{"note":"Statements read from one scanned government report in the IGS library collection on the Internet Archive. Each statement has a verbatim quote found on its page (quote, page_url). The summary and subject_label of each statement were written by a model (Claude Haiku 5.5) and can be wrong: read the page before quoting. At most 20 selected pages of a report were read. Keys are the column names of the tables igs_reports and igs_claims; a column that is null for a statement is left out, and columns with one value for every statement of this report are given once under same_for_every_statement. \"[name withheld]\" stands where the release withholds a name; the site's page guard withholds a few more in reports after 1951, so a cell here can differ from the table; for a few reports prepared_by and creator are left out. A statement's links to the Board record are under links (show_target_kind: decision, instrument or ballot measure; show_target_id; show_url); they replace the table's decision_id and instrument_id, which are left out. place_id, place_label and place_precision come from a corrected place match where there is one. part, speaker, speaker_role, stance and speaker_evidence say who is speaking: a model (Claude Haiku 5.5) read each page and its context and can be wrong. part: main_text, attachment, appendix, letter, comment, response, table or cover_or_contents; speaker: issuer, another_body, letter_writer or unclear; speaker_role: a role or organisation, never a personal name; stance: own_position, quotes_to_dispute, quotes_to_report, restates_to_reject or unclear. The report page shows a statement only when speaker is issuer, part is main_text or appendix, and stance is own_position or quotes_to_report; hidden gives the part, the speaker or the stance of the others. ","release":"v0.9.2","licence":"CC0-1.0","slug":"igsl_annual-report-sf-public-utilities_1984","url":"https://data.qipu.org/usa/san-francisco/reports/igsl_annual-report-sf-public-utilities_1984/","statement_url":"https://data.qipu.org/usa/san-francisco/reports/igsl_annual-report-sf-public-utilities_1984/#{anchor}","tables":{"igs_reports":"https://tiles.qipu.org/data/releases/v0.9.2/parquet/igs_reports.parquet","igs_claims":"https://tiles.qipu.org/data/releases/v0.9.2/parquet/igs_claims.parquet"},"report":{"report_id":"igsl_annual-report-sf-public-utilities_1984","source_id":"igsl_annual-report-sf-public-utilities_1984","title":"Annual report  1984 ","year":1984,"n_pages":38,"creator":"San Francisco Public Utilities Commission. corporate author.","source_url":"https://archive.org/details/igsl_annual-report-sf-public-utilities_1984","issuer":"San Francisco Public Utilities Commission","issuer_type":"government","gov_level":"city_county","prepared_by":null,"doc_kind":"annual_report","jurisdiction":"San Francisco","jurisdiction_id":"sf","city":"sf","issuer_by":"meta","doc_kind_by":"meta","jurisdiction_by":"meta","run_id":"igs-labels-rules+haiku55-cli-2026-10-23"},"pages_with_statements":11,"statements_total":44,"statements_by_kind":{"finding":36,"proposal":3,"cites_decision":2,"background":3},"same_for_every_statement":{"source_id":"igsl_annual-report-sf-public-utilities_1984","source_url":"https://archive.org/details/igsl_annual-report-sf-public-utilities_1984","source_label":"IGS library: Annual report  1984 ","report_year":1984,"issuer":"San Francisco Public Utilities Commission","issuer_type":"government","doc_kind":"annual_report","t_precision":"year","status":"extracted","claim_kind":"observation","extraction_table":"igs_claims","run_id":"igs-sf-pages-v2-haiku55-batch-2026-10-23","city":"sf","prompt_version":"igs-page-v2-2026-10-23"},"summary":{"what":"An annual report by the Public Utilities Commission on the city's water, power and Muni transit operations for the 1983-84 fiscal year.","figures":[{"label":"Water use","value":"260 million gallons daily","claim_ids":["c:e68de226ffa5a2e04f5ec4759e595171"]},{"label":"Customers","value":"1.8 million customers","claim_ids":["c:e68de226ffa5a2e04f5ec4759e595171"]},{"label":"Projects","value":"$263.6 million across 128 projects","claim_ids":["c:a4d6ec217e623c9ec433c2963fbdf444"]},{"label":"Budget","value":"$32.95 million","claim_ids":["c:54d2d321ff4129c31c54d0907b8aece6"]}],"main_points":["c:77abc8389890db7b12de9ec502c2892c","c:5048ac15b690bf292c9b82d69e9fc216","c:47204276d1677b44cde9611236798970"],"board_decisions_after":[],"board_decisions_before":[],"made_by":"A model (Claude Haiku 5.5) wrote the lead and picked the figures, main points and later Board decisions from the statements, from a second reading of the report's summary and cost pages, and from Board decisions dated 3 years before to 10 years after the report; every number it wrote was checked against them, and a figure must be about the report's own area or project."},"statements":[{"claim_id":"c:af840060dc7d23c0d75c55161060e54d","page_id":"igsl_annual-report-sf-public-utilities_1984:3","page_url":"https://archive.org/details/igsl_annual-report-sf-public-utilities_1984/page/n2","statement_kind":"background","subject_label":"Annual report submission","summary":"The letter states the annual report for FY 1983/1984 is submitted as required by the City Charter.","property":"other","date_printed":"FY 1983/1984","t_from":"1983","quote":"As required by the City Charter sections 3.500 and 3.501 this annual report for Fiscal Year 1983/1984, is submitted.","anchor":"s-af840060dc7d","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"As required by the City Charter sections 3.500 and 3.501 this annual report"},{"claim_id":"c:1fd81ff4869588e2538fe32a7ac46742","page_id":"igsl_annual-report-sf-public-utilities_1984:5","page_url":"https://archive.org/details/igsl_annual-report-sf-public-utilities_1984/page/n4","statement_kind":"finding","subject_label":"GMC bus rehabilitation","summary":"Delivery of 149 rehabilitated GMC buses is reported as complete.","property":"units","value_text":"149 buses","value_num":149.0,"unit":"units","t_from":"1984","quote":"Delivery of 149 of these rehabilitated GMC buses is complete.","anchor":"s-1fd81ff48695","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Annual report narrative; Delivery of 149 of these rehabilitated GMC buses is complete."},{"claim_id":"c:54d2d321ff4129c31c54d0907b8aece6","page_id":"igsl_annual-report-sf-public-utilities_1984:5","page_url":"https://archive.org/details/igsl_annual-report-sf-public-utilities_1984/page/n4","statement_kind":"finding","subject_label":"MUNI total budget","summary":"The Municipal Railway's functions have a FY 1983-84 budget of $32.95 million (≈ $111.5 million in 2026 dollars).","property":"cost_usd","value_text":"$32.95 million","value_num":32950000.0,"unit":"USD","date_printed":"FY 1983-84","t_from":"1983","quote":"These functions have a total of 83 staff positions and a FY 1983-84 budget of $32.95 million.","anchor":"s-54d2d321ff41","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Organization: These functions have a total of 83 staff positions"},{"claim_id":"c:598791d5a2582ca7a071879bae387156","page_id":"igsl_annual-report-sf-public-utilities_1984:5","page_url":"https://archive.org/details/igsl_annual-report-sf-public-utilities_1984/page/n4","statement_kind":"finding","subject_label":"MUNI Facilities Maintenance Division budget","summary":"The Facilities Maintenance Division had 298 approved positions and an annual budget of $16.1 million (≈ $52.2 million in 2026 dollars) for FY 83/84.","property":"cost_usd","value_text":"$16.1 million","value_num":16100000.0,"unit":"USD","date_printed":"FY 83/84","t_from":"1984","quote":"this division had 298 approved positions and an annual budget of $16.1 million.","anchor":"s-598791d5a258","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Facilities Maintenance Division maintains fixed facilities."},{"claim_id":"c:a591fa718e306abfd2401c00d8fbcc71","page_id":"igsl_annual-report-sf-public-utilities_1984:5","page_url":"https://archive.org/details/igsl_annual-report-sf-public-utilities_1984/page/n4","statement_kind":"finding","subject_label":"MUNI Equipment Maintenance Division budget","summary":"The Equipment Maintenance Division has 831 positions and an operating budget of $47.4 million (≈ $153.7 million in 2026 dollars).","property":"cost_usd","value_text":"$47.4 million","value_num":47400000.0,"unit":"USD","t_from":"1984","quote":"There are 831 positions in the division with an operating budget of $47.4 million.","anchor":"s-a591fa718e30","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"The Equipment Maintenance Division provides the number of vehicles"},{"claim_id":"c:b5ad75c3d1eb1f73777680a9564b97be","page_id":"igsl_annual-report-sf-public-utilities_1984:5","page_url":"https://archive.org/details/igsl_annual-report-sf-public-utilities_1984/page/n4","statement_kind":"finding","subject_label":"MUNI Operations Division budget","summary":"The Operations Division had 2,441 approved positions and a budget of $89.65 million (≈ $290.7 million in 2026 dollars).","property":"cost_usd","value_text":"$89.65 million","value_num":89650000.0,"unit":"USD","t_from":"1984","quote":"there were 2,441 approved positions in the division witha budget of $89.65 million.","anchor":"s-b5ad75c3d1eb","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"The Operations Division determines how many operators are required"},{"claim_id":"c:00e00e5852409dba35e64fffd3471aa2","page_id":"igsl_annual-report-sf-public-utilities_1984:7","page_url":"https://archive.org/details/igsl_annual-report-sf-public-utilities_1984/page/n6","statement_kind":"finding","subject_label":"Permanent maintenance facility site","summary":"MUNI completed site acquisition for a permanent maintenance facility at Harrison and 16th Streets and started design.","property":"acquired","value_text":"site acquisition completed; design started","t_from":"1984","quote":"Completed site acquisition as part of a long-range Facility Plan and started design of a permanent maintenance facility at Harrison and 16th Streets.","place_label":"Harrison and 16th Streets","place_precision":"intersection","place_id":"qipu:sf/place/street/harrison-st","resolved_by":"place links file","anchor":"s-00e00e585240","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"Municipal Railway (MUNI) annual report narrative","stance":"own_position","speaker_evidence":"During FY 1983/84, Muni has: Completed site acquisition"},{"claim_id":"c:13346f943a6048e2e9bba18007343b25","page_id":"igsl_annual-report-sf-public-utilities_1984:7","page_url":"https://archive.org/details/igsl_annual-report-sf-public-utilities_1984/page/n6","statement_kind":"finding","subject_label":"Interim maintenance facility for articulated buses","summary":"MUNI opened a new interim facility for articulated bus maintenance at Army and Third Streets.","property":"other","value_text":"interim facility opened","date_printed":"May 30, 1984","t_from":"1984","quote":"Opened a new interim facility for the maintenance of articulated buses at Army and Third Streets.","place_label":"Army and Third Streets","place_precision":"intersection","anchor":"s-13346f943a60","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"Municipal Railway (MUNI) annual report narrative","stance":"own_position","speaker_evidence":"During FY 1983/84, Muni has: Opened a new interim facility"},{"claim_id":"c:733ecf235c21706daf7cc21bd43ae46e","page_id":"igsl_annual-report-sf-public-utilities_1984:7","page_url":"https://archive.org/details/igsl_annual-report-sf-public-utilities_1984/page/n6","statement_kind":"finding","subject_label":"Light rail car peak service","summary":"Cars used during peak hours increased from 82 to 92.","property":"units","value_text":"from 82 to 92 cars","value_num":92.0,"unit":"units","date_printed":"December 1983","t_from":"1983","quote":"The number of cars used during the peak hours increased from 82 to 92 (December 1983).","anchor":"s-733ecf235c21","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"Municipal Railway (MUNI) annual report narrative","stance":"own_position","speaker_evidence":"30 new Light Rail Cars to increase Metro capacity. The number of cars"},{"claim_id":"c:7e348fd9602b47f71701a00c3f450019","page_id":"igsl_annual-report-sf-public-utilities_1984:7","page_url":"https://archive.org/details/igsl_annual-report-sf-public-utilities_1984/page/n6","statement_kind":"finding","subject_label":"High Capacity M.A.N. articulated buses","summary":"MUNI placed 100 new High Capacity M.A.N. articulated diesel buses to increase capacity on heavy routes.","property":"units","value_text":"100 buses","value_num":100.0,"unit":"units","t_from":"1984","quote":"to provide increased passenger capacity on [name withheld] heavist routes, including Geary Street and the Downtown Loop.","place_label":"Geary Street and the Downtown Loop","place_precision":"street","place_id":"qipu:sf/place/street/geary-st","resolved_by":"place links file","anchor":"s-7e348fd9602b","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"Municipal Railway (MUNI) annual report narrative","stance":"own_position","speaker_evidence":"100 new High Capacity M.A.N. articulated diesel buses to provide increased passenger capacity"},{"claim_id":"c:9bfef695b6ddae50c7d618341d2f9cac","page_id":"igsl_annual-report-sf-public-utilities_1984:7","page_url":"https://archive.org/details/igsl_annual-report-sf-public-utilities_1984/page/n6","statement_kind":"finding","subject_label":"Cable Car System","summary":"MUNI completed the rehabilitation of the Cable Car System and reinstated full service on three routes.","property":"other","value_text":"full service on three cable car routes","date_printed":"June 21, 1984","t_from":"1984","quote":"Completed the rehabilitation of the Cable Car System and reinstituted full service on the three cable car routes by June 21, 1984.","place_label":"Cable Car System","anchor":"s-9bfef695b6dd","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"Municipal Railway (MUNI) annual report narrative","stance":"own_position","speaker_evidence":"During FY 1983/84, Muni has: Completed the rehabilitation of the Cable Car System"},{"claim_id":"c:bae2648dbae7cdfd665026277ee5eddf","page_id":"igsl_annual-report-sf-public-utilities_1984:7","page_url":"https://archive.org/details/igsl_annual-report-sf-public-utilities_1984/page/n6","statement_kind":"finding","subject_label":"Flyer diesel buses","summary":"MUNI placed 180 new Flyer standard diesel buses in service.","property":"units","value_text":"180 buses","value_num":180.0,"unit":"units","date_printed":"May 1984","t_from":"1984","quote":"180 new ‘‘Flyer’’ standard diesel buses to replace diesels built in 1969. (May 1984).","anchor":"s-bae2648dbae7","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"Municipal Railway (MUNI) annual report narrative","stance":"own_position","speaker_evidence":"Placed in service as part of a long-range Equipment Procurement Plan"},{"claim_id":"c:50ba1e7b0e7cebe6f6365dc307588d19","page_id":"igsl_annual-report-sf-public-utilities_1984:15","page_url":"https://archive.org/details/igsl_annual-report-sf-public-utilities_1984/page/n14","statement_kind":"background","subject_label":"San Francisco Water Department","summary":"The people of San Francisco created the Water Department on March 3, 1930 by purchasing the Spring Valley Water Company.","property":"event","value_text":"March 3, 1930","date_printed":"March 3, 1930","t_from":"1930","quote":"The people of San Francisco created the Water De- partment on March 3, 1930 by purchasing the properties, facilities and service areas of the privately owned Spring Valley Water Company.","place_label":"San Francisco","anchor":"s-50ba1e7b0e7c","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"The people of San Francisco created the Water Department"},{"claim_id":"c:77abc8389890db7b12de9ec502c2892c","page_id":"igsl_annual-report-sf-public-utilities_1984:15","page_url":"https://archive.org/details/igsl_annual-report-sf-public-utilities_1984/page/n14","statement_kind":"finding","subject_label":"Water quality","summary":"Water quality was well within state and federal standards except for targets pertaining to water corrosivity.","property":"other","value_text":"well within standards","date_printed":"FY 1983-84","t_from":"1983","quote":"Except for targets pertaining to water corrosivity, water quality was well within state and fed- eral standards and guidelines.","anchor":"s-77abc8389890","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Overview Testing and sampling procedures for monitoring water quality"},{"claim_id":"c:a2e81cdf6820aad09f5b8c21ff49a28e","page_id":"igsl_annual-report-sf-public-utilities_1984:15","page_url":"https://archive.org/details/igsl_annual-report-sf-public-utilities_1984/page/n14","statement_kind":"cites_decision","subject_label":"Water rate schedule","summary":"The Public Utilities Commission and the Board of Supervisors adopted a new Rate Schedule for Water service.","property":"adopted","value_text":"10 percent increase","value_num":10.0,"unit":"percent","date_printed":"effective August 1, 1984","t_from":"1984","quote":"a new Rate Schedule for Water service adopted by the Public Utilities Commission and the Board of Super- visors.","anchor":"s-a2e81cdf6820","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Negotiations were concluded on the water rate litigation"},{"claim_id":"c:e68de226ffa5a2e04f5ec4759e595171","page_id":"igsl_annual-report-sf-public-utilities_1984:15","page_url":"https://archive.org/details/igsl_annual-report-sf-public-utilities_1984/page/n14","statement_kind":"finding","subject_label":"Water use","summary":"About 260 million gallons of water are used daily by 1.8 million customers.","property":"population","value_text":"260 million gallons daily; 1.8 million customers","value_num":1800000.0,"unit":"persons","t_from":"1984","quote":"Today about 260 million gallon of water are used daily by 1.8 million customers.","anchor":"s-e68de226ffa5","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Today about 260 million gallon of water are used daily"},{"claim_id":"c:29717fe502e3a625834d07bb207ec928","page_id":"igsl_annual-report-sf-public-utilities_1984:17","page_url":"https://archive.org/details/igsl_annual-report-sf-public-utilities_1984/page/n16","statement_kind":"finding","subject_label":"Water quality testing","summary":"Of 20 samples tested, 11 had negative Langlier Index values, and the suggested guidelines were not met.","property":"finding","value_text":"11 of 20 samples negative Langlier Index","value_num":11.0,"date_printed":"Fiscal Year 1984-85","t_from":"1984","quote":"Of 20 samples tested, 11 had negative Langlier Index values, and four have Aggressiveness Index values between 11.86 and 11.98.","anchor":"s-29717fe502e3","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"The suggested guidelines were not met. Of 20 samples tested"},{"claim_id":"c:2afe9974f75c538c1ce13c3873c8ec28","page_id":"igsl_annual-report-sf-public-utilities_1984:17","page_url":"https://archive.org/details/igsl_annual-report-sf-public-utilities_1984/page/n16","statement_kind":"finding","subject_label":"Lime feeding at Sunol Treatment Plant","summary":"Lime feeding at Sunol Treatment Plant was increased by 28% as a routine operation.","property":"other","value_text":"increased by 28%","value_num":28.0,"unit":"percent","t_from":"1984","quote":"lime feeding at Sunol Treatment Plant was increased by 28%.","place_label":"Sunol Treatment Plant","anchor":"s-2afe9974f75c","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"lime feeding at Sunol Treatment Plant was increased by 28%"},{"claim_id":"c:48f43629137ed2d499ca416e951006f1","page_id":"igsl_annual-report-sf-public-utilities_1984:17","page_url":"https://archive.org/details/igsl_annual-report-sf-public-utilities_1984/page/n16","statement_kind":"finding","subject_label":"Bacteriological testing in Spring 1984","summary":"In the Spring of 1984, 63 tubes (1.5%) tested positive for bacteriological content, but resampling indicated negative content.","property":"finding","value_text":"63 tubes (1.5%) positive","value_num":63.0,"date_printed":"Spring of 1984","t_from":"1984","quote":"in the Spring of 1984, 63 tubes (1.5%) were found to be positive. However, resampling in both instances indi- cated negative bacteriological content.","anchor":"s-48f43629137e","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"However, resampling in both instances indicated negative bacteriological content"},{"claim_id":"c:5048ac15b690bf292c9b82d69e9fc216","page_id":"igsl_annual-report-sf-public-utilities_1984:17","page_url":"https://archive.org/details/igsl_annual-report-sf-public-utilities_1984/page/n16","statement_kind":"proposal","subject_label":"Corrosion control review","summary":"A comprehensive study to review system wide corrosion control will be conducted in Fiscal Year 1984-85.","property":"other","value_text":"comprehensive corrosion control study","date_printed":"Fiscal Year 1984-85","t_from":"1984","quote":"A comprehensive study to review system wide corrosion control will be conducted in Fiscal Year 1984-85.","anchor":"s-5048ac15b690","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"A comprehensive study to review system wide corrosion control will be conducted"},{"claim_id":"c:699772fecb8f869de54f73dc193e7172","page_id":"igsl_annual-report-sf-public-utilities_1984:17","page_url":"https://archive.org/details/igsl_annual-report-sf-public-utilities_1984/page/n16","statement_kind":"finding","subject_label":"Physical and chemical water quality monitoring","summary":"Federal and State monitoring requirements were exceeded by 78%, and results indicated no abnormalities in the water tested.","property":"finding","value_text":"exceeded by 78%","value_num":78.0,"unit":"percent","t_from":"1984","quote":"were exceeded by 78%. Results indicated no abnormalities in the water tested.","anchor":"s-699772fecb8f","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Results indicated no abnormalities in the water tested"},{"claim_id":"c:92ffba4615003a53dea0bf3959af2e2d","page_id":"igsl_annual-report-sf-public-utilities_1984:17","page_url":"https://archive.org/details/igsl_annual-report-sf-public-utilities_1984/page/n16","statement_kind":"finding","subject_label":"Water Department sampling","summary":"Water Department tests exceeded the state minimum requirement by over 200%.","property":"finding","value_text":"exceeded state minimum by over 200%","value_num":200.0,"unit":"percent","date_printed":"1984","t_from":"1984","quote":"Water Department tests exceeded state minimum re- quirement by over 200%.","anchor":"s-92ffba461500","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Water Department tests exceeded state minimum requirement by over 200%"},{"claim_id":"c:a0101e368ad1dd75c3b646808271fb8d","page_id":"igsl_annual-report-sf-public-utilities_1984:17","page_url":"https://archive.org/details/igsl_annual-report-sf-public-utilities_1984/page/n16","statement_kind":"proposal","subject_label":"Customer information and billing system","summary":"The system specification manual, Phase I, is slated for completion by September 1984.","property":"proposes","value_text":"September 1984","date_printed":"September 1984","t_from":"1984","quote":"The system specification manual, Phase I, is slated for com- pletion by September 1984.","anchor":"s-a0101e368ad1","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"The system specification manual, Phase I, is slated for completion by September 1984"},{"claim_id":"c:d1f898c74c304fe310bba094c4c2d8f2","page_id":"igsl_annual-report-sf-public-utilities_1984:17","page_url":"https://archive.org/details/igsl_annual-report-sf-public-utilities_1984/page/n16","statement_kind":"finding","subject_label":"Trihalomethane levels in drinking water","summary":"The Water Department system wide running annual average for Trihalomethane was 63.5 parts per billion, within the 100 ppb permissible limit.","property":"finding","value_text":"63.5 parts per billion","value_num":63.5,"date_printed":"1984","t_from":"1984","quote":"the Water Department system wide running annual aver- age for the year is 63.5 parts per billion, well within the permissible limit.","anchor":"s-d1f898c74c30","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"the Water Department system wide running annual average for the year is 63.5 parts per billion"},{"claim_id":"c:e18b763c22d0e717c190f1ec92ab188d","page_id":"igsl_annual-report-sf-public-utilities_1984:17","page_url":"https://archive.org/details/igsl_annual-report-sf-public-utilities_1984/page/n16","statement_kind":"finding","subject_label":"Customer information and billing system","summary":"A new water and sewer customer information and billing system for the Commercial Division was approved.","property":"approved","value_text":"approved","t_from":"1984","quote":"A new water and sewer customer information and billing system for the Commercial Division was ap- proved.","anchor":"s-e18b763c22d0","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"A new water and sewer customer information and billing system for the Commercial Division was approved"},{"claim_id":"c:35f7fba45000d2bb195e633575a3da9b","page_id":"igsl_annual-report-sf-public-utilities_1984:23","page_url":"https://archive.org/details/igsl_annual-report-sf-public-utilities_1984/page/n22","statement_kind":"finding","subject_label":"[name withheld] water delivery","summary":"Hetch Hetchy met the Water Department's domestic water delivery demands in the year.","property":"other","date_printed":"1984","t_from":"1984","quote":"Hetch Hetchy met the Water Department;s domestic water delivery demands. Power production systemwide met scheduled production goals for the year","place_label":"Hetch Hetchy","place_precision":"site","place_id":"qipu:sf/place/landmark/hetch-hetchy","resolved_by":"place links file","anchor":"s-35f7fba45000","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Overview Hetch Hetchy met the Water Department;s domestic water delivery demands"},{"claim_id":"c:4b068eb3efe1bfb7650aa09c7bc01222","page_id":"igsl_annual-report-sf-public-utilities_1984:23","page_url":"https://archive.org/details/igsl_annual-report-sf-public-utilities_1984/page/n22","statement_kind":"background","subject_label":"Raker Act","summary":"The Raker Act granted San Francisco the right to develop Tuolumne River watersheds with dams and aqueducts.","property":"other","value_text":"December 6, 1913","date_printed":"1913-12-06","t_from":"1913","quote":"The Raker Act, HR7207, signed into law by President Woodrow Wilson on December 6,1913, granted San Francisco the right to develop the watersheds of the Tuolumne River","place_label":"Tuolumne River watershed","anchor":"s-4b068eb3efe1","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"THE HETCH HETCHY SYSTEM Dean W. Coffey, General Manager"},{"claim_id":"c:5cb3d800533f09bff33d0a8358a07124","page_id":"igsl_annual-report-sf-public-utilities_1984:23","page_url":"https://archive.org/details/igsl_annual-report-sf-public-utilities_1984/page/n22","statement_kind":"finding","subject_label":"Hetch Hetchy Reservoir","summary":"O'Shaughnessy Dam impounds the Tuolumne River in Hetch Hetchy Reservoir with capacity of 360,360 acre feet.","property":"other","value_text":"360,360 acre feet","value_num":360360.0,"unit":"other","t_from":"1984","quote":"O'Shaugnessy Dam which impounds the Tuolumne River with Hetch Hetchy Reservoir - capacity 360,360 acre feet - watershed 459 square miles.","place_label":"Hetch Hetchy Reservoir","anchor":"s-5cb3d800533f","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Waters of the Tuolumne River in the High Sierra are collected in three major dams"},{"claim_id":"c:c527e873ae4a794f9cda0f14147fd25b","page_id":"igsl_annual-report-sf-public-utilities_1984:23","page_url":"https://archive.org/details/igsl_annual-report-sf-public-utilities_1984/page/n22","statement_kind":"finding","subject_label":"[name withheld] contracts","summary":"Discussions are being held with Turlock and Modesto Irrigation districts and with PG&E for renewal of current contracts.","property":"other","value_text":"June 30, 1985","date_printed":"1985-06-30","t_from":"1985","quote":"Discussions are being held with Turlock and Modesto Irrigation districts and with PG&E for renewal of the current contracts beyond their expiration dated of June 30, 1985.","anchor":"s-c527e873ae4a","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Overview Discussions are being held with Turlock and Modesto Irrigation districts"},{"claim_id":"c:1f537556a4801da89c8bd04e25167091","page_id":"igsl_annual-report-sf-public-utilities_1984:27","page_url":"https://archive.org/details/igsl_annual-report-sf-public-utilities_1984/page/n26","statement_kind":"finding","subject_label":"Capitalization and liabilities","summary":"Total capitalization was reported at $377,450 thousand (≈ $1.2 billion in 2026 dollars) for 1984 versus $352,550 thousand (≈ $1.1 billion in 2026 dollars) for 1983.","property":"other","value_text":"$377,450","value_num":377450.0,"unit":"USD","date_printed":"1984","t_from":"1984","quote":"CAPITALIZATION AND LIABILITIES Net capital investment Long-term debt Long-term sick leave payable Total capitalization","anchor":"s-1f537556a480","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"Public Utilities Commission balance sheet","stance":"own_position","speaker_evidence":"Hetch Hetchy Project Balance Sheet, Years Ended June 30, 1984 and 1983"},{"claim_id":"c:2127341bc0aae54407d326991fdd8ae9","page_id":"igsl_annual-report-sf-public-utilities_1984:29","page_url":"https://archive.org/details/igsl_annual-report-sf-public-utilities_1984/page/n28","statement_kind":"finding","subject_label":"Utilities Engineering Bureau projects","summary":"During FY 83/84 the UEB had 128 funded projects budgeted at $264 million (≈ $856.1 million in 2026 dollars), 24 completed, 72 underway, 32 without schedules.","property":"cost_usd","value_text":"$264 million","value_num":264000000.0,"unit":"USD","date_printed":"FY 83/84","t_from":"1984","quote":"During FY 83/84, the UEB had 128 funded projects, of which 24 were completed by year-end, 72 were underway and 32 were without assigned schedules.","anchor":"s-2127341bc0aa","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Overview During FY 83/84, the UEB had 128 funded projects"},{"claim_id":"c:47204276d1677b44cde9611236798970","page_id":"igsl_annual-report-sf-public-utilities_1984:29","page_url":"https://archive.org/details/igsl_annual-report-sf-public-utilities_1984/page/n28","statement_kind":"proposal","subject_label":"UEB Management Assessment supplemental request","summary":"The report describes a $1.9 million (≈ $6.2 million in 2026 dollars) supplemental request to develop better management tools, not yet reviewed by the Board of Supervisors.","property":"proposes","value_text":"$1.9 million","value_num":1900000.0,"unit":"USD","date_printed":"FY 84/85","t_from":"1984","quote":"A supplemental request for $1.9 million to develop better management tools and approaches was made as a result of the Management Assessment conducted during the first half of the year.","anchor":"s-47204276d167","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"A supplemental request for $1.9 million to develop better management tools"},{"claim_id":"c:e380b024f2b4eacac86cfbdb44a5ed7f","page_id":"igsl_annual-report-sf-public-utilities_1984:29","page_url":"https://archive.org/details/igsl_annual-report-sf-public-utilities_1984/page/n28","statement_kind":"finding","subject_label":"UEB Management Assessment","summary":"The Management Assessment supplemental of $1.9 million (≈ $6.2 million in 2026 dollars) has not yet been approved by the Board of Supervisors.","property":"rejected","value_text":"not yet approved","unit":"USD","t_from":"1984","quote":"The $1.9 million Management Assessment supplemental has not yet been approved by the Board of super- visors.","anchor":"s-e380b024f2b4","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"The $1.9 million Management Assessment supplemental has not yet been approved"},{"claim_id":"c:3276e639344ab614189bf0952fe782d0","page_id":"igsl_annual-report-sf-public-utilities_1984:30","page_url":"https://archive.org/details/igsl_annual-report-sf-public-utilities_1984/page/n29","statement_kind":"finding","subject_label":"Muni Metro Startup costs audit","summary":"Of $4.6 million (≈ $14.9 million in 2026 dollars) in questioned MMSU costs, about $357,000 (≈ $1.2 million in 2026 dollars) was ultimately disallowed.","property":"other","value_text":"$357,000 disallowed","value_num":357000.0,"unit":"USD","t_from":"1984","quote":"Of the $4.6 million in questioned costs, approximately $357,000 was ultimately disallowed.","anchor":"s-3276e639344a","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Audits and Performance Analysis completed and submitted external reports"},{"claim_id":"c:36e2052d59fad754f5e74730a96b7faa","page_id":"igsl_annual-report-sf-public-utilities_1984:30","page_url":"https://archive.org/details/igsl_annual-report-sf-public-utilities_1984/page/n29","statement_kind":"finding","subject_label":"Bureau of Finance budget","summary":"The Bureau of Finance has 143 budgeted positions and an operating budget of $3.4 million (≈ $11.0 million in 2026 dollars).","property":"cost_usd","value_text":"$3.4 million","value_num":3400000.0,"unit":"USD","date_printed":"this fiscal year","t_from":"1984","quote":"Bureau of Finance has 143 budgeted positions and an operating budget of $3.4 million during this fiscal year.","anchor":"s-36e2052d59fa","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Bureau of Finance has 143 budgeted positions"},{"claim_id":"c:a4d6ec217e623c9ec433c2963fbdf444","page_id":"igsl_annual-report-sf-public-utilities_1984:30","page_url":"https://archive.org/details/igsl_annual-report-sf-public-utilities_1984/page/n29","statement_kind":"finding","subject_label":"PUC total projects budget value","summary":"The PUC reports a total project budget value of $263.6 million (≈ $854.8 million in 2026 dollars) across 128 projects.","property":"cost_usd","value_text":"$263.6","value_num":263600000.0,"unit":"USD","date_printed":"Effective: June 30, 1984","t_from":"1984","quote":"TOTAL PROJECTS total 32 33 63 128 budget value $149.6 $22.4 $91.8 $263.6","anchor":"s-a4d6ec217e62","shown":false,"hidden":"table","part":"table","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"UEB PROJECTS STATUS FY 83/84 Effective: June 30, 1984"},{"claim_id":"c:34635c2d76b0c5b1773829d8dec9e0d4","page_id":"igsl_annual-report-sf-public-utilities_1984:31","page_url":"https://archive.org/details/igsl_annual-report-sf-public-utilities_1984/page/n30","statement_kind":"finding","subject_label":"Muni Capital Improvement Plan funding","summary":"About 75% of the funds in the first year of the Muni Capital Improvement Plan were received from governmental grants in FY 83/84.","property":"other","value_text":"Approximately 75%","value_num":75.0,"unit":"percent","date_printed":"FY 83/84","t_from":"1984","quote":"Approximately 75% of the funds included in the first year of the Muni Capital Improvement Plan (1983-88) were received from various governmental grants during FY 83/84","anchor":"s-34635c2d76b0","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Budgets and Grants submitted the Capital Improvement Plan for Muni"},{"claim_id":"c:45c890887d81ee6a723fb90981efc7d5","page_id":"igsl_annual-report-sf-public-utilities_1984:31","page_url":"https://archive.org/details/igsl_annual-report-sf-public-utilities_1984/page/n30","statement_kind":"finding","subject_label":"Bureau of Management Information Systems budget","summary":"The Bureau of Management Information Systems had a budget of $3.2 million (≈ $10.4 million in 2026 dollars) and 74 approved positions.","property":"cost_usd","value_text":"$3.2 million","value_num":3200000.0,"unit":"USD","date_printed":"FY 83/84","t_from":"1984","quote":"For FY 83/84 BMIS had a budget of $3.2 million and 74 approved positions.","anchor":"s-45c890887d81","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"BMIS provides systems analysis and data processing support to the PUC"},{"claim_id":"c:55de1abed8c1e66d0413353216133216","page_id":"igsl_annual-report-sf-public-utilities_1984:31","page_url":"https://archive.org/details/igsl_annual-report-sf-public-utilities_1984/page/n30","statement_kind":"finding","subject_label":"UMTA 127 Audit Report","summary":"The research on the UMTA 127 Audit Report covered about $18 million (≈ $58.4 million in 2026 dollars) in questioned costs.","property":"other","value_text":"approximately $18 million","value_num":18000000.0,"unit":"USD","t_from":"1984","quote":"Report was completed covering approximately $18 million in questioned costs.","anchor":"s-55de1abed8c1","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Report was completed covering approximately $18 million in questioned costs"},{"claim_id":"c:e09dde896db26d048af6beb03b831efe","page_id":"igsl_annual-report-sf-public-utilities_1984:31","page_url":"https://archive.org/details/igsl_annual-report-sf-public-utilities_1984/page/n30","statement_kind":"finding","subject_label":"Bureau of Personnel & Training budget","summary":"The Personnel and Training Bureau has 32 approved positions and a budget of $1 million (≈ $3.2 million in 2026 dollars).","property":"cost_usd","value_text":"$1 million","value_num":1000000.0,"unit":"USD","t_from":"1984","quote":"This bureau has 32 approved positions and is budgeted at $1 million for overall operations.","anchor":"s-e09dde896db2","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"This bureau has 32 approved positions and is budgeted at $1 million"},{"claim_id":"c:17e968ecc14ec43567b352a8a1558cbb","page_id":"igsl_annual-report-sf-public-utilities_1984:33","page_url":"https://archive.org/details/igsl_annual-report-sf-public-utilities_1984/page/n32","statement_kind":"finding","subject_label":"Lighting and HVAC improvements savings","summary":"Lighting and HVAC improvements have resulted in about $100,000 (≈ $324,293 in 2026 dollars) in annualized savings.","property":"other","value_text":"approximately $100,000 in annualized savings","value_num":100000.0,"unit":"USD","t_from":"1984","quote":"Work accomplished in both Lighting and HVAC improvements have resulted in approximately $100,000 in annualized savings.","anchor":"s-17e968ecc14e","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Overview: Work accomplished in both Lighting and HVAC improvements"},{"claim_id":"c:9b1313121d83756ece0556345c3b9423","page_id":"igsl_annual-report-sf-public-utilities_1984:33","page_url":"https://archive.org/details/igsl_annual-report-sf-public-utilities_1984/page/n32","statement_kind":"finding","subject_label":"Bureau of Energy Conservation budget","summary":"The operating budget for the Bureau of Energy Conservation is $627,712 (≈ $2.0 million in 2026 dollars).","property":"cost_usd","value_text":"$627,712","value_num":627712.0,"unit":"USD","t_from":"1984","quote":"The operating budget for the Bureau is $627,712.","anchor":"s-9b1313121d83","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"BUREAU OF ENERGY CONSERVATION Organizational Description"},{"claim_id":"c:d135e456137192c372939b9ed08cd5f5","page_id":"igsl_annual-report-sf-public-utilities_1984:33","page_url":"https://archive.org/details/igsl_annual-report-sf-public-utilities_1984/page/n32","statement_kind":"finding","subject_label":"Energy conservation private sector fund raising","summary":"The private sector fund raising effort realized $1.3 million (≈ $4.2 million in 2026 dollars), far exceeding a $100,000 (≈ $324,293 in 2026 dollars) target.","property":"other","value_text":"$1.3 million","value_num":1300000.0,"unit":"USD","t_from":"1984","quote":"The private sector fund raising effort realized $1.3 million, far exceeding the $100,000 target.","anchor":"s-d135e4561371","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Overview: Substantial progress has been made in meeting all the targets"},{"claim_id":"c:d2f8a271d332ff6a89d447ec627176c7","page_id":"igsl_annual-report-sf-public-utilities_1984:33","page_url":"https://archive.org/details/igsl_annual-report-sf-public-utilities_1984/page/n32","statement_kind":"cites_decision","subject_label":"Supplemental appropriation for school district energy programs","summary":"The Board of Supervisors gave final approval for a $996,000 (≈ $3.2 million in 2026 dollars) supplemental appropriation for school district energy programs.","property":"approved","value_text":"$996,000 supplemental appropriation","value_num":996000.0,"unit":"USD","date_printed":"April","t_from":"1984","quote":"In April the Board of Supervisors gave final approval for a $996,000 supplemental appropriation for Unified and Community College School District energy programs.","anchor":"s-d2f8a271d332","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Public Education Energy Management Task Force: In April the Board of Supervisors gave final approval"}]}