Qipudata
San Francisco · v0.9.2

Records › City reports › Community safety element (1996)

Cover of the report
City report · plan · 1996

Community safety element (1996)

Community safety element : summary background report

A plan by the City Planning Department on earthquake, fire, tsunami and other hazards that could affect San Francisco, with recommendations for reducing their risks.The Board of Supervisors amended the General Plan to add the Community Safety Element in August 1997. Scan on the Internet Archive ↗

Residents
about 750,000Scan 32 ↗
Daytime population
about 1.3 million peopleScan 32 ↗
Jobs at risk
up to 42,000Scan 47 ↗

“[name withheld]” stands for a name the release withholds (Privacy).

Report recommendations
  • The state's preliminary liquefaction map for the northern part of the City is to be issued in mid-1996 for public review.Scan 25 ↗
  • Map 6 shows areas of potential inundation from a tsunami with a 20 foot run-up at the Golden Gate.Scan 29 ↗
Findings
  • Following a magnitude 8.3 earthquake, about 29,000 feet of sewers are likely to need replacement in vulnerable areas.Scan 40 ↗
Board decisions
  • 1996 · This reportCity and County of San Francisco, Planning Department
  • Resolution amending the General Plan with a Community Safety Element is referred to the Housing and Neighborhood Services Committee.Record · Journal page ↗
  • Resolution adopting a negative declaration for the Community Safety Element is referred to the Housing and Neighborhood Services Committee.Record · Journal page ↗
  • General Plan amended to add the Community Safety Element, as adopted by the Planning Commission.Record · Journal page ↗
  • Final negative declaration adopted: adding a Community Safety Element to the General Plan has no significant environmental impact.Record · Journal page ↗
30 quotes from the scan

Printed words Quoted from the page as read from the scan.

Report recommendations-d7faab0d8755

“It is being updated and will be presented to the Board of Supervisors for its approval in 1996.”

Scan 8

Findings-0d2c2cbdc25b

“A preliminary map showing areas with a potential for liquefaction during an earthquake is being released for local review in mid-1996.”

Scan 9

Backgrounds-8e5217ea26ef

“In 1990 the California Legislature enacted the Seismic Hazards Mapping Act (Chapter 1168, Statutes of 1990).”

Scan 9

Findings-49d409303215

“This one is less likely to occur, with a likelihood of 2% by the year 2020.”

Scan 15

Findings-c456b454d098

“The most damaging possible earthquake would be a magnitude 8 on the North Coast Segment of the San Andreas fault, similar to the 1906 earthquake.”

Scan 15

Findings-1a692e17b9f1

“Liquefiable soils in San Francisco usually include uncompressed artificial fill, unconsolidated sand or dune sand, with a high water level.”

Scan 25

Backgrounds-49227b31ecbb

“The California Department of Conservation, Division of Mines and Geology (CDMG) is preparing maps of areas of liquefaction potential, as required by the Seismic Hazard Mapping Act of 1990.”

Scan 25

Backgrounds-f35ebafae384

“Liquefaction is the transformation of a confined layer of sandy water-saturated material into a liquid-like state because of earthquake shaking.”

Scan 25

Report recommendations-d17fed50b0a6

“Map 6 shows the areas of potential inundation a tsunami with a 20 foot run-up at the Golden Gate.”

Scan 29

Findings-0b325a4f5849

“In 1987, the California Division of Mines and Geology estimated a range of 1,500-4,500 deaths from a magnitude 7.5 earthquake on the Hayward Fault.”

Scan 32

Findings-523d9a8d1f43

“San Francisco’s residential population of about 750,000 is a reasonable estimate of nighttime population.”

Scan 32

Findings-c4c9637d7368

“Non-ductile concrete frame buildings were constructed as factories, warehouses, or office buildings in the densest parts of the City until the San Francisco building code was changed in 1968 to require ductility.”

Scan 35

Findings-85135bcc7355

“The 1994 Northridge earthquake resulted In an estimated loss of about $20 billion.”

Scan 45

Findings-c0a2a54dd993

“Structural damage to private and public facilities in the [name withheld] earthquake resulted in an estimated cost of about $6 billion to the region.”

Scan 45

Findings-ec1ce6530b00

“The part of the City most vulnerable to fire, the dense downtown area, also contains many historic buildings and other structures.”

Scan 45

Findings-0e9c37a89d9c

“Many San Francisco hospitals were built before 1973, and may be subject to loss of function after an earthquake.”

Scan 51

Findings-68e72054d4b7

“About 1,450 of the state’s 12,000 transportation structures require retrofit under this standard, with another 875 still in the analysis/design process.”

Scan 56

Report recommendations-2d85a0882ee2

“The Bay Bridge, because of its critical role in the region’s transportation system, will be retrofit to a standard higher than no collapse.”

Scan 57

Findings-4dfaa9dd8475

“Mains in areas with poor soils will be replaced first. 35,000 linear feet are replaced each year.”

Scan 57

Report recommendations-607aea35e392

“The District will supply 20% of the $175 million cost and is seeking federal funding for the rest.”

Scan 57

Backgrounds-462d0c66f654

“Current regulations allocate 15% of all FEMA disaster funding to hazard mitigation.”

Scan 67

Findings-710ba035505a

“Hazard mitigation grants of seven million dollars has been approved for San Francisco projects.”

Scan 67

Findings-baebb71fb65f

“After the Loma Prieta earthquake, about 2,500 households received temporary housing assistance.”

Scan 67

Backgrounds-c38f16dec676

“Local agencies need to provide 25% of the funding of approved projects.”

Scan 67

Findings-d780c8e4ad96

“The Los Angeles County Reconstruction Authority has not been established.”

Scan 72

Backgrounds-f1c470f8c3a7

“The Emergency Operations Organization of the City of Los Angeles approved a Recovery and Reconstruction Plan in 1994.”

Scan 72

Identifier ia:C124916687