{"note":"Statements read from one scanned government report in the IGS library collection on the Internet Archive. Each statement has a verbatim quote found on its page (quote, page_url). The summary and subject_label of each statement were written by a model (Claude Haiku 5.5) and can be wrong: read the page before quoting. At most 20 selected pages of a report were read. Keys are the column names of the tables igs_reports and igs_claims; a column that is null for a statement is left out, and columns with one value for every statement of this report are given once under same_for_every_statement. \"[name withheld]\" stands where the release withholds a name; the site's page guard withholds a few more in reports after 1951, so a cell here can differ from the table; for a few reports prepared_by and creator are left out. A statement's links to the Board record are under links (show_target_kind: decision, instrument or ballot measure; show_target_id; show_url); they replace the table's decision_id and instrument_id, which are left out. place_id, place_label and place_precision come from a corrected place match where there is one. part, speaker, speaker_role, stance and speaker_evidence say who is speaking: a model (Claude Haiku 5.5) read each page and its context and can be wrong. part: main_text, attachment, appendix, letter, comment, response, table or cover_or_contents; speaker: issuer, another_body, letter_writer or unclear; speaker_role: a role or organisation, never a personal name; stance: own_position, quotes_to_dispute, quotes_to_report, restates_to_reject or unclear. The report page shows a statement only when speaker is issuer, part is main_text or appendix, and stance is own_position or quotes_to_report; hidden gives the part, the speaker or the stance of the others. ","release":"v0.9.2","licence":"CC0-1.0","slug":"c124914333","url":"https://data.qipu.org/usa/san-francisco/reports/c124914333/","statement_url":"https://data.qipu.org/usa/san-francisco/reports/c124914333/#{anchor}","tables":{"igs_reports":"https://tiles.qipu.org/data/releases/v0.9.2/parquet/igs_reports.parquet","igs_claims":"https://tiles.qipu.org/data/releases/v0.9.2/parquet/igs_claims.parquet"},"report":{"report_id":"C124914333","source_id":"C124914333","title":"Laguna Honda Hospital institutional master plan","year":1994,"n_pages":214,"creator":"San Francisco (Calif.). Department of Public Health","source_url":"https://archive.org/details/C124914333","issuer":"City and County of San Francisco, Department of Public Health","issuer_type":"government","gov_level":"city_county","prepared_by":null,"doc_kind":"plan","jurisdiction":"San Francisco","jurisdiction_id":"sf","city":"sf","issuer_by":"meta","doc_kind_by":"meta","jurisdiction_by":"meta","run_id":"igs-labels-rules+haiku55-cli-2026-10-23"},"pages_with_statements":11,"statements_total":32,"statements_by_kind":{"finding":20,"proposal":9,"cites_decision":0,"background":3},"same_for_every_statement":{"source_id":"C124914333","source_url":"https://archive.org/details/C124914333","source_label":"IGS library: Laguna Honda Hospital institutional master plan","report_year":1994,"issuer":"City and County of San Francisco, Department of Public Health","issuer_type":"government","doc_kind":"plan","t_precision":"year","status":"extracted","claim_kind":"observation","extraction_table":"igs_claims","run_id":"igs-sf-pages-v2-haiku55-batch-2026-10-23","city":"sf","prompt_version":"igs-page-v2-2026-10-23"},"summary":{"what":"A 1994 plan by the City and County of San Francisco, Department of Public Health for Laguna Honda Hospital.","figures":[{"label":"Area","value":"62 acres","claim_ids":["c:0d0cbb07f6cfaea595bc1bdb8e9ffd24"]},{"label":"Cost","value":"$344,400,000 (1992 dollars)","claim_ids":["c:c052ea00e1bbd34b05980db8f470bcd8"]},{"label":"Staff","value":"1,578 FTEs","claim_ids":["c:d41271fd5d3f1a16a76ba3e42726ee1b"]},{"label":"Patients on tube feeding","value":"more than 150 patients","page_url":"https://archive.org/details/C124914333/page/n6","quote":"On average, more than 150 patients require daily nasogastric or gastrostomic tube feeding."}],"main_points":["c:f888c9d71ed9dff5a0bd5510ab8aeec2","c:35685717da91313225f114ea2ff560b7","c:31dbd2d48efa682512cc11dbc04d0343"],"board_decisions_after":["qipu:sf/decision/meetingminutes2004sanf|19","qipu:sf/decision/meetingminutes2004sanf:91/2","qipu:sf/decision/meetingjanmar2004minutes991sanfrich|g241","qipu:sf/decision/hand:laguna-honda-bonds-1999","qipu:sf/decision/journalaprjuneofproceed94sanfrich|g1266","qipu:sf/decision/journalaprjuneofproceed94sanfrich|g737","qipu:sf/decision/journalofjulydecproceed93sanfrich:68/3"],"board_decisions_before":["qipu:sf/decision/journalofproceedjanapr86sanfrich:325/11"],"made_by":"A model (Claude Haiku 5.5) wrote the lead and picked the figures, main points and later Board decisions from the statements, from a second reading of the report's summary and cost pages, and from Board decisions dated 3 years before to 10 years after the report; every number it wrote was checked against them, and a figure must be about the report's own area or project."},"statements":[{"claim_id":"c:5d059ae197563833ad7cf767c72a16e6","page_id":"C124914333:7","page_url":"https://archive.org/details/C124914333/page/n6","statement_kind":"finding","subject_label":"Laguna Honda Hospital code compliance","summary":"The document finds the hospital does not comply with minimum contemporary requirements for skilled nursing facilities.","property":"finding","value_text":"does not comply","t_from":"1994","quote":"It does not comply with even the minimum contemporary requirements for skilled nursing facilities.","place_label":"Laguna Honda Hospital","place_precision":"building","place_id":"qipu:sf/place/institution/laguna-honda-hospital-5d7f7a","resolved_by":"place links file","anchor":"s-5d059ae19756","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"EXECUTIVE SUMMARY bullet on code non-compliance"},{"claim_id":"c:6dab6a66cbb5c4fc32d322f3114db5da","page_id":"C124914333:7","page_url":"https://archive.org/details/C124914333/page/n6","statement_kind":"finding","subject_label":"Laguna Honda Hospital campus size","summary":"The Laguna Honda Hospital Campus is 62 acres, located high on a hill.","property":"acreage","value_text":"62 acre","value_num":62.0,"unit":"acres","t_from":"1994","quote":"The 62 acre Campus is located high on a hill overlooking low density residential neighborhoods.","place_label":"Laguna Honda Hospital Campus","anchor":"s-6dab6a66cbb5","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"SITE DESCRIPTION: The 62 acre Campus is located high on a hill"},{"claim_id":"c:80f7197d342047ef36d3c05f6e0bbc2e","page_id":"C124914333:7","page_url":"https://archive.org/details/C124914333/page/n6","statement_kind":"finding","subject_label":"San Francisco population aged 60 or older","summary":"San Francisco has about twice the national share of people age 60 or older.","property":"other","value_text":"20% vs. 11% nationally","value_num":20.0,"unit":"percent","t_from":"1994","quote":"In addition, San Francisco, at present, has approximately twice as many people age 60 or older than the national average (20% vs. 11% nationally).","place_label":"San Francisco","anchor":"s-80f7197d3420","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"EXECUTIVE SUMMARY: San Francisco, at present, has approximately twice"},{"claim_id":"c:8fefe5003a1b0dfa27b1a34b4db395f2","page_id":"C124914333:7","page_url":"https://archive.org/details/C124914333/page/n6","statement_kind":"finding","subject_label":"Laguna Honda patients requiring tube feeding","summary":"On average more than 150 patients require daily nasogastric or gastrostomic tube feeding.","property":"other","value_text":"more than 150 patients","value_num":150.0,"unit":"persons","t_from":"1994","quote":"On average, more than 150 patients require daily nasogastric or gastrostomic tube feeding.","place_label":"Laguna Honda Hospital","place_precision":"building","place_id":"qipu:sf/place/institution/laguna-honda-hospital-5d7f7a","resolved_by":"place links file","anchor":"s-8fefe5003a1b","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"EXECUTIVE SUMMARY: On average, more than 150 patients require"},{"claim_id":"c:a0e8044199e971f04446835ec637d1c3","page_id":"C124914333:7","page_url":"https://archive.org/details/C124914333/page/n6","statement_kind":"finding","subject_label":"Laguna Honda Hospital patient ages","summary":"The document reports average patient age of 67 for males and 77 for females.","property":"other","value_text":"67 males, 77 females","value_num":67.0,"t_from":"1994","quote":"The average age of patients is 67 for males and 77 for females.","place_label":"Laguna Honda Hospital","place_precision":"building","place_id":"qipu:sf/place/institution/laguna-honda-hospital-5d7f7a","resolved_by":"place links file","anchor":"s-a0e8044199e9","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"EXECUTIVE SUMMARY: The average age of patients is 67"},{"claim_id":"c:7ad527dc3858aa7d152a8af503b69306","page_id":"C124914333:15","page_url":"https://archive.org/details/C124914333/page/n14","statement_kind":"finding","subject_label":"Laguna Honda Hospital role","summary":"The document states Laguna Honda is the largest municipally owned long term care institution in the nation.","property":"finding","value_text":"largest municipally owned long term care institution","t_from":"1994","quote":"It is the largest municipally owned long term care institution in the nation.","place_label":"Laguna Honda Hospital","place_precision":"building","place_id":"qipu:sf/place/institution/laguna-honda-hospital-5d7f7a","resolved_by":"place links file","anchor":"s-7ad527dc3858","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Laguna Honda Hospital plays a vital role as the provider of last resort"},{"claim_id":"c:f0fec66b8038b4171570c7f35d4045b3","page_id":"C124914333:15","page_url":"https://archive.org/details/C124914333/page/n14","statement_kind":"finding","subject_label":"Facility master planning need","summary":"The Blue Ribbon Committee report stressed the need to prepare a Comprehensive Facility Master Plan.","property":"finding","value_text":"Comprehensive Facility Master Plan","date_printed":"1987","t_from":"1987","quote":"The report stressed the need to prepare a Comprehensive Facility Master Plan.","place_label":"Laguna Honda Hospital","place_precision":"building","place_id":"qipu:sf/place/institution/laguna-honda-hospital-5d7f7a","resolved_by":"place links file","anchor":"s-f0fec66b8038","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"quotes_to_report","speaker_evidence":"The report stressed the need to prepare a Comprehensive Facility Master Plan"},{"claim_id":"c:d41271fd5d3f1a16a76ba3e42726ee1b","page_id":"C124914333:49","page_url":"https://archive.org/details/C124914333/page/n48","statement_kind":"finding","subject_label":"Hospital full-time equivalent staff","summary":"The hospital reported 1,578 full-time equivalent staff for fiscal year 1993/94.","property":"jobs","value_text":"1,578 FTEs","value_num":1578.0,"unit":"jobs","date_printed":"Fiscal Year 1993/94","t_from":"1993","quote":"Fiscal Year 1993/94 Full Time Equivalents (FTE’s) Physicians 37 Registered Nurses 252 Licensed Vocational Nurses 61 All Others 1,228 TOTAL 1,578 FIE’s","place_label":"Laguna Honda Hospital","place_precision":"building","place_id":"qipu:sf/place/institution/laguna-honda-hospital-5d7f7a","resolved_by":"place links file","anchor":"s-d41271fd5d3f","shown":false,"hidden":"table","part":"table","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Fiscal Year 1993/94 Full Time Equivalents (FTE's) Physicians 37"},{"claim_id":"c:e85ab7e67d98f1d3fb882c471c26ebbd","page_id":"C124914333:59","page_url":"https://archive.org/details/C124914333/page/n58","statement_kind":"proposal","subject_label":"Affirmative action activities","summary":"The department's Equal Employment Opportunity Unit will initiate a set of activities for fiscal year 1993-94.","property":"other","date_printed":"fiscal year 1993-94","t_from":"1993","quote":"the following activities will be initiated for fiscal year 1993-94","anchor":"s-e85ab7e67d98","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"Department of Public Health (EEO Unit) affirmative action program narrative","stance":"own_position","speaker_evidence":"the following activities will be initiated for fiscal year 1993-94"},{"claim_id":"c:0d0cbb07f6cfaea595bc1bdb8e9ffd24","page_id":"C124914333:65","page_url":"https://archive.org/details/C124914333/page/n64","statement_kind":"finding","subject_label":"Laguna Honda Hospital site","summary":"The hospital occupies a sloping 62-acre site on the upper western slope of Twin Peaks.","property":"acreage","value_text":"62 acres","value_num":62.0,"unit":"acres","t_from":"1994","quote":"The Hospital’s sloping 62- acre site is adjacent to the City’s Youth Guidance Center, located southeast of the LHH campus.","place_label":"Laguna Honda Hospital, Twin Peaks","place_precision":"building","place_id":"qipu:sf/place/institution/laguna-honda-hospital-5d7f7a","resolved_by":"place links file","anchor":"s-0d0cbb07f6cf","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Laguna Honda Hospital is centrally located in San Francisco"},{"claim_id":"c:9319a9e8b2cdf16da24988691e002820","page_id":"C124914333:81","page_url":"https://archive.org/details/C124914333/page/n80","statement_kind":"background","subject_label":"Surrounding residential zoning","summary":"The immediately surrounding residential areas are zoned RH-1(D) and RH-1.","property":"use","value_text":"RH-1(D) and RH-1","t_from":"1994","quote":"The immediately surrounding residential areas are zoned RH-1(D) and RH-1.","place_label":"Surrounding residential areas","anchor":"s-9319a9e8b2cd","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"The immediately surrounding residential areas are zoned"},{"claim_id":"c:c79ac984689ac3d0eb86e2b8935f98a6","page_id":"C124914333:81","page_url":"https://archive.org/details/C124914333/page/n80","statement_kind":"background","subject_label":"Laguna Honda Hospital site zoning","summary":"The hospital site is within a Public Use District, indicating government ownership and public use.","property":"use","value_text":"Public Use District","t_from":"1994","quote":"The Laguna Honda Hospital site, including the adjacent Youth Guidance Center, is located within a Public Use District, indicating that it is owned by a governmental agency and used for public purposes.","place_label":"Laguna Honda Hospital site","place_precision":"building","place_id":"qipu:sf/place/institution/laguna-honda-hospital-5d7f7a","resolved_by":"place links file","anchor":"s-c79ac984689a","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"The Laguna Honda Hospital site, including the adjacent Youth Guidance Center, is located within a Public Use District"},{"claim_id":"c:c83f1ea2fe6c280e299591082e8d978f","page_id":"C124914333:81","page_url":"https://archive.org/details/C124914333/page/n80","statement_kind":"background","subject_label":"Hospital permitted use","summary":"The Hospital is a permitted principal use for a Public Use District.","property":"use","value_text":"permitted principal use","t_from":"1994","quote":"As a city and county operated institution, the Hospital is a permitted principal use for a Public Use District","place_label":"Laguna Honda Hospital site","place_precision":"building","place_id":"qipu:sf/place/institution/laguna-honda-hospital-5d7f7a","resolved_by":"place links file","anchor":"s-c83f1ea2fe6c","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"As a city and county operated institution, the Hospital is a permitted principal use"},{"claim_id":"c:4099c3f8eb4926232a366a9994e5a9e3","page_id":"C124914333:99","page_url":"https://archive.org/details/C124914333/page/n98","statement_kind":"proposal","subject_label":"Woodside Drive access road","summary":"The plan proposes an access road at Woodside Drive to reach the existing parking lot on the southeast edge of the site.","property":"proposes","value_text":"access road at Woodside Drive","date_printed":"within first five years","t_from":"1994","quote":"The proposed access road at Woodside Drive will access the existing parking lot on the southeast edge of the site.","place_label":"Woodside Drive","anchor":"s-4099c3f8eb49","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"CHANGES IN TRAFFIC LEVELS & CIRCULATION PATTERNS"},{"claim_id":"c:31dbd2d48efa682512cc11dbc04d0343","page_id":"C124914333:107","page_url":"https://archive.org/details/C124914333/page/n106","statement_kind":"finding","subject_label":"Main Building architectural deficiencies","summary":"The Main Building contains a number of architectural deficiencies.","property":"finding","value_text":"architectural deficiencies","t_from":"1994","quote":"The Main Building contains a number of architectural deficiencies.","place_label":"Main Building","anchor":"s-31dbd2d48efa","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"CONCLUSIONS The Main Building contains a number of architectural deficiencies."},{"claim_id":"c:39f1b616ecc4b3bcb5f88af9167f3fc1","page_id":"C124914333:107","page_url":"https://archive.org/details/C124914333/page/n106","statement_kind":"finding","subject_label":"Clarendon Hall code compliance","summary":"Clarendon Hall does not have the architectural code deficiencies of the Main Building because of its 1978 remodel.","property":"finding","value_text":"no architectural code deficiencies","date_printed":"1978","t_from":"1978","quote":"Clarendon Hall, because of the fairly recent remodel completed in 1978, does not have the architectural code deficiencies of the Main Building.","place_label":"Clarendon Hall","anchor":"s-39f1b616ecc4","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Clarendon Hall, because of the fairly recent remodel completed in 1978"},{"claim_id":"c:45a1d52f13049fe5b488855d04a7eaa1","page_id":"C124914333:107","page_url":"https://archive.org/details/C124914333/page/n106","statement_kind":"finding","subject_label":"Clarendon Hall earthquake damage","summary":"Clarendon Hall suffered damage in the 1989 earthquake that will require time and sizable investment to repair.","property":"finding","value_text":"damage from 1989 earthquake","date_printed":"1989","t_from":"1989","quote":"The damage suffered by Clarendon Hall in the 1989 earthquake will require time and sizable investment to repair.","place_label":"Clarendon Hall","anchor":"s-45a1d52f1304","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"The damage suffered by Clarendon Hall in the 1989 earthquake will require"},{"claim_id":"c:b9c7ddefff9a70b96f76358e555edcac","page_id":"C124914333:107","page_url":"https://archive.org/details/C124914333/page/n106","statement_kind":"finding","subject_label":"Clarendon Hall program accommodations","summary":"Clarendon Hall provides minimum accommodations for the Adult Day Health Care Center.","property":"finding","value_text":"minimum accommodations","t_from":"1994","quote":"As the site of the Adult Day Health Care Center, Clarendon Hall provides minimum accommodations for that program.","place_label":"Clarendon Hall","anchor":"s-b9c7ddefff9a","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"As the site of the Adult Day Health Care Center, Clarendon Hall provides minimum"},{"claim_id":"c:0e8199db164a2dc052f3c047696d8a4d","page_id":"C124914333:109","page_url":"https://archive.org/details/C124914333/page/n108","statement_kind":"finding","subject_label":"Asbestos in buildings","summary":"Clayton Environmental Consultants found asbestos containing materials in all Hospital buildings except the Greenhouse.","property":"finding","value_text":"all buildings except Greenhouse","t_from":"1994","quote":"Clayton Environmental Consultants, Inc. found asbestos containing materials in all buildings at the Hospital except for the Greenhouse.","place_label":"Laguna Honda Hospital","place_precision":"building","place_id":"qipu:sf/place/institution/laguna-honda-hospital-5d7f7a","resolved_by":"place links file","anchor":"s-0e8199db164a","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"quotes_to_report","speaker_evidence":"ASBESTOS ASSESSMENT Clayton Environmental Consultants, Inc. found"},{"claim_id":"c:20a9a61fddbee44301112f81d5b06188","page_id":"C124914333:109","page_url":"https://archive.org/details/C124914333/page/n108","statement_kind":"finding","subject_label":"Laundry Building","summary":"The report says the Laundry Building is the most questionable support building because of rusted structural steel joists.","property":"finding","value_text":"rusted structural steel joists","t_from":"1994","quote":"The Laundry Building, with its rusted structural steel joists due to the Laundry’s high internal humidity is the most questionable.","place_label":"Laguna Honda Hospital campus","anchor":"s-20a9a61fddbe","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"SUPPORT BUILDINGS None of the remaining buildings"},{"claim_id":"c:26e97c2a066330afb6eff1825fb200b7","page_id":"C124914333:109","page_url":"https://archive.org/details/C124914333/page/n108","statement_kind":"finding","subject_label":"Asbestos assessment","summary":"The City commissioned Clayton Environmental Consultants, Inc. to investigate asbestos containing materials at the Hospital.","property":"event","value_text":"commissioned asbestos assessment","date_printed":"January 1990","t_from":"1990","quote":"In January of 1990 the City commissioned Clayton Environmental Consultants, Inc. to investigate asbestos containing materials at the Hospital.","place_label":"Laguna Honda Hospital","place_precision":"building","place_id":"qipu:sf/place/institution/laguna-honda-hospital-5d7f7a","resolved_by":"place links file","anchor":"s-26e97c2a0663","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"In January of 1990 the City commissioned Clayton"},{"claim_id":"c:49948d87124076c061f8c9a3eb7ab072","page_id":"C124914333:109","page_url":"https://archive.org/details/C124914333/page/n108","statement_kind":"finding","subject_label":"Asbestos removal and replacement cost","summary":"Removal and replacement of asbestos containing materials was estimated at up to $4 million (≈ $9.1 million in 2026 dollars) for construction only.","property":"cost_usd","value_text":"up to $4 million","value_num":4000000.0,"unit":"USD","t_from":"1994","quote":"Removal and replacement of asbestos containing materials was estimated at up to $4 million for construction only.","place_label":"Laguna Honda Hospital","place_precision":"building","place_id":"qipu:sf/place/institution/laguna-honda-hospital-5d7f7a","resolved_by":"place links file","anchor":"s-49948d871240","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"quotes_to_report","speaker_evidence":"Removal and replacement of asbestos containing materials was estimated"},{"claim_id":"c:4b0c341c12220b500eb5a0cb543eea24","page_id":"C124914333:109","page_url":"https://archive.org/details/C124914333/page/n108","statement_kind":"proposal","subject_label":"Ancillary support buildings","summary":"The report says reconstruction or replacement of the ancillary buildings should be considered.","property":"proposes","value_text":"reconstruction or replacement","t_from":"1994","quote":"Consideration should be given to their reconstruction or replacement.","place_label":"Laguna Honda Hospital campus","anchor":"s-4b0c341c1222","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Consideration should be given to their reconstruction or replacement."},{"claim_id":"c:5f3b18ac3e07ba8000ce91883b34f3ca","page_id":"C124914333:109","page_url":"https://archive.org/details/C124914333/page/n108","statement_kind":"finding","subject_label":"Ancillary support buildings","summary":"The report says all ancillary buildings are past their useful life and are being patched as funds become available.","property":"finding","value_text":"past useful life","t_from":"1994","quote":"All of the ancillary buildings are past their useful life and are continuing to be patched on \"as funds become available\" basis.","place_label":"Laguna Honda Hospital campus","anchor":"s-5f3b18ac3e07","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"All of the ancillary buildings are past their useful life"},{"claim_id":"c:cd0254f27b585a38835817412ade3be8","page_id":"C124914333:109","page_url":"https://archive.org/details/C124914333/page/n108","statement_kind":"finding","subject_label":"Asbestos abatement cost","summary":"Preliminary estimates put asbestos abatement measures at up to $3 million (≈ $6.8 million in 2026 dollars) for construction only.","property":"cost_usd","value_text":"up to $3 million","value_num":3000000.0,"unit":"USD","t_from":"1994","quote":"Their preliminary cost estimates for abatement measures total up to $3 million for construction only.","place_label":"Laguna Honda Hospital","place_precision":"building","place_id":"qipu:sf/place/institution/laguna-honda-hospital-5d7f7a","resolved_by":"place links file","anchor":"s-cd0254f27b58","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"quotes_to_report","speaker_evidence":"Their preliminary cost estimates for abatement measures"},{"claim_id":"c:35685717da91313225f114ea2ff560b7","page_id":"C124914333:189","page_url":"https://archive.org/details/C124914333/page/n188","statement_kind":"proposal","subject_label":"Woodside Drive access","summary":"The plan proposes upgrading the existing one-way access at Woodside Drive to a second entry and exit with a signal.","property":"proposes","value_text":"upgrade Woodside Drive access","t_from":"1994","quote":"the existing one-way access at Woodside Drive would be upgraded, a signal would be provided and this road would serve as a second entry and exit","place_label":"Woodside Drive","anchor":"s-35685717da91","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"The first phase of the proposed development at Laguna Honda is planned"},{"claim_id":"c:652bf586152fa41aaf4d58c86cae6edb","page_id":"C124914333:189","page_url":"https://archive.org/details/C124914333/page/n188","statement_kind":"proposal","subject_label":"New Laundry Facility location","summary":"The plan proposes locating the new Laundry Facility at the eastern edge of the sloping site along the new service drive.","property":"proposes","value_text":"eastern edge of sloping site","t_from":"1994","quote":"The proposed location of the new Laundry Facility is at the eastern edge of the sloping site along the new service drive.","place_label":"eastern edge of Laguna Honda site","anchor":"s-652bf586152f","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"PROPOSED MEASURES TO LESSEN IMPACT"},{"claim_id":"c:f888c9d71ed9dff5a0bd5510ab8aeec2","page_id":"C124914333:189","page_url":"https://archive.org/details/C124914333/page/n188","statement_kind":"proposal","subject_label":"Replacement hospital height","summary":"The recommended alternative would make the Hospital seven stories tall without exceeding the top elevation of the remaining existing buildings.","property":"stories","value_text":"seven stories","value_num":7.0,"unit":"stories","t_from":"1994","quote":"The Hospital can therefore be seven stories tall while not exceeding the top elevation of the existing buildings which remain.","place_label":"Laguna Honda Hospital site","place_precision":"building","place_id":"qipu:sf/place/institution/laguna-honda-hospital-5d7f7a","resolved_by":"place links file","anchor":"s-f888c9d71ed9","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"The recommended development alternative for the replacement of Laguna Honda Hospital respects the character"},{"claim_id":"c:059dda0be225437c52cc1a5a8aae9280","page_id":"C124914333:199","page_url":"https://archive.org/details/C124914333/page/n198","statement_kind":"finding","subject_label":"Alternate A cost ranking","summary":"The plan finds Alternate A was the least desirable of the three alternates studied.","property":"finding","value_text":"least desirable of three alternates","t_from":"1994","quote":"Alternate A was determined in the evaluation process to be the least desirable of the three alternates.","anchor":"s-059dda0be225","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Alternate A was determined in the evaluation process to be the least desirable"},{"claim_id":"c:1bcd5eb9c1140bbd420d69d4e805045d","page_id":"C124914333:199","page_url":"https://archive.org/details/C124914333/page/n198","statement_kind":"proposal","subject_label":"Alternate B replacement hospital height","summary":"The plan says the Alternate B replacement hospital would rise 4 stories above the existing building.","property":"stories","value_text":"4 stories above existing building","value_num":4.0,"unit":"stories","t_from":"1994","quote":"The Replacement Hospital rises 4 stories above existing building, obstructing neighborhood views and engendering community opposition","anchor":"s-1bcd5eb9c114","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"The primary disadvantages of Alternate B are as follows"},{"claim_id":"c:b00ae85e6b7bb22dfd75513fc745495e","page_id":"C124914333:199","page_url":"https://archive.org/details/C124914333/page/n198","statement_kind":"proposal","subject_label":"Alternate B construction duration","summary":"The plan estimates Alternate B construction would take seven and [name withheld] years.","property":"other","value_text":"seven and [name withheld] years","value_num":7.5,"unit":"years","t_from":"1994","quote":"The projected construction period was seven and [name withheld] years. Alternate B provides almost complete replacement of existing hospital facilities over four construction phases.","anchor":"s-b00ae85e6b7b","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"The projected construction period was seven and one half years."},{"claim_id":"c:c052ea00e1bbd34b05980db8f470bcd8","page_id":"C124914333:199","page_url":"https://archive.org/details/C124914333/page/n198","statement_kind":"proposal","subject_label":"Alternate B construction cost estimate","summary":"The plan estimates Alternate B would cost $344,400,000 (≈ $827.1 million in 2026 dollars) in 1992 dollars, or $574,000,000 (≈ $1.4 billion in 2026 dollars) with escalation.","property":"cost_usd","value_text":"$344,400,000 (1992 dollars)","value_num":344400000.0,"unit":"USD","date_printed":"1992","t_from":"1992","quote":"The estimated construction cost for Alternate B in 1992 dollars was $344,400,000 and with escalation would have been $574,000,000.","anchor":"s-c052ea00e1bb","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"The estimated construction cost for Alternate B in 1992 dollars was"}]}