{"note":"Statements read from one scanned government report in the IGS library collection on the Internet Archive. Each statement has a verbatim quote found on its page (quote, page_url). The summary and subject_label of each statement were written by a model (Claude Haiku 5.5) and can be wrong: read the page before quoting. At most 20 selected pages of a report were read. Keys are the column names of the tables igs_reports and igs_claims; a column that is null for a statement is left out, and columns with one value for every statement of this report are given once under same_for_every_statement. \"[name withheld]\" stands where the release withholds a name; the site's page guard withholds a few more in reports after 1951, so a cell here can differ from the table; for a few reports prepared_by and creator are left out. A statement's links to the Board record are under links (show_target_kind: decision, instrument or ballot measure; show_target_id; show_url); they replace the table's decision_id and instrument_id, which are left out. place_id, place_label and place_precision come from a corrected place match where there is one. part, speaker, speaker_role, stance and speaker_evidence say who is speaking: a model (Claude Haiku 5.5) read each page and its context and can be wrong. part: main_text, attachment, appendix, letter, comment, response, table or cover_or_contents; speaker: issuer, another_body, letter_writer or unclear; speaker_role: a role or organisation, never a personal name; stance: own_position, quotes_to_dispute, quotes_to_report, restates_to_reject or unclear. The report page shows a statement only when speaker is issuer, part is main_text or appendix, and stance is own_position or quotes_to_report; hidden gives the part, the speaker or the stance of the others. ","release":"v0.9.2","licence":"CC0-1.0","slug":"c124922708","url":"https://data.qipu.org/usa/san-francisco/reports/c124922708/","statement_url":"https://data.qipu.org/usa/san-francisco/reports/c124922708/#{anchor}","tables":{"igs_reports":"https://tiles.qipu.org/data/releases/v0.9.2/parquet/igs_reports.parquet","igs_claims":"https://tiles.qipu.org/data/releases/v0.9.2/parquet/igs_claims.parquet"},"report":{"report_id":"C124922708","source_id":"C124922708","title":"San Francisco countywide transportation plan : draft for public review","year":2000,"n_pages":190,"creator":null,"source_url":"https://archive.org/details/C124922708","issuer":"San Francisco County Transportation Authority","issuer_type":"government","gov_level":"special_district","prepared_by":"San Francisco County Transportation Authority","doc_kind":"plan","jurisdiction":"San Francisco","jurisdiction_id":"sf","city":"sf","issuer_by":"model","doc_kind_by":"model","jurisdiction_by":"model","run_id":"igs-labels-rules+haiku55-cli-2026-10-23"},"pages_with_statements":15,"statements_total":45,"statements_by_kind":{"finding":15,"proposal":25,"cites_decision":1,"background":4},"same_for_every_statement":{"source_id":"C124922708","source_url":"https://archive.org/details/C124922708","source_label":"IGS library: San Francisco countywide transportation plan : draft for public review","report_year":2000,"issuer":"San Francisco County Transportation Authority","issuer_type":"government","doc_kind":"plan","t_precision":"year","status":"extracted","claim_kind":"observation","extraction_table":"igs_claims","run_id":"igs-sf-pages-v2-haiku55-batch-2026-10-23","city":"sf","prompt_version":"igs-page-v2-2026-10-23"},"summary":{"what":"A draft plan by the San Francisco County Transportation Authority setting out transit, bicycle, pedestrian and roadway strategies and the funding they need for the coming decades.","figures":[{"label":"Cost","value":"$5.6 billion over 30 years","claim_ids":["c:750cb7367fd8b6aa8b93809fe15faea3"]},{"label":"Owed","value":"$864 million projected shortfall","claim_ids":["c:f9563f17303f30d01c3429d1bab93685"]},{"label":"Sales tax","value":"more than 42 percent of funding","claim_ids":["c:fa1421c3104d95c17567769d12bdc748"]},{"label":"Sales tax extension","value":"Approximately $1.6 billion","page_url":"https://archive.org/details/C124922708/page/n178","quote":"Approximately $1.6 billion is estimated to be available from the sales tax extension."}],"main_points":["c:750cb7367fd8b6aa8b93809fe15faea3","c:fa1421c3104d95c17567769d12bdc748","c:cff70ce6f6fe9639b7c2c6e21f86867c"],"board_decisions_after":[],"board_decisions_before":["qipu:sf/decision/journalofproceed93sanfrich:101/2"],"made_by":"A model (Claude Haiku 5.5) wrote the lead and picked the figures, main points and later Board decisions from the statements, from a second reading of the report's summary and cost pages, and from Board decisions dated 3 years before to 10 years after the report; every number it wrote was checked against them, and a figure must be about the report's own area or project."},"statements":[{"claim_id":"c:99be071d2ea4b80c964181eb75a84f5c","page_id":"C124922708:19","page_url":"https://archive.org/details/C124922708/page/n18","statement_kind":"background","subject_label":"MTC regional goals","summary":"The report states MTC has adopted five interrelated goals including mobility and equity.","property":"other","value_text":"five interrelated goals","value_num":5.0,"t_from":"2000","quote":"MTC has adopted five interrelated goals of mobility, economic vitality, community vitality, sensitivity to the environment, and promotion of equity.","anchor":"s-99be071d2ea4","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"quotes_to_report","speaker_evidence":"For example, MTC has adopted five interrelated goals"},{"claim_id":"c:ffb3b41a777fca4d413816d9e6171716","page_id":"C124922708:19","page_url":"https://archive.org/details/C124922708/page/n18","statement_kind":"background","subject_label":"Regional Transportation Plan","summary":"The report says the Regional Transportation Plan sets parameters for the region's use of federal transportation funds.","property":"other","t_from":"2000","quote":"The RTP sets the parameters for the region’s use of federal transportation funds.","anchor":"s-ffb3b41a777f","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"The RTP sets the parameters for the region's use of federal transportation funds."},{"claim_id":"c:53df0c95eb701ae35465e3668b36cecf","page_id":"C124922708:35","page_url":"https://archive.org/details/C124922708/page/n34","statement_kind":"background","subject_label":"Bay Area travel model history","summary":"The report says the Bay Area Transportation Study Commission was created by the California legislature in the 1960s.","property":"other","value_text":"1960s","date_printed":"1960s","t_from":"2000","quote":"Model development in the San Francisco Bay Area dates back to the 1960s when the Bay Area Transportation Study Commission","place_label":"San Francisco Bay Area","anchor":"s-53df0c95eb70","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"SAN FRANCISCO TRANSPORTATION PLAN - DRAFT PAGE 3-18"},{"claim_id":"c:0e5d94fd435a669d0f6d1b128ae8b5e0","page_id":"C124922708:43","page_url":"https://archive.org/details/C124922708/page/n42","statement_kind":"proposal","subject_label":"Muni AM peak ridership","summary":"The model projects Muni AM peak passengers will grow by 17 percent, or 37,800 trips.","property":"other","value_text":"17 percent (37,800 trips)","value_num":37800.0,"unit":"trips","date_printed":"1998-2020","t_from":"1998","quote":"The number of passengers taking Muni during the AM peak commute period will grow by 17 percent (37,800 trips).","place_label":"San Francisco","anchor":"s-0e5d94fd435a","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"FUTURE BASELINE TRANSPORTATION CONDITIONS"},{"claim_id":"c:4f4f68b3f4c4b1433340b51f5df8d2ef","page_id":"C124922708:43","page_url":"https://archive.org/details/C124922708/page/n42","statement_kind":"proposal","subject_label":"Growth in trips to and from San Francisco","summary":"The model projects trips to and from San Francisco will rise by 259,000 daily by 2020.","property":"other","value_text":"259,000 daily trips","value_num":259000.0,"unit":"trips","date_printed":"2020","t_from":"2020","quote":"A slightly larger increase (259,000 daily trips) will occur in trips to and from San Francisco, representing a 22 percent increase.","place_label":"San Francisco","anchor":"s-4f4f68b3f4c4","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"A slightly larger increase (259,000 daily trips) will occur"},{"claim_id":"c:607685183f559207e7d674e879ddfa07","page_id":"C124922708:43","page_url":"https://archive.org/details/C124922708/page/n42","statement_kind":"proposal","subject_label":"Transit share of trips to and from San Francisco","summary":"The model projects the transit share of trips to and from San Francisco will rise to 19.4 percent by 2020.","property":"other","value_text":"from 17.9 percent to 19.4 percent","value_num":19.4,"unit":"percent","date_printed":"2020","t_from":"2020","quote":"The transit share for trips to and from San Francisco will increase by 1.5 percent, from 17.9 percent to 19.4 percent by 2020.","place_label":"San Francisco","anchor":"s-607685183f55","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Modal Split — The mode split in the year 2020"},{"claim_id":"c:cf8cfa2e0d10fb0e8c9f2e396dfd7778","page_id":"C124922708:43","page_url":"https://archive.org/details/C124922708/page/n42","statement_kind":"proposal","subject_label":"Growth in trips within San Francisco","summary":"The model projects trips within San Francisco will rise by 250,000 daily by 2020.","property":"other","value_text":"250,000 daily trips","value_num":250000.0,"unit":"trips","date_printed":"2020","t_from":"2020","quote":"About half of the growth will be in trips within San Francisco, which will increase by 250,000 daily trips, a 13 percent increase.","place_label":"San Francisco","anchor":"s-cf8cfa2e0d10","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"About half of the growth will be in trips within San Francisco"},{"claim_id":"c:cff70ce6f6fe9639b7c2c6e21f86867c","page_id":"C124922708:43","page_url":"https://archive.org/details/C124922708/page/n42","statement_kind":"finding","subject_label":"Future transportation demand and capacity","summary":"The report finds transportation demand is expected to outpace capacity even with planned investments.","property":"finding","value_text":"deteriorating transportation conditions","date_printed":"2020","t_from":"2020","quote":"even with the planned investments in the system, transportation demand is expected to outpace the available capacity, resulting in deteriorating transportation conditions.","place_label":"San Francisco","anchor":"s-cff70ce6f6fe","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"The most interesting finding is that even with the planned investments"},{"claim_id":"c:0eafe8f632b1a847720f6d54f936f418","page_id":"C124922708:47","page_url":"https://archive.org/details/C124922708/page/n46","statement_kind":"finding","subject_label":"Traffic congestion on key City corridors","summary":"The plan projects that traffic congestion will worsen on key corridors including Van Ness Avenue, 19th Avenue and Geary Boulevard.","property":"other","date_printed":"2020","t_from":"2020","quote":"Traffic congestion is expected to worsen on key corridors in the City including: e Van Ness Avenue e 19th Avenue e Geary Boulevard","place_label":"Van Ness Avenue; 19th Avenue; Geary Boulevard","place_precision":"street","anchor":"s-0eafe8f632b1","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"FUTURE BASELINE TRANSPORTATION CONDITIONS"},{"claim_id":"c:212fbbebf5539d5430ef3cd411f6360a","page_id":"C124922708:47","page_url":"https://archive.org/details/C124922708/page/n46","statement_kind":"finding","subject_label":"Transit mode split for work trips","summary":"The plan finds that the travel mode split for San Francisco residents remains unchanged for work trips, so greater transit emphasis is needed.","property":"other","value_text":"unchanged","t_from":"2000","quote":"suggesting that a greater emphasis on transit usage is needed to achieve the City's Transit First Policy.","place_label":"San Francisco","anchor":"s-212fbbebf553","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Travel mode split for San Francisco residents remains unchanged for work trips"},{"claim_id":"c:5aac721c6d2ece133a3804ec98b40a15","page_id":"C124922708:47","page_url":"https://archive.org/details/C124922708/page/n46","statement_kind":"finding","subject_label":"Travel times to regional destinations","summary":"The plan projects that average travel times to regional destinations will rise up to 22 percent, most on trips to the East Bay and North Bay.","property":"other","value_text":"up to 22 percent","value_num":22.0,"unit":"percent","date_printed":"2020","t_from":"2020","quote":"Average travel times between San Francisco neighborhoods and key representative regional destinations will increase up to 22 percent","place_label":"San Francisco","anchor":"s-5aac721c6d2e","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Average travel times between San Francisco neighborhoods and key representative regional destinations"},{"claim_id":"c:d7fa9305fd5dd2d1fd882247c846d72e","page_id":"C124922708:47","page_url":"https://archive.org/details/C124922708/page/n46","statement_kind":"finding","subject_label":"Bay Bridge travel time","summary":"The plan projects that average travel times through the Bay Bridge gateway will increase by 24 percent by 2020.","property":"other","value_text":"24 percent","value_num":24.0,"unit":"percent","date_printed":"2020","t_from":"2020","quote":"Key inbound gateways into San Francisco will become more congested, increasing average travel times: e The San Francisco/Oakland Bay Bridge (I-80): 24 percent","place_label":"San Francisco/Oakland Bay Bridge","anchor":"s-d7fa9305fd5d","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Key inbound gateways into San Francisco will become more congested"},{"claim_id":"c:f3bd68efbd4ac25d81390bb7185ba51f","page_id":"C124922708:47","page_url":"https://archive.org/details/C124922708/page/n46","statement_kind":"finding","subject_label":"Golden Gate Bridge travel time","summary":"The plan projects that average travel times through the Golden Gate Bridge gateway will increase by 59 percent by 2020.","property":"other","value_text":"59 percent","value_num":59.0,"unit":"percent","date_printed":"2020","t_from":"2020","quote":"Key inbound gateways into San Francisco will become more congested, increasing average travel times: e The Golden Gate Bridge (U.S. 101): 59 percent","place_label":"Golden Gate Bridge","anchor":"s-f3bd68efbd4a","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"The Golden Gate Bridge (U.S. 101): 59 percent"},{"claim_id":"c:f578b731c4907397b909172844a99a26","page_id":"C124922708:47","page_url":"https://archive.org/details/C124922708/page/n46","statement_kind":"finding","subject_label":"Surface travel speeds","summary":"The plan projects that surface travel speeds in San Francisco will decline overall between five and twenty percent.","property":"other","value_text":"five to twenty percent","value_num":5.0,"unit":"percent","date_printed":"2020","t_from":"2020","quote":"Surface travel speeds in San Francisco will decline overall, between five and twenty percent","place_label":"San Francisco","anchor":"s-f578b731c490","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Surface travel speeds in San Francisco will decline overall"},{"claim_id":"c:85758fe5cf04f284c00546768af53214","page_id":"C124922708:87","page_url":"https://archive.org/details/C124922708/page/n86","statement_kind":"proposal","subject_label":"Strategy 1 funding assumption","summary":"The strategy assumes continued federal, state and local funding and reauthorization of the half-cent sales tax to fund most programs.","property":"other","value_text":"half-cent sales tax reauthorization assumed","t_from":"2000","quote":"continuation of existing federal, state and local funding programs and reauthorization of San Francisco’s half-cent sales tax for transportation is assumed to fund the majority of the transportation programs.","anchor":"s-85758fe5cf04","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Chapter 6 MAINTAIN AND SUSTAIN EXISTING SYSTEM"},{"claim_id":"c:ad3da834623406508139ef011b45c8ce","page_id":"C124922708:87","page_url":"https://archive.org/details/C124922708/page/n86","statement_kind":"proposal","subject_label":"Countywide Transportation Plan strategies","summary":"The plan recommends implementing all four strategies.","property":"proposes","value_text":"four strategies","value_num":4.0,"t_from":"2000","quote":"New actions are described in the following chapters which describe Strategies 2,3 and 4. The plan recommends implementing all four strategies.","anchor":"s-ad3da8346234","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"The plan recommends implementing all four strategies."},{"claim_id":"c:0bf7676911307a291f8cf75f6ff79123","page_id":"C124922708:89","page_url":"https://archive.org/details/C124922708/page/n88","statement_kind":"cites_decision","subject_label":"Transit First policy","summary":"San Francisco has adopted a Transit First policy.","property":"adopted","value_text":"Transit First policy","t_from":"2000","quote":"San Francisco has adopted a Transit First policy and improving the San Francisco Municipal Railway is a key priority for the Transportation Plan.","place_label":"San Francisco","anchor":"s-0bf767691130","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"San Francisco has adopted a Transit First policy and improving"},{"claim_id":"c:761cf1d35b3632ca693935d7ee35baa1","page_id":"C124922708:89","page_url":"https://archive.org/details/C124922708/page/n88","statement_kind":"finding","subject_label":"Muni revenue vehicle replacement","summary":"Most of [name withheld] revenue vehicles were replaced from 1997 to 2002.","property":"event","value_text":"1997 to 2002","date_printed":"1997 to 2002","t_from":"1997","quote":"In 2002, Muni’s average fleet age will be the lowest it has been in many years due to the replacement of most of its revenue vehicles in the period from 1997 to 2002.","anchor":"s-761cf1d35b36","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Rebuild and Rehabilitation — In 2002, Muni's average fleet age"},{"claim_id":"c:9ac66f10eff935a85ecf1af5001774dc","page_id":"C124922708:89","page_url":"https://archive.org/details/C124922708/page/n88","statement_kind":"finding","subject_label":"Muni vehicle fleet","summary":"Muni has a fleet of over 1,000 vehicles.","property":"other","value_text":"over 1,000 vehicles","value_num":1000.0,"unit":"vehicles","t_from":"2000","quote":"Muni has a fleet of over 1,000 vehicles of many types and sizes.","anchor":"s-9ac66f10eff9","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Muni Fleet Program -- Muni has a fleet of over 1,000 vehicles"},{"claim_id":"c:be4b4daf1fd05a71295f947f2c2ec244","page_id":"C124922708:89","page_url":"https://archive.org/details/C124922708/page/n88","statement_kind":"proposal","subject_label":"Muni fleet replacement","summary":"About $1.5 billion (≈ $2.9 billion in 2026 dollars) will be spent on fleet replacement over the next thirty years.","property":"cost_usd","value_text":"Approximately $1.5 billion","value_num":1500000000.0,"unit":"USD","date_printed":"next thirty years","t_from":"2000","quote":"Approximately $1.5 billion will be spent on fleet replacement during the next thirty years.","anchor":"s-be4b4daf1fd0","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Replacement -— Until recently, Muni's fleet was largely beyond"},{"claim_id":"c:209a6bf76b58546e0544700f23e56c08","page_id":"C124922708:99","page_url":"https://archive.org/details/C124922708/page/n98","statement_kind":"proposal","subject_label":"Pedestrian Improvement Capital Fund","summary":"Approximately $44 million (≈ $86.1 million in 2026 dollars) is needed for the pedestrian capital fund over thirty years.","property":"cost_usd","value_text":"approximately $44 million","value_num":44000000.0,"unit":"USD","date_printed":"next thirty years","t_from":"2000","quote":"In the next thirty years approximately $44 million is needed to fund this program.","anchor":"s-209a6bf76b58","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"SAN FRANCISCO TRANSPORTATION PLAN - DRAFT PAGE 6-50"},{"claim_id":"c:d558ea5ce1442e139159197522435aa3","page_id":"C124922708:99","page_url":"https://archive.org/details/C124922708/page/n98","statement_kind":"proposal","subject_label":"Pedestrian Improvement Capital Fund shortfall","summary":"The pedestrian program is projected to have a shortfall of about $19 million (≈ $37.2 million in 2026 dollars).","property":"cost_usd","value_text":"shortfall of approximately $19 million","value_num":19000000.0,"unit":"USD","t_from":"2000","quote":"This program is projected to experience a shortfall of approximately $19 million.","anchor":"s-d558ea5ce144","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"This program is projected to experience a shortfall"},{"claim_id":"c:9f8ff2df0f8a6a4b93483f1f5bfb0fa6","page_id":"C124922708:111","page_url":"https://archive.org/details/C124922708/page/n110","statement_kind":"proposal","subject_label":"Bicycle capital program sales tax share","summary":"About $25 million (≈ $48.9 million in 2026 dollars) of the bike program would come from sales tax reauthorization.","property":"cost_usd","value_text":"approximately $25 million","value_num":25000000.0,"unit":"USD","date_printed":"next twenty years","t_from":"2000","quote":"In the next twenty years approximately $50 million is needed for this program, approximately $25 million (SO percent) would come from reauthorization of the sales tax program.","anchor":"s-9f8ff2df0f8a","shown":true,"part":"appendix","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"APPENDIX of the key reasons; In the next twenty years approximately $50 million is needed"},{"claim_id":"c:bb8011e9bfeaf5eb4b91cba2adab223a","page_id":"C124922708:111","page_url":"https://archive.org/details/C124922708/page/n110","statement_kind":"proposal","subject_label":"Bicycle Improvement Capital Program","summary":"Approximately $50 million (≈ $97.8 million in 2026 dollars) is needed for the bike capital program over twenty years.","property":"cost_usd","value_text":"approximately $50 million","value_num":50000000.0,"unit":"USD","date_printed":"next twenty years","t_from":"2000","quote":"In the next twenty years approximately $50 million is needed for this program, approximately $25 million (SO percent) would come from reauthorization of the sales tax program.","anchor":"s-bb8011e9bfea","shown":true,"part":"appendix","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"APPENDIX of the key reasons; In the next twenty years approximately $50 million is needed"},{"claim_id":"c:bec3bca646e535b1341b4cd0a2aa936b","page_id":"C124922708:111","page_url":"https://archive.org/details/C124922708/page/n110","statement_kind":"proposal","subject_label":"Pedestrian Improvement Capital Fund","summary":"Approximately $20 million (≈ $39.1 million in 2026 dollars) is needed for the pedestrian capital fund over thirty years.","property":"cost_usd","value_text":"approximately $20 million","value_num":20000000.0,"unit":"USD","date_printed":"next thirty years","t_from":"2000","quote":"In the next thirty years approximately $20 million is needed for this program.","anchor":"s-bec3bca646e5","shown":true,"part":"appendix","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Pedestrian Improvement Capital Fund; In the next thirty years approximately $20 million"},{"claim_id":"c:d66f64a045a8bd96bdb439d89220f10b","page_id":"C124922708:111","page_url":"https://archive.org/details/C124922708/page/n110","statement_kind":"proposal","subject_label":"San Francisco Bicycle Corridors Planning","summary":"The Department of Parking and Traffic will prepare the bicycle corridors plan.","property":"lead_agency","value_text":"Department of Parking and Traffic","t_from":"2000","quote":"The Department of Parking and Traffic will be responsible for preparing this plan.","anchor":"s-d66f64a045a8","shown":true,"part":"appendix","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"San Francisco Bicycle Corridors Planning; The Department of Parking and Traffic will be responsible"},{"claim_id":"c:e35ce58db8d943167705e6878b1070d2","page_id":"C124922708:111","page_url":"https://archive.org/details/C124922708/page/n110","statement_kind":"proposal","subject_label":"Traffic Calming Program","summary":"Approximately $40 million (≈ $78.3 million in 2026 dollars) is needed for the traffic calming program over thirty years.","property":"cost_usd","value_text":"approximately $40 million","value_num":40000000.0,"unit":"USD","date_printed":"next thirty years","t_from":"2000","quote":"In the next thirty years approximately $40 million is needed for this program, with approximately $10 million in anticipated sales tax reauthorization funding.","anchor":"s-e35ce58db8d9","shown":true,"part":"appendix","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Traffic Calming Program; In the next thirty years approximately $40 million"},{"claim_id":"c:2f5581c82fe980afc132a1d4e44afc4f","page_id":"C124922708:119","page_url":"https://archive.org/details/C124922708/page/n118","statement_kind":"proposal","subject_label":"Muni passenger miles in 2020 under Strategy 2","summary":"The plan projects that overall passenger miles on Muni will grow by 10,000 under Strategy 2.","property":"other","value_text":"10,000 additional passenger miles","value_num":10000.0,"date_printed":"2020","t_from":"2020","quote":"The overall number of passenger miles on Muni will grow by 10,000, a 1.6 percent increase, a higher rate than the overall number of passengers","place_label":"Muni system","anchor":"s-2f5581c82fe9","shown":false,"part":"appendix","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"APPENDIX ... The overall number of passenger miles on Muni will grow by 10,000"},{"claim_id":"c:8f97d7d9c0f47148a8e718dd87eef184","page_id":"C124922708:119","page_url":"https://archive.org/details/C124922708/page/n118","statement_kind":"proposal","subject_label":"Transit trips to and from San Francisco in 2020 under Strategy 2","summary":"The plan projects that daily transit person trips to and from San Francisco will grow by 1,700 under Strategy 2.","property":"other","value_text":"1,700 additional daily person trips","value_num":1700.0,"unit":"persons","date_printed":"2020","t_from":"2020","quote":"The number of daily person trips to and from San Francisco made by transit will grow by 1,700, representing a 1 percent increase","place_label":"San Francisco","anchor":"s-8f97d7d9c0f4","shown":false,"part":"appendix","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"APPENDIX ... The number of daily person trips to and from San Francisco made by transit will grow"},{"claim_id":"c:c3f0616d9cbb1d2294517e926f19e555","page_id":"C124922708:127","page_url":"https://archive.org/details/C124922708/page/n126","statement_kind":"proposal","subject_label":"Strategy 3 system expansion","summary":"The plan states that Strategy 3 focuses on improving transit and roadways in San Francisco and the Bay Area.","property":"proposes","value_text":"Strategy 3 transit and roadway improvements","t_from":"2000","quote":"Strategy 3 focuses on improving transit and roadways in San Francisco and the Bay Area. Significant new funding sources will be needed to implement this strategy.","place_label":"San Francisco and the Bay Area","anchor":"s-c3f0616d9cbb","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Chapter 8 SYSTEM EXPANSION"},{"claim_id":"c:f1ea14530787fce1814ad6a16cc9bcd5","page_id":"C124922708:127","page_url":"https://archive.org/details/C124922708/page/n126","statement_kind":"finding","subject_label":"Funding status of Strategy 3 actions","summary":"The report finds that all actions included in Scenario 3 are essentially unfunded.","property":"other","value_text":"essentially unfunded","t_from":"2000","quote":"All the actions included in Scenario 3 are essentially unfunded. Given the amount of federal, state and local funding expected to be available during the next twenty years","anchor":"s-f1ea14530787","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"FINANCIAL CONSTRAINTS"},{"claim_id":"c:2617b774a994a4f6f36568310b960af0","page_id":"C124922708:137","page_url":"https://archive.org/details/C124922708/page/n136","statement_kind":"finding","subject_label":"Southern Crossing of the Bay","summary":"The Metropolitan Transportation Commission is completing a conceptual study of a new Southern Crossing of the Bay.","property":"other","value_text":"conceptual study","t_from":"2000","quote":"The Metropolitan Transportation Commission is currently completing a conceptual study of a new Southern Crossing of the Bay.","place_label":"Southern Crossing","anchor":"s-2617b774a994","shown":false,"hidden":"another_body","part":"appendix","speaker":"another_body","speaker_role":"Metropolitan Transportation Commission","stance":"quotes_to_report","speaker_evidence":"The Metropolitan Transportation Commission is currently completing a conceptual study"},{"claim_id":"c:513429a287a7b9002034dd3e4dc4f6f4","page_id":"C124922708:137","page_url":"https://archive.org/details/C124922708/page/n136","statement_kind":"proposal","subject_label":"California High Speed Rail network","summary":"The report states that the high speed rail network is planned to serve SFO and downtown San Francisco via the Caltrain alignment.","property":"proposes","value_text":"serve SFO and downtown San Francisco","t_from":"2000","quote":"This network is currently planned to serve San Francisco International Airport and downtown San Francisco using the Caltrain alignment.","place_label":"San Francisco International Airport","anchor":"s-513429a287a7","shown":false,"hidden":"another_body","part":"appendix","speaker":"another_body","speaker_role":"California High Speed Rail Authority","stance":"quotes_to_report","speaker_evidence":"This network is currently planned to serve San Francisco International Airport"},{"claim_id":"c:bd5a21c2a6c77868c21541a9c7e1b90f","page_id":"C124922708:137","page_url":"https://archive.org/details/C124922708/page/n136","statement_kind":"proposal","subject_label":"Transbay Terminal rebuilding financing","summary":"The report says financing for the new Transbay Terminal will rely significantly on joint development opportunities.","property":"other","value_text":"joint development financing","t_from":"2000","quote":"Financing for the new terminal will rely significantly on joint development opportunities from land occupied by the existing terminal and access structures.","place_label":"Transbay Terminal","anchor":"s-bd5a21c2a6c7","shown":true,"part":"appendix","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Financing for the new terminal will rely significantly on joint development"},{"claim_id":"c:fe65adaa6d0503aa4f26c6e690402cb5","page_id":"C124922708:137","page_url":"https://archive.org/details/C124922708/page/n136","statement_kind":"proposal","subject_label":"Southern Crossing bridge cost","summary":"The report states that initial cost estimates for the Southern Crossing bridge are in the $4 billion (≈ $7.8 billion in 2026 dollars) range.","property":"cost_usd","value_text":"$4 billion range","value_num":4000000000.0,"unit":"USD","t_from":"2000","quote":"Initial cost estimates for the bridge are in the $4 billion range.","place_label":"Southern Crossing","anchor":"s-fe65adaa6d05","shown":true,"part":"appendix","speaker":"issuer","speaker_role":"the issuer","stance":"quotes_to_report","speaker_evidence":"Initial cost estimates for the bridge are in the $4 billion range."},{"claim_id":"c:10814035766ba58db3c02df9e1ab49d0","page_id":"C124922708:147","page_url":"https://archive.org/details/C124922708/page/n146","statement_kind":"proposal","subject_label":"Supercorridor concept","summary":"The plan calls for studying the supercorridor idea and determining its feasibility.","property":"recommendation","value_text":"study feasibility","t_from":"2000","quote":"This plan calls for studying the idea and determining its feasibility. It has been implemented in several other cities including Paris, Singapore, and in Norway.","anchor":"s-10814035766b","shown":true,"part":"appendix","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"APPENDIX ... This plan calls for studying the idea"},{"claim_id":"c:65872133814173973f5bb84aac3bd5a9","page_id":"C124922708:147","page_url":"https://archive.org/details/C124922708/page/n146","statement_kind":"proposal","subject_label":"Fell/Oak Couplet supercorridor","summary":"The plan recommends that a basic feasibility study be completed of the Supercorridor concept.","property":"recommendation","value_text":"basic feasibility study","t_from":"2000","quote":"The Transportation Plan recommends that a very basic feasibility study be completed of the Supercorridor concept and that it be re-evaluated","anchor":"s-658721338141","shown":false,"part":"appendix","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"The Transportation Plan recommends that a very basic feasibility study"},{"claim_id":"c:b8956a8167f6bc09f4508a42db89eaab","page_id":"C124922708:147","page_url":"https://archive.org/details/C124922708/page/n146","statement_kind":"proposal","subject_label":"Van Ness Avenue supercorridor","summary":"The report proposes taking regional traffic off Van Ness Avenue, Franklin and Gough Streets through a tunnel.","property":"proposes","value_text":"tunnel between Fell Street and Lombard","t_from":"2000","quote":"The idea would be to take regional traffic off Van Ness Avenue, Franklin and Gough Streets. The goal would be to reclaim street space on Van Ness Avenue","place_label":"Van Ness Avenue","place_precision":"street","place_id":"qipu:sf/place/street/van-ness-ave","resolved_by":"place links file","anchor":"s-b8956a8167f6","shown":false,"part":"appendix","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"The idea would be to take regional traffic off Van Ness Avenue"},{"claim_id":"c:8b6069ce5237bbdc101aaeeff5c6e7c2","page_id":"C124922708:165","page_url":"https://archive.org/details/C124922708/page/n164","statement_kind":"background","subject_label":"Plan cost and revenue projections","summary":"The Plan's costs and revenues are expressed in 2001 dollars.","property":"other","value_text":"2001 dollars","value_num":2001.0,"t_from":"2000","quote":"The costs and revenues in the Plan are expressed in 2001 dollars, reflecting the potential adoption of a sales tax continuation expenditure plan and voter approval of the tax","anchor":"s-8b6069ce5237","shown":false,"part":"appendix","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"APPENDIX ... The costs and revenues in the Plan are expressed in 2001 dollars"},{"claim_id":"c:a4020c756df25bd0a6f15443a6e362c7","page_id":"C124922708:165","page_url":"https://archive.org/details/C124922708/page/n164","statement_kind":"finding","subject_label":"Program and project cost data sources","summary":"San Francisco City Departments projected costs and funding from sources other than the half-cent sales tax for the next ten years.","property":"other","date_printed":"next ten years","t_from":"2000","quote":"The San Francisco City Departments (Muni, Department of Public Works, Department of Parking and Traffic, City Planning Department) have projected the costs and funding from sources other","place_label":"San Francisco","anchor":"s-a4020c756df2","shown":false,"part":"appendix","speaker":"issuer","speaker_role":"the issuer","stance":"quotes_to_report","speaker_evidence":"APPENDIX ... The San Francisco City Departments (Muni, Department of Public Works"},{"claim_id":"c:750cb7367fd8b6aa8b93809fe15faea3","page_id":"C124922708:173","page_url":"https://archive.org/details/C124922708/page/n172","statement_kind":"finding","subject_label":"Maintaining the existing system","summary":"Maintaining the existing system over 30 years needs $5.6 billion (≈ $11.0 billion in 2026 dollars), and projected sources will not pay the entire cost.","property":"cost_usd","value_text":"$5.6 billion","value_num":5600000000.0,"unit":"USD","date_printed":"next 30 years","t_from":"2000","quote":"Over the next 30 years, $5.6 billion is needed to maintain the existing system and projected sources will not pay for the entire cost.","place_label":"San Francisco","anchor":"s-750cb7367fd8","shown":true,"part":"appendix","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"FINANCIAL STRATEGY ... Current resources are inadequate to maintain and sustain the existing system"},{"claim_id":"c:f9563f17303f30d01c3429d1bab93685","page_id":"C124922708:173","page_url":"https://archive.org/details/C124922708/page/n172","statement_kind":"finding","subject_label":"Projected shortfall over 30 years","summary":"The projected shortfall over the next 30 years is about $864 million (≈ $1.7 billion in 2026 dollars).","property":"other","value_text":"$864 million","value_num":864000000.0,"unit":"USD","date_printed":"FY 01-31","t_from":"2000","quote":"The projected $864 million shortfall will require future planning efforts to focus on both cost and revenue solutions.","place_label":"San Francisco","anchor":"s-f9563f17303f","shown":true,"part":"appendix","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Current resources are inadequate to maintain and sustain the existing system"},{"claim_id":"c:fa1421c3104d95c17567769d12bdc748","page_id":"C124922708:173","page_url":"https://archive.org/details/C124922708/page/n172","statement_kind":"finding","subject_label":"Reliance on half-cent sales tax","summary":"The transportation system relies on the half-cent sales tax for more than 42 percent of funding needed over 30 years.","property":"other","value_text":"more than 42 percent","value_num":42.0,"unit":"percent","date_printed":"next 30 years","t_from":"2000","quote":"relies on the half-cent sales tax for more than 42 percent of the funding needed to maintain and sustain the existing system over the next 30 years","place_label":"San Francisco","anchor":"s-fa1421c3104d","shown":false,"part":"appendix","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Reliance on the half-cent sales tax for transportation"},{"claim_id":"c:1687491d205a430517e6f9ca884ab783","page_id":"C124922708:175","page_url":"https://archive.org/details/C124922708/page/n174","statement_kind":"proposal","subject_label":"Financial element updates","summary":"The financial element of the Countywide Transportation Plan will be updated with regular updates of the Plan.","property":"proposes","t_from":"2000","quote":"The financial element of the Countywide Transportation Plan will be updated with the regular updates of the Plan, incorporating actions to address the projected shortfalls.","anchor":"s-1687491d205a","shown":true,"part":"appendix","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"APPENDIX ... The financial element of the Countywide Transportation Plan will be updated"},{"claim_id":"c:d3db63be8d0f568ce064440ad087dce4","page_id":"C124922708:175","page_url":"https://archive.org/details/C124922708/page/n174","statement_kind":"proposal","subject_label":"Program and project cost-control policy","summary":"The Plan proposes to seek the most cost effective means of delivering programs and projects.","property":"proposes","t_from":"2000","quote":"Seek the most cost effective means of delivering programs and projects 2 Defer programs and projects only if necessary","anchor":"s-d3db63be8d0f","shown":false,"part":"appendix","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"A partial list of policies and actions to be considered follows. Seek the most cost effective means"}]}