{"note":"Statements read from one scanned government report in the IGS library collection on the Internet Archive. Each statement has a verbatim quote found on its page (quote, page_url). The summary and subject_label of each statement were written by a model (Claude Haiku 5.5) and can be wrong: read the page before quoting. At most 20 selected pages of a report were read. Keys are the column names of the tables igs_reports and igs_claims; a column that is null for a statement is left out, and columns with one value for every statement of this report are given once under same_for_every_statement. \"[name withheld]\" stands where the release withholds a name; the site's page guard withholds a few more in reports after 1951, so a cell here can differ from the table; for a few reports prepared_by and creator are left out. A statement's links to the Board record are under links (show_target_kind: decision, instrument or ballot measure; show_target_id; show_url); they replace the table's decision_id and instrument_id, which are left out. place_id, place_label and place_precision come from a corrected place match where there is one. part, speaker, speaker_role, stance and speaker_evidence say who is speaking: a model (Claude Haiku 5.5) read each page and its context and can be wrong. part: main_text, attachment, appendix, letter, comment, response, table or cover_or_contents; speaker: issuer, another_body, letter_writer or unclear; speaker_role: a role or organisation, never a personal name; stance: own_position, quotes_to_dispute, quotes_to_report, restates_to_reject or unclear. The report page shows a statement only when speaker is issuer, part is main_text or appendix, and stance is own_position or quotes_to_report; hidden gives the part, the speaker or the stance of the others. ","release":"v0.9.2","licence":"CC0-1.0","slug":"c124922975","url":"https://data.qipu.org/usa/san-francisco/reports/c124922975/","statement_url":"https://data.qipu.org/usa/san-francisco/reports/c124922975/#{anchor}","tables":{"igs_reports":"https://tiles.qipu.org/data/releases/v0.9.2/parquet/igs_reports.parquet","igs_claims":"https://tiles.qipu.org/data/releases/v0.9.2/parquet/igs_claims.parquet"},"report":{"report_id":"C124922975","source_id":"C124922975","title":"[Department of Public Works estimated additional costs to complete the City Hall non-seismic improvement project : memorandum from the Board of Supervisors' Budget Analyst to the Finance Committee]","year":1997,"n_pages":30,"creator":null,"source_url":"https://archive.org/details/C124922975","issuer":"City and County of San Francisco, Board of Supervisors, Budget Analyst","issuer_type":"government","gov_level":"city_county","prepared_by":"Budget Analyst, City and County of San Francisco","doc_kind":"budget","jurisdiction":"San Francisco","jurisdiction_id":"sf","city":"sf","issuer_by":"model","doc_kind_by":"meta","jurisdiction_by":"model","run_id":"igs-labels-rules+haiku55-cli-2026-10-23"},"pages_with_statements":18,"statements_total":59,"statements_by_kind":{"finding":34,"proposal":18,"cites_decision":6,"background":1},"same_for_every_statement":{"source_id":"C124922975","source_url":"https://archive.org/details/C124922975","source_label":"IGS library: [Department of Public Works estimated additional costs to complete the City Hall non-seismic improvement project : memor","report_year":1997,"issuer":"City and County of San Francisco, Board of Supervisors, Budget Analyst","issuer_type":"government","doc_kind":"budget","t_precision":"year","status":"extracted","claim_kind":"observation","extraction_table":"igs_claims","run_id":"igs-sf-pages-v2-haiku55-batch-2026-10-23","city":"sf","prompt_version":"igs-page-v2-2026-10-23"},"summary":{"what":"A memorandum by the Board of Supervisors' Budget Analyst on the estimated additional costs to finish the non-seismic improvements to City Hall, and how they would be funded.","figures":[{"label":"Cost","value":"$292,734,811 total project","claim_ids":["c:26461777594fba4b3e899d5ea661fb05"]},{"label":"Owed","value":"$47,670,481 non-seismic shortfall","claim_ids":["c:25f3eb94ce4497a353309cda20142cad"]},{"label":"Completion","value":"January 2, 1999","claim_ids":["c:db52f1e083b27408eaeb8ef4895f9ff8"]}],"main_points":["c:6b39d888f60867c3937f4dcdf4fb490f","c:3ccca1a3420c88bce29631bc43b6a3c8","c:342cb844cb4a038e7623d11004f875d9"],"board_decisions_after":["qipu:sf/decision/journalofproceed93sanfrich:8/5","qipu:sf/decision/journalofproceed92septdecsanfrich:247/3","qipu:sf/decision/journalofproceed92septdecsanfrich:280/5","qipu:sf/decision/journalofproceed93sanfrich:280/4","qipu:sf/decision/journalofproceed93sanfrich:331/3","qipu:sf/decision/journalofproceed93sanfrich:438/3"],"board_decisions_before":["qipu:sf/decision/journalmayaugofproceed91sanfrich:8/1","qipu:sf/decision/journalmayaugofproceed91sanfrich:275/1"],"made_by":"A model (Claude Haiku 5.5) wrote the lead and picked the figures, main points and later Board decisions from the statements, from a second reading of the report's summary and cost pages, and from Board decisions dated 3 years before to 10 years after the report; every number it wrote was checked against them, and a figure must be about the report's own area or project."},"statements":[{"claim_id":"c:4a8c41dc405649f0bac57771b42d9328","page_id":"C124922975:1","page_url":"https://archive.org/details/C124922975/page/n0","statement_kind":"cites_decision","subject_label":"ESP2 general obligation bonds","summary":"San Francisco voters approved 332.4 million dollars in ESP2 earthquake safety bonds.","property":"approved","value_text":"$332,400,000","value_num":332400000.0,"unit":"USD","date_printed":"June 1990","t_from":"1990","quote":"In June of 1990, San Francisco voters approved $332,400,000 in General Obligation Public Safety Improvement Bonds, Phase 2 (ESP2)","place_label":"San Francisco","anchor":"s-4a8c41dc4056","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Memo to Finance Committee; In June of 1990, San Francisco voters approved"},{"claim_id":"c:506fa4af82f6bfd78d9399078be3e8a1","page_id":"C124922975:1","page_url":"https://archive.org/details/C124922975/page/n0","statement_kind":"finding","subject_label":"ESP2 bond interest earnings","summary":"The ESP2 bonds have earned a total of 39.3 million dollars in interest to date, according to DPW.","property":"other","value_text":"$39.3 million","value_num":39300000.0,"unit":"USD","date_printed":"to date","t_from":"1997","quote":"According to DPW, the ESP2 bonds have earned a total of $39.3 million in interest, to date.","anchor":"s-506fa4af82f6","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"quotes_to_report","speaker_evidence":"According to DPW, the ESP2 bonds have earned"},{"claim_id":"c:54382cfc0b450e524406b6f3d8c04f3b","page_id":"C124922975:1","page_url":"https://archive.org/details/C124922975/page/n0","statement_kind":"proposal","subject_label":"Supplemental appropriation of ESP2 interest","summary":"The proposed supplemental appropriation would appropriate 12 million dollars of ESP2 interest earnings for City Hall seismic improvements.","property":"proposes","value_text":"$12 million","value_num":12000000.0,"unit":"USD","t_from":"1997","quote":"The proposed supplemental appropriation would appropriate $12 million of the interest earnings from the ESP2 bonds for seismic improvements related to the City Hall Project.","place_label":"City Hall","place_precision":"building","place_id":"qipu:sf/place/landmark/sf-city-hall","resolved_by":"place links file","anchor":"s-54382cfc0b45","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"The proposed supplemental appropriation would appropriate $12 million"},{"claim_id":"c:fa48bd25a899423cb4d7b6de4234c69b","page_id":"C124922975:1","page_url":"https://archive.org/details/C124922975/page/n0","statement_kind":"finding","subject_label":"ESP2 bonds allocated to City Hall seismic project","summary":"A total of 75.7 million dollars of ESP2 bonds has been allocated to the City Hall seismic-related project.","property":"cost_usd","value_text":"$75.7 million","value_num":75700000.0,"unit":"USD","date_printed":"to date","t_from":"1997","quote":"To date, $75.7 million of the ESP2 bonds have been allocated to the City Hall seismic-related Project.","place_label":"City Hall","place_precision":"building","place_id":"qipu:sf/place/landmark/sf-city-hall","resolved_by":"place links file","anchor":"s-fa48bd25a899","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"To date, $75.7 million of the ESP2 bonds have been allocated"},{"claim_id":"c:728ebba65a5fbd84281847bdbe28d5f5","page_id":"C124922975:2","page_url":"https://archive.org/details/C124922975/page/n1","statement_kind":"finding","subject_label":"FEMA and OES funds for City Hall seismic work","summary":"FEMA and the State Office of Emergency Services allocated 105 million dollars for the City Hall seismic-related project.","property":"other","value_text":"$105 million","value_num":105000000.0,"unit":"USD","t_from":"1997","quote":"FEMA and the State Office of Emergency Services (OES) allocated $105 million for the City Hall Seismic-related Project, for a total of $180.7 million","place_label":"City Hall","place_precision":"building","place_id":"qipu:sf/place/landmark/sf-city-hall","resolved_by":"place links file","anchor":"s-728ebba65a5f","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"Board of Supervisors Budget Analyst","stance":"own_position","speaker_evidence":"As reported above, the City Hall Seismic-related Project received a total of $75.7 million"},{"claim_id":"c:f5bbc942d8d128a2b9a35ee1eb53d696","page_id":"C124922975:2","page_url":"https://archive.org/details/C124922975/page/n1","statement_kind":"proposal","subject_label":"Reappropriation of ESP2 funds","summary":"The proposed supplemental appropriation would reappropriate 8.3 million dollars of previously appropriated ESP2 funds for City Hall.","property":"proposes","value_text":"$8,300,000","value_num":8300000.0,"unit":"USD","t_from":"1997","quote":"The proposed supplemental appropriation would also reappropriate $8,300,000 of the following previously appropriated ESP2 bond funds for the City Hall seismic improvement project.","place_label":"City Hall","place_precision":"building","place_id":"qipu:sf/place/landmark/sf-city-hall","resolved_by":"place links file","anchor":"s-f5bbc942d8d1","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"Board of Supervisors Budget Analyst","stance":"own_position","speaker_evidence":"The proposed supplemental appropriation would also reappropriate $8,300,000"},{"claim_id":"c:774632d55738eb25dc77542256a1dc79","page_id":"C124922975:3","page_url":"https://archive.org/details/C124922975/page/n2","statement_kind":"cites_decision","subject_label":"Appropriation of Proposition A design funds","summary":"The Board of Supervisors appropriated 5.69 million dollars of Proposition A bond funds to begin design work.","property":"approved","value_text":"$5,687,710","value_num":5687710.0,"unit":"USD","date_printed":"April 1996","t_from":"1996","quote":"In April of 1996, the Board of Supervisors appropriated $5,687,710 of the Proposition A non-seismic bond funds to begin design work and for other related costs.","decided_by":"San Francisco voters","instrument_kind":"proposition","instrument_printed":"A","instrument_date_printed":"November 1995","place_label":"City Hall","place_precision":"building","place_id":"qipu:sf/place/landmark/sf-city-hall","resolved_by":"place links file","anchor":"s-774632d55738","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"Board of Supervisors' Budget Analyst memo to Finance Committee","stance":"own_position","speaker_evidence":"In April of 1996, the Board of Supervisors appropriated","links":[{"show_target_kind":"ballot measure","show_target_id":"ballot/1995-11-A","show_url":"https://data.qipu.org/usa/san-francisco/records/instruments/ballot/1995-11-A/"}]},{"claim_id":"c:a01ca3eec241de865eb49e21e500e740","page_id":"C124922975:3","page_url":"https://archive.org/details/C124922975/page/n2","statement_kind":"finding","subject_label":"Additional seismic work at City Hall","summary":"DPW reports additional seismic work of 30.97 million dollars was required at City Hall beyond the initial 180.7 million dollars.","property":"cost_usd","value_text":"$30,968,000","value_num":30968000.0,"unit":"USD","t_from":"1997","quote":"Mr. [name withheld] reports that Attachment 1 reflects the costs of the additional $30,968,000 of seismic work required at City Hall","place_label":"City Hall","place_precision":"building","place_id":"qipu:sf/place/landmark/sf-city-hall","resolved_by":"place links file","anchor":"s-a01ca3eec241","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"quotes_to_report","speaker_evidence":"Mr. Irons reports that Attachment 1 reflects the costs"},{"claim_id":"c:a141f85eb6fb0e8b9da6cdb5f2a43cf5","page_id":"C124922975:3","page_url":"https://archive.org/details/C124922975/page/n2","statement_kind":"cites_decision","subject_label":"Proposition A non-seismic City Hall bonds","summary":"San Francisco voters approved a 63.59 million dollar general obligation bond for non-seismic City Hall improvements.","property":"approved","value_text":"$63,590,000","value_num":63590000.0,"unit":"USD","date_printed":"November 1995","t_from":"1995","quote":"in November of 1995, San Francisco voters approved a $63,590,000 General Obligation bond issuance to support non-seismic improvements to City Hall (Proposition A).","decided_by":"San Francisco voters","instrument_kind":"proposition","instrument_printed":"A","instrument_date_printed":"November 1995","place_label":"City Hall","place_precision":"building","place_id":"qipu:sf/place/landmark/sf-city-hall","resolved_by":"place links file","anchor":"s-a141f85eb6fb","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"Board of Supervisors' Budget Analyst memo to Finance Committee","stance":"own_position","speaker_evidence":"in November of 1995, San Francisco voters approved a $63,590,000","links":[{"show_target_kind":"ballot measure","show_target_id":"ballot/1995-11-A","show_url":"https://data.qipu.org/usa/san-francisco/records/instruments/ballot/1995-11-A/"}]},{"claim_id":"c:a2b5da145a8c2897dc929850a85761c2","page_id":"C124922975:3","page_url":"https://archive.org/details/C124922975/page/n2","statement_kind":"cites_decision","subject_label":"Appropriation of balance of 1995 City Hall bond funds","summary":"The Board of Supervisors appropriated the balance of 57.9 million dollars, placing 43.5 million dollars on reserve.","property":"approved","value_text":"$57,902,290","value_num":57902290.0,"unit":"USD","date_printed":"July 1996","t_from":"1996","quote":"In July of 1996, the Board of Supervisors appropriated the balance of $57,902,290 of the 1995 City Hall Improvement Bond Funds, placing $43,524,203 on reserve","decided_by":"San Francisco voters","instrument_kind":"proposition","instrument_printed":"A","instrument_date_printed":"November 1995","place_label":"City Hall","place_precision":"building","place_id":"qipu:sf/place/landmark/sf-city-hall","resolved_by":"place links file","anchor":"s-a2b5da145a8c","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"Board of Supervisors' Budget Analyst memo to Finance Committee","stance":"own_position","speaker_evidence":"In July of 1996, the Board of Supervisors appropriated the balance"},{"claim_id":"c:d12bf179dfd5164a56a16404648a8ff7","page_id":"C124922975:3","page_url":"https://archive.org/details/C124922975/page/n2","statement_kind":"finding","subject_label":"Interest earnings on Proposition A bonds","summary":"The Proposition A non-seismic bonds have earned 4.89 million dollars of interest to date, according to DPW.","property":"other","value_text":"$4,892,702","value_num":4892702.0,"unit":"USD","date_printed":"to date","t_from":"1997","quote":"the Proposition A General Obligation non-seismic bonds of $63,590,000 have earned $4,892,702 of interest, to date.","anchor":"s-d12bf179dfd5","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"quotes_to_report","speaker_evidence":"According to DPW, the Proposition A General Obligation non-seismic bonds","links":[{"show_target_kind":"ballot measure","show_target_id":"ballot/1995-11-A","show_url":"https://data.qipu.org/usa/san-francisco/records/instruments/ballot/1995-11-A/"}]},{"claim_id":"c:5ba28fa337fdcaa05395a61c9d6a65ea","page_id":"C124922975:5","page_url":"https://archive.org/details/C124922975/page/n4","statement_kind":"finding","subject_label":"Funding gap for City Hall non-seismic work","summary":"The requested 25.19 million dollars would finance only 52.8 percent of the proposed additional non-seismic improvements to City Hall.","property":"other","value_text":"$25,192,702","value_num":25192702.0,"unit":"USD","t_from":"1997","quote":"the requested $25,192,702 would only be able to finance 52.8 percent of the proposed additional non-seismic improvements to City Hall","place_label":"City Hall","place_precision":"building","place_id":"qipu:sf/place/landmark/sf-city-hall","resolved_by":"place links file","anchor":"s-5ba28fa337fd","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"Budget Analyst","stance":"own_position","speaker_evidence":"Memo to Finance Committee; the requested $25,192,702 would only be able to finance"},{"claim_id":"c:4cd2a644cdbbb2ea1e871df96ecbd59d","page_id":"C124922975:6","page_url":"https://archive.org/details/C124922975/page/n5","statement_kind":"proposal","subject_label":"General Obligation Bond for City-owned buildings","summary":"DPW is planning a General Obligation Bond issue in 1998 or 1999 for seismic and renovation costs of more City-owned buildings.","property":"proposes","value_text":"1998 or 1999","date_printed":"1998 or 1999","t_from":"1998","quote":"DPW is currently planning a General Obligation Bond issue in 1998 or 1999 to cover the seismic and renovation costs for more City-owned buildings","anchor":"s-4cd2a644cdbb","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"According to Mr. Irons, DPW is currently planning a General Obligation Bond issue"},{"claim_id":"c:8e91bceea71c8a9d1db4174e5d5bb484","page_id":"C124922975:6","page_url":"https://archive.org/details/C124922975/page/n5","statement_kind":"proposal","subject_label":"Use of seismic bond funds for City Hall","summary":"DPW recommends that the City use the seismic bond funds to reimburse additional seismic improvements at City Hall.","property":"proposes","t_from":"1997","quote":"DPW has recommended that the City use all of these seismic- related bond funds to reimburse additional seismic improvements in City Hall","place_label":"City Hall","place_precision":"building","place_id":"qipu:sf/place/landmark/sf-city-hall","resolved_by":"place links file","anchor":"s-8e91bceea71c","shown":false,"hidden":"another_body","part":"main_text","speaker":"another_body","speaker_role":"Department of Public Works","stance":"quotes_to_report","speaker_evidence":"DPW has recommended that the City use all of these seismic- related bond funds"},{"claim_id":"c:e9cec02e4e059b76f94fa7d905a42166","page_id":"C124922975:6","page_url":"https://archive.org/details/C124922975/page/n5","statement_kind":"finding","subject_label":"101 Grove Street Building seismic upgrading cost","summary":"DPW estimates seismic upgrading and renovation of the 101 Grove Street Building at about $45.4 million (≈ $95.3 million in 2026 dollars).","property":"cost_usd","value_text":"$45.4 million","value_num":45400000.0,"unit":"USD","t_from":"1997","quote":"seismic upgrading and renovation of the 101 Grove Street Building is estimated to cost approximately $45.4 million, according to DPW estimates","place_label":"101 Grove Street Building","place_precision":"address","place_id":"qipu:sf/place/address/eas-451099","resolved_by":"place links file","anchor":"s-e9cec02e4e05","shown":false,"hidden":"another_body","part":"main_text","speaker":"another_body","speaker_role":"Department of Public Works","stance":"quotes_to_report","speaker_evidence":"according to DPW estimates"},{"claim_id":"c:342cb844cb4a038e7623d11004f875d9","page_id":"C124922975:7","page_url":"https://archive.org/details/C124922975/page/n6","statement_kind":"finding","subject_label":"Remaining shortfall after proposed supplemental appropriation","summary":"If the proposed supplemental appropriation is approved, the remaining shortfall for City Hall would be $22,477,779 (≈ $47.2 million in 2026 dollars).","property":"cost_usd","value_text":"$22,477,779","value_num":22477779.0,"unit":"USD","t_from":"1997","quote":"If the proposed supplemental appropriation of $25,192,702 is approved, then the remaining shortfall for the completion of the non-seismic related City Hall Project is $22,477,779","place_label":"City Hall","place_precision":"building","place_id":"qipu:sf/place/landmark/sf-city-hall","resolved_by":"place links file","anchor":"s-342cb844cb4a","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Memo to Finance Committee; \"then the remaining shortfall for the completion\""},{"claim_id":"c:6b39d888f60867c3937f4dcdf4fb490f","page_id":"C124922975:7","page_url":"https://archive.org/details/C124922975/page/n6","statement_kind":"finding","subject_label":"City Hall non-seismic project funding shortfall","summary":"The actual shortfall to complete the non-seismic City Hall Project is reported as $47,670,481 (≈ $100.1 million in 2026 dollars).","property":"cost_usd","value_text":"$47,670,481","value_num":47670481.0,"unit":"USD","t_from":"1997","quote":"the actual shortfall of funds to complete the non-seismic related City Hall Project is currently $47,670,481, as shown in Attachment 3","place_label":"City Hall","place_precision":"building","place_id":"qipu:sf/place/landmark/sf-city-hall","resolved_by":"place links file","anchor":"s-6b39d888f608","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"quotes_to_report","speaker_evidence":"\"Mr. Irons reports that the actual shortfall of funds\""},{"claim_id":"c:8c51a7c052dfe7e5cdff7d49c3fb084e","page_id":"C124922975:7","page_url":"https://archive.org/details/C124922975/page/n6","statement_kind":"finding","subject_label":"Federal Hazard Mitigation grant application","summary":"Mr. [name withheld] reports that DPW is working on an application for about $55 million (≈ $115.5 million in 2026 dollars) in Federal Hazard Mitigation grant funds.","property":"other","value_text":"approximately $55 million","value_num":55000000.0,"unit":"USD","t_from":"1997","quote":"Mr. [name withheld] reports that he is currently working on submitting an application for Federal Hazard Mitigation grant funds of approximately $55 million","place_label":"City Hall","place_precision":"building","place_id":"qipu:sf/place/landmark/sf-city-hall","resolved_by":"place links file","anchor":"s-8c51a7c052df","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"quotes_to_report","speaker_evidence":"\"Mr. Irons reports that he is currently working on submitting\""},{"claim_id":"c:01f4aab744d5782005cb868ff9111b23","page_id":"C124922975:8","page_url":"https://archive.org/details/C124922975/page/n7","statement_kind":"finding","subject_label":"Expenditures to date on City Hall Project","summary":"A total of $172,871,624 (≈ $362.9 million in 2026 dollars) has been expended on the City Hall Project to date.","property":"cost_usd","value_text":"$172,871,624","value_num":172871624.0,"unit":"USD","date_printed":"to date","t_from":"1997","quote":"a total of $172,871,624 has been expended to date","place_label":"City Hall","place_precision":"building","place_id":"qipu:sf/place/landmark/sf-city-hall","resolved_by":"place links file","anchor":"s-01f4aab744d5","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"Board of Supervisors Budget Analyst","stance":"quotes_to_report","speaker_evidence":"As shown in Attachment 5, a total of $172,871,624 has been expended to date. Attachment 5 is a schedule provided by Mr. Irons"},{"claim_id":"c:087a830e8bdbeaef8e651e1b9645804e","page_id":"C124922975:8","page_url":"https://archive.org/details/C124922975/page/n7","statement_kind":"finding","subject_label":"Total City Hall Project cost","summary":"The total cost for the City Hall Project, including seismic and non-seismic improvements, is $292,734,811 (≈ $614.5 million in 2026 dollars).","property":"cost_usd","value_text":"$292,734,811","value_num":292734811.0,"unit":"USD","t_from":"1997","quote":"the total cost for the City Hall Project is $292,734,811, including both seismic and non-seismic improvements","place_label":"City Hall","place_precision":"building","place_id":"qipu:sf/place/landmark/sf-city-hall","resolved_by":"place links file","anchor":"s-087a830e8bdb","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"Board of Supervisors Budget Analyst","stance":"quotes_to_report","speaker_evidence":"As shown in Attachment 5, the total cost for the City Hall Project is $292,734,811"},{"claim_id":"c:b8bc3564e6712882d3034428e48f80bf","page_id":"C124922975:8","page_url":"https://archive.org/details/C124922975/page/n7","statement_kind":"proposal","subject_label":"City Hall occupancy plan employee count","summary":"The proposed plan represents a reduction of 557 City Hall employees, over 42 percent fewer than before the renovations.","property":"jobs","value_text":"557 fewer employees","value_num":557.0,"unit":"jobs","t_from":"1997","quote":"The proposed plan therefore represents a reduction of 557 City Hall employees, or over 42 percent fewer employees than were located in City Hall prior to the renovations","place_label":"City Hall","place_precision":"building","place_id":"qipu:sf/place/landmark/sf-city-hall","resolved_by":"place links file","anchor":"s-b8bc3564e671","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"Board of Supervisors Budget Analyst","stance":"own_position","speaker_evidence":"The proposed plan therefore represents a reduction of 557 City Hall employees"},{"claim_id":"c:127f2fcea2e05944ddb43a524bc94957","page_id":"C124922975:9","page_url":"https://archive.org/details/C124922975/page/n8","statement_kind":"finding","subject_label":"Annual lease cost per relocated employee","summary":"Mr. [name withheld] says lease costs are about $4,500 (≈ $9,447 in 2026 dollars) per year per employee for private office space.","property":"rent_usd","value_text":"$4,500 per year per employee","value_num":4500.0,"unit":"USD","date_printed":"per year","t_from":"1997","quote":"these costs are approximately $4,500 per year per employee, based on approximately 250 square foot per employee at $18 per square foot per year","anchor":"s-127f2fcea2e0","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"Budget Analyst","stance":"quotes_to_report","speaker_evidence":"According to Mr. Irons, these costs are approximately $4,500 per year per employee"},{"claim_id":"c:4b1dd55cd6f6e2b5dbfffa233b8c187a","page_id":"C124922975:9","page_url":"https://archive.org/details/C124922975/page/n8","statement_kind":"proposal","subject_label":"Amendment removing non-seismic from ordinance title","summary":"The Controller's Office has prepared an Amendment of the Whole that removes the word non-seismic from the title of the ordinance.","property":"proposes","t_from":"1997","quote":"The Controller’s Office has prepared an Amendment of the Whole, which removes the word “non-seismic” from the title of the proposed ordinance.","anchor":"s-4b1dd55cd6f6","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"Budget Analyst","stance":"own_position","speaker_evidence":"The Controller's Office has prepared an Amendment of the Whole"},{"claim_id":"c:db52f1e083b27408eaeb8ef4895f9ff8","page_id":"C124922975:9","page_url":"https://archive.org/details/C124922975/page/n8","statement_kind":"finding","subject_label":"City Hall completion schedule","summary":"Mr. [name withheld] states that City Hall is on schedule and is anticipated to be completed by January 2, 1999.","property":"event","value_text":"January 2, 1999","date_printed":"January 2, 1999","t_from":"1999","quote":"Mr. [name withheld] states that City Hall is on schedule and is anticipated to be completed by January 2, 1999","place_label":"City Hall","place_precision":"building","place_id":"qipu:sf/place/landmark/sf-city-hall","resolved_by":"place links file","anchor":"s-db52f1e083b2","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"Budget Analyst","stance":"quotes_to_report","speaker_evidence":"Mr. [name] states that City Hall is on schedule"},{"claim_id":"c:7d50add229fc82ff6745d8fb4b714d0f","page_id":"C124922975:10","page_url":"https://archive.org/details/C124922975/page/n9","statement_kind":"finding","subject_label":"Additional seismic work at City Hall","summary":"Costs of an additional seismic work at City Hall have been required beyond the initial bond allocation.","property":"cost_usd","value_text":"$30,968,000","value_num":30968000.0,"unit":"USD","t_from":"1997","quote":"As shown in Attachment 1, costs of an additional $30,968,000 of_seismic related work","place_label":"City Hall","place_precision":"building","place_id":"qipu:sf/place/landmark/sf-city-hall","resolved_by":"place links file","anchor":"s-7d50add229fc","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"Board of Supervisors Budget Analyst","stance":"own_position","speaker_evidence":"Memo to Finance Committee; As shown in Attachment 1, costs of an additional"},{"claim_id":"c:900b277851b0541c35b07853ad7981f3","page_id":"C124922975:10","page_url":"https://archive.org/details/C124922975/page/n9","statement_kind":"proposal","subject_label":"Supplemental appropriation for City Hall project","summary":"The proposed supplemental appropriation would appropriate 12 million dollars of 1990 ESP2 bond interest earnings.","property":"proposes","value_text":"$25,192,702","value_num":25192702.0,"unit":"USD","t_from":"1997","quote":"the proposed $25,192,702 supplemental appropriation would appropriate $12 million of 1990 ESP2 Bond interest earnings","place_label":"City Hall","place_precision":"building","place_id":"qipu:sf/place/landmark/sf-city-hall","resolved_by":"place links file","anchor":"s-900b277851b0","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"Board of Supervisors Budget Analyst","stance":"own_position","speaker_evidence":"In summary, the proposed $25,192,702 supplemental appropriation would appropriate"},{"claim_id":"c:9b066dea36858cd48ae3408464dae022","page_id":"C124922975:10","page_url":"https://archive.org/details/C124922975/page/n9","statement_kind":"finding","subject_label":"Extended overhead construction contractor costs","summary":"Mr. [name withheld] says non-approval would cost about 575,000 dollars per month in extended overhead.","property":"cost_usd","value_text":"$575,000 per month","value_num":575000.0,"unit":"USD","t_from":"1997","quote":"incurring approximately $575,000 per month in extended overhead construction contractor costs","place_label":"City Hall","place_precision":"building","place_id":"qipu:sf/place/landmark/sf-city-hall","resolved_by":"place links file","anchor":"s-9b066dea3685","shown":false,"hidden":"another_body","part":"main_text","speaker":"another_body","speaker_role":"Project Manager for the City Hall Project, Department of Public Works, as report","stance":"quotes_to_report","speaker_evidence":"accordings=to™. Mr. irons, such as incurring approximately $575,000 per month"},{"claim_id":"c:9d060a7deb8ece33c0cf30db4e89e632","page_id":"C124922975:10","page_url":"https://archive.org/details/C124922975/page/n9","statement_kind":"finding","subject_label":"Total monthly additional costs if funds not approved","summary":"Mr. [name withheld] estimates total additional costs of about 1,245,000 dollars per month if funds are not approved.","property":"cost_usd","value_text":"$1,245,000 per month","value_num":1245000.0,"unit":"USD","t_from":"1997","quote":"for a total of approximately $1,245,000 per month of additional costs","place_label":"City Hall","place_precision":"building","place_id":"qipu:sf/place/landmark/sf-city-hall","resolved_by":"place links file","anchor":"s-9d060a7deb8e","shown":false,"hidden":"another_body","part":"main_text","speaker":"another_body","speaker_role":"Project Manager for the City Hall Project, Department of Public Works, as report","stance":"quotes_to_report","speaker_evidence":"for a total of approximately $1,245,000 per month of additional costs"},{"claim_id":"c:c6678b5b68d1c9c8dc445e9982d761ad","page_id":"C124922975:10","page_url":"https://archive.org/details/C124922975/page/n9","statement_kind":"finding","subject_label":"Initial seismic bond allocation for City Hall","summary":"The initial City Hall seismic allocation was 180.7 million dollars in the 1990 ESP2 bond.","property":"other","value_text":"$180.7 million","value_num":180700000.0,"unit":"USD","date_printed":"1990","t_from":"1990","quote":"beyond the initial $180.7 million allocated in the 1990 ESP2 General Obligation Bond","place_label":"City Hall","place_precision":"building","place_id":"qipu:sf/place/landmark/sf-city-hall","resolved_by":"place links file","anchor":"s-c6678b5b68d1","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"Board of Supervisors Budget Analyst","stance":"own_position","speaker_evidence":"beyond the initial $180.7 million allocated in the 1990 ESP2 General Obligation Bond"},{"claim_id":"c:1b77f9bb630821d280bfa30d058bda44","page_id":"C124922975:11","page_url":"https://archive.org/details/C124922975/page/n10","statement_kind":"finding","subject_label":"Use of 1995 non-seismic bond funds for seismic work","summary":"The City Attorney's Office has determined that 1995 non-seismic bond funds can be used to fund seismic projects.","property":"other","t_from":"1997","quote":"The City Attorney’s Office has determined that the 1995 non-seismic bond funds can be used to fund seismic projects","place_label":"City Hall","place_precision":"building","place_id":"qipu:sf/place/landmark/sf-city-hall","resolved_by":"place links file","anchor":"s-1b77f9bb6308","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"Budget Analyst, reporting the City Attorney's determination","stance":"quotes_to_report","speaker_evidence":"The City Attorney's Office has determined that"},{"claim_id":"c:25f3eb94ce4497a353309cda20142cad","page_id":"C124922975:11","page_url":"https://archive.org/details/C124922975/page/n10","statement_kind":"finding","subject_label":"Additional non-seismic improvements without full funding","summary":"Attachment 3 identifies 47,670,481 dollars of additional non-seismic improvements lacking sufficient funding.","property":"cost_usd","value_text":"$47,670,481","value_num":47670481.0,"unit":"USD","t_from":"1997","quote":"Attachment 3 identifies total costs of $47,670,481 of additional non-seismic improvements, for which DPW does not currently have sufficient funding","place_label":"City Hall","place_precision":"building","place_id":"qipu:sf/place/landmark/sf-city-hall","resolved_by":"place links file","anchor":"s-25f3eb94ce44","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Attachment 3 identifies total costs of"},{"claim_id":"c:26461777594fba4b3e899d5ea661fb05","page_id":"C124922975:11","page_url":"https://archive.org/details/C124922975/page/n10","statement_kind":"finding","subject_label":"Total estimated City Hall project cost","summary":"The total estimated cost for the City Hall Project is 292,734,811 dollars including seismic and non-seismic work.","property":"cost_usd","value_text":"$292,734,811","value_num":292734811.0,"unit":"USD","t_from":"1997","quote":"The total estimated cost for the City Hall Project is $292,734,811, including both seismic and non-seismic improvements","place_label":"City Hall","place_precision":"building","place_id":"qipu:sf/place/landmark/sf-city-hall","resolved_by":"place links file","anchor":"s-26461777594f","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"The total estimated cost for the City Hall Project is"},{"claim_id":"c:3ccca1a3420c88bce29631bc43b6a3c8","page_id":"C124922975:11","page_url":"https://archive.org/details/C124922975/page/n10","statement_kind":"finding","subject_label":"Remaining funding shortfall for non-seismic improvements","summary":"The remaining shortfall for non-seismic improvements would total 22,477,779 dollars after the supplemental appropriation.","property":"cost_usd","value_text":"$22,477,779","value_num":22477779.0,"unit":"USD","t_from":"1997","quote":"the remaining shortfall to complete these non-seismic improvements would total $22,477,779","place_label":"City Hall","place_precision":"building","place_id":"qipu:sf/place/landmark/sf-city-hall","resolved_by":"place links file","anchor":"s-3ccca1a3420c","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"the remaining shortfall to complete these non-seismic improvements would total"},{"claim_id":"c:95048e844b230915ce68364d47d3a103","page_id":"C124922975:11","page_url":"https://archive.org/details/C124922975/page/n10","statement_kind":"proposal","subject_label":"Federal Hazard Mitigation grant application","summary":"Mr. [name withheld] is submitting an application for 55 million dollars of federal Hazard Mitigation grant funds.","property":"other","value_text":"$55 million","value_num":55000000.0,"unit":"USD","t_from":"1997","quote":"Mr. [name withheld] is currently submitting an application for $55 million of Federal Hazard Mitigation grant funds","place_label":"City Hall","place_precision":"building","place_id":"qipu:sf/place/landmark/sf-city-hall","resolved_by":"place links file","anchor":"s-95048e844b23","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"Budget Analyst, reporting DPW's grant application by [name]","stance":"quotes_to_report","speaker_evidence":"Mr. [name] is currently submitting an application for $55 million"},{"claim_id":"c:e95c88887e497426de32b60daa07adcb","page_id":"C124922975:11","page_url":"https://archive.org/details/C124922975/page/n10","statement_kind":"background","subject_label":"1995 Proposition A bond authority","summary":"The official digest for the 1995 Proposition A bonds stated the City could borrow 63,590,000 dollars for other City Hall improvements.","property":"other","value_text":"$63,590,000","value_num":63590000.0,"unit":"USD","date_printed":"1995","t_from":"1995","quote":"Proposition A will allow the City to borrow $63,590,000 by issuing general obligation bonds to make other improvements","place_label":"City Hall","place_precision":"building","place_id":"qipu:sf/place/landmark/sf-city-hall","resolved_by":"place links file","anchor":"s-e95c88887e49","shown":false,"hidden":"another_body","part":"main_text","speaker":"another_body","speaker_role":"official digest for the 1995 Proposition A bonds","stance":"quotes_to_report","speaker_evidence":"the official digest for the 1995 Proposition A non-seismic [name] stated","links":[{"show_target_kind":"ballot measure","show_target_id":"ballot/1995-11-A","show_url":"https://data.qipu.org/usa/san-francisco/records/instruments/ballot/1995-11-A/"}]},{"claim_id":"c:ec55f78591b5e996361a154888d43ec5","page_id":"C124922975:11","page_url":"https://archive.org/details/C124922975/page/n10","statement_kind":"finding","subject_label":"Use of 1990 seismic bonds for non-seismic work","summary":"The 1990 seismic bonds cannot be used to fund non-seismic improvements to City Hall.","property":"other","t_from":"1997","quote":"the 1990 seismic bonds cannot be used to fund non-seismic improvements to City Hall","place_label":"City Hall","place_precision":"building","place_id":"qipu:sf/place/landmark/sf-city-hall","resolved_by":"place links file","anchor":"s-ec55f78591b5","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"the 1990 seismic bonds cannot be used to fund non-seismic improvements"},{"claim_id":"c:fc0c37437f2ec8727ee41c6b73b541d9","page_id":"C124922975:11","page_url":"https://archive.org/details/C124922975/page/n10","statement_kind":"proposal","subject_label":"Reimbursement of 1995 bond monies used for seismic work","summary":"The proposed supplemental appropriation would reimburse 1995 Proposition A non-seismic bond monies used for seismic projects.","property":"proposes","value_text":"$25,192,702","value_num":25192702.0,"unit":"USD","t_from":"1997","quote":"the proposed $25,192,702 supplemental appropriation would be used to reimburse those 1995 Proposition A non-seismic bond monies that were used to fund seismic projects","place_label":"City Hall","place_precision":"building","place_id":"qipu:sf/place/landmark/sf-city-hall","resolved_by":"place links file","anchor":"s-fc0c37437f2e","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"the proposed $25,192,702 supplemental appropriation would be used to reimburse","links":[{"show_target_kind":"ballot measure","show_target_id":"ballot/1995-11-A","show_url":"https://data.qipu.org/usa/san-francisco/records/instruments/ballot/1995-11-A/"}]},{"claim_id":"c:0a4b60c9061971507500827d68b64ebc","page_id":"C124922975:12","page_url":"https://archive.org/details/C124922975/page/n11","statement_kind":"proposal","subject_label":"Event revenue from public spaces","summary":"Mr. [name withheld] estimates event revenues of 260,000 dollars per year for one event per week.","property":"other","value_text":"$260,000 per year","value_num":260000.0,"unit":"USD","t_from":"1997","quote":"revenues of $260,000 per year for one event per week or as much as $1,000,000 a year for four events per week","place_label":"City Hall","place_precision":"building","place_id":"qipu:sf/place/landmark/sf-city-hall","resolved_by":"place links file","anchor":"s-0a4b60c90619","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"Board of Supervisors Budget Analyst","stance":"quotes_to_report","speaker_evidence":"According to Mr. Irons, \"the building will have two grand public spaces\"; Irons states revenues could be realized from fees for event use of light courts.</br>"},{"claim_id":"c:2fc06dd1b94a822b631570eeec93f502","page_id":"C124922975:12","page_url":"https://archive.org/details/C124922975/page/n11","statement_kind":"finding","subject_label":"Federal grant deadline for shortfall","summary":"DPW will likely seek General Fund monies if it does not secure at least 22 million dollars of federal grants by February 1, 1998.","property":"other","value_text":"$22 million","value_num":22000000.0,"unit":"USD","date_printed":"February 1, 1998","t_from":"1998","quote":"least $22 million by February 1, 1998, DPW will likely be seeking General Fund monies","place_label":"City Hall","place_precision":"building","place_id":"qipu:sf/place/landmark/sf-city-hall","resolved_by":"place links file","anchor":"s-2fc06dd1b94a","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Budget Analyst memo text; DPW will likely be seeking General Fund monies to complete additional improvements"},{"claim_id":"c:d2c8924140d4db9268790a730b02671b","page_id":"C124922975:12","page_url":"https://archive.org/details/C124922975/page/n11","statement_kind":"proposal","subject_label":"City employees relocated to City Hall under plan","summary":"The proposed plan would relocate a total of 749 City employees to City Hall.","property":"proposes","value_text":"749","value_num":749.0,"unit":"persons","t_from":"1997","quote":"The proposed plan indicates that a total of 749 City employees would be relocated to City Hall","place_label":"City Hall","place_precision":"building","place_id":"qipu:sf/place/landmark/sf-city-hall","resolved_by":"place links file","anchor":"s-d2c8924140d4","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"quotes_to_report","speaker_evidence":"The proposed plan indicates that a total of 749 City employees would be relocated"},{"claim_id":"c:e1f37374f84d7dc13940e04346f2e8a0","page_id":"C124922975:12","page_url":"https://archive.org/details/C124922975/page/n11","statement_kind":"finding","subject_label":"City Hall employees before renovation","summary":"Prior to renovation a total of 1,306 City employees were located in City Hall.","property":"population","value_text":"1,306","value_num":1306.0,"unit":"persons","t_from":"1997","quote":"Prior to the renovation of City Hall, a total of 1,306 City employees were located in City Hall, including temporary help","place_label":"City Hall","place_precision":"building","place_id":"qipu:sf/place/landmark/sf-city-hall","resolved_by":"place links file","anchor":"s-e1f37374f84d","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Prior to the renovation of City Hall, a total of 1,306 City employees were located"},{"claim_id":"c:f72b1ee5da228f20f451dddaead93d42","page_id":"C124922975:12","page_url":"https://archive.org/details/C124922975/page/n11","statement_kind":"finding","subject_label":"Lease cost for private office space","summary":"Mr. [name withheld] says lease costs for relocated employees will be about 4,500 dollars per year per employee.","property":"cost_usd","value_text":"$4,500 per year per employee","value_num":4500.0,"unit":"USD","t_from":"1997","quote":"it will cost approximately $4,500 per year per employee","place_label":"City Hall","place_precision":"building","place_id":"qipu:sf/place/landmark/sf-city-hall","resolved_by":"place links file","anchor":"s-f72b1ee5da22","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"Board of Supervisors Budget Analyst","stance":"quotes_to_report","speaker_evidence":"According to Mr. Irons, it will cost approximately $4,500 per year per employee"},{"claim_id":"c:bea4654b7b3b488cf6ae85439532c1cd","page_id":"C124922975:16","page_url":"https://archive.org/details/C124922975/page/n15","statement_kind":"finding","subject_label":"Use of 1996A bonds for seismic projects","summary":"The City Attorney advises that 1996A bond proceeds may be used to fund seismic projects at City Hall.","property":"other","date_printed":"December 11, 1997","t_from":"1997","quote":"1996A Bond proceeds may be used to fund seismic projects at City Hall","place_label":"City Hall","place_precision":"building","place_id":"qipu:sf/place/landmark/sf-city-hall","resolved_by":"place links file","anchor":"s-bea4654b7b3b","shown":false,"hidden":"attachment","part":"attachment","speaker":"letter_writer","speaker_role":"Deputy City Attorney, Office of the City Attorney","stance":"own_position","speaker_evidence":"Attachment 2 ... [name] ... Michelle W. Sexton Deputy City Attorney"},{"claim_id":"c:3c5cd37e4b5ca08cdd33afe34995de4e","page_id":"C124922975:17","page_url":"https://archive.org/details/C124922975/page/n16","statement_kind":"proposal","subject_label":"Flexible space alterations to City Hall","summary":"The attachment proposes a major redesign of all spaces to permit modern functioning of department spaces.","property":"proposes","t_from":"1997","quote":"Flexible Space Alterations A major redesign of all spaces, respecting the historic fabric, to permit proper modern functioning of department spaces","place_label":"City Hall","place_precision":"building","place_id":"qipu:sf/place/landmark/sf-city-hall","resolved_by":"place links file","anchor":"s-3c5cd37e4b5c","shown":false,"hidden":"attachment","part":"attachment","speaker":"issuer","speaker_role":"Board of Supervisors Budget Analyst (attachment listing desired enhancements)","stance":"own_position","speaker_evidence":"Attachment 3 Page 1 of 2 CITY HALL SUPPLEMENTAL APPROPRIATION ATTACHMENT B [name]"},{"claim_id":"c:7e7bfc2b201671ba450146aecfb7dfdf","page_id":"C124922975:17","page_url":"https://archive.org/details/C124922975/page/n16","statement_kind":"proposal","subject_label":"Historic preservation reconstruction and renovation","summary":"The attachment proposes reconstruction, renovation and refurbishment beyond the scope allocated in Proposition A.","property":"proposes","t_from":"1997","quote":"Reconstruction, renovation and refurbishment, beyond the scope allocated in Proposition A of millwork, cabinets, counters, the dome, doors and hardware","place_label":"City Hall","place_precision":"building","place_id":"qipu:sf/place/landmark/sf-city-hall","resolved_by":"place links file","anchor":"s-7e7bfc2b2016","shown":false,"hidden":"attachment","part":"attachment","speaker":"issuer","speaker_role":"Board of Supervisors Budget Analyst (attachment listing desired enhancements)","stance":"own_position","speaker_evidence":"ATTACHMENT B Desired building enhancements not funded by Proposition A","links":[{"show_target_kind":"ballot measure","show_target_id":"ballot/1995-11-A","show_url":"https://data.qipu.org/usa/san-francisco/records/instruments/ballot/1995-11-A/"}]},{"claim_id":"c:3496c336bdb82a4485b10eb4dbfc4866","page_id":"C124922975:18","page_url":"https://archive.org/details/C124922975/page/n17","statement_kind":"proposal","subject_label":"Work volume if the enhancements are funded","summary":"The attachment projects that, if funded as proposed, the work volume will have doubled with no extension of time.","property":"proposes","value_text":"doubled work volume","t_from":"1997","quote":"will have doubled with no extension of time","place_label":"City Hall","place_precision":"building","place_id":"qipu:sf/place/landmark/sf-city-hall","resolved_by":"place links file","anchor":"s-3496c336bdb8","shown":false,"hidden":"attachment","part":"attachment","speaker":"unclear","speaker_role":"consultant or project team writing Attachment B","stance":"unclear","speaker_evidence":"Attachment “B” Desired building enhancements not funded by Proposition “A”"},{"claim_id":"c:5f637df4046811ba59446060585227d9","page_id":"C124922975:18","page_url":"https://archive.org/details/C124922975/page/n17","statement_kind":"finding","subject_label":"Construction bidding climate","summary":"The attachment states there is a much less competitive bidding climate than 2 1/2 years ago.","property":"finding","value_text":"much less competitive bidding climate","t_from":"1997","quote":"Due to the enormous amount of construction in California, there is a much less compettive bidding climate now than 2 1/2 years ago","anchor":"s-5f637df40468","shown":false,"hidden":"attachment","part":"attachment","speaker":"unclear","stance":"unclear","speaker_evidence":"Attachment 3 Page 2 of 2 City Hall Supplemental Attachment “B”"},{"claim_id":"c:9f734f06680bcd4e88d7c4481d816be1","page_id":"C124922975:18","page_url":"https://archive.org/details/C124922975/page/n17","statement_kind":"finding","subject_label":"Total cost of work defined as desired enhancements","summary":"The attachment states the total cost of the work defined above, which is the difference from the original Proposition A scope.","property":"cost_usd","value_text":"$47,670,481","value_num":47670481.0,"unit":"USD","date_printed":"November 1997","t_from":"1997","quote":"TOTAL COST OF WORK DEFINED ABOVE: $47,670,481","place_label":"City Hall","place_precision":"building","place_id":"qipu:sf/place/landmark/sf-city-hall","resolved_by":"place links file","anchor":"s-9f734f06680b","shown":false,"hidden":"attachment","part":"attachment","speaker":"unclear","stance":"unclear","speaker_evidence":"[name]: $47,670,481","links":[{"show_target_kind":"ballot measure","show_target_id":"ballot/1995-11-A","show_url":"https://data.qipu.org/usa/san-francisco/records/instruments/ballot/1995-11-A/"}]},{"claim_id":"c:08f996f49f44850bcd430a24645a6a8c","page_id":"C124922975:19","page_url":"https://archive.org/details/C124922975/page/n18","statement_kind":"proposal","subject_label":"Prioritized list if federal and state funding is unavailable","summary":"The Project Manager says he will submit a prioritized list of work items if federal and state funding is not available.","property":"proposes","value_text":"prioritized list of items of work","date_printed":"February 1, 1998","t_from":"1998","quote":"Should anticipated Federal/State funding of at least $22 million dollars not be clearly available by February 1, 1998","place_label":"City Hall","place_precision":"building","place_id":"qipu:sf/place/landmark/sf-city-hall","resolved_by":"place links file","anchor":"s-08f996f49f44","shown":false,"hidden":"attachment","part":"attachment","speaker":"issuer","speaker_role":"Department of Public Works project manager","stance":"own_position","speaker_evidence":"Attachment 4 ... [name] ... Anthony E. Irons Project Manager"},{"claim_id":"c:d19d14dc0e6970bc3618a13320ff513b","page_id":"C124922975:19","page_url":"https://archive.org/details/C124922975/page/n18","statement_kind":"proposal","subject_label":"Construction plan after the $25.19 million appropriation","summary":"The Project Manager states he will proceed with construction as presently designed after the appropriation.","property":"proposes","value_text":"proceed with construction as presently designed","t_from":"1997","quote":"will proceed with construction as presently designed consistent with all previous directions","place_label":"City Hall","place_precision":"building","place_id":"qipu:sf/place/landmark/sf-city-hall","resolved_by":"place links file","anchor":"s-d19d14dc0e69","shown":false,"hidden":"attachment","part":"attachment","speaker":"issuer","speaker_role":"Department of Public Works project manager","stance":"own_position","speaker_evidence":"I will convey to the Board of Supervisors ... I will proceed with construction as presently designed"},{"claim_id":"c:f9e8f2ca0dac426a89d9f8294dd885d9","page_id":"C124922975:21","page_url":"https://archive.org/details/C124922975/page/n20","statement_kind":"finding","subject_label":"Pre-relocation occupants of City Hall","summary":"The statistics table reports a total of 1189 pre-relocation occupants, or 1306 including temporary help and volunteers.","property":"other","value_text":"1189 (1306 with temporary)","value_num":1189.0,"unit":"persons","t_from":"1997","quote":"TOTAL (w/temp) 1189 (1306)","place_label":"City Hall","place_precision":"building","place_id":"qipu:sf/place/landmark/sf-city-hall","resolved_by":"place links file","anchor":"s-f9e8f2ca0dac","shown":false,"hidden":"table","part":"table","speaker":"issuer","speaker_role":"Department of Public Works, Bureau of Construction Management","stance":"own_position","speaker_evidence":"Attachment 6 pre-relocation occupants table; TOTAL (w/temp) 1189 (1306)"},{"claim_id":"c:0b0cfa00b1ff3e182580297fc8d63ad7","page_id":"C124922975:25","page_url":"https://archive.org/details/C124922975/page/n24","statement_kind":"finding","subject_label":"Subcontracting participation","summary":"Minority business subcontract share is 22.1% against a goal of 20%; women business share is 7.9% against a goal of 6%.","property":"other","value_text":"MBE 22.1%, WBE 7.9%","value_num":22.1,"unit":"percent","t_from":"1997","quote":"MBE: 22.1% WBE: 7.9% MBE GOAL: 20% WBE GOAL: 6%","anchor":"s-0b0cfa00b1ff","shown":false,"hidden":"attachment","part":"attachment","speaker":"another_body","speaker_role":"Huber, Hunt & Nichols, Inc., a subsidiary of The Hunt Corporation (contractor)","stance":"own_position","speaker_evidence":"Attachment _/ Huber, Hunt & Nichols, Inc. [name]"},{"claim_id":"c:2460748736c28cb32532df698452edea","page_id":"C124922975:26","page_url":"https://archive.org/details/C124922975/page/n25","statement_kind":"cites_decision","subject_label":"City Hall design concept","summary":"The Finance Committee approved the current City Hall design concept.","property":"approved","value_text":"approved","date_printed":"July 17, 1996","t_from":"1996","quote":"The current design concept, presented to and approved by the Finance Committee on July 17, 1996, envisions fairly major alterations to many spaces","place_label":"City Hall","place_precision":"building","place_id":"qipu:sf/place/landmark/sf-city-hall","resolved_by":"place links file","anchor":"s-2460748736c2","shown":false,"hidden":"attachment","part":"attachment","speaker":"another_body","speaker_role":"Department of Public Works","stance":"own_position","speaker_evidence":"The current design concept, presented to and approved by the Finance Committee"},{"claim_id":"c:44b6332a3b0815f6a26578f0747beab7","page_id":"C124922975:26","page_url":"https://archive.org/details/C124922975/page/n25","statement_kind":"proposal","subject_label":"Project schedule","summary":"The total project is expected to open by January 2, 1999.","property":"other","value_text":"January 2, 1999","date_printed":"January 2, 1999","t_from":"1999","quote":"The total project is currently on schedule, which means it will be open by January 2, 1999.","place_label":"City Hall","place_precision":"building","place_id":"qipu:sf/place/landmark/sf-city-hall","resolved_by":"place links file","anchor":"s-44b6332a3b08","shown":false,"hidden":"attachment","part":"attachment","speaker":"another_body","speaker_role":"Department of Public Works","stance":"own_position","speaker_evidence":"[name] total project is currently on schedule"},{"claim_id":"c:5fb995e7416b02cc71f4a74341136eff","page_id":"C124922975:26","page_url":"https://archive.org/details/C124922975/page/n25","statement_kind":"proposal","subject_label":"Additional seismic funding request","summary":"The Department of Public Works requests $25.19 million (≈ $52.9 million in 2026 dollars) for seismic related repairs to City Hall.","property":"proposes","value_text":"$25.19 million","value_num":25190000.0,"unit":"USD","t_from":"1997","quote":"Attached is a detailed listing of the $25.19 million we need to make seismic related repairs to City Hall (see attachment “A”).","place_label":"City Hall","place_precision":"building","place_id":"qipu:sf/place/landmark/sf-city-hall","resolved_by":"place links file","anchor":"s-5fb995e7416b","shown":false,"hidden":"attachment","part":"attachment","speaker":"another_body","speaker_role":"Department of Public Works","stance":"own_position","speaker_evidence":"[name] is a detailed listing of the $25.19 million"},{"claim_id":"c:71ecdb53a495286bb3f5092786d022b9","page_id":"C124922975:26","page_url":"https://archive.org/details/C124922975/page/n25","statement_kind":"finding","subject_label":"Seismic funding for City Hall","summary":"The seismic funds originally allocated to City Hall were insufficient for a complete, functioning, occupiable building.","property":"finding","value_text":"insufficient","t_from":"1997","quote":"the seismic funds originally allocated to the City Hall project were insufficient to provide a complete, functioning, occupiable building.","place_label":"City Hall","place_precision":"building","place_id":"qipu:sf/place/landmark/sf-city-hall","resolved_by":"place links file","anchor":"s-71ecdb53a495","shown":false,"hidden":"attachment","part":"attachment","speaker":"another_body","speaker_role":"Department of Public Works","stance":"own_position","speaker_evidence":"The specific reasons this project needs additional funding are: 1. As previously noted"},{"claim_id":"c:98e38e2173c8671e2c14f7814e67fd38","page_id":"C124922975:26","page_url":"https://archive.org/details/C124922975/page/n25","statement_kind":"cites_decision","subject_label":"Remaining Proposition A funds","summary":"The Finance Committee released the remaining Proposition A funds for this project.","property":"other","value_text":"released","date_printed":"September 1997","t_from":"1997","quote":"In September of 1997, the Finance Committee released the remaining Proposition “A” funds for this project.","place_label":"City Hall","place_precision":"building","place_id":"qipu:sf/place/landmark/sf-city-hall","resolved_by":"place links file","anchor":"s-98e38e2173c8","shown":false,"hidden":"attachment","part":"attachment","speaker":"another_body","speaker_role":"Department of Public Works","stance":"own_position","speaker_evidence":"[name] of 1997, the Finance Committee released the remaining Proposition A funds","links":[{"show_target_kind":"ballot measure","show_target_id":"ballot/1995-11-A","show_url":"https://data.qipu.org/usa/san-francisco/records/instruments/ballot/1995-11-A/"}]},{"claim_id":"c:9ecb9e91951e400ddab41f816213635e","page_id":"C124922975:26","page_url":"https://archive.org/details/C124922975/page/n25","statement_kind":"finding","subject_label":"Proposition A work scope","summary":"Proposition A work funded basic patching, painting and carpeting with the intent of relocating occupants back where they came from.","property":"finding","value_text":"neither desirable nor practical","t_from":"1997","quote":"The Proposition “A” work funded basic patching, painting, carpeting for existing spaces with the intent of relocating everyone, except the courts, back exactly where they came from.","place_label":"City Hall","place_precision":"building","place_id":"qipu:sf/place/landmark/sf-city-hall","resolved_by":"place links file","anchor":"s-9ecb9e91951e","shown":false,"hidden":"attachment","part":"attachment","speaker":"another_body","speaker_role":"Department of Public Works","stance":"own_position","speaker_evidence":"The Proposition A work funded basic patching, painting, carpeting","links":[{"show_target_kind":"ballot measure","show_target_id":"ballot/1995-11-A","show_url":"https://data.qipu.org/usa/san-francisco/records/instruments/ballot/1995-11-A/"}]},{"claim_id":"c:d7b005f5c6d0b5acd0b01dab021ae100","page_id":"C124922975:26","page_url":"https://archive.org/details/C124922975/page/n25","statement_kind":"finding","subject_label":"Construction bids","summary":"Bids have been coming in approximately 10% more than estimated.","property":"other","value_text":"approximately 10% more than estimated","value_num":10.0,"unit":"percent","t_from":"1997","quote":"As a result, bids have been coming in approximately 10% more than estimated.","anchor":"s-d7b005f5c6d0","shown":false,"hidden":"attachment","part":"attachment","speaker":"another_body","speaker_role":"Department of Public Works","stance":"own_position","speaker_evidence":"bids have been coming in approximately 10% more than estimated"}]}