{"note":"Statements read from one scanned government report in the IGS library collection on the Internet Archive. Each statement has a verbatim quote found on its page (quote, page_url). The summary and subject_label of each statement were written by a model (Claude Haiku 5.5) and can be wrong: read the page before quoting. At most 20 selected pages of a report were read. Keys are the column names of the tables igs_reports and igs_claims; a column that is null for a statement is left out, and columns with one value for every statement of this report are given once under same_for_every_statement. \"[name withheld]\" stands where the release withholds a name; the site's page guard withholds a few more in reports after 1951, so a cell here can differ from the table; for a few reports prepared_by and creator are left out. A statement's links to the Board record are under links (show_target_kind: decision, instrument or ballot measure; show_target_id; show_url); they replace the table's decision_id and instrument_id, which are left out. place_id, place_label and place_precision come from a corrected place match where there is one. part, speaker, speaker_role, stance and speaker_evidence say who is speaking: a model (Claude Haiku 5.5) read each page and its context and can be wrong. part: main_text, attachment, appendix, letter, comment, response, table or cover_or_contents; speaker: issuer, another_body, letter_writer or unclear; speaker_role: a role or organisation, never a personal name; stance: own_position, quotes_to_dispute, quotes_to_report, restates_to_reject or unclear. The report page shows a statement only when speaker is issuer, part is main_text or appendix, and stance is own_position or quotes_to_report; hidden gives the part, the speaker or the stance of the others. ","release":"v0.9.2","licence":"CC0-1.0","slug":"c124924113","url":"https://data.qipu.org/usa/san-francisco/reports/c124924113/","statement_url":"https://data.qipu.org/usa/san-francisco/reports/c124924113/#{anchor}","tables":{"igs_reports":"https://tiles.qipu.org/data/releases/v0.9.2/parquet/igs_reports.parquet","igs_claims":"https://tiles.qipu.org/data/releases/v0.9.2/parquet/igs_claims.parquet"},"report":{"report_id":"C124924113","source_id":"C124924113","title":"Downtown San Francisco conservation and development planning program : Phase 1 study : summary","year":1979,"n_pages":6,"creator":null,"source_url":"https://archive.org/details/C124924113","issuer":"City and County of San Francisco, Department of City Planning","issuer_type":"government","gov_level":"city_county","prepared_by":"Department of City Planning staff","doc_kind":"study","jurisdiction":"San Francisco","jurisdiction_id":"sf","city":"sf","issuer_by":"model","doc_kind_by":"model","jurisdiction_by":"model","run_id":"igs-labels-rules+haiku55-cli-2026-10-23"},"pages_with_statements":4,"statements_total":16,"statements_by_kind":{"finding":7,"proposal":4,"cites_decision":0,"background":5},"same_for_every_statement":{"source_id":"C124924113","source_url":"https://archive.org/details/C124924113","source_label":"IGS library: Downtown San Francisco conservation and development planning program : Phase 1 study : summary","report_year":1979,"issuer":"City and County of San Francisco, Department of City Planning","issuer_type":"government","doc_kind":"study","t_precision":"year","status":"extracted","claim_kind":"observation","extraction_table":"igs_claims","run_id":"igs-sf-pages-v2-haiku55-batch-2026-10-23","city":"sf","prompt_version":"igs-page-v2-2026-10-23"},"summary":{"what":"A study by the Department of City Planning, prepared by consultants, that sets out the first phase of the Downtown San Francisco planning program and proposes the scope of later phases and temporary controls.","next":"In March 1985, the Board sent a draft ordinance limiting TDR transfers and office development in downtown C-3-0 districts to the Planning Commission for hearing.","next_decision":"qipu:sf/decision/journaljanjuneofproceed80sanfrich:360/1","figures":[{"label":"Projected growth","value":"about 50 million square feet","claim_ids":["c:af55dd9710a7b84a335579b997e38b69"]},{"label":"Housing demand","value":"17,200 new units by 1985","claim_ids":["c:e10b98059615cb96876ac1323eaee405"]},{"label":"Commuter movement","value":"25 percent short-term (1985); 60 percent long-term (2000)","claim_ids":["c:46a296107da36c8e4fde2ea85bbf8088"]}],"main_points":["c:6080ddf81988d66551c9081ec5dc439c","c:7c7c146dc16723dfba033192de50d6bc","c:f13fc4e4fc258313df2d25f507a0f4f8"],"board_decisions_after":["qipu:sf/decision/journaljanjuneofproceed80sanfrich:360/1","qipu:sf/decision/journalofjanjuneproceed79sanfrich:26/2","qipu:sf/decision/journaljanjuneofproceed80sanfrich:506/4","qipu:sf/decision/journaljanjuneofproceed80sanfrich:605/1","qipu:sf/decision/journaljanjuneofproceed80sanfrich:605/4","qipu:sf/decision/journaljanjuneofproceed80sanfrich:649/2","qipu:sf/decision/journaljanjuneofproceed80sanfrich:722/1","qipu:sf/decision/journalofjanjuneproceed79sanfrich:496/3"],"board_decisions_before":["qipu:sf/decision/journaljulydecofproceed74sanfrich|g876","qipu:sf/decision/journaljulydecofproceed74sanfrich|g1711"],"made_by":"A model (Claude Haiku 5.5) wrote the lead and picked the figures, main points and later Board decisions from the statements, from a second reading of the report's summary and cost pages, and from Board decisions dated 3 years before to 10 years after the report; every number it wrote was checked against them, and a figure must be about the report's own area or project."},"statements":[{"claim_id":"c:6080ddf81988d66551c9081ec5dc439c","page_id":"C124924113:1","page_url":"https://archive.org/details/C124924113/page/n0","statement_kind":"proposal","subject_label":"Phase 1 report scope and interim controls","summary":"The report proposes a scope of work for the remaining phases of the Downtown program and suggests temporary controls.","property":"proposes","value_text":"scope of work for remaining phases; temporary controls","t_from":"1979","quote":"It proposes a scope of work required for the remaining phases of the Downtown program, and suggests temporary controls to guide development","place_label":"Downtown San Francisco","anchor":"s-6080ddf81988","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"INTRODUCTION It proposes a scope of work required"},{"claim_id":"c:ab76ef9e30ffc2d4c217d50b1935cfb6","page_id":"C124924113:1","page_url":"https://archive.org/details/C124924113/page/n0","statement_kind":"background","subject_label":"Phase 1 report submission","summary":"Sedway/Cooke submitted its Phase 1 report to the Department of City Planning in early October 1979.","property":"event","value_text":"early October, 1979","date_printed":"early October, 1979","t_from":"1979","quote":"In early October, 1979, after two months of intensive analysis, the consulting firm of Sedway/Cooke submitted to the San Francisco Department of City Planning its report","anchor":"s-ab76ef9e30ff","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"quotes_to_report","speaker_evidence":"the consulting firm of Sedway/Cooke submitted to the San Francisco Department of City Planning"},{"claim_id":"c:19a1fbf444c84534ee5e1686926253d1","page_id":"C124924113:2","page_url":"https://archive.org/details/C124924113/page/n1","statement_kind":"background","subject_label":"Master Plan status","summary":"The Master Plan and Urban Design Plan are statements of broader city-wide policy and are not binding.","property":"other","value_text":"not binding","t_from":"1979","quote":"The Master Plan and the Urban Design Plan are statements of broader city-wide policy, and are not binding.","anchor":"s-19a1fbf444c8","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"The Master Plan and the Urban Design Plan are statements of broader city-wide policy"},{"claim_id":"c:23d4c7b4b5a65c1a46447c96fcc39e85","page_id":"C124924113:2","page_url":"https://archive.org/details/C124924113/page/n1","statement_kind":"background","subject_label":"Phase 1 funding","summary":"The Mayor and the Board of Supervisors funded Phase 1 of the Downtown program.","property":"other","value_text":"funded by the Mayor and the Board of Supervisors","t_from":"1979","quote":"Phase | of the San Francisco Downtown Conservation and Development Planning Program was funded by the Mayor and the Board of Supervisors.","anchor":"s-23d4c7b4b5a6","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Phase | of the San Francisco Downtown Conservation and Development Planning Program was funded"},{"claim_id":"c:29aef2f3c04888377e9d5fe032715dcd","page_id":"C124924113:2","page_url":"https://archive.org/details/C124924113/page/n1","statement_kind":"proposal","subject_label":"Final Downtown Plan","summary":"The final plan, expected to take about fifteen months, will set official public policy and comprehensive development regulations.","property":"proposes","value_text":"approximately fifteen months","value_num":15.0,"unit":"other","t_from":"1979","quote":"The final plan, to take approximately fifteen months to complete, will be a statement of official public policy arrived at after full public discussion","anchor":"s-29aef2f3c048","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"The final plan, to take approximately fifteen months to complete, will be a statement"},{"claim_id":"c:3e14c1bbdeaf1b82f11380f830faed2d","page_id":"C124924113:2","page_url":"https://archive.org/details/C124924113/page/n1","statement_kind":"background","subject_label":"Study area","summary":"The study covered the Financial District, Union Square, the Tenderloin, Civic Center and South of Market.","property":"other","value_text":"Financial District, Union Square, Tenderloin, Civic Center, South of Market","t_from":"1979","quote":"The study covered the Financial District, Union Square, the Tenderloin, Civic Center and South of Market areas.","place_label":"Financial District, Union Square, Tenderloin, Civic Center, South of Market","place_precision":"area","place_id":"qipu:sf/place/hood/financial-district-south-beach","resolved_by":"place links file","anchor":"s-3e14c1bbdeaf","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"The study covered the Financial District, Union Square, the Tenderloin"},{"claim_id":"c:2992dfba7916b6e873a398c66455ef93","page_id":"C124924113:3","page_url":"https://archive.org/details/C124924113/page/n2","statement_kind":"finding","subject_label":"Capacity under current regulations","summary":"Phase 1 analysis indicates that this growth could be accommodated in Downtown under current regulations.","property":"finding","value_text":"could be accommodated under current regulations","t_from":"1979","quote":"Phase | analysis indicates that this level of future growth could be accommodated in Downtown under current regulations.","place_label":"Downtown","anchor":"s-2992dfba7916","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"MAJOR FINDINGS. Phase | analysis indicates that this level"},{"claim_id":"c:2b7e2b91e96e04d180842522542c13d2","page_id":"C124924113:3","page_url":"https://archive.org/details/C124924113/page/n2","statement_kind":"finding","subject_label":"Carbon monoxide emissions","summary":"Downtown carbon monoxide emissions would increase by about 50 percent by 2000.","property":"other","value_text":"about 50 percent","value_num":50.0,"unit":"percent","date_printed":"2000","t_from":"2000","quote":"Carbon monoxide emissions in the Downtown area would increase by about 50 percent by the year 2000, because of increased traffic and slower driving speeds.","place_label":"Downtown area","anchor":"s-2b7e2b91e96e","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"MAJOR FINDINGS. Carbon monoxide emissions in the Downtown area"},{"claim_id":"c:46a296107da36c8e4fde2ea85bbf8088","page_id":"C124924113:3","page_url":"https://archive.org/details/C124924113/page/n2","statement_kind":"finding","subject_label":"Commuter movement","summary":"Commuter movement would increase by 25 percent short-term (1985) and 60 percent long-term (2000).","property":"finding","value_text":"25 percent short-term (1985); 60 percent long-term (2000)","value_num":25.0,"unit":"percent","date_printed":"1985, 2000","t_from":"1985","quote":"Commuter movement would increase enormously, by 25 percent short-term (1985) and 60 percent long-term (2000), requiring substantial transit improvements.","place_label":"Downtown","anchor":"s-46a296107da3","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"MAJOR FINDINGS. Commuter movement would increase enormously"},{"claim_id":"c:66911880ba5a74c17e391e95028e1c6c","page_id":"C124924113:3","page_url":"https://archive.org/details/C124924113/page/n2","statement_kind":"finding","subject_label":"Historic buildings","summary":"A share of historic and architecturally significant buildings would be demolished under current regulations.","property":"demolished","value_text":"about 1I5 percent","unit":"percent","t_from":"1979","quote":"about 1I5 percent of all such buildings would be demolished under current regulations.","place_label":"Downtown","anchor":"s-66911880ba5a","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Historic and architecturally significant structures would continue"},{"claim_id":"c:7c7c146dc16723dfba033192de50d6bc","page_id":"C124924113:3","page_url":"https://archive.org/details/C124924113/page/n2","statement_kind":"proposal","subject_label":"Interim controls","summary":"The report proposes temporary interim controls while the Downtown Plan is prepared.","property":"proposes","value_text":"temporary interim controls","t_from":"1979","quote":"However, while the Plan is being prepared, temporary \"interim\" controls are proposed.","place_label":"Downtown","anchor":"s-7c7c146dc167","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"NEXT STEPS. However, while the Plan is being prepared"},{"claim_id":"c:af55dd9710a7b84a335579b997e38b69","page_id":"C124924113:3","page_url":"https://archive.org/details/C124924113/page/n2","statement_kind":"finding","subject_label":"Projected Downtown building demand","summary":"A market demand is projected for about 50 million square feet of additional Downtown building space from 1979 to 2000.","property":"floor_area_sqft","value_text":"about 50 million square feet","value_num":50000000.0,"unit":"sqft","date_printed":"1979-2000","t_from":"1979","quote":"Between the years 1979 and 2000, a \"market demand\" is projected for about 50 million square feet of additional building space in Downtown.","place_label":"Downtown","anchor":"s-af55dd9710a7","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"MAJOR FINDINGS. Between the years 1979 and 2000"},{"claim_id":"c:e10b98059615cb96876ac1323eaee405","page_id":"C124924113:3","page_url":"https://archive.org/details/C124924113/page/n2","statement_kind":"finding","subject_label":"Housing demand from new employees","summary":"New Downtown employees would generate demand for 17,200 new housing units by 1985.","property":"units","value_text":"17,200 new units","value_num":17200.0,"unit":"units","date_printed":"1985","t_from":"1985","quote":"New Downtown employees would generate substantial housing demand--!7,200 new units for Downtown employees by 1985.","place_label":"Downtown","anchor":"s-e10b98059615","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"New Downtown employees would generate substantial housing demand"},{"claim_id":"c:e6e4bef5f5cb1f741a320d2d76066a16","page_id":"C124924113:3","page_url":"https://archive.org/details/C124924113/page/n2","statement_kind":"finding","subject_label":"Incremental costs versus revenues","summary":"Incremental costs of new Downtown development could exceed incremental revenues by as much as 25 percent.","property":"finding","value_text":"as much as 25 percent","value_num":25.0,"unit":"percent","t_from":"1979","quote":"Incremental costs for new Downtown development could exceed incremental revenues by as much as 25 percent.","place_label":"Downtown","anchor":"s-e6e4bef5f5cb","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Incremental costs for new Downtown development could exceed"},{"claim_id":"c:f13fc4e4fc258313df2d25f507a0f4f8","page_id":"C124924113:3","page_url":"https://archive.org/details/C124924113/page/n2","statement_kind":"proposal","subject_label":"Phase 2 and Phase 3 program","summary":"The consultants recommend a planning program with Phase 2 preparing the Downtown Plan and Phase 3 adopting it.","property":"proposes","value_text":"Phase 2 preparation; Phase 3 approval and adoption","t_from":"1979","quote":"The following figure illustrates the planning program for the Downtown Plan which the consultants have recommended. Phase | is complete","place_label":"Downtown","anchor":"s-f13fc4e4fc25","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"The following figure illustrates the planning program"},{"claim_id":"c:45f1cbf0f7bb16c4549765192a7fd41f","page_id":"C124924113:4","page_url":"https://archive.org/details/C124924113/page/n3","statement_kind":"background","subject_label":"Report availability","summary":"Copies of the full Phase 1 report are available for public review at the Department of City Planning and the Main Library.","property":"other","value_text":"100 Larkin Street; Main Library, Civic Center","t_from":"1979","quote":"Copies of the full Phase | report are available for public review at the Department of City Plarining, 100 Larkin Street, San Francisco and at the Main Library, Civic Center.","place_label":"100 Larkin Street","place_precision":"address","place_id":"qipu:sf/place/address/eas-282045","resolved_by":"place links file","anchor":"s-45f1cbf0f7bb","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Copies of the full Phase | report are available for public review at the Department of City Planning"}]}