What city reports said about Treasure Island
26 statements from 3 reports, oldest report first.
The page of Treasure Island · All places in the reports
Matched to this place by name. Quoted from the report. Sorted by a model.
“[name withheld]” stands for a name the release withholds (Privacy).
Community safety : implementation programs : an element of the Master plan of the City and County of San Francisco 1997
City and County of San Francisco, Planning Department
FindingThe City is currently planning for the reuse of Treasure Island, located on unengineered fill in the Bay. scan 8
The City is currently planning for the reuse of Treasure Island, located on unengineered fill in the Bay.
Treasure Island and Yerba Buena Island 1998
City and County of San Francisco, Department of City Planning
Report recommendationCreate a mix of uses that generate sufficient revenue streams to support public services on the Islands. scan 2
Create a mix of uses that generate sufficient revenue streams to support public services on the Islands.
Report recommendationIdentify key public improvements needed to support reuse and economic and job development and describe a phasing and implementation plan. scan 2
Identify key public improvements needed to support reuse and economic and job development and describe a phasing and implementation plan.
Report recommendationThe Planning Department will host a public planning session to review possible development schemes for Treasure Island and Yerba Buena Island. scan 26
The Planning Department will host a public planning session to review possible development schemes for Treasure Island and Yerba Buena Island.
BackgroundProperty held in Trust cannot be sold, although land and facilities may be leased for limited periods, not to exceed 66 years. scan 30
Property held in Trust cannot be sold, although land and facilities may be leased for limited periods, not to exceed 66 years.
BackgroundIn July 1996 the Planning Commission and Board of Supervisors adopted a CRC endorsed Draft Reuse Plan for the Islands. scan 30
In July 1996 the Planning Commission and Board of Supervisors adopted a CRC endorsed Draft Reuse Plan for the Islands.
Report recommendationThe proposed land use plan focuses on recreation, open space, entertainment, cultural and hospitality uses. scan 31
The proposed land use plan focuses on recreation, open space, entertainment, cultural and hospitality uses.
Report recommendationThe costs of these public improvements are estimated at over $263 million for the entire project. scan 32
The costs of these public improvements are estimated at over $263 million for the entire project.
Report recommendationThe Reuse Plan anticipates full development over a 35 year period to take place in five phases. scan 32
The Reuse Plan anticipates full development over a 35 year period to take place in five phases.
FindingAlthough publicly-oriented commercial development will generate sales and hotel taxes over time, the cost of services is expected to significantly outpace revenues. scan 33
Although publicly-oriented commercial development will generate sales and hotel taxes over time, the cost of services is expected to significantly outpace revenues.
BackgroundNew development for housing, general office, or for other non-conforming uses on TI, is prohibited under the Trust. scan 36
New development for housing, general office, or for other non-conforming uses on TI, is prohibited under the Trust.
Report recommendationCertify the Final EIR; Adopt the Area Plan, Zoning Controls, General Plan Amendments, Redevelopment Plan and Design for Development document. scan 37
Certify the Final EIR; Adopt the Area Plan, Zoning Controls, General Plan Amendments, Redevelopment Plan and Design for Development document.
BackgroundUsing the 1996 adopted Draft Reuse Plan as a framework, develop the details of land use and urban design parameters for the Islands. scan 37
Using the 1996 adopted Draft Reuse Plan as a framework, develop the details of land use and urban design parameters for the Islands.
Report recommendationPrepare an Area Plan, underlying Zoning Controls and a Redevelopment Plan/Design for Development Document (implementation program) for the Islands. scan 37
Prepare an Area Plan, underlying Zoning Controls and a Redevelopment Plan/Design for Development Document (implementation program) for the Islands.
BackgroundThe strong desire to preserve and adaptively-reuse historic buildings. scan 38
The strong desire to preserve and adaptively-reuse historic buildings.
BackgroundThe need to build at least one, preferably two, ferry landings. scan 38
The need to build at least one, preferably two, ferry landings.
BackgroundThe phasing of toxic materials remediation by the Navy. scan 38
The phasing of toxic materials remediation by the Navy.
Disposal and reuse of Naval Station Treasure Island : draft environmental impact statement 2002
U.S. Navy, Southwest Division Naval Facilities Engineering Command
Report recommendationRaise the dike as necessary to account for site settlement, changes in maximum tidal heights, and rises in sca levels. scan 37
Raise the dike as necessary to account for site settlement, changes in maximum tidal heights, and rises in sca levels.
FindingAlternative 3 could subject occupants, visitors, and property to substantial flooding hazards throughout Treasure Island. scan 37
Alternative 3 could subject occupants, visitors, and property to substantial flooding hazards throughout Treasure Island.
Report recommendationAn 18-hole golf course would be developed on the northern half of Treasure Island. scan 74
An 18-hole golf course would be developed on the northern half of Treasure Island.
Report recommendationAlternative 2 proposes 254 acres (103 ha) of open space and recreation uses. scan 74
Alternative 2 proposes 254 acres (103 ha) of open space and recreation uses.
Report recommendationAlternative 2 proposes 19 acres (8 ha) of residential uses. scan 74
Alternative 2 proposes 19 acres (8 ha) of residential uses.
Report recommendationAlternative 2 proposes 18 acres (7 ha) of institutional and community uses on Treasure Island, generating an estimated 103 jobs. scan 74
Alternative 2 proposes 18 acres (7 ha) of institutional and community uses on Treasure Island, generating an estimated 103 jobs.
Report recommendationThe total number of jobs expected to be generated by publicly oriented uses on Treasure Island 1s 2,513. scan 74
The total number of jobs expected to be generated by publicly oriented uses on Treasure Island 1s 2,513.
FindingBackground studies conducted at both Treasure Island and Yerba Buena Island identified significant archaeological properties and historic buildings and structures that are within the areas that Navy transferred to the Coast Guard and the FHWA. scan 120
Background studies conducted at both Treasure Island and Yerba Buena Island identified significant archaeological properties and historic buildings and structures that are within the areas that Navy transferred to the Coast Guard and the FHWA.
FindingTidal mixing with ground water has been noted up to about 100 feet (30.5 m) inland from the shoreline (DON 1995e), resulting in brackish ground water. scan 209
Tidal mixing with ground water has been noted up to about 100 feet (30.5 m) inland from the shoreline (DON 1995e), resulting in brackish ground water.