is an active document used as the basis for all land use decisions.","anchor":"s-05b2c728200d","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Status: The Master Plan is an active document used as the basis for all land use decisions."},{"claim_id":"c:4b7db4a4d3e0f008a40ded83bc96def4","page_id":"C124914193:119","page_url":"https://archive.org/details/C124914193/page/n118","statement_kind":"background","subject_label":"Master Plan priority policies","summary":"Proposition M established eight Priority Policies of the Master Plan in 1986.","property":"other","value_text":"eight priority policies","value_num":8.0,"date_printed":"1986","t_from":"1986","quote":"The following Priority Policies of the Master Plan were established by Proposition M in 1986","anchor":"s-4b7db4a4d3e0","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Findings: The following Priority Policies of the Master Plan were established by Proposition M in 1986","links":[{"show_target_kind":"ballot measure","show_target_id":"ballot/1986-11-M","show_url":"https://data.qipu.org/usa/san-francisco/records/instruments/ballot/1986-11-M/"}]},{"claim_id":"c:7e4b43141e6e7e7db37dbe1b519f2a28","page_id":"C124914193:119","page_url":"https://archive.org/details/C124914193/page/n118","statement_kind":"background","subject_label":"Urban Design Element","summary":"The 1973 Urban Design Element was described as one of the first comprehensive urban design plans in the U.S.","property":"other","value_text":"1973","value_num":1973.0,"date_printed":"1973","t_from":"1973","quote":"The Urban Design Element was one of the first comprehensive urban design plans in the U.S.","anchor":"s-7e4b43141e6e","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Summary: The Urban Design Element was one of the first comprehensive urban design plans in the U.S."},{"claim_id":"c:3f04445e777cb150d7e09ce4a188a6d0","page_id":"C124914193:127","page_url":"https://archive.org/details/C124914193/page/n126","statement_kind":"finding","subject_label":"71 Natoma residential project","summary":"The 71 Natoma project was approved with 509 residential units and 20,000 square feet of retail.","property":"approved","value_text":"509 residential units w/20,000 s.f. retail","value_num":509.0,"unit":"units","t_from":"1995","quote":"71 Natoma--509 Residential units w/20,000 s.f. retail (475'/49 stories)","place_label":"71 Natoma","place_precision":"address","anchor":"s-3f04445e777c","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"C. APPROVED/PROPOSED DEVELOPMENT; The Transbay Area Plan study is within"},{"claim_id":"c:d1bd0c347aa9d949a8d5f3a511043911","page_id":"C124914193:127","page_url":"https://archive.org/details/C124914193/page/n126","statement_kind":"finding","subject_label":"101 Second office project","summary":"The 101 Second office project was approved with 370,000 square feet of office space.","property":"approved","value_text":"370,000 s.f. office space (425'/32 stories)","value_num":370000.0,"unit":"sqft","t_from":"1995","quote":"a number of larger projects have been approved within and adjacent to the study area (see Figure 19): 101 Second--370,000 s.f. office space","place_label":"101 Second","place_precision":"address","place_id":"qipu:sf/place/address/eas-470923","resolved_by":"place links file","anchor":"s-d1bd0c347aa9","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"a number of larger projects have been approved within and adjacent to the study area"},{"claim_id":"c:adb1e7e60adb70411488f7a9d4898d61","page_id":"C124914193:137","page_url":"https://archive.org/details/C124914193/page/n136","statement_kind":"finding","subject_label":"Work trips to San Francisco","summary":"Trips originating in San Francisco were over 61 percent of all work trips by transit to the city in 1990.","property":"other","value_text":"over 61 percent","value_num":61.0,"unit":"percent","date_printed":"1990","t_from":"1990","quote":"Trips originating in San Francisco account for over 61 percent of all work trips by transit to the city in 1990.","place_label":"San Francisco","anchor":"s-adb1e7e60adb","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"B. EXISTING AND PROJECTED TRAVEL DATA"},{"claim_id":"c:efedcc819620ca8cd42cf21c2e43c63b","page_id":"C124914193:137","page_url":"https://archive.org/details/C124914193/page/n136","statement_kind":"finding","subject_label":"Work trips to adjacent areas","summary":"In 1990, 20.9 percent of San Francisco work trips were to adjacent areas, mostly by auto.","property":"other","value_text":"20.9 percent (105,687 trips)","value_num":20.9,"unit":"percent","date_printed":"1990","t_from":"1990","quote":"In 1990, 20.9 percent of San Francisco work trips (105,687) were to adjacent areas and most of these trips were by auto.","place_label":"San Francisco","anchor":"s-efedcc819620","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Major findings from this analysis, for both 1990 and 2010"},{"claim_id":"c:0044dd6569453d115eadfd4ad66e738a","page_id":"C124914193:169","page_url":"https://archive.org/details/C124914193/page/n168","statement_kind":"cites_decision","subject_label":"Transbay Transit Terminal upgrade resolution","summary":"Several Bay Area city councils and agencies passed a 1993 resolution supporting upgrading the Transbay Transit Terminal.","property":"approved","value_text":"resolution passed 1993","date_printed":"1993","t_from":"1993","quote":"The following resolution was passed in 1993 by City Councils in Oakland, Berkeley, Richmond","place_label":"Transbay Transit Terminal","anchor":"s-0044dd656945","shown":false,"hidden":"attachment","part":"attachment","speaker":"another_body","speaker_role":"another body","stance":"quotes_to_report","speaker_evidence":"The following resolution was passed in 1993 by [name] in Oakland, Berkeley, Richmond"},{"claim_id":"c:618eddbff5484aaace64fb653761946d","page_id":"C124914193:169","page_url":"https://archive.org/details/C124914193/page/n168","statement_kind":"finding","subject_label":"Transbay Terminal seismic and code upgrades","summary":"Caltrans has programmed $32 million (≈ $70.7 million in 2026 dollars) for seismic and other code upgrades to the Transbay Terminal.","property":"cost_usd","value_text":"$32 million","value_num":32000000.0,"unit":"USD","t_from":"1995","quote":"Caltrans has programmed $32 million for seismic and other code upgrades to the Transbay Terminal","place_label":"Transbay Transit Terminal","anchor":"s-618eddbff548","shown":false,"hidden":"attachment","part":"attachment","speaker":"another_body","speaker_role":"resolution text by supporting cities and agencies (Caltrans programming claim)","stance":"quotes_to_report","speaker_evidence":"WHEREAS, Caltrans has programmed $32 million for seismic and other code upgrades"}]}