{"note":"Statements read from one scanned government report in the IGS library collection on the Internet Archive. Each statement has a verbatim quote found on its page (quote, page_url). The summary and subject_label of each statement were written by a model (Claude Haiku 5.5) and can be wrong: read the page before quoting. At most 20 selected pages of a report were read. Keys are the column names of the tables igs_reports and igs_claims; a column that is null for a statement is left out, and columns with one value for every statement of this report are given once under same_for_every_statement. \"[name withheld]\" stands where the release withholds a name; the site's page guard withholds a few more in reports after 1951, so a cell here can differ from the table; for a few reports prepared_by and creator are left out. A statement's links to the Board record are under links (show_target_kind: decision, instrument or ballot measure; show_target_id; show_url); they replace the table's decision_id and instrument_id, which are left out. place_id, place_label and place_precision come from a corrected place match where there is one. part, speaker, speaker_role, stance and speaker_evidence say who is speaking: a model (Claude Haiku 5.5) read each page and its context and can be wrong. part: main_text, attachment, appendix, letter, comment, response, table or cover_or_contents; speaker: issuer, another_body, letter_writer or unclear; speaker_role: a role or organisation, never a personal name; stance: own_position, quotes_to_dispute, quotes_to_report, restates_to_reject or unclear. The report page shows a statement only when speaker is issuer, part is main_text or appendix, and stance is own_position or quotes_to_report; hidden gives the part, the speaker or the stance of the others. ","release":"v0.9.2","licence":"CC0-1.0","slug":"c124915258","url":"https://data.qipu.org/usa/san-francisco/reports/c124915258/","statement_url":"https://data.qipu.org/usa/san-francisco/reports/c124915258/#{anchor}","tables":{"igs_reports":"https://tiles.qipu.org/data/releases/v0.9.2/parquet/igs_reports.parquet","igs_claims":"https://tiles.qipu.org/data/releases/v0.9.2/parquet/igs_claims.parquet"},"report":{"report_id":"C124915258","source_id":"C124915258","title":"Draft environmental impact statement/draft environmental impact report for the Third Street light rail project in the City and County of San Francisco","year":1998,"n_pages":556,"creator":null,"source_url":"https://archive.org/details/C124915258","issuer":"City and County of San Francisco, Planning Department","issuer_type":"government","gov_level":"city_county","prepared_by":"US Department of Transportation, Federal Transit Administration (joint EIS/EIR)","doc_kind":"eir","jurisdiction":"San Francisco","jurisdiction_id":"sf","city":"sf","issuer_by":"model","doc_kind_by":"meta","jurisdiction_by":"model","run_id":"igs-labels-rules+haiku55-cli-2026-10-23"},"pages_with_statements":17,"statements_total":53,"statements_by_kind":{"finding":23,"proposal":20,"cites_decision":4,"background":6},"same_for_every_statement":{"source_id":"C124915258","source_url":"https://archive.org/details/C124915258","source_label":"IGS library: Draft environmental impact statement/draft environmental impact report for the Third Street light rail project in the Ci","report_year":1998,"issuer":"City and County of San Francisco, Planning Department","issuer_type":"government","doc_kind":"eir","t_precision":"year","status":"extracted","claim_kind":"observation","extraction_table":"igs_claims","run_id":"igs-sf-pages-v2-haiku55-batch-2026-10-23","city":"sf","prompt_version":"igs-page-v2-2026-10-23"},"summary":{"what":"A draft environmental impact report by the San Francisco Planning Department assessing the proposed Third Street light rail project and its alternatives.","next":"The Board passed an ordinance allowing advertising on E-Line and Third Street Light Rail boarding platforms in November 2006.","next_decision":"qipu:sf/decision/meetingminutesd2006sanf_0:269/3","figures":[{"label":"Cost","value":"approximately $500 million","claim_ids":["c:42a645d2dd26bcb6894535357c73435e"]},{"label":"Corridor population","value":"39 percent increase by 2015","claim_ids":["c:2eeb7c2d28b6f1d62dcea561da96eeb5"]},{"label":"Corridor employment","value":"35 percent increase by 2015","claim_ids":["c:341e7f0aa8329847e71c18c893ee7c9d"]},{"label":"Local funding","value":"$377.7 million (FY 97 dollars)","page_url":"https://archive.org/details/C124915258/page/n450","quote":"bringing the total Proposition B commitment to an estimated $377.7 million in FY 97 dollars"}],"main_points":["c:6aa0518a22d2a86a04157d212f50a779","c:5412e9064d2c928895f06a8043ba296d","c:f31795aa433bf472021385ef72965616"],"board_decisions_after":["qipu:sf/decision/meetingminutesd2006sanf_0:269/3","qipu:sf/decision/meetingminutesb2000sanf_0|439","qipu:sf/decision/meetingjuneaug2004minutes9917sanfrich:415/1","qipu:sf/decision/meetingjuneaug2004minutes9917sanfrich:478/3","qipu:sf/decision/meetingminutesb2001sanf_0:429/1","qipu:sf/decision/meetingminutesbo2002sanf:349/1","qipu:sf/decision/meetingminutesjanmay97sanfrich:349/1","qipu:sf/decision/meetingjanmar2006minutes101sanfrich:16/1"],"board_decisions_before":["qipu:sf/decision/1minutes199899sanf|g239"],"made_by":"A model (Claude Haiku 5.5) wrote the lead and picked the figures, main points and later Board decisions from the statements, from a second reading of the report's summary and cost pages, and from Board decisions dated 3 years before to 10 years after the report; every number it wrote was checked against them, and a figure must be about the report's own area or project."},"statements":[{"claim_id":"c:0d5daaa6c4ee01c119ab1de9a0818ef3","page_id":"C124915258:27","page_url":"https://archive.org/details/C124915258/page/n26","statement_kind":"proposal","subject_label":"Thomas Avenue station","summary":"The proposed station at Thomas Avenue was moved to Williams-Van Dyke to coincide with the transfer point for the 54-line.","property":"proposes","value_text":"station moved to Williams-Van Dyke","t_from":"1998","quote":"the proposed station at Thomas Avenue was moved to Williams-Van Dyke to coincide with the transfer point for the 54-line","place_label":"Williams-Van Dyke","place_precision":"intersection","place_id":"qipu:sf/place/street/williams-ave","resolved_by":"place links file","anchor":"s-0d5daaa6c4ee","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"S.2 ALTERNATIVES; the proposed station at Thomas Avenue was moved"},{"claim_id":"c:3d2419db7abf31db17c0ec4af8e8ec60","page_id":"C124915258:27","page_url":"https://archive.org/details/C124915258/page/n26","statement_kind":"proposal","subject_label":"Third/Shafter station","summary":"A station was added at Third/Shafter to serve the southern end of the Third Street commercial core.","property":"proposes","value_text":"station at Third/Shafter","t_from":"1998","quote":"a station was added at Third/Shafter to serve the southern end of the Third Street commercial core","place_label":"Third/Shafter","place_precision":"intersection","anchor":"s-3d2419db7abf","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"S.2 ALTERNATIVES; a station was added at Third/Shafter"},{"claim_id":"c:6aa0518a22d2a86a04157d212f50a779","page_id":"C124915258:27","page_url":"https://archive.org/details/C124915258/page/n26","statement_kind":"proposal","subject_label":"Third Street light rail surface alignment options","summary":"The project proposes a mixed-flow option that would retain curb parking on Third Street along the nine-block commercial core.","property":"alternative","value_text":"mixed-flow option","t_from":"1998","quote":"would retain curb parking on Third Street along the nine-block commercial core as well as providing a landscaped median","place_label":"Third Street between Kirkwood and Thomas Avenues","place_precision":"street_segment","place_id":"qipu:sf/place/street/03rd-st","resolved_by":"place links file","anchor":"s-6aa0518a22d2","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"This mixed-flow option would retain curb parking on Third Street"},{"claim_id":"c:a8fafa565bbc798c5214af7748331b43","page_id":"C124915258:27","page_url":"https://archive.org/details/C124915258/page/n26","statement_kind":"background","subject_label":"Bayshore Corridor System Planning Study","summary":"The study recommended implementing light rail service along Third Street in the Corridor.","property":"recommendation","value_text":"light rail along Third Street","date_printed":"December 1993","t_from":"1993","quote":"The study recommendations emphasized the importance of implementing light rail service along Third Street in the Corridor","place_label":"Third Street","place_precision":"street","place_id":"qipu:sf/place/street/03rd-st","resolved_by":"place links file","anchor":"s-a8fafa565bbc","shown":false,"hidden":"another_body","part":"main_text","speaker":"another_body","speaker_role":"the Bayshore Corridor System Planning Study by MUNI","stance":"quotes_to_report","speaker_evidence":"The Bayshore Corridor System Planning Study, completed by MUNI in December 1993"},{"claim_id":"c:b90e603198fea8a57680e7564735eed8","page_id":"C124915258:27","page_url":"https://archive.org/details/C124915258/page/n26","statement_kind":"cites_decision","subject_label":"Third Street light rail planning","summary":"The San Francisco Public Utilities Commission approved resolution 94-0044 to carry forward light rail through the federal capital project development process.","property":"approved","value_text":"resolution #94-0044","date_printed":"February 1994","t_from":"1994","quote":"In February 1994, the San Francisco Public Utilities Commission (the predecessor of the Public Transportation Commission) approved a resolution (#94-0044)","decided_by":"San Francisco Public Utilities Commission","instrument_kind":"resolution","instrument_printed":"94-0044","instrument_date_printed":"February 1994","place_label":"Third Street","place_precision":"street","place_id":"qipu:sf/place/street/03rd-st","resolved_by":"place links file","anchor":"s-b90e603198fe","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"In February 1994, the San Francisco Public Utilities Commission approved a resolution"},{"claim_id":"c:039a45ba798f4714b219afa45f892e16","page_id":"C124915258:48","page_url":"https://archive.org/details/C124915258/page/n47","statement_kind":"proposal","subject_label":"Initial Operating Segment construction employment","summary":"The document estimates that construction of the IOS would create 145 permanent jobs.","property":"jobs","value_text":"145 permanent jobs","value_num":145.0,"unit":"jobs","t_from":"1998","quote":"Construction of IOS would create 1,845 person-years of employment, 145 permanent jobs, and access to job centers.","anchor":"s-039a45ba798f","shown":false,"hidden":"table","part":"table","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"TABLE S-6 (Cont.) SUMMARY OF MAJOR ENVIRONMENTAL IMPACTS"},{"claim_id":"c:46e8e2533c47766c71c03de63ea0b028","page_id":"C124915258:48","page_url":"https://archive.org/details/C124915258/page/n47","statement_kind":"finding","subject_label":"No Project Alternative transit service","summary":"The document finds that under the No Project Alternative the Corridor would be underserved by transit.","property":"other","value_text":"underserved by transit","t_from":"1998","quote":"Corridor would be underserved by transit. Increased traffic congestion would diminish service reliability.","place_label":"Corridor","anchor":"s-46e8e2533c47","shown":false,"hidden":"table","part":"table","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"TABLE S-6 (Cont.) SUMMARY OF MAJOR ENVIRONMENTAL IMPACTS"},{"claim_id":"c:c9693d0de851a64ed539cec1b9459f7f","page_id":"C124915258:48","page_url":"https://archive.org/details/C124915258/page/n47","statement_kind":"proposal","subject_label":"New Central Subway construction employment","summary":"The document estimates that construction of the New Central Subway would create 80 permanent jobs.","property":"jobs","value_text":"80 permanent jobs","value_num":80.0,"unit":"jobs","t_from":"1998","quote":"Construction of the New Central Subway would create 3,033 person-years of employment and 80 permanent jobs.","anchor":"s-c9693d0de851","shown":false,"hidden":"table","part":"table","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"TABLE S-6 (Cont.) SUMMARY OF MAJOR ENVIRONMENTAL IMPACTS"},{"claim_id":"c:d1994b0afd0cbaddcf4106810aa24d57","page_id":"C124915258:48","page_url":"https://archive.org/details/C124915258/page/n47","statement_kind":"proposal","subject_label":"No Build/TSM Alternative bus service","summary":"The document estimates that the No Build/TSM Alternative would create 140 new jobs to operate additional bus service.","property":"jobs","value_text":"140 new jobs","value_num":140.0,"unit":"jobs","t_from":"1998","quote":"140 new jobs to operate additional bus service would be created.","anchor":"s-d1994b0afd0c","shown":false,"hidden":"table","part":"table","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"TABLE S-6 (Cont.) SUMMARY OF MAJOR ENVIRONMENTAL IMPACTS"},{"claim_id":"c:2ad6e55574463b1a60a3246b589cced0","page_id":"C124915258:56","page_url":"https://archive.org/details/C124915258/page/n55","statement_kind":"finding","subject_label":"New Central Subway financing","summary":"The document states that the New Central Subway would require unsecured federal and unidentified state or local resources.","property":"other","value_text":"unsecured federal as well as unidentified state or local resources","t_from":"1998","quote":"construction of the New Central Subway would require unsecured federal as well as unidentified state or local resources.","anchor":"s-2ad6e5557446","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Financial Goal. The Light Rail and the No Build/TSM Alternatives would not incur"},{"claim_id":"c:b85bb4a55866c95b400576d3fcc2040f","page_id":"C124915258:56","page_url":"https://archive.org/details/C124915258/page/n55","statement_kind":"finding","subject_label":"Community Advisory Group","summary":"The Community Advisory Group has met throughout the planning process to provide comments and recommendations on the project.","property":"other","value_text":"approximately 30 neighborhood representatives","value_num":30.0,"t_from":"1998","quote":"The Community Advisory Group (CAG), a body of approximately 30 neighborhood representatives, has met throughout the planning process","anchor":"s-b85bb4a55866","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"S.8 COMMUNITY INVOLVEMENT The DEIS/DEIR builds on community input"},{"claim_id":"c:bc6fc1d2eee95bdde7d558aa519fbd02","page_id":"C124915258:56","page_url":"https://archive.org/details/C124915258/page/n55","statement_kind":"finding","subject_label":"Community support for the Project","summary":"The document reports that over 40 community meetings were held in the Corridor on the Project alternatives.","property":"other","value_text":"over 40 meetings","value_num":40.0,"t_from":"1998","quote":"Community support for the Project has been established by holding over 40 meetings in the Corridor to discuss the Project alternatives","place_label":"Corridor","anchor":"s-bc6fc1d2eee9","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Community Acceptance Goal. Community support for the Project has been established"},{"claim_id":"c:2eeb7c2d28b6f1d62dcea561da96eeb5","page_id":"C124915258:64","page_url":"https://archive.org/details/C124915258/page/n63","statement_kind":"proposal","subject_label":"Corridor population growth","summary":"The document projects a 39 percent increase in Corridor population by 2015.","property":"population","value_text":"39 percent increase","value_num":39.0,"unit":"percent","date_printed":"2015","t_from":"2015","quote":"a 39 percent increase in Corridor population and a 35 percent increase in Corridor employment is projected by 2015","place_label":"Corridor","anchor":"s-2eeb7c2d28b6","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"1.0: PURPOSE AND NEED - NEED FOR TRANSPORTATION IMPROVEMENTS"},{"claim_id":"c:341e7f0aa8329847e71c18c893ee7c9d","page_id":"C124915258:64","page_url":"https://archive.org/details/C124915258/page/n63","statement_kind":"proposal","subject_label":"Corridor employment growth","summary":"The document projects a 35 percent increase in Corridor employment by 2015.","property":"jobs","value_text":"35 percent increase","value_num":35.0,"unit":"percent","date_printed":"2015","t_from":"2015","quote":"a 39 percent increase in Corridor population and a 35 percent increase in Corridor employment is projected by 2015","place_label":"Corridor","anchor":"s-341e7f0aa832","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"1.3.3. PROJECTED INCREASES IN 2015 TRANSIT AND AUTO TRAVEL DEMAND"},{"claim_id":"c:add0b40ab21095a20f86b17c8b7c0a1d","page_id":"C124915258:64","page_url":"https://archive.org/details/C124915258/page/n63","statement_kind":"finding","subject_label":"Chinatown connectivity","summary":"Residents of Chinatown perceive reduced connectivity after the removal of the Embarcadero Freeway following the 1989 earthquake.","property":"other","value_text":"reduced connectivity","date_printed":"1989","t_from":"1989","quote":"Residents of Chinatown perceive reduced connectivity resulting from the removal of Embarcadero Freeway following the 1989 earthquake.","place_label":"Chinatown","place_precision":"area","place_id":"qipu:sf/place/hood/chinatown","resolved_by":"place links file","anchor":"s-add0b40ab210","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"quotes_to_report","speaker_evidence":"Residents of Chinatown perceive reduced connectivity"},{"claim_id":"c:eed5795d69e665a1698f3d5070e9680c","page_id":"C124915258:64","page_url":"https://archive.org/details/C124915258/page/n63","statement_kind":"proposal","subject_label":"Mission Bay development","summary":"The document projects that much of the Corridor growth will result from development in Mission Bay.","property":"other","value_text":"Mission Bay development","t_from":"1998","quote":"Much of the population and employment growth will result from development in Mission Bay which is projected to include","place_label":"Mission Bay","place_precision":"area","place_id":"qipu:sf/place/hood/mission-bay","resolved_by":"place links file","anchor":"s-eed5795d69e6","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Much of the population and employment growth will result from development in Mission Bay"},{"claim_id":"c:30b757b70501ebf007124f564e404ebd","page_id":"C124915258:75","page_url":"https://archive.org/details/C124915258/page/n74","statement_kind":"cites_decision","subject_label":"Five light rail options carried forward","summary":"The San Francisco Public Utilities Commission approved a resolution to carry forward five light rail options through the federal capital project process.","property":"approved","value_text":"Resolution 94-0044","date_printed":"February 1994","t_from":"1994","quote":"approved a resolution (#94-0044) to carry forward five light rail options through the federal capital project development process.","decided_by":"San Francisco Public Utilities Commission","instrument_kind":"resolution","instrument_printed":"94-0044","instrument_date_printed":"February 1994","anchor":"s-30b757b70501","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"quotes_to_report","speaker_evidence":"In February 1994, the San Francisco Public Utilities Commission approved a resolution (#94-0044)"},{"claim_id":"c:d582825f0249dea20e5445949be775be","page_id":"C124915258:75","page_url":"https://archive.org/details/C124915258/page/n74","statement_kind":"finding","subject_label":"Low floor light rail operations","summary":"The Low Floor Light Rail Operations Study determined that operating low floor vehicles into the Market Street Subway would be feasible.","property":"other","value_text":"feasible","date_printed":"February 1996","t_from":"1996","quote":"determined that it would be feasible to operate low floor light rail vehicles (LRVs) into the Market Street Subway.","place_label":"Market Street Subway","place_precision":"street","anchor":"s-d582825f0249","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"quotes_to_report","speaker_evidence":"The Low Floor Light Rail Operations Study determined that it would be feasible"},{"claim_id":"c:dd4e521b17f0f772e594d2de18bd7550","page_id":"C124915258:75","page_url":"https://archive.org/details/C124915258/page/n74","statement_kind":"proposal","subject_label":"Metro East maintenance site","summary":"The Metro East study recommended that Port property on Cargo Way near Third Street be considered as an alternative rail yard site.","property":"recommendation","value_text":"Port property on Cargo Way near Third Street","t_from":"1998","quote":"compared the cost/benefits of alternative rail yard sites and recommended that Port property on Cargo Way near Third Street be considered as a viable alternative site.","place_label":"Cargo Way near Third Street","place_precision":"intersection","place_id":"qipu:sf/place/street/cargo-way","resolved_by":"place links file","anchor":"s-dd4e521b17f0","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"quotes_to_report","speaker_evidence":"The Metro East Alternative Site Development Study compared the cost/benefits"},{"claim_id":"c:f31795aa433bf472021385ef72965616","page_id":"C124915258:75","page_url":"https://archive.org/details/C124915258/page/n74","statement_kind":"finding","subject_label":"Bayshore Corridor System Planning Study","summary":"The MUNI Bayshore Corridor System Planning Study recommended light rail service along Third Street.","property":"recommendation","value_text":"light rail along Third Street","date_printed":"December 1993","t_from":"1993","quote":"The study recommendations emphasized the importance of implementing light rail service along Third Street in the Corridor","place_label":"Third Street","place_precision":"street","place_id":"qipu:sf/place/street/03rd-st","resolved_by":"place links file","anchor":"s-f31795aa433b","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"quotes_to_report","speaker_evidence":"The study recommendations emphasized the importance of implementing light rail service"},{"claim_id":"c:5412e9064d2c928895f06a8043ba296d","page_id":"C124915258:76","page_url":"https://archive.org/details/C124915258/page/n75","statement_kind":"proposal","subject_label":"Light Rail Alternative","summary":"The Light Rail Alternative would implement a new light rail line from the Caltrain Bayshore Station to Downtown.","property":"alternative","t_from":"1998","quote":"a Light Rail Alternative, which implemented a new light rail line from the Caltrain Bayshore Station in Visitacion Valley to Downtown","place_label":"Caltrain Bayshore Station to Downtown","anchor":"s-5412e9064d2c","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"The initial Third Street Light Rail Project alternatives, described in the Initial Definition"},{"claim_id":"c:bdbd65dfc945e44f095900cdc00e2279","page_id":"C124915258:76","page_url":"https://archive.org/details/C124915258/page/n75","statement_kind":"finding","subject_label":"Third Street Light Rail Project funding","summary":"The project is locally funded, supported primarily by over $300 million (≈ $629.8 million in 2026 dollars) in Proposition B sales tax revenues (1997 dollars).","property":"cost_usd","value_text":"over $300 million (1997 dollars)","value_num":300000000.0,"unit":"USD","date_printed":"1997","t_from":"1997","quote":"supported primarily by over $300 million - 1997 dollars - in Proposition B local sales tax revenues","place_label":"Third Street","place_precision":"street","place_id":"qipu:sf/place/street/03rd-st","resolved_by":"place links file","anchor":"s-bdbd65dfc945","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"The Third Street Light Rail Project is included in the current Metropolitan Transportation Commission"},{"claim_id":"c:bf47acd8bd793e10f851efd736037688","page_id":"C124915258:76","page_url":"https://archive.org/details/C124915258/page/n75","statement_kind":"cites_decision","subject_label":"FTA authorization of Third Street Project","summary":"The FTA Regional Administrator concurred with MIS completion and authorized the Third Street Project to proceed with Preliminary Engineering and a Draft EIS.","property":"approved","value_text":"authorized Preliminary Engineering and preparation of Draft EIS","date_printed":"October 1996","t_from":"1996","quote":"In October 1996, the Regional Administrator from the San Francisco FTA office concurred with MIS completion","place_label":"Third Street","place_precision":"street","place_id":"qipu:sf/place/street/03rd-st","resolved_by":"place links file","anchor":"s-bf47acd8bd79","shown":false,"hidden":"another_body","part":"main_text","speaker":"another_body","speaker_role":"Federal Transit Administration San Francisco office","stance":"quotes_to_report","speaker_evidence":"the [name] from the [name] office concurred with MIS completion"},{"claim_id":"c:f69866c1b7ffa1b639817a1a7a944a27","page_id":"C124915258:81","page_url":"https://archive.org/details/C124915258/page/n80","statement_kind":"proposal","subject_label":"New LRV maintenance facility","summary":"The report identifies the Western Pacific site as the preferred location for the LRV maintenance facility, pending negotiations with the Port.","property":"recommendation","value_text":"Western Pacific site","t_from":"1998","quote":"Identified the Western Pacific site as the preferred location, pending negotiations with the Port.","place_label":"Western Pacific site","anchor":"s-f69866c1b7ff","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Identified the Western Pacific site as the preferred location"},{"claim_id":"c:fc77513a53dc32b783d098f7c6bc4a77","page_id":"C124915258:81","page_url":"https://archive.org/details/C124915258/page/n80","statement_kind":"cites_decision","subject_label":"Central Subway alignment selection","summary":"The Public Transportation Commission selected the Market Street Subway alignment as the initial phase and the Central Subway as the ultimate project.","property":"adopted","value_text":"Market Street Subway initial phase","t_from":"1998","quote":"For capital cost and phasing reasons, the PTC selected the Market Street Subway alignment as the initial phase and the Central Subway as the ultimate project.","place_label":"Market Street","place_precision":"street","place_id":"qipu:sf/place/street/market-st","resolved_by":"place links file","anchor":"s-fc77513a53dc","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"the PTC selected the Market Street Subway alignment as the initial phase"},{"claim_id":"c:785980e9f8d1a4f709f2d0e5f9b070cc","page_id":"C124915258:153","page_url":"https://archive.org/details/C124915258/page/n152","statement_kind":"finding","subject_label":"15-Third bus line","summary":"The 15-Third bus line currently carries over 25,000 daily riders.","property":"other","value_text":"over 25,000 daily riders","value_num":25000.0,"unit":"persons","t_from":"1998","quote":"The 15-Third, which currently carries over 25,000 daily mders, operates between City College and North Beach","place_label":"Third Street","place_precision":"street","place_id":"qipu:sf/place/street/03rd-st","resolved_by":"place links file","anchor":"s-785980e9f8d1","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"3.1.1 TRANSIT Section 3.1.1 provides a discussion"},{"claim_id":"c:fb66f8be42d3b0cee5b0b1b7341df403","page_id":"C124915258:153","page_url":"https://archive.org/details/C124915258/page/n152","statement_kind":"finding","subject_label":"MUNI bus system","summary":"MUNI operates 79 bus lines and carries over 211 million riders annually.","property":"other","value_text":"over 211 million riders","value_num":211000000.0,"unit":"persons","t_from":"1998","quote":"MUNI operates 79 bus lines seven days a week and, on an annual basis, carries over 211 million riders.","anchor":"s-fb66f8be42d3","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"MUNI Transit System Bus System MUNI operates 79 bus lines"},{"claim_id":"c:0941f7ac877dbcae5726520bed112efb","page_id":"C124915258:214","page_url":"https://archive.org/details/C124915258/page/n213","statement_kind":"finding","subject_label":"Parking impacts under New Central Subway","summary":"The EIR finds no significant parking impacts would occur under the New Central Subway.","property":"finding","value_text":"no significant parking impacts","t_from":"1998","quote":"No significant parking impacts would occur under the New Central Subway.","anchor":"s-0941f7ac877d","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"No significant parking impacts would occur under the New Central Subway."},{"claim_id":"c:b5b0f1a4c8bc84886eb3ecf3f3c1870a","page_id":"C124915258:214","page_url":"https://archive.org/details/C124915258/page/n213","statement_kind":"proposal","subject_label":"Union Square parking garage","summary":"The proposed underground pedestrian connection would eliminate two or three parking spaces in the Union Square parking garage.","property":"proposes","value_text":"two or three parking spaces","value_num":2.0,"t_from":"1998","quote":"two or three parking spaces would be eliminated in the Union Square parking garage due to the proposed underground pedestrian connection","place_label":"Union Square parking garage","place_precision":"building","anchor":"s-b5b0f1a4c8bc","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"two or three parking spaces would be eliminated in the Union Square parking garage"},{"claim_id":"c:f652259cf20c30a228b7e6d255b63d1b","page_id":"C124915258:214","page_url":"https://archive.org/details/C124915258/page/n213","statement_kind":"proposal","subject_label":"Parking improvement measures","summary":"The report recommends signs for alternative parking areas during construction and time limits near commercial establishments.","property":"recommendation","t_from":"1998","quote":"it is recommended that signs denoting alternative parking areas (e.g., public parking garages) be placed upstream of and through the construction zones","place_label":"Third Street","place_precision":"street","place_id":"qipu:sf/place/street/03rd-st","resolved_by":"place links file","anchor":"s-f652259cf20c","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"it is recommended that signs denoting alternative parking areas"},{"claim_id":"c:26c6ebf8ec5963fa14cd63741626590b","page_id":"C124915258:281","page_url":"https://archive.org/details/C124915258/page/n280","statement_kind":"finding","subject_label":"Dune sand thickness along Third Street","summary":"The report states the dune sand in the study area along Third Street is about 30 meters thick.","property":"other","value_text":"approximately 30 meters (98 feet)","value_num":98.0,"unit":"ft","t_from":"1998","quote":"Thickness of the sand in the study area along Third Street are approximately 30 meters (98 feet).","place_label":"Third Street","place_precision":"street","place_id":"qipu:sf/place/street/03rd-st","resolved_by":"place links file","anchor":"s-26c6ebf8ec59","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Thickness of the sand in the study area along Third Street are approximately 30 meters"},{"claim_id":"c:c067ceb29e979387c3137039a9264962","page_id":"C124915258:281","page_url":"https://archive.org/details/C124915258/page/n280","statement_kind":"finding","subject_label":"Third Street tunnel alignment geology","summary":"The northbound Third Street tunnel and surface alignment is within surficial deposits to approximately Townsend Street.","property":"other","value_text":"surficial deposits","t_from":"1998","quote":"The northbound Third Street tunnel and surface alignment is within surficial deposits to approximately Townsend Street.","place_label":"Third Street","place_precision":"street","place_id":"qipu:sf/place/street/03rd-st","resolved_by":"place links file","anchor":"s-c067ceb29e97","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"The northbound Third Street tunnel and surface alignment is within surficial deposits"},{"claim_id":"c:1b94b0fe79cb2e9ab784761a27dad8e9","page_id":"C124915258:290","page_url":"https://archive.org/details/C124915258/page/n289","statement_kind":"background","subject_label":"Groundwater basins in the study area","summary":"The study area is underlain by four groundwater basins as defined by the U. [name withheld].","property":"other","value_text":"four groundwater basins","value_num":4.0,"t_from":"1998","quote":"The study area is underlain by four groundwater basins as defined by the U. [name withheld].","anchor":"s-1b94b0fe79cb","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"The study area is underlain by four groundwater basins"},{"claim_id":"c:421df136fe8072b57a63b2e39aa7c16f","page_id":"C124915258:290","page_url":"https://archive.org/details/C124915258/page/n289","statement_kind":"finding","subject_label":"Groundwater depth along New Central Subway alignment","summary":"Groundwater along the New Central Subway alignment is about 12 meters (39 feet) below ground surface near Kearny and California streets.","property":"other","value_text":"approximately 12 meters (39 feet) below ground surface","value_num":39.0,"unit":"ft","t_from":"1998","quote":"Groundwater occurs at depths along the New Central Subway alignment ranging from approximately 12 meters (39 feet) below ground surface near Kearny and California streets","place_label":"Kearny and California streets","place_precision":"intersection","place_id":"qipu:sf/place/street/kearny-st","resolved_by":"place links file","anchor":"s-421df136fe80","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Groundwater occurs at depths along the New Central Subway alignment"},{"claim_id":"c:4d30b407cd5c62d2ed8248550abb63d8","page_id":"C124915258:290","page_url":"https://archive.org/details/C124915258/page/n289","statement_kind":"finding","subject_label":"Tsunami run-up near Ferry Building","summary":"The estimated run-up from a 100-year tsunami near the Ferry Building is 1.7 meters (5.6 feet).","property":"other","value_text":"1.7 meters (5.6 feet)","value_num":5.6,"unit":"ft","t_from":"1998","quote":"The estimated run-up from a tsunami with 100-year return period (i.e., expected to occur once every 100 years, on average) range from 1.7 meters (5.6 feet) near the Ferry Building","place_label":"Ferry Building","place_precision":"building","place_id":"qipu:sf/place/landmark/ferry-building","resolved_by":"place links file","anchor":"s-4d30b407cd5c","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"The estimated run-up from a tsunami with 100-year return period"},{"claim_id":"c:0d28a0d1537d2d0fdfe4b0f6ebd89513","page_id":"C124915258:346","page_url":"https://archive.org/details/C124915258/page/n345","statement_kind":"proposal","subject_label":"New Central Subway construction labor and cost","summary":"The report estimates design and construction of the New Central Subway would require an additional 3,033 person-years of labor.","property":"jobs","value_text":"3,033 person-years","value_num":3033.0,"unit":"persons","t_from":"1998","quote":"design and construction of the New Central Subway would require an additional 3,033 person-years of labor and the expenditure of approximately $500 million for materials and labor.","place_label":"New Central Subway","anchor":"s-0d28a0d1537d","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"As presented in Table 5-2, design and construction of the New Central Subway would require"},{"claim_id":"c:42a645d2dd26bcb6894535357c73435e","page_id":"C124915258:346","page_url":"https://archive.org/details/C124915258/page/n345","statement_kind":"proposal","subject_label":"New Central Subway construction cost","summary":"The report estimates New Central Subway design and construction would cost approximately 500 million dollars for materials and labor.","property":"cost_usd","value_text":"approximately $500 million","value_num":500000000.0,"unit":"USD","t_from":"1998","quote":"the expenditure of approximately $500 million for materials and labor.","place_label":"New Central Subway","anchor":"s-42a645d2dd26","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"the expenditure of approximately $500 million for materials and labor."},{"claim_id":"c:c6add42cd833f05ed2321fc351a5efb7","page_id":"C124915258:346","page_url":"https://archive.org/details/C124915258/page/n345","statement_kind":"proposal","subject_label":"New Central Subway operating jobs","summary":"The report projects the New Central Subway would generate about 80 additional jobs beyond the IOS.","property":"jobs","value_text":"approximately 80 additional jobs","value_num":80.0,"unit":"jobs","t_from":"1998","quote":"The operation of the New Central Subway would generate approximately 80 additional jobs beyond that of the IOS, including at the maintenance facility.","place_label":"New Central Subway","anchor":"s-c6add42cd833","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"The operation of the New Central Subway would generate approximately 80 additional jobs"},{"claim_id":"c:316c3526c45a1ff63b4d0ecce89281ae","page_id":"C124915258:379","page_url":"https://archive.org/details/C124915258/page/n378","statement_kind":"proposal","subject_label":"Design-level geotechnical review at Western Pacific site","summary":"The design-level geotechnical investigations would be reviewed by the Port of San Francisco for compliance with existing building codes.","property":"other","t_from":"1998","quote":"would be reviewed by the Port of San Francisco, Building Inspection and Construction Management Department for compliance with existing building codes","place_label":"Western Pacific Maintenance Facility Site","anchor":"s-316c3526c45a","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"The design-level geotechnical investigations and foundation and soil stabilization recommendations would be reviewed by the Port of San Francisco"},{"claim_id":"c:81c0e7250fc81c49e676b77373129f61","page_id":"C124915258:379","page_url":"https://archive.org/details/C124915258/page/n378","statement_kind":"finding","subject_label":"Western Pacific site artificial fill","summary":"The Western Pacific site is underlain by artificial fill from 1.8 meters (6 feet) to 13 meters (43 feet) deep.","property":"other","value_text":"1.8 meters (6 feet) to 13 meters (43 feet)","value_num":43.0,"unit":"ft","t_from":"1998","quote":"The Western Pacific site is underlain by heterogeneous artificial fill to depths ranging from 1.8 meters (6 feet) to 13 meters (43 feet) below the ground surface.","place_label":"Western Pacific Maintenance Facility Site","anchor":"s-81c0e7250fc8","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"The Western Pacific site is underlain by heterogeneous artificial fill to depths ranging from 1.8 meters"},{"claim_id":"c:3eae2be9ed56bb95e57014e235ae509e","page_id":"C124915258:395","page_url":"https://archive.org/details/C124915258/page/n394","statement_kind":"finding","subject_label":"Groundwater levels in study area","summary":"Groundwater levels in the study area have been reported to range from about 6 to 28 feet below ground surface.","property":"other","value_text":"6 to 28 feet bgs","unit":"ft","t_from":"1998","quote":"Groundwater levels in the study area have been reported to range between 1.8 meters (6 feet) bgs and 8.5 meters (28 feet) bgs.","place_label":"study area","anchor":"s-3eae2be9ed56","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Groundwater levels in the study area have been reported to range"},{"claim_id":"c:a42bec221160b3e863becfdf3a30a0f2","page_id":"C124915258:395","page_url":"https://archive.org/details/C124915258/page/n394","statement_kind":"proposal","subject_label":"Light Rail Alternative construction dewatering","summary":"Light Rail Alternative construction would require excavation below groundwater and therefore dewatering.","property":"other","t_from":"1998","quote":"Construction of the Light Rail Alternative would require excavation below the groundwater level along portions of the alignment.","anchor":"s-a42bec221160","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Construction of the Light Rail Alternative would require excavation below the groundwater level"},{"claim_id":"c:a7d37a477bb491809836eab0366f5df2","page_id":"C124915258:395","page_url":"https://archive.org/details/C124915258/page/n394","statement_kind":"finding","subject_label":"Direct discharge of dewatered groundwater to the Bay","summary":"The document judges it unlikely that the RWQCB would permit direct discharge of dewatering water to the Bay.","property":"other","t_from":"1998","quote":"It is unlikely that the RWQCB would permit this type of discharge.","place_label":"San Francisco Bay","anchor":"s-a7d37a477bb4","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"It is unlikely that the RWQCB would permit this type of discharge."},{"claim_id":"c:d21b9531c8767851cd173d654c7aea3a","page_id":"C124915258:395","page_url":"https://archive.org/details/C124915258/page/n394","statement_kind":"background","subject_label":"Article 20 hazardous materials requirements","summary":"Article 20 of the San Francisco Municipal Code requires measures to avoid hazardous materials effects during construction.","property":"other","t_from":"1998","quote":"Measures to avoid adverse effects caused by the presence of hazardous materials during construction are required by Article 20 of the San Francisco Municipal Code.","anchor":"s-d21b9531c876","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Measures to avoid adverse effects caused by the presence of hazardous materials"},{"claim_id":"c:7cffa8ca687df9ac6a3e8d41ff97244b","page_id":"C124915258:413","page_url":"https://archive.org/details/C124915258/page/n412","statement_kind":"finding","subject_label":"Light Rail Alternative regional emissions","summary":"Overall the Light Rail Alternative would reduce regional emissions, although the Maintenance Facility would slightly increase them.","property":"other","value_text":"net reduction in regional emissions","t_from":"1998","quote":"Overall, the Light Rail Alternative would result in a net reduction in regional emissions, although a slight increase in regional emissions would result from the Maintenance Facility.","anchor":"s-7cffa8ca687d","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"5.0: ENVIRONMENTAL CONSEQUENCES AND MITIGATION MEASURES"},{"claim_id":"c:e526355e02b6ec1b0fc184cec5949d9a","page_id":"C124915258:413","page_url":"https://archive.org/details/C124915258/page/n412","statement_kind":"finding","subject_label":"Light Rail Alternative regional vehicle miles traveled","summary":"The Light Rail Alternative would reduce daily regional VMT compared with the No Project and No Build/TSM Alternatives.","property":"other","value_text":"net reduction of daily VMT","t_from":"1998","quote":"there would be a net reduction of daily VMT for the region with the implementation of the Light Rail Alternative, compared to the No Project and No Build/TSM Alternatives.","anchor":"s-e526355e02b6","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Regional emissions would slightly increase due to additional vehicular traffic"},{"claim_id":"c:f1728bb0c6a1cf99732f2d5d622e0942","page_id":"C124915258:413","page_url":"https://archive.org/details/C124915258/page/n412","statement_kind":"proposal","subject_label":"Construction impacts of maintenance facility","summary":"The document states construction impacts would be less than significant if the No Build/TSM construction mitigation measures were implemented.","property":"other","value_text":"less than significant","t_from":"1998","quote":"The construction-related impacts would be reduced to a less than significant level if the construction mitigation measures for the No Build/TSM Alternative, described above, were implemented.","anchor":"s-f1728bb0c6a1","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"The construction-related impacts would be reduced to a less than significant level"},{"claim_id":"c:f7063daf6db65ff15c5102985656259c","page_id":"C124915258:413","page_url":"https://archive.org/details/C124915258/page/n412","statement_kind":"finding","subject_label":"Maintenance facility regional emissions","summary":"Regional emissions would slightly increase due to added vehicle traffic to and from the maintenance facility site.","property":"other","value_text":"slight increase","t_from":"1998","quote":"Regional emissions would slightly increase due to additional vehicular traffic to and from the maintenance facility site","place_label":"maintenance facility site","anchor":"s-f7063daf6db6","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Regional emissions would slightly increase due to additional vehicular traffic to and"},{"claim_id":"c:42d6d44afc41611e16b2aae10bd3337f","page_id":"C124915258:448","page_url":"https://archive.org/details/C124915258/page/n447","statement_kind":"finding","subject_label":"MUNI infrastructure maintenance spending","summary":"An estimated 203 million dollars will be spent on maintaining MUNI infrastructure through FY 2006.","property":"cost_usd","value_text":"$203 million","value_num":203000000.0,"unit":"USD","date_printed":"through FY 2006","t_from":"2006","quote":"An estimated $203 million will be spent on maintaining MUNI's infrastructure through FY 2006.","anchor":"s-42d6d44afc41","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"7.0: FINANCIAL FEASIBILITY - ASSESSMENT OF FINANCIAL CONDITION; Infrastructure Improvements"},{"claim_id":"c:5513c96a3b338bcd4aa94d96f01f1dbe","page_id":"C124915258:448","page_url":"https://archive.org/details/C124915258/page/n447","statement_kind":"background","subject_label":"MUNI passenger fare levels","summary":"The Financial Condition report assumes fare levels stay at current rates because the Board of Supervisors sets fare policy.","property":"other","value_text":"current rates","t_from":"1998","quote":"Because fare levels are policy determinations by the Board of Supervisors, this Financial Condition report assumes fare levels will remain at current rates.","anchor":"s-5513c96a3b33","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Passenger Fares; this Financial Condition report assumes fare levels"},{"claim_id":"c:78493f80a9db02d2e1d6e352a2aa2f71","page_id":"C124915258:448","page_url":"https://archive.org/details/C124915258/page/n447","statement_kind":"finding","subject_label":"MUNI facility improvement costs","summary":"Costs to maintain usage of many MUNI transit facilities have been estimated at about 25.9 million dollars.","property":"cost_usd","value_text":"-$25.9 million","value_num":25900000.0,"unit":"USD","t_from":"1998","quote":"Those costs have been estimated at -$25.9 million.","anchor":"s-78493f80a9db","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Facility Improvements; Those costs have been estimated at"},{"claim_id":"c:c709590f0533733bd757a1598c6193f5","page_id":"C124915258:448","page_url":"https://archive.org/details/C124915258/page/n447","statement_kind":"background","subject_label":"General Fund transfer to MUNI","summary":"A General Fund budget augmentation to MUNI, equal to former Hetch Hetchy transfers, has been about 7.5 million dollars annually since FY 1994.","property":"other","value_text":"approximately $7.5 million annually","value_num":7500000.0,"unit":"USD","date_printed":"since FY 1994","t_from":"1994","quote":"This transfer has been approximately $7.5 million annually since FY 1994.","anchor":"s-c709590f0533","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"General Fund; This transfer has been approximately"},{"claim_id":"c:6d9deee701b9db1e8bc8991b7d7bf38b","page_id":"C124915258:486","page_url":"https://archive.org/details/C124915258/page/n485","statement_kind":"background","subject_label":"General Plan transit policy","summary":"Appendix B lists a transit policy that rapid transit lines should lead to stations and terminals connected in downtown San Francisco.","property":"other","t_from":"1998","quote":"Policy 4.1: Rapid transit lines from all outlying corridors should lead to stations and terminals that are adjacent or connected to each other in downtown San Francisco.","place_label":"downtown San Francisco","anchor":"s-6d9deee701b9","shown":true,"part":"appendix","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"APPENDICES - APPENDIX B Policy 4.1: Rapid transit lines"}]}