{"note":"Statements read from one scanned government report in the IGS library collection on the Internet Archive. Each statement has a verbatim quote found on its page (quote, page_url). The summary and subject_label of each statement were written by a model (Claude Haiku 5.5) and can be wrong: read the page before quoting. At most 20 selected pages of a report were read. Keys are the column names of the tables igs_reports and igs_claims; a column that is null for a statement is left out, and columns with one value for every statement of this report are given once under same_for_every_statement. \"[name withheld]\" stands where the release withholds a name; the site's page guard withholds a few more in reports after 1951, so a cell here can differ from the table; for a few reports prepared_by and creator are left out. A statement's links to the Board record are under links (show_target_kind: decision, instrument or ballot measure; show_target_id; show_url); they replace the table's decision_id and instrument_id, which are left out. place_id, place_label and place_precision come from a corrected place match where there is one. part, speaker, speaker_role, stance and speaker_evidence say who is speaking: a model (Claude Haiku 5.5) read each page and its context and can be wrong. part: main_text, attachment, appendix, letter, comment, response, table or cover_or_contents; speaker: issuer, another_body, letter_writer or unclear; speaker_role: a role or organisation, never a personal name; stance: own_position, quotes_to_dispute, quotes_to_report, restates_to_reject or unclear. The report page shows a statement only when speaker is issuer, part is main_text or appendix, and stance is own_position or quotes_to_report; hidden gives the part, the speaker or the stance of the others. ","release":"v0.9.2","licence":"CC0-1.0","slug":"c124919865","url":"https://data.qipu.org/usa/san-francisco/reports/c124919865/","statement_url":"https://data.qipu.org/usa/san-francisco/reports/c124919865/#{anchor}","tables":{"igs_reports":"https://tiles.qipu.org/data/releases/v0.9.2/parquet/igs_reports.parquet","igs_claims":"https://tiles.qipu.org/data/releases/v0.9.2/parquet/igs_claims.parquet"},"report":{"report_id":"C124919865","source_id":"C124919865","title":"School of the Arts master plan : San Francisco Unified School District : draft environmental impact report","year":1997,"n_pages":196,"creator":null,"source_url":"https://archive.org/details/C124919865","issuer":"San Francisco Unified School District","issuer_type":"government","gov_level":"school_district","prepared_by":null,"doc_kind":"eir","jurisdiction":"San Francisco","jurisdiction_id":"sf","city":"sf","issuer_by":"model","doc_kind_by":"meta","jurisdiction_by":"model","run_id":"igs-labels-rules+haiku55-cli-2026-10-23"},"pages_with_statements":18,"statements_total":48,"statements_by_kind":{"finding":16,"proposal":25,"cites_decision":2,"background":5},"same_for_every_statement":{"source_id":"C124919865","source_url":"https://archive.org/details/C124919865","source_label":"IGS library: School of the Arts master plan : San Francisco Unified School District : draft environmental impact report","report_year":1997,"issuer":"San Francisco Unified School District","issuer_type":"government","doc_kind":"eir","t_precision":"year","status":"extracted","claim_kind":"observation","extraction_table":"igs_claims","run_id":"igs-sf-pages-v2-haiku55-batch-2026-10-23","city":"sf","prompt_version":"igs-page-v2-2026-10-23"},"summary":{"what":"A draft environmental impact report by the San Francisco Unified School District on a master plan to rebuild and expand the School of the Arts across several Van Ness Avenue and Fell Street sites.","figures":[{"label":"Budget","value":"$46 million","claim_ids":["c:480496c42b834a8eae4c65d6c5dd3a8a"]},{"label":"Capacity","value":"up to a maximum of 1,000 students","claim_ids":["c:56860d273978282249ae4d76b8c2fc0c"]},{"label":"Vacant","value":"since 1989","claim_ids":["c:78ea70c557f805477e1717b968d6117a"]},{"label":"170 Fell cost","value":"$26.078 million","claim_ids":["c:ef656aab94a40c7b7f4f371a19df02dc"]}],"main_points":["c:07b1e06f98cefe4de2c09a6965bddcd1","c:648993032a82405aeba6e2dda35bf594","c:fea21a2bc6e7d931fbfeefa296438ed8"],"board_decisions_after":[],"board_decisions_before":[],"made_by":"A model (Claude Haiku 5.5) wrote the lead and picked the figures, main points and later Board decisions from the statements, from a second reading of the report's summary and cost pages, and from Board decisions dated 3 years before to 10 years after the report; every number it wrote was checked against them, and a figure must be about the report's own area or project."},"statements":[{"claim_id":"c:268bcb4ef3722ce927c4a3c50cd34a7c","page_id":"C124919865:15","page_url":"https://archive.org/details/C124919865/page/n14","statement_kind":"finding","subject_label":"Laguna Street/U.S. 101 Off-Ramp intersection","summary":"Under cumulative conditions with the project, the Laguna Street/U.S. 101 Off-Ramp intersection would operate at LOS F.","property":"other","value_text":"LOS F","t_from":"1997","quote":"The Van Ness Avenue/Fell Street and Laguna Street/U.S. 101 Off- Ramp intersections would operate at LOS F.","place_label":"Laguna Street/U.S. 101 Off-Ramp","place_precision":"street","place_id":"qipu:sf/place/street/laguna-st","resolved_by":"place links file","anchor":"s-268bcb4ef372","shown":false,"hidden":"table","part":"table","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"TABLE S-1: SUMMARY OF IMPACTS AND MITIGATION MEASURES"},{"claim_id":"c:3123ba9bdf5de7cf1084d79cb5164d50","page_id":"C124919865:15","page_url":"https://archive.org/details/C124919865/page/n14","statement_kind":"finding","subject_label":"Van Ness Avenue/Fell Street intersection","summary":"Under cumulative conditions with the project, the Van Ness Avenue/Fell Street intersection would operate at LOS F.","property":"other","value_text":"LOS F","t_from":"1997","quote":"The Van Ness Avenue/Fell Street and Laguna Street/U.S. 101 Off- Ramp intersections would operate at LOS F.","place_label":"Van Ness Avenue/Fell Street","place_precision":"intersection","place_id":"qipu:sf/place/street/van-ness-ave","resolved_by":"place links file","anchor":"s-3123ba9bdf5d","shown":false,"hidden":"table","part":"table","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"TABLE S-1: SUMMARY OF IMPACTS AND MITIGATION MEASURES"},{"claim_id":"c:360baec385ca78fbf4003123cec18e17","page_id":"C124919865:33","page_url":"https://archive.org/details/C124919865/page/n32","statement_kind":"proposal","subject_label":"135 Van Ness Building renovation","summary":"The project would renovate the entire 135 Van Ness building, including seismic retrofit and upgrades.","property":"proposes","value_text":"entire building renovated","t_from":"1997","quote":"The entire building would be renovated, including the north and south wings, which would consist of seismic retrofit and other upgrades","place_label":"135 Van Ness Avenue","place_precision":"address","place_id":"qipu:sf/place/address/eas-459456","resolved_by":"place links file","anchor":"s-360baec385ca","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"3. Project Description 135 Van Ness Building: The entire building would be renovated"},{"claim_id":"c:4862157c116f59bb685beb5ca725f9d1","page_id":"C124919865:33","page_url":"https://archive.org/details/C124919865/page/n32","statement_kind":"proposal","subject_label":"170 Fell Street parking","summary":"The project proposes no off-street parking.","property":"proposes","value_text":"no off-street parking","t_from":"1997","quote":"No off-street parking is proposed for the project.","place_label":"170 Fell Street","place_precision":"address","place_id":"qipu:sf/place/address/eas-465042","resolved_by":"place links file","anchor":"s-4862157c116f","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"No off-street parking is proposed for the project."},{"claim_id":"c:56860d273978282249ae4d76b8c2fc0c","page_id":"C124919865:33","page_url":"https://archive.org/details/C124919865/page/n32","statement_kind":"proposal","subject_label":"SOTA project capacity","summary":"The new SOTA complex would provide capacity for up to 1,000 students when completed in 1999.","property":"other","value_text":"up to a maximum of 1,000 students","value_num":1000.0,"unit":"persons","date_printed":"1999","t_from":"1999","quote":"When the project is completed in 1999, the new SOTA complex would provide an expanded capacity for up to a maximum of 1,000 students.","anchor":"s-56860d273978","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"When the project is completed in 1999, the new SOTA complex would provide"},{"claim_id":"c:8d6327e674c1e301997216c6bb22c612","page_id":"C124919865:33","page_url":"https://archive.org/details/C124919865/page/n32","statement_kind":"background","subject_label":"SOTA project architect","summary":"Gordon H. Chong + Partners of San Francisco is the project architect.","property":"architect","value_text":"Gordon H. Chong + Partners","t_from":"1997","quote":"Gordon H. Chong + Partners of San Francisco is the project architect, assisted by Page & Turnbull for historic preservation","anchor":"s-8d6327e674c1","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Gordon H. Chong + Partners of San Francisco is the project architect"},{"claim_id":"c:9e2cfa1145322997b03f191655e0ecc0","page_id":"C124919865:33","page_url":"https://archive.org/details/C124919865/page/n32","statement_kind":"proposal","subject_label":"170 Fell Street replacement building","summary":"The new building at 170 Fell Street would be similar in size, scale and height to the demolished building.","property":"proposes","value_text":"similar in size, scale and height","t_from":"1997","quote":"The new building at 170 Fell Street would be similar in size, scale and height to the demolished 170 Fell Street Building.","place_label":"170 Fell Street","place_precision":"address","place_id":"qipu:sf/place/address/eas-465042","resolved_by":"place links file","anchor":"s-9e2cfa114532","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"The new building at 170 Fell Street would be similar in size, scale and height"},{"claim_id":"c:01219a6b4b761b495017c606d77eb27b","page_id":"C124919865:39","page_url":"https://archive.org/details/C124919865/page/n38","statement_kind":"background","subject_label":"135 Van Ness historic status","summary":"The 135 Van Ness building is a Landmark building whose adaptive reuse would follow the Secretary of the Interior's Standards.","property":"historic_rating","value_text":"Landmark building","t_from":"1997","quote":"The adaptive reuse of 135 Van Ness, a Landmark building, would be undertaken, to the maximum extent feasible, in compliance with Secretary of the Interior's Standards","place_label":"135 Van Ness Avenue","place_precision":"address","place_id":"qipu:sf/place/address/eas-459456","resolved_by":"place links file","anchor":"s-01219a6b4b76","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"3. Project Description; The adaptive reuse of 135 Van Ness would be undertaken"},{"claim_id":"c:83cd672219552066191dfc33bbe8cc0b","page_id":"C124919865:39","page_url":"https://archive.org/details/C124919865/page/n38","statement_kind":"cites_decision","subject_label":"Exemption from City jurisdiction","summary":"The SFUSD adopted Resolution 59-12W3 exempting the project from City and County of San Francisco jurisdiction.","property":"other","value_text":"exempted from City jurisdiction","date_printed":"August 30, 1995","t_from":"1995","quote":"The SFUSD adopted Resolution Number 59-12W3 on August 30, 1995, exempting the project from the jurisdiction of the City and County of San Francisco.","decided_by":"San Francisco Unified School District (SFUSD)","instrument_kind":"resolution","instrument_printed":"59-12W3","instrument_date_printed":"August 30, 1995","anchor":"s-83cd67221955","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"The SFUSD adopted Resolution Number 59-12W3 on August 30, 1995"},{"claim_id":"c:b5c69a1d2551444938c4324e5b3582b2","page_id":"C124919865:39","page_url":"https://archive.org/details/C124919865/page/n38","statement_kind":"proposal","subject_label":"Final EIR certification","summary":"A Final EIR would be presented to the School Board for certification as to its accuracy, objectivity, and completeness.","property":"other","value_text":"certification of Final EIR","t_from":"1997","quote":"A Final EIR, consisting of the Draft EIR with revisions and the responses to comments, will be presented to the School Board for certification","anchor":"s-b5c69a1d2551","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"APPROVAL REQUIREMENTS; A Final EIR, consisting of the Draft EIR"},{"claim_id":"c:1751cde17ea52c07a4c921ec334ce0e4","page_id":"C124919865:40","page_url":"https://archive.org/details/C124919865/page/n39","statement_kind":"proposal","subject_label":"Project funding","summary":"The project would partly be funded by FEMA, so it must also undergo federal environmental review.","property":"other","value_text":"FEMA","t_from":"1997","quote":"Part of the funding for the proposed project would come from the U.S. Federal Emergency Management Agency (FEMA)","anchor":"s-1751cde17ea5","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"3. Project Description Part of the funding for the proposed project"},{"claim_id":"c:c3fc1ae4e48ebd85cc16a3cbf9c3b5df","page_id":"C124919865:40","page_url":"https://archive.org/details/C124919865/page/n39","statement_kind":"proposal","subject_label":"Memorandum of Agreement","summary":"The MOA would set forth stipulations designed to mitigate the adverse effects of the project on historic resources.","property":"other","value_text":"MOA","t_from":"1997","quote":"The MOA would set forth stipulations designed to mitigate the adverse effects of the project’s implementation on historic resources.","anchor":"s-c3fc1ae4e48e","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"The MOA would set forth stipulations designed to mitigate the"},{"claim_id":"c:484085369c77dbfa475a52e3af588e0e","page_id":"C124919865:71","page_url":"https://archive.org/details/C124919865/page/n70","statement_kind":"cites_decision","subject_label":"Exemption from City jurisdiction","summary":"The SFUSD adopted Resolution No. 59-12W3, which exempts the project from City and County of San Francisco jurisdiction.","property":"adopted","value_text":"Resolution No. 59-12W3","date_printed":"August 30, 1995","t_from":"1995","quote":"the SFUSD has adopted Resolution No. 59-12W3, August 30, 1995, which exempts the project from the jurisdiction of the City and County of San Francisco","decided_by":"SFUSD","instrument_kind":"resolution","instrument_printed":"59-12W3","instrument_date_printed":"August 30, 1995","anchor":"s-484085369c77","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"San Francisco Unified School District","stance":"own_position","speaker_evidence":"As noted on page 3-15 in Chapter 3, the SFUSD has adopted Resolution"},{"claim_id":"c:e240d8b3ed297308d880ce8ff6d1d03b","page_id":"C124919865:71","page_url":"https://archive.org/details/C124919865/page/n70","statement_kind":"proposal","subject_label":"Streetscape planting","summary":"The streetscape plan shows prototypical street tree planting along the sidewalks on Van Ness Avenue and Fell Street.","property":"proposes","value_text":"street tree planting","t_from":"1997","quote":"The streetscape plan shows prototypical street tree planting along the sidewalks on Van Ness Avenue and Fell Street","place_label":"Van Ness Avenue and Fell Street","place_precision":"intersection","place_id":"qipu:sf/place/street/van-ness-ave","resolved_by":"place links file","anchor":"s-e240d8b3ed29","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"The streetscape plan shows prototypical street tree planting"},{"claim_id":"c:4b17eb439fecc40976479401efa55bc4","page_id":"C124919865:73","page_url":"https://archive.org/details/C124919865/page/n72","statement_kind":"background","subject_label":"Transit Preferential Streets","summary":"The San Francisco General Plan designates Transit Preferential Streets, important for transit operations.","property":"other","value_text":"Transit Preferential Streets","t_from":"1997","quote":"The San Francisco General Plan designates Transit Preferential Streets, which are considered important streets for transit operations","anchor":"s-4b17eb439fec","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"quotes_to_report","speaker_evidence":"The San Francisco General Plan designates Transit Preferential Streets"},{"claim_id":"c:945eea5a214fe5c522d7723348be0882","page_id":"C124919865:73","page_url":"https://archive.org/details/C124919865/page/n72","statement_kind":"finding","subject_label":"Market Street traffic","summary":"Market Street has two lanes in each direction near the project site and serves as a major transit corridor.","property":"other","value_text":"two lanes in each direction","value_num":2.0,"t_from":"1997","quote":"In the vicinity of the project site, Market Street has two lanes in each direction and serves as a major transit corridor.","place_label":"Market Street","place_precision":"street","place_id":"qipu:sf/place/street/market-st","resolved_by":"place links file","anchor":"s-945eea5a214f","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"In the vicinity of the project site, Market Street has two lanes"},{"claim_id":"c:c04d4f4da43531df96629eadb3e9efaa","page_id":"C124919865:73","page_url":"https://archive.org/details/C124919865/page/n72","statement_kind":"finding","subject_label":"Van Ness Avenue","summary":"Van Ness Avenue forms the eastern boundary of the project site and has three travel lanes in each direction.","property":"other","value_text":"three travel lanes in each direction","value_num":3.0,"t_from":"1997","quote":"Van Ness Avenue forms the eastern boundary of the project site, where it has three travel lanes in each direction","place_label":"Van Ness Avenue","place_precision":"street","place_id":"qipu:sf/place/street/van-ness-ave","resolved_by":"place links file","anchor":"s-c04d4f4da435","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Van Ness Avenue forms the eastern boundary of the project site"},{"claim_id":"c:145414323f6071851aca3f9bd67f162c","page_id":"C124919865:76","page_url":"https://archive.org/details/C124919865/page/n75","statement_kind":"finding","subject_label":"On-street parking supply in survey area","summary":"The survey area has about 1,275 on-street parking spaces.","property":"other","value_text":"1,275","value_num":1275.0,"t_from":"1997","quote":"A total of approximately 1,275 on-street parking spaces are located with the parking survey area, consisting of 445 unrestricted spaces, 40 special-purpose/colored zone spaces, 140 time- restricted spaces, and 650 metered spaces.","place_label":"two-block parking survey area","anchor":"s-145414323f60","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"A total of approximately 1,275 on-street parking spaces are located"},{"claim_id":"c:185e76002465ca20b04471bdc6d03ffc","page_id":"C124919865:76","page_url":"https://archive.org/details/C124919865/page/n75","statement_kind":"finding","subject_label":"On-street parking occupancy","summary":"On-street occupancy in the survey area was about 88 percent on weekday midday.","property":"other","value_text":"88 percent","value_num":88.0,"unit":"percent","date_printed":"weekday midday period","t_from":"1997","quote":"The on-street parking occupancy rate in the survey area was approximately 88 percent during the weekday midday period, and 86 percent during the weekend evening period.","place_label":"two-block parking survey area","anchor":"s-185e76002465","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"The on-street parking occupancy rate in the survey area was approximately 88 percent"},{"claim_id":"c:61d6b0655c3b73f576889cc90835418d","page_id":"C124919865:76","page_url":"https://archive.org/details/C124919865/page/n75","statement_kind":"finding","subject_label":"Reliability of parking survey","summary":"The parking survey results are considered slightly skewed by nearby construction.","property":"other","value_text":"slightly skewed","date_printed":"time of the on-street parking survey","t_from":"1997","quote":"Therefore, the results of the on-street parking survey are considered to be slightly skewed, and the average on-street occupancy rate under typical conditions is expected to be lower.","place_label":"War Memorial Opera House; City Hall","place_precision":"building","place_id":"qipu:sf/place/landmark/war-memorial-opera-house","resolved_by":"place links file","anchor":"s-61d6b0655c3b","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Therefore, the results of the on-street parking survey are considered to be slightly skewed"},{"claim_id":"c:49099f6e919765ddf5b63fc0253be158","page_id":"C124919865:87","page_url":"https://archive.org/details/C124919865/page/n86","statement_kind":"proposal","subject_label":"Laguna Street/U.S. 101 Off-Ramp service level","summary":"The EIR forecasts the Laguna Street/U.S. 101 Off-Ramp intersection would deteriorate from LOS D to LOS F under cumulative conditions.","property":"other","value_text":"LOS F","date_printed":"2010","t_from":"2010","quote":"the Laguna Street/U.S. 101 Off-Ramp intersection would deteriorate from LOS D to LOS F as a result of cumulative increases in traffic.","place_label":"Laguna Street/U.S. 101 Off-Ramp","place_precision":"street","place_id":"qipu:sf/place/street/laguna-st","resolved_by":"place links file","anchor":"s-49099f6e9197","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"the Laguna Street/U.S. 101 Off-Ramp intersection would deteriorate from LOS D"},{"claim_id":"c:dc92fd4b0efd7c18aa43c45da451b0c1","page_id":"C124919865:87","page_url":"https://archive.org/details/C124919865/page/n86","statement_kind":"finding","subject_label":"Van Ness Avenue/Fell Street service level","summary":"The Van Ness Avenue/Fell Street intersection operates at LOS F under existing conditions.","property":"other","value_text":"LOS F","date_printed":"existing conditions","t_from":"1997","quote":"except the intersection of Van Ness Avenue/Fell Street, which operates at LOS F.","place_label":"Van Ness Avenue/Fell Street","place_precision":"intersection","place_id":"qipu:sf/place/street/van-ness-ave","resolved_by":"place links file","anchor":"s-dc92fd4b0efd","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"As shown in Table 4, under existing conditions, all study intersections operate"},{"claim_id":"c:f53a4763ceb929b3951a8b3df3bc3690","page_id":"C124919865:87","page_url":"https://archive.org/details/C124919865/page/n86","statement_kind":"proposal","subject_label":"Traffic impact of the proposed project","summary":"The EIR projects slight increases in vehicle delay at most study intersections, with no change in service levels.","property":"other","value_text":"no change in service levels","t_from":"1997","quote":"Impact C1: Traffic-generated impacts by the proposed project would result in slight increases in vehicle delay at most of the study intersections, but service levels would not change.","place_label":"study intersections","anchor":"s-f53a4763ceb9","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Impact C1: Traffic-generated impacts by the proposed project would result in slight increases"},{"claim_id":"c:13c7a10514cd9d13c7a8063c98b85c98","page_id":"C124919865:99","page_url":"https://archive.org/details/C124919865/page/n98","statement_kind":"proposal","subject_label":"Construction dust mitigation","summary":"The project sponsor would require the contractor to wet down the site at least twice a day during construction.","property":"other","value_text":"twice a day","value_num":2.0,"date_printed":"during construction","t_from":"1997","quote":"The project sponsor would require the contractor to wet down the site during demolition and construction at least twice a day during construction to reduce particulate by at least 50 percent","anchor":"s-13c7a10514cd","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Mitigation Measure D1: The project sponsor would require the contractor"},{"claim_id":"c:3c7cec5d1d12404c7f6a05147a9b8882","page_id":"C124919865:99","page_url":"https://archive.org/details/C124919865/page/n98","statement_kind":"finding","subject_label":"Construction fugitive dust impact","summary":"The EIR concludes construction dust could be potentially significant and intermittent before mitigation.","property":"other","value_text":"potentially significant","t_from":"1997","quote":"This impact could be potentially significant and intermittent.","anchor":"s-3c7cec5d1d12","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Impact D1: Fugitive dust generated by construction"},{"claim_id":"c:ccd8700ab93cc033507d1afe7d9f14c4","page_id":"C124919865:99","page_url":"https://archive.org/details/C124919865/page/n98","statement_kind":"background","subject_label":"Carbon monoxide significance threshold","summary":"The District has a carbon monoxide significance threshold of 550 pounds per day.","property":"other","value_text":"550 pounds per day","value_num":550.0,"t_from":"1997","quote":"The District also has a threshold of significance for carbon monoxide of 550 pounds per day.","anchor":"s-ccd8700ab93c","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"The District also has a threshold of significance for carbon monoxide"},{"claim_id":"c:07b1e06f98cefe4de2c09a6965bddcd1","page_id":"C124919865:101","page_url":"https://archive.org/details/C124919865/page/n100","statement_kind":"finding","subject_label":"Regional air quality impact of project","summary":"Project regional emissions are below the BAAQMD criteria, so the impact is less than significant.","property":"other","value_text":"less than significant","t_from":"1997","quote":"Project emissions shown in Table 7 are below these criteria for those pollutants, so the proposed project would have a less than significant impact on regional air quality.","anchor":"s-07b1e06f98ce","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Project emissions shown in Table 7 are below these criteria"},{"claim_id":"c:a787718eade9528432fcd457ccd103a0","page_id":"C124919865:101","page_url":"https://archive.org/details/C124919865/page/n100","statement_kind":"background","subject_label":"Regional air quality significance criterion","summary":"BAAQMD guidelines consider regional emission increases significant above 80 pounds per day.","property":"other","value_text":"80 pounds per day","value_num":80.0,"t_from":"1997","quote":"consider emission increases to be significant if the project emissions exceed 80 Ibs per day for regional pollutants (HC, NO,, PM,,).","anchor":"s-a787718eade9","shown":false,"hidden":"another_body","part":"main_text","speaker":"another_body","speaker_role":"Bay Area Air Quality Management District","stance":"quotes_to_report","speaker_evidence":"Guidelines for the evaluation of project impacts issued by the Bay Area Air Quality Management District"},{"claim_id":"c:2fabcf975123d9a418f22bac5af82560","page_id":"C124919865:113","page_url":"https://archive.org/details/C124919865/page/n112","statement_kind":"proposal","subject_label":"Variant 1 renovation of 170 Fell Street","summary":"The report says Variant 1 would renovate 170 Fell Street and preserve its key architectural features.","property":"alternative","t_from":"1997","quote":"Renovation and modification of 170 Fell Street would preserve key architectural features of the historic building.","place_label":"170 Fell Street","place_precision":"address","place_id":"qipu:sf/place/address/eas-465042","resolved_by":"place links file","anchor":"s-2fabcf975123","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Renovation and modification of 170 Fell Street would preserve key architectural features"},{"claim_id":"c:633f17c76c2f731e13dd0df0cd567374","page_id":"C124919865:113","page_url":"https://archive.org/details/C124919865/page/n112","statement_kind":"proposal","subject_label":"Variant 1 reuse of SOTA at Font Street","summary":"The report says under Variant 1 the SOTA would stay at its existing size and location on Font Street.","property":"alternative","t_from":"1997","quote":"the SOTA would not expand or relocate, but would continue to operate at its existing size and location on Font Street, adjacent to San Francisco State University.","place_label":"Font Street","anchor":"s-633f17c76c2f","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Under Variant 1, the SOTA would not expand or relocate"},{"claim_id":"c:5b1ce3d58ea0d5bdbd55d3a798fdb0cd","page_id":"C124919865:129","page_url":"https://archive.org/details/C124919865/page/n128","statement_kind":"proposal","subject_label":"Variant 2 Library Wing reduction","summary":"The report says the Library Wing of 185 Van Ness Avenue would be decreased by one bay under Variant 2.","property":"alternative","value_text":"about 525 sq. ft. smaller","value_num":525.0,"unit":"sqft","t_from":"1997","quote":"the Library Wing of the 185 Van Ness Avenue Building would be decreased by one bay in order to create a new entrance to the SOTA complex","place_label":"185 Van Ness Avenue","place_precision":"street","place_id":"qipu:sf/place/street/van-ness-ave","resolved_by":"place links file","anchor":"s-5b1ce3d58ea0","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Under this variant, the Library Wing of the 185 Van Ness Avenue Building would be decreased"},{"claim_id":"c:61d24ed5334f3b1a0a2e164ec1ef7195","page_id":"C124919865:129","page_url":"https://archive.org/details/C124919865/page/n128","statement_kind":"finding","subject_label":"Variant 2 land use effect","summary":"The EIR concludes Variant 2 would not have a significant effect on land use in the Hayes Valley neighborhood or Civic Center area.","property":"other","t_from":"1997","quote":"this would not have a significant effect on the existing land use characteristics of the Hayes Valley neighborhood or the Civic Center area.","place_label":"Hayes Valley neighborhood","place_precision":"area","place_id":"qipu:sf/place/hood/hayes-valley","resolved_by":"place links file","anchor":"s-61d24ed5334f","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"this would not have a significant effect on the existing land use characteristics"},{"claim_id":"c:648993032a82405aeba6e2dda35bf594","page_id":"C124919865:129","page_url":"https://archive.org/details/C124919865/page/n128","statement_kind":"proposal","subject_label":"Variant 2 retains 170 Fell Street","summary":"The report says Variant 2 would not demolish 170 Fell Street, avoiding the significant impact to a historic resource.","property":"alternative","t_from":"1997","quote":"the 170 Fell Street building would not be demolished, thereby eliminating the significant impact to an historic architectural resource that would occur under the proposed project.","place_label":"170 Fell Street","place_precision":"address","place_id":"qipu:sf/place/address/eas-465042","resolved_by":"place links file","anchor":"s-648993032a82","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"the 170 Fell Street building would not be demolished, thereby eliminating the significant impact"},{"claim_id":"c:ef656aab94a40c7b7f4f371a19df02dc","page_id":"C124919865:129","page_url":"https://archive.org/details/C124919865/page/n128","statement_kind":"proposal","subject_label":"Variant 2 cost of 170 Fell Street improvements","summary":"The report estimates Variant 2 improvements to 170 Fell Street at about $26.078 million, compared with $17.75 million (≈ $37.3 million in 2026 dollars) for the proposed project.","property":"cost_usd","value_text":"$26.078 million","value_num":26078000.0,"unit":"USD","t_from":"1997","quote":"the improvements to the 170 Fell Street building are estimated to cost approximately $26.078 million, including soft development and hard construction, compared to $17.75 million for the proposed project.","place_label":"170 Fell Street","place_precision":"address","place_id":"qipu:sf/place/address/eas-465042","resolved_by":"place links file","anchor":"s-ef656aab94a4","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"the improvements to the 170 Fell Street building are estimated to cost approximately $26.078 million"},{"claim_id":"c:43793c9df06e348cdfc13a888af729ae","page_id":"C124919865:131","page_url":"https://archive.org/details/C124919865/page/n130","statement_kind":"finding","subject_label":"Variant 2 economic feasibility","summary":"The project sponsor says Variant 2 is economically infeasible.","property":"other","value_text":"economically infeasible","t_from":"1997","quote":"This variant is economically infeasible in that the SFUSD has budgeted $46 million for this project","anchor":"s-43793c9df06e","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"6. Alternatives to The Proposed Project; This variant is economically infeasible"},{"claim_id":"c:480496c42b834a8eae4c65d6c5dd3a8a","page_id":"C124919865:131","page_url":"https://archive.org/details/C124919865/page/n130","statement_kind":"finding","subject_label":"SFUSD project budget","summary":"The SFUSD has budgeted $46 million (≈ $96.6 million in 2026 dollars) for the project, with $14 million (≈ $29.4 million in 2026 dollars) from FEMA and the rest from voter-approved bond issues.","property":"cost_usd","value_text":"$46 million","value_num":46000000.0,"unit":"USD","t_from":"1997","quote":"the SFUSD has budgeted $46 million for this project, with $14 million from FEMA and the remaining from various bond issues approved by the voters.","anchor":"s-480496c42b83","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"the SFUSD has budgeted $46 million for this project, with $14 million from FEMA"},{"claim_id":"c:5cd03aa24f616ef3b43228cc20bf968e","page_id":"C124919865:131","page_url":"https://archive.org/details/C124919865/page/n130","statement_kind":"finding","subject_label":"170 Fell Street ceiling height","summary":"The existing ceiling height of the 170 Fell Street building is 11 feet 5 inches.","property":"other","value_text":"11 feet 5 inches","unit":"ft","t_from":"1997","quote":"The existing ceiling height of the 170 Fell Street Building is only 11 feet 5 inches high.","place_label":"170 Fell Street","place_precision":"address","place_id":"qipu:sf/place/address/eas-465042","resolved_by":"place links file","anchor":"s-5cd03aa24f61","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"The existing ceiling height of the 170 Fell Street Building is only 11 feet 5 inches high."},{"claim_id":"c:723e252bfec9d023ce9a3a0714f9b016","page_id":"C124919865:143","page_url":"https://archive.org/details/C124919865/page/n142","statement_kind":"proposal","subject_label":"Variant 3 extra cost over proposed project","summary":"The report estimates Variant 3 would cost $7,380,000 (≈ $15.5 million in 2026 dollars) more than the proposed new 170 Fell Street building.","property":"cost_usd","value_text":"$7,380,000","value_num":7380000.0,"unit":"USD","t_from":"1997","quote":"which is $7,380,000 more that the proposed new 170 Fell Street Building.","place_label":"170 Fell Street","place_precision":"address","place_id":"qipu:sf/place/address/eas-465042","resolved_by":"place links file","anchor":"s-723e252bfec9","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"project sponsor (San Francisco Unified School District)","stance":"own_position","speaker_evidence":"REASONS FOR REJECTION OF THIS VARIANT ... the project sponsor rejects this Alternative"},{"claim_id":"c:92b7e914f58b1eaf3fc4567a5e1d1241","page_id":"C124919865:143","page_url":"https://archive.org/details/C124919865/page/n142","statement_kind":"proposal","subject_label":"Variant 3 construction cost","summary":"The report estimates the construction cost of Variant 3 at $25,126,000 (≈ $52.7 million in 2026 dollars).","property":"cost_usd","value_text":"$25,126,000","value_num":25126000.0,"unit":"USD","t_from":"1997","quote":"The construction cost of this variant is estimated to be $25,126,000, which is $7,380,000 more that the proposed new 170 Fell Street Building.","place_label":"170 Fell Street","place_precision":"address","place_id":"qipu:sf/place/address/eas-465042","resolved_by":"place links file","anchor":"s-92b7e914f58b","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"project sponsor (San Francisco Unified School District)","stance":"own_position","speaker_evidence":"This variant would be economically infeasible in that the SFUSD has budgeted $46 million"},{"claim_id":"c:07c9a4e5dad93af93ca9cb20c79c9e39","page_id":"C124919865:150","page_url":"https://archive.org/details/C124919865/page/n149","statement_kind":"proposal","subject_label":"Weekday AM peak-hour traffic under Alternative C","summary":"The EIR estimates Alternative C would generate about 47 net new weekday AM peak-hour vehicle trips.","property":"other","value_text":"approximately 47 net new vehicle-trips","value_num":47.0,"unit":"trips","t_from":"1997","quote":"the project is anticipated to generate approximately 47 net new vehicle-trips during the weekday AM peak hour","anchor":"s-07c9a4e5dad9","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"San Francisco Unified School District (EIR author)","stance":"own_position","speaker_evidence":"Under this alternative, the project is anticipated to generate approximately 47 net new vehicle-trips"},{"claim_id":"c:3b0896be146498b32c9f01382304bc57","page_id":"C124919865:150","page_url":"https://archive.org/details/C124919865/page/n149","statement_kind":"proposal","subject_label":"170 Fell Street building structural strengthening under Alternative C","summary":"The EIR proposes that the 170 Fell Street building be strengthened to meet the 1995 San Francisco Building Code.","property":"alternative","value_text":"Alternative C","t_from":"1997","quote":"Under Alternative C, the 170 Fell Street building would be strengthened to comply with Section 3404.6 (formerly Section 104(f)) of the 1995 San Francisco Building Code.","place_label":"170 Fell Street","place_precision":"address","place_id":"qipu:sf/place/address/eas-465042","resolved_by":"place links file","anchor":"s-3b0896be1464","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"San Francisco Unified School District (EIR author)","stance":"own_position","speaker_evidence":"Under Alternative C, the 170 Fell Street building would be strengthened to comply with"},{"claim_id":"c:fea21a2bc6e7d931fbfeefa296438ed8","page_id":"C124919865:151","page_url":"https://archive.org/details/C124919865/page/n150","statement_kind":"proposal","subject_label":"Environmental effect of Alternative C on historic resource","summary":"The EIR says Alternative C would eliminate the significant impact to a historic architectural resource that would occur under the proposed project.","property":"alternative","value_text":"Alternative C","t_from":"1997","quote":"Alternative C would eliminate the significant impact to an historic architectural resource that would occur under the proposed project.","place_label":"170 Fell Street","place_precision":"address","place_id":"qipu:sf/place/address/eas-465042","resolved_by":"place links file","anchor":"s-fea21a2bc6e7","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"San Francisco Unified School District (EIR author)","stance":"own_position","speaker_evidence":"6. Alternatives to The Proposed Project; REASONS FOR REJECTING THIS ALTERNATIVE"},{"claim_id":"c:4faadb3fa22c4a9f04f797bde6dbfdcd","page_id":"C124919865:166","page_url":"https://archive.org/details/C124919865/page/n165","statement_kind":"proposal","subject_label":"Replacement of school district offices with performing arts school at 135 Van Ness Avenue","summary":"The Initial Study says replacing the district offices with a performing arts school would revert the site to its historic school use.","property":"proposes","value_text":"performing arts school","t_from":"1997","quote":"The replacement of the administrative offices of the school district by a school of performing arts would revert the site to its historic use as a school.","place_label":"135 Van Ness Avenue","place_precision":"address","place_id":"qipu:sf/place/address/eas-459456","resolved_by":"place links file","anchor":"s-4faadb3fa22c","shown":true,"part":"appendix","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"9. Appendices: Initial Study"},{"claim_id":"c:63a52f91ee4e148735ee9ffce8a27d51","page_id":"C124919865:166","page_url":"https://archive.org/details/C124919865/page/n165","statement_kind":"proposal","subject_label":"Maximum projected population at the school site","summary":"The Initial Study says maximum use could involve about 1,000 students and 150 faculty and support staff.","property":"population","value_text":"about 1,000 students and 150 faculty and support staff","value_num":1000.0,"unit":"persons","t_from":"1997","quote":"Maximum use of the project could involve about 1,000 students and 150 faculty and support staff.","place_label":"135 Van Ness Avenue","place_precision":"address","place_id":"qipu:sf/place/address/eas-459456","resolved_by":"place links file","anchor":"s-63a52f91ee4e","shown":true,"part":"appendix","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"9. Appendices: Initial Study"},{"claim_id":"c:78ea70c557f805477e1717b968d6117a","page_id":"C124919865:166","page_url":"https://archive.org/details/C124919865/page/n165","statement_kind":"finding","subject_label":"Vacancy of 170 Fell Street and gymnasium wing","summary":"The 170 Fell Street building and the gymnasium wing of the 135 Van Ness Avenue building have been vacant since 1989.","property":"other","value_text":"vacant since 1989","date_printed":"1989","t_from":"1989","quote":"The 170 Fell Street building and the gymnasium wing of the 135 Van Ness Avenue building have been vacant since 1989 following the Loma Prieta Earthquake.","place_label":"170 Fell Street","place_precision":"address","place_id":"qipu:sf/place/address/eas-465042","resolved_by":"place links file","anchor":"s-78ea70c557f8","shown":true,"part":"appendix","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"9. Appendices: Initial Study"},{"claim_id":"c:bb2066805ed92f4c4fe49513f791104f","page_id":"C124919865:166","page_url":"https://archive.org/details/C124919865/page/n165","statement_kind":"finding","subject_label":"Housing displacement by the project","summary":"The Initial Study finds the project would not displace any existing dwelling units.","property":"households_displaced","value_text":"none","value_num":0.0,"unit":"households","t_from":"1997","quote":"The project would not displace any existing dwelling units.","place_label":"135 Van Ness Avenue","place_precision":"address","place_id":"qipu:sf/place/address/eas-459456","resolved_by":"place links file","anchor":"s-bb2066805ed9","shown":true,"part":"appendix","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Maximum use of the project could involve"},{"claim_id":"c:5638d027ec599e0ba54efb71bb8db553","page_id":"C124919865:179","page_url":"https://archive.org/details/C124919865/page/n178","statement_kind":"proposal","subject_label":"Asbestos abatement before demolition of 170 Fell Street","summary":"The SFUSD would employ a licensed asbestos abatement contractor to remove asbestos materials before demolition of 170 Fell Street.","property":"other","value_text":"licensed asbestos abatement contractor","t_from":"1997","quote":"The SFUSD would employ a licensed asbestos abatement contractor registered with Cal-OSHA to remove all asbestos containing building materials (ACBMs) prior to demolition of the 170 Fell Street building.","place_label":"170 Fell Street","place_precision":"address","place_id":"qipu:sf/place/address/eas-465042","resolved_by":"place links file","anchor":"s-5638d027ec59","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"San Francisco Unified School District (SFUSD) as project proponent","stance":"own_position","speaker_evidence":"8. Appendices: Initial Study; The SFUSD would employ a licensed asbestos abatement contractor"},{"claim_id":"c:ac38100ffaf69464bded6f286f7f6271","page_id":"C124919865:179","page_url":"https://archive.org/details/C124919865/page/n178","statement_kind":"proposal","subject_label":"Construction hours limit and night work approval","summary":"The SFUSD would limit construction hours to 7 a.m. to 6 p.m. unless the Department of Public Works authorizes night work.","property":"other","value_text":"7:00 a.m. to 6:00 p.m.","t_from":"1997","quote":"limit construction hours to between 7:00 a.m. and 6:00 p.m., unless night work is reviewed and authorized by the Department of Public Works","anchor":"s-ac38100ffaf6","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"San Francisco Unified School District (SFUSD) as project proponent","stance":"own_position","speaker_evidence":"Construction Noise: The SFUSD would require the contractor(s) to implement the following construction noise reduction strategies"}]}