{"note":"Statements read from one scanned government report in the IGS library collection on the Internet Archive. Each statement has a verbatim quote found on its page (quote, page_url). The summary and subject_label of each statement were written by a model (Claude Haiku 5.5) and can be wrong: read the page before quoting. At most 20 selected pages of a report were read. Keys are the column names of the tables igs_reports and igs_claims; a column that is null for a statement is left out, and columns with one value for every statement of this report are given once under same_for_every_statement. \"[name withheld]\" stands where the release withholds a name; the site's page guard withholds a few more in reports after 1951, so a cell here can differ from the table; for a few reports prepared_by and creator are left out. A statement's links to the Board record are under links (show_target_kind: decision, instrument or ballot measure; show_target_id; show_url); they replace the table's decision_id and instrument_id, which are left out. place_id, place_label and place_precision come from a corrected place match where there is one. part, speaker, speaker_role, stance and speaker_evidence say who is speaking: a model (Claude Haiku 5.5) read each page and its context and can be wrong. part: main_text, attachment, appendix, letter, comment, response, table or cover_or_contents; speaker: issuer, another_body, letter_writer or unclear; speaker_role: a role or organisation, never a personal name; stance: own_position, quotes_to_dispute, quotes_to_report, restates_to_reject or unclear. The report page shows a statement only when speaker is issuer, part is main_text or appendix, and stance is own_position or quotes_to_report; hidden gives the part, the speaker or the stance of the others. ","release":"v0.9.2","licence":"CC0-1.0","slug":"c124917982","url":"https://data.qipu.org/usa/san-francisco/reports/c124917982/","statement_url":"https://data.qipu.org/usa/san-francisco/reports/c124917982/#{anchor}","tables":{"igs_reports":"https://tiles.qipu.org/data/releases/v0.9.2/parquet/igs_reports.parquet","igs_claims":"https://tiles.qipu.org/data/releases/v0.9.2/parquet/igs_claims.parquet"},"report":{"report_id":"C124917982","source_id":"C124917982","title":"San Francisco Unified School District : operational audit, school repair program : 1988 Proposition A, 1990 Proposition B : final report","year":1995,"n_pages":106,"creator":"Coopers & Lybrand","source_url":"https://archive.org/details/C124917982","issuer":"San Francisco Unified School District","issuer_type":"government","gov_level":"school_district","prepared_by":"Coopers & Lybrand (Coopers & Lybrand Consulting)","doc_kind":"audit_financial","jurisdiction":"San Francisco","jurisdiction_id":"sf","city":"sf","issuer_by":"model","doc_kind_by":"meta","jurisdiction_by":"model","run_id":"igs-labels-rules+haiku55-cli-2026-10-23"},"pages_with_statements":14,"statements_total":61,"statements_by_kind":{"finding":39,"proposal":17,"cites_decision":2,"background":3},"same_for_every_statement":{"source_id":"C124917982","source_url":"https://archive.org/details/C124917982","source_label":"IGS library: San Francisco Unified School District : operational audit, school repair program : 1988 Proposition A, 1990 Proposition ","report_year":1995,"issuer":"San Francisco Unified School District","issuer_type":"government","doc_kind":"audit_financial","t_precision":"year","status":"extracted","claim_kind":"observation","extraction_table":"igs_claims","run_id":"igs-sf-pages-v2-haiku55-batch-2026-10-23","city":"sf","prompt_version":"igs-page-v2-2026-10-23"},"summary":{"what":"A 1995 audit by the San Francisco Unified School District about Balboa High School.","next":"In January 2002 the Board rejected a resolution urging the District to honour its promise on Proposition A bond money.","next_decision":"qipu:sf/decision/meetingminutesjanmay97sanfrich:45/1","figures":[{"label":"Proposition A","value":"$90 million bond issue","claim_ids":["c:f5b1d974bf3b971a8064a4b45ba3de8a"]},{"label":"Proposition B","value":"$90 million bond issue","claim_ids":["c:f5faa421ef49ac885c970e7d454141e7"]},{"label":"Spent","value":"$98.4 million spent","claim_ids":["c:3390f6b1cee1dfbe9a96761a26e75fc2"]},{"label":"Unfunded need","value":"$293 million unfunded need","claim_ids":["c:fa171d5db064551b90c4da00fcd94826"]}],"main_points":["c:1eead436cdd99bd62f31e35a6bd9ff9b","c:182a5d0286424e31fdd093979661214d","c:ac236fce93b00b9d643853075516a6da"],"board_decisions_after":["qipu:sf/decision/meetingminutesjanmay97sanfrich:45/1","qipu:sf/decision/meetingjanmar2004minutes991sanfrich:67/1","qipu:sf/decision/meetingminutesbo2001sanf:378/5","qipu:sf/decision/meetingminutesjanapr96sanfrich:382/5","qipu:sf/decision/meetingminutesb2001sanf_0:441/4","qipu:sf/decision/meetingminutesmayaug96sanfrich:445/4","qipu:sf/decision/meetingminutes96septdecsanfrich:157/1","qipu:sf/decision/meetingminutesbo2002sanf:45/1"],"board_decisions_before":["qipu:sf/decision/journalofjuldecproceed87sanfrich:307/2"],"made_by":"A model (Claude Haiku 5.5) wrote the lead and picked the figures, main points and later Board decisions from the statements, from a second reading of the report's summary and cost pages, and from Board decisions dated 3 years before to 10 years after the report; every number it wrote was checked against them, and a figure must be about the report's own area or project."},"statements":[{"claim_id":"c:2b39314bd3b7119d05dda16ad235cdd3","page_id":"C124917982:9","page_url":"https://archive.org/details/C124917982/page/n8","statement_kind":"finding","subject_label":"FP&C performance","summary":"The review found that FP&C performed adequately (average) in its management of the sampled school projects.","property":"finding","value_text":"adequately (average)","t_from":"1995","quote":"After an in-depth review of three sample schools and a review of the FP&C project management policies and procedures in general, we found that FP&C performed adequately (average) in their","anchor":"s-2b39314bd3b7","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"After an in-depth review of three sample schools"},{"claim_id":"c:96a8982489b8556f8af29bcb23eadbf1","page_id":"C124917982:9","page_url":"https://archive.org/details/C124917982/page/n8","statement_kind":"finding","subject_label":"Proposition A expenditure","summary":"As of December 31, 1994, approximately 97% of Proposition A funds had been expended.","property":"other","value_text":"approximately 97%","value_num":97.0,"unit":"percent","date_printed":"December 31, 1994","t_from":"1994","quote":"As of December 31, 1994, approximately 97% of the funds from Proposition A had been expended.","anchor":"s-96a8982489b8","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"As of December 31, 1994, approximately 97% of the funds"},{"claim_id":"c:a5a5301168d0ddaae3e51ce347d29316","page_id":"C124917982:9","page_url":"https://archive.org/details/C124917982/page/n8","statement_kind":"background","subject_label":"Operational audit engagement","summary":"The Superintendent engaged Coopers & Lybrand in March 1995 to perform an operational audit of the Proposition A school repair program.","property":"other","date_printed":"March 1995","t_from":"1995","quote":"Coopers & Lybrand L.L.P. was engaged by the Superintendent in March, 1995 to perform an operational audit of the school repair program","anchor":"s-a5a5301168d0","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Objectives of the Review Coopers & Lybrand L.L.P. was engaged by the Superintendent"},{"claim_id":"c:c2430dd1a9cf048dabe2da4bbf237126","page_id":"C124917982:9","page_url":"https://archive.org/details/C124917982/page/n8","statement_kind":"background","subject_label":"Proposition B bond measure","summary":"Proposition B, the 1990 bond measure, provided an additional $90 million (≈ $232.0 million in 2026 dollars) for earthquake repairs, seismic upgrades, fire and safety, and deferred maintenance.","property":"cost_usd","value_text":"$90 million","value_num":90000000.0,"unit":"USD","date_printed":"1990","t_from":"1990","quote":"Proposition B, the 1990 bond measure for an additional $90 million targeted for earthquake repairs, seismic upgrades, fire and safety issues, as well as deferred maintenance.","anchor":"s-c2430dd1a9cf","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Proposition B, the 1990 bond measure for an additional $90 million"},{"claim_id":"c:e085955a19a4ee37e0d79806217becba","page_id":"C124917982:9","page_url":"https://archive.org/details/C124917982/page/n8","statement_kind":"finding","subject_label":"Total school repair needs","summary":"Total repair needs for all SFUSD schools were estimated at over $450 million (≈ $994.9 million in 2026 dollars) prior to the earthquake.","property":"cost_usd","value_text":"over $450 million","value_num":450000000.0,"unit":"USD","t_from":"1995","quote":"With total repair needs for all SFUSD schools estimated at over $450 million prior to the earthquake, it was expected that the total money available would cover many serious deficiencies","anchor":"s-e085955a19a4","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"With total repair needs for all SFUSD schools estimated at over $450 million"},{"claim_id":"c:19b67858d2d52e1a192ed99f1cdb4343","page_id":"C124917982:15","page_url":"https://archive.org/details/C124917982/page/n14","statement_kind":"proposal","subject_label":"Monthly summary report","summary":"The report recommends that a summary report for the construction program be developed and issued monthly.","property":"recommendation","value_text":"monthly","t_from":"1995","quote":"We also recommend that a summary report for the construction program be developed and issued monthly.","anchor":"s-19b67858d2d5","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"We also recommend that a summary report for the construction program"},{"claim_id":"c:261a92c40d043f4477e1e4291112c161","page_id":"C124917982:15","page_url":"https://archive.org/details/C124917982/page/n14","statement_kind":"finding","subject_label":"Construction contingency practice","summary":"The District uses a standard 10% contingency for each construction project regardless of type, size, or complexity.","property":"other","value_text":"standard 10% contingency","value_num":10.0,"unit":"percent","t_from":"1995","quote":"We found that the District has the current practice of using a standard 10% contingency for each construction project.","anchor":"s-261a92c40d04","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"quotes_to_report","speaker_evidence":"We found that the District has the current practice of using a standard 10% contingency"},{"claim_id":"c:776801a8222cabbdb7909ac0fcf80cb8","page_id":"C124917982:15","page_url":"https://archive.org/details/C124917982/page/n14","statement_kind":"proposal","subject_label":"FP&C project management system","summary":"The report recommends implementing the recently developed project management system developed by FP&C.","property":"recommendation","t_from":"1995","quote":"We recommend implementing the recently developed project management system developed by FP&C.","anchor":"s-776801a8222c","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"We recommend implementing the recently developed project management system"},{"claim_id":"c:c4d35c2644c512b2556bda28602d0496","page_id":"C124917982:15","page_url":"https://archive.org/details/C124917982/page/n14","statement_kind":"proposal","subject_label":"Project Execution Flow Chart","summary":"The report recommends that the flow chart be expanded to include an accompanying Project Procedure detailing each step.","property":"recommendation","t_from":"1995","quote":"We recommend that the flow chart be expanded to include an accompanying Project Procedure which details each step along the chart.","anchor":"s-c4d35c2644c5","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"We recommend that the flow chart be expanded to include an accompanying Project Procedure"},{"claim_id":"c:fb90534b58f2628c013a8379f23e6340","page_id":"C124917982:15","page_url":"https://archive.org/details/C124917982/page/n14","statement_kind":"proposal","subject_label":"Construction contingency","summary":"The report recommends that the contingency be varied depending on the type, size, and complexity of the project.","property":"recommendation","t_from":"1995","quote":"However, we also recommend that the contingency be varied depending on the type, size, and complexity of the project.","anchor":"s-fb90534b58f2","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"However, we also recommend that the contingency be varied"},{"claim_id":"c:1eead436cdd99bd62f31e35a6bd9ff9b","page_id":"C124917982:21","page_url":"https://archive.org/details/C124917982/page/n20","statement_kind":"proposal","subject_label":"Inspector reporting lines","summary":"The report recommends that the Inspectors report to the Design Department within FP&C, not the project management group.","property":"recommendation","t_from":"1995","quote":"We recommend that the Inspectors report to the Design Department within FP&C, not the project management group.","anchor":"s-1eead436cdd9","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"We recommend that the Inspectors report to the Design Department"},{"claim_id":"c:7399918a0791457f55f79e1225c405e2","page_id":"C124917982:21","page_url":"https://archive.org/details/C124917982/page/n20","statement_kind":"proposal","subject_label":"Substitutions policy","summary":"The report recommends that SFUSD develop a formal substitutions policy requiring requests within the first 10% of contract time.","property":"recommendation","value_text":"first 10% of the contract time","value_num":10.0,"unit":"percent","t_from":"1995","quote":"We recommend that SFUSD develop a formal, tough substitutions policy similar to the following:","anchor":"s-7399918a0791","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"We recommend that SFUSD develop a formal, tough substitutions policy"},{"claim_id":"c:8168e95d06e5ea68eed1414a4321095e","page_id":"C124917982:21","page_url":"https://archive.org/details/C124917982/page/n20","statement_kind":"finding","subject_label":"Liquidated damages","summary":"The review found no case where a contractor was found deficient and liquidated damages were enforced.","property":"finding","t_from":"1995","quote":"we did not find a single case where the contractor was found to be deficient in his contractual duties and the LD's were enforced.","anchor":"s-8168e95d06e5","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"We found liquidated damage (LD's) clauses in every major contract."},{"claim_id":"c:cba4322402657895aab6a8f34184227c","page_id":"C124917982:21","page_url":"https://archive.org/details/C124917982/page/n20","statement_kind":"finding","subject_label":"Architect of record site visits","summary":"The architect of record did not always visit the site on a weekly basis and relied heavily on the inspectors.","property":"finding","t_from":"1995","quote":"The architect of record did not always visit the site on a weekly basis and relied heavily on the inspectors.","anchor":"s-cba432240265","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"The architect of record did not always visit the site on a weekly basis"},{"claim_id":"c:475742f3db7802a031bbe25e908524c3","page_id":"C124917982:25","page_url":"https://archive.org/details/C124917982/page/n24","statement_kind":"background","subject_label":"Scope of Proposition A repairs","summary":"Proposition A was designed to fund basic repairs such as restrooms, windows, roofs, walls, heating systems, and electrical wiring.","property":"other","date_printed":"1988","t_from":"1988","quote":"Proposition A was designed to fund basic repairs such as outdated and deteriorated restrooms, windows, roofs, walls, heating systems, and electrical wiring.","anchor":"s-475742f3db78","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Proposition A was designed to fund basic repairs"},{"claim_id":"c:6a8dcc70ca147db7886ad0e94c4c1355","page_id":"C124917982:25","page_url":"https://archive.org/details/C124917982/page/n24","statement_kind":"finding","subject_label":"Age of SFUSD operating schools","summary":"The average age of the 142 operating schools and child care centers is 45 years, with 10 schools over 65 years old.","property":"other","value_text":"45 years average age","value_num":45.0,"unit":"years","t_from":"1995","quote":"The average age of the 142 operating schools and child care centers in the San Francisco Unified School District (SFUSD) is 45 years, with 10 schools over 65 years old.","anchor":"s-6a8dcc70ca14","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"The average age of the 142 operating schools"},{"claim_id":"c:8c528fe90c6f68a64269183a5810506e","page_id":"C124917982:25","page_url":"https://archive.org/details/C124917982/page/n24","statement_kind":"finding","subject_label":"Fire and life safety work category","summary":"A twelfth work category, fire and life safety improvements, became necessary almost immediately after the program began.","property":"other","value_text":"twelfth work category","t_from":"1995","quote":"Almost immediately, it became apparent that a twelfth work category, fire and life safety improvements, was required.","anchor":"s-8c528fe90c6f","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Almost immediately, it became apparent that a twelfth work category"},{"claim_id":"c:b029fe3a0c538101eaab0cd50f16704f","page_id":"C124917982:25","page_url":"https://archive.org/details/C124917982/page/n24","statement_kind":"finding","subject_label":"Modernization cost of school facilities","summary":"A 1988 study showed that over $450 million (≈ $1.3 billion in 2026 dollars) would be required to modernize these facilities.","property":"cost_usd","value_text":"over $450 million","value_num":450000000.0,"unit":"USD","date_printed":"1988","t_from":"1988","quote":"In 1988, a study showed that over $450 million would be required to modernize these facilities.","anchor":"s-b029fe3a0c53","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"quotes_to_report","speaker_evidence":"In 1988, a study showed that over $450 million"},{"claim_id":"c:f5b1d974bf3b971a8064a4b45ba3de8a","page_id":"C124917982:25","page_url":"https://archive.org/details/C124917982/page/n24","statement_kind":"cites_decision","subject_label":"Proposition A 1988 school repair bond","summary":"Voters approved Proposition A in 1988, a $90 million (≈ $256.3 million in 2026 dollars) bond issue to fund the most urgent school repairs at 128 schools.","property":"approved","value_text":"$90 million bond issue","value_num":90000000.0,"unit":"USD","date_printed":"1988","t_from":"1988","quote":"The voters in San Francisco responded by approving Proposition A in 1988, a $90 million bond issue to fund the most urgent school repairs at 128 schools.","decided_by":"Voters","instrument_kind":"proposition","instrument_printed":"Proposition A","instrument_date_printed":"1988","anchor":"s-f5b1d974bf3b","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"The voters in San Francisco responded by approving Proposition A"},{"claim_id":"c:f5faa421ef49ac885c970e7d454141e7","page_id":"C124917982:25","page_url":"https://archive.org/details/C124917982/page/n24","statement_kind":"cites_decision","subject_label":"Proposition B 1990 earthquake repair bond","summary":"Proposition B, an additional $90 million (≈ $232.0 million in 2026 dollars) bond issue, was passed in 1990 to provide money for earthquake repairs.","property":"approved","value_text":"$90 million bond issue","value_num":90000000.0,"unit":"USD","date_printed":"1990","t_from":"1990","quote":"This was followed by Proposition B, an additional $90 million bond issue that was passed in 1990 and provided money for earthquake repairs.","decided_by":"Voters","instrument_kind":"proposition","instrument_printed":"Proposition B","instrument_date_printed":"1990","anchor":"s-f5faa421ef49","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"This was followed by Proposition B, an additional $90 million"},{"claim_id":"c:3390f6b1cee1dfbe9a96761a26e75fc2","page_id":"C124917982:29","page_url":"https://archive.org/details/C124917982/page/n28","statement_kind":"finding","subject_label":"Proposition A spending","summary":"Through December 31, 1994, $98.4 million (≈ $223.7 million in 2026 dollars) had been spent, leaving a balance of $3.1 million (≈ $7.0 million in 2026 dollars).","property":"other","value_text":"$98.4 million spent","value_num":98400000.0,"unit":"USD","date_printed":"December 31, 1994","t_from":"1994","quote":"Through December 31, 1994, $98.4 million had been spent leaving a balance of $3.1 million.","anchor":"s-3390f6b1cee1","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Through December 31, 1994, $98.4 million had been spent"},{"claim_id":"c:98e94eca82647feb2b45c1a3976a1dc8","page_id":"C124917982:29","page_url":"https://archive.org/details/C124917982/page/n28","statement_kind":"finding","subject_label":"Proposition A proceeds","summary":"Proposition A proceeds grew to approximately $101.5 million (≈ $289.1 million in 2026 dollars), including interest, through December 1994.","property":"other","value_text":"approximately $101.5 million","value_num":101500000.0,"unit":"USD","date_printed":"July 1988 to December 1994","t_from":"1988","quote":"The original $90 million proceeds from Proposition A (bond principal) grew to approximately $101.5 million including interest received on the invested fund principal from July, 1988 to December, 1994.","anchor":"s-98e94eca8264","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"The original $90 million proceeds from Proposition A"},{"claim_id":"c:c7d82e84d9c29907a5814e903b1bba1e","page_id":"C124917982:29","page_url":"https://archive.org/details/C124917982/page/n28","statement_kind":"finding","subject_label":"Proposition A 1994 passage","summary":"The latest Proposition A was passed in 1994.","property":"approved","value_text":"latest Proposition A passed in 1994","date_printed":"1994","t_from":"1994","quote":"determine if improvements could be recommended for the ongoing programs being carried out under Proposition B and the latest Proposition A passed in 1994.","anchor":"s-c7d82e84d9c2","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Objectives of the Review"},{"claim_id":"c:fa171d5db064551b90c4da00fcd94826","page_id":"C124917982:29","page_url":"https://archive.org/details/C124917982/page/n28","statement_kind":"finding","subject_label":"Unfunded school repair need","summary":"Estimated costs for the ensuing five years were $67 million (≈ $148.1 million in 2026 dollars), leaving an unfunded need of $293 million (≈ $647.8 million in 2026 dollars).","property":"cost_usd","value_text":"$293 million unfunded need","value_num":293000000.0,"unit":"USD","t_from":"1995","quote":"the ensuing five years were estimated at $67 million, leaving an unfunded need of $293 million.","anchor":"s-fa171d5db064","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"the ensuing five years were estimated at $67 million"},{"claim_id":"c:6ea45f2a99ae9affd7e30d8b5b4cac38","page_id":"C124917982:51","page_url":"https://archive.org/details/C124917982/page/n50","statement_kind":"proposal","subject_label":"Contingencies in budgeting and managing design and construction projects","summary":"The auditors recommend that the District continue to use contingencies when budgeting for and managing design and construction projects.","property":"recommendation","t_from":"1995","quote":"We recommend that the District continue to use contingencies when budgeting for and managing design and construction projects.","anchor":"s-6ea45f2a99ae","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Recommendation: We recommend that the District continue"},{"claim_id":"c:a2bb0af11a6baee8ddc99d5215dfc4c1","page_id":"C124917982:51","page_url":"https://archive.org/details/C124917982/page/n50","statement_kind":"finding","subject_label":"Variations in project contingencies","summary":"Variations in contingency depending on project type, size, and complexity must be approved by the Director of Facilities Planning and Management Operations.","property":"other","t_from":"1995","quote":"Any variations in the contingency on a project, depending on the type, size, and complexity must be approved by the Director of Facilities Planning and Management Operations.","anchor":"s-a2bb0af11a6b","shown":false,"hidden":"response","part":"response","speaker":"another_body","speaker_role":"another body","stance":"own_position","speaker_evidence":"District Response: This recommendation has been implemented."},{"claim_id":"c:f443e7749158ebcd729732721ef8b605","page_id":"C124917982:51","page_url":"https://archive.org/details/C124917982/page/n50","statement_kind":"finding","subject_label":"District contingency requirement for new construction","summary":"The District currently requires a 5% contingency for new construction, in addition to the standard 10% for renovation projects.","property":"other","value_text":"5% contingency for new construction","value_num":5.0,"unit":"percent","t_from":"1995","quote":"In addition to the standard 10% contingency for renovation projects, the District currently requires a 5% contingency for new construction.","anchor":"s-f443e7749158","shown":false,"hidden":"response","part":"response","speaker":"another_body","speaker_role":"the District","stance":"own_position","speaker_evidence":"District Response: This recommendation has been implemented."},{"claim_id":"c:0cf8bece38386636384fdd324c428471","page_id":"C124917982:61","page_url":"https://archive.org/details/C124917982/page/n60","statement_kind":"finding","subject_label":"ORS plan checks","summary":"ORS plan checks often take four months or more.","property":"other","value_text":"four months or more","value_num":4.0,"t_from":"1995","quote":"it often takes four months or more for ORS plan checks","anchor":"s-0cf8bece3838","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"a strong argument can be made that the additional burden in time"},{"claim_id":"c:81a898d17284d31dfa8d49d9c75ffa8a","page_id":"C124917982:61","page_url":"https://archive.org/details/C124917982/page/n60","statement_kind":"proposal","subject_label":"Review of the ORS approval requirement","summary":"The auditors believe the requirement for ORS approval should be reviewed and possibly amended because of its time and money costs.","property":"recommendation","t_from":"1995","quote":"We believe that a significant enough amount of time and money is involved here to warrant further investigation into getting the requirement reviewed and possibly amended.","anchor":"s-81a898d17284","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"We believe that a significant enough amount of time and money"},{"claim_id":"c:d7d7df5d78b0b238a153cbc59916dfff","page_id":"C124917982:61","page_url":"https://archive.org/details/C124917982/page/n60","statement_kind":"finding","subject_label":"Department of the State Architect review requirement","summary":"The District requires Department of the State Architect review of projects that change structural design, affect accessibility or fire protection, or cost more than $20,000 (≈ $44,218 in 2026 dollars).","property":"other","value_text":"$20,000","value_num":20000.0,"unit":"USD","t_from":"1995","quote":"All projects that modify the structural design of a building, involve revisions to site accessibility or fire protection systems, or which cost more than $20,000 must be reviewed by the Department of the State Architect (DSA).","anchor":"s-d7d7df5d78b0","shown":false,"hidden":"response","part":"response","speaker":"another_body","speaker_role":"District response","stance":"quotes_to_report","speaker_evidence":"District Response: This recommendation is currently being implemented."},{"claim_id":"c:28ae5ad7065c5b6ec8bcb2011cedadf5","page_id":"C124917982:63","page_url":"https://archive.org/details/C124917982/page/n62","statement_kind":"finding","subject_label":"Contractor prequalification","summary":"The report found SFUSD has no strict contractor prequalification process.","property":"finding","t_from":"1995","quote":"SFUSD does not have a strict contractor prequalification process - the only requirements are to be bondable, insurable, agree to pay prevailing wages, and be responsive","anchor":"s-28ae5ad7065c","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Finding: SFUSD does not have a strict contractor prequalification process"},{"claim_id":"c:2f1f5d5c14cf8cf08780dd68f4ae04ed","page_id":"C124917982:63","page_url":"https://archive.org/details/C124917982/page/n62","statement_kind":"proposal","subject_label":"Model school concept","summary":"The report recommends trying the model school concept again, with input from the CAC and other school districts.","property":"proposes","t_from":"1995","quote":"We believe that the model school concept should be tried again, this time with input from the CAC and other school districts.","anchor":"s-2f1f5d5c14cf","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"We believe that the model school concept should be tried again"},{"claim_id":"c:76aeec3bbe81e1855f0a7e11a9e4591e","page_id":"C124917982:63","page_url":"https://archive.org/details/C124917982/page/n62","statement_kind":"finding","subject_label":"Citizen's Advisory Committee role","summary":"The report found concerns about the role and effectiveness of the Citizen's Advisory Committee.","property":"finding","t_from":"1995","quote":"The concerns focused on how to improve its involvement and increase its effectiveness.","anchor":"s-76aeec3bbe81","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"We found concerns from various key individuals regarding the role"},{"claim_id":"c:787bf05360395a2df511f22461e60de6","page_id":"C124917982:63","page_url":"https://archive.org/details/C124917982/page/n62","statement_kind":"proposal","subject_label":"Citizen's Advisory Committee role","summary":"The report recommends that the role of the CAC be reviewed and redefined if necessary.","property":"recommendation","t_from":"1995","quote":"We recommend that the role of the CAC be reviewed and redefined if necessary so that the Committee has a renewed sense of their role.","anchor":"s-787bf0536039","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"We recommend that the role of the CAC be reviewed and redefined"},{"claim_id":"c:8d6d91d368cfdf5e8bb53253bc73bd60","page_id":"C124917982:63","page_url":"https://archive.org/details/C124917982/page/n62","statement_kind":"finding","subject_label":"Prevailing wage investigation requirement","summary":"The report found the prevailing wage investigation requirement has never been enforced to its knowledge.","property":"finding","t_from":"1995","quote":"but it has never been enforced to our knowledge.","anchor":"s-8d6d91d368cf","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"There is also a requirement (prior to receiving approval from the School Board)"},{"claim_id":"c:f397b2860b6f636b9efd4a901d2de0f3","page_id":"C124917982:63","page_url":"https://archive.org/details/C124917982/page/n62","statement_kind":"finding","subject_label":"Superintendent review of CAC","summary":"The Superintendent said he is reviewing the composition and role of the committee.","property":"other","t_from":"1995","quote":"The Superintendent is currently reviewing the composition and role of the committee and will make recommendations in the near future.","anchor":"s-f397b2860b6f","shown":false,"hidden":"another_body","part":"main_text","speaker":"another_body","speaker_role":"District Response, the Superintendent","stance":"own_position","speaker_evidence":"District Response: The Superintendent is currently reviewing"},{"claim_id":"c:319c0ffd02c50585e4ee42388834b43a","page_id":"C124917982:73","page_url":"https://archive.org/details/C124917982/page/n72","statement_kind":"proposal","subject_label":"Change order approval process","summary":"The report recommends holding change order approval to strict time deadlines.","property":"recommendation","t_from":"1995","quote":"We recommend that the change order approval process be held to strict time deadlines so that the contractors do not have to work without formal review or approval.","anchor":"s-319c0ffd02c5","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"We recommend that the change order approval process be held to strict time deadlines"},{"claim_id":"c:50176969a9f9d5b049103882fc24e06a","page_id":"C124917982:73","page_url":"https://archive.org/details/C124917982/page/n72","statement_kind":"proposal","subject_label":"Contractor payment request forms","summary":"The report recommends that PMs review contractor payment formats with finance staff before initial issuance.","property":"recommendation","t_from":"1995","quote":"we do believe that the PM's should review the contractor's format with their finance/accounting staff prior to initial issuance","anchor":"s-50176969a9f9","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"we do believe that the PM's should review the contractor's format with their finance/accounting staff"},{"claim_id":"c:78d40b6df1486ab40629ac495da2b2cd","page_id":"C124917982:73","page_url":"https://archive.org/details/C124917982/page/n72","statement_kind":"proposal","subject_label":"Minor change orders","summary":"The report recommends that minor change orders be approved by the Project Manager without further review.","property":"recommendation","t_from":"1995","quote":"We also recommend that minor change orders be approved by the Project Manager without further review;","anchor":"s-78d40b6df148","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"We also recommend that minor change orders be approved by the Project Manager without further review"},{"claim_id":"c:c688f1bfaf94565326966e9df51d7a6f","page_id":"C124917982:73","page_url":"https://archive.org/details/C124917982/page/n72","statement_kind":"finding","subject_label":"Change order procedure","summary":"The District states its Project Manager's Procedure Manual requires tracking of change orders.","property":"finding","t_from":"1995","quote":"The Project Manager's Procedure Manual requires project managers to identify the responsible party, the numerical order of, and the disposition of change orders.","anchor":"s-c688f1bfaf94","shown":false,"hidden":"another_body","part":"main_text","speaker":"another_body","speaker_role":"another body","stance":"quotes_to_report","speaker_evidence":"District Response: This recommendation is currently being implemented."},{"claim_id":"c:d255909d02560b18b4564cc48846e258","page_id":"C124917982:73","page_url":"https://archive.org/details/C124917982/page/n72","statement_kind":"finding","subject_label":"Contractor payment request forms","summary":"The report found contractor payment request forms ranged from an AIA form to a handwritten request.","property":"finding","t_from":"1995","quote":"The forms ranged from a AIA form to a handwritten request on the contractor's letterhead.","anchor":"s-d255909d0256","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"The forms ranged from a AIA form to a handwritten request on the contractor's letterhead."},{"claim_id":"c:182a5d0286424e31fdd093979661214d","page_id":"C124917982:77","page_url":"https://archive.org/details/C124917982/page/n76","statement_kind":"proposal","subject_label":"Liquidated damages enforcement","summary":"The report recommends enforcing liquidated damage provisions or using them in negotiations with late contractors.","property":"recommendation","t_from":"1995","quote":"We recommend that liquidated damage provisions in contracts be enforced, or at least used in negotiations with contractors who are late in completing their work.","anchor":"s-182a5d028642","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"We recommend that liquidated damage provisions in contracts be enforced"},{"claim_id":"c:3538bb5a338a43f513c98cffc56c1769","page_id":"C124917982:77","page_url":"https://archive.org/details/C124917982/page/n76","statement_kind":"finding","subject_label":"Liquidated damages enforcement","summary":"The report found no case where liquidated damages were enforced against a deficient contractor.","property":"finding","t_from":"1995","quote":"we did not find a single case where the contractor was found to be deficient in his contractual duties and the LD's were enforced.","anchor":"s-3538bb5a338a","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"we did not find a single case where the contractor was found to be deficient"},{"claim_id":"c:3dd21e265e4c9e1273cce4018ae44fda","page_id":"C124917982:77","page_url":"https://archive.org/details/C124917982/page/n76","statement_kind":"finding","subject_label":"Contract schedule requirement","summary":"The District states contract documents require completion of a CPM schedule.","property":"finding","t_from":"1995","quote":"Contract documents require completion of a CPM schedule.","anchor":"s-3dd21e265e4c","shown":false,"hidden":"response","part":"response","speaker":"another_body","speaker_role":"District","stance":"own_position","speaker_evidence":"District_Response: This recommendation is currently being implemented. Contract documents require completion"},{"claim_id":"c:43619cd53086f085a8dbe4d215f0bbc1","page_id":"C124917982:77","page_url":"https://archive.org/details/C124917982/page/n76","statement_kind":"finding","subject_label":"Liquidated damages and CPM District response","summary":"The District says it intends to enforce liquidated damages to ensure project completion.","property":"other","t_from":"1995","quote":"The District has every intent of enforcing liquidated damages or using liquidated damages in negotiations with contractors to ensure project completion.","anchor":"s-43619cd53086","shown":false,"hidden":"response","part":"response","speaker":"another_body","speaker_role":"District","stance":"own_position","speaker_evidence":"District Response: This recommendation is currently being implemented. The District has every intent"},{"claim_id":"c:4f9276f3f4106ef2efddb95be496863a","page_id":"C124917982:77","page_url":"https://archive.org/details/C124917982/page/n76","statement_kind":"proposal","subject_label":"Monthly progress payments and schedule","summary":"The report recommends tying monthly progress payments to completion of schedule requirements.","property":"recommendation","t_from":"1995","quote":"Monthly progress payments should be tied to the general's successful completion of these requirements","anchor":"s-4f9276f3f410","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Monthly progress payments should be tied to the general's successful completion"},{"claim_id":"c:a4d32cdcea6d2ee01ce54f059eecb0ce","page_id":"C124917982:77","page_url":"https://archive.org/details/C124917982/page/n76","statement_kind":"finding","subject_label":"Prevailing wage violations","summary":"The report found numerous complaints from various parties of prevailing wage violations by contractors.","property":"finding","t_from":"1995","quote":"We found numerous complaints from various parties (inspectors, other general contractors, union officials, architects, etc.) of violations by contractors","anchor":"s-a4d32cdcea6d","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"We found numerous complaints from various parties"},{"claim_id":"c:ac236fce93b00b9d643853075516a6da","page_id":"C124917982:77","page_url":"https://archive.org/details/C124917982/page/n76","statement_kind":"proposal","subject_label":"Certified payroll review","summary":"The report recommends a District review to ensure certified payrolls are submitted and prevailing wages paid.","property":"recommendation","t_from":"1995","quote":"We recommend a review by the District to ensure that certified payrolls are submitted and that prevailing wages are being paid.","anchor":"s-ac236fce93b0","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"We recommend a review by the District to ensure that certified payrolls"},{"claim_id":"c:e98e2042c6e6453c0094e0383b1e46dc","page_id":"C124917982:77","page_url":"https://archive.org/details/C124917982/page/n76","statement_kind":"finding","subject_label":"Liquidated damages clauses","summary":"The report found liquidated damages clauses in every major contract.","property":"finding","t_from":"1995","quote":"We found liquidated damage (LD's) clauses in every major contract.","anchor":"s-e98e2042c6e6","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"We found liquidated damage (LD's) clauses in every major contract."},{"claim_id":"c:2962e2d61eafbbc7509f21a85aa62f04","page_id":"C124917982:79","page_url":"https://archive.org/details/C124917982/page/n78","statement_kind":"proposal","subject_label":"Reporting lines for school construction inspectors","summary":"The report recommends that the Inspectors report to the Design Department within FP&C, not the project management group.","property":"proposes","t_from":"1995","quote":"We recommend that the Inspectors report to the Design Department within FP&C, not the project management group.","anchor":"s-2962e2d61eaf","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"We recommend that the Inspectors report to the Design Department"},{"claim_id":"c:4278beff11fadfe7ffb3ff2d035d3762","page_id":"C124917982:79","page_url":"https://archive.org/details/C124917982/page/n78","statement_kind":"finding","subject_label":"Architect of record site visits","summary":"The architect of record did not always visit the site weekly and relied heavily on the inspectors.","property":"finding","t_from":"1995","quote":"The architect of record did not always visit the site on a weekly basis and relied heavily on the inspectors.","anchor":"s-4278beff11fa","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Finding: The architect of record did not always visit the site"},{"claim_id":"c:a66e4e86216a2b3fbec7e729fbdd7603","page_id":"C124917982:79","page_url":"https://archive.org/details/C124917982/page/n78","statement_kind":"finding","subject_label":"Reporting lines for school construction inspectors","summary":"The report finds confusion about the role, responsibility and reporting lines of the Inspectors.","property":"finding","t_from":"1995","quote":"There is confusion regarding the role, responsibility, and reporting lines for the Inspectors.","anchor":"s-a66e4e86216a","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Finding: There is confusion regarding the role"},{"claim_id":"c:76527ca5f4a369fe3ac8f7b89229398c","page_id":"C124917982:87","page_url":"https://archive.org/details/C124917982/page/n86","statement_kind":"finding","subject_label":"Yellow Book estimates versus actual costs of Proposition A work","summary":"The 1988 Yellow Book estimates were schematic planning estimates, not final cost estimates.","property":"other","date_printed":"1988","t_from":"1988","quote":"The 1988 Yellow Book estimates were schematic planning estimates for the purpose of providing order of magnitude costs, not final cost estimates","anchor":"s-76527ca5f4a3","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"The 1988 Yellow Book estimates were schematic planning estimates"},{"claim_id":"c:421ba9fe9d3bd6bf857c893aa7a840f0","page_id":"C124917982:95","page_url":"https://archive.org/details/C124917982/page/n94","statement_kind":"finding","subject_label":"Design process for a school renovation","summary":"The report finds the design was led by a structural engineer rather than an architect, as is customary.","property":"finding","t_from":"1995","quote":"We noted that the design process was led by a structural engineer, not an architect as is customary, due to seismic considerations.","anchor":"s-421ba9fe9d3b","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"We noted that the design process was led by a structural engineer"},{"claim_id":"c:6a0744a1887827daf1e0a01c1ac9b3fa","page_id":"C124917982:95","page_url":"https://archive.org/details/C124917982/page/n94","statement_kind":"finding","subject_label":"Use of Proposition A funds at a school","summary":"The report finds Proposition A funds could not be segregated from funds of other programs.","property":"finding","t_from":"1995","quote":"It was not possible to segregate the specific funds associated with Proposition A for the construction program since they were intermingled with funds from other programs.","anchor":"s-6a0744a18878","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"It was not possible to segregate the specific funds associated with Proposition A"},{"claim_id":"c:ae8e8c450a1ab9cc01a816718ba7acb4","page_id":"C124917982:95","page_url":"https://archive.org/details/C124917982/page/n94","statement_kind":"finding","subject_label":"Largest Proposition A contract, Arntz Builders","summary":"The report finds the Arntz contract ended at approximately $5.0 million (≈ $11.1 million in 2026 dollars) after 12 modifications.","property":"cost_usd","value_text":"approximately $5.0 million","value_num":5000000.0,"unit":"USD","t_from":"1995","quote":"There were 12 contract modifications, which resulted in a final cost of approximately $5.0 million.","anchor":"s-ae8e8c450a1a","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"There were 12 contract modifications, which resulted in a final cost"},{"claim_id":"c:bc3f1b4e7dec48160ab2bbfce2f683ff","page_id":"C124917982:95","page_url":"https://archive.org/details/C124917982/page/n94","statement_kind":"finding","subject_label":"Largest Proposition A contract, Arntz Builders","summary":"The report finds the Arntz Builders contract was let at $3,385,000 (≈ $7.5 million in 2026 dollars) after 12 modifications.","property":"cost_usd","value_text":"$3,385,000","value_num":3385000.0,"unit":"USD","t_from":"1995","quote":"[name withheld] was the low bidder out of 3 bids received at a cost of $3,385,000.","anchor":"s-bc3f1b4e7dec","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"We analyzed the largest contract, let to Arntz Builders. Arntz was the low bidder"},{"claim_id":"c:d71db1b6b0aed57513871bd69c464a1c","page_id":"C124917982:95","page_url":"https://archive.org/details/C124917982/page/n94","statement_kind":"finding","subject_label":"Proposition A improvements at a school","summary":"The report finds Proposition A improvements improved the school, especially its heating system.","property":"finding","t_from":"1995","quote":"The improvements funded by Proposition A have improved the school, especially the new heating system with its associated Energy Management System.","anchor":"s-d71db1b6b0ae","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Site Visit. The improvements funded by Proposition A have improved the school"},{"claim_id":"c:32eb499cf0c565085fb2ff180c313fd1","page_id":"C124917982:99","page_url":"https://archive.org/details/C124917982/page/n98","statement_kind":"finding","subject_label":"Balboa High School Proposition A construction","summary":"The report finds only $1.4 million (≈ $3.4 million in 2026 dollars) of construction was performed under 1988 Proposition A at Balboa.","property":"cost_usd","value_text":"$1.4 million","value_num":1400000.0,"unit":"USD","date_printed":"early 1992","t_from":"1992","quote":"This caused the originally planned construction to be delayed resulting in only $1.4 million in construction actually being performed under 1988 Proposition A.","place_label":"Balboa High School","place_precision":"building","place_id":"qipu:sf/place/institution/balboa-high-school-9c7969","resolved_by":"place links file","anchor":"s-32eb499cf0c5","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"This caused the originally planned construction to be delayed"},{"claim_id":"c:8d18a47c13059493c2cd3f0f69279fbb","page_id":"C124917982:99","page_url":"https://archive.org/details/C124917982/page/n98","statement_kind":"finding","subject_label":"Kimel window sash contract, Balboa","summary":"The report finds the Kimel window sash contract was bid at $205,920 (≈ $494,531 in 2026 dollars) and completed at $260,000 (≈ $624,408 in 2026 dollars).","property":"cost_usd","value_text":"$260,000","value_num":260000.0,"unit":"USD","date_printed":"1992-93","t_from":"1992","quote":"The window sash replacement contract with Kimel was originally bid at $205,920 and completed at $260,000.","place_label":"Balboa High School","place_precision":"building","place_id":"qipu:sf/place/institution/balboa-high-school-9c7969","resolved_by":"place links file","anchor":"s-8d18a47c1305","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"The window sash replacement contract with Kimel was originally bid"},{"claim_id":"c:a494c1d91e5ccb01170e17395798de54","page_id":"C124917982:99","page_url":"https://archive.org/details/C124917982/page/n98","statement_kind":"finding","subject_label":"Trenery counseling office rehab contract, Balboa","summary":"The report finds the Trenery contract was bid at $127,800 (≈ $306,920 in 2026 dollars) and completed at $150,000 (≈ $360,235 in 2026 dollars).","property":"cost_usd","value_text":"$150,000","value_num":150000.0,"unit":"USD","date_printed":"1992-93","t_from":"1992","quote":"The counseling office rehab contract with Trenery was originally bid at $127,800 and completed at $150,000.","place_label":"Balboa High School","place_precision":"building","place_id":"qipu:sf/place/institution/balboa-high-school-9c7969","resolved_by":"place links file","anchor":"s-a494c1d91e5c","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"The counseling office rehab contract with Trenery was originally bid"}]}