{"note":"Statements read from one scanned government report in the IGS library collection on the Internet Archive. Each statement has a verbatim quote found on its page (quote, page_url). The summary and subject_label of each statement were written by a model (Claude Haiku 5.5) and can be wrong: read the page before quoting. At most 20 selected pages of a report were read. Keys are the column names of the tables igs_reports and igs_claims; a column that is null for a statement is left out, and columns with one value for every statement of this report are given once under same_for_every_statement. \"[name withheld]\" stands where the release withholds a name; the site's page guard withholds a few more in reports after 1951, so a cell here can differ from the table; for a few reports prepared_by and creator are left out. A statement's links to the Board record are under links (show_target_kind: decision, instrument or ballot measure; show_target_id; show_url); they replace the table's decision_id and instrument_id, which are left out. place_id, place_label and place_precision come from a corrected place match where there is one. part, speaker, speaker_role, stance and speaker_evidence say who is speaking: a model (Claude Haiku 5.5) read each page and its context and can be wrong. part: main_text, attachment, appendix, letter, comment, response, table or cover_or_contents; speaker: issuer, another_body, letter_writer or unclear; speaker_role: a role or organisation, never a personal name; stance: own_position, quotes_to_dispute, quotes_to_report, restates_to_reject or unclear. The report page shows a statement only when speaker is issuer, part is main_text or appendix, and stance is own_position or quotes_to_report; hidden gives the part, the speaker or the stance of the others. ","release":"v0.9.2","licence":"CC0-1.0","slug":"c124914494","url":"https://data.qipu.org/usa/san-francisco/reports/c124914494/","statement_url":"https://data.qipu.org/usa/san-francisco/reports/c124914494/#{anchor}","tables":{"igs_reports":"https://tiles.qipu.org/data/releases/v0.9.2/parquet/igs_reports.parquet","igs_claims":"https://tiles.qipu.org/data/releases/v0.9.2/parquet/igs_claims.parquet"},"report":{"report_id":"C124914494","source_id":"C124914494","title":"Transit terminal study","year":1993,"n_pages":114,"creator":null,"source_url":"https://archive.org/details/C124914494","issuer":"City and County of San Francisco, Planning Department","issuer_type":"government","gov_level":"city_county","prepared_by":"Korve Engineering, Crosby Hemlich Architects, Turner Construction","doc_kind":"study","jurisdiction":"San Francisco","jurisdiction_id":"sf","city":"sf","issuer_by":"model","doc_kind_by":"model","jurisdiction_by":"model","run_id":"igs-labels-rules+haiku55-cli-2026-10-23"},"pages_with_statements":12,"statements_total":37,"statements_by_kind":{"finding":7,"proposal":27,"cites_decision":1,"background":2},"same_for_every_statement":{"source_id":"C124914494","source_url":"https://archive.org/details/C124914494","source_label":"IGS library: Transit terminal study","report_year":1993,"issuer":"City and County of San Francisco, Planning Department","issuer_type":"government","doc_kind":"study","t_precision":"year","status":"extracted","claim_kind":"observation","extraction_table":"igs_claims","run_id":"igs-sf-pages-v2-haiku55-batch-2026-10-23","city":"sf","prompt_version":"igs-page-v2-2026-10-23"},"summary":{"what":"A study by the Planning Department comparing transit terminal alternatives, recommending a new terminal at Main/Beale over upgrading the existing Transbay Terminal.","next":"In February 2001 the Board adopted, as amended, a resolution to form a joint powers agency for a new Transbay Terminal transit facility.","next_decision":"qipu:sf/decision/meetingminutesjanapr96sanfrich:171/1","figures":[{"label":"Cost","value":"$101 million for Alternative B","claim_ids":["c:27a1655c9b654a7cfb36617131f842a6"]},{"label":"Passengers","value":"more than 31,000 daily in 1992","claim_ids":["c:05ef134f49ce0e3e25ddbce4bb00a0d0"]},{"label":"Bus operators","value":"12 at the Terminal","claim_ids":["c:f276bc2bf31de5c3911828a5212704d3"]},{"label":"Basic upgrade cost","value":"about $36 million","page_url":"https://archive.org/details/C124914494/page/n20","quote":"The current estimated cost for the basic upgrades is about $36 million."}],"main_points":["c:536e5e510bf5dfa49bda760b7fc48e94","c:2d6d5d0967a6809047573b9d71c9d0cc","c:305eae31452bc240458702ec7bc1821c"],"board_decisions_after":["qipu:sf/decision/meetingminutesjanapr96sanfrich:171/1","qipu:sf/decision/journalofproceed91sanfrich|156","qipu:sf/decision/journalofproceed91sanfrich|158","qipu:sf/decision/journalofproceedjanapr92sanfrich:227/5","qipu:sf/decision/journalofmayaugproceed92sanfrich:32/3","qipu:sf/decision/meetingminutesjanapr96sanfrich:149/4","qipu:sf/decision/meetingminutesbo2001sanf:169/1"],"board_decisions_before":["qipu:sf/decision/journalofseptdecproceed89sanfrich:241/3"],"made_by":"A model (Claude Haiku 5.5) wrote the lead and picked the figures, main points and later Board decisions from the statements, from a second reading of the report's summary and cost pages, and from Board decisions dated 3 years before to 10 years after the report; every number it wrote was checked against them, and a figure must be about the report's own area or project."},"statements":[{"claim_id":"c:1c16fb2ba9b9fbe38907e9a0b03ba711","page_id":"C124914494:12","page_url":"https://archive.org/details/C124914494/page/n11","statement_kind":"proposal","subject_label":"Cost of Alternative A","summary":"The study estimates that implementing Alternative A would cost $79 million (≈ $184.2 million in 2026 dollars).","property":"cost_usd","value_text":"$79 million","value_num":79000000.0,"unit":"USD","t_from":"1993","quote":"The estimated cost to implement Alternative A would be $79 million.","place_label":"Transbay Transit Terminal","anchor":"s-1c16fb2ba9b9","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Staff Recommendations; The estimated cost to implement Alternative A"},{"claim_id":"c:27a1655c9b654a7cfb36617131f842a6","page_id":"C124914494:12","page_url":"https://archive.org/details/C124914494/page/n11","statement_kind":"proposal","subject_label":"Cost of Alternative B","summary":"The study estimates that implementing Alternative B would cost $101 million (≈ $235.5 million in 2026 dollars).","property":"cost_usd","value_text":"$101 million","value_num":101000000.0,"unit":"USD","t_from":"1993","quote":"The estimated cost to implement Alternative B would be $101 million.","place_label":"Main/Beale","place_precision":"intersection","place_id":"qipu:sf/place/street/main-st","resolved_by":"place links file","anchor":"s-27a1655c9b65","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Staff Recommendations; The estimated cost to implement Alternative B"},{"claim_id":"c:536e5e510bf5dfa49bda760b7fc48e94","page_id":"C124914494:12","page_url":"https://archive.org/details/C124914494/page/n11","statement_kind":"proposal","subject_label":"Alternative B, new terminal at Main/Beale","summary":"The staff recommends Alternative B, which sites a new transit terminal at Main/Beale.","property":"proposes","value_text":"Alternative B","t_from":"1993","quote":"Alternative B, which sites a new transit terminal at Main/Beale and creates opportunities for development of new land uses at the existing Transbay Transit Terminal site, has excellent potential","place_label":"Main/Beale","place_precision":"intersection","place_id":"qipu:sf/place/street/main-st","resolved_by":"place links file","anchor":"s-536e5e510bf5","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Staff Recommendations; Alternative B, which sites a new transit terminal"},{"claim_id":"c:890dfb8911d1b048935a7eccdd2de7f6","page_id":"C124914494:12","page_url":"https://archive.org/details/C124914494/page/n11","statement_kind":"proposal","subject_label":"Preliminary ranking of alternatives","summary":"Staff's preliminary evaluation gives a ranking of alternatives for meeting future transit needs.","property":"recommendation","value_text":"ranking of alternatives","t_from":"1993","quote":"Preliminary evaluation indicates the following ranking of alternatives for meeting future transit needs:","anchor":"s-890dfb8911d1","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Staff Recommendations; Preliminary evaluation indicates the following ranking"},{"claim_id":"c:8d25a0ac7f0d03b4e99d62fcceef12bb","page_id":"C124914494:12","page_url":"https://archive.org/details/C124914494/page/n11","statement_kind":"proposal","subject_label":"Cost of Alternative X","summary":"The study estimates that implementing Alternative X would cost $93 million (≈ $216.9 million in 2026 dollars).","property":"cost_usd","value_text":"$93 million","value_num":93000000.0,"unit":"USD","t_from":"1993","quote":"The estimated cost to implement Alternative X would be $93 million.","place_label":"Transbay Transit Terminal","anchor":"s-8d25a0ac7f0d","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Alternative X, which modifies the existing Terminal"},{"claim_id":"c:e0366f4eb01b48dd7385af103467b5aa","page_id":"C124914494:12","page_url":"https://archive.org/details/C124914494/page/n11","statement_kind":"finding","subject_label":"Land acquisition","summary":"The study says some land acquisition would be needed for either Alternative A or B.","property":"other","value_text":"land acquisition needed","t_from":"1993","quote":"Some land acquisition would be needed for either Alternative A or B.","anchor":"s-e0366f4eb01b","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Some land acquisition would be needed for either Alternative A or B."},{"claim_id":"c:05ef134f49ce0e3e25ddbce4bb00a0d0","page_id":"C124914494:13","page_url":"https://archive.org/details/C124914494/page/n12","statement_kind":"finding","subject_label":"Daily passengers at the Terminal","summary":"In 1992 more than 31,000 passengers used the Terminal and nearby streets daily.","property":"population","value_text":"more than 31,000 passengers","value_num":31000.0,"unit":"persons","date_printed":"1992","t_from":"1992","quote":"in 1992 more than 31,000 passengers used the Terminal and the streets around the Terminal daily.","place_label":"Transbay Transit Terminal","anchor":"s-05ef134f49ce","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"quotes_to_report","speaker_evidence":"According to the staff working paper of the Transit Needs Study, in 1992 more than 31,000 passengers"},{"claim_id":"c:6825f260ade4002e99a67b9988ee9499","page_id":"C124914494:13","page_url":"https://archive.org/details/C124914494/page/n12","statement_kind":"background","subject_label":"Transbay Transit Terminal construction","summary":"The Transbay Transit Terminal and its ramp system were completed in 1939 as part of the Bay Bridge construction.","property":"built_year","value_text":"1939","value_num":1939.0,"date_printed":"1939","t_from":"1939","quote":"The Transbay Transit Terminal (Terminal) and its adjoining ramp system were completed in 1939 as part of the construction of the Bay Bridge.","place_label":"Transbay Transit Terminal","anchor":"s-6825f260ade4","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"II. EXISTING TRANSBAY TRANSIT TERMINAL OPERATIONS Background"},{"claim_id":"c:f276bc2bf31de5c3911828a5212704d3","page_id":"C124914494:13","page_url":"https://archive.org/details/C124914494/page/n12","statement_kind":"finding","subject_label":"Bus operators at the Terminal","summary":"Twelve commute, non-commute and tour bus operators currently use the Terminal building.","property":"other","value_text":"12 bus operators","value_num":12.0,"t_from":"1993","quote":"Currently there are 12 commute, non-commute and tour bus operators using the Terminal building.","place_label":"Transbay Transit Terminal","anchor":"s-f276bc2bf31d","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Existing conditions Currently there are 12 commute, non-commute"},{"claim_id":"c:305eae31452bc240458702ec7bc1821c","page_id":"C124914494:21","page_url":"https://archive.org/details/C124914494/page/n20","statement_kind":"finding","subject_label":"Cost of basic Terminal upgrades","summary":"The current estimated cost for the basic upgrades to the Terminal is about 36 million dollars.","property":"cost_usd","value_text":"about $36 million","value_num":36000000.0,"unit":"USD","t_from":"1993","quote":"The current estimated cost for the basic upgrades is about $36 million.","place_label":"Transbay Transit Terminal","anchor":"s-305eae31452b","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the Planning Department","stance":"own_position","speaker_evidence":"Ill. BACKGROUND A. BACKGROUND TO TRANSBAY TERMINAL"},{"claim_id":"c:528b9cd20361b72db04295db4a5ecaed","page_id":"C124914494:21","page_url":"https://archive.org/details/C124914494/page/n20","statement_kind":"finding","subject_label":"Transbay Transit Terminal seismic upgrades","summary":"The OSA study released in 1992 concluded that the Terminal building needed substantial upgrades to meet current seismic and other codes.","property":"finding","value_text":"substantial upgrades needed","date_printed":"1992","t_from":"1992","quote":"The OSA study released in 1992 concluded that the Terminal building needed substantial upgrades to meet current seismic and other fire/life/safety codes.","place_label":"Transbay Transit Terminal","anchor":"s-528b9cd20361","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the Planning Department","stance":"quotes_to_report","speaker_evidence":"The OSA study released in 1992 concluded that"},{"claim_id":"c:8ab1d1ce6515bebb5f16a1d10fd8a8bf","page_id":"C124914494:21","page_url":"https://archive.org/details/C124914494/page/n20","statement_kind":"background","subject_label":"Terminal Separator Structure","summary":"The Terminal Separator provided an elevated connection between I-80 and the Embarcadero Freeway before the earthquake damaged it.","property":"other","t_from":"1993","quote":"The Terminal Separator provided an elevated connection between I-80 and the Embarcadero Freeway prior to being damaged by the earthquake.","place_label":"Terminal Separator Structure","anchor":"s-8ab1d1ce6515","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the Planning Department","stance":"own_position","speaker_evidence":"Following the October 1989 Loma Prieta earthquake"},{"claim_id":"c:c68954bbe485388be0db1a1653985e5f","page_id":"C124914494:21","page_url":"https://archive.org/details/C124914494/page/n20","statement_kind":"cites_decision","subject_label":"Board resolution on Terminal alternatives","summary":"The Board of Supervisors unanimously passed a resolution requesting that Caltrans study alternatives to rehabilitation of the Terminal.","property":"other","value_text":"resolution passed unanimously","date_printed":"March 22, 1993","t_from":"1993","quote":"On March 22, 1993, the San Francisco Board of Supervisors (Board), at the request of the Mayor, unanimously passed a resolution requesting that Caltrans work with the City to study alternatives","place_label":"Transbay Transit Terminal","anchor":"s-c68954bbe485","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the Planning Department","stance":"own_position","speaker_evidence":"In response to the City's request, Caltrans agreed"},{"claim_id":"c:625974ce930d1ba7aba2beb85c2444b8","page_id":"C124914494:27","page_url":"https://archive.org/details/C124914494/page/n26","statement_kind":"proposal","subject_label":"Bus service growth projection","summary":"The Transit Needs Study projects that bus service to the Terminal may increase by 60 percent over the next twenty years.","property":"other","value_text":"60 percent","value_num":60.0,"unit":"percent","date_printed":"next twenty years","t_from":"1993","quote":"bus service to the Terminal may increase by 60 percent over the next twenty years, and the number of passengers using the Terminal facility may almost double over the same period.","place_label":"Transbay Transit Terminal","anchor":"s-625974ce930d","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"In general, the staff working paper of the Transit Needs Study projects that bus service"},{"claim_id":"c:aab849c7c39bcf274d41e82a9f83d5db","page_id":"C124914494:27","page_url":"https://archive.org/details/C124914494/page/n26","statement_kind":"proposal","subject_label":"AC Transit bus berth need","summary":"Based on Transit Needs Study projections, AC Transit would require forty bus berths on the third floor deck.","property":"other","value_text":"forty bus berths","value_num":40.0,"unit":"units","t_from":"1993","quote":"Based on projections in the Transit Needs Study, AC Transit would require forty bus berths on the third floor deck.","place_label":"Third floor deck of Transbay Transit Terminal","anchor":"s-aab849c7c39b","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Based on projections in the Transit Needs Study, AC Transit would require forty bus berths"},{"claim_id":"c:02cdef62fedadbbc263e249d166aed16","page_id":"C124914494:30","page_url":"https://archive.org/details/C124914494/page/n29","statement_kind":"proposal","subject_label":"Alternative X effect on rail","summary":"Alternative X would foreclose the possibility of direct Caltrain or other rail service into the Terminal.","property":"alternative","value_text":"forecloses direct rail service","t_from":"1993","quote":"Alternative X would foreclose the possibility of direct Caltrain or other rail service into the Terminal.","place_label":"Transbay Transit Terminal","anchor":"s-02cdef62feda","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the Planning Department","stance":"own_position","speaker_evidence":"The present report focuses on development of an alternative"},{"claim_id":"c:8029ce2aa981c920260aa9ef199cf7d1","page_id":"C124914494:30","page_url":"https://archive.org/details/C124914494/page/n29","statement_kind":"proposal","subject_label":"Underground rail station site","summary":"An extension of Caltrain or high speed rail could be accommodated in an underground station under Howard Street and private property.","property":"proposes","value_text":"underground rail station","t_from":"1993","quote":"An extension of Caltrain and/or high speed rail could be accommodated in a separate underground rail station located underneath Howard Street and private property between Natoma and Howard Streets.","place_label":"Howard Street between Natoma and Howard Streets","place_precision":"street_segment","place_id":"qipu:sf/place/street/howard-st","resolved_by":"place links file","anchor":"s-8029ce2aa981","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the Planning Department","stance":"own_position","speaker_evidence":"An extension of Caltrain and/or high speed rail could be accommodated"},{"claim_id":"c:c4a6232e6be5d795f558db9d7e9cf84a","page_id":"C124914494:30","page_url":"https://archive.org/details/C124914494/page/n29","statement_kind":"proposal","subject_label":"Alternative X terminal modification","summary":"Alternative X would retain the existing Terminal facade and reconfigure the bus deck from three lanes to four lanes.","property":"alternative","value_text":"Alternative X","t_from":"1993","quote":"Alternative X would basically retain the existing Terminal building facade and create additional space for buses by reconfiguring the existing bus deck.","place_label":"Transbay Transit Terminal","anchor":"s-c4a6232e6be5","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the Planning Department","stance":"own_position","speaker_evidence":"Alternative X would basically retain the existing Terminal building facade"},{"claim_id":"c:d8067e3dd9d242a243be6d48702514d6","page_id":"C124914494:30","page_url":"https://archive.org/details/C124914494/page/n29","statement_kind":"proposal","subject_label":"Alternative X cost","summary":"Construction costs for a modified Terminal under Alternative X would be an estimated 93 million dollars.","property":"cost_usd","value_text":"an estimated $93 million","value_num":93000000.0,"unit":"USD","t_from":"1993","quote":"Construction costs would be an estimated $93 million for a modified Terminal (see Appendix B).","place_label":"Transbay Transit Terminal","anchor":"s-d8067e3dd9d2","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the Planning Department","stance":"own_position","speaker_evidence":"Construction costs would be an estimated $93 million"},{"claim_id":"c:2d6d5d0967a6809047573b9d71c9d0cc","page_id":"C124914494:59","page_url":"https://archive.org/details/C124914494/page/n58","statement_kind":"proposal","subject_label":"Alternative A construction complexity","summary":"The study says Alternative A, with a new terminal and land uses stacked above, may be a complicated project needing about thirty months.","property":"other","value_text":"thirty months","value_num":30.0,"t_from":"1993","quote":"Alternative A, with a new transit terminal and other land uses stacked above, may be a complicated construction project and would require approximately thirty months.","anchor":"s-2d6d5d0967a6","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Alternative A, with a new transit terminal and other land uses stacked above"},{"claim_id":"c:5025207ca8d602d3a8545eceb437f47a","page_id":"C124914494:59","page_url":"https://archive.org/details/C124914494/page/n58","statement_kind":"proposal","subject_label":"Modified Terminal (Alternative X) completion","summary":"The study says a modified Terminal under Alternative X could be completed in the second half of 1997.","property":"other","value_text":"second half of 1997","date_printed":"second half of 1997","t_from":"1997","quote":"the earliest that a modified Terminal (Alternative X) could be completed would be in the second half of 1997","place_label":"existing Terminal","anchor":"s-5025207ca8d6","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"the earliest that a modified Terminal (Alternative X) could be completed would be in the second half of 1997"},{"claim_id":"c:a9a7cd885f6fbf7cd041ff40da1533bb","page_id":"C124914494:59","page_url":"https://archive.org/details/C124914494/page/n58","statement_kind":"proposal","subject_label":"New transit terminal delivery for Alternatives A or B","summary":"The study projects a new transit terminal under Alternative A or B could be delivered between early 1999 and early 2000.","property":"other","value_text":"between early 1999 and early 2000","date_printed":"1999 to 2000","t_from":"1999","quote":"a new transit terminal for Alternative A or B could be delivered between early 1999 and early 2000","anchor":"s-a9a7cd885f6f","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"a new transit terminal for Alternative A or B could be delivered between early 1999 and early 2000"},{"claim_id":"c:c5e2efcab349caf2cd081c0737941d5c","page_id":"C124914494:59","page_url":"https://archive.org/details/C124914494/page/n58","statement_kind":"proposal","subject_label":"Alternative B construction schedule","summary":"The study estimates Alternative B would take twenty-six months to complete construction.","property":"other","value_text":"twenty-six months","value_num":26.0,"t_from":"1993","quote":"Alternative B is estimated to take twenty-six months to complete construction.","anchor":"s-c5e2efcab349","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Alternative B is estimated to take twenty-six months to complete construction."},{"claim_id":"c:ed35cf8f43e107b87c3c11b21eab0893","page_id":"C124914494:59","page_url":"https://archive.org/details/C124914494/page/n58","statement_kind":"proposal","subject_label":"Alternative X schedule","summary":"The study estimates Alternative X would take twenty-six months for construction.","property":"other","value_text":"twenty-six months","value_num":26.0,"t_from":"1993","quote":"Alternative X, which would require major modifications to the existing Terminal, is estimated to take twenty-six months for construction.","place_label":"existing Terminal","anchor":"s-ed35cf8f43e1","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Alternative X, which would require major modifications to the existing Terminal"},{"claim_id":"c:229b44831800506c8c579a0254527a5b","page_id":"C124914494:73","page_url":"https://archive.org/details/C124914494/page/n72","statement_kind":"proposal","subject_label":"Underground AC Transit bus terminal","summary":"The design proposes an underground bus terminal on the block bounded by Mission, First, Natoma and Beale Streets.","property":"proposes","value_text":"underground bus terminal","t_from":"1993","quote":"An underground bus terminal located on the block bounded by Mission, First, Natoma, and Beale Streets for AC Transit, Amtrak, Gray Line Sacramento Commute service","place_label":"Block bounded by Mission, First, Natoma, and Beale Streets","place_precision":"area","anchor":"s-229b44831800","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"Planning Department","stance":"own_position","speaker_evidence":"The design for the new Transbay Terminal at this site will include the following features"},{"claim_id":"c:cc56c1b1b8b8773149204d848af5a649","page_id":"C124914494:73","page_url":"https://archive.org/details/C124914494/page/n72","statement_kind":"proposal","subject_label":"Natoma Street realignment","summary":"Natoma Street would be realigned to Howard Street.","property":"other","value_text":"realigned to Howard Street","t_from":"1993","quote":"Natoma street will be realigned to Howard Street.","place_label":"Natoma Street","place_precision":"street","place_id":"qipu:sf/place/street/natoma-st","resolved_by":"place links file","anchor":"s-cc56c1b1b8b8","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"Planning Department","stance":"own_position","speaker_evidence":"Bus access to this terminal will be provided by an exclusive bus ramp"},{"claim_id":"c:ce3ab1f9967a93d493dc699a0674a05f","page_id":"C124914494:73","page_url":"https://archive.org/details/C124914494/page/n72","statement_kind":"proposal","subject_label":"Underground terminal bus bays","summary":"The underground terminal would have 44 bus bays and 7 bus platforms.","property":"other","value_text":"44 bus bays","value_num":44.0,"t_from":"1993","quote":"This terminal will have a total of 7 bus platforms and 44 bus bays.","anchor":"s-ce3ab1f9967a","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"Planning Department","stance":"own_position","speaker_evidence":"Underground AC Transit Terminal. This terminal will have a total of 7 bus platforms"},{"claim_id":"c:0f0ce96a03ddfc1e4e033de18721f05c","page_id":"C124914494:77","page_url":"https://archive.org/details/C124914494/page/n76","statement_kind":"proposal","subject_label":"Above-ground AC Transit terminal","summary":"The Alternative B terminal would have 40 bus bays on five bus platforms.","property":"other","value_text":"40 bus bays","value_num":40.0,"t_from":"1993","quote":"This terminal will have a total of 5 bus platforms and 40 bus bays.","place_label":"Mission, Beale, Folsom, and Main Streets blocks","place_precision":"area","place_id":"qipu:sf/place/hood/mission","resolved_by":"place links file","anchor":"s-0f0ce96a03dd","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Above ground AC Transit Terminal. This terminal will have a total of 5 bus platforms"},{"claim_id":"c:03c2fff94c8f3633de56f27dd407959f","page_id":"C124914494:78","page_url":"https://archive.org/details/C124914494/page/n77","statement_kind":"proposal","subject_label":"Greyhound and intercity bus terminal","summary":"The mezzanine would accommodate 20 intercity bus bays.","property":"other","value_text":"20 bus bays","value_num":20.0,"t_from":"1993","quote":"A total of 20 bus bays could be accommodated.","place_label":"Mezzanine level of the Alternative B terminal","anchor":"s-03c2fff94c8f","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Greyhound and Other Intercity Transit Terminal"},{"claim_id":"c:d425706601051c3dc0efc9b367d84df8","page_id":"C124914494:82","page_url":"https://archive.org/details/C124914494/page/n81","statement_kind":"proposal","subject_label":"Alternative A bus capacity","summary":"The new terminal would have twice as many bus bays as the existing terminal.","property":"other","value_text":"twice as many bus bays","t_from":"1993","quote":"The new terminal will have twice as many bus bays as the existing terminal.","place_label":"Existing Transbay Terminal site","anchor":"s-d42570660105","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Opportunities and Constraints. This section presents opportunities and constraints"},{"claim_id":"c:e0ad718b2fac1f746217baa869ad0a29","page_id":"C124914494:82","page_url":"https://archive.org/details/C124914494/page/n81","statement_kind":"proposal","subject_label":"Underground parking garage","summary":"An underground parking garage could be built on the southeast section of the block bounded by First, Howard, Second and Mission Streets.","property":"proposes","value_text":"underground parking garage","t_from":"1993","quote":"Underground parking garage could be constructed on the southeast section of the block bounded by First, Howard, Second, and Mission Streets.","place_label":"Block bounded by First, Howard, Second, and Mission Streets","place_precision":"area","anchor":"s-e0ad718b2fac","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Opportunities. It provides an opportunity to expand the Transbay Terminal"},{"claim_id":"c:b560e6c82bf5e2ce0e81085af4ceea40","page_id":"C124914494:88","page_url":"https://archive.org/details/C124914494/page/n87","statement_kind":"proposal","subject_label":"Bus aisles and bus bays","summary":"The study specifies standard bus bays of 65 feet and articulated bus bays of 85 feet.","property":"other","value_text":"65 feet standard, 85 feet articulated","value_num":65.0,"unit":"ft","t_from":"1993","quote":"Bus Aisles: 25 feet minimum fe) Bus Bays - Standard buses: 65 feet long - Articulated buses: 85 feet long","anchor":"s-b560e6c82bf5","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"Planning Department","stance":"own_position","speaker_evidence":"Bus Aisle and Bus Bays"},{"claim_id":"c:d2b9abd443bb42de852a2ad2b03b35ed","page_id":"C124914494:88","page_url":"https://archive.org/details/C124914494/page/n87","statement_kind":"proposal","subject_label":"Bus platform width and fixtures","summary":"The study specifies a bus platform 20 feet wide with space for escalator, stairway and elevator.","property":"other","value_text":"20 feet wide","value_num":20.0,"unit":"ft","t_from":"1993","quote":"Bus Platform: 20 feet wide. Space for one 11 foot wide double, or 5’6\" wide single escalator, one 9 foot wide stairway","anchor":"s-d2b9abd443bb","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"Planning Department","stance":"own_position","speaker_evidence":"Bus Aisle and Bus Bays"},{"claim_id":"c:1eb6d2a045cfbf1dc0d8e82861ada251","page_id":"C124914494:110","page_url":"https://archive.org/details/C124914494/page/n109","statement_kind":"proposal","subject_label":"Alternative B new transit terminal","summary":"The cost estimate gives Alternative B a total direct construction cost of 76,681,875 dollars.","property":"cost_usd","value_text":"76,681,875","value_num":76681875.0,"unit":"USD","t_from":"1993","quote":"TOTAL DIRECT CONSTRUCTION COST pee NS] 76,681,875 Owner’s Contingency, Design, Construction Management","place_label":"Main/Beale site","place_precision":"intersection","place_id":"qipu:sf/place/street/main-st","resolved_by":"place links file","anchor":"s-1eb6d2a045cf","shown":false,"hidden":"table","part":"table","speaker":"issuer","speaker_role":"Planning Department","stance":"own_position","speaker_evidence":"TOTAL DIRECT CONSTRUCTION COST"},{"claim_id":"c:d34c0579b13ec16e3145487b7d86bf90","page_id":"C124914494:110","page_url":"https://archive.org/details/C124914494/page/n109","statement_kind":"proposal","subject_label":"Alternative B new transit terminal","summary":"The cost estimate gives Alternative B a grand total of 101,167,343 dollars.","property":"cost_usd","value_text":"101,167,343","value_num":101167343.0,"unit":"USD","t_from":"1993","quote":"RAMP DEMOLITION, CONSTRUCTION CONTINGENCY a 10,630,000 AND RELATED COSTS: +50 % 13,855,468 101,167,343","place_label":"Main/Beale site","place_precision":"intersection","place_id":"qipu:sf/place/street/main-st","resolved_by":"place links file","anchor":"s-d34c0579b13e","shown":false,"hidden":"table","part":"table","speaker":"issuer","speaker_role":"Planning Department","stance":"own_position","speaker_evidence":"RAMP DEMOLITION, CONSTRUCTION CONTINGENCY"},{"claim_id":"c:dafef76e16bd2a38253f1dc9cbaf0052","page_id":"C124914494:110","page_url":"https://archive.org/details/C124914494/page/n109","statement_kind":"finding","subject_label":"Historic preservation costs","summary":"The cost estimate does not include any costs for historic preservation impacts.","property":"other","value_text":"not included","t_from":"1993","quote":"Notes to Alternative B: We have not included any costs for historic preservation impacts.","anchor":"s-dafef76e16bd","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"Planning Department","stance":"own_position","speaker_evidence":"Notes to Alternative B: We have not included"},{"claim_id":"c:e99f6d07501a4305fc57464f64f7a42f","page_id":"C124914494:110","page_url":"https://archive.org/details/C124914494/page/n109","statement_kind":"finding","subject_label":"Interim bus operations costs","summary":"The cost estimate does not include costs for interim bus operations during construction.","property":"other","value_text":"not included","t_from":"1993","quote":"No costs are included for interim bus operations which would have to be relocated during construction.","anchor":"s-e99f6d07501a","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"Planning Department","stance":"own_position","speaker_evidence":"No costs are included for interim bus operations"}]}