{"note":"Statements read from one scanned government report in the IGS library collection on the Internet Archive. Each statement has a verbatim quote found on its page (quote, page_url). The summary and subject_label of each statement were written by a model (Claude Haiku 5.5) and can be wrong: read the page before quoting. At most 20 selected pages of a report were read. Keys are the column names of the tables igs_reports and igs_claims; a column that is null for a statement is left out, and columns with one value for every statement of this report are given once under same_for_every_statement. \"[name withheld]\" stands where the release withholds a name; the site's page guard withholds a few more in reports after 1951, so a cell here can differ from the table; for a few reports prepared_by and creator are left out. A statement's links to the Board record are under links (show_target_kind: decision, instrument or ballot measure; show_target_id; show_url); they replace the table's decision_id and instrument_id, which are left out. place_id, place_label and place_precision come from a corrected place match where there is one. part, speaker, speaker_role, stance and speaker_evidence say who is speaking: a model (Claude Haiku 5.5) read each page and its context and can be wrong. part: main_text, attachment, appendix, letter, comment, response, table or cover_or_contents; speaker: issuer, another_body, letter_writer or unclear; speaker_role: a role or organisation, never a personal name; stance: own_position, quotes_to_dispute, quotes_to_report, restates_to_reject or unclear. The report page shows a statement only when speaker is issuer, part is main_text or appendix, and stance is own_position or quotes_to_report; hidden gives the part, the speaker or the stance of the others. ","release":"v0.9.2","licence":"CC0-1.0","slug":"c124918144","url":"https://data.qipu.org/usa/san-francisco/reports/c124918144/","statement_url":"https://data.qipu.org/usa/san-francisco/reports/c124918144/#{anchor}","tables":{"igs_reports":"https://tiles.qipu.org/data/releases/v0.9.2/parquet/igs_reports.parquet","igs_claims":"https://tiles.qipu.org/data/releases/v0.9.2/parquet/igs_claims.parquet"},"report":{"report_id":"C124918144","source_id":"C124918144","title":"Review of the projected costs and economic benefits associated with the San Francisco Giants' proposed ballpark at China Basin","year":1996,"n_pages":42,"creator":null,"source_url":"https://archive.org/details/C124918144","issuer":"City and County of San Francisco, Board of Supervisors, Budget Analyst","issuer_type":"government","gov_level":"city_county","prepared_by":null,"doc_kind":"staff_report","jurisdiction":"San Francisco","jurisdiction_id":"sf","city":"sf","issuer_by":"model","doc_kind_by":"model","jurisdiction_by":"model","run_id":"igs-labels-rules+haiku55-cli-2026-10-23"},"pages_with_statements":19,"statements_total":50,"statements_by_kind":{"finding":34,"proposal":12,"cites_decision":1,"background":3},"same_for_every_statement":{"source_id":"C124918144","source_url":"https://archive.org/details/C124918144","source_label":"IGS library: Review of the projected costs and economic benefits associated with the San Francisco Giants' proposed ballpark at China","report_year":1996,"issuer":"City and County of San Francisco, Board of Supervisors, Budget Analyst","issuer_type":"government","doc_kind":"staff_report","t_precision":"year","status":"extracted","claim_kind":"observation","extraction_table":"igs_claims","run_id":"igs-sf-pages-v2-haiku55-batch-2026-10-23","city":"sf","prompt_version":"igs-page-v2-2026-10-23"},"summary":{"what":"A review by the Board of Supervisors' Budget Analyst of the projected costs and economic benefits of a proposed privately financed downtown ballpark at China Basin.","next":"The Board allowed the Giants ballpark at China Basin in March 1996, a decision that followed the Budget Analyst's report.","next_decision":"qipu:sf/decision/hand:ballpark-1996","figures":[{"label":"Construction","value":"$255 million","claim_ids":["c:95e1263f7f2fc332ba8a203259262902"]},{"label":"Toxic cleanup","value":"$5.0 million to $20 million or more","page_url":"https://archive.org/details/C124918144/page/n5","quote":"Potential costs for encapsulation versus an environmental cleanup requiring significant offsite disposal of toxics, have been presented as approximately $5.0 million for encapsulation, to as much as $20 million or more for a full cleanup."},{"label":"Port site","value":"13.5 acre site","claim_ids":["c:806a78cbc219cffa679ccd27d32eda7f"]},{"label":"Possessory interest tax","value":"$3.5 million annually","claim_ids":["c:2216c639fb5456b1069cbf11894ba393"]}],"main_points":["c:806a78cbc219cffa679ccd27d32eda7f","c:86d7a1cfb61f16ff34aa715075051e20","c:7704a415d445bb13a0376b53d699b3fb"],"board_decisions_after":["qipu:sf/decision/hand:ballpark-1996","qipu:sf/decision/journalofproceed91sanfrich:43/2","qipu:sf/decision/journalofproceed91sanfrich:115/2","qipu:sf/decision/journalofproceed91sanfrich:115/7","qipu:sf/decision/journalofproceed91sanfrich:132/4"],"board_decisions_before":[],"made_by":"A model (Claude Haiku 5.5) wrote the lead and picked the figures, main points and later Board decisions from the statements, from a second reading of the report's summary and cost pages, and from Board decisions dated 3 years before to 10 years after the report; every number it wrote was checked against them, and a figure must be about the report's own area or project."},"statements":[{"claim_id":"c:1c0052646acd2468ec7c5a3b30ed6edd","page_id":"C124918144:3","page_url":"https://archive.org/details/C124918144/page/n2","statement_kind":"cites_decision","subject_label":"Board motion on ballpark cost analysis","summary":"The Board of Supervisors adopted a motion directing the Budget Analyst to analyze any and all costs of the ballpark proposal.","property":"other","value_text":"motion","date_printed":"January 8, 1996","t_from":"1996","quote":"On January 8, 1996, the Board of Supervisors adopted a motion directing the Budget Analyst to analyze any and all costs of the Giants’ ballpark proposal.","decided_by":"Registrar of Voters","instrument_kind":"proposition","instrument_printed":"B","instrument_date_printed":"March 26, 1996","anchor":"s-1c0052646acd","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the Budget Analyst","stance":"own_position","speaker_evidence":"Honorable Tom Ammiano ... Budget Analyst's report; On January 8, 1996, the Board of Supervisors adopted a motion"},{"claim_id":"c:95e1263f7f2fc332ba8a203259262902","page_id":"C124918144:3","page_url":"https://archive.org/details/C124918144/page/n2","statement_kind":"proposal","subject_label":"Ballpark construction cost","summary":"Total construction project costs for the ballpark are estimated at $255 million (≈ $547.6 million in 2026 dollars).","property":"cost_usd","value_text":"$255 million","value_num":255000000.0,"unit":"USD","t_from":"1996","quote":"Total construction project costs for the ballpark are estimated at $255 million.","place_label":"China Basin","anchor":"s-95e1263f7f2f","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"quotes_to_report","speaker_evidence":"Transmitted herewith is the Budget Analyst's report"},{"claim_id":"c:f2bbf8eda80ead0aed0d45f123344b3d","page_id":"C124918144:3","page_url":"https://archive.org/details/C124918144/page/n2","statement_kind":"background","subject_label":"Giants proposal for Proposition B","summary":"The Giants proposed Proposition B as the first step toward construction of a privately financed downtown ballpark.","property":"other","t_from":"1996","quote":"The San Francisco Giants (Giants) proposed Proposition B as the first step toward construction of a privately financed downtown ballpark.","place_label":"China Basin","anchor":"s-f2bbf8eda80e","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the Budget Analyst","stance":"quotes_to_report","speaker_evidence":"The San Francisco Giants (Giants) proposed Proposition B as the first step"},{"claim_id":"c:5150d9b12484598ea4f9a11643c598a9","page_id":"C124918144:4","page_url":"https://archive.org/details/C124918144/page/n3","statement_kind":"finding","subject_label":"Port land parcel from Caltrans","summary":"The Port must acquire or lease a 155,000 square foot parcel of land from Caltrans for the ground lease site.","property":"other","value_text":"155,000 square foot parcel","value_num":155000.0,"unit":"sqft","t_from":"1996","quote":"The Port must acquire or lease a 155,000 square foot parcel of land from Caltrans which is to be included in the ground lease for the ballpark site.","anchor":"s-5150d9b12484","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"The Port must acquire or lease a 155,000 square foot parcel"},{"claim_id":"c:7704a415d445bb13a0376b53d699b3fb","page_id":"C124918144:4","page_url":"https://archive.org/details/C124918144/page/n3","statement_kind":"finding","subject_label":"Port financial risk","summary":"The Port of San Francisco could face the greatest financial risk, or possible gain, under the Giants proposal.","property":"finding","t_from":"1996","quote":"The Port of San Francisco could face the greatest financial risk, or the possibility of financial gain, under the San Francisco Giants’ proposal","anchor":"s-7704a415d445","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"The Port of San Francisco could face the greatest financial risk"},{"claim_id":"c:86d7a1cfb61f16ff34aa715075051e20","page_id":"C124918144:4","page_url":"https://archive.org/details/C124918144/page/n3","statement_kind":"finding","subject_label":"General Fund costs","summary":"The Budget Analyst estimates General Fund costs of up to $300,000 (≈ $644,245 in 2026 dollars) annually for the ballpark.","property":"cost_usd","value_text":"up to $300,000 annually","value_num":300000.0,"unit":"USD","t_from":"1996","quote":"We estimate that such General Fund costs would include up to $300,000 annually (above the costs of providing","anchor":"s-86d7a1cfb61f","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"We estimate that such General Fund costs would include up to $300,000 annually"},{"claim_id":"c:3b3520f62fac1de6dae637556c33a367","page_id":"C124918144:6","page_url":"https://archive.org/details/C124918144/page/n5","statement_kind":"finding","subject_label":"Toxic remediation cost range","summary":"Potential costs range from about $5.0 million (≈ $10.7 million in 2026 dollars) for encapsulation to as much as $20 million (≈ $42.9 million in 2026 dollars) or more for full cleanup.","property":"cost_usd","value_text":"approximately $5.0 million for encapsulation, to as much as $20 million or more","value_num":5000000.0,"unit":"USD","t_from":"1996","quote":"approximately $5.0 million for encapsulation, to as much as $20 million or more for a full cleanup.","place_label":"China Basin","anchor":"s-3b3520f62fac","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"Budget Analyst","stance":"own_position","speaker_evidence":"Potential costs for encapsulation versus an environmental cleanup"},{"claim_id":"c:705852514b22faf65788414086b770eb","page_id":"C124918144:6","page_url":"https://archive.org/details/C124918144/page/n5","statement_kind":"finding","subject_label":"Muni bridge service net cost","summary":"The Muni estimates the net cost of added service for games at the ballpark would approximate $800,000 (≈ $1.7 million in 2026 dollars) annually.","property":"cost_usd","value_text":"$800,000 annually","value_num":800000.0,"unit":"USD","t_from":"1996","quote":"The net cost of this level of service would approximate $800,000 annually, or $300,000 annually more than the net cost of service to Candlestick Park.","place_label":"China Basin","anchor":"s-705852514b22","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"Budget Analyst","stance":"quotes_to_report","speaker_evidence":"the Muni estimates that increased transit service operating requirements"},{"claim_id":"c:7f4082baf7421cfb4f7271c1b201c252","page_id":"C124918144:6","page_url":"https://archive.org/details/C124918144/page/n5","statement_kind":"finding","subject_label":"Relocation costs for Port maintenance facility","summary":"In 1989 the Budget Analyst received estimates of up to $7.0 million (≈ $19.0 million in 2026 dollars) for relocation costs.","property":"cost_usd","value_text":"up to $7.0 million","value_num":7000000.0,"unit":"USD","date_printed":"1989","t_from":"1989","quote":"In 1989, the Budget Analyst received estimates of up to $7.0 million for such relocation costs.","place_label":"Pier 46B","anchor":"s-7f4082baf742","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"Budget Analyst","stance":"own_position","speaker_evidence":"In 1989, the Budget Analyst received estimates of up to $7.0 million"},{"claim_id":"c:064d31ff66a24d8989e80c1dd682a85d","page_id":"C124918144:7","page_url":"https://archive.org/details/C124918144/page/n6","statement_kind":"proposal","subject_label":"Giants study direct economic benefits","summary":"The Giants study estimates a new ballpark would produce direct economic benefits of $65.0 million (≈ $127.2 million in 2026 dollars) annually in 2000.","property":"other","value_text":"$65.0 million annually","value_num":65000000.0,"unit":"USD","date_printed":"2000","t_from":"2000","quote":"produce direct economic benefits amounting to $65.0 million annually ($22.5 million more than the benefits that would result if the team were to remain at Candlestick Park)","place_label":"China Basin","anchor":"s-064d31ff66a2","shown":false,"hidden":"another_body","part":"main_text","speaker":"another_body","speaker_role":"the Giants' economic impact study, as reported by the Budget Analyst","stance":"quotes_to_report","speaker_evidence":"The Giants' study concluded that a new ballpark would initially"},{"claim_id":"c:181d7c45c6c1d50a9c1f0cbc99fd1bf4","page_id":"C124918144:7","page_url":"https://archive.org/details/C124918144/page/n6","statement_kind":"finding","subject_label":"Possessory Interest Tax revenue","summary":"The Assessor estimates the ballpark would produce $3.5 million (≈ $7.5 million in 2026 dollars) annually in increased Possessory Interest Tax revenue.","property":"other","value_text":"$3.5 million annually","value_num":3500000.0,"unit":"USD","t_from":"1996","quote":"The Assessor has estimated that the proposed ballpark project would produce $3.5 million annually in increased Possessory Interest Tax revenue.","anchor":"s-181d7c45c6c1","shown":false,"hidden":"another_body","part":"main_text","speaker":"another_body","speaker_role":"the Assessor","stance":"quotes_to_report","speaker_evidence":"The Assessor has estimated that the proposed ballpark"},{"claim_id":"c:bce5b018e2182a2065a9d5179fdcb11e","page_id":"C124918144:7","page_url":"https://archive.org/details/C124918144/page/n6","statement_kind":"proposal","subject_label":"Construction jobs","summary":"The Giants study says construction of a new ballpark would produce 3,655 jobs.","property":"jobs","value_text":"3,655 jobs","value_num":3655.0,"unit":"jobs","t_from":"1996","quote":"The Giants’ study also points out that the construction of a new ballpark would produce 3,655 jobs with an average duration of four months","place_label":"China Basin","anchor":"s-bce5b018e218","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"quotes_to_report","speaker_evidence":"The Giants' study also points out that the construction"},{"claim_id":"c:2dc4d57da5a300eaae36855121aeba27","page_id":"C124918144:8","page_url":"https://archive.org/details/C124918144/page/n7","statement_kind":"proposal","subject_label":"Direct city revenue from Giants ballpark","summary":"The Budget Analyst estimates direct revenue to the City would increase if a new downtown ballpark is built and attendance projections are realized.","property":"other","value_text":"$471,000 to $766,000 annually","unit":"USD","t_from":"1996","quote":"Using the information presented in the Giants’ economic impact analysis study, such direct revenue would increase by between $471,000 and $766,000 annually, depending on actual attendance","place_label":"downtown ballpark","anchor":"s-2dc4d57da5a3","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the Budget Analyst (issuer's transmittal letter)","stance":"own_position","speaker_evidence":"Section VIII of our report addresses direct revenue payments"},{"claim_id":"c:03824e8b00f1c8ba37f991e3f8a2cc98","page_id":"C124918144:12","page_url":"https://archive.org/details/C124918144/page/n11","statement_kind":"finding","subject_label":"Recreation and Park rental income if Giants leave Candlestick","summary":"The Recreation and Park Department would lose approximately $1.0 (≈ $2.15 in 2026 dollars) to $1.2 million (≈ $2.6 million in 2026 dollars) annually in rental income if the Giants leave Candlestick Park.","property":"other","value_text":"$1.0 to $1.2 million annually","unit":"USD","t_from":"1996","quote":"the Recreation and Park Department will lose approximately $1.0 to $1.2 million annually in rental income.","place_label":"Candlestick Park","place_precision":"site","place_id":"qipu:sf/place/institution/candlestick-park-7d336c","resolved_by":"place links file","anchor":"s-03824e8b00f1","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Budget Analyst report narrative; Recreation and Park Department will lose approximately $1.0 to $1.2 million"},{"claim_id":"c:983d70972251325d99455fef9879c7b2","page_id":"C124918144:12","page_url":"https://archive.org/details/C124918144/page/n11","statement_kind":"finding","subject_label":"Port financing of pre-construction costs","summary":"The Port does not have the resources to fund the pre-construction costs needed to ready the ballpark site.","property":"finding","value_text":"Port lacks resources for pre-construction costs","t_from":"1996","quote":"the Port does not have the resources to fund the pre-construction costs necessary to get the site in condition to construct the ballpark.","place_label":"China Basin ballpark site","anchor":"s-983d70972251","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"BOARD OF SUPERVISORS - BUDGET ANALYST; the Port does not have the resources"},{"claim_id":"c:b54f6fc3c1f1f39838b720dfe8af7675","page_id":"C124918144:12","page_url":"https://archive.org/details/C124918144/page/n11","statement_kind":"proposal","subject_label":"General Fund costs of ballpark","summary":"The Budget Analyst estimates added General Fund costs for Muni transit services of up to $300,000 (≈ $644,245 in 2026 dollars) annually.","property":"cost_usd","value_text":"up to $300,000 annually","value_num":300000.0,"unit":"USD","t_from":"1996","quote":"We estimate that such General Fund costs would include up to $300,000 annually (above the costs of providing current service for baseball games at Candlestick Park)","anchor":"s-b54f6fc3c1f1","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"We estimate that such General Fund costs would include up to $300,000 annually"},{"claim_id":"c:989d2b476e99cdcc16e129dcad1abbf4","page_id":"C124918144:13","page_url":"https://archive.org/details/C124918144/page/n12","statement_kind":"finding","subject_label":"Potential capital costs for transportation improvements","summary":"The San Francisco County Transportation Authority report included no specific costs for the potential capital improvements.","property":"cost_usd","value_text":"no specific costs","unit":"USD","t_from":"1996","quote":"The Authority’s report included no specific costs for the potential capital improvements.","anchor":"s-989d2b476e99","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"BOARD OF SUPERVISORS - BUDGET ANALYST"},{"claim_id":"c:0b8ebb8708a1bb21d97e90f6e38fde41","page_id":"C124918144:16","page_url":"https://archive.org/details/C124918144/page/n15","statement_kind":"finding","subject_label":"Remediation cost range","summary":"Encapsulation is estimated at about $5.0 million (≈ $10.7 million in 2026 dollars), while a full cleanup could cost $20 million (≈ $42.9 million in 2026 dollars) or more.","property":"cost_usd","value_text":"approximately $5.0 million for encapsulation, to as much as $20 million or more","value_num":5000000.0,"unit":"USD","t_from":"1996","quote":"Potential costs for encapsulation versus an environmental cleanup requiring significant offsite disposal of toxics, have been presented as approximately $5.0 million for encapsulation, to as much as $20 million or more for a full cleanup.","place_label":"China Basin","anchor":"s-0b8ebb8708a1","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"Budget Analyst","stance":"quotes_to_report","speaker_evidence":"Potential costs for encapsulation versus an environmental cleanup ... have been presented as approximately $5.0 million"},{"claim_id":"c:0c606f8a82865e150401e966dab8f3c8","page_id":"C124918144:16","page_url":"https://archive.org/details/C124918144/page/n15","statement_kind":"finding","subject_label":"Port lease termination and relocation","summary":"The Port does not anticipate significant expenditures for relocating its ten tenants.","property":"other","value_text":"not significant","t_from":"1996","quote":"The Port does not anticipate significant expenditures for relocating the ten tenants.","place_label":"China Basin","anchor":"s-0c606f8a8286","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"Budget Analyst","stance":"own_position","speaker_evidence":"The Port does not anticipate significant expenditures for relocating the ten tenants."},{"claim_id":"c:1cdbb8018496a0c0e9525245ff947a8c","page_id":"C124918144:16","page_url":"https://archive.org/details/C124918144/page/n15","statement_kind":"finding","subject_label":"Port maintenance facility size","summary":"The Port maintenance facility occupies 135,000 square feet at Pier 46B.","property":"floor_area_sqft","value_text":"135,000 square feet","value_num":135000.0,"unit":"sqft","t_from":"1996","quote":"The Port’s maintenance facility currently occupies 135,000 square feet at Pier 46B.","place_label":"Pier 46B","anchor":"s-1cdbb8018496","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"Budget Analyst","stance":"own_position","speaker_evidence":"The Port's maintenance facility currently occupies 135,000 square feet at Pier 46B."},{"claim_id":"c:31fe2ce75d796d07056b88e3a8fa1bf4","page_id":"C124918144:16","page_url":"https://archive.org/details/C124918144/page/n15","statement_kind":"finding","subject_label":"Port tenants on ballpark site","summary":"The Port currently has ten tenants on the site, nine of whom have early termination clauses.","property":"other","value_text":"ten tenants","value_num":10.0,"t_from":"1996","quote":"The Port currently has ten tenants on the site, nine of whom have leases with early termination clauses, requiring notices of one to six months","place_label":"China Basin","anchor":"s-31fe2ce75d79","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"Budget Analyst","stance":"quotes_to_report","speaker_evidence":"The Port currently has ten tenants on the site, nine of whom have leases"},{"claim_id":"c:806a78cbc219cffa679ccd27d32eda7f","page_id":"C124918144:16","page_url":"https://archive.org/details/C124918144/page/n15","statement_kind":"finding","subject_label":"Remediation as largest cost factor","summary":"Toxic remediation of the 13.5 acre site is the single largest potential cost factor for the ballpark.","property":"acreage","value_text":"13.5 acre site","value_num":13.5,"unit":"acres","t_from":"1996","quote":"The single largest potential cost factor connected to the use of the 13.5 acre site for a new ballpark will be the need for toxic remediation of the site.","place_label":"China Basin","anchor":"s-806a78cbc219","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"Budget Analyst","stance":"own_position","speaker_evidence":"The single largest potential cost factor connected to the use of the 13.5 acre site"},{"claim_id":"c:88348b0633a8ff16ad03664562b1a22c","page_id":"C124918144:16","page_url":"https://archive.org/details/C124918144/page/n15","statement_kind":"background","subject_label":"Caltrans property acquisition estimate","summary":"The Budget Analyst's 1989 report estimated up to $11.0 million (≈ $29.9 million in 2026 dollars) to acquire the Caltrans property.","property":"cost_usd","value_text":"up to $11.0 million","value_num":11000000.0,"unit":"USD","date_printed":"1989","t_from":"1989","quote":"The Budget Analyst’s report on the 1989 China Basin Ballpark Proposal included an estimate of up to $11.0 million for the acquisition of the Caltrans property.","place_label":"China Basin","anchor":"s-88348b0633a8","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"Budget Analyst","stance":"own_position","speaker_evidence":"The Budget Analyst's report on the 1989 China Basin Ballpark Proposal included an estimate of up to $11.0 million"},{"claim_id":"c:887363dd76d6387acc09e173d4ade475","page_id":"C124918144:16","page_url":"https://archive.org/details/C124918144/page/n15","statement_kind":"finding","subject_label":"Maintenance facility relocation estimate","summary":"The Budget Analyst received 1989 estimates of up to $7.0 million (≈ $19.0 million in 2026 dollars) for relocating the Port maintenance facility.","property":"cost_usd","value_text":"up to $7.0 million","value_num":7000000.0,"unit":"USD","date_printed":"1989","t_from":"1989","quote":"In 1989, the Budget Analyst received estimates of up to $7.0 million for such relocation costs.","place_label":"Pier 46B","anchor":"s-887363dd76d6","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"Budget Analyst","stance":"quotes_to_report","speaker_evidence":"In 1989, the Budget Analyst received estimates of up to $7.0 million"},{"claim_id":"c:c122ba607d9a62796c2a5b80550e3a44","page_id":"C124918144:16","page_url":"https://archive.org/details/C124918144/page/n15","statement_kind":"finding","subject_label":"Demolition cost range for Pier 46B structures","summary":"In 1989 demolition of the four structures on and near Pier 46B was estimated at $2.0 million (≈ $5.4 million in 2026 dollars) to $7.0 million (≈ $19.0 million in 2026 dollars).","property":"cost_usd","value_text":"approximately $2.0 million to $7.0 million","value_num":2000000.0,"unit":"USD","date_printed":"1989","t_from":"1989","quote":"In 1989, the Budget Analyst was informed that such estimated demolition costs ranged from approximately $2.0 million to $7.0 million in order to demolish the four structures on and near to Pier 46B.","place_label":"Pier 46B","anchor":"s-c122ba607d9a","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"Budget Analyst","stance":"quotes_to_report","speaker_evidence":"In 1989, the Budget Analyst was informed that such estimated demolition costs ranged"},{"claim_id":"c:ff49ae3d5c3b10084137bf31dde019de","page_id":"C124918144:17","page_url":"https://archive.org/details/C124918144/page/n16","statement_kind":"finding","subject_label":"Encapsulation as viable alternative","summary":"Engineering and environmental health professionals view encapsulation as a viable remediation alternative.","property":"other","value_text":"viable alternative","t_from":"1996","quote":"The Budget Analyst has learned that the encapsulation strategy is viewed as a viable alternative by engineering and environmental health professionals.","place_label":"China Basin","anchor":"s-ff49ae3d5c3b","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"Budget Analyst","stance":"quotes_to_report","speaker_evidence":"The Budget Analyst has learned that the encapsulation strategy is viewed as a viable alternative"},{"claim_id":"c:7cd708838013399709826c08528afb3a","page_id":"C124918144:21","page_url":"https://archive.org/details/C124918144/page/n20","statement_kind":"finding","subject_label":"Candlestick Park debt service","summary":"Candlestick Park expansion bond debt service currently amounts to $1.75 million (≈ $3.5 million in 2026 dollars) annually and will be paid off in 1999-2000.","property":"cost_usd","value_text":"$1.75 million annually","value_num":1750000.0,"unit":"USD","date_printed":"1999-2000","t_from":"1999","quote":"This debt service currently amounts $1.75 million annually.","place_label":"Candlestick Park","place_precision":"site","place_id":"qipu:sf/place/institution/candlestick-park-7d336c","resolved_by":"place links file","anchor":"s-7cd708838013","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the Budget Analyst (issuer)","stance":"own_position","speaker_evidence":"Candlestick Park expansion bonds... This debt service currently amounts"},{"claim_id":"c:d41dd2ca1ab3149951f6759fdbeb8f01","page_id":"C124918144:21","page_url":"https://archive.org/details/C124918144/page/n20","statement_kind":"finding","subject_label":"Net General Fund savings from Giants departure","summary":"The report estimates a net City savings of up to $1.0 million (≈ $2.1 million in 2026 dollars) annually, not due to a new ballpark.","property":"other","value_text":"up to $1.0 million annually","value_num":1000000.0,"unit":"USD","t_from":"1996","quote":"resulting in a net savings to the City of up to $1.0 million annually.","place_label":"Candlestick Park","place_precision":"site","place_id":"qipu:sf/place/institution/candlestick-park-7d336c","resolved_by":"place links file","anchor":"s-d41dd2ca1ab3","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the Budget Analyst (issuer)","stance":"own_position","speaker_evidence":"the savings from decreased debt service and operations will offset the lost lease revenue"},{"claim_id":"c:e31201d780358515f47ea1fd8278b906","page_id":"C124918144:21","page_url":"https://archive.org/details/C124918144/page/n20","statement_kind":"finding","subject_label":"Giants lease revenue loss at Candlestick Park","summary":"Loss of the Giants as a Candlestick tenant would reduce Recreation and Park lease revenue by $1.0 (≈ $1.96 in 2026 dollars) to $1.2 million (≈ $2.3 million in 2026 dollars) annually.","property":"other","value_text":"between $1.0 and $1.2 million annually","value_num":1000000.0,"unit":"USD","date_printed":"2000","t_from":"2000","quote":"The loss of the Giants as a Candlestick Park tenant beginning with the year 2000 baseball season would mean decreased lease revenue to the Recreation and Park Department of between $1.0 and $1.2 million annually.","place_label":"Candlestick Park","place_precision":"site","place_id":"qipu:sf/place/institution/candlestick-park-7d336c","resolved_by":"place links file","anchor":"s-e31201d78035","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the Budget Analyst (issuer)","stance":"own_position","speaker_evidence":"The loss of the Giants as a Candlestick Park tenant beginning with the year 2000"},{"claim_id":"c:50b20b66449997c413f2930bf339a42c","page_id":"C124918144:25","page_url":"https://archive.org/details/C124918144/page/n24","statement_kind":"finding","subject_label":"Possessory Interest Tax revenue from ballpark","summary":"The Assessor estimates the ballpark project would produce $3.5 million (≈ $7.5 million in 2026 dollars) annually in increased Possessory Interest Tax revenue.","property":"other","value_text":"$3.5 million annually","value_num":3500000.0,"unit":"USD","t_from":"1996","quote":"The Assessor has estimated that the proposed ballpark project would produce $3.5 million annually in increased Possessory Interest Tax revenue.","place_label":"China Basin","anchor":"s-50b20b664499","shown":false,"hidden":"another_body","part":"main_text","speaker":"another_body","speaker_role":"the Assessor","stance":"quotes_to_report","speaker_evidence":"The Assessor has estimated that the proposed ballpark project would produce $3.5 million"},{"claim_id":"c:aaef7ee8d80983ef29941f64c4e082ba","page_id":"C124918144:25","page_url":"https://archive.org/details/C124918144/page/n24","statement_kind":"proposal","subject_label":"Redevelopment Agency tax increment contribution","summary":"The Redevelopment Agency would be asked to finance a $10 million (≈ $21.5 million in 2026 dollars) contribution to the ballpark project with Tax Increment Bonds.","property":"proposes","value_text":"$10 million","value_num":10000000.0,"unit":"USD","t_from":"1996","quote":"The San Francisco Redevelopment Agency will be asked to debt finance, using Tax Increment Bonds, a $10 million contribution to the project.","place_label":"China Basin","anchor":"s-aaef7ee8d809","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"The San Francisco Redevelopment Agency will be asked to debt finance"},{"claim_id":"c:ba2bbcebf4a832ded455798308eb004c","page_id":"C124918144:25","page_url":"https://archive.org/details/C124918144/page/n24","statement_kind":"background","subject_label":"Housing set-aside of project area appropriations","summary":"State law requires 20% of project area appropriations to be set aside for housing programs.","property":"other","value_text":"20%","value_num":20.0,"unit":"percent","t_from":"1996","quote":"State law mandates that 20% of project area appropriations must be set aside as a contribution to housing programs.","anchor":"s-ba2bbcebf4a8","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"State law mandates that 20% of project area appropriations"},{"claim_id":"c:fca85b47bf2c44769c77066b8a3b82d1","page_id":"C124918144:25","page_url":"https://archive.org/details/C124918144/page/n24","statement_kind":"finding","subject_label":"Redevelopment plan preparation cost","summary":"The Redevelopment Agency estimates the one-time cost of preparing the redevelopment plan at about $100,000 (≈ $214,748 in 2026 dollars).","property":"cost_usd","value_text":"approximately $100,000","value_num":100000.0,"unit":"USD","t_from":"1996","quote":"The Redevelopment Agency estimates that the one time cost of preparing the redevelopment plan would approximate $100,000.","place_label":"China Basin","anchor":"s-fca85b47bf2c","shown":false,"hidden":"another_body","part":"main_text","speaker":"another_body","speaker_role":"Redevelopment Agency","stance":"quotes_to_report","speaker_evidence":"The Redevelopment Agency estimates that the one time cost"},{"claim_id":"c:16fc48aeaea178486d1957ae0943f46d","page_id":"C124918144:26","page_url":"https://archive.org/details/C124918144/page/n25","statement_kind":"finding","subject_label":"Redevelopment Agency debt service for the ballpark","summary":"The Budget Analyst finds the ballpark tax revenue more than adequate to fund Redevelopment Agency debt service of $920,700 (≈ $2.0 million in 2026 dollars) annually.","property":"cost_usd","value_text":"$920,700 annually","value_num":920700.0,"unit":"USD","date_printed":"annually","t_from":"1996","quote":"Redevelopment Agency costs for the ballpark project of $920,700 annually for debt service and $184,200 annually for housing program contributions.","place_label":"China Basin","anchor":"s-16fc48aeaea1","shown":false,"hidden":"table","part":"table","speaker":"issuer","speaker_role":"Budget Analyst","stance":"own_position","speaker_evidence":"Distribution of Estimated Annual Possessory Interest Tax Revenue; BOARD OF SUPERVISORS - BUDGET ANALYST"},{"claim_id":"c:2216c639fb5456b1069cbf11894ba393","page_id":"C124918144:26","page_url":"https://archive.org/details/C124918144/page/n25","statement_kind":"proposal","subject_label":"Possessory interest tax revenue from the ballpark","summary":"The Budget Analyst estimates annual possessory interest tax revenue of $3.5 million (≈ $7.5 million in 2026 dollars) from the proposed ballpark.","property":"other","value_text":"$3,500,000","value_num":3500000.0,"unit":"USD","t_from":"1996","quote":"Therefore, the total estimated Possessory Interest Tax revenue of $3.5 million annually is more than adequate to fund Redevelopment Agency costs","place_label":"China Basin","anchor":"s-2216c639fb54","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"Budget Analyst","stance":"own_position","speaker_evidence":"Therefore, the total estimated Possessory Interest Tax revenue of $3.5 million annually"},{"claim_id":"c:4e4eeae4c68de567e96a4fd2a5ee07de","page_id":"C124918144:27","page_url":"https://archive.org/details/C124918144/page/n26","statement_kind":"finding","subject_label":"Transportation Authority capital cost estimates","summary":"The Transportation Authority has not provided cost estimates for the potential capital projects it identified.","property":"cost_usd","value_text":"no cost estimates provided","unit":"USD","t_from":"1996","quote":"No cost estimates have been provided by Authority for the identified capital projects.","place_label":"South of Market","place_precision":"area","place_id":"qipu:sf/place/hood/south-of-market","resolved_by":"place links file","anchor":"s-4e4eeae4c68d","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"Board of Supervisors - Budget Analyst","stance":"own_position","speaker_evidence":"No cost estimates have been provided by Authority for the identified capital projects."},{"claim_id":"c:6b849d8a9392721f627a620ea4fa04bf","page_id":"C124918144:27","page_url":"https://archive.org/details/C124918144/page/n26","statement_kind":"proposal","subject_label":"Muni operating costs for ballpark service","summary":"The Muni concludes that ballpark service will cost about $800,000 (≈ $1.7 million in 2026 dollars) annually net of cash revenue, $300,000 (≈ $644,245 in 2026 dollars) more than Candlestick service.","property":"cost_usd","value_text":"$800,000 annually","value_num":800000.0,"unit":"USD","date_printed":"annually","t_from":"1996","quote":"the Muni has concluded that such costs will approximate $800,000 annually (net of cash revenue) or $300,000 more than the current cost","place_label":"Candlestick Park","place_precision":"site","place_id":"qipu:sf/place/institution/candlestick-park-7d336c","resolved_by":"place links file","anchor":"s-6b849d8a9392","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"quotes_to_report","speaker_evidence":"the Muni has concluded that such costs will approximate $800,000 annually"},{"claim_id":"c:51d9ce826436f67fb0cd0a9ac6933fb6","page_id":"C124918144:29","page_url":"https://archive.org/details/C124918144/page/n28","statement_kind":"finding","subject_label":"Economic impact of the ballpark","summary":"The Budget Analyst observes that the increased estimated economic impacts largely result from projected increased attendance at the new ballpark.","property":"other","t_from":"1996","quote":"As can be seen from the above, the increased estimated direct and indirect economic impacts appear to largely result from the projected increased attendance level","place_label":"China Basin","anchor":"s-51d9ce826436","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"Budget Analyst","stance":"own_position","speaker_evidence":"As can be seen from the above, the increased estimated direct and indirect economic impacts"},{"claim_id":"c:5c7b171591b87bb854daaf262dcae3ed","page_id":"C124918144:29","page_url":"https://archive.org/details/C124918144/page/n28","statement_kind":"finding","subject_label":"Giants economic impact study","summary":"The Budget Analyst has not verified the source data or accuracy of computations in the Giants' updated economic impact report.","property":"other","t_from":"1996","quote":"The Budget Analyst has not verified the source data or the accuracy of computations in the updated report on economic impacts.","anchor":"s-5c7b171591b8","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"Budget Analyst","stance":"own_position","speaker_evidence":"The Budget Analyst has not verified the source data or the accuracy of computations"},{"claim_id":"c:8f119e8661527d94a890d02a39346e75","page_id":"C124918144:30","page_url":"https://archive.org/details/C124918144/page/n29","statement_kind":"proposal","subject_label":"Construction jobs from the new ballpark","summary":"The Giants' study projects that construction of a new ballpark would produce 3,655 jobs.","property":"jobs","value_text":"3,655 jobs","value_num":3655.0,"unit":"jobs","t_from":"1996","quote":"the construction of a new ballpark would produce 3,655 jobs with an average duration of four months (during the 28 month construction period)","place_label":"China Basin","anchor":"s-8f119e866152","shown":false,"hidden":"another_body","part":"main_text","speaker":"another_body","speaker_role":"the Giants' study, reported by the Budget Analyst","stance":"quotes_to_report","speaker_evidence":"The Giants' study also points out that the construction"},{"claim_id":"c:f19879eb4ecf4f62962aaf580a322851","page_id":"C124918144:30","page_url":"https://archive.org/details/C124918144/page/n29","statement_kind":"proposal","subject_label":"Operations jobs at the new ballpark","summary":"The Giants' study projects ballpark operations will employ 1,800 to 2,150 persons per home game.","property":"jobs","value_text":"1,800 to 2,150 persons per home game","value_num":1800.0,"unit":"persons","t_from":"1996","quote":"ballpark operations will employ between 1,800 and 2,150 persons per home game, including both full and part time Giants' employees","place_label":"China Basin","anchor":"s-f19879eb4ecf","shown":false,"hidden":"another_body","part":"main_text","speaker":"another_body","speaker_role":"the Giants' study, reported by the Budget Analyst","stance":"quotes_to_report","speaker_evidence":"The Giants' study also points out that the construction"},{"claim_id":"c:9bdf3fd932e1c495453b7707956678c6","page_id":"C124918144:31","page_url":"https://archive.org/details/C124918144/page/n30","statement_kind":"proposal","subject_label":"Direct revenue to the City from a new downtown ballpark","summary":"The Budget Analyst estimates direct revenue to the City would increase by $471,000 (≈ $1.0 million in 2026 dollars) to $766,000 (≈ $1.6 million in 2026 dollars) annually if a new ballpark is built.","property":"other","value_text":"$471,000 to $766,000 annually","value_num":471000.0,"unit":"USD","t_from":"1996","quote":"such direct revenue would increase by between $471,000 and $766,000 annually, depending on actual attendance, if a new downtown ballpark were to be constructed","place_label":"China Basin","anchor":"s-9bdf3fd932e1","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"Budget Analyst","stance":"own_position","speaker_evidence":"VII. Direct Revenue Payments to the City and County of San Francisco"},{"claim_id":"c:00f8000dc1a9fecd28a734e3d51fa179","page_id":"C124918144:35","page_url":"https://archive.org/details/C124918144/page/n34","statement_kind":"finding","subject_label":"Port liability for contamination","summary":"The Giants' letter states the Port will be relieved of existing contamination liability.","property":"other","value_text":"relieved of existing risk of liability for contamination","t_from":"1996","quote":"The Port will be relieved of existing risk of liability for contamination.","place_label":"Port site, China Basin","anchor":"s-00f8000dc1a9","shown":false,"hidden":"letter","part":"letter","speaker":"letter_writer","speaker_role":"a letter writer","stance":"own_position","speaker_evidence":"Page 2 Mr. [name]; Findings, continued; The Port will be relieved"},{"claim_id":"c:2ab4ec7e27f1c3cec04682be8ee20dec","page_id":"C124918144:35","page_url":"https://archive.org/details/C124918144/page/n34","statement_kind":"finding","subject_label":"Economic impact of the Giants relocation","summary":"The Giants' letter states the economic impact is $117 million (≈ $251.3 million in 2026 dollars) to $125 million (≈ $268.4 million in 2026 dollars) a year.","property":"other","value_text":"$117 million to $125 million per year","value_num":117000000.0,"unit":"USD","t_from":"1996","quote":"The economic impact of $117 million to $125 million is an annual positive contribution to the City and County of San Francisco.","anchor":"s-2ab4ec7e27f1","shown":false,"hidden":"letter","part":"letter","speaker":"letter_writer","speaker_role":"San Francisco Giants","stance":"own_position","speaker_evidence":"[name]; The economic impact of $117 million to $125 million"},{"claim_id":"c:b20ed04eeb6ea6e4c461d53381367702","page_id":"C124918144:35","page_url":"https://archive.org/details/C124918144/page/n34","statement_kind":"proposal","subject_label":"Jobs from a new downtown ballpark","summary":"The Giants' letter projects a new downtown ballpark will generate more than 6,400 jobs.","property":"jobs","value_text":"more than 6,400 jobs","value_num":6400.0,"unit":"jobs","t_from":"1996","quote":"The presence of the Giants in a new downtown ballpark will generate more than 6,400 jobs","anchor":"s-b20ed04eeb6e","shown":false,"hidden":"letter","part":"letter","speaker":"letter_writer","speaker_role":"San Francisco Giants","stance":"own_position","speaker_evidence":"Findings, continued; The presence of the Giants in a new downtown ballpark"},{"claim_id":"c:b30dae01c4467f2a0971181c29b34604","page_id":"C124918144:35","page_url":"https://archive.org/details/C124918144/page/n34","statement_kind":"finding","subject_label":"Incremental fiscal impact to the City of relocation","summary":"The Giants' letter states the incremental impact to the City is $32 million (≈ $68.7 million in 2026 dollars) to $40 million (≈ $85.9 million in 2026 dollars) per year.","property":"other","value_text":"$32 million to $40 million per year","value_num":32000000.0,"unit":"USD","t_from":"1996","quote":"The incremental impact to the City because of the relocation of the Giants to a downtown ballpark is $32 million to $40 million per year.","anchor":"s-b30dae01c446","shown":false,"hidden":"letter","part":"letter","speaker":"letter_writer","speaker_role":"San Francisco Giants","stance":"own_position","speaker_evidence":"[name]; The incremental impact to the City because of the relocation"},{"claim_id":"c:d3431e551b57a4dc59beb61746317d47","page_id":"C124918144:36","page_url":"https://archive.org/details/C124918144/page/n35","statement_kind":"finding","subject_label":"Maintenance facility demolition and relocation cost estimates","summary":"The Giants' letter says it cannot comment on the report's maintenance facility cost estimates and calls them misleading.","property":"cost_usd","value_text":"$2 to $7 million demolition; up to $7 million relocation","unit":"USD","date_printed":"1989 estimate","t_from":"1989","quote":"The Giants are unable to comment on the estimates cited in your report relating to the maintenance facility demolition ($2 to $7 million) and relocation (up to $7 million).","anchor":"s-d3431e551b57","shown":false,"hidden":"letter","part":"letter","speaker":"letter_writer","speaker_role":"the Giants (ballpark proponent letter to the Budget Analyst)","stance":"quotes_to_dispute","speaker_evidence":"Page 3 Mr. [name] 29, 1996; The Giants are unable to comment on the estimates cited in your report"},{"claim_id":"c:00ff3da668a679885316267554e38b04","page_id":"C124918144:38","page_url":"https://archive.org/details/C124918144/page/n37","statement_kind":"finding","subject_label":"Possessory interest tax contribution from the new ballpark","summary":"The Budget Analyst's analysis shows possessory tax contribution after debt service and housing programs is $2,395,000 (≈ $5.1 million in 2026 dollars) per year.","property":"other","value_text":"$2,395,000 per year","value_num":2395000.0,"unit":"USD","t_from":"1996","quote":"the possessory tax contribution total after debt service and housing programs as a result of the new ballpark is $2,395,000 per year","anchor":"s-00ff3da668a6","shown":false,"hidden":"letter","part":"letter","speaker":"letter_writer","speaker_role":"the Giants (the club writing to the Budget Analyst)","stance":"quotes_to_dispute","speaker_evidence":"Page 5 Mr. [name] 29, 1996 [name], continued; \"Your analysis shows that\""},{"claim_id":"c:15e1a704ffa3d75fd77b20a8d958f8e6","page_id":"C124918144:38","page_url":"https://archive.org/details/C124918144/page/n37","statement_kind":"finding","subject_label":"Bus fleet need","summary":"Muni has stated that no additional buses are necessary to serve the ballpark.","property":"other","value_text":"no additional buses necessary","t_from":"1996","quote":"Muni has stated that no additional buses are necessary as it has the capacity to serve the ballpark.","anchor":"s-15e1a704ffa3","shown":false,"hidden":"letter","part":"letter","speaker":"letter_writer","speaker_role":"the Giants","stance":"quotes_to_report","speaker_evidence":"[name] -- [name]; \"Muni has stated that no additional buses are necessary\""},{"claim_id":"c:fa9470674512a82fb8aa6dbf11a92500","page_id":"C124918144:38","page_url":"https://archive.org/details/C124918144/page/n37","statement_kind":"finding","subject_label":"Parking structures and pedestrian overcrossing","summary":"The Giants state they have not asked the City to build parking structures because parking is already planned.","property":"other","value_text":"no parking structures requested","t_from":"1996","quote":"Contrary to statements in the report, the Giants have not asked for the City to develop parking structures to deal with the ballpark requirements","anchor":"s-fa9470674512","shown":false,"hidden":"letter","part":"letter","speaker":"letter_writer","speaker_role":"the Giants","stance":"quotes_to_dispute","speaker_evidence":"\"Contrary to statements in the report, the Giants have not asked\""}]}