{"note":"Statements read from one scanned government report in the IGS library collection on the Internet Archive. Each statement has a verbatim quote found on its page (quote, page_url). The summary and subject_label of each statement were written by a model (Claude Haiku 5.5) and can be wrong: read the page before quoting. At most 20 selected pages of a report were read. Keys are the column names of the tables igs_reports and igs_claims; a column that is null for a statement is left out, and columns with one value for every statement of this report are given once under same_for_every_statement. \"[name withheld]\" stands where the release withholds a name; the site's page guard withholds a few more in reports after 1951, so a cell here can differ from the table; for a few reports prepared_by and creator are left out. A statement's links to the Board record are under links (show_target_kind: decision, instrument or ballot measure; show_target_id; show_url); they replace the table's decision_id and instrument_id, which are left out. place_id, place_label and place_precision come from a corrected place match where there is one. part, speaker, speaker_role, stance and speaker_evidence say who is speaking: a model (Claude Haiku 5.5) read each page and its context and can be wrong. part: main_text, attachment, appendix, letter, comment, response, table or cover_or_contents; speaker: issuer, another_body, letter_writer or unclear; speaker_role: a role or organisation, never a personal name; stance: own_position, quotes_to_dispute, quotes_to_report, restates_to_reject or unclear. The report page shows a statement only when speaker is issuer, part is main_text or appendix, and stance is own_position or quotes_to_report; hidden gives the part, the speaker or the stance of the others. ","release":"v0.9.2","licence":"CC0-1.0","slug":"c124921892","url":"https://data.qipu.org/usa/san-francisco/reports/c124921892/","statement_url":"https://data.qipu.org/usa/san-francisco/reports/c124921892/#{anchor}","tables":{"igs_reports":"https://tiles.qipu.org/data/releases/v0.9.2/parquet/igs_reports.parquet","igs_claims":"https://tiles.qipu.org/data/releases/v0.9.2/parquet/igs_claims.parquet"},"report":{"report_id":"C124921892","source_id":"C124921892","title":"Management audit of the San Francisco Municipal Railway","year":1996,"n_pages":330,"creator":null,"source_url":"https://archive.org/details/C124921892","issuer":"City and County of San Francisco, Board of Supervisors, Budget Analyst","issuer_type":"government","gov_level":"city_county","prepared_by":"Budget Analyst, City and County of San Francisco","doc_kind":"audit_financial","jurisdiction":"San Francisco","jurisdiction_id":"sf","city":"sf","issuer_by":"model","doc_kind_by":"meta","jurisdiction_by":"model","run_id":"igs-labels-rules+haiku55-cli-2026-10-23"},"pages_with_statements":16,"statements_total":66,"statements_by_kind":{"finding":41,"proposal":21,"cites_decision":2,"background":2},"same_for_every_statement":{"source_id":"C124921892","source_url":"https://archive.org/details/C124921892","source_label":"IGS library: Management audit of the San Francisco Municipal Railway","report_year":1996,"issuer":"City and County of San Francisco, Board of Supervisors, Budget Analyst","issuer_type":"government","doc_kind":"audit_financial","t_precision":"year","status":"extracted","claim_kind":"observation","extraction_table":"igs_claims","run_id":"igs-sf-pages-v2-haiku55-batch-2026-10-23","city":"sf","prompt_version":"igs-page-v2-2026-10-23"},"summary":{"what":"An audit by the Budget Analyst of the San Francisco Municipal Railway's management, staffing, revenue, facilities and contracting practices.","figures":[{"label":"Staff","value":"approximately 3,570 employees","page_url":"https://archive.org/details/C124921892/page/n60","quote":"manage an authorized staff of approximately 3,570 employees"},{"label":"Operating budget","value":"approximately $280 million","page_url":"https://archive.org/details/C124921892/page/n4","quote":"the Department was initially authorized an operating budget of approximately $280 million"},{"label":"On schedule","value":"62 percent of vehicles","claim_ids":["c:ff570df966e3b20c5197277a76a71b46"]},{"label":"Fare revenue","value":"$91 million annually, $72 million cash","claim_ids":["c:493aebef9d7a7debccad31704492e8fd"]}],"main_points":["c:ff570df966e3b20c5197277a76a71b46","c:30817a32a8be9c9b15465ec74ed37f20","c:5cdefaeb8e7074ce07e52c7c1899263c"],"board_decisions_after":["qipu:sf/decision/journalofproceedjanapr92sanfrich:295/3","qipu:sf/decision/journalmayaugofproceed91sanfrich:252/5","qipu:sf/decision/journalofproceedjanapr92sanfrich:279/3","qipu:sf/decision/journalofproceedjanapr92sanfrich:295/4","qipu:sf/decision/journalofproceedjanapr92sanfrich:305/3","qipu:sf/decision/journalofmayaugproceed92sanfrich:102/4"],"board_decisions_before":["qipu:sf/decision/journalofproceed91sanfrich:27/11","qipu:sf/decision/journalofproceed91sanfrich:108/1"],"made_by":"A model (Claude Haiku 5.5) wrote the lead and picked the figures, main points and later Board decisions from the statements, from a second reading of the report's summary and cost pages, and from Board decisions dated 3 years before to 10 years after the report; every number it wrote was checked against them, and a figure must be about the report's own area or project."},"statements":[{"claim_id":"c:1f4144c44b94a0c9b91446a3205a317a","page_id":"C124921892:25","page_url":"https://archive.org/details/C124921892/page/n24","statement_kind":"finding","subject_label":"Diesel engines","summary":"The report finds that 20 new diesel engines were purchased over two years ago but never installed.","property":"other","value_text":"20 new diesel engines","value_num":20.0,"unit":"units","date_printed":"over two years before 1996","t_from":"1996","quote":"20 new diesel engines were purchased over two years ago, but never installed.","anchor":"s-1f4144c44b94","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Rudolf Nothenberg, President and Members of the Public Transportation Commission July 11, 1996 Page 23"},{"claim_id":"c:a6cccf0a20753eace6e1ebb2e7876570","page_id":"C124921892:25","page_url":"https://archive.org/details/C124921892/page/n24","statement_kind":"proposal","subject_label":"Diesel engines","summary":"The report recommends that the Public Transportation Department consider selling the engines and implementing an alternate engine repair program.","property":"recommendation","value_text":"save an estimated $1.1 million","value_num":1100000.0,"unit":"USD","t_from":"1996","quote":"the Public Transportation Department should consider selling the engines and implementing an alternate program of engine repair that would save an estimated $1.1 million","anchor":"s-a6cccf0a2075","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"The Public Transportation Department should consider selling the engines"},{"claim_id":"c:af83fda1ce9bb08324366ed64432afe2","page_id":"C124921892:25","page_url":"https://archive.org/details/C124921892/page/n24","statement_kind":"proposal","subject_label":"Parts storerooms hours","summary":"The report recommends three additional parts storekeeping positions so storerooms are open longer hours.","property":"proposes","value_text":"three additional parts storekeeping positions","value_num":3.0,"unit":"jobs","t_from":"1996","quote":"We have recommended an additional three parts storekeeping positions so that storerooms are open between 6 AM and 7 PM on weekdays, and between 8 AM and 5 PM on weekends.","place_label":"parts storerooms","anchor":"s-af83fda1ce9b","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"We have recommended an additional three parts storekeeping positions"},{"claim_id":"c:30817a32a8be9c9b15465ec74ed37f20","page_id":"C124921892:83","page_url":"https://archive.org/details/C124921892/page/n82","statement_kind":"proposal","subject_label":"Municipal Railway organizational structure","summary":"The report recommends that the Department and the Commission consider alternative organizational structures to increase management accountability.","property":"recommendation","value_text":"alternative organizational structures","t_from":"1996","quote":"The Department and the Public Transportation Commission should consider alternative organizational structures for the Municipal Railway in order to increase management accountability","place_label":"Municipal Railway","anchor":"s-30817a32a8be","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"The Department and the Public Transportation Commission should consider alternative organizational structures"},{"claim_id":"c:870a43c8a471566a43d0e0e71c073f0c","page_id":"C124921892:83","page_url":"https://archive.org/details/C124921892/page/n82","statement_kind":"background","subject_label":"Other transit properties","summary":"The report notes that other large transit properties with multiple vehicle modes are organized according to general service.","property":"other","value_text":"organized according to general service","t_from":"1996","quote":"Other large transit properties with multiple vehicle modes are organized according to general service.","anchor":"s-870a43c8a471","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Other large transit properties with multiple vehicle modes are organized according to general service."},{"claim_id":"c:8e307bcc66169c06bef2440588ee54a9","page_id":"C124921892:83","page_url":"https://archive.org/details/C124921892/page/n82","statement_kind":"finding","subject_label":"Municipal Railway management structure","summary":"The report finds that the current structure by specialty reduces accountability by service or product line.","property":"finding","value_text":"reduces accountability by service or product line","t_from":"1996","quote":"This organizational structure creates a system of management by specialty, but reduces accountability by service or product line","anchor":"s-8e307bcc6616","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"This organizational structure creates a system of management by specialty"},{"claim_id":"c:65f06d6327d011786aa5b0b1ba91cc6c","page_id":"C124921892:109","page_url":"https://archive.org/details/C124921892/page/n108","statement_kind":"finding","subject_label":"Vacant Assistant Chief Inspector positions","summary":"Two of the Assistant Chief Inspector positions are vacant because those staff were assigned to Transportation Superintendent duties.","property":"finding","value_text":"two positions vacant","value_num":2.0,"unit":"jobs","t_from":"1996","quote":"Currently, two of the Assistant Chief Inspector positions are vacant, due to assignment of those two staff persons to Transportation Superintendent duties.","anchor":"s-65f06d6327d0","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"The Transit Service Supervision Unit is authorized"},{"claim_id":"c:ba8eabbdf412d10faca53e4c61b1e192","page_id":"C124921892:109","page_url":"https://archive.org/details/C124921892/page/n108","statement_kind":"finding","subject_label":"Transit Service Supervision Unit staffing","summary":"The Transit Service Supervision Unit is authorized a total of 71 positions.","property":"other","value_text":"71 positions","value_num":71.0,"unit":"jobs","t_from":"1996","quote":"The Transit Service Supervision Unit is authorized a total of 71 positions, including one Chief Inspector, five Assistant Inspectors, two clerical support positions, and 64 inspectors.","anchor":"s-ba8eabbdf412","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"The Transit Service Supervision Unit is authorized a total of 71 positions"},{"claim_id":"c:c14d53410465d0b403c85dac661e95d2","page_id":"C124921892:109","page_url":"https://archive.org/details/C124921892/page/n108","statement_kind":"proposal","subject_label":"Transit service supervision and schedule adherence","summary":"The report says MUNI can enhance transit service and schedule adherence by adding supervisors, adjusting schedules and using random line supervision.","property":"recommendation","t_from":"1996","quote":"By increasing the number of transit supervisors, adjusting transit schedules to conform with operator and equipment resources, and by regularly employing random line supervision techniques, MUNI can enhance transit services","anchor":"s-c14d53410465","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"By increasing the number of transit supervisors, adjusting transit schedules"},{"claim_id":"c:ef0b99a8b9fde162bff542a6c3bb6401","page_id":"C124921892:109","page_url":"https://archive.org/details/C124921892/page/n108","statement_kind":"finding","subject_label":"Motor coaches pulling in early","summary":"Approximately eight percent of motor coaches pull in to the yards before their last scheduled passenger stop.","property":"finding","value_text":"approximately eight percent","value_num":8.0,"unit":"percent","t_from":"1996","quote":"approximately eight percent of motor coaches pull-in to the yards prior to their last scheduled passenger service stop.","anchor":"s-ef0b99a8b9fd","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"We also found that approximately eight percent of motor coaches"},{"claim_id":"c:fa4ec8b07485bc4c979b831c43c37c39","page_id":"C124921892:109","page_url":"https://archive.org/details/C124921892/page/n108","statement_kind":"finding","subject_label":"Budgeted transit supervisor positions","summary":"The number of budgeted fixed post and mobile transit supervisor positions has steadily decreased from 95 in FY 1981-82 to 64 in FY 1995-96.","property":"other","value_text":"64 in FY 1995-96","value_num":64.0,"unit":"jobs","date_printed":"FY 1995-96","t_from":"1995","quote":"The number of budgeted fixed post and mobile transit supervisor positions has steadily decreased from a high of 95 in FY 1981-82 to 64 in FY 1995-96.","anchor":"s-fa4ec8b07485","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"The number of budgeted fixed post and mobile transit supervisor positions has steadily decreased"},{"claim_id":"c:ff570df966e3b20c5197277a76a71b46","page_id":"C124921892:109","page_url":"https://archive.org/details/C124921892/page/n108","statement_kind":"finding","subject_label":"MUNI vehicle schedule adherence","summary":"The study team found that only 62 percent of MUNI vehicles adhere to their published schedules, against a Department goal of 85 percent.","property":"finding","value_text":"62 percent","value_num":62.0,"unit":"percent","t_from":"1996","quote":"only 62 percent of MUNI vehicles adhere to their published schedules, as compared with a service goal of 85 percent established by the Department.","anchor":"s-ff570df966e3","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"we found that only 62 percent of MUNI vehicles adhere to their published schedules"},{"claim_id":"c:1f9ac5b5d7832b10f8ab038a1eef7721","page_id":"C124921892:124","page_url":"https://archive.org/details/C124921892/page/n123","statement_kind":"finding","subject_label":"Station Agents required to staff booths","summary":"The analysis finds that 57 Station Agents are required to staff the station booths.","property":"finding","value_text":"57 Station Agents","value_num":57.0,"unit":"jobs","t_from":"1996","quote":"the total number of Station Agents required to staff the station booths is 57--composed of 42 eight-hour positions and 15 ten-hour positions.","place_label":"MUNI Metro Station","anchor":"s-1f9ac5b5d783","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"we have performed the analysis shown in Appendix 1.5.2"},{"claim_id":"c:74ed617aff0c082b51722dcabd72bd0d","page_id":"C124921892:124","page_url":"https://archive.org/details/C124921892/page/n123","statement_kind":"finding","subject_label":"Metro Station Agent staffing","summary":"The Metro Station Operations Unit is authorized 57 full-time Station Agents and has 53 assigned.","property":"other","value_text":"57 authorized, 53 assigned","value_num":57.0,"unit":"jobs","t_from":"1996","quote":"the Metro Station Operations Unit is currently authorized 57 full-time Station Agents, and has 53 assigned.","place_label":"MUNI Metro Station","anchor":"s-74ed617aff0c","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"the Metro Station Operations Unit is currently authorized 57 full-time Station Agents, and has 53 assigned"},{"claim_id":"c:9738952acc3f7842060df13c10d0787c","page_id":"C124921892:124","page_url":"https://archive.org/details/C124921892/page/n123","statement_kind":"finding","subject_label":"Revenue losses at Metro stations","summary":"The report believes total losses would be far in excess of the 45,667 dollars in identified costs per year.","property":"cost_usd","value_text":"$45,667 per year","value_num":45667.0,"unit":"USD","t_from":"1996","quote":"we believe that the total figure would be far in excess of the $45,667 in identified costs per year.","place_label":"MUNI Metro Station","anchor":"s-9738952acc3f","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"we believe that the total figure would be far in excess of the $45,667"},{"claim_id":"c:f755b8f4cbd751eecab938e13b07b7c3","page_id":"C124921892:124","page_url":"https://archive.org/details/C124921892/page/n123","statement_kind":"finding","subject_label":"Coin canister costs","summary":"The report cites an additional 19,067 dollars in costs for 23 coin canisters.","property":"cost_usd","value_text":"$19,067","value_num":19067.0,"unit":"USD","t_from":"1996","quote":"additional $19,067 for the 23 coin canisters.","place_label":"MUNI Metro Station","anchor":"s-f755b8f4cbd7","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"additional $19,067 for the 23 coin canisters"},{"claim_id":"c:14930a14b64ca4bea3c484c9261786e5","page_id":"C124921892:133","page_url":"https://archive.org/details/C124921892/page/n132","statement_kind":"finding","subject_label":"Cable Car Barn security","summary":"During an unannounced visit, the garage doors at the Cable Car Barn were left open and unguarded.","property":"finding","value_text":"open and unguarded","t_from":"1996","quote":"we observed that the Mason and Washington Street garage doors were left open and unguarded.","place_label":"Cable Car Barn","place_precision":"building","place_id":"qipu:sf/place/landmark/cable-car-barn","resolved_by":"place links file","anchor":"s-14930a14b64c","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"During an unannounced visit to the Cable Car Barn at 3:30 A.M., we observed"},{"claim_id":"c:2d3aac10e1a92f7f07c377c26aee13a2","page_id":"C124921892:133","page_url":"https://archive.org/details/C124921892/page/n132","statement_kind":"finding","subject_label":"Cable Car Barn graveyard staffing","summary":"Five maintenance employees are assigned to the graveyard shift at the Cable Car Barn.","property":"finding","value_text":"five employees","value_num":5.0,"unit":"persons","t_from":"1996","quote":"Five maintenance employees are assigned to work on the graveyard shift at the Cable Car Barn, so there should be sufficient staff","place_label":"Cable Car Barn","place_precision":"building","place_id":"qipu:sf/place/landmark/cable-car-barn","resolved_by":"place links file","anchor":"s-2d3aac10e1a9","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"We believe that this represents a serious breach of security at a City facility"},{"claim_id":"c:63991750640529687aeee73d9bf152de","page_id":"C124921892:133","page_url":"https://archive.org/details/C124921892/page/n132","statement_kind":"finding","subject_label":"Employee napping in private vehicle","summary":"The Department indicates the person found sleeping was an off-duty platform operator napping before his drive home.","property":"other","value_text":"off-duty platform operator","t_from":"1996","quote":"The Department indicates that the individual found sleeping during our observation was an off-duty platform operator who was napping prior to his drive home.","place_label":"Cable Car Barn","place_precision":"building","place_id":"qipu:sf/place/landmark/cable-car-barn","resolved_by":"place links file","privacy_flag":"may_name_private_person_after_1950","privacy_class":"private_person","public_after_year":2071,"anchor":"s-639917506405","shown":false,"hidden":"another_body","part":"main_text","speaker":"another_body","speaker_role":"Department of Public Transportation (MUNI management)","stance":"quotes_to_report","speaker_evidence":"The Department indicates that the individual found sleeping during our observation"},{"claim_id":"c:09448964a15f20dec2627e1b79e024d9","page_id":"C124921892:135","page_url":"https://archive.org/details/C124921892/page/n134","statement_kind":"proposal","subject_label":"One coach-one driver policy","summary":"The report says a one coach-one driver policy would improve equipment respect and accountability.","property":"proposes","value_text":"one coach-one driver policy","t_from":"1996","quote":"Such a policy would improve equipment respect and accountability and would build relationships between operators and mechanics","anchor":"s-09448964a15f","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Increasing Operator Responsibility; Such a policy would improve"},{"claim_id":"c:22859aed57b93f6e0c9e2327e8de3d10","page_id":"C124921892:135","page_url":"https://archive.org/details/C124921892/page/n134","statement_kind":"finding","subject_label":"Road calls","summary":"There have been an average of 1,800 road calls per month during the last six months.","property":"finding","value_text":"1,800 per month","value_num":1800.0,"date_printed":"last six months","t_from":"1996","quote":"During the last six months, there have been an average of 1,800 road calls per month.","anchor":"s-22859aed57b9","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"During the last six months, there have been an average"},{"claim_id":"c:3a30bb6b4d01357420f096d2a37bf041","page_id":"C124921892:135","page_url":"https://archive.org/details/C124921892/page/n134","statement_kind":"proposal","subject_label":"Estimated effect of quality assurance program","summary":"The report estimates a 10 percent reduction in road calls would reduce them by 180.","property":"proposes","value_text":"180 fewer calls","value_num":180.0,"t_from":"1996","quote":"A conservative estimate of a 10 percent reduction of such calls due to the implementation of an effective quality assurance program would reduce the calls by 180.","anchor":"s-3a30bb6b4d01","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"A conservative estimate of a 10 percent reduction"},{"claim_id":"c:5ac53f2894b71b049a64ecd4a688532b","page_id":"C124921892:135","page_url":"https://archive.org/details/C124921892/page/n134","statement_kind":"proposal","subject_label":"Road call quality control program","summary":"The report recommends that a quality control program be reinstated and implemented by maintenance managers.","property":"recommendation","t_from":"1996","quote":"Such a program should be reinstated and implemented by maintenance managers based on a more careful review of available road call data.","anchor":"s-5ac53f2894b7","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Such a program should be reinstated and implemented"},{"claim_id":"c:d121742fe391ccadc97d1318d874499d","page_id":"C124921892:135","page_url":"https://archive.org/details/C124921892/page/n134","statement_kind":"proposal","subject_label":"Fare box signaling equipment","summary":"The vendor estimates equipment and installation for the 500 coach diesel fleet at 108,000 dollars.","property":"cost_usd","value_text":"$108,000","value_num":108000.0,"unit":"USD","t_from":"1996","quote":"According to the vendor manufacturer, there would cost an estimated $216 per vehicle, for a total $108,000 cost of equipment and installation for the 500 coach diesel fleet.","anchor":"s-d121742fe391","shown":false,"hidden":"another_body","part":"main_text","speaker":"another_body","speaker_role":"the vendor manufacturer","stance":"quotes_to_report","speaker_evidence":"According to the vendor manufacturer, there would cost"},{"claim_id":"c:6396815ee9f2baf8cca49a4833a0cf1f","page_id":"C124921892:161","page_url":"https://archive.org/details/C124921892/page/n160","statement_kind":"proposal","subject_label":"Restoring three employees to Maintenance Division","summary":"The Budget Analyst recommends that three employees working in other MUNI divisions be restored immediately to the Maintenance Division.","property":"recommendation","value_text":"three employees","value_num":3.0,"unit":"persons","t_from":"1996","quote":"We recommend that three additional employees, as identified below, who are currently working in other MUNI divisions be restored immediately to the Maintenance Division.","place_label":"Maintenance Division","anchor":"s-6396815ee9f2","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"We recommend that three additional employees"},{"claim_id":"c:1dfb3f658d40b2e185ba0a128d56122c","page_id":"C124921892:186","page_url":"https://archive.org/details/C124921892/page/n185","statement_kind":"finding","subject_label":"Revenue collection system audit history","summary":"The report notes the Municipal Railway's revenue collection system has not been audited for over five years, apart from a Cable Car audit.","property":"finding","value_text":"not audited for over five years","value_num":5.0,"unit":"years","t_from":"1996","quote":"The Municipal Railway’s revenue collection system has not been audited for over five years, with the exception of the Cable Car revenue collection system in January 1994","anchor":"s-1dfb3f658d40","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Section 2.5 Farebox Revenue Collection and Control"},{"claim_id":"c:1fddcd8e16d6cec183b8d2bfdd170b13","page_id":"C124921892:186","page_url":"https://archive.org/details/C124921892/page/n185","statement_kind":"finding","subject_label":"Revenue procedures manuals","summary":"The report finds that General procedures manuals for the Revenue Division have not been updated in the last 10 years.","property":"finding","value_text":"not updated in last 10 years","value_num":10.0,"t_from":"1996","quote":"General procedures manuals for the Municipal Railway’s Revenue Division, including the Collection, Reconciliation, and Processing Units, have not been updated in the last 10 years.","anchor":"s-1fddcd8e16d6","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"General procedures manuals for the Municipal Railway's Revenue Division"},{"claim_id":"c:493aebef9d7a7debccad31704492e8fd","page_id":"C124921892:186","page_url":"https://archive.org/details/C124921892/page/n185","statement_kind":"finding","subject_label":"Annual MUNI fare revenue collected","summary":"The report finds that about $72 million (≈ $154.6 million in 2026 dollars) of the $91 million (≈ $195.4 million in 2026 dollars) annual fare revenue is collected from cash fares.","property":"other","value_text":"$72 million from cash fares","value_num":72000000.0,"unit":"USD","t_from":"1996","quote":"Of the $91 million in annual fare revenue, 79 percent, or approximately $72 million of fare revenues are collected from cash fares.","anchor":"s-493aebef9d7a","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Of the $91 million in annual fare revenue, 79 percent"},{"claim_id":"c:73ea83f0ff9c1965bad4287cd79deae5","page_id":"C124921892:201","page_url":"https://archive.org/details/C124921892/page/n200","statement_kind":"finding","subject_label":"Surplus status of MUNI facilities","summary":"The report finds that no MUNI facilities are presently considered surplus to the Municipal Railway.","property":"finding","value_text":"none presently surplus","t_from":"1996","quote":"A review of the current use of these facilities and properties indicate that none are presently considered surplus to the Municipal Railway.","anchor":"s-73ea83f0ff9c","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"A review of the current use of these facilities and properties indicate"},{"claim_id":"c:8fe9b8d0878ffabcecb16bbcd1bdd569","page_id":"C124921892:201","page_url":"https://archive.org/details/C124921892/page/n200","statement_kind":"background","subject_label":"Proposition J surplus asset review","summary":"Proposition J requires the Budget Analyst to examine MUNI's potential for selling surplus assets.","property":"other","value_text":"Proposition J requirement","t_from":"1996","quote":"Proposition J requires that the Budget Analyst examine MUNI’s potential for selling surplus assets.","anchor":"s-8fe9b8d0878f","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Proposition J requires that the Budget Analyst examine MUNI's potential"},{"claim_id":"c:2c62162149355b4a42ebd94f2108163a","page_id":"C124921892:205","page_url":"https://archive.org/details/C124921892/page/n204","statement_kind":"finding","subject_label":"MUNI capital funding for fleet replacement","summary":"The report notes that fleet replacements will use more than half of the $1.34 billion (≈ $3.0 billion in 2026 dollars) capital funding projected in the CIP for 1995 through 2005.","property":"cost_usd","value_text":"$1.34 billion","value_num":1340000000.0,"unit":"USD","date_printed":"1995 through 2005","t_from":"1995","quote":"MUNI's fleet replacements will use more than half of the $1.34 billion in capital project funding that is projected in the CIP from 1995 through 2005.","anchor":"s-2c6216214935","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Section 3.1 Facility Planning; MUNI's fleet replacements will use more than half"},{"claim_id":"c:45ad4a0377253432a2d03e2b993387b7","page_id":"C124921892:205","page_url":"https://archive.org/details/C124921892/page/n204","statement_kind":"proposal","subject_label":"700 Pennsylvania Street Ways & Structures replacement","summary":"The capital plan places replacement of the Ways & Structures facility at 700 Pennsylvania Street in the special circumstances category for completion in the ten year CIP period.","property":"proposes","value_text":"replacement of Ways & Structures facility","t_from":"1996","quote":"replacement of the Ways & Structures facility with a new building at 700 Pennsylvania Street, has been placed in the “special circumstances” category and slated for completion during the ten year CIP period.","place_label":"700 Pennsylvania Street","place_precision":"address","place_id":"qipu:sf/place/address/eas-369997","resolved_by":"place links file","anchor":"s-45ad4a037725","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Only one other major facility project, replacement of the Ways & Structures facility"},{"claim_id":"c:5bf62852063c1194c9773a87581ff468","page_id":"C124921892:205","page_url":"https://archive.org/details/C124921892/page/n204","statement_kind":"finding","subject_label":"Transportation Authority funding for facilities master plan","summary":"The Transportation Authority provided MUNI with $400,000 (≈ $960,627 in 2026 dollars) to develop a Facilities Master Plan in 1992.","property":"other","value_text":"$400,000","value_num":400000.0,"unit":"USD","date_printed":"1992","t_from":"1992","quote":"the Transportation Authority provided MUNI with $400,000 to develop a Facilities Master Plan in 1992.","anchor":"s-5bf62852063c","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"the Transportation Authority provided MUNI with $400,000 to develop a Facilities Master Plan"},{"claim_id":"c:bcd65e16db2c3e83e5eae662aa552ea7","page_id":"C124921892:205","page_url":"https://archive.org/details/C124921892/page/n204","statement_kind":"proposal","subject_label":"Facilities Master Plan analysis","summary":"The report states that an in-depth analysis of facility efficiency is needed to lay the groundwork for a Facilities Master Plan.","property":"recommendation","value_text":"analysis needed for Facilities Master Plan","t_from":"1996","quote":"Such an analysis is needed to lay the groundwork for a Facilities Master Plan.","anchor":"s-bcd65e16db2c","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Such an analysis is needed to lay the groundwork for a Facilities Master Plan."},{"claim_id":"c:ce6f661c4d7eb5b52f07ea342a1580f8","page_id":"C124921892:205","page_url":"https://archive.org/details/C124921892/page/n204","statement_kind":"finding","subject_label":"Funding of MUNI facilities projects","summary":"The report finds that the MTC ranks facilities projects low for funding.","property":"finding","value_text":"ranks facilities projects low","t_from":"1996","quote":"The MTC, which allocates most federal funds for transit capital projects, ranks facilities projects low.","anchor":"s-ce6f661c4d7e","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"The MTC, which allocates most federal funds for transit capital projects, ranks facilities projects low."},{"claim_id":"c:dbcb3b6a374dff7a1e180ed641940d69","page_id":"C124921892:205","page_url":"https://archive.org/details/C124921892/page/n204","statement_kind":"finding","subject_label":"Facility Assessment by DPW","summary":"During 1996 MUNI administrators allocated the bulk of the $400,000 (≈ $858,993 in 2026 dollars) master plan funding to a Facility Assessment by DPW.","property":"other","value_text":"Facility Assessment by DPW","value_num":400000.0,"unit":"USD","date_printed":"1996","t_from":"1996","quote":"During 1996, with the approval of the Transportation Authority, MUNI administrators allocated the bulk of the $400,000 Facility Master Plan funding from the Transportation Authority","anchor":"s-dbcb3b6a374d","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"During 1996, with the approval of the Transportation Authority, MUNI administrators allocated"},{"claim_id":"c:25b5aae14fb59f5922cd65315ca9d4a4","page_id":"C124921892:214","page_url":"https://archive.org/details/C124921892/page/n213","statement_kind":"proposal","subject_label":"Kirkland Division relocation","summary":"The SRTP includes a long range plan to relocate the Kirkland Division to the Islais Creek site.","property":"proposes","value_text":"relocate Kirkland Division to Islais Creek site","date_printed":"post 2005","t_from":"2005","quote":"The SRTP includes a long range (i.e. post 2005) plan to relocate the Kirkland Division to the Islais Creek site.","place_label":"Islais Creek","place_precision":"site","place_id":"qipu:sf/place/creek/islais-creek","resolved_by":"place links file","anchor":"s-25b5aae14fb5","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Section 3.2 Disposition of Surplus Assets, Kirkland Division"},{"claim_id":"c:47fd537e2d00dee52f6a2419dca87e7f","page_id":"C124921892:214","page_url":"https://archive.org/details/C124921892/page/n213","statement_kind":"proposal","subject_label":"Disposition of MUNI property","summary":"The report recommends that MUNI incorporate property disposition options into development of a Master Facility Plan.","property":"recommendation","value_text":"incorporate property disposition into Master Facility Plan","t_from":"1996","quote":"We recommend that MUNI incorporate consideration of property disposition options into development of a Master Facility Plan","anchor":"s-47fd537e2d00","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"We recommend that MUNI incorporate consideration of property disposition options"},{"claim_id":"c:aaa3417e6e5ebce2d1930bb0eac25808","page_id":"C124921892:214","page_url":"https://archive.org/details/C124921892/page/n213","statement_kind":"finding","subject_label":"Kirkland Division site","summary":"The Kirkland site is a full block of about 2.6 acres in the Fisherman’s Wharf area.","property":"acreage","value_text":"approximately 2.6 acres","value_num":2.6,"unit":"acres","t_from":"1996","quote":"The Kirkland site is located on a full block of approximately 2.6 acres in the Fisherman’s Wharf area.","place_label":"Fisherman’s Wharf","place_precision":"site","place_id":"qipu:sf/place/landmark/fishermans-wharf","resolved_by":"place links file","anchor":"s-aaa3417e6e5e","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"The Kirkland site is located on a full block of approximately 2.6 acres"},{"claim_id":"c:c0c9ef021a2a2175fb990118c42fa4e5","page_id":"C124921892:214","page_url":"https://archive.org/details/C124921892/page/n213","statement_kind":"finding","subject_label":"Kirkland Division land use","summary":"The report finds the Kirkland Division is an incompatible land use given surrounding tourism and commercial activity.","property":"finding","value_text":"incompatible land use","t_from":"1996","quote":"the increasingly intensive tourism/commercial activities of the surrounding neighborhood have created a land-use pattern in which the Kirkland Division is an incompatible land use.","place_label":"Kirkland Division, Fisherman’s Wharf","anchor":"s-c0c9ef021a2a","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"the Kirkland Division is an incompatible land use"},{"claim_id":"c:d80f114fb7ef7b709d8b9aad20ac2ca6","page_id":"C124921892:214","page_url":"https://archive.org/details/C124921892/page/n213","statement_kind":"proposal","subject_label":"Fisherman’s Wharf site development","summary":"The SFMRIC Assets Development Study analyses the financial feasibility of a hotel development on the Kirkland site.","property":"proposes","value_text":"hotel development","t_from":"1996","quote":"The SFMRIC “Assets Development Study” analyses the financial feasibility of a hotel development on the site.","place_label":"Fisherman’s Wharf","place_precision":"site","place_id":"qipu:sf/place/landmark/fishermans-wharf","resolved_by":"place links file","anchor":"s-d80f114fb7ef","shown":false,"hidden":"another_body","part":"main_text","speaker":"another_body","speaker_role":"another body","stance":"quotes_to_report","speaker_evidence":"[name] \"Assets Development Study\" analyses the financial feasibility"},{"claim_id":"c:2c4392554265a101e06f9b3bd6ebd010","page_id":"C124921892:218","page_url":"https://archive.org/details/C124921892/page/n217","statement_kind":"finding","subject_label":"MUNI substations","summary":"MUNI has six substations occupying a total area of 72,344 square feet.","property":"floor_area_sqft","value_text":"72,344 square feet","value_num":72344.0,"unit":"sqft","t_from":"1996","quote":"MUNI currently has six substations located throughout the City, occupying a total area of 72,344 square feet, at the following locations:","anchor":"s-2c4392554265","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Substations supply and distribute power... MUNI currently has six substations"},{"claim_id":"c:416d483e4bb97fb2f8a198798f32b6e6","page_id":"C124921892:218","page_url":"https://archive.org/details/C124921892/page/n217","statement_kind":"finding","subject_label":"Stevenson Street substation ground lease","summary":"MUNI leases ground rights to part of the 79 Stevenson Street substation, which is used as a cafe.","property":"leased","value_text":"ground rights lease, cafe use","t_from":"1996","quote":"MUNT is currently leasing the ground rights to a portion of the substation located at 79 Stevenson Street, which is being used as a cafe by the tenants.","place_label":"79 Stevenson Street","place_precision":"address","place_id":"qipu:sf/place/address/eas-491894","resolved_by":"place links file","anchor":"s-416d483e4bb9","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"MUNI is currently leasing the ground rights to a portion of the substation"},{"claim_id":"c:4774808ce943b4ff114eb97b48349e28","page_id":"C124921892:218","page_url":"https://archive.org/details/C124921892/page/n217","statement_kind":"finding","subject_label":"Retail or commercial development above substations","summary":"The City Attorney advises that retail or commercial development above or below substations would not be precluded.","property":"finding","value_text":"retail or commercial permissible","t_from":"1996","quote":"the City Attorney’s Office advises that these concerns would not preclude retail or commercial development above or below substations, such as that located at 79 Stevenson Street.","place_label":"79 Stevenson Street","place_precision":"address","place_id":"qipu:sf/place/address/eas-491894","resolved_by":"place links file","anchor":"s-4774808ce943","shown":false,"hidden":"another_body","part":"main_text","speaker":"another_body","speaker_role":"City Attorney's Office","stance":"quotes_to_report","speaker_evidence":"the City Attorney's Office advises that these concerns would not preclude"},{"claim_id":"c:90e1ee26ac825b1357f0c180b7ee98f3","page_id":"C124921892:218","page_url":"https://archive.org/details/C124921892/page/n217","statement_kind":"finding","subject_label":"Stevenson Street substation lease rent","summary":"The Stevenson Street lease provides the City rental revenue of $3.41 (≈ $7.32 in 2026 dollars) per square foot per month.","property":"rent_usd","value_text":"$3.41 per square foot per month","value_num":3.41,"unit":"USD","t_from":"1996","quote":"The terms of the lease provide the City with rental revenues of $3.41 per square foot per month.","place_label":"79 Stevenson Street","place_precision":"address","place_id":"qipu:sf/place/address/eas-491894","resolved_by":"place links file","anchor":"s-90e1ee26ac82","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"The terms of the lease provide the City with rental revenues"},{"claim_id":"c:b1359875656eb3286b729c2796f45fa6","page_id":"C124921892:218","page_url":"https://archive.org/details/C124921892/page/n217","statement_kind":"proposal","subject_label":"Substation lease potential","summary":"The report suggests MUNI obtain Department of Real Estate help selecting substations with strongest lease potential.","property":"recommendation","value_text":"select substations for lease analysis with DRE","t_from":"1996","quote":"MUNI could, however, obtain assistance from the Department of Real Estate (DRE) in selecting the substations that present the strongest lease potential","anchor":"s-b1359875656e","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"MUNI could, however, obtain assistance from the Department of Real Estate"},{"claim_id":"c:ca02839c595829204e85708848dc59f1","page_id":"C124921892:218","page_url":"https://archive.org/details/C124921892/page/n217","statement_kind":"finding","subject_label":"Residential air rights above substations","summary":"The City Attorney advises against residential projects above substations due to uncertain health risks.","property":"finding","value_text":"not recommended for residential","t_from":"1996","quote":"The City Attorney advises that various factors, including uncertainty regarding possible health risks related to the substation electrical activities led that office to recommend against","place_label":"Fillmore Street substation, W. Russia Street substation","place_precision":"building","anchor":"s-ca02839c5958","shown":false,"hidden":"another_body","part":"main_text","speaker":"another_body","speaker_role":"City Attorney's Office","stance":"quotes_to_report","speaker_evidence":"The City Attorney advises that various factors, including uncertainty"},{"claim_id":"c:277323b0fa88b9d8a6324556ea4170b4","page_id":"C124921892:240","page_url":"https://archive.org/details/C124921892/page/n239","statement_kind":"finding","subject_label":"Warranty tracking staffing","summary":"Maintenance Division managers indicate there has been no dedicated warranty staff since 1989.","property":"finding","value_text":"no dedicated warranty staff","date_printed":"since 1989","t_from":"1989","quote":"Discussions with Maintenance Division managers indicate that since 1989 there have been no dedicated and knowledgeable staff assigned to a warranty tracking and reimbursement program.","anchor":"s-277323b0fa88","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Section 4.2 Warranty Administration; Discussions with Maintenance Division managers indicate"},{"claim_id":"c:3e0d12cefb94ea134528c5cac1b9bbb3","page_id":"C124921892:240","page_url":"https://archive.org/details/C124921892/page/n239","statement_kind":"finding","subject_label":"Diesel bus and trolley deliveries","summary":"MUNI accepted delivery of 233 diesel buses and electric trolley coaches during the period since 1989.","property":"other","value_text":"233 vehicles","value_num":233.0,"unit":"units","date_printed":"since 1989","t_from":"1989","quote":"during this period, MUNI accepted the delivery of 233 diesel buses and electric trolley coaches","anchor":"s-3e0d12cefb94","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"However, during this period, MUNI accepted the delivery of 233 diesel buses"},{"claim_id":"c:7e37bce847548411684ccc4508522941","page_id":"C124921892:240","page_url":"https://archive.org/details/C124921892/page/n239","statement_kind":"finding","subject_label":"Warranty reimbursements","summary":"The report says warranty returns should have been much greater over the last six years.","property":"finding","value_text":"much greater return on warranty claims should have occurred","date_printed":"1989-1995","t_from":"1989","quote":"Clearly, there should have been a much greater return on warranty claims over the last six years--at least to the level achieved in previous years.","anchor":"s-7e37bce84754","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Clearly, there should have been a much greater return on warranty claims"},{"claim_id":"c:833f04b9af25c4ac0f1576649b5d5fed","page_id":"C124921892:240","page_url":"https://archive.org/details/C124921892/page/n239","statement_kind":"finding","subject_label":"Mid-eighties diesel bus deliveries","summary":"Mid-eighties warranty reimbursements were associated with delivery of 280 diesel buses.","property":"other","value_text":"280 diesel buses","value_num":280.0,"unit":"units","date_printed":"mid-eighties","t_from":"1996","quote":"The annual average reimbursements during the mid-eighties were associated with the delivery of 280 diesel buses","anchor":"s-833f04b9af25","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"The annual average reimbursements during the mid-eighties were associated with"},{"claim_id":"c:93517525bdb0b2f544c08a7d8a645eed","page_id":"C124921892:240","page_url":"https://archive.org/details/C124921892/page/n239","statement_kind":"proposal","subject_label":"Warranty management positions","summary":"MUNI proposed two new warranty management positions in its 1996-97 budget at an annual cost of $135,160 (≈ $290,254 in 2026 dollars).","property":"cost_usd","value_text":"$135,160 annual cost","value_num":135160.0,"unit":"USD","date_printed":"1996-97","t_from":"1996","quote":"MUNI has also proposed two new management positions in its 1996-97 budget: a Warranty Fleet Manager and a Warranty Quality Assurance Officer, for an anticipated annual cost of $135,160","anchor":"s-93517525bdb0","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"MUNI has also proposed two new management positions in its 1996-97 budget"},{"claim_id":"c:9c5b6debb99225b2e66b9906d63092f4","page_id":"C124921892:240","page_url":"https://archive.org/details/C124921892/page/n239","statement_kind":"finding","subject_label":"Warranty staff reassignment","summary":"MUNI has reassigned a Senior Maintenance Controller to compile warranty provisions for vehicles bought 1989 to 1992.","property":"other","value_text":"reassigned Senior Maintenance Controller","t_from":"1996","quote":"MUNI has currently reassigned a Senior Maintenance Controller to compile and review warranty provisions for revenue vehicles purchased between 1989 and 1992","anchor":"s-9c5b6debb992","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"MUNI has currently reassigned a Senior Maintenance Controller"},{"claim_id":"c:17df934ee173ebc7417f9ec99e8934d5","page_id":"C124921892:266","page_url":"https://archive.org/details/C124921892/page/n265","statement_kind":"proposal","subject_label":"Crime awareness marketing proposal","summary":"The Acting Director of Community Affairs developed a proposal with miscellaneous production and design costs of about $42,600 (≈ $91,483 in 2026 dollars).","property":"cost_usd","value_text":"approximately $42,600","value_num":42600.0,"unit":"USD","t_from":"1996","quote":"Add miscellaneous production and design costs estimated at approximately $42,600.","anchor":"s-17df934ee173","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"quotes_to_report","speaker_evidence":"She developed a proposal which would: Add miscellaneous production and design costs estimated at approximately $42,600.](proposal listed by issuer)"},{"claim_id":"c:63d7f15d566e823c25f95a79c13c73a0","page_id":"C124921892:266","page_url":"https://archive.org/details/C124921892/page/n265","statement_kind":"proposal","subject_label":"MUNI printing budget","summary":"The Department included a printing budget increase to $132,000 (≈ $283,468 in 2026 dollars) in FY 1996-97.","property":"cost_usd","value_text":"$132,000 in FY 1996-97","value_num":132000.0,"unit":"USD","date_printed":"FY 1996-97","t_from":"1996","quote":"The Department included an increase in its printing budget of $63,000 in FY 1995-96 to $132,000 in FY 1996-97.","anchor":"s-63d7f15d566e","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"The Department included an increase in its printing budget of $63,000 in FY 1995-96"},{"claim_id":"c:bf9275ebf36a93b2e17c3936c08ed31b","page_id":"C124921892:266","page_url":"https://archive.org/details/C124921892/page/n265","statement_kind":"finding","subject_label":"MUNI advertising contract with TDI","summary":"MUNI receives a minimum guaranteed payment of $2.2 million (≈ $4.7 million in 2026 dollars) annually from its contract with Transportation Displays, Inc.","property":"other","value_text":"$2.2 million annually minimum guaranteed","value_num":2200000.0,"unit":"USD","t_from":"1996","quote":"MUNI presently receives a minimum guaranteed payment of $2.2 million annually for ad space on transit vehicles and at Metro stations","anchor":"s-bf9275ebf36a","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"MUNI presently receives a minimum guaranteed payment of $2.2 million annually"},{"claim_id":"c:3434fc674e847677fa828937325a4012","page_id":"C124921892:274","page_url":"https://archive.org/details/C124921892/page/n273","statement_kind":"cites_decision","subject_label":"PUC policy on private sector participation","summary":"The Public Utilities Commission approved resolutions 86-0103 and 87-0327 affirming private sector involvement in transportation services.","property":"approved","value_text":"Resolutions 86-0103 and 87-0327","t_from":"1996","quote":"Section 6.1 of the Public Transportation Department’s Short-Range Transit Plan (SRTP) cites two resolutions, Numbers 86-0103 and 87-0327, which were approved by the Public Utilities Commission (PUC).","decided_by":"Public Utilities Commission","instrument_kind":"resolution","instrument_printed":"86-0103","anchor":"s-3434fc674e84","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"quotes_to_report","speaker_evidence":"Section 6.1 of the Public Transportation Department’s Short-Range Transit Plan (SRTP) cites two resolutions"},{"claim_id":"c:6ee92589421bdc8ab42eeee1bf76dbe5","page_id":"C124921892:274","page_url":"https://archive.org/details/C124921892/page/n273","statement_kind":"cites_decision","subject_label":"PUC Resolution 87-0327 directive to MUNI","summary":"PUC Resolution 87-0327 directs staff to undertake actions to maximize the cost effectiveness of MUNI fixed-route service.","property":"other","value_text":"Directs staff to develop private provider evaluation process and productivity analysis","t_from":"1996","quote":"RESOLVED, That the Commission hereby directs the staff to undertake the following actions to maximize the cost effectiveness of MUNI’s fixed-route service:","anchor":"s-6ee92589421b","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"quotes_to_report","speaker_evidence":"RESOLVED, That the Commission hereby directs the staff"},{"claim_id":"c:d338581dff54576c0b483dc0037abee8","page_id":"C124921892:274","page_url":"https://archive.org/details/C124921892/page/n273","statement_kind":"finding","subject_label":"Literature on contracting for transportation services","summary":"The audit notes that available literature on contracting is inconclusive about contracting versus public service delivery.","property":"finding","value_text":"inconclusive","t_from":"1996","quote":"Available literature on contracting for transportation services is vast, but is also inconclusive about the advantages of using contract rather than publicly-owned services.","anchor":"s-d338581dff54","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Available literature on contracting for transportation services is vast"},{"claim_id":"c:1550682ec4f50b5d75fb1a08ec38fd2c","page_id":"C124921892:275","page_url":"https://archive.org/details/C124921892/page/n274","statement_kind":"proposal","subject_label":"MUNI management contracting criteria","summary":"The audit recommends the Public Transportation Commission direct MUNI management to identify service elements and develop contracting criteria.","property":"recommendation","value_text":"Identify service elements and develop criteria","t_from":"1996","quote":"Therefore, the Public Transportation Commission should direct MUNI management to identify service elements, and develop and present criteria that will encourage practical, cost effective contracting solutions for transit services.","anchor":"s-1550682ec4f5","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Section 7.1 Contracting for MUNI Service; the Public Transportation Commission should direct"},{"claim_id":"c:22fa46dcb9cbc4002d3e9447f0559f31","page_id":"C124921892:275","page_url":"https://archive.org/details/C124921892/page/n274","statement_kind":"finding","subject_label":"MUNI side letter agreement with Transport Workers Union","summary":"A side letter agreement between MUNI and Transport Workers Union Local 250A on privatization is still in effect, according to the City Attorney's Office.","property":"other","value_text":"Side letter agreement still in effect","t_from":"1996","quote":"Appendix 7.1.1 to this audit report is a side letter agreement between the San Francisco Municipal Railway and the Transport Workers Union Local 250A concerning “Privatization” which, according to the City Attorney’s Office, is still in effect.","anchor":"s-22fa46dcb9cb","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Appendix 7.1.1 to this audit report is a side letter agreement"},{"claim_id":"c:3e0895041d50ea1397f0ed7ec2754de4","page_id":"C124921892:275","page_url":"https://archive.org/details/C124921892/page/n274","statement_kind":"finding","subject_label":"SRTP interim policy guidelines","summary":"The audit finds the SRTP interim policy guidelines are not comprehensive and not conducive to contracting.","property":"finding","value_text":"not comprehensive","t_from":"1996","quote":"However, these SRTP interim policy guidelines are not comprehensive and do not establish an environment that is conducive to contracting.","anchor":"s-3e0895041d50","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"However, these SRTP interim policy guidelines are not comprehensive"},{"claim_id":"c:5cdefaeb8e7074ce07e52c7c1899263c","page_id":"C124921892:275","page_url":"https://archive.org/details/C124921892/page/n274","statement_kind":"proposal","subject_label":"Report on contracting options to the Commission","summary":"The audit recommends a report on contracting options be given to the Commission within three months after acceptance of the audit.","property":"recommendation","value_text":"Report within three months after acceptance of audit","value_num":3.0,"unit":"months","t_from":"1996","quote":"A report which clearly presents options available to the City should be provided to the Commission no later than three months after the acceptance of this management audit.","anchor":"s-5cdefaeb8e70","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"A report which clearly presents options available to the City should be provided"},{"claim_id":"c:83c3ddadc8826906a67d64b39d3278d2","page_id":"C124921892:275","page_url":"https://archive.org/details/C124921892/page/n274","statement_kind":"finding","subject_label":"MUNI contracting criteria","summary":"The audit finds that the Department has not yet developed contracting criteria.","property":"finding","value_text":"no contracting criteria developed yet","t_from":"1996","quote":"For example, no contracting criteria has yet been developed by the Department, although Section E.1.3, “Evaluation,” of Appendix E states","anchor":"s-83c3ddadc882","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"quotes_to_report","speaker_evidence":"Section E.1.3, \"Evaluation,\" of Appendix E states, in part"},{"claim_id":"c:8a0ec9688f825e3d3152f9767c1f3ce3","page_id":"C124921892:275","page_url":"https://archive.org/details/C124921892/page/n274","statement_kind":"proposal","subject_label":"Supplementary service for Candlestick Park events","summary":"The audit suggests supplementary service for sports events at Candlestick Park as a possible private contracting area.","property":"proposes","value_text":"Supplementary service for sports events","t_from":"1996","quote":"Such service areas could include: ° Supplementary service, such as that provided for sports events held at Candlestick Park;","place_label":"Candlestick Park","place_precision":"site","place_id":"qipu:sf/place/institution/candlestick-park-7d336c","resolved_by":"place links file","anchor":"s-8a0ec9688f82","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Such service areas could include: Supplementary service"},{"claim_id":"c:d030896ee78bef5faf955bfd2af15905","page_id":"C124921892:275","page_url":"https://archive.org/details/C124921892/page/n274","statement_kind":"finding","subject_label":"MUNI unsolicited proposal procedures (Appendix E)","summary":"MUNI developed Appendix E of the SRTP on handling unsolicited proposals in response to the first PUC directive.","property":"other","value_text":"Appendix E procedures for unsolicited proposals","t_from":"1996","quote":"In response to the first directive contained in PUC Resolution No. 87-0327, MUNI developed Appendix E of the SRTP entitled “Procedures for Handling Unsolicited Proposals and any Resulting Complaints.”","anchor":"s-d030896ee78b","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"MUNI developed Appendix E of the SRTP entitled"}]}