{"note":"Statements read from one scanned government report in the IGS library collection on the Internet Archive. Each statement has a verbatim quote found on its page (quote, page_url). The summary and subject_label of each statement were written by a model (Claude Haiku 5.5) and can be wrong: read the page before quoting. At most 20 selected pages of a report were read. Keys are the column names of the tables igs_reports and igs_claims; a column that is null for a statement is left out, and columns with one value for every statement of this report are given once under same_for_every_statement. \"[name withheld]\" stands where the release withholds a name; the site's page guard withholds a few more in reports after 1951, so a cell here can differ from the table; for a few reports prepared_by and creator are left out. A statement's links to the Board record are under links (show_target_kind: decision, instrument or ballot measure; show_target_id; show_url); they replace the table's decision_id and instrument_id, which are left out. place_id, place_label and place_precision come from a corrected place match where there is one. part, speaker, speaker_role, stance and speaker_evidence say who is speaking: a model (Claude Haiku 5.5) read each page and its context and can be wrong. part: main_text, attachment, appendix, letter, comment, response, table or cover_or_contents; speaker: issuer, another_body, letter_writer or unclear; speaker_role: a role or organisation, never a personal name; stance: own_position, quotes_to_dispute, quotes_to_report, restates_to_reject or unclear. The report page shows a statement only when speaker is issuer, part is main_text or appendix, and stance is own_position or quotes_to_report; hidden gives the part, the speaker or the stance of the others. ","release":"v0.9.2","licence":"CC0-1.0","slug":"c124914731","url":"https://data.qipu.org/usa/san-francisco/reports/c124914731/","statement_url":"https://data.qipu.org/usa/san-francisco/reports/c124914731/#{anchor}","tables":{"igs_reports":"https://tiles.qipu.org/data/releases/v0.9.2/parquet/igs_reports.parquet","igs_claims":"https://tiles.qipu.org/data/releases/v0.9.2/parquet/igs_claims.parquet"},"report":{"report_id":"C124914731","source_id":"C124914731","title":"Central freeway retrofit plan cost analysis","year":1997,"n_pages":20,"creator":null,"source_url":"https://archive.org/details/C124914731","issuer":"City and County of San Francisco Board of Supervisors, Budget Analyst","issuer_type":"government","gov_level":"city_county","prepared_by":null,"doc_kind":"staff_report","jurisdiction":"San Francisco","jurisdiction_id":"sf","city":"sf","issuer_by":"meta","doc_kind_by":"model","jurisdiction_by":"meta","run_id":"igs-labels-rules+haiku55-cli-2026-10-23"},"pages_with_statements":14,"statements_total":51,"statements_by_kind":{"finding":21,"proposal":19,"cites_decision":5,"background":6},"same_for_every_statement":{"source_id":"C124914731","source_url":"https://archive.org/details/C124914731","source_label":"IGS library: Central freeway retrofit plan cost analysis","report_year":1997,"issuer":"City and County of San Francisco Board of Supervisors, Budget Analyst","issuer_type":"government","doc_kind":"staff_report","t_precision":"year","status":"extracted","claim_kind":"observation","extraction_table":"igs_claims","run_id":"igs-sf-pages-v2-haiku55-batch-2026-10-23","city":"sf","prompt_version":"igs-page-v2-2026-10-23"},"summary":{"what":"A cost analysis by the Board of Supervisors Budget Analyst comparing options to retrofit or replace the damaged Central Freeway, and their funding.","figures":[{"label":"Cost","value":"$67.6 million total for Alternative 1B","claim_ids":["c:e3960a19ad8ad88d249cc640bf77f681"]},{"label":"Shortfall","value":"$50,100,000 shortfall for Alternative 1B","claim_ids":["c:e0d3bf2548feea35c2a1f5536cdc17c3"]},{"label":"Federal funds","value":"$40 million in ER funds","claim_ids":["c:c78fad752eb562cdfaa566fd55842a74"]},{"label":"Period","value":"58 months for Alternative 1B","claim_ids":["c:21b9eb19664f909926ab1ba8c566fc5f"]}],"main_points":["c:13e99877c14b4e13e7084f283322e090","c:9883e7d22949449a4f9d62f7e2cfda27","c:0f144e292c514cc611b0fed5414d50a0"],"board_decisions_after":[],"board_decisions_before":["qipu:sf/decision/journalofjuldecproceed87sanfrich:10/2","qipu:sf/decision/journalofjanaprproceed90sanfrich:103/4","qipu:sf/decision/journalofproceed91sanfrich:147/6"],"made_by":"A model (Claude Haiku 5.5) wrote the lead and picked the figures, main points and later Board decisions from the statements, from a second reading of the report's summary and cost pages, and from Board decisions dated 3 years before to 10 years after the report; every number it wrote was checked against them, and a figure must be about the report's own area or project."},"statements":[{"claim_id":"c:915bb61ac7d3a7930de1deb8333b80e9","page_id":"C124914731:1","page_url":"https://archive.org/details/C124914731/page/n0","statement_kind":"finding","subject_label":"Franklin and Gough Streets ramps","summary":"The Franklin and Gough Streets ramps north of Fell Street were demolished.","property":"demolished","value_text":"demolished","date_printed":"early 1990s","t_from":"1997","quote":"the Franklin and Gough Streets ramps, north of Fell Street, were demolished","place_label":"Franklin and Gough Streets ramps","place_precision":"street_segment","anchor":"s-915bb61ac7d3","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Background The Central Freeway (U.S. 101) was"},{"claim_id":"c:a839e4cccecbd7d82de51de6bf423c40","page_id":"C124914731:1","page_url":"https://archive.org/details/C124914731/page/n0","statement_kind":"cites_decision","subject_label":"Resolution 541-92 on new ramps","summary":"The Board of Supervisors approved Resolution 541-92 declaring City policy not to build new above-ground ramps north of Fell Street.","property":"approved","value_text":"City policy against new above-ground ramps north of Fell Street","date_printed":"July 6, 1992","t_from":"1992","quote":"not to build any new above-ground ramps north of Fell Street to replace the demolished sections of the Central Freeway.","decided_by":"San Francisco voters","instrument_kind":"proposition","instrument_printed":"H","instrument_date_printed":"November 4, 1997","place_label":"north of Fell Street","place_precision":"street_segment","anchor":"s-a839e4cccecb","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"quotes_to_report","speaker_evidence":"On July 6, 1992, the San Francisco Board of Supervisors approved a resolution","links":[{"show_target_kind":"decision","show_target_id":"qipu:sf/decision/journalofjuldecproceed87sanfrich:10/2","show_url":"https://data.qipu.org/usa/san-francisco/record/?id=qipu%3Asf%2Fdecision%2Fjournalofjuldecproceed87sanfrich%3A10%2F2"}]},{"claim_id":"c:b53537ab0ec6141afb97e16fe5e06f23","page_id":"C124914731:1","page_url":"https://archive.org/details/C124914731/page/n0","statement_kind":"finding","subject_label":"[name withheld] earthquake damage","summary":"The [name withheld] Earthquake caused extensive damage to the Central Freeway.","property":"finding","value_text":"extensive damage","date_printed":"October 17, 1989","t_from":"1989","quote":"On October 17, 1989, the [name withheld] Earthquake caused extensive damage to the Central Freeway.","place_label":"Central Freeway","anchor":"s-b53537ab0ec6","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"On October 17, 1989, the Loma Prieta Earthquake caused extensive damage"},{"claim_id":"c:b8d597a60376aad502e920551a0a1df2","page_id":"C124914731:1","page_url":"https://archive.org/details/C124914731/page/n0","statement_kind":"background","subject_label":"Central Freeway construction","summary":"The Central Freeway was originally constructed in 1959 as part of a planned freeway network.","property":"other","value_text":"1959","value_num":1959.0,"date_printed":"1959","t_from":"1959","quote":"The Central Freeway (U.S. 101) was originally constructed in 1959 as part of an overall freeway network in San Francisco","place_label":"Central Freeway","anchor":"s-b8d597a60376","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"The Central Freeway (U.S. 101) was originally constructed in 1959"},{"claim_id":"c:2f7fbef8645afa744e56a5e57a3b68c4","page_id":"C124914731:2","page_url":"https://archive.org/details/C124914731/page/n1","statement_kind":"finding","subject_label":"Upper deck safety hazard","summary":"The Statewide Seismic Peer Review Panel determined the double-deck configuration posed a potential safety hazard.","property":"finding","value_text":"potential safety hazard","date_printed":"1995","t_from":"1995","quote":"In 1995, the Statewide Seismic Peer Review Panel determined that the double- deck configuration of the Central Freeway posed a potential safety hazard","place_label":"Central Freeway","anchor":"s-2f7fbef8645a","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"quotes_to_report","speaker_evidence":"In 1995, the Statewide Seismic Peer Review Panel determined"},{"claim_id":"c:6be3a52040c1063070f42c8ea4aa0862","page_id":"C124914731:2","page_url":"https://archive.org/details/C124914731/page/n1","statement_kind":"finding","subject_label":"Westbound reopening to Fell Street off-ramp","summary":"Caltrans reopened the Central Freeway westbound to the Fell Street off-ramp.","property":"event","value_text":"reopened westbound to Fell Street off-ramp","date_printed":"April 14, 1997","t_from":"1997","quote":"on April 14, 1997, due to increased traffic resulting from the repaving construction project on 19th Avenue (State Route 1), Caltrans reopened the Central Freeway in the westbound direction","place_label":"19th Avenue (State Route 1)","place_precision":"street","place_id":"qipu:sf/place/street/19th-ave","resolved_by":"place links file","anchor":"s-6be3a52040c1","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"on April 14, 1997, due to increased traffic resulting from"},{"claim_id":"c:8013f76f1ffbc36c68e0cc1d2951e010","page_id":"C124914731:2","page_url":"https://archive.org/details/C124914731/page/n1","statement_kind":"proposal","subject_label":"Alternative 3B-2","summary":"Alternative 3B-2 would provide a new four-lane single deck structure from Mission Street to Haight Street.","property":"alternative","value_text":"four-lane single deck structure","value_num":4.0,"unit":"lanes","t_from":"1997","quote":"This alternative would provide a new four-lane single deck structure from Mission Street crossing over Market Street and coming down at Haight Street","place_label":"Mission Street to Haight Street","place_precision":"intersection","place_id":"qipu:sf/place/street/mission-st","resolved_by":"place links file","anchor":"s-8013f76f1ffb","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"quotes_to_report","speaker_evidence":"Alternative 3B-2: This alternative would provide a new four-lane"},{"claim_id":"c:86af9c49d2ac4d83c8721899ac7f3441","page_id":"C124914731:2","page_url":"https://archive.org/details/C124914731/page/n1","statement_kind":"finding","subject_label":"Upper deck demolition","summary":"Caltrans demolished the upper deck of the Central Freeway from Mission to Oak Streets.","property":"demolished","value_text":"upper deck from Mission to Oak Streets","date_printed":"August to November 1996","t_from":"1996","quote":"Caltrans demolished the upper deck of the Central Freeway from Mission to Oak Streets.","place_label":"Mission to Oak Streets","place_precision":"area","place_id":"qipu:sf/place/hood/mission","resolved_by":"place links file","anchor":"s-86af9c49d2ac","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Caltrans demolished the upper deck of the Central Freeway"},{"claim_id":"c:bc50221db12cb80db4d92b2baeb8576d","page_id":"C124914731:2","page_url":"https://archive.org/details/C124914731/page/n1","statement_kind":"proposal","subject_label":"Alternative 8B","summary":"Alternative 8B would provide a new four-lane single deck structure from Mission Street down to Market Street.","property":"alternative","value_text":"four-lane single deck structure","value_num":4.0,"unit":"lanes","t_from":"1997","quote":"This alternative would provide a new four-lane single deck structure from Mission Street coming down at Market Street with signalized five-lane on and off-ramps","place_label":"Mission Street to Market Street","place_precision":"intersection","place_id":"qipu:sf/place/street/mission-st","resolved_by":"place links file","anchor":"s-bc50221db12c","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"quotes_to_report","speaker_evidence":"Alternative 8B: This alternative would provide a new four-lane"},{"claim_id":"c:f17c7f696c532254b26655f381afad45","page_id":"C124914731:2","page_url":"https://archive.org/details/C124914731/page/n1","statement_kind":"proposal","subject_label":"Alternative 1B (Proposition H)","summary":"Alternative 1B would retrofit the lower deck from South Van Ness Avenue to Page Street and widen it to four lanes.","property":"alternative","value_text":"four-lane single deck","value_num":4.0,"t_from":"1997","quote":"This alternative would retrofit the existing lower deck from South Van Ness Avenue to Page Street and widen the lower deck to a four-lane single deck configuration.","place_label":"South Van Ness Avenue to Page Street","place_precision":"intersection","place_id":"qipu:sf/place/street/south-van-ness-ave","resolved_by":"place links file","anchor":"s-f17c7f696c53","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"quotes_to_report","speaker_evidence":"Alternative 1B (Proposition H): This alternative would retrofit"},{"claim_id":"c:e076473a1b1e777b482ab588eafdac5f","page_id":"C124914731:3","page_url":"https://archive.org/details/C124914731/page/n2","statement_kind":"proposal","subject_label":"Alternative 8/9B","summary":"Alternative 8/9B would add a South Van Ness off-ramp, an Otis Street on-ramp and new Octavia Boulevard from Market to Fell Streets.","property":"alternative","value_text":"new off-ramps, on-ramp and Octavia Boulevard","t_from":"1997","quote":"This alternative would also add (1) a new off-ramp at South Van Ness Avenue, (2) a new on-ramp at Otis Street, (3) a new “South Octavia Street” between Market and Mission Streets","place_label":"Octavia Boulevard from Market to Fell Streets","anchor":"s-e076473a1b1e","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Alternative 8/9B: This alternative would also add"},{"claim_id":"c:e53e2de12bb6ca62958393837d0d8875","page_id":"C124914731:3","page_url":"https://archive.org/details/C124914731/page/n2","statement_kind":"cites_decision","subject_label":"Senate Bill 181","summary":"Senate Bill 181, approved in 1991, prohibits Caltrans from repairing or replacing the Central Freeway until the Board approves an alternative.","property":"other","value_text":"prohibits Caltrans repair or replacement until Board approves an alternative","date_printed":"1991","t_from":"1991","quote":"Senate Bill 181 (SB181), approved in 1991, prohibits Caltrans from proceeding with the repair or replacement of the Central Freeway until the Board of Supervisors approves one of the selected alternatives.","decided_by":"California State Legislature (Senate Bill 181)","instrument_kind":"other","instrument_printed":"181","instrument_date_printed":"1991","place_label":"Central Freeway","anchor":"s-e53e2de12bb6","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Senate Bill 181 (SB181), approved in 1991, prohibits Caltrans"},{"claim_id":"c:050add4bebd51863d97848c146956a08","page_id":"C124914731:4","page_url":"https://archive.org/details/C124914731/page/n3","statement_kind":"proposal","subject_label":"Engineering and oversight cost share","summary":"Caltrans estimates engineering and oversight will cost about 30 percent of each alternative's demolition, construction and TSM costs.","property":"cost_usd","value_text":"30 percent","value_num":30.0,"unit":"percent","t_from":"1997","quote":"Caltrans estimates that it will cost approximately 30 percent of each alternative’s demolition, construction and TSM costs to complete the design and engineering work","place_label":"Central Freeway","anchor":"s-050add4bebd5","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"quotes_to_report","speaker_evidence":"The Estimated Engineering & Oversight Costs reflected above are based on Caltrans estimates"},{"claim_id":"c:09049d62e3b4fe3cae52cded3973fd77","page_id":"C124914731:4","page_url":"https://archive.org/details/C124914731/page/n3","statement_kind":"finding","subject_label":"Construction funding requirement","summary":"Mr. [name withheld] reports all construction funds must be identified before Caltrans begins reconstruction of the Central Freeway.","property":"finding","value_text":"all construction funds identified first","t_from":"1997","quote":"Mr. [name withheld] reports that all of the construction funds would need to be identified before Caltrans would begin the reconstruction of the Central Freeway.","place_label":"Central Freeway","anchor":"s-09049d62e3b4","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"quotes_to_report","speaker_evidence":"Mr. Bosler reports that all of the construction funds would need to be identified"},{"claim_id":"c:cb7502b4b94f96d6fa87934ca0c456f5","page_id":"C124914731:4","page_url":"https://archive.org/details/C124914731/page/n3","statement_kind":"proposal","subject_label":"Alternative 8/9B total cost","summary":"Caltrans estimates Alternative 8/9B, the least expensive option, would cost about 49.45 million dollars in total.","property":"cost_usd","value_text":"$49.45 million total","value_num":49450000.0,"unit":"USD","t_from":"1997","quote":"Alternative 8/9B is the least expensive of the four Alternatives, at an estimated construction cost of $38.5 million and a total estimated cost of $49.45 million.","place_label":"Central Freeway","anchor":"s-cb7502b4b94f","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Alternative 8/9B is the least expensive of the four Alternatives"},{"claim_id":"c:e3960a19ad8ad88d249cc640bf77f681","page_id":"C124914731:4","page_url":"https://archive.org/details/C124914731/page/n3","statement_kind":"proposal","subject_label":"Alternative 1B total cost","summary":"Caltrans estimates Alternative 1B, Proposition H, would cost about 67.6 million dollars in total.","property":"cost_usd","value_text":"$67.6 million total","value_num":67600000.0,"unit":"USD","t_from":"1997","quote":"As reflected above, Alternative 1B is the most expensive of the four above- noted Alternatives, at an estimated construction cost of $52 million and a total estimated cost of $67.6 million.","place_label":"Central Freeway","anchor":"s-e3960a19ad8a","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"As reflected above, Alternative 1B is the most expensive"},{"claim_id":"c:8ee85dd7fd00a721b46a9b0e6312e3dd","page_id":"C124914731:5","page_url":"https://archive.org/details/C124914731/page/n4","statement_kind":"proposal","subject_label":"Alternative 1B (Prop. H) construction timeline","summary":"The report estimates Alternative 1B would take the longest time to complete, 58 months.","property":"alternative","value_text":"58 months (4.8 years)","value_num":58.0,"unit":"months","t_from":"1997","quote":"Alternative 1B is estimated to require the longest period of time to complete, a total of 58 months, or 4.8 years","place_label":"Central Freeway","anchor":"s-8ee85dd7fd00","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Alternative 1B is estimated to require the longest period of time"},{"claim_id":"c:c3d1f27356931118a57b04c2f41b5198","page_id":"C124914731:5","page_url":"https://archive.org/details/C124914731/page/n4","statement_kind":"finding","subject_label":"Expended ER funds for Central Freeway","summary":"About 22.5 million dollars of the 40 million dollars in ER funds has been spent.","property":"other","value_text":"approximately $22,500,000 expended","value_num":22500000.0,"unit":"USD","t_from":"1997","quote":"approximately $22,500,000 has been expended and approximately $17,500,000 currently remains","place_label":"Central Freeway","anchor":"s-c3d1f2735693","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"quotes_to_report","speaker_evidence":"According to Mr. Bosler, of the original $40,000,000 of ER funds"},{"claim_id":"c:c78fad752eb562cdfaa566fd55842a74","page_id":"C124914731:5","page_url":"https://archive.org/details/C124914731/page/n4","statement_kind":"finding","subject_label":"Federal ER funds for Central Freeway","summary":"FHWA and Caltrans allocated 40 million dollars of ER funds for the Central Freeway.","property":"other","value_text":"$40 million","value_num":40000000.0,"unit":"USD","t_from":"1997","quote":"specifically allocated $40 million of these ER funds for the Central Freeway, which was the estimated amount required","place_label":"Central Freeway","anchor":"s-c78fad752eb5","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"The Federal Highway Administration (FHWA), in cooperation with Caltrans, specifically allocated $40 million"},{"claim_id":"c:d5a06f69fca4931044f86ef82d0ee66f","page_id":"C124914731:5","page_url":"https://archive.org/details/C124914731/page/n4","statement_kind":"finding","subject_label":"Federal emergency relief funding","summary":"Congress appropriated 1 billion dollars in federal ER funds for transportation repair after [name withheld].","property":"other","value_text":"$1 billion","value_num":1000000000.0,"unit":"USD","t_from":"1997","quote":"the U.S. Congress appropriated $1 billion in Federal Emergency Relief (ER) funds for repair and replacement of transportation projects throughout Northern California","place_label":"Northern California","anchor":"s-d5a06f69fca4","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Following the Loma Prieta earthquake, the U.S. Congress appropriated $1 billion"},{"claim_id":"c:dff411073107bdc1c92c5f39ac4503d5","page_id":"C124914731:5","page_url":"https://archive.org/details/C124914731/page/n4","statement_kind":"proposal","subject_label":"Alternative 8B construction timeline","summary":"The report estimates Alternative 8B would have the shortest construction phase, 21 months.","property":"alternative","value_text":"21 months construction, 45 months total","value_num":21.0,"unit":"months","t_from":"1997","quote":"Alternative 8B will require the shortest construction phase of 21 months, for a total of approximately 3.75 years","place_label":"Central Freeway","anchor":"s-dff411073107","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Alternative 8B will require the shortest construction phase of 21 months"},{"claim_id":"c:4bac08adf56f2c56e5821b8c10fbdbe4","page_id":"C124914731:6","page_url":"https://archive.org/details/C124914731/page/n5","statement_kind":"cites_decision","subject_label":"SB 45 changes to STIP process","summary":"The Governor approved SB 45, which changes the STIP funding process and delays the STIP timetable to early 1998.","property":"other","value_text":"SB 45 approved","date_printed":"1997","t_from":"1997","quote":"Senate Bill 45 (SB45), just recently approved by the Governor, changes the STIP funding process and will delay the current STIP timetable until early 1998","decided_by":"Governor of California","instrument_kind":"other","instrument_printed":"SB 45","anchor":"s-4bac08adf56f","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"This report is prepared in response to your request for the Budget Analyst"},{"claim_id":"c:9b068d69177dd95f41f8439b36417389","page_id":"C124914731:6","page_url":"https://archive.org/details/C124914731/page/n5","statement_kind":"proposal","subject_label":"Estimated cost and shortfall of Alternative 1B","summary":"The report estimates Alternative 1B costs 67.6 million dollars against 17.5 million dollars available, a 50.1 million dollar shortfall.","property":"cost_usd","value_text":"$ 67,600,000","value_num":67600000.0,"unit":"USD","t_from":"1997","quote":"1B (Prop. H) $ 67,600,000 $17,500,000 $ 50,100,000","place_label":"Central Freeway","anchor":"s-9b068d69177d","shown":false,"hidden":"table","part":"table","speaker":"issuer","speaker_role":"Budget Analyst","stance":"own_position","speaker_evidence":"Total ER Funds Estimated Alternatives Estimated Costs Available Shortfall 1B (Prop. H)"},{"claim_id":"c:c97b100946dbe798f7e228e69805b0e6","page_id":"C124914731:6","page_url":"https://archive.org/details/C124914731/page/n5","statement_kind":"background","subject_label":"State Transportation Improvement Program","summary":"The STIP sets out all state funding commitments to transportation over a seven-year period.","property":"other","value_text":"seven-year period","value_num":7.0,"unit":"years","t_from":"1997","quote":"The State Transportation Improvement Program (STIP) delineates all State funding commitments to transportation projects and programs over a seven-year period","anchor":"s-c97b100946db","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"Budget Analyst","stance":"own_position","speaker_evidence":"The State Transportation Improvement Program (STIP) delineates all State funding commitments"},{"claim_id":"c:f6edfde7cf75d64d90649e4ea26614f0","page_id":"C124914731:6","page_url":"https://archive.org/details/C124914731/page/n5","statement_kind":"cites_decision","subject_label":"SB 181 land sale legislation, 1991","summary":"The State Senate approved SB 181 in 1991, allowing City use of land sale funds for the Embarcadero Roadway project.","property":"other","value_text":"SB181 approved 1991","date_printed":"1991","t_from":"1991","quote":"the State Senate approved a bill (SB181) in 1991, to allow the City of San Francisco to use such funds for the Embarcadero Roadway project","decided_by":"State Senate","instrument_kind":"other","instrument_printed":"SB181","instrument_date_printed":"1991","place_label":"Embarcadero Roadway","place_precision":"street","anchor":"s-f6edfde7cf75","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"Budget Analyst","stance":"own_position","speaker_evidence":"the State Senate approved a bill (SB181) in 1991"},{"claim_id":"c:31b1be9d495fc098353d75938a7a263e","page_id":"C124914731:7","page_url":"https://archive.org/details/C124914731/page/n6","statement_kind":"proposal","subject_label":"Land sales revenue assumptions","summary":"The Budget Analyst assumes land values of 55 dollars per square foot residential and 90 dollars commercial.","property":"other","value_text":"$55/sq ft residential; $90/sq ft commercial","unit":"USD","t_from":"1997","quote":"The above estimated sales revenues are based on an estimated value of $55 per square foot for residential property and $90 per square foot for commercial property","place_label":"Central Freeway","anchor":"s-31b1be9d495f","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"The above estimated sales revenues are based on an estimated value of $55 per square foot"},{"claim_id":"c:3547c4f00c2dc6629d9d6f4637ffd34b","page_id":"C124914731:7","page_url":"https://archive.org/details/C124914731/page/n6","statement_kind":"background","subject_label":"Central Freeway funding decision","summary":"The California Transportation Commission will make the ultimate decision on Central Freeway funding amounts and sources.","property":"other","t_from":"1997","quote":"the California Transportation Commission (CTC) will make the ultimate decision regarding the amounts and sources of funds for the Central Freeway","place_label":"Central Freeway","anchor":"s-3547c4f00c2d","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"quotes_to_report","speaker_evidence":"Mr. Yahata reports that currently the two most likely sources"},{"claim_id":"c:c6f99ea5979a08da57b77254b6f2783e","page_id":"C124914731:7","page_url":"https://archive.org/details/C124914731/page/n6","statement_kind":"finding","subject_label":"SHOPP funds for Bay Area","summary":"About 250 million dollars of SHOPP funds was allocated to the Bay Area for the 1998 cycle.","property":"other","value_text":"Approximately $250 million","value_num":250000000.0,"unit":"USD","date_printed":"1998 SHOPP cycle","t_from":"1998","quote":"Approximately $250 million of SHOPP funds was allocated to Bay Area for the 1998 SHOPP cycle","place_label":"Bay Area","anchor":"s-c6f99ea5979a","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"quotes_to_report","speaker_evidence":"Mr. Inoue reports that SHOPP funds primarily come from"},{"claim_id":"c:71d946c67122b2fef08428e37d253565","page_id":"C124914731:8","page_url":"https://archive.org/details/C124914731/page/n7","statement_kind":"background","subject_label":"Proposition H plan deadline","summary":"Proposition H requires the northern accessibility plan to be completed by July 1, 1998.","property":"proposes","value_text":"July 1, 1998","date_printed":"July 1, 1998","t_from":"1998","quote":"this plan would be required to be completed by July 1, 1998","place_label":"Central Freeway","anchor":"s-71d946c67122","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Proposition H requires that a plan... According to Proposition H"},{"claim_id":"c:9883e7d22949449a4f9d62f7e2cfda27","page_id":"C124914731:8","page_url":"https://archive.org/details/C124914731/page/n7","statement_kind":"finding","subject_label":"Funding availability for Prop H plan","summary":"Neither ER funds nor SHOPP funds would be available for financing the Proposition H plan.","property":"other","value_text":"not available","t_from":"1997","quote":"neither ER funds nor SHOPP funds would be available for financing such a plan","place_label":"Central Freeway","anchor":"s-9883e7d22949","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"quotes_to_report","speaker_evidence":"Both Mr. Yahata and Mr. Bosler report that"},{"claim_id":"c:a20a786fa3f092fb6810b2ceeaa7ab29","page_id":"C124914731:8","page_url":"https://archive.org/details/C124914731/page/n7","statement_kind":"background","subject_label":"Proposition H","summary":"Proposition H would repeal Resolution 541-92 and require a plan for northern accessibility to the Central Freeway.","property":"proposes","value_text":"repeal Resolution 541-92","t_from":"1997","quote":"Proposition H would repeal Resolution 541-92, approved by the Board of Supervisors in 1992 which made it a City policy","place_label":"north of Fell Street","place_precision":"area","anchor":"s-a20a786fa3f0","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Proposition H would repeal Resolution 541-92","links":[{"show_target_kind":"decision","show_target_id":"qipu:sf/decision/journalofjuldecproceed87sanfrich:10/2","show_url":"https://data.qipu.org/usa/san-francisco/record/?id=qipu%3Asf%2Fdecision%2Fjournalofjuldecproceed87sanfrich%3A10%2F2"}]},{"claim_id":"c:c0173b2e34e0aa570d54dfd9c887a6db","page_id":"C124914731:8","page_url":"https://archive.org/details/C124914731/page/n7","statement_kind":"cites_decision","subject_label":"Resolution 541-92 freeway ramp policy","summary":"The Board of Supervisors approved Resolution 541-92 in 1992, making it city policy not to build new above-ground ramps north of Fell Street.","property":"adopted","value_text":"Resolution 541-92","date_printed":"1992","t_from":"1992","quote":"Resolution 541-92, approved by the Board of Supervisors in 1992 which made it a City policy to not build any new above-ground freeway ramps north of Fell Street","decided_by":"Board of Supervisors","instrument_kind":"resolution","instrument_printed":"541-92","instrument_date_printed":"1992","place_label":"north of Fell Street","place_precision":"area","anchor":"s-c0173b2e34e0","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Proposition H would repeal Resolution 541-92, approved by the Board","links":[{"show_target_kind":"decision","show_target_id":"qipu:sf/decision/journalofjuldecproceed87sanfrich:10/2","show_url":"https://data.qipu.org/usa/san-francisco/record/?id=qipu%3Asf%2Fdecision%2Fjournalofjuldecproceed87sanfrich%3A10%2F2"}]},{"claim_id":"c:d0063cc84c9584fdea226c7758c5c385","page_id":"C124914731:8","page_url":"https://archive.org/details/C124914731/page/n7","statement_kind":"proposal","subject_label":"Consultant cost for northern accessibility plan","summary":"Department of Parking and Traffic estimates the northern accessibility plan would cost about 200,000 dollars.","property":"cost_usd","value_text":"approximately $200,000","value_num":200000.0,"unit":"USD","t_from":"1997","quote":"it is estimated to cost approximately $200,000 to complete this plan for resolving the northern accessibility to the Central Freeway","place_label":"Central Freeway","anchor":"s-d0063cc84c95","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"quotes_to_report","speaker_evidence":"Mr. Jerry Robbins of the Department of Parking and Traffic, based on informal discussions"},{"claim_id":"c:61b80693f4038abb5f9a08a00b45afe3","page_id":"C124914731:9","page_url":"https://archive.org/details/C124914731/page/n8","statement_kind":"finding","subject_label":"Federal ER and SHOPP funds for capital projects","summary":"Caltrans reports that neither ER nor SHOPP funds would be available for capital projects identified from the Proposition H plan.","property":"other","value_text":"not available","t_from":"1997","quote":"As a result, Mr. [name withheld] reports that neither ER nor SHOPP funds would be available to be used for capital projects identified from the Proposition H plan.","anchor":"s-61b80693f403","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"quotes_to_report","speaker_evidence":"Mr. Yahata reports that neither ER nor SHOPP funds would be available"},{"claim_id":"c:8fd451172f77a66e2c58bdfe591d537c","page_id":"C124914731:9","page_url":"https://archive.org/details/C124914731/page/n8","statement_kind":"finding","subject_label":"Caltrans funds for City costs","summary":"The memo reports that Caltrans fully reimbursed the City for City-incurred expenses during earlier Central Freeway construction.","property":"other","value_text":"fully reimbursed","t_from":"1997","quote":"Caltrans fully reimbursed the City for such City-incurred expenses.","place_label":"Central Freeway","anchor":"s-8fd451172f77","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"quotes_to_report","speaker_evidence":"Mr. Yong and Mr. Strauss confirmed that the City negotiated with Caltrans"},{"claim_id":"c:fb5352d5afb307aedcff6f78c84297cf","page_id":"C124914731:9","page_url":"https://archive.org/details/C124914731/page/n8","statement_kind":"proposal","subject_label":"Alternative 1B construction cost","summary":"The memo says ramp costs would be in addition to the previously estimated $52 million (≈ $109.2 million in 2026 dollars) construction cost of Alternative 1B.","property":"cost_usd","value_text":"$52 million","value_num":52000000.0,"unit":"USD","t_from":"1997","quote":"these ramp costs would be in addition to the previously estimated $52 million for the construction portion of the Alternative 1B","place_label":"Central Freeway","anchor":"s-fb5352d5afb3","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"It should also be noted that these ramp costs would be in addition"},{"claim_id":"c:28715c9a5e325bdf5092e2506f176d91","page_id":"C124914731:10","page_url":"https://archive.org/details/C124914731/page/n9","statement_kind":"finding","subject_label":"Extra property tax revenue near removed ramps","summary":"The memo estimates the City received about $21,000 (≈ $45,097 in 2026 dollars) more annually in 1996-97 property tax revenue from the area.","property":"other","value_text":"approximately $21,000 annually","value_num":21000.0,"unit":"USD","date_printed":"1996-97","t_from":"1996","quote":"the City received approximately $21,000 annually more in 1996-97 property tax revenue from this area than would have been received","place_label":"Franklin Street, Gough Street, Fell Street and Turk Street","place_precision":"area","anchor":"s-28715c9a5e32","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Memo to Supervisor Ammiano October 14, 1997 Page 10"},{"claim_id":"c:565b6c8b4b9f7fb0356feaffb075596a","page_id":"C124914731:10","page_url":"https://archive.org/details/C124914731/page/n9","statement_kind":"finding","subject_label":"Assessed values near removed Franklin and Gough ramps","summary":"Assessed values in the area bounded by Franklin, Gough, Fell and Turk Streets rose about 23.8 percent, per the memo.","property":"assessed_value_usd","value_text":"approximately 23.8 percent","value_num":23.8,"unit":"percent","date_printed":"1991 to 1996","t_from":"1991","quote":"assessed property values increased by approximately 23.8 percent in the same time period, or 7.4 percent more than the City-wide average.","place_label":"Franklin Street, Gough Street, Fell Street and Turk Street","place_precision":"area","anchor":"s-565b6c8b4b9f","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Based on data provided by the Assessor's Office, City-wide assessed property values"},{"claim_id":"c:d0b74e13eb45d0cda51e7085febbe8d8","page_id":"C124914731:10","page_url":"https://archive.org/details/C124914731/page/n9","statement_kind":"finding","subject_label":"City-wide assessed property values","summary":"The memo reports City-wide assessed property values rose 16.4 percent between 1991 and 1996.","property":"assessed_value_usd","value_text":"16.4 percent","value_num":16.4,"unit":"percent","date_printed":"1991 to 1996","t_from":"1991","quote":"City-wide assessed property values increased by 16.4 percent between 1991 and 1996.","place_label":"San Francisco","anchor":"s-d0b74e13eb45","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Based on data provided by the Assessor's Office"},{"claim_id":"c:d8c81a79a76cc000fed82b059664b152","page_id":"C124914731:10","page_url":"https://archive.org/details/C124914731/page/n9","statement_kind":"finding","subject_label":"Citywide crime trend","summary":"[name withheld] reports Citywide crime was down nine percent as of July 30, 1997 compared with the prior year.","property":"other","value_text":"down nine percent","value_num":9.0,"unit":"percent","date_printed":"July 30, 1997","t_from":"1997","quote":"Citywide, crime was down nine percent as of July 30, 1997 as compared with the previous year ending July 30, 1996.","place_label":"San Francisco","anchor":"s-d8c81a79a76c","shown":false,"hidden":"another_body","part":"main_text","speaker":"another_body","speaker_role":"Police Department, Northern Police Station captain","stance":"quotes_to_report","speaker_evidence":"[name] of Northern Police Station reports that Citywide, crime was down nine percent"},{"claim_id":"c:0a38ba9ac244a5ecea591ab3fadce612","page_id":"C124914731:11","page_url":"https://archive.org/details/C124914731/page/n10","statement_kind":"finding","subject_label":"Injury accidents in South of Market","summary":"Injury accidents in South of Market rose about 46 percent, from 81 to 118, during July to December 1996.","property":"other","value_text":"approximately 46 percent, from 81 to 118","value_num":46.0,"unit":"percent","date_printed":"July to December 1996","t_from":"1996","quote":"the number of injury accidents in the South of Market area increased by approximately 46 percent, from 81 to 118, during the six month period","place_label":"South of Market","place_precision":"area","place_id":"qipu:sf/place/hood/south-of-market","resolved_by":"place links file","anchor":"s-0a38ba9ac244","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"quotes_to_report","speaker_evidence":"Data provided by the DPT also shows that the number of injury accidents"},{"claim_id":"c:21b9eb19664f909926ab1ba8c566fc5f","page_id":"C124914731:11","page_url":"https://archive.org/details/C124914731/page/n10","statement_kind":"proposal","subject_label":"Alternative 1B schedule","summary":"The memo estimates Alternative 1B would take 58 months, the longest of the four alternatives.","property":"other","value_text":"58 months","value_num":58.0,"t_from":"1997","quote":"Alternative 1B is estimated to require 58 months, or 4.8 years, which is the longest period of time to complete","place_label":"Central Freeway","anchor":"s-21b9eb19664f","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Alternative 1B is estimated to require 58 months"},{"claim_id":"c:9f53dbd71257cf8e66464e53c6329447","page_id":"C124914731:11","page_url":"https://archive.org/details/C124914731/page/n10","statement_kind":"proposal","subject_label":"Alternative 1B cost and schedule","summary":"The memo says Alternative 1B is the most expensive option, with a $52 million (≈ $109.2 million in 2026 dollars) construction cost and $67.6 million (≈ $141.9 million in 2026 dollars) total cost.","property":"cost_usd","value_text":"$67.6 million total","value_num":67600000.0,"unit":"USD","t_from":"1997","quote":"Alternative 1B, which is the Proposition H Alternative, is the most expensive of the four Alternatives, at an estimated construction cost of $52 million and a total estimated cost of $67.6 million.","place_label":"Central Freeway","anchor":"s-9f53dbd71257","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"In summary, this analysis reviews four project alternatives"},{"claim_id":"c:13e99877c14b4e13e7084f283322e090","page_id":"C124914731:12","page_url":"https://archive.org/details/C124914731/page/n11","statement_kind":"proposal","subject_label":"Alternative 8/9B cost","summary":"The memo says Alternative 8/9B is the least expensive, at $38.5 million (≈ $80.8 million in 2026 dollars) construction and $49.45 million (≈ $103.8 million in 2026 dollars) total cost.","property":"cost_usd","value_text":"$49.45 million total","value_num":49450000.0,"unit":"USD","t_from":"1997","quote":"Alternative 8/9B is the least expensive of the four Alternatives, at an estimated construction cost of $38.5 million and a total cost of $49.45 million.","place_label":"Central Freeway","anchor":"s-13e99877c14b","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Memo to Supervisor Ammiano October 14, 1997 Page 12"},{"claim_id":"c:953a755c95825bb844e124fa6e3857bb","page_id":"C124914731:12","page_url":"https://archive.org/details/C124914731/page/n11","statement_kind":"finding","subject_label":"Original Federal ER funds remaining","summary":"Of $40,000,000 (≈ $84.0 million in 2026 dollars) in original ER funds for the Central Freeway, about $17,500,000 (≈ $36.7 million in 2026 dollars) remains.","property":"other","value_text":"approximately $17,500,000 currently remains","value_num":17500000.0,"unit":"USD","t_from":"1997","quote":"Of the original $40,000,000 of Federal Emergency Relief (ER) funds specifically allocated for the Central Freeway, approximately $17,500,000 currently remains.","place_label":"Central Freeway","anchor":"s-953a755c9582","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Of the original $40,000,000 of Federal Emergency Relief"},{"claim_id":"c:e0d3bf2548feea35c2a1f5536cdc17c3","page_id":"C124914731:12","page_url":"https://archive.org/details/C124914731/page/n11","statement_kind":"finding","subject_label":"Funding shortfall for Alternative 1B","summary":"The memo projects a funding shortfall of $50,100,000 (≈ $105.2 million in 2026 dollars) for Alternative 1B.","property":"cost_usd","value_text":"$50,100,000","value_num":50100000.0,"unit":"USD","t_from":"1997","quote":"Specifically, for Alternative 1B the projected shorfall is $50,100,000","place_label":"Central Freeway","anchor":"s-e0d3bf2548fe","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Specifically, for Alternative 1B the projected shorfall is"},{"claim_id":"c:e6aa97a58acb143a89e208a42ef725b6","page_id":"C124914731:12","page_url":"https://archive.org/details/C124914731/page/n11","statement_kind":"proposal","subject_label":"Northern accessibility plan","summary":"The memo estimates the Proposition H northern accessibility plan would cost about $200,000 (≈ $419,863 in 2026 dollars) if contracted out.","property":"cost_usd","value_text":"approximately $200,000","value_num":200000.0,"unit":"USD","t_from":"1997","quote":"This plan is estimated to cost approximately $200,000, if the City were to contract for such services.","place_label":"Central Freeway","anchor":"s-e6aa97a58acb","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"This plan is estimated to cost approximately $200,000"},{"claim_id":"c:ea72564e7e5ce3916027c3bbf2863262","page_id":"C124914731:12","page_url":"https://archive.org/details/C124914731/page/n11","statement_kind":"background","subject_label":"Proposition H requirement","summary":"Proposition H requires the City to work with Caltrans to develop a plan by July 1, 1998 for northern accessibility.","property":"other","value_text":"by July 1, 1998","date_printed":"July 1, 1998","t_from":"1998","quote":"Proposition H requires that the City work with Caltrans to develop a plan by July 1, 1998 to resolve the northern accessibility","place_label":"Central Freeway","anchor":"s-ea72564e7e5c","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Proposition H requires that the City work with Caltrans"},{"claim_id":"c:0f144e292c514cc611b0fed5414d50a0","page_id":"C124914731:13","page_url":"https://archive.org/details/C124914731/page/n12","statement_kind":"finding","subject_label":"Previously proposed transportation projects","summary":"The memo concludes that STIP funding for the Proposition H plan could reduce or delay the City's previously proposed transportation projects.","property":"other","t_from":"1997","quote":"which would also result in the potential reduction or delay for the City’s previously proposed transportation projects.","anchor":"s-0f144e292c51","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Memo to Supervisor Ammiano October 14, 1997 Page 13"},{"claim_id":"c:fd1c27f7812acb73a3f56259d360297a","page_id":"C124914731:13","page_url":"https://archive.org/details/C124914731/page/n12","statement_kind":"proposal","subject_label":"Proposition H plan improvements","summary":"The memo says the improvements recommended by the Proposition H plan would need State Transportation Improvement Program funding.","property":"proposes","t_from":"1997","quote":"Funds for the construction of the various improvements recommended by this Proposition H plan would likely need to be included as part of the City’s State Transportation Improvement Program (STIP) funding","anchor":"s-fd1c27f7812a","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Memo to Supervisor Ammiano October 14, 1997 Page 13"},{"claim_id":"c:35618e32a7556f8546a756644ecaeea5","page_id":"C124914731:17","page_url":"https://archive.org/details/C124914731/page/n16","statement_kind":"proposal","subject_label":"Central Freeway plan","summary":"A plan for the Central Freeway, shown as Alternative 8-9, B and requiring no eminent domain, is mapped as of August 1997.","property":"alternative","value_text":"Alternative 8-9, B","date_printed":"August, 1997","t_from":"1997","quote":"Plan for the Central Freeway (requires No Eminent Domain) (Alternative 8-9, B) August, 1997","place_label":"Central Freeway","anchor":"s-35618e32a755","shown":false,"hidden":"attachment","part":"attachment","speaker":"unclear","speaker_role":"unclear","stance":"unclear","speaker_evidence":"Attachment O Page; Plan for the Central Freeway (requires [name])"}]}