Records › Topics › Schools › All Board decisions › 1910s
Schools
Board decisions, 1910s
- Payment to A. Lynch & Co. for concrete work at Laguna Honda School was adopted. passed Record · Journal page ↗
- Supervisor Bancroft reported that Brode Iron Works held the steel contract for the John Swett School, finding no general contract. Record · Journal page ↗
- Proposed payments totalling $4,338.74 for desks, chairs and clocks for various schools, passed for printing. first reading Record · Journal page ↗
- Final payments for plumbing at Mission Grammar School and yard work at Washington Grammar School were authorized from the school bond fund. passed Record · Journal page ↗
- Extra plumbing work at Mission Grammar School and extra work at Sutro Grammar School were authorized for payment from bond funds. passed Record · Journal page ↗
- The Board authorized the City Attorney to seek offers for several lots needed for new school sites. passed Record · Journal page ↗
- Resolution proposed to pay about $30,193 for construction and supplies at four San Francisco schools. first reading Record · Journal page ↗
- Wm. Bruce is to be paid $3,000, the first installment for moving the Girls' High School. first reading Record · Journal page ↗
- Payment of $720 to C. F. Weber & Co. and Michael Kiernan and $1,600 for school chairs and plastering work passed first reading only. first reading Record · Journal page ↗
- The Board approved a final $947.50 payment to Wm. S. Snook & Son for plumbing at Peabody Primary School. passed Record · Journal page ↗
- Board of Education received $1,000 to complete equipment at the Jean Parker School. passed Record · Journal page ↗
- Resolution to pay $8,950 for work at John Swett Grammar School was passed for printing. first reading Record · Journal page ↗
- The Board passed for printing an $804.25 final payment to John G. Sutton Co. for plumbing at Visitacion Valley School. first reading Record · Journal page ↗
- Sets aside $750 for the Board of Education to raise and underpin the Lafayette School building. Record · Journal page ↗
- Approved $750 to raise the Lafayette School Building and add underpinning after the lot was graded. passed Record · Journal page ↗
- City paid McLeran & Peterson $7,407 as a fifth installment on the Polytechnic High School shop building. passed Record · Journal page ↗
- City paid Brandon & Lawson $5,115 as a first installment for brickwork at Lowell High School. passed Record · Journal page ↗
- Payment of $1,343.25 to Caldwell & Co. as a ninth installment for building the Spring Valley School approved. passed Record · Journal page ↗
- Board sets aside $3,727.50 for the Board of Public Works to repair school buildings in December 1911. passed Record · Journal page ↗
- Resolution proposed authorizing $5,530 in school building payments for Franklin, John Swett and Lincoln schools. Record · Journal page ↗
- Resolution proposed paying $2,093.82 for chairs and desks supplied to Grattan School. Record · Journal page ↗
- $209.51 for repairs to the sidewalk and yard of Frank McCoppin School was adopted. passed Record · Journal page ↗
- Proposed acceptance of an offer to sell Potrero Nuevo Block 85 land for $14,500 for Starr King School. Record · Journal page ↗
- Resolution proposed giving McLeran & Peterson ninety more days, after February 15, 1912, to finish Polytechnic shop buildings. passed Record · Journal page ↗
- $2,500 for finishing yard work at Peabody School was proposed and passed for printing. first reading Record · Journal page ↗
- Supervisor Hayden proposed urging the Board of Education to set summer school vacations for crop harvesting; referred to the Education Committee. referred Record · Journal page ↗
- Board adopted a resolution urging the Board of Education to schedule summer school vacations so children can work harvesting in July and August. passed Record · Journal page ↗
- Board of Public Works authorized $4500 from school construction funds to complete the Jean Parker Grammar School. passed Record · Journal page ↗
- Board of Public Works authorized $2500 more to complete the Denman Grammar School building. passed Record · Journal page ↗
- Resolution urges the Board of Public Works to prioritise pupils' health and comfort in designing school buildings. passed Record · Journal page ↗
- Board of Health proposed $250 for equipment and supplies for medical inspection of schools. Record · Journal page ↗
- City Attorney authorized to seek offers for land on Broadway and in Holly Park as additional school sites. passed Record · Journal page ↗
- The Board of Education was granted a former fire lot on Hayes Street to enlarge the Denman Grammar School site. passed Record · Journal page ↗
- Payments on school plumbing and heating contracts at four San Francisco schools authorized from the school construction account. Record · Journal page ↗
- Board ordered the City Attorney to begin condemnation of a Broadway parcel needed as an added Washington Irving School site. passed Record · Journal page ↗
- Board authorizes condemnation of land on Broadway near Sansome Street for Washington Irving School expansion. passed Record · Journal page ↗
- City proposed a 1500-gallon crude petroleum storage tank at Visitacion School on Schwerin Street. first reading Record · Journal page ↗
- Final $1,217.80 payment to John G. Sutton Co. for Clement Primary School plumbing proposed, passed for printing. first reading Record · Journal page ↗
- Resolution proposed to pay $5,702.50 from school construction funds to Lange & Bergstrom and United Builders' Supply for school work. Record · Journal page ↗
- Resolution proposed to pay $1,422.66 to Whitaker & Ray-Wiggin Co. for desks at Hancock Grammar School. passed Record · Journal page ↗
- Brode Iron Works and Foster & Vogt were granted extensions of time on their city construction contracts, including the John Swett School steel. passed Record · Journal page ↗
- Resolution to pay F. H. Born $2,025 for Grattan School construction was passed for printing. first reading Record · Journal page ↗
- Passed for printing a $2,000 ordinance authorizing a yard fence contract at Mission Grammar School. first reading Record · Journal page ↗
- Two school lots on Eighteenth and Thirty-second avenues transferred to the Fire Department's control. passed Record · Journal page ↗
- Spending of $3,000 to finish yard work at Bay View School is proposed by the Board of Public Works. Record · Journal page ↗
- The Board ordered the Clerk to advertise sale of $312,000 Polytechnic High School bonds, sale set for May 22, 1911. passed Record · Journal page ↗
- Henning and Burke received a ninety-day extension to finish their contract for building the Denman Grammar School. passed Record · Journal page ↗
- Payment of $778.60 to San Francisco Cornice Co. for storm doors at four schools passed for printing. first reading Record · Journal page ↗
- Resolution grants McSheehy Bros. ninety days and Henning & Bauke twenty-five days extra to finish school construction work. passed Record · Journal page ↗
- Extensions of time granted to McSheehy Bros. for Peabody School and to Henning & Burke for Denman School construction. passed Record · Journal page ↗
- Thirty-day extension granted to Cainford-Lettich & Company to finish plumbing at Burnett Primary School. passed Record · Journal page ↗
- Payment of $970.41 to R. J. Keown Jr. for asphalt at the West End School proposed. Record · Journal page ↗
- Resolution authorizes $1,138.38 in school yard supply payments to J. W. Shouten & Co. and Golden Gate Brick Co., passed for printing. first reading Record · Journal page ↗
- Payments totalling $2,158.50 to Whitaker & Ray-Wiggin Co. and Joost Bros. for blackboards and hardware at two schools. Record · Journal page ↗
- Resolution proposes paying $3,034.08 from the School Construction Account for blackboards at Burnett School and heating at Adams School. Record · Journal page ↗
- Resolution proposes paying Flinn & Treacy $1,875.00 from the School Construction Account for yard work at Bay View School. Record · Journal page ↗
- Bill No. 1774 would approve the Board of Education's lease of a school lot on Tehama Street to American Forge Company. Record · Journal page ↗
- The Pacific Auxiliary Fire Alarm Company was requested to install twenty fire alarm boxes in school buildings citywide. passed Record · Journal page ↗
- Payment of $9,763.75 to Six contractors for plumbing, heating, plastering and ventilation work at five city schools approved. passed Record · Journal page ↗
- The Board approved $2,158 in hardware payments to Joost Bros. and Bennett Bros. for three city schools. passed Record · Journal page ↗
- Board set aside $13,000 from the Polytechnic High School Fund for shop buildings at Polytechnic High School. passed Record · Journal page ↗
- Ordinance approves the Board of Education leasing its Tehama Street school lot to American Forge Company. passed Record · Journal page ↗
- The Board adopted $3,000 from the School Construction Account to finish yard work at Bay View School. passed Record · Journal page ↗
- The Board of Education and Playground Commission exchanged city lots at Seventh and Bryant streets, as approved by resolution. passed Record · Journal page ↗
- Henning and Burke were given ninety more days to finish general construction of the Denman Grammar School. passed Record · Journal page ↗
- Payments totalling $5,904.75 to three contractors for Franklin, Denman and Burnett school work are authorized from the School Construction Account. Record · Journal page ↗
- Payments from the school construction account went to contractors building the Hancock, Cleveland, Adams and Franklin schools. Record · Journal page ↗
- Payments from the school construction account went to suppliers of furniture and typewriters for several city schools. Record · Journal page ↗
- Board proposed $2250 from the School Construction Account to finish building the Peabody Primary School. Record · Journal page ↗
- Proposed resolution setting aside $4000 from the School Construction Account for storm doors in ten school buildings. Record · Journal page ↗
- Proposed resolution setting aside $2200 to finish yard work at West End Primary School. Record · Journal page ↗
- City Attorney authorized to condemn two lots in Holly Park Tract to enlarge the Holly Park School. passed Record · Journal page ↗
- Resolution adopted to build a handball court and fences at Sutro Grammar School, paid from school construction funds. passed Record · Journal page ↗
- The City accepted J. F. Atteil's offer to sell a lot at Church and Twenty-second streets for the Edison School for $9,150. passed Record · Journal page ↗
- The City accepted the Curran estate's offer to sell a 25 by 110 foot lot on Alabama Street for the Precita Valley School for $4,300. passed Record · Journal page ↗
- Mayor proposed to sell improvements on the Visitacion Valley School site; vote continues on next page. Record · Journal page ↗
- The Board approved a 35-year lease of a school lot at Taylor and Vallejo streets to G. F. Bernard for $15,429. passed Record · Journal page ↗
- Five thousand dollars from the General Fund was set aside for drawing plans for Patrick Henry School and annexes. first reading Record · Journal page ↗
- Two thousand five hundred forty-seven dollars was proposed as first payment to McLeran and Peterson for the Polytechnic Shop Building. first reading Record · Journal page ↗
- Resolution authorizes $4,664.70 in payments for heating, ventilating and concrete work on school buildings, including John G. Sutton Company's final payment. Record · Journal page ↗
- Resolution authorizes school building payments to Lange & Bergstrom, Finlayson-Stettin, Knowles & Kaiser and C. F. Weber & Company for Adams, Jean Parker and Franklin schools. Record · Journal page ↗
- The city agreed to accept P. Martin's offer of land in Mission Block 90 as an additional site for Edison School. passed Record · Journal page ↗
- The Board accepted George Somers's offer to sell land in Excelsior Homestead Block No. 14 for an additional Monroe School site. passed Record · Journal page ↗
- Patrick Coleman's offer to sell Twenty-second Street land for the Edison School at $4500 accepted. passed Record · Journal page ↗
- Anna Martin's offer to sell Twenty-second Street land for the Edison School at $3800 proposed for acceptance. Record · Journal page ↗
- The Board authorized the City Attorney to condemn land on Alabama Street for the Precita Valley School. passed Record · Journal page ↗
- The City was proposed for a 1,500-gallon crude petroleum storage tank behind Lincoln School on Clara Street, passed for printing. first reading Record · Journal page ↗
- The City was proposed for a 1,505-gallon crude petroleum storage tank beside Grattan Primary School, passed for printing. first reading Record · Journal page ↗
- Board passed for printing a $6,675 payment to Henning & Burke for yard work at Clement Primary School. first reading Record · Journal page ↗
- G. D. Patterson Company was granted a ninety-day extension to finish general construction of the Franklin Grammar School. passed Record · Journal page ↗
- Brode Iron Works and the Ferrolite Company were granted extra time to finish city school and jail construction contracts. passed Record · Journal page ↗
- Resolution proposed accepting Cayetano Arellano's offer to sell Lot 30, Block 3 Holly Park Tract for $2700 for a school. Record · Journal page ↗
- Alice Faverman's offer to sell Lot 41, Block 3, Holly Park Tract for $2190 for Holly Park School was adopted. passed Record · Journal page ↗
- Anita Sheibley's offer to sell Lot 29, Block 3, Holly Park Tract for $3255 for Holly Park School was proposed. Record · Journal page ↗
- Three contractors received extra time to finish San Francisco Hospital, Grattan School and Clement School work; the advertising fee was waived. passed Record · Journal page ↗
- Pacific Auxiliary Fire Alarm Company must install signal boxes in sixteen named schools within fifty days, as the Board of Education requested. passed Record · Journal page ↗
- Pacific Telephone & Telegraph Company requested to install a telephone at the Garfield School site on Union Street. passed Record · Journal page ↗
- Bay Cities Home Telephone Company requested to install three telephones at school sites for official business. passed Record · Journal page ↗
- Caldwell & Company, F. H. Born and Henning & Burke received extensions to finish work on the San Francisco Hospital, Grattan School and Clement School. passed Record · Journal page ↗
- Anita Sheibley to receive $3,255 for a lot on Highland avenue added as Holly Park School ground. first reading Record · Journal page ↗
- Cayatano Arellano to receive $2,700 for a lot on Highland avenue added as Holly Park School ground. first reading Record · Journal page ↗
- The Bay Cities Home Telephone Company was asked to move a telephone to the new Visitacion Valley and Peabody school buildings. passed Record · Journal page ↗
- Alice Faverman was authorized to receive $2,190 for a lot on Park Street needed for the Holly Park School. Record · Journal page ↗
- Resolution authorizes $2,250 paid to Isabel Sprague for a lot on Oakdale Avenue for Burnett School. Record · Journal page ↗
- Proposed $8,970 fourth installment to Robert Trost for construction of Lincoln School, passed for printing. first reading Record · Journal page ↗
- Proposed $1,133.88 payment to Whitaker & Ray-Wiggin Co. for desks at Peabody School, passed for printing. first reading Record · Journal page ↗
- Supervisor Gallagher moved to send the charter amendment on electing the school Superintendent back to the Judiciary Committee; the motion carried. referred Record · Journal page ↗
- Board recommended moving $2.4M from school maintenance to salary funds for Board of Education staff. passed Record · Journal page ↗
- Payment of $20,025 to Elmer Carlson as the 10th payment for general construction at Lowell High School; listed, no vote found. Record · Journal page ↗
- City Engineer directed to survey and set boundary stakes on the school lot at Thirtieth Avenue and Geary Street. passed Record · Journal page ↗
- Expenditures were authorized for school building repairs, architect fees and a motor vehicle, paid to named claimants. Record · Journal page ↗
- Bill ordering construction of an academic building at Polytechnic High School was passed for printing. first reading Record · Journal page ↗
- Board authorizes a long list of payments to contractors and claimants for police, school, transit and street work. passed Record · Journal page ↗
- Resolution asks the Board of Education to report probable school locations in Richmond and Sunset districts, to combine lots. passed Record · Journal page ↗
- Board passed for printing a resolution authorizing about two dozen city payments for rails, City Hall, a school, police and water. first reading Record · Journal page ↗
- Resolution urging the Board of Education to keep existing teachers' salaries was refused passage, six ayes to nine noes. refused Record · Journal page ↗
- Resolution authorizes payments from library, City Hall, school and fire bond funds to listed claimants; final vote continues next page. Record · Journal page ↗
- Resolution urging against a $4000 salary for a non-resident school physical training supervisor failed. refused Record · Journal page ↗
- Supervisor Power proposed a charter amendment adding a school building tax and school bond provisions; outcome continues on the next page. Record · Journal page ↗
- Proposed charter changes to school building and contract rules were referred to the Judiciary Committee. referred Record · Journal page ↗
- Charter Amendment 21 gives the elected Superintendent of Schools a vote on the Board of Education, sent to voters. sent to voters Record · Journal page ↗
- Supervisor Power's proposal to spend $9,000 from a 1904 bond on school yard land was laid over one week. Record · Journal page ↗
- Frank McCoppin Primary School stands on 7th Avenue near Balboa Street Record · Minutes page ↗
- Robert Trost granted ninety more days to finish the Frank McCoppin Primary School building contract. passed Record · Journal page ↗
- Payments totaling $35,523.40 from school construction bond funds for work at several San Francisco schools passed for printing. first reading Record · Journal page ↗
- Telegraph Hill Neighborhood Association asked to move the Washington Irving school site from Broadway to Vallejo street; sent to committee. referred Record · Journal page ↗
- Board of Public Works recommends giving Kittle Construction Company thirty more days to finish Mission Grammar School work; referred to committee. referred Record · Journal page ↗
- Second construction payment of $12,531 to Hansbrough Bros. for the Garfield Primary School was approved. passed Record · Journal page ↗
- An ordinance orders construction of a Spring Valley school building, spending up to $111,500 plus $4,400 for equipment. passed Record · Journal page ↗
- Resolution sets aside $5,000 from the School Construction Account for additional classrooms at Clement School. Record · Journal page ↗
- J. P. Doherty to get $1,050 for plumbing McKinley School; passed first reading only. first reading Record · Journal page ↗
- First installment of $5,250 approved to J. F. Smith for plastering work at Sutro Grammar School. passed Record · Journal page ↗
- Board granted Kittle Construction Company thirty more days to finish the Mission Grammar School building. Record · Journal page ↗
- Resolution 5035 repealed, cancelling payment of F. H. Born's claims for extra work on Hancock and McKinley schools. passed Record · Journal page ↗
- Payments totalling $35,523.40 approved from the school construction account for hardware, plastering, iron and steel work on school buildings. passed Record · Journal page ↗
- A first installment was adopted for J. P. Doherty's plumbing work on the McKinley Primary School Building. passed Record · Journal page ↗
- A time extension for the Frank McCoppin Primary School building was proposed; the outcome continues on the next page. Record · Journal page ↗
- Payments proposed to Compressed Air Machinery Co. and H. W. Moffatt & Co. for Mission Grammar School heating work and testing equipment. Record · Journal page ↗
- More time asked for W. Hanley's McKinley school plastering contract Record · Journal page ↗
- City paid Compressed Air Machinery Co. $738.90 and H. W. Mottatt & Co. $4,000 for school building work. passed Record · Journal page ↗
- Board considers $2,000 for yard work at Winfield Scott School; outcome continues on next page. Record · Journal page ↗
- Fourth installment payment to McSheehy Bros. for building the South End Primary School was proposed from the School Construction Account. Record · Journal page ↗
- Second installment of $4,117.50 proposed for Cronan's Eagle Cornice Works for heating work at Madison Primary School. Record · Journal page ↗
- Board of Public Works may spend $60,000 on school building repairs from January through June 1910. Record · Journal page ↗
- Bay View Land Company accepted a $10,000 offer for land needed for Harrison Primary School; referred to Public Buildings Committee. referred Record · Journal page ↗
- Board approved a $16,000.25 fourth payment to McSheehy Bros. for building the South End Primary School. passed Record · Journal page ↗
- Board approved $8,350 in progress payments for steel work at Hancock Grammar and plastering at Bryant Cosmopolitan School. passed Record · Journal page ↗
- A $5,325 expenditure for concrete, bitumen and cement work at Laguna Honda School is proposed. Record · Journal page ↗
- Board paid Cronan's Eagle Cornice Works $4,117.50 for heating and ventilating at Madison Primary School. passed Record · Journal page ↗
- The Board of Public Works was authorized to spend $80,000 on school building repairs from January to June 1910. passed Record · Journal page ↗
- Brown & Smart were granted ninety more days to finish the Madison Primary School building contract. passed Record · Journal page ↗
- Henning & Burke were granted thirty more days to finish the Washington Grammar School building contract. passed Record · Journal page ↗
- Kittle Construction Company was granted thirty more days to finish general construction of the Mission Grammar School. Record · Journal page ↗
- First installment authorized to Henshaw, Pinkney & Co. for heating and ventilating at Garfield Primary School. Record · Journal page ↗
- Payment of $847 authorized to James P. Clow & Sons for toilet outfits at Henry Durant School. Record · Journal page ↗
- City authorizes a $10,000 payment to Bay View Land Company for land for Harrison Primary School. passed Record · Journal page ↗
- Resolution passed for printing to pay Dyer Brothers $9050 for structural steel at Commercial High School. first reading Record · Journal page ↗
- $10,000 to Bay View Land Company for the school lot Record · Journal page ↗
- Phone asked for School Director Richard I. Whelan on Webster Street passed Record · Journal page ↗
- Kittle Construction asks that a $12 advertising charge on its Mission Grammar School work be remitted; referred to committee. referred Record · Journal page ↗
- Payments of school construction funds approved to Henning & Burke and F. H. Born for McKinley and Sheridan primary schools. passed Record · Journal page ↗
- Sixth construction payment for Mission Grammar School approved to Kittle Construction Company under its contract. passed Record · Journal page ↗
- Payments from the school construction account approved to three contractors for plumbing, construction and plastering at city schools. passed Record · Journal page ↗
- Board authorized a final $9,050 payment to Dyer Brothers for steel work at Commercial High School. passed Record · Journal page ↗
- City approved a school construction fund payment to Henshaw, Bulkley & Co. for heating and ventilating at Garfield Primary School. passed Record · Journal page ↗
- City approved payments for toilet fittings at Henry Durant School and asphalt paving on Fourteenth Street between Harrison and Howard streets. passed Record · Journal page ↗
- $9000 was set aside from the school construction account for extra classrooms at Clement Primary School. passed Record · Journal page ↗
- Payments from school bond funds were proposed to contractors for work at Hancock and South End schools. first reading Record · Journal page ↗
- H. W. Hanley to be given ninety more days to plaster McCoppin School; passed first reading only first reading Record · Journal page ↗
- A resolution authorizing payments from the School Construction Account for steel and plaster work at Hancock and Bryant schools. Record · Journal page ↗
- Board approved $20,348 in payments to J. E. O'Mara and McSheehy Bros. for school plumbing and construction work. passed Record · Journal page ↗
- Payments of about $2,544 for furniture for Mission Grammar School were authorized, pending final action on the next page. Record · Journal page ↗
- Ninety-day extension proposed for S. L. Hausbrough to finish the Clement Primary School building contract. first reading Record · Journal page ↗
- F. H. Born asks ninety more days on the McKinley school Record · Journal page ↗
- $10,000 to Bay View Land Company for the school lot; put over to a later meeting. Record · Journal page ↗
- Contractor given 90 more days on McCoppin School plastering passed Record · Journal page ↗
- Payment of $10,000 to Bay View Land Company for land on Jamestown avenue as the site of Harrison Primary School approved. passed Record · Journal page ↗
- Payments from the school construction account to McSheehy Bros. and Henning & Burke for West End and Washington school work. Record · Journal page ↗
- Payments from the school construction account for heating at South End Primary and steel work at Jean Parker School. Record · Journal page ↗
- Payments from the school construction account for plumbing and plastering work at city schools, including the Garfield School. Record · Journal page ↗
- Board of Public Works recommended time extensions for three contractors on school and infirmary building contracts; adopted. passed Record · Journal page ↗
- Payments authorized for moving the temporary Girls' High School and building the Hancock Grammar School and Tharp Commercial School. passed Record · Journal page ↗
- Invitation filed to the Sheridan School cornerstone laying Record · Journal page ↗
- Invitation filed to the Sheridan School cornerstone laying Record · Journal page ↗
- Board of Public Works recommends a ninety-day extension for Gust Johnson to finish plastering West End School; referred to committee. referred Record · Journal page ↗
- Board of Education asks $10,000 to raise and move the Grant School on Pacific Avenue; referred to committee. referred Record · Journal page ↗
- Board of Education asks approval of its $1,250 lease purchase for North Beach Children's Playground; referred to committee. referred Record · Journal page ↗
- First construction payments approved for the West End Primary School and yard work at Washington Grammar School. passed Record · Journal page ↗
- Progress payments approved for heating work at South End Primary School and steel work at Jean Parker School. passed Record · Journal page ↗
- Payments of $9,544.00 approved for hardware, plumbing and plastering work at four San Francisco schools. passed Record · Journal page ↗
- Payments for desks and chairs for the Mission Grammar School were approved from the school construction account. passed Record · Journal page ↗
- Contractor S. L. Hanslirough was granted a 90-day extension to finish the Clement Primary School building. Record · Journal page ↗
- Three contractors granted extensions of time to finish public building work, including school buildings and the Infirmary. passed Record · Journal page ↗
- Payments totalling $33,957.25 from the school construction account to four contractors for school buildings were passed for printing. first reading Record · Journal page ↗
- A proposed $3,400 expenditure from the school fund for yard work at the Monroe School Building is continued to the next page. Record · Journal page ↗
- Board proposed paying J. W. Schouten & Co. $1,607.01 for lumber used on school building repairs. Record · Journal page ↗
- Board proposed setting aside $29,000 from the 1908 school bond fund for plans and inspection of new school buildings. Record · Journal page ↗
- City funds $1250 for curbs and asphalt paving in front of a school lot on Persia Avenue. passed Record · Journal page ↗
- Board granted Wm. S. Snook & Son extensions of time to finish plumbing at the Garfield and Sutro schools. passed Record · Journal page ↗
- Eureka Valley Improvement Club petitioned for more accommodations and grounds at Douglass School; referred to the Public Buildings Committee. referred Record · Journal page ↗
- A second installment payment for building the McCoppin School to contractor Robert Trost was proposed. Record · Journal page ↗
- Payments for building the Denman Grammar School and heating work at South End Primary School were proposed. Record · Journal page ↗
- A progress payment for plastering at the Sutro Grammar School to James F. Smith was proposed. Record · Journal page ↗
- First installment to Ahlbach & Mayer for plumbing at Newton J. Tharp Commercial High School proposed. Record · Journal page ↗
- Payments to J. W. Schouten & Co. and J. B. McIntyre Bindery Co. for lumber and record books proposed. Record · Journal page ↗
- A $5137.50 payment to Lange & Bergstrom for yard work at Golden Gate School was passed for printing. first reading Record · Journal page ↗
- A $4875 payment to Cronan's Eagle Cornice Works for heating and ventilating at McCoppin School was passed for printing. first reading Record · Journal page ↗
- City Attorney's opinion says the Board of Education alone sets employment terms for School Department teachers; sent to Judiciary Committee. referred Record · Journal page ↗
- Board approved $33,957.25 in payments to four contractors for work on San Francisco school buildings. passed Record · Journal page ↗
- Henning and Burke and John G. Sutton Co. were paid for work on the Denman and South End schools, the Board adopting Resolution 5423. passed Record · Journal page ↗
- Payments for plastering at Sutro Grammar School and construction at Garfield Primary School were proposed, with James F. Smith named as payee. Record · Journal page ↗
- Lange & Bergstrom receive $5,137.50 first installment for yard work at Golden Gate School. passed Record · Journal page ↗
- Payment approved to Cronan's Fatile Cornice Works, first installment for heating and ventilating work at McCoppin School. passed Record · Journal page ↗
- Payment of $3,400 to Flint & Treacy Contracting Co. for yard work at Monroe School under the school construction account approved. passed Record · Journal page ↗
- First installment approved to Allbach & Mayor for plumbing and gas fitting at Newton J. Tharp Commercial School. passed Record · Journal page ↗
- The city approved a $1,607.01 payment to J. W. Schouten & Co. for lumber used in repairs to school buildings. passed Record · Journal page ↗
- Board set aside $29,000 from the School Construction Account for plans and inspection of new school buildings. passed Record · Journal page ↗
- Resolution proposes bond-fund payments to contractors for work at the Bryant Cosmopolitan and Madison Primary schools. Record · Journal page ↗
- Snook & Son given more time at Garfield and Sutro schools passed Record · Journal page ↗
- Henning & Burke to be paid for Washington Grammar School yard Record · Journal page ↗
- Neighborhood clubs protested moving the Lowell High School site from Hayes Street to Washington and Hyde streets. Record · Journal page ↗
- The Board of Education asked for appropriations from the 1908 bond issue to build certain school buildings; it was referred to committee. referred Record · Journal page ↗
- School building construction payments from the 1908 bond issue proposed for contractors; the vote is on the next page. Record · Journal page ↗
- Payment of $12,281.87 to Spring Valley Water Company and J. W. Schouten & Co. for February water hydrant service and school lumber approved. passed Record · Journal page ↗
- City paid Robert Dalzid Jr. Co. and Henning & Burke for final work at Mission and Washington Grammar Schools. passed Record · Journal page ↗
- Board approved $592.00 and $1,032.55 in extra school building work at Mission and Sutro Grammar Schools. passed Record · Journal page ↗
- Board approved a $1,218.75 second payment to Henshaw, Bulkley & Co. for Garfield School heating and ventilation. passed Record · Journal page ↗
- Board proposed an expenditure of $985.00 from the school construction account for yard work at Washington Grammar School. Record · Journal page ↗
- Payments authorized from the 1908 school bond fund for hardware at Garfield School and heating at Mission Grammar School. Record · Journal page ↗
- Final payment of $1,712.50 authorized to Lange & Bergstrom for yard work at Golden Gate School. Record · Journal page ↗
- Resolution sets aside $3,400 from school repair funds to buy equipment for Polytechnic High School, amending Resolution 5228. Record · Journal page ↗
- Board of Education funds $3,400 for lathes and tools at Polytechnic High School. passed Record · Journal page ↗
- Board of Public Works and Board of Education set aside $200,000 to build and equip four schools. passed Record · Journal page ↗
- Supervisors approved a first construction payment to Lautre & Heggstrom for the Lakeview Primary School under the school construction account. passed Record · Journal page ↗
- Board approved payments for hospital food, a police allowance, pamphlets, a lease buyout at 808 Montgomery Avenue and school heating. passed Record · Journal page ↗
- Palace Hardware Co. was paid in full for hardware at Garfield Primary and Sutton Grammar schools. passed Record · Journal page ↗
- Board proposed moving $3,400 from school repair funds to equip Polytechnic High School. Record · Journal page ↗
- Board laid over for one week a $200,000 resolution to complete and equip four named schools. Record · Journal page ↗
- Payment of $780 to Brown & Smart for extra work at Madison Primary School was authorized. Record · Journal page ↗
- Contractor F. H. Born granted ninety-day extensions to finish the McKinley and Hancock school buildings. passed Record · Journal page ↗
- Hayes Valley Improvement Association petitioned for money to buy more ground for the John Swett Grammar School, referred to committee. referred Record · Journal page ↗
- The Board of Education asks that the condemned Burnett School building be vacated and a new building constructed; referred. referred Record · Journal page ↗
- The Board of Public Works recommends giving C. A. Blume Construction Company ninety more days to finish steel work on Denman School; referred. referred Record · Journal page ↗
- Board adopted $200,000 from the school construction account to build and equip Marshall, Grattan, Peabody and Cleveland schools. passed Record · Journal page ↗
- School bond funds of $15,947.40 paid for blackboards and heating work at Mission Grammar and Commercial High schools. passed Record · Journal page ↗
- School building supplies paid: C. F. Weber & Co. $1,096.87 for blackboards and Palace Hardware Co. $940.00 for McCoppin Primary School hardware. passed Record · Journal page ↗
- Board of Education paid C. F. Weber & Co. $1,772.90 for furniture for the Portola School. passed Record · Journal page ↗
- Payment of $780 to Brown & Smart from school bond funds for extra work at Madison Primary School approved. passed Record · Journal page ↗
- Contractor F. H. Born was granted ninety more days each to finish the McKinley and Hancock school buildings. passed Record · Journal page ↗
- Payments totalling $19,461.25 from the school bond fund for school building work and desks were proposed for printing. first reading Record · Journal page ↗
- Payment to Whitaker & Ray-Wiggin Co. for blackboards furnished to the Portola School is proposed. Record · Journal page ↗
- The Kittle Construction Company was proposed for a thirty-day extension to finish the Mission Grammar School building. first reading Record · Journal page ↗
- $1,200 for street work at the school on Excelsior Avenue Record · Journal page ↗
- Payments totaling $35,860.75 to five contractors for work on several San Francisco schools were authorized from bond funds. passed Record · Journal page ↗
- Final payment of $2,653.75 approved to H. W. Moffatt & Co. for heating installed at Mission Grammar School. passed Record · Journal page ↗
- Payments for heating, plastering and cornice work at Bryant Cosmopolitan and Frank McCoppin schools were passed for printing. first reading Record · Journal page ↗
- Payment authorized to John G. Sutton Co. for heating and ventilating apparatus at Sutro Grammar School. Record · Journal page ↗
- Payments authorized to five contractors for cork carpet, plastering, floors and plumbing at four city schools. Record · Journal page ↗
- Payment to City Street Improvement Company for granite curbs and sidewalks fronting school lots on Sixth and Ninth avenues. Record · Journal page ↗
- Payment of $1737.50 to J. W. Schouten & Co. for lumber used in repairs to school buildings. Record · Journal page ↗
- Payments totalling $19,461.25 from the school construction bond fund to contractors for work at several schools were passed. passed Record · Journal page ↗
- Whitaker & Kay-Wiragin Co. was paid from school construction funds for blackboards furnished to Portola School. passed Record · Journal page ↗
- Kittle Construction Company granted a thirty-day extension to finish the Mission Grammar School building contract. passed Record · Journal page ↗
- H. W. Moffatt & Co. was authorized $2653.75 as final payment for heating apparatus at Mission Grammar School. Record · Journal page ↗
- $1,200 for street work at the school on Excelsior Avenue Record · Journal page ↗
- Payment of $14,811.85 to Four contractors for heating, ventilating and plastering work at three San Francisco schools approved. passed Record · Journal page ↗
- Payments totaling $8,615.12 approved from the school bond fund to five contractors for work at city schools. passed Record · Journal page ↗
- Payment of $1,737.50 to J. W. Schouten & Co. for lumber for school building repairs was adopted. passed Record · Journal page ↗
- Ordinance 1147 on preventing tuberculosis spread in schools, amending Ordinance 975, was passed by the Board. passed Record · Journal page ↗
- The C. A. Blume Construction Company was granted more time to finish steel work on the Denman School building. passed Record · Journal page ↗
- Payments of $10,743 to Hansbrough for Sheridan Primary School and $2,390 to Knowles & Kaiser for Garfield Primary School were approved. passed Record · Journal page ↗
- Board set aside $1,500 from the School Construction Account for shades and equipment at Mission Grammar School. passed Record · Journal page ↗
- A resolution authorizing payments from the school construction bond issue was introduced and passed for printing. first reading Record · Journal page ↗
- Payments from the school bond fund for construction work at Clement Primary and McKinley schools were adopted. passed Record · Journal page ↗
- Final payment to contractor for Sutro School plastering passed Record · Journal page ↗
- The Board of Public Works recommended giving Kittle Construction Company more time to finish the Mission Grammar School buildings, with its advertising fee waived. referred Record · Journal page ↗
- The Board of Public Works recommended a ninety-day extension for H. W. Hanley to finish plastering the McKinley School. referred Record · Journal page ↗
- Board of Public Works recommends giving contractor F. H. Horn ninety more days to finish the McKinley Primary School building. referred Record · Journal page ↗
- Board of Public Works recommends advertising for sale the old frame building at Capital avenue and Lobos street, formerly Sheridan Primary School. referred Record · Journal page ↗
- Payments totalling $20,492 for construction at the Clement and McKinley schools were passed. passed Record · Journal page ↗
- An $18,000 second installment for building the Sheridan Primary School to Henning & Burke was passed. passed Record · Journal page ↗
- Payments totalling $13,133 for plastering at Garfield Primary and construction of Holly Park School were passed. passed Record · Journal page ↗
- James F. Smith received final payment of $2,883.75 for plastering work at the Sutro Grammar School. passed Record · Journal page ↗
- Board of Education granted $1,500 from the school construction account to equip Mission Grammar School. passed Record · Journal page ↗
- Resolution proposes $615.75 from the school construction account to Grant Fee for extra work at Commercial High School. Record · Journal page ↗
- A ninety-day extension was proposed for J. P. Dougherty to finish plumbing work on the McKinley School building. Record · Journal page ↗
- City Attorney was authorized to ask owners to sell lots for new school sites in several neighbourhoods, including Western Addition and Hunters Point. passed Record · Journal page ↗
- City Attorney to seek offers of land for new school sites passed Record · Journal page ↗
- The New Valley Promotion Association asked for $6,500 to secure a playground site for James Lick School, referred to the Public Buildings Committee. referred Record · Journal page ↗
- Board of Education asked for $15,000 from bond money to build an annex at Hamilton School; referred to the Public Buildings Committee. referred Record · Journal page ↗
- Payments from the school construction account go to contractors for work at several San Francisco schools. passed Record · Journal page ↗
- Grant Fee received $615.75 for extra work at Commercial High School, paid from school construction funds. passed Record · Journal page ↗
- Plumbing contractor J. P. Dougherty granted a ninety-day extension to finish plumbing work on the McKinley School building. passed Record · Journal page ↗
- Resolution passed for printing: $16,629.54 from the school bond fund paid to contractors for five school projects. first reading Record · Journal page ↗
- $150 added to an earlier $3000 for equipping Portola School was adopted. passed Record · Journal page ↗
- Proposed: thirty more days for Kittle Construction Company to finish the Mission Grammar School building, passed for printing by Nelson. passed Record · Journal page ↗
- Board approves money for completing the school's equipment Record · Journal page ↗
- Mayor to auction the old frame building at the Sheridan School Record · Journal page ↗
- $1,000 for street work in front of school on 23rd Avenue passed Record · Journal page ↗
- North Beach Improvement Club asked for $6,000 to buy land for Garfield Primary School yard; the petition was referred to the Finance Committee. referred Record · Journal page ↗
- M. W. Mohr asked for a hearing on alleged unsafe conditions in certain school buildings; referred to the Public Buildings Committee. referred Record · Journal page ↗
- Board authorized school construction payments to several contractors for heating, paving, carpet, plastering and lathing work, totaling $16,629.54. passed Record · Journal page ↗
- Payments from the school construction account approved to contractors for work at several San Francisco schools, including $3,335.75 for Sutro Grammar School. passed Record · Journal page ↗
- A $2,094.75 payment for wooden floors at Sutro Grammar School was proposed; its outcome continues on the next page. Record · Journal page ↗
- Paving and curbing approved in front of school property on Twenty-third Avenue between California and Clement streets for $1000. passed Record · Journal page ↗
- Extended time for Kittle Construction Company and F. H. Born to finish the Mission Grammar and McKinley school buildings. passed Record · Journal page ↗
- Payment of $2,625 approved to Robert Dalziel Jr. Co. for the first installment on Portola School's heating system. Record · Journal page ↗
- Resolution repealing the $200,000 set-aside for building and equipping Marshall, Grattan, Peabody and Cleveland Schools was passed for printing. first reading Record · Journal page ↗
- Final payment of $938.25 from the School Construction Account to Finlayson-Stettin Co. for Sutro Grammar School floors was adopted. passed Record · Journal page ↗
- $1,000 set aside to pave and curb in front of a school passed Record · Journal page ↗
- Board authorized school construction and equipment payments for Hancock, Jean Parker, Madison and Clement schools; outcome continues. Record · Journal page ↗
- Board proposed an expenditure of $2,625 for a heating and ventilating system at Portola School. Record · Journal page ↗
- Board approved $938.25 from the school construction account to Finlayson-Stettin Co. for Sutro Grammar School wood floors. passed Record · Journal page ↗
- Proposed $272,500 for completing and equipping Adams, Franklin and Cleveland schools was laid over one week. Record · Journal page ↗
- W. H. Hanley was granted ninety more days to finish plastering contracts at the McKinley and Frank McCoppin schools. passed Record · Journal page ↗
- Payments totalling $19,076 for Denman, Madison and Mission grammar school construction were passed for printing. first reading Record · Journal page ↗
- City Attorney asked to seek offers for land for new Fremont, Marshall and Columbia school sites. passed Record · Journal page ↗
- Sacramento Street property formerly used by California Woman's Hospital transferred to the School Department for school purposes. passed Record · Journal page ↗
- Mayor authorized to sell at public auction the shack buildings on the Portola School site at Somerset Street. passed Record · Journal page ↗
- $272,500 proposed to build the Adams, Franklin and Cleveland schools Record · Journal page ↗
- $265,000 set aside to build and equip three new schools Record · Journal page ↗
- Adams, Franklin and Cleveland school buildings receive $265,000 from school construction bond funds for completion and equipment. passed Record · Journal page ↗
- Resolution proposed to set aside $3,000 from the School Construction Account for equipment at Clement School. Record · Journal page ↗
- Resolution granting extensions of time on school building work was passed for printing, text continues on the next page. passed Record · Journal page ↗
- Board authorized a $6,501 payment to C. A. Blume Construction Co. for steel work at Denman Grammar School. passed Record · Journal page ↗
- Payment of $6501.00 to C. A. Blume Construction Co. for steel work at the Denman Grammar School approved. passed Record · Journal page ↗
- A resolution sets aside $3,000 from the School Construction Account for equipment at Clement School; the vote continues. Record · Journal page ↗
- Contractors granted extra time to finish the Newton J. Tharp Commercial School and Hancock Grammar School buildings. passed Record · Journal page ↗
- City paid two contractors $5,809.00 from 1908 bond funds for work at Sutro Grammar and Lake View schools. Record · Journal page ↗
- Sets aside $1,901.47 to pave streets in front of school property at six locations. Record · Journal page ↗
- $22,087.75 paid for work at four school buildings Record · Journal page ↗
- The Board of Public Works recommended $4,500 to move the Southern Police Station off a Clara Street school lot. referred Record · Journal page ↗
- The Board of Public Works recommended $4,000 for four additional classrooms, with the outcome not shown on this page. Record · Journal page ↗
- Finlayson-Stettin Company asked for more time to finish its contract building the Jean Parker School, referred to committee. referred Record · Journal page ↗
- The Peralta Heights Improvement Club asked for funds to build a six-room primary school, referred to the Public Buildings Committee. referred Record · Journal page ↗
- Board of Education asked for $50,000 from bond proceeds to build Visitacion Valley School, referred to committee. referred Record · Journal page ↗
- Resolution on paying for the heating and ventilating system at Madison Primary School was proposed. Record · Journal page ↗
- Proposed payment of $1,483.90 to C. F. Weber & Co. for desks and chairs at Madison Primary School. Record · Journal page ↗
- Payments of $12,288.50 and $6,000 from the school construction bond fund proposed for Lakeview Primary School work. Record · Journal page ↗
- Payment proposed to C. A. Blume Construction Co. for steel and iron work at Denman Grammar School. Record · Journal page ↗
- Supervisor Walsh proposed a resolution instructing the Board of Education to pay about $11,000 in back salary to teachers. referred Record · Journal page ↗
- Payment of $728 to Kittle Construction for extra work at Mission Grammar School passed first reading only. first reading Record · Journal page ↗
- City Attorney instructed to condemn three private parcels for the [name withheld], Monroe and Edison schools. passed Record · Journal page ↗
- Board of Public Works recommends ninety more days for National Electric Company to install telephones and bells in school buildings. referred Record · Journal page ↗
- Alfred H. Grant accepted the city's offer of $4,500 for land on Nineteenth street for Douglass School. referred Record · Journal page ↗
- Board of Education requests $5,500 to complete and equip the Portola School. referred Record · Journal page ↗
- C. A. Blume Construction Co. was paid the final sum for steel and iron work at Denman Grammar School. passed Record · Journal page ↗
- Payment of $5,929.00 to Finlayson-Stettin Co. and United Builders' Supply Co. for work at Sutro and Lake View schools approved. passed Record · Journal page ↗
- Cronan's Eagle Corner Works was paid for the heating and ventilating system installed at the Madison Primary School. passed Record · Journal page ↗
- Resolution pays C. F. Weber & Co. $1,480.90 for desks and chairs for Madison Primary School. passed Record · Journal page ↗
- Payment from the School Construction Account approved to Kittle Construction Co. for extra work at Mission Grammar School. passed Record · Journal page ↗
- $1,961.47 approved for paving in front of school property at several San Francisco street crossings. passed Record · Journal page ↗
- A resolution proposed paying several contractors from the school construction account for work on city schools, passed for printing. first reading Record · Journal page ↗
- The Board accepted Emily B. Hopkins's offer to sell land on Fell Street for $9500 as an addition to Denman Grammar School. passed Record · Journal page ↗
- A resolution to pay Emily B. Hopkins $9500 from the School Construction Account for Denman Grammar School land was passed for printing. first reading Record · Journal page ↗
- $22,087 paid to builders on four school projects passed Record · Journal page ↗
- Emily B. Hopkins to be paid for the Denman school lot Record · Journal page ↗
- Payment of $1,188.75 to Finlayson-Stettin for fittings at the Sutro Grammar School passed first reading only. first reading Record · Journal page ↗
- Payments totaling $40,294.25 for school building work under the bond issue were passed, covering Sutro, Tharp and West End schools. passed Record · Journal page ↗
- Board proposed paying Emily B. Hopkins $9,500 for land on Fell Street as an additional site for Denman Grammar School. passed Record · Journal page ↗
- Payment of $1,188.75 to Finlayson-Stettin Co. as a first installment for fittings at Sutro Grammar School approved. passed Record · Journal page ↗
- The Board of Public Works recommended setting aside $20,500 to complete and equip certain school buildings. Record · Journal page ↗
- The Board of Public Works was given $15,000 to move the Hamilton School Building to give the Girls' High School room. passed Record · Journal page ↗
- The Board set aside $10,000 for the Board of Public Works to do yard work at certain bond-funded schools. passed Record · Journal page ↗
- The Board set aside $3,400 for the Board of Public Works to repair school buildings during June 1910. passed Record · Journal page ↗
- Board of Public Works approved $14,371.75 to finish construction of Garfield Primary School. passed Record · Journal page ↗
- Payments proposed to C. F. Weber & Co. for desks and chairs for the Bryant and Sutro schools. Record · Journal page ↗
- Payment proposed to Palace Hardware Co. for hardware furnished to the Sheridan Primary School. Record · Journal page ↗
- Board of Education was given $550.00 from the School Construction Account to finish equipping Portola School. passed Record · Journal page ↗
- National Electric Company sought a ninety-day extension to install telephone equipment in certain schools. Record · Journal page ↗
- McSheehy Bros. and Ahlbach & Mayer were granted extensions to finish school building contracts; passed for printing. first reading Record · Journal page ↗
- National Electric Company was granted a ninety-day extension to install telephones and bells in six city schools. passed Record · Journal page ↗
- Board accepted Sarah Patek's offer to sell Golden Gate Avenue land for $9,750 as an addition to John Swett Grammar School. passed Record · Journal page ↗
- Alfred H. Grant's offer to sell Nineteenth Street land for $4,500 for Douglass Primary School was proposed for acceptance. passed Record · Journal page ↗
- Resolution introduced to pay three contractors $17,072.50 for heating, floors and construction at San Francisco schools. first reading Record · Journal page ↗
- City sues to buy land for the Burnett and Monroe schools Record · Journal page ↗
- Payment of $17,072.50 to Hansbrough Bros. and others for work on schools passed first reading only. first reading Record · Journal page ↗
- City approved $17,072.50 in bond-fund payments to three contractors for heating, floors and construction at three San Francisco schools. passed Record · Journal page ↗
- City payments for additional footings at Jean Parker School to Finlayson-Stettin Co. were listed; the vote continues on the next page. Record · Journal page ↗
- City paid C. F. Weber & Co. for desks and chairs furnished to Bryant Cosmopolitan and Sutro Grammar Schools. passed Record · Journal page ↗
- The Board finally passed a $1,028 payment to Palace Hardware Co. for hardware for Sheridan Primary School. passed Record · Journal page ↗
- The Board of Education gets $550 from the School Construction Account to equip the Portola School. passed Record · Journal page ↗
- McSheehy Bros. and Ahlbach & Mayer were each granted extra time to finish their school building contracts; advertising fees were waived. passed Record · Journal page ↗
- National Electric Company was granted a ninety-day extension to finish telephone installation in several named schools; the vote continues on the next page. passed Record · Journal page ↗
- Payment of $11,000 authorized to Elizabeth Krenz for land on Golden Gate Avenue for the John Swett Grammar School. Record · Journal page ↗
- Payment of $9,750 authorized to Sarah Patek for land on Golden Gate Avenue for the John Swett Grammar School. Record · Journal page ↗
- Payment of $4,500 authorized to Alfred Grant for land on Nineteenth Street for the Douglass Primary School. Record · Journal page ↗
- Payments of $1,075.18 and $2,325 authorized for desks at Sutro School and wood floors at Sheridan School. Record · Journal page ↗
- Payments totalling $1,650 to three engineers for examining structural plans of five San Francisco school buildings were proposed. Record · Journal page ↗
- Setting aside $25,500 for school building repairs during July, August and September 1910 was proposed for the Board of Public Works. Record · Journal page ↗
- Henning & Burke receive forty-five more days to finish the general construction of the Sheridan Primary School building. passed Record · Journal page ↗
- Resolution 6121 accepts Mary Mocker's offer to sell land and improvements for $12,000 as a John Swett Grammar School site. Record · Journal page ↗
- The Mayor was authorized to sell three unused frame buildings from proposed school sites at public auction. passed Record · Journal page ↗
- The Home Telephone Company was asked to install telephones at the Cleveland, Spring Valley and Franklin school sites. passed Record · Journal page ↗
- The Board authorized $14,679 in school construction payments to J. P. Lorden Mill Co. and S. L. Hansbrough from the school bond fund. passed Record · Journal page ↗
- The Board authorized two plastering payments to Gust Johnson for the Sheridan and West End Primary Schools. passed Record · Journal page ↗
- The Board authorized payments for school repairs to J. W. Schouten & Co. and for plumbing at the Park Police Station to Wm. S. Snook & Son. passed Record · Journal page ↗
- Ordinance to construct Harrison Primary School, with $21,000 for construction and $1,500 for equipment, continues on next page. Record · Journal page ↗
- City Attorney accepted Veronica J. Porcher's offer to sell land on Golden Gate Avenue for $14,000 for John Swett Grammar School; referred to Building Committee. referred Record · Journal page ↗
- Golden Gate Structural and Ornamental Iron Works claimed $380 for work on the Sutro Grammar School building, referred to committee. referred Record · Journal page ↗
- Payment of $13,370.25 to S. L. Hansbrough and J. P. Lorden Mill Co. and $1,308.75 for school construction work approved. passed Record · Journal page ↗
- Gust Johnson receives $5,283 in progress payments for plastering work at the Sheridan and West End Primary Schools. passed Record · Journal page ↗
- Payment of $4500 to Alfred H. Grant buys land on Nineteenth Street for Douglass Primary School. passed Record · Journal page ↗
- Payments approved for school desks at Sutro Grammar School, wooden floors at Sheridan Primary School, and printing of General Ordinances. passed Record · Journal page ↗
- Payment of $550 to Three engineers each to examine structural plans and conditions of five school buildings approved. passed Record · Journal page ↗
- Board of Public Works authorized $25,500 for repairs to school buildings during July, August and September 1910. passed Record · Journal page ↗
- An ordinance orders construction of the Marshall Primary School, not to exceed $76,500, with a contract to be let by the Board of Public Works. Record · Journal page ↗
- Construction of the Visitacion Valley Primary School approved, with $47,500 for the building and $2,500 for equipment. passed Record · Journal page ↗
- Heining & Burke were given 45 more days to finish the general construction of the Sheridan Primary School building. passed Record · Journal page ↗
- Foster & Vogt and McSheehy Bros. were granted extra time to finish fireproofing the San Francisco Hospital and the West End School. passed Record · Journal page ↗
- Resolution proposed to spend $2000 building four additional classrooms at Redding School, passed for printing. first reading Record · Journal page ↗
- Payment to Elizabeth Kreuz for the John Swett school lot approved. Record · Journal page ↗
- Passed for printing a $14,000 payment to Veronica J. Porcher for land on Golden Gate Avenue for John Swett Grammar School. first reading Record · Journal page ↗
- Passed for printing $3,735 in first payments for plumbing and electrical work at Holly Park and Hancock schools. first reading Record · Journal page ↗
- $2,000 proposed for manual training and domestic science room fixtures at Sheridan Primary School. Record · Journal page ↗
- John and Mary Frank's offer to sell Oakdale Avenue land for $3500 as a Burnett school addition is pending. Record · Journal page ↗
- Payment of $2,085 to Edmund Grundy for plumbing at Holly Park Primary School; no vote on record. Record · Journal page ↗
- Lincoln Grammar School to be built for $85,500 Record · Journal page ↗
- City buys Veronica Porcher's Golden Gate Avenue lot for $14,000 Record · Journal page ↗
- Resolution authorizing school construction bond payments to several contractors for work at San Francisco schools was passed for printing. first reading Record · Journal page ↗
- Payments authorized from the school construction account for heating, hardware and electrical work at Garfield and Tharp schools. Record · Journal page ↗
- Bill 1410 proposes ordering construction of the John Swett Grammar School for up to $101,800 and passed for printing. first reading Record · Journal page ↗
- Board accepted Joseph A. Jeffery's $6100 offer of land on Hayes Street for Denman Grammar School. passed Record · Journal page ↗
- Board considered B. Van Alstine's $5650 offer of land in Western Addition for Denman Grammar School. Record · Journal page ↗
- Proposed $7000 payment to Eva J. Julian for Hayes Street land for the Denman Grammar School addition. Record · Journal page ↗
- Payment of $6100 to Jos. A. Jeffery for land added to Denman Grammar School proposed; outcome not shown on this page. Record · Journal page ↗
- Payment of $2000 to Benjamin Gilbert for land on Oakdale Avenue for Burnett Primary School proposed; outcome not shown here. Record · Journal page ↗
- Contractors K. W. Elliott and Hansbrough Bros. granted extra time to finish Park Police Station and Clement school building contracts. passed Record · Journal page ↗
- Payments to builders on several school projects passed Record · Journal page ↗
- Architect paid for plans for planned Marshall School passed Record · Journal page ↗
- The City Attorney reported an offer to sell Fell Street land for $5,050 for Denman School; sent to Public Buildings Committee. referred Record · Journal page ↗
- The City Attorney recommended condemning Golden Gate Avenue property for the John Swett Grammar School; sent to committee. referred Record · Journal page ↗
- Board approved $17,964.41 in payments to contractors for heating, steel, flooring and blackboards at several city schools. passed Record · Journal page ↗
- Board approved $17,250 in school construction payments to Henry C. Smith for Peabody School plans and Hansbrough Bros. for Garfield School. passed Record · Journal page ↗
- The Board approved $12,000 to buy land on Golden Gate Avenue as an addition to the John Swett Grammar School site. passed Record · Journal page ↗
- Payment of $3,735 to three contractors for plumbing and electrical work at Holly Park and Hancock schools approved. passed Record · Journal page ↗
- The Board proposed $2,000 from the School Department budget to build four additional classrooms at Redding School. passed Record · Journal page ↗
- Board of Public Works authorized $2000 for fixtures in Sheridan Primary School manual training and domestic science rooms, adopted by the Board. passed Record · Journal page ↗
- $14,000 for plans and specifications for the Girls' High School was proposed from the School Construction Account. passed Record · Journal page ↗
- $10,000 for plans for new school buildings was proposed from the School Construction Account, enabling the City Architect to prepare them. Record · Journal page ↗
- Ordinance proposed building Burnett Grammar School for $52,500, with $3,500 for equipment from school bond proceeds. Record · Journal page ↗
- Resolution adopted asking City Attorney to seek offers for McAllister Street lots needed for Fremont School expansion. passed Record · Journal page ↗
- City Attorney directed to solicit offers to sell land on McAllister Street as an addition to Fremont School. passed Record · Journal page ↗
- Payment of $5600 to Robert McMillan for land on Twenty-fifth Street as an addition to the James Lick School site was proposed. Record · Journal page ↗
- Payment of $3500 to John and Mary Franke for a lot at Oakdale Avenue and Lane Street for Burnett School was proposed. Record · Journal page ↗
- Five school construction payments totalling $21,549.75 from the 1908 bond fund were introduced for printing, with McLaughlin moving. first reading Record · Journal page ↗
- City Street Improvement paid $3,358.50 for paving on Sixteenth Street Record · Journal page ↗
- Lincoln Grammar School to be built for $85,500 Record · Journal page ↗
- Robert McMillan's land bought for $5,600 for the James Lick School Record · Journal page ↗
- City Attorney told to condemn land for the John Swett School Record · Journal page ↗
- Mayor asked to auction the old Madison and Sutro school buildings Record · Journal page ↗
- El Vespero Parlor No. 118 asked that money be set aside to enclose the Bay View School yard and plant trees; referred. referred Record · Journal page ↗
- Payment of $11,111.25 from the school construction account to Robert Trost for the McCoppin School contract. Record · Journal page ↗
- $14,000 set aside for Board of Public Works to prepare plans for the Girls' High School. passed Record · Journal page ↗
- Proposed $10,000 set aside from the school construction account to prepare plans for new school buildings. Record · Journal page ↗
- Board ordered construction of the Burnett Grammar School Building, authorizing up to $52,500 plus $3,500 for equipment. passed Record · Journal page ↗
- The city finally approved paying John and Mary Franke $3500 for a lot at Oakdale Avenue and Lane Street for Burnett School. passed Record · Journal page ↗
- Robert McMillan's land bought for the James Lick School Record · Journal page ↗
- Six school construction contractors were paid a total of $31,654.25 from the 1908 school bond fund. passed Record · Journal page ↗
- Four contractors were paid a total of $20,132.40 for plastering and heating work at San Francisco schools. passed Record · Journal page ↗
- Payment of $5,459 to Palace Hardware Co., Butte Engineering and Electric Co. and others for work at the Tharp Commercial School approved. passed Record · Journal page ↗
- Contractors E. W. Elliott and Hansbrough Bros. were granted more time to finish the Park Police Station and Clement School. passed Record · Journal page ↗
- An ordinance ordered construction of the John Swett Grammar School building, with up to $101,800 for the work. passed Record · Journal page ↗
- Payment of $7000 to Eva J. Julian for land needed for Denman Grammar School was proposed; outcome continues. Record · Journal page ↗
- Payment of $6100 to Joseph A. Jeffery from the school construction fund for a Hayes Street lot added to Denman Grammar School approved. passed Record · Journal page ↗
- Final payments totalling $2,072.00 to Grant Fee and Hansbrough Bros. for work at two city schools; passed first reading only first reading Record · Journal page ↗
- Payment of $1,500 to Architect for plans for Marshall School approved. passed Record · Journal page ↗
- Payment of $2,000 to Benjamin Gilbert for Burnett School land approved. Record · Journal page ↗
- Payment of $1,018.50 to Van Emon Elevator Co. for the Tharp School elevator approved. passed Record · Journal page ↗
- Burke granted forty-five more days to finish the contract for the Sheridan Primary School. Record · Journal page ↗
- Payments to contractors for school building work, including J. J. Connolly and Hansbrough Bros. Co., were listed from the School Construction Account. Record · Journal page ↗
- Grant Fee and Hansbrough Bros. were paid $2,072.00 in final payments for work at Tharp and Garfield schools. passed Record · Journal page ↗
- Van Emon Elevator Co. was paid half its contract price for an elevator at Tharp Commercial High School. passed Record · Journal page ↗
- A $1,200 payment for yard work at Dudley Stone School was proposed; the outcome continues on the next page. Record · Journal page ↗
- Garfield Primary School to be paid for plumbing and heating work by two contractors; no status on record Record · Journal page ↗
- Knowles & Kaiser to be paid a first instalment for plastering work at the Hancock Grammar School; no status on record Record · Journal page ↗
- Payment of $1,161.50 to Wm. S. Snook & Son final payment for plumbing at Garfield Primary School; no vote on record. Record · Journal page ↗
- Sets aside $20,000 from the school construction fund for plans for Polytechnic High School. Record · Journal page ↗
- Proposed twenty-day extension for Ahlbach & Mayer to finish plumbing at Newton J. Tharp Commercial School. first reading Record · Journal page ↗
- Proposed ninety-day extension for Central Electric Company to install telephone systems in four schools. first reading Record · Journal page ↗
- Payment of $5,650 to B. Van Alstine for Denman School land; no vote on record. Record · Journal page ↗
- Board of Public Works recommended giving contractor F. H. Born ninety more days to finish McKinley Primary School; referred to committee. referred Record · Journal page ↗
- Paid W. S. Snook & Son and Henshaw, Kelley & Co. for Garfield School plumbing and heating work, totalling $4,025. passed Record · Journal page ↗
- Paid Knowles & Kaiser $2,425.50, first installment for plastering at Hancock Grammar School. passed Record · Journal page ↗
- Board paid Wm. S. Snook & Son $1,161.50, final payment for plumbing at Garfield Primary School. passed Record · Journal page ↗
- Board set aside $20,000 for plans and specifications for Polytechnic High School. passed Record · Journal page ↗
- School construction payments totalling $36,036.50 for Tharp, Hancock and McKinley schools were passed for printing. first reading Record · Journal page ↗
- An $11,000 payment for land on Golden Gate Avenue as an extra site for John Swett Grammar School was passed for printing. first reading Record · Journal page ↗
- Payment of $12,144.75 to F. H. Born for building the Hancock Grammar School; no vote on record; approved later. Record · Journal page ↗
- Board of Education proposed a Charter amendment segregating school funds and setting a minimum teacher salary tax rate; sent to committee. referred Record · Journal page ↗
- Public Works recommended that the Gas and Electric Company install meters and power at Sheridan Primary School. referred Record · Journal page ↗
- Public Works recommended sixty more days for Brode Iron Works to finish steel work at Spring Valley Grammar School. referred Record · Journal page ↗
- Board passed payments totaling $30,030.50 for construction, heating and yard work at Tharp, Hancock and McKinley schools. passed Record · Journal page ↗
- Board approved $11,000 payment to Alexander and Elizabeth Lynch for land on Golden Gate Avenue for John Swett Grammar School. passed Record · Journal page ↗
- Payments totaling $4,337.05 from the 1908 school bond fund for blackboards, elevator and painting at three schools. passed Record · Journal page ↗
- Payments totaling $4,080.20 from the school construction account for furniture at Garfield and Clement Schools. passed Record · Journal page ↗
- Payment of $12,144.75 to F. H. Born for building the Hancock Grammar School approved. Record · Journal page ↗
- A charter amendment relating to school funds was proposed to the city's voters; its outcome appears on the next page. passed Record · Journal page ↗
- Board authorizes $524.10 payment to C. F. Weber & Co. for desks, tables and chairs at McCoppin School. passed Record · Journal page ↗
- Three contractors were granted extensions of time to finish work at the Hall of Justice and Spring Valley Grammar School. passed Record · Journal page ↗
- Four school building contractors were paid $12,511.50 for heating, plumbing and plastering work, passed for printing. first reading Record · Journal page ↗
- Manning, Maxwell & Moore was to be paid $2,304.00 for lathes for Polytechnic High School, passed for printing. first reading Record · Journal page ↗
- Ahlbach & Mayer was granted twenty more days to finish plumbing work on the Newton J. Tharp Commercial School Building. passed Record · Journal page ↗
- Central Electric Company was given ninety more days to install telephone systems in four San Francisco schools. passed Record · Journal page ↗
- Payments totalling $38,968 approved for construction of the Newton J. Tharp Commercial School. passed Record · Journal page ↗
- Payments of about $4,338 for school blackboards, elevator and painting contracts were finally passed. passed Record · Journal page ↗
- Payments of about $4,080 for furniture for Garfield and Clement Schools were finally passed. passed Record · Journal page ↗
- The city approved $1,325.99 to Hansbrough Bros. for extra retaining wall work at Garfield Primary School. passed Record · Journal page ↗
- Ordinance proposed to build Lowell High School at Grove, Hayes, Ashbury and Masonic, up to $340,000. Record · Journal page ↗
- Board proposes extending construction contract deadlines for the McKinley Primary School building, with F. H. Born given sixty more days. passed Record · Journal page ↗
- Payments totaling $114,566.99 to contractors for sewer work in several San Francisco districts were passed for printing. first reading Record · Journal page ↗
- Proposed payments to contractors for work and supplies at several San Francisco schools, including Spring Valley School. Record · Journal page ↗
- San Francisco Fireproofing Company filed a $407.25 claim for materials used on the Frank McCoppin School; it was referred to the Finance Committee. referred Record · Journal page ↗
- Resolution proposed to pay three contractors and planners for Clement, Lowell and Cleveland school work. Record · Journal page ↗
- Payment of $3,683.00 to Robert Trost, Palace Hardware Co. and Decker Electrical Co. for work at three San Francisco schools; no vote on record. Record · Journal page ↗
- Payment of $2,590.00 to Palace Hardware Co. for hardware furnished to three San Francisco schools; no vote on record. Record · Journal page ↗
- Payment of $2,590 to Palace Hardware Co. in total for hardware furnished to three San Francisco schools approved. passed Record · Journal page ↗
- Born and the National Electric Company were granted extensions of time to finish McKinley and other school building contracts. passed Record · Journal page ↗
- $10,000 fourth installment for building Sheridan Primary School was passed on first reading. first reading Record · Journal page ↗
- Payments of $582 to Ahlbach & Mayer and $1,711 to John G. Sutton Co. for extra work at two schools. Record · Journal page ↗
- Proposes final payment of $509.25 to Van Emon Elevator Co. for an elevator at the Tharp Commercial School. Record · Journal page ↗
- Resolution giving Henning & Burke forty-five more days to finish the Sheridan Primary School was passed for printing. first reading Record · Journal page ↗
- Board of Public Works asks for $250 to test the ground at the Marshall Primary School site; sent to the Public Buildings Committee. referred Record · Journal page ↗
- Hansbrough Bros., O'Brien & Werner and Elmer Carlson were paid for work on Bay Area school buildings. passed Record · Journal page ↗
- John G. Sutton Co. was paid the final sum for heating and ventilating at Commercial High School. passed Record · Journal page ↗
- Payments for McCoppin floors, Holly Park hardware and Tharp clock passed Record · Journal page ↗
- Lowell High School to be built on Masonic Avenue block passed Record · Journal page ↗
- Golden Gate Valley Association asks for funds to light and bulkhead the Yerba Buena School yard and repair Moulton Avenue. referred Record · Journal page ↗
- Board of Public Works requested $600 to improve the roadway in front of Bernal School. referred Record · Journal page ↗
- Fourth installment of $10,000 proposed for construction of Sheridan Primary School; outcome continues on next page. passed Record · Journal page ↗
- Payments totaling $2,293.00 approved for extra work at the Tharp Commercial School and Sheridan Primary School. passed Record · Journal page ↗
- Payment of $509.25 to Van Emon Elevator Co. in final payment for an elevator installed at the Tharp Commercial School approved. passed Record · Journal page ↗
- Henning & Burke given 45 more days to finish Sheridan Primary School, delayed by plastering and plumbing contractors. passed Record · Journal page ↗
- Resolution proposed to pay $524.10 to C. F. Weber & Co. for furniture at the McCoppin School, passed for printing. first reading Record · Journal page ↗
- Three contractors were granted extensions of time on Hall of Justice and Spring Valley school building contracts, passed for printing. first reading Record · Journal page ↗
- $250 for test holes at the Marshall Primary School site Record · Journal page ↗
- Payments to contractors for plumbing, ventilating and plastering school buildings were proposed; the outcome continues on the next page. passed Record · Journal page ↗
- Payment of $2,304 to Manning, Maxwell & Moore for manual training lathes for Polytechnic High School approved. passed Record · Journal page ↗
- Payment of $1,137.60 to C. F. Weber & Co. for desks and chairs furnished to the McCoppin School approved. passed Record · Journal page ↗
- School building payments totalling $59,595.25 to several contractors were passed for printing. first reading Record · Journal page ↗
- Hansbrough Brothers given sixty more days at the Holly Park school passed Record · Journal page ↗
- Nearly $60,000 paid to builders on several school projects passed Record · Journal page ↗
- Proposed resolution authorizes school construction payments for heating, plumbing and steel work at four San Francisco schools. first reading Record · Journal page ↗
- Payment of $525 to Jos. McKenna for refinishing floors and installing linowall at the Tharp Commercial School approved. passed Record · Journal page ↗
- Bids for school and Polytechnic High School bonds were opened and referred to the Finance Committee. referred Record · Journal page ↗
- Extensions of time were proposed for contractors Henning & Burke and J. E. O'Mara on Denman and Hancock Grammar School work. first reading Record · Journal page ↗
- Board approved $59,595.25 in payments to contractors building seven city schools from the School Construction Account. passed Record · Journal page ↗
- Payments of $17,885.60 approved for heating, plumbing and steel work at four public school buildings. passed Record · Journal page ↗
- Payment of $52.50 to Jos. McKenna approved for floor work at Tharp Commercial School. passed Record · Journal page ↗
- Henning & Burke and J. E. O'Mara were granted ninety-day extensions on school building contracts, Denman and Hancock Grammar Schools. passed Record · Journal page ↗
- Resolution to authorize $17,581.10 from school construction bonds to pay seven contractors for school building work; no status on record Record · Journal page ↗
- Board of Education reported further funds needed to equip Garfield, McKinley, McCoppin and Bryant schools; referred to Finance Committee. referred Record · Journal page ↗
- Seven payments totaling $17,581.10 for school building work at Hancock, Holly Park, McKinley and other schools approved. passed Record · Journal page ↗
- Progress payments to Robert Trost and Knowles & Kaiser for school building work were passed for printing. first reading Record · Journal page ↗
- First installment to Flinn & Treacy for yard work at the Oceanside school was passed for printing. first reading Record · Journal page ↗
- The City Attorney was directed to begin condemnation proceedings to acquire land in Block 280 for the Burnett School. Record · Journal page ↗
- Mayor authorized to sell the improvements on the former John Swett School site on Golden Gate avenue at public auction. passed Record · Journal page ↗
- Oil tank proposed for the Peabody School on Sixth Avenue Record · Journal page ↗
- Land to be condemned for more room at the Burnett School Record · Journal page ↗
- Board of Public Works asked for $5,000 for yard work at Pacific Heights School; sent to the Finance Committee. referred Record · Journal page ↗
- Board of Public Works proposed offering $50,000 of 1904 school bonds to finish a school building; referred to the Finance Committee. referred Record · Journal page ↗
- Robert Trost filed a $385.40 claim for extra work on the Frank McCoppin School, referred to the Finance Committee. referred Record · Journal page ↗
- Bond-funded payments were approved to Robert Trost for McCopin school and to Knowles & Kaiser for Hancock school plastering. passed Record · Journal page ↗
- A first installment for yard work at the Oceanside school was proposed for payment from the school construction account. Record · Journal page ↗
- Payments from the school construction bond account to contractors building several San Francisco schools were passed for printing. first reading Record · Journal page ↗
- Resolution proposed to set aside $3,760 to equip the Garfield, Frank McCoppin and Bryant Cosmopolitan schools. Record · Journal page ↗
- Resolution proposed to set aside $3,515 to equip McKinley Primary School. Record · Journal page ↗
- Payments of $969 to Palace Hardware Co. and $3,300 to F. H. Born for work at Lakeview and Hancock schools. passed Record · Journal page ↗
- Old Frank McCoppin School shacks to be sold at public auction passed Record · Journal page ↗
- Storage tank of up to 2000 gallons allowed at Peabody School on 6th Avenue passed Record · Journal page ↗
- Builder given 60 more days to finish Holly Park school passed Record · Journal page ↗
- Old buildings on the John Swett School site to be auctioned Record · Journal page ↗
- Public Works recommends giving contractor F. H. Born sixty more days to finish the Hancock Grammar School construction. referred Record · Journal page ↗
- Public Works recommends giving National Electric Company more time to install fire alarm bells and telephones in school buildings. referred Record · Journal page ↗
- Board granted ninety-day extensions to contractors on McKinley and Oceanside schools and Hall of Justice; advertising charges remitted. passed Record · Journal page ↗
- Eight contractors were paid school construction progress payments totalling $39,549.75 from the school bond fund. passed Record · Journal page ↗
- Payments totalling $17,059.25 to contractors for work at six San Francisco schools were approved from bond funds. passed Record · Journal page ↗
- Payments for school furniture from the School Construction Account were proposed; the outcome is on the next page. Record · Journal page ↗
- Payments of $969 to Palace Hardware Co. and $3,300 to F. H. Born for school construction work were approved from bond funds. passed Record · Journal page ↗
- Approved $3,760 from the school construction account to equip Garfield, McCoppin and Bryant schools. passed Record · Journal page ↗
- The Board granted ninety-day extensions to three contractors building the McKinley Primary School, Oceanside School and Hall of Justice. passed Record · Journal page ↗
- Payments of $529.80 to J. J. Connolly and $767.00 to Robert Trost for school building work are proposed. Record · Journal page ↗
- Kelly-moved payments from the School Construction Account, including $2,475.40 to J. J. Connolly for Clement Primary School plastering. passed Record · Journal page ↗
- Farallone Street land offered for the Sheridan School for $9,350 Record · Journal page ↗
- $20,000 set aside for school building plans and inspection Record · Journal page ↗
- Land to be bought on Farallones Street for the Sheridan School; passed first reading only. first reading Record · Journal page ↗
- T. J. Neilan's offer of $9,350 accepted for Sheridan School land passed Record · Journal page ↗
- Payments totalling $37,336.25 to contractors for school buildings from the School Construction Account were passed for printing. first reading Record · Journal page ↗
- Resolution sets aside $33,500 for school building repairs by the Board of Public Works, October to December 1910. passed Record · Journal page ↗
- Payments to Henry C. Fitts and Brode Iron Works for Peabody and Spring Valley Grammar school work were passed for printing. first reading Record · Journal page ↗
- Dillon & Hubbard owed fees for the Polytechnic High School bonds Record · Journal page ↗
- Telephones asked for schools and electricity department inspectors' homes Record · Journal page ↗
- Home Telephone asked for school and inspectors' telephones too Record · Journal page ↗
- Board of Education protests a garage next to Redding School on Pine street; referred to the Fire Committee. referred Record · Journal page ↗
- Board of Public Works proposed $6,590 from school bond sales for yard work at Sutro Grammar School; referred. referred Record · Journal page ↗
- Board of Education asked for $16,000 from bond money to complete yard work at Clement School; referred. referred Record · Journal page ↗
- Board of Education asked for $6,250 to equip Sheridan School; referred to committee. referred Record · Journal page ↗
- Board authorized $37,336.25 in bond-fund payments to contractors for work on several city primary schools. passed Record · Journal page ↗
- Board considered paying T. J. Nellan $9,350 for land on Farallones Street for Sheridan Primary School. Record · Journal page ↗
- $3,887.50 paid for Peabody School architect fees and Spring Valley Grammar School steelwork from the school bond account. passed Record · Journal page ↗
- Board approved $1,296.80 in payments to two contractors for work at Clement and McCoppin schools. passed Record · Journal page ↗
- $33,500 was set aside for repairs to school buildings during October through December 1910. passed Record · Journal page ↗
- National Electric Company was granted ninety more days from November 30, 1910 to install fire alarms in four schools. passed Record · Journal page ↗
- $10,500 is proposed for equipping Tharp Commercial School from the school construction account; no outcome printed here. Record · Journal page ↗
- Supervisors repealed the $15,000 resolution for moving Hamilton School, since the work will not be done. passed Record · Journal page ↗
- A sixty-day extension to finish the Hancock Grammar School building contract for F. H. Born was referred. referred Record · Journal page ↗
- Payments made for Franklin and Spring Valley school work passed Record · Journal page ↗
- $20,000 set aside for plans for the Polytechnic High School Record · Journal page ↗
- City approves school construction payments totalling $14,020.02 to contractors for heating, floors, blackboards, steel, and plumbing at several schools. passed Record · Journal page ↗
- Payments approved from the School Construction Account to contractors for work on five city schools. passed Record · Journal page ↗
- Proposed $10,500 appropriation for equipping Tharp Commercial School, with the outcome printed on a later page. Record · Journal page ↗
- F. H. Born was granted two sixty-day extensions to finish general construction of the Hancock Grammar School building. passed Record · Journal page ↗
- A resolution proposed paying five contractors and suppliers a total of $13,122.10 for work on several San Francisco schools. Record · Journal page ↗
- Board of Education authorized school construction funds for C.F. Weber & Co. furniture at Tharp Commercial School, totalling $5,647.60. Record · Journal page ↗
- Board of Education asked for an appropriation to equip Longfellow and Farragut schools; sent to the Finance Committee. referred Record · Journal page ↗
- The Board of Education asked to lease Denman School land at Taylor and Vallejo streets to E. F. Burns and Charles S. Cushing for thirty-five years. referred Record · Journal page ↗
- The Board of Education requested $4,825 and $5,050 to equip the Tunipero Serra and Holly Park schools; referred to Finance. referred Record · Journal page ↗
- The Board of Education asked for $1,500 for an iron fence at Mission Grammar School; referred to the Finance Committee. referred Record · Journal page ↗
- The Board of Education asked that a vacant stable on Rose avenue beside Moulder School not be reoccupied; referred to committee. referred Record · Journal page ↗
- Passed $13,122.10 in payments to contractors and suppliers for work on five city school buildings. passed Record · Journal page ↗
- Passed a $12,718.50 third installment to Hansbrough Bros. for construction of Holly Park School. passed Record · Journal page ↗
- Payment of $5,647.60 to C. F. Weber & Co. for Tharp Commercial School furniture; vote continues on next page. Record · Journal page ↗
- Board set aside $6,590 from the School Construction Account for yard work at Sutro Grammar School. passed Record · Journal page ↗
- Board of Education given $2250 from school construction bond funds to finish equipping Sheridan Primary School. passed Record · Journal page ↗
- Payment of $1,464.30 to McSheehy Bros. for Peabody School foundation reinforcement was proposed and passed for printing. first reading Record · Journal page ↗
- Board finally approved $28,526.15 in school building construction payments to five contractors, including McCoppin, Denman, Adams and Lakeview schools. passed Record · Journal page ↗
- The Board paid $13,725 in progress payments for construction of the Burnett and Jean Parker schools. passed Record · Journal page ↗
- The Board approved $1,454.30 paid to McSheehy Bros. for reinforcing the foundations of the Peabody School. passed Record · Journal page ↗
- Resolution proposed to pay four contractors a total of $8,416.15 for school plastering and lathing work. Record · Journal page ↗
- Resolution proposed to pay $4,387.13 to two suppliers for school desks, tables and a blackboard. Record · Journal page ↗
- The Board of Public Works set aside $20,500 for school building repairs from January to March 1911. Record · Journal page ↗
- Proposed $3000 from the School Construction Account to equip the Lakeview School. Record · Journal page ↗
- Proposed $2125 from the School Construction Account to finish equipping Hancock, Holly Park and West End schools. Record · Journal page ↗
- The Board asked Bay Cities Home Telephone Company to install telephones in eight San Francisco schools. passed Record · Journal page ↗
- City proposed paying F. H. Born $10,882.19 for extra work on the Hancock and McKinley Primary schools. Record · Journal page ↗
- City proposed payments totalling $6,183.64 to several contractors for street paving and moving Adams School buildings. Record · Journal page ↗
- Desks and furniture bought for Sheridan and Holly Park schools passed Record · Journal page ↗
- $575 added to the Holly Park Primary School appropriation Record · Journal page ↗
- A notice of claim for $30.28 for plastering Lake View School was referred to the Finance Committee. referred Record · Journal page ↗
- Passed for printing: $3,699 in payments for vacuum cleaning and construction at two San Francisco schools. first reading Record · Journal page ↗
- Board of Education asked that the Mayor be authorized to sell a building on the John Swett School site on Golden Gate avenue. referred Record · Journal page ↗
- Board of Public Works asked that insurance claims on the steel work of Adams Grammar School be waived as work was accepted. referred Record · Journal page ↗
- Board of Public Works recommended $4,000 for storm doors in certain school buildings, referred for action. referred Record · Journal page ↗
- Five payments totalling $37,300 were approved from the School Construction Account to contractors building several city schools. passed Record · Journal page ↗
- Payments from the School Construction Account for lathing and plastering at several city schools were proposed, with the vote continuing on the next page. Record · Journal page ↗
- Board approved $4,387.13 in school furniture and equipment payments to two suppliers. passed Record · Journal page ↗
- Board of Public Works was authorized to spend $20,500 on necessary repairs to school buildings from January to March 1911. passed Record · Journal page ↗
- Approved: $3000 from the School Construction Account to equip the Lakeview School. passed Record · Journal page ↗
- Approved: $2125 from the School Construction Account to equip Hancock Grammar, Holly Park Primary and West End Primary schools. passed Record · Journal page ↗
- Board passed for printing payments from the School Construction Account to four contractors for work on Hancock, Clement and Burnett schools. first reading Record · Journal page ↗
- Payments totaling $5,846.25 for school chairs, plastering and plumbing were passed for printing. first reading Record · Journal page ↗
- Sunnyside Improvement Club asked that surplus school funds be used to grade, pave and fence Sunnyside School grounds; referred to committee. referred Record · Journal page ↗
- Four contractors were paid a combined $14,856.75 for school building work at Hancock, Clement, Burnett and Franklin schools. passed Record · Journal page ↗
- Payments of $5,846.25 for chairs, plastering and plumbing at three San Francisco schools were approved from the school construction account. passed Record · Journal page ↗
- Payments for vacuum cleaning at West End Primary School and construction at Adams Cosmopolitan School are proposed, outcome continues on next page. Record · Journal page ↗
- Payments totaling $2,222 covered plumbing at McKinley Primary School and desks for Tharp Commercial School. passed Record · Journal page ↗
- Central Electric Company's $487.25 claim against [name withheld] for McKinley School electrical work was referred to the Finance Committee. referred Record · Journal page ↗
- Scarritt and Clark's $422.16 claim against Henning and Burke for Sheridan Primary School labor was referred to committee. referred Record · Journal page ↗
- Resolution authorizes school construction payments to F. Griffin, Kiernan & Donohue, and Ralston Iron Works from the bond fund. Record · Journal page ↗
- Payment of $20,511.75 to five contractors and payees for construction work at four city schools approved. passed Record · Journal page ↗
- Payment of $8,121.98 to four suppliers for desks, clocks and typewriters for three city schools approved. passed Record · Journal page ↗
- $4,000 set aside for storm doors at ten named San Francisco school buildings. passed Record · Journal page ↗
- $2,200 set aside to finish yard work at West End Primary School, using leftover funds from an earlier appropriation. passed Record · Journal page ↗
- Progress payments totalling $9,207 were approved to three contractors building the Clement and Peabody primary schools. passed Record · Journal page ↗
- City approved a $1,410 first installment to W. S. Snook & Son for plumbing work at the Peabody School. passed Record · Journal page ↗
- The Board funded $2250 to pay six more women inspectors of schools for February to June 1911. passed Record · Journal page ↗
- Board passed $11,205 in school construction payments to Central Electric Co. and Brode Iron Works for Franklin and John Swett schools. passed Record · Journal page ↗
- Payments totalling $3,595.35 for painting, flooring and blackboards at three city schools were approved. passed Record · Journal page ↗
- Board set aside $1,000 from the School Construction Account for yard work at various schools. passed Record · Journal page ↗
- Passed for printing: payments for building the Hancock, Grattan and Cleveland schools from 1908 bond funds. first reading Record · Journal page ↗
- Proposed payments for electrical and heating work at the Peabody and Burnett schools, from 1908 bond funds. Record · Journal page ↗
- Proposed second installment payment to Flinn & Treacy for yard work at the Oceanside School. Record · Journal page ↗
- Proposed final payment of $1,000 to Lange & Bergstrom for building the Lake View Primary School. Record · Journal page ↗
- Board approved $28,802.25 in bond-fund payments to contractors building the Hancock, Grattan and Cleveland schools. passed Record · Journal page ↗
- Payments totaling $3,318.75 approved for electrical and heating work at the Peabody and Burnett schools. passed Record · Journal page ↗
- Payment of $1,125 to Flinn & Treacy for the second installment of yard work at Oceanside School approved. passed Record · Journal page ↗
- Lange & Bergstrom received the final $1,000 payment for construction of the Lake View Primary School. passed Record · Journal page ↗
- Payment of $515.25 to California Electrical Construction Co. for the second installment of electrical work at Hancock Grammar School approved. passed Record · Journal page ↗
- Payments totalling $2,782.61 for desks, a blackboard and fixtures at three San Francisco schools were passed for printing. first reading Record · Journal page ↗
- Henning & Burke asked for immediate payment of the balance owed for building Sheridan Primary School; referred to Finance Committee. referred Record · Journal page ↗
- Board of Education asks for immediate payment to Samuel Sadler for a building sold from the John Swett School site; sent to Finance Committee. referred Record · Journal page ↗
- Board of Education asked for a telephone to be installed in the music supervisor's office at Golden Gate School; referred. referred Record · Journal page ↗
- Board of Education asked that the Mayor be authorized to sell improvements on land bought for Denman School; referred. referred Record · Journal page ↗
- Board of Public Works recommended giving National Electrical Company ninety more days to finish fire alarm work at Jean Parker School; referred. referred Record · Journal page ↗
- Board of Public Works recommended giving Flinn & Treacy ninety more days to finish yard work at Pacific Heights School; referred. referred Record · Journal page ↗
- The Board adopted the Education Committee report on arranging school vacations so children can help harvest fruit and berry crops. passed Record · Journal page ↗
- Resolution proposed to pay John G. Sutton Co. the first installment for the Jean Parker School heating system. Record · Journal page ↗
- Payment of $4,222.50 to Atlas Heating and Ventilating Co. for Franklin School heating was passed for printing. first reading Record · Journal page ↗
- Bay Development Company claimed $282 for materials used on the Jean Parker School building; referred to Finance Committee. referred Record · Journal page ↗
- Board of Education recommends accepting E. E. Burns's bid to lease a school lot at Bush and Taylor streets; referred to Finance Committee. referred Record · Journal page ↗
- Board of Education recommends $75,000 from the 1908 bond issue to build a ten-classroom building at Washington Irving School; referred to Finance Committee. referred Record · Journal page ↗
- Payments of $2,782.61 from the school construction account to C. F. Weber & Co. and J. P. Lorden Mill Co. for school equipment were authorized. passed Record · Journal page ↗
- An additional $4,500 from the school construction account was set aside to complete the Jean Parker Grammar School building. passed Record · Journal page ↗
- Payments totalling $26,871.75 to contractors for school buildings were passed for printing, funded from the School Construction Account. first reading Record · Journal page ↗
- Payment of $6,250 proposed to Owl Realty Company for a Nineteenth Street lot added to Douglass Primary School. Record · Journal page ↗
- Final payment of $1,137.25 proposed to J. E. O'Mara for plumbing work at Hancock Grammar School. Record · Journal page ↗
- The Board of Education's lease of a school lot at Bush and Taylor streets to E. F. Burns was approved. passed Record · Journal page ↗
- City Attorney was instructed to begin condemnation of land on Lobos Street for an added Sheridan Primary School site. passed Record · Journal page ↗
- Paint supplier W. P. Fuller & Company gave notice of a claim against Wiese & Sons for paint used at Denman School. referred Record · Journal page ↗
- City approved payments for construction and electrical work at the Clement, Peabody and Burnett schools. passed Record · Journal page ↗
- Payments totaling $26,871.75 to contractors for construction and plastering work at several San Francisco schools were approved. passed Record · Journal page ↗
- A $6,250 purchase of a lot on Nineteenth Street from Owl Realty Company for the Douglass Primary School was proposed. Record · Journal page ↗
- Resolution approved paying Atlas Heating and Ventilating Co. $4,222.50, a second installment on Franklin School's heating system. passed Record · Journal page ↗
- Resolution approved paying John G. Sutton Co. $3,675, a first installment on the Jean Parker Grammar School heating system. passed Record · Journal page ↗
- City made final payment of $1,137.25 to J. E. O'Mara for plumbing work at Hancock Grammar School. passed Record · Journal page ↗
- Board of Education lease of a Bush and Taylor streets school lot to E. F. Burns was laid over one week. Record · Journal page ↗
- The National Electric Company was granted 90 more days to install fire alarm bells and telephones at Jean Parker Grammar School. passed Record · Journal page ↗
- Elmer Carlson was proposed for a sixty-day extension to finish general construction of Cleveland School. referred Record · Journal page ↗
- The Board of Education proposed the Mayor be authorized to sell old school shack buildings at public auction. referred Record · Journal page ↗
- Progress payments for heating at Peabody School and plastering at Franklin School were authorized from the school construction account. Record · Journal page ↗
- Payments totalling $8,108.71 were approved for school furniture, fees and electrical work at several San Francisco schools. passed Record · Journal page ↗
- The Board approved a lease by the Board of Education of the school lot at Bush and Taylor streets to E. F. Burns. passed Record · Journal page ↗
- Flinn and Treacy granted thirty more days to finish school yard work at Pacific Heights School. passed Record · Journal page ↗
- Payment of $7,425 to Four contractors in total for plumbing and heating work at four city schools approved. passed Record · Journal page ↗
- Fixtures and chairs for the Tharp Commercial School were paid for at $1,780.00 to Coefield Company and $600.00 to Superior Seating Co. passed Record · Journal page ↗
- Board authorized payments of $1,217.80 to John G. Sutton Co. and $502.50 to a cleaning firm for two school buildings. passed Record · Journal page ↗
- W. P. Fuller & Co. filed a $2,050 claim for glass supplied to build Denman School; the claim was referred to the Finance Committee. referred Record · Journal page ↗
- Board approved $5,702.50 in school construction payments to Lange & Bergstrom and United Builders' Supply Co. for Burnett and Lakeview Schools. passed Record · Journal page ↗
- Board of Public Works recommends $26,000 from school bonds for yard work at Clement Primary School, referred to committee. referred Record · Journal page ↗
- Three school construction payments totalling $23,486.75 approved for Henning & Burke, Finlayson-Stettin and G. D. Patterson. passed Record · Journal page ↗
- School construction payments proposed, including $4,074.75 to Finlayson-Stettin for Jean Parker School; vote continues. Record · Journal page ↗
- Board adopted $7,633.25 in progress payments to three contractors building the Jean Parker, John Swett and Harrison schools. passed Record · Journal page ↗
- Board adopted a $2,025 second installment to F. H. Born for construction of the Grattan School. passed Record · Journal page ↗
- Board approved $20,500 for repairs to school buildings during April, May and June 1911. passed Record · Journal page ↗
- Proposed fifth installment of $4,005 to McSheehy Bros. for building the Peabody School. first reading Record · Journal page ↗
- Board approved City Architect's report that $200,000 for Polytechnic High School covers shop building and steel work. passed Record · Journal page ↗
- City paid McLeran & Peterson $4,995 as second installment for building the Visitacion Valley School. passed Record · Journal page ↗
- City paid McSheehy Bros. $4,005 as fifth installment for construction of the Peabody School. passed Record · Journal page ↗
- Plan to let Public Works contract for yard work at Clement Primary School, up to about $26,000; passed first reading only. first reading Record · Journal page ↗
- Board granted Elmer Carlson sixty more days to finish general construction of the Cleveland School. passed Record · Journal page ↗
- Payments were allowed for architect fees on the Marshall School and progress payments on the Grattan School construction contract. passed Record · Journal page ↗
- Students of Humboldt Evening School petitioned for a new building; the petition was referred to the Public Buildings Committee. referred Record · Journal page ↗
- Progress payments totaling $26,266.50 were approved for construction of Spring Valley, Burnett and Cleveland schools. passed Record · Journal page ↗
- Payments totalling $6,266.60 for architect fees and construction at the Marshall, Grattan and Jean Parker schools were approved. passed Record · Journal page ↗
- Payments of $4,863.00 approved for desks and heating systems at four San Francisco schools. passed Record · Journal page ↗
- Bill No. 1717 would let the Board of Public Works contract for a $103,000 shop building at Polytechnic High School. Record · Journal page ↗
- M. R. Foesey asked for an appropriation to house pupils of the Humboldt Evening School, referred to committee. referred Record · Journal page ↗
- Resolution would pay Wittman Lyman & Co. $2,747.50 and F. H. Born $1,000 for Lake View and Hancock school work. Record · Journal page ↗
- City authorized $2,000 to H. W. Hanley for lathing and plastering at McKinley School. passed Record · Journal page ↗
- Resolution authorizing $12,647.75 in payments to contractors for work on Denman and Harrison Primary Schools was passed for printing. first reading Record · Journal page ↗
- Proposed payment of $2,500.50 to McCabe & Brown for first installment of yard work at Sutro School. Record · Journal page ↗
- Proposed $516.00 payment to John G. Sutton Co. for enlarging the boiler at Portola School. Record · Journal page ↗
- Board of Education asks that a school lot on Nineteenth Avenue south of California Street be formally transferred to the Fire Department. referred Record · Journal page ↗
- Three contractors were paid a total of $12,647.75 for work on the Denman and Harrison Primary schools. passed Record · Journal page ↗
- Payment of $2,599.50 to McCabe & Brown as first installment on yard work at the Sutro School approved. passed Record · Journal page ↗
- Payment of $778.60 to San Francisco Cornice Co. for storm doors at the Clement, Holly Park and Garfield schools approved. passed Record · Journal page ↗
- Payment of $516.00 to John G. Sutton Co. for enlarging a boiler at Portola School approved. passed Record · Journal page ↗
- Resolution passed for printing to pay McSheehy Bros. $4,080 as a sixth installment on building the Peabody School. first reading Record · Journal page ↗
- Resolution passed for printing to pay three suppliers a total of $2,138.38 from the school construction account. first reading Record · Journal page ↗
- Resolution passed for printing to pay Bennett Bros. and Kiernan & Donohue a total of $1,760.10 for two primary schools. first reading Record · Journal page ↗
- The city approved a $4,080 sixth payment to McSheehy Bros. for construction of the Peabody School. passed Record · Journal page ↗
- A $2,135.38 school payment proposal to Dyer Brothers and two other suppliers was referred to the Finance and Buildings Committee. referred Record · Journal page ↗
- The city finally passed $1,700.10 in school payments to Bennett Bros. and Kiernan & Donohue for Clement and Cleveland Primary Schools. passed Record · Journal page ↗
- Payments totaling $53,434.94 for work and equipment at several San Francisco schools were approved from the School Construction Account. passed Record · Journal page ↗
- Payments totalling $4,915.95 for school furniture at Clement Primary and construction of Visitacion Valley School were proposed. Record · Journal page ↗
- Payment of $2,156.25 to Henning & Burke as a first installment for yard work at Clement Primary School approved. passed Record · Journal page ↗
- Proposed school payments totaling $2,138.38 were indefinitely postponed on Kelly's motion. Record · Journal page ↗
- Payment of $1,138.38 to J. W. Schouten & Co. and Golden Gate Brick Co. combined for yard supplies at two schools approved. passed Record · Journal page ↗
- Resolution approves $976.41 paid to R. J. Keown Jr. for asphalt at the West End School yard. passed Record · Journal page ↗
- Board of Public Works recommended $13,000 more from the bond issue for Polytechnic High School, referred to the Finance Committee. referred Record · Journal page ↗
- Board of Education asked for $50,000 from 1904 bonds to build a new parental school at Seventh and Bryant streets, referred to committee. referred Record · Journal page ↗
- Resolution paying $2,158.50 for school blackboards and hardware was recommitted to the Finance Committee. referred Record · Journal page ↗
- Payment of $1,000 to Dyer Brothers for planking the floors of the Tharp Commercial School approved. passed Record · Journal page ↗
- Payment of $740 to C. F. Weber & Co. for 370 assembly chairs for the Hancock Grammar School approved. passed Record · Journal page ↗
- Three bidders offered for Polytechnic High School bonds; the bids were referred to the Finance Committee. referred Record · Journal page ↗
- Payments of $3,034.08 for blackboards and a heating system at the Burnett and Adams schools were approved. passed Record · Journal page ↗
- Payments totalling $2,158.50 for blackboards and hardware at two schools were indefinitely postponed. Record · Journal page ↗
- A payment of $1,875 to Flinn & Treacy for yard work at Bay View School was finally passed. passed Record · Journal page ↗
- Payment of $1,198.50 to Whitaker & Ray-Wiggin Co. for blackboards at the Jean Parker School was approved. passed Record · Journal page ↗
- Second payment of $1,143 to McCabe & Brown for yard work at the Sutro Grammar School was approved. passed Record · Journal page ↗
- Payments totalling $9,763.75 from the School Construction Account for work on several city school buildings were passed for printing. first reading Record · Journal page ↗
- A payment from the School Construction Account for hardware furnished to school buildings was proposed to Joost Bros. Record · Journal page ↗
- Resolution adopted setting aside $500 from the Polytechnic High School fund for a program clock. passed Record · Journal page ↗
- Resolution adopted directing sealed bids for $100,000 of school bonds, opened at 3 p.m. June 10, 1911. passed Record · Journal page ↗
- Proposed measure authorizing payments for construction of school buildings was passed for printing on Kelly's motion. first reading Record · Journal page ↗
- Board approved $14,357.97 in payments from the school construction account for work on several San Francisco school buildings. passed Record · Journal page ↗
- Board approved a $1,273.50 payment to Robert Trost for a yard fence at Mission Grammar School. passed Record · Journal page ↗
- Board of Education submitted a $70,870 estimate for equipping Polytechnic High School; referred to the Finance Committee. referred Record · Journal page ↗
- Board of Public Works recommended $350,000 for building and equipping the Girls' High School; referred to committee. referred Record · Journal page ↗
- Payments from the school construction account to claimants for work on school buildings, including [name withheld], are authorized. Record · Journal page ↗
- John Cazaretto filed a $9,080.04 claim for materials used on the Denman School; the claim was referred to committee. referred Record · Journal page ↗
- Payments totalling $10,116.50 to Wm. S. Snook & Son and Elmer Carlson for work on the Spring Valley and Cleveland schools were approved. passed Record · Journal page ↗
- Payments totalling $5,840.50 for heating, construction and chairs at the Denman, McCoppin and Farragut schools were approved. passed Record · Journal page ↗
- Bennett Bros was paid first installments for school hardware at Peabody, Adams, Jean Parker and Visitacion schools. passed Record · Journal page ↗
- Claim of $90.54 by Waterhouse and Price Company for material used on the Franklin School was referred to the Clerk. referred Record · Journal page ↗
- Claim of $506.45 by Healy-Tibbitts Construction Company for material used on the Spring Valley School was referred to the Clerk. referred Record · Journal page ↗
- Board of Public Works recommended ninety more days for Henning and Burke to finish the Clement School yard contract. referred Record · Journal page ↗
- Payment of $9,450 to Lange & Bergstrom for construction of the Adams Grammar School; passed final; approved. passed Record · Journal page ↗
- Progress payments totalling $3,915 for yard work at the Sutro, Ocean Side and Bay View schools were approved. passed Record · Journal page ↗
- Unsold 1904 school bonds were ordered placed on sale at the City Treasurer's office at a fixed price. passed Record · Journal page ↗
- Brode Iron Works was granted ninety more days to finish steel work on the John Swett School Building. passed Record · Journal page ↗
- Payments totalling $9,944.60 for work on Hancock, Denman, Sheridan, Lakeview, Adams and Grattan Schools were passed for printing. first reading Record · Journal page ↗
- The Board of Public Works recommended $53,127.50 for public building repairs and school remodeling, plus $1,500 for janitorial supplies; referred to the Public Buildings Committee. referred Record · Journal page ↗
- Board of Education requested an extra $100,000 to finish the Girls' High School, referred to the Finance Committee. referred Record · Journal page ↗
- Board is authorizing school construction fund payments, including $509.60 to San Francisco Cornice Co. for school storm doors. Record · Journal page ↗
- Public Building Fund payment of $3,003.75 proposed to G. D. Patterson Co. for Franklin School construction. Record · Journal page ↗
- Payments totaling $7,730.64 proposed to contractors working on the McKinley, Denman and Lincoln schools. first reading Record · Journal page ↗
- Board of Public Works recommended a ninety-day extension for McSheehy Bros. to finish the Peabody School contract. referred Record · Journal page ↗
- City accepts Michael McHugh's offer to sell land on Dehon Street for Everett Grammar School for $3,500. passed Record · Journal page ↗
- Resolution proposed paying five contractors $14,988 for work on San Francisco school buildings from the 1908 bond fund. first reading Record · Journal page ↗
- Board of Public Works recommends $33,000 from 1904 school bonds for yard work at Denman Grammar School; referred to Building Committee. referred Record · Journal page ↗
- Board of Education proposed leasing its school lot at Taylor and Vallejo streets for $15,429, sent to committee. referred Record · Journal page ↗
- Board of Public Works recommended giving Caldwell and Company ninety more days to finish the Spring Valley School contract, sent to committee. referred Record · Journal page ↗
- Board approved $14,983 in contractor payments for Grattan, Adams, Peabody and Spring Valley school buildings. passed Record · Journal page ↗
- The city is paying contractors on school building work, including heating, roofing and ornamental iron; the vote follows on the next page. Record · Journal page ↗
- The Board set aside $25,000 for summer 1911 repairs to school houses, to be carried out by Public Works. Record · Journal page ↗
- $2,250 approved to finish building the Peabody Primary School, in addition to an earlier $76,500. passed Record · Journal page ↗
- Southern Heights Improvement Club protested moving $50,000 of school bond money until its school claim is heard; referred to committee. referred Record · Journal page ↗
- Board of Education asked for $15,500 from the 1904 bond issue for a Douglass School annex at Nineteenth and Collingwood streets; sent to Public Buildings Committee. referred Record · Journal page ↗
- Board of Public Works recommended $410 for a handball court and fences at Sutro Grammar School; sent to Public Buildings Committee. referred Record · Journal page ↗
- Payments totalling $7,617 approved from the school construction account for hardware, heating, electrical work at several schools. passed Record · Journal page ↗
- Proposed $3,500 payment to Michael McHugh for a Dehon Street lot added to the Everett Grammar School site. Record · Journal page ↗
- The Board approved final payments totaling $2,861 to Flinn & Treacy for yard work at Oceanside and Bay View schools. passed Record · Journal page ↗
- The Board approved $1,796.25 second installment to Kiernan and O'Brien for plumbing work at Jean Parker School. passed Record · Journal page ↗
- Proposed $33,000 from the School Construction Account for yard work at Denman Grammar School. first reading Record · Journal page ↗
- E. W. Stone filed a $21,904.27 claim for materials and labor on the McKinley Primary School building; referred to the Clerk. referred Record · Journal page ↗
- Payments totalling $13,830.14 for supplies and construction at the Burnett, West End, Jean Parker and Visitacion Valley schools were finally passed. passed Record · Journal page ↗
- Sets aside $33,000 from the school construction account for yard work at Denman Grammar School. passed Record · Journal page ↗
- Resolution authorizing payments for work on school buildings from the School Construction fund was passed for printing. first reading Record · Journal page ↗
- Resolution sets aside $25,000 for necessary repairs to school houses from August to December 1911. passed Record · Journal page ↗
- City approved $30,225.14 in progress payments to contractors building several San Francisco schools, including Lowell High School and Jean Parker School. passed Record · Journal page ↗
- The Board set aside $25,000 for the Board of Public Works to repair school houses from August to December 1911. passed Record · Journal page ↗
- Proposed resolution would pay $4,589.15 to contractors for heating, plumbing and blackboards at three San Francisco schools. Record · Journal page ↗
- Proposed resolution would pay $2,757.75 to contractors for plumbing work at the Jean Parker and Franklin Grammar schools. Record · Journal page ↗
- The Board authorized a $1,047.50 final payment to McCabe & Brown for yard work at Sutro Grammar School. passed Record · Journal page ↗
- Merchants' Association protested payment of part of Henning & Burke's demands for Clement School yard work; referred to Finance Committee. referred Record · Journal page ↗
- George Somers offered to sell land on London Street to the city for $4300 for Monroe School; referred to Finance Committee. referred Record · Journal page ↗
- L. A. Norris Co. filed an $852.73 claim against contractors Finlayson & Stettin over the Jean Parker School building. Record · Journal page ↗
- Passed final payments totalling $4,589.15 for heating, plumbing and blackboard work at Peabody, Jean Parker and Lincoln schools. passed Record · Journal page ↗
- Payment of $2,757.75 to Two plumbing contractors in total for work at the Jean Parker and Franklin Grammar schools approved. passed Record · Journal page ↗
- McCabe & Brown were paid a final $1,647.50 for yard work at the Sutro Grammar School. passed Record · Journal page ↗
- Caldwell and Company granted ninety more days to finish building the Spring Valley School. passed Record · Journal page ↗
- F. Ambrose offered to sell land for Monroe School for $4750; sent to the Finance Committee. referred Record · Journal page ↗
- Merchants' Association protested paying part of Henning & Burke's bill for work at Clement School; sent to the Finance Committee. referred Record · Journal page ↗
- Board of Supervisors passed $5,000 for drawing plans for Patrick Henry School and annexes to three schools. passed Record · Journal page ↗
- Board authorized a second payment of $6,468.75 to Henning & Burke for Clement School yard work. passed Record · Journal page ↗
- Board authorized a $2,547 first payment to McLeran and Peterson for the Polytechnic shop building. passed Record · Journal page ↗
- City approved final payment of $2,375 to John G. Sutton Co. and $2,289.70 to Robert Trost for school building work. passed Record · Journal page ↗
- City approved payments to five contractors for floors, plastering, blackboards and plumbing at several city schools, totalling $21,201.22. passed Record · Journal page ↗
- Resolution to pay Robert R. Vair $10,300 for land at Norwich and Alabama streets for Precita Valley School was passed for printing. first reading Record · Journal page ↗
- Resolution to pay J. H. Attell $9,100 for land at Twenty-second and Church streets for Edison School was passed for printing. first reading Record · Journal page ↗
- Proposed $3,700 payment to George Miller for a lot on Alabama Street as the Precita Valley School site. Record · Journal page ↗
- Payments of about $2,476 proposed to C. F. Weber & Co. and Whitaker & Ray Wiggin Co. for chairs and desks for Cleveland and Denman Schools. Record · Journal page ↗
- Payments of $1,201.50 proposed to John G. Sutton Co. and A. Knowles for electric and plastering work at two schools. Record · Journal page ↗
- Public Works recommended $375,000 for a Girls' High School on Scott Street; referred to the Public Buildings and Finance Committees. referred Record · Journal page ↗
- Payments of $25,952.25 to four firms for school building work at Jean Parker, Spring Valley and Grattan schools were approved. passed Record · Journal page ↗
- A $10,300 payment to Roger R. Vair for a Precita Valley School site was taken up and continues on the next page. Record · Journal page ↗
- City approved $9,100 payment to J. H. Attell for land added as an additional Edison School site. passed Record · Journal page ↗
- Payment of $3,700 to George Miller for a lot on Alabama Street as the site for Precita Valley School, approved by resolution approved. passed Record · Journal page ↗
- Payments for chairs and desks for a school building are proposed from the School Construction Account. Record · Journal page ↗
- The city paid John G. Sutton Co. and A. Knowles $1,201.50 for electrical and plastering work at two schools. passed Record · Journal page ↗
- Public Works recommends a ninety-day extension for Brode Iron Works to finish steel work on John Swett School. referred Record · Journal page ↗
- Proposed $8,300 purchase of two lots on Twenty-second Street for an Edison Primary School playground, laid over one week. Record · Journal page ↗
- Final payment of $2,938 approved to John G. Sutton Co. for the heating system at Jean Parker School. passed Record · Journal page ↗
- Passed for printing: $13,548 in school fund payments to contractors for Grattan, Spring Valley and Lincoln schools. first reading Record · Journal page ↗
- Passed for printing: $2,142.60 in school fund payments to C. F. Weber & Co. for furniture at two grammar schools. first reading Record · Journal page ↗
- Ordinance proposed to order construction of a Girls' High School on Scott Street, up to $375,000. Record · Journal page ↗
- C. W. Moore Company offered land for $6,000 as an extra site for Washington Irving School; sent to Finance Committee. Record · Journal page ↗
- Payments of $900 and $2,625 approved for electrical and heating work at Lincoln School. passed Record · Journal page ↗
- Payment of $781 approved to Caldwell & Co. for extra work at Spring Valley Grammar School. passed Record · Journal page ↗
- Clerk directed to advertise for bids on $209,200 in school bonds, with bids received September 25, 1911. passed Record · Journal page ↗
- Board accepted L. Depaoli's offer to sell land on Moultrie Street for $3,300 as an extra playground for Bernal Grammar School. passed Record · Journal page ↗
- Payments for blackboards at Grattan School and structural steel at Lowell High School were proposed for printing. first reading Record · Journal page ↗
- An offer by John Healy et al. to sell land on Wisconsin street for $925 for Burnett Primary School was referred to the Finance Committee. referred Record · Journal page ↗
- Cayatano Arellano offered to sell 180 Highland avenue for $2700 for Holly Park School; the offer was sent to committee. referred Record · Journal page ↗
- Public Works recommends Henning and Burke get thirty more days to finish yard work at Clement School. referred Record · Journal page ↗
- Public Works recommends F. H. Born get ninety more days to finish general construction of Grattan School. referred Record · Journal page ↗
- Resolution 8454 proposes payment from the School Construction Account to C. F. Weber & Co. for blackboards on school buildings. Record · Journal page ↗
- Payments approved to three contractors for work on the Grattan, Spring Valley and Lincoln school buildings. passed Record · Journal page ↗
- Purchases of two lots on Twenty-second Street, totalling $8,300, for the Edison Primary School playground were adopted. passed Record · Journal page ↗
- Payment of $6,675 to Henning & Burke for yard work at Clement Primary School was adopted. passed Record · Journal page ↗
- Payment of $5,538 to McLeran & Peterson as a second installment on the Polytechnic High School building was adopted. passed Record · Journal page ↗
- Purchase of a London Street lot for $4,750 from Margaret Richter as an additional Monroe School playground was adopted. passed Record · Journal page ↗
- Resolution pays George Somers $4,300 for a lot on London Street for the Monroe School playground. passed Record · Journal page ↗
- Resolution authorizing payments for work at Lincoln School is proposed; its outcome continues on the next page. Record · Journal page ↗
- Resolution authorizing payment to C. F. Weber for school building furniture is proposed; outcome continues on the next page. Record · Journal page ↗
- Payment of $781 approved to Caldwell & Co. for extra work at the Spring Valley Grammar School. passed Record · Journal page ↗
- Payment of $656.25 approved to J. P. Doherty as fourth installment for plumbing work at Adams School. passed Record · Journal page ↗
- Ordinance proposed to order construction of the Girls' High School on Scott Street between Geary and O'Farrell streets. Record · Journal page ↗
- Payments for school building work at Grattan, Visitacion Valley and Adams Cosmopolitan schools; the vote continues on the next page. Record · Journal page ↗
- Resolution approved final $584.50 payment to Butte Engineering and Electric Co. for electric work at Adams Cosmopolitan School. passed Record · Journal page ↗
- Proposed extensions of time for contractors finishing steel work on John Swett School and the City and County Jail. Record · Journal page ↗
- Proposals to buy $209,000 in school bonds were opened, and no bids were received. Record · Journal page ↗
- San Francisco Gas and Electric Company filed a $161.00 claim against Standard Electric Construction Company for work on Cleveland School. referred Record · Journal page ↗
- The Board of Education asked that the Mayor be allowed to sell shack buildings formerly used by Jean Parker School; referred to committee. referred Record · Journal page ↗
- Public Works recommended letting Lange and Bergstrom cancel their insurance on the Adams Grammar School building after finishing their contract. referred Record · Journal page ↗
- Payments totalling $7,213.75 to contractors for school heating and construction work passed for printing. first reading Record · Journal page ↗
- Payments totalling $4,117.72 approved for desks and chairs at Adams Cosmopolitan School and Franklin School construction. Record · Journal page ↗
- $3,300 approved to L. Depaoli for a lot at Jarboe avenue and Moultrie street, added to Bernal Grammar School. Record · Journal page ↗
- A resolution to repeal Resolution 7590 and undo the transfer of an Eighteenth Avenue school lot to the Fire Department. Record · Journal page ↗
- Mayor authorized to sell shack buildings formerly used by Visitacion Valley School at public auction. Record · Journal page ↗
- Payments totalling $26,056.25 for work on the Visitacion Valley, Lowell High and Franklin schools were adopted. passed Record · Journal page ↗
- A resolution paying $13,400 and $900 for school construction was indefinitely postponed after passing for printing. Record · Journal page ↗
- Board finally passed a $13,500 payment to Pacific Rolling Mill Co. for structural steel at Lowell High School. passed Record · Journal page ↗
- Third installment of $4,215 paid to McLeran and Peterson for the Polytechnic High School shop building. passed Record · Journal page ↗
- Fourth installment of $3,330 paid to Henning & Burke for yard work at Clement School. passed Record · Journal page ↗
- Payment of $3,072 to Henning & Burke from school construction funds for extra yard work at Clement Primary School approved. passed Record · Journal page ↗
- The city proposed paying Cayatano Arellano $2,700 for land added to Holly Park School, with the vote continuing onto the next page. Record · Journal page ↗
- Approves a $2,190 payment to Alice Faverman for land added to Holly Park School grounds on Park Street. passed Record · Journal page ↗
- Approves a $929.10 payment to C. F. Weber & Co. for furniture furnished for Adams School. passed Record · Journal page ↗
- The city authorized $7,213.75 in school construction payments for heating systems at three schools and the John Swett Grammar School. passed Record · Journal page ↗
- First instalment of $4,650 approved to Henning & Burke for yard work at Denman Grammar School. passed Record · Journal page ↗
- Payments approved for desks at Adams Cosmopolitan School and a progress payment on Franklin School, totalling $4,117.72. passed Record · Journal page ↗
- Paid Atlas Heating and Ventilating Co. $1,200 as third installment on the Franklin School heating system. passed Record · Journal page ↗
- Paid Brown & Smartt $1,000 as final payment for construction of Madison Primary School. passed Record · Journal page ↗
- Final payment of $18,400 for structural steel at Lowell High School passed for printing. first reading Record · Journal page ↗
- Pacific Rolling Mill and Michael Kiernan were to be paid from school bond funds for work at Lowell High and Spring Valley schools. Record · Journal page ↗
- Henning and Burke were to be paid $3,330 for a fourth installment of yard work at Clement School. Record · Journal page ↗
- Board approved final payment of $6,730 to F. H. Born for building the McKinley Primary School. passed Record · Journal page ↗
- Payment of $2,250 approved to Isabel Sprague for a lot needed for Burnett School. passed Record · Journal page ↗
- $1,875 paid as a seventh installment on construction of Grattan School, approved. passed Record · Journal page ↗
- A second payment of $1,432.50 to Wm. S. Snook & Son for plumbing at Peabody Primary School was approved. passed Record · Journal page ↗
- A third payment of $900 to Michael Kiernan for plastering at Spring Valley School was approved. passed Record · Journal page ↗
- A resolution provides $12,000 from the School Construction Account to equip eight named school buildings. Record · Journal page ↗
- Payment of $13,400 to Pacific Rolling Mill Co. as final payment for structural steel at Lowell High School approved. passed Record · Journal page ↗
- Payment of $11,700 to Henning & Burke as second installment for yard work at the Denman School approved. passed Record · Journal page ↗
- Payments totalling $7,186.58 approved for desks, chairs and tables at Peabody, Jean Parker, Visitacion Valley and Franklin schools. passed Record · Journal page ↗
- Approved $1,750 from the school construction account to grade the yard of the Lafayette School. passed Record · Journal page ↗
- California Club endorsed the Board of Education's request for $6000 to introduce school gardening in public schools; referred to committee. referred Record · Journal page ↗
- W. P. Fuller and Company claims $251.98 for material used in building Grattan School; referred. referred Record · Journal page ↗
- A resolution authorizing payments from the School Construction Account for school building work was passed for printing. first reading Record · Journal page ↗
- Payments of $987.75, $5,307 and $4,395 to contractors for work on Visitacion, Spring Valley and Lowell schools were sent to print. first reading Record · Journal page ↗
- A payment to Whitaker & Ray-Wiggin Co. for chairs and desks for various schools is listed; its amount is not shown here. Record · Journal page ↗
- Final payment of $947.50 to Wm. S. Snook & Son for plumbing at Peabody Primary School proposed. Record · Journal page ↗
- Offer to sell land on Hayes Street near Clayton Street for $37,500 for Jackson School was accepted on Supervisor Kelly's motion. Record · Journal page ↗
- City approved $10,689.75 in progress payments to three contractors building the Visitacion, Spring Valley and Lowell schools. passed Record · Journal page ↗
- The city approved a final payment of $9,650 to F. H. Born for construction of the Grattan School. passed Record · Journal page ↗
- Payment of $4,500 to V. J. Belknap as first instalment for plumbing work at Lowell High School approved. passed Record · Journal page ↗
- Payment of $4,303 to Frances A. Curran for a lot on Alabama Street for the Precita Valley School approved. passed Record · Journal page ↗
- Board paid contractor Wm. Bruce $3,000 from the School Construction Account to move the Girls' High School. passed Record · Journal page ↗
- Board paid Whitaker & Ray-Wiggin Co. a total of $2,659.73 for chairs and desks at two schools. passed Record · Journal page ↗
- Board paid C. F. Weber & Co. $720 for chairs and Michael Kiernan $1,600 for plastering at two schools. passed Record · Journal page ↗
- City approved $1,441 to Henning & Burke for extra work on the Denman school yard. passed Record · Journal page ↗
- Payments totalling $17,329 to McLeran and Peterson for shop building work at Polytechnic High School passed. passed Record · Journal page ↗
- Payments totalling $8,950 to Brode Iron Works and O. C. Holt for John Swett Grammar School work passed. passed Record · Journal page ↗
- Ordinance 1732 authorizes the Board of Public Works to contract for structural steel for Polytechnic High School's Academic Building, up to $75,000. passed Record · Journal page ↗
- Passed for printing a $37,500 payment to C. W. Moores for land for the Jackson Primary School on Hayes Street. first reading Record · Journal page ↗
- Passed for printing payments totalling $9,646.75 for moving and building Girls' High, Grattan and Lowell school buildings. first reading Record · Journal page ↗
- Payment for yard work at the Denman and Lafayette schools, paid from the School Construction Account, is listed for printing. Record · Journal page ↗
- Board of Education's requests for $209.51 and $590 for school work were referred to committee. referred Record · Journal page ↗
- City approved $37,500 to buy land on Hayes Street for the Jackson Primary School site. passed Record · Journal page ↗
- City approved $4,800 in payments to Henning & Burke and M. A. Greely for yard work at Denman and Lafayette schools. passed Record · Journal page ↗
- Payments of $804.25 and $1,395 approved to John G. Sutton Co. and Pacific Fire Extinguisher Co. for school building work. passed Record · Journal page ↗
- Payment of $870 approved to Joost Bros. for hardware supplied to the Spring Valley School. passed Record · Journal page ↗
- Board of Education asks for 1904 bond money to buy additional land for Grant School. referred Record · Journal page ↗
- Public Works recommended giving McLaren & Peterson 90 more days to finish the Polytechnic School shop building. referred Record · Journal page ↗
- Board of Education asked for $1,075 to finish yard work at Peabody School, referred to committee. referred Record · Journal page ↗
- Board approved progress payments for John Swett Grammar School and Lowell High School construction and heating work. passed Record · Journal page ↗
- Board finally passed payments from the school construction account, including $1,000 to A. Knowles for Franklin School plastering. passed Record · Journal page ↗
- Payment of $5,530 to Three contractors in total for work on the Franklin, John Swett and Lincoln schools approved. passed Record · Journal page ↗
- Payment of $2,093.82 to Two suppliers in total for chairs and desks for the Grattan School approved. passed Record · Journal page ↗
- Payment of $879.75 to Henning & Burke as second installment for street work in front of Clement Primary School approved. passed Record · Journal page ↗
- Supervisors adopted $590 for the Board of Education to install a ventilating system in the Mission High School auditorium. passed Record · Journal page ↗
- Stone Company's $147.50 materials claim for Grattan School was referred to the Clerk. referred Record · Journal page ↗
- A progress payment to Brandon & Lawson for school building work was passed for printing. first reading Record · Journal page ↗
- Payments of $15,135 to two contractors for work at the Lowell High School and Lincoln School were passed for printing. first reading Record · Journal page ↗
- Resolution authorizes a $2,766 installment to Henning & Burke for yard work at the Denman Grammar School. Record · Journal page ↗
- Mayor asked to sell shack buildings on Alabama street, on lots bought for the Precita Valley school. passed Record · Journal page ↗
- Cornelia M. Stafford's land bought for $22,000 for the Grant School Record · Journal page ↗
- Board adopted $2,500 from the school construction account to finish yard work at Peabody School. passed Record · Journal page ↗
- $20,000 for school building repairs approved passed Record · Journal page ↗
- Mayor Rolph appointed Dr. A. A. D'Ancona to the Board of Education, replacing Henry Payot whose term expired. Record · Journal page ↗
- Progress payments to contractors building Lowell, Girls' and John Swett schools were passed for printing after reconsideration. first reading Record · Journal page ↗
- Sixth installment of $3,783 to McLeran and Peterson for Polytechnic High School shop building proposed; outcome continues next page. Record · Journal page ↗
- $22,000 to be paid to Cornelia M. Stafford for Grant School land; passed first reading only first reading Record · Journal page ↗
- $14,500 to be paid to Margaret Hayden for Starr King School land; passed first reading only, matter later adopted first reading Record · Journal page ↗
- Lowell High School to be allowed an oil tank on Hayes Street; sent to committee, no final vote found referred Record · Journal page ↗
- Payments totalling $28,902.15 to five contractors for school building work at Lowell, Girls', Swett and Lincoln schools were passed. passed Record · Journal page ↗
- Payment of $22,000 to Cornelia M. Stafford for a Broadway lot added to Grant Primary School was passed. passed Record · Journal page ↗
- Progress payments totalling $15,135 to two contractors for Lowell High and Lincoln School work were listed; outcome not shown here. Record · Journal page ↗
- Board authorized $7,722 final payment to Henning & Burke for yard work at Denman Grammar School. passed Record · Journal page ↗
- City approved a $3,783 installment to McLeran and Peterson for the Polytechnic High School shop building. passed Record · Journal page ↗
- Second Broadway lot taken for the Grant Primary School Record · Journal page ↗
- Land at Twenty-fifth and Utah streets to be taken for Starr King School; sent to committee, later adopted Record · Journal page ↗
- Board proposed paying $14,500 from school construction funds to buy land for the Starr King School site. Record · Journal page ↗
- An $8,000 resolution for an Everett School annex, funded from 1904 school bonds, was referred to committee. referred Record · Journal page ↗
- The Mayor was requested to auction shack buildings on the Jackson School site, at the Board of Education's request. passed Record · Journal page ↗
- Payment of $15,972.75 to Caldwell & Company for building the Spring Valley School; no vote on record. Record · Journal page ↗
- Six school construction payments to contractors were authorized from the 1908 bond fund, with the final vote on the next page. Record · Journal page ↗
- Payment of $3,450 for a school shop was listed among school fund claims in a payment schedule. Record · Journal page ↗
- Resolution provides $8,000 from 1904 school bonds to build an annex to Everett School. passed Record · Journal page ↗
- Board appropriates funds for school repairs, special sanitation, an automobile for the Relief Home and hospital, elections, and water supply reports, pending vote. Record · Journal page ↗
- Mayor asks why Daniel Webster School in Potrero cannot be built from 1904 bonds; Finance Committee says no such funds remain. Record · Journal page ↗
- Proposed appropriations include $1,500 for Spring Valley Grammar School blackboards and $6,750 for special sanitation work. Record · Journal page ↗
- Expenditures for plumbing, paving, electrical work and furniture at several named schools were passed for printing. first reading Record · Journal page ↗
- Mayor authorized to sell the shack buildings on the former Lincoln School site on Harrison Street. passed Record · Journal page ↗
- The Board asked the Public Welfare Committee to study open-air instruction for school children and suitable school building designs. passed Record · Journal page ↗
- Proposed resolution authorizing payments to contractors for sewers, schools, a hospital and water mains from bond funds. first reading Record · Journal page ↗
- Sheet Metal Workers Association asks for a separate sheet metal contract at Polytechnic High School; referred to Public Works. referred Record · Journal page ↗
- Board asks City Attorney whether paying school building contracts with unsold city bonds instead of money is legal. passed Record · Journal page ↗
- Authorizations for street repaving and school and Hall of Justice payments passed for printing. first reading Record · Journal page ↗
- Mayor to sell the old Lincoln School shacks on Harrison Street passed Record · Journal page ↗
- City Attorney advised that the charter bars paying for school construction with city bonds; sent to Finance and Buildings Committee. referred Record · Journal page ↗
- Resolution 9327 proposes payments for street repaving and heating work at Lowell High School, with the vote continuing on the next page. Record · Journal page ↗
- Board passed for printing a resolution authorizing many city payments for schools, the hospital, sewers, fire protection and parks. first reading Record · Journal page ↗
- Resolution 9340 authorizes bond-funded construction payments for Polytechnic, Lincoln, Lowell and other schools, the Hall of Justice and San Francisco Hospital. Record · Journal page ↗
- Resolution proposed to provide $4,500 from the school construction account for plans for certain school buildings. Record · Journal page ↗
- $55,000 to build the Starr King School at Twenty-fifth and Utah Record · Journal page ↗
- $52,500 provided to build the Le Conte School on Alabama Street Record · Journal page ↗
- Resolution 9352 authorizes payments to contractors for sewers, schools, Hall of Justice, San Francisco Hospital, library books and street repairs. passed Record · Journal page ↗
- Board adopted, as amended, a resolution urging city departments to speed plans for the Geary Street Railroad, incinerators, Mission Viaduct and schools. passed Record · Journal page ↗
- Board approved payments from school, hospital, jail and water accounts to contractors and claimants, including Healy-Tibbitts Construction Co. passed Record · Journal page ↗
- Funding of $55,000 for Starr King School construction and equipment was put off one week. Record · Journal page ↗
- Funding of $4,500 for plans for certain school buildings was put off one week. Record · Journal page ↗
- A time extension for Ralston Iron Works on structural steel for Girls' High School was laid over one week. Record · Journal page ↗
- $4,500 is granted for plans and specifications for certain school buildings still to be chosen; resolution adopted. passed Record · Journal page ↗
- $55,000 provided for the Starr King School at Twenty-fifth and Utah Record · Journal page ↗
- Proposed $55,000 to build and equip Starr King School at Twenty-fifth and Utah streets; laid over one week. Record · Journal page ↗
- Proposed $4,500 for plans and specifications for certain school buildings; laid over one week. Record · Journal page ↗
- Payments to contractors and suppliers for schools, hospitals, the jail and Pumping Station No. 1 were put forward for printing. first reading Record · Journal page ↗
- Ralston Iron Works and McSheehy Bros. granted time extensions on Girls' High School and San Francisco Hospital contracts. passed Record · Journal page ↗
- Four contractors building the John Swett Grammar School were each granted ninety more days from March 27, 1912. passed Record · Journal page ↗
- City to set aside $19,000 to repave Howard Street with basalt blocks; passed first reading only first reading Record · Journal page ↗
- Payment of twenty-three city claims to contractors and utilities approved, including $36,000 to Henning & Burke for Girls' High School. passed Record · Journal page ↗
- Board approved a batch of construction and supply payments for school, sewer, water, and street projects. Record · Journal page ↗
- Ralston Iron Works was granted a thirty-day extension on its structural steel contract for Girls' High School. passed Record · Journal page ↗
- Four contractors on the John Swett Grammar School building were each granted ninety days' extension on their contracts. passed Record · Journal page ↗
- A resolution proposes paying Abby F. Knipe $1500 for Park Street land as an additional site for Junipero Serra School. Record · Journal page ↗
- Shack buildings formerly used by John Swett School to be sold at public auction when vacated, on McAllister Street. passed Record · Journal page ↗
- Ninety-day extensions granted to four contractors building the John Swett Grammar School. passed Record · Journal page ↗
- City accepted Abby F. Knipe's offer to sell a Holly Park lot on Park Street for $1,500 as a school site. passed Record · Journal page ↗
- Payment of $1,500 to Abby F. Knipe for land beside Junipero Serra School approved. passed Record · Journal page ↗
- Board asked the Board of Public Works to co-operate on building a platform for school children at the May Day event at the Civic Center. passed Record · Journal page ↗
- Payment of $28,988.25 to Henning & Burke for a sixth payment on the Girls' High School general contract approved. passed Record · Journal page ↗
- Payment of $516 to Palm Vacuum Cleaning Co. for final vacuum cleaning work at Visitacion Valley School approved. passed Record · Journal page ↗
- Elmer Carlson and V. J. Belknap each given ninety more days on the Lowell High School building work. passed Record · Journal page ↗
- City Attorney asked to offer to buy land for Cooper School, condemning it if the price exceeds assessed value. passed Record · Journal page ↗
- Proposed appropriations of $1,300 for John Swett School equipment, $1,500 for architect Walter Cook, $1,500 school inspections and $3,500 for surveys. Record · Journal page ↗
- Board authorized payments for library books, bindery work, and Polytechnic High School shop construction and electrical work. passed Record · Journal page ↗
- The Board appropriated $4,000 from the 1908 public building fund for Washington Irving School construction, with inspection by Public Works. passed Record · Journal page ↗
- A school lot near Geary Street in the Richmond District was transferred to the Fire Department. passed Record · Journal page ↗
- A resolution to pay the Centenary Methodist Church $22,000 for land for Lowell High School was passed for printing. first reading Record · Journal page ↗
- Supervisor Andrew J. Gallagher's motion urging restoration of salaries cut at the Board of Education was carried. passed Record · Journal page ↗
- $3,000 set aside to repair fire houses 10 and 26 Record · Journal page ↗
- Fire Department asks for a school lot near Twelfth Avenue Record · Journal page ↗
- Centenary Methodist Church land bought to enlarge Lowell High School Record · Journal page ↗
- Payments from park, general and school funds to named firms and suppliers were passed for printing, led by $25,946.25 to W. H. Henning. first reading Record · Journal page ↗
- Board accepted an offer by Louis P. Werner and the Mennes to sell land at Fifteenth and Capp streets for the Marshall School. passed Record · Journal page ↗
- Board authorized paying $33,000 from the school construction account to Louis P. Werner and the Mennes for the Marshall School lot. passed Record · Journal page ↗
- $3,000 set aside to repair fire houses 10 and 26 passed Record · Journal page ↗
- Payment of $33,000 to Louis P. Werner for the Marshall School site put over to a later meeting, approved later. Record · Journal page ↗
- Payment of $22,000 to Centenary Methodist Church for land for Lowell High School approved. passed Record · Journal page ↗
- Schoolyard ordered for the Visitacion Valley School on Schwerin Street passed Record · Journal page ↗
- Payment of $33,000 to Louis P. Werner for the Marshall School site approved. passed Record · Journal page ↗
- Schoolyard ordered for Visitacion Valley School on Schwerin Street passed Record · Journal page ↗
- Resolution appropriating $25,000 for repairs to school buildings from July to September 1912 was adopted. passed Record · Journal page ↗
- Rooms 207 to 212 in Temporary City Hall assigned to the Superintendent of Schools. passed Record · Journal page ↗
- Land bought from Suzanne Alferitz for the Cooper School Record · Journal page ↗
- Resolution approves paying Suzanne Alferitz $23,500 for a Lombard and Jones street lot for Cooper School. passed Record · Journal page ↗
- Bills paid for Golden Gate Park courts and Polytechnic High School Record · Journal page ↗
- Fire engine house ordered on Twelfth Avenue for $37,000 Record · Journal page ↗
- The Board set aside $25,000 from Polytechnic High School bond proceeds so the Board of Education could buy equipment for the new school. passed Record · Journal page ↗
- The Board ordered construction of the Patrick Henry School on Vermont Street, spending up to $60,000 from school construction funds. passed Record · Journal page ↗
- Patrick Henry School proposed for Vermont Street at $60,000 Record · Journal page ↗
- Treasurer ordered to transfer $381.92 from one school bond redemption fund to the school bond fund. passed Record · Journal page ↗
- Ordinance orders construction of Patrick Henry School on Vermont Street, authorising up to $60,000 from the school construction account. passed Record · Journal page ↗
- James C. Bach to lease the school lot on Washington Street refused Record · Journal page ↗
- $8,000 to be set aside for school repairs in September; passed first reading only. first reading Record · Journal page ↗
- Board approved a $24,000 payment to George A. Webster for land used as the Oriental School site. passed Record · Journal page ↗
- The Board awarded contracts to several firms for furniture and filing cabinets for the Superintendent of Schools, totalling about $1,100. passed Record · Journal page ↗
- James C. Bach refused a school lot lease on Washington Street refused Record · Journal page ↗
- Payment of $35,526.63 to Elmer Carlson for building Lowell High School passed first reading only. first reading Record · Journal page ↗
- Payment of $24,000 to George A. Webster for an Oriental School site was laid over one week. Record · Journal page ↗
- Board approved paying George A. Webster $24,000 from school bond funds for a Washington Street lot for Oriental School. passed Record · Journal page ↗
- Proposed ninety-day extension for William S. Snook & Son to finish plumbing at John Swett Grammar School; advertising charges remitted. first reading Record · Journal page ↗
- $8,000 set aside for school repairs in September passed Record · Journal page ↗
- William S. Snook & Son granted ninety more days to finish plumbing work at John Swett Grammar School. passed Record · Journal page ↗
- Payment of $24,000 to George A. Webster for the Oriental School site approved. passed Record · Journal page ↗
- Charter Amendment No. 3 proposes restructuring the Board of Education, with directors appointed by the Mayor and a Secretary paid up to $4000. Record · Journal page ↗
- Oriental School site on Washington Street referred to Board of Education after neighbours protested its construction there. referred Record · Journal page ↗
- J. Looney Co. was granted a ninety-day extension to finish plumbing contract work at the Girls' High School. passed Record · Journal page ↗
- Oriental School urged for the Washington Street site near Stockton Record · Journal page ↗
- Resolution authorizes payments from bond funds to George F. Bartlett and Dyer Bros. for Hetch Hetchy and Polytechnic High School work. Record · Journal page ↗
- Plumbing contractor gets 90 more days at Girls' High School passed Record · Journal page ↗
- The Board of Public Works is requested to invite bids to move the Commercial School from Grove Street to the Fell Street library site. passed Record · Journal page ↗
- Proposed ordinance would place unsold 1904 school bonds, $179,600 issue, on sale at the Treasurer's office. Record · Journal page ↗
- Payments from 1912 bond and general funds authorized for claims including Engine House No. 46 construction and school work. Record · Journal page ↗
- Unsold 1904 school bonds of $179,600 were ordered placed on sale at the City Treasurer's office. passed Record · Journal page ↗
- The Board of Public Works was asked to explain why work stopped for a month on Polytechnic High School. passed Record · Journal page ↗
- Elmer Carlson was granted a sixty-day extension to finish yard work on the Lowell High School contract. passed Record · Journal page ↗
- Resolution 9853 appropriates funds for December 1912 repairs to fire, police, school and public buildings, streets and sewers. Record · Journal page ↗
- $3950 from school construction funds proposed for plans for Glenn Park School. first reading Record · Journal page ↗
- Resolution proposes appropriating $10,670 for Girls' High School blackboards, $350 for 5th avenue railroad repairs and $135 for a Bernal School sidewalk. Record · Journal page ↗
- $3,950 set aside for plans for the Glenn Park School passed Record · Journal page ↗
- Appropriation resolution sets aside funds from the School Construction Account to cover a construction deficit; final vote continues on next page. Record · Journal page ↗
- $350 for an asphalt sidewalk at Bernal School on Cortland Avenue Record · Journal page ↗
- Le Conte School to be built at Norwich and Alabama streets first reading Record · Journal page ↗
- Payment of $910 to Eccles & Smith for Polytechnic High School shop equipment; no vote on record; approved later. Record · Journal page ↗
- High School of Commerce to move to Fell and Franklin streets; passed first reading only first reading Record · Journal page ↗
- The Board passed an ordinance moving the High School of Commerce building from Grove Street to the library site at Fell and Franklin streets. passed Record · Journal page ↗
- City orders construction of the Le Conte School on Harrison Street Record · Journal page ↗
- Payment of $10,750 to Mario Perasso for Washington Irving School land approved. Record · Journal page ↗
- Payment of $981 to Whitaker & Ray-Wiggin for Grattan School desks and chairs; no vote on record. Record · Journal page ↗
- Payment of $910 to Eccles & Smith for Polytechnic High School shop equipment approved. Record · Journal page ↗
- Payments authorized to three contractors for Girls' High School plumbing and North Point Main sewer work, passed for printing. first reading Record · Journal page ↗
- Money set aside to pave Lincoln Way at Thirty-sixth Avenue Record · Journal page ↗
- City spends $213.75 on window shades for the John Swett School Record · Journal page ↗
- Payment of $13,550 to St. Peter's Episcopal Church for Cooper School land approved. Record · Journal page ↗
- Board urged the Board of Education to accept moving Commerce High School from Grove Street to the Fell and Franklin library site. passed Record · Journal page ↗
- Board of Public Works will spend $152,500 to move the High School of Commerce out of the Civic Center. passed Record · Journal page ↗
- The Board set aside $152,500 to move the High School of Commerce out of the Civic Center. passed Record · Journal page ↗
- $25,000 was appropriated for equipment at Girls' High School under the Board of Education. Record · Journal page ↗
- Board of Education asked to list school buildings and additions needed over the next three years. passed Record · Journal page ↗
- Finance Committee reviews a $1500 request to hire more health inspectors for public schools; decision continues on next page. Record · Journal page ↗
- $1,000 to be set aside to finish the stage at Girls' High School; passed first reading only first reading Record · Journal page ↗
- Academic Building of Polytechnic High School ordered built to Public Works plans, passed on final reading. passed Record · Journal page ↗
- Authorizations for payments to Pacific Gas and Electric and Elmer Carlson for Municipal Railway and Lowell High School work were passed for printing. first reading Record · Journal page ↗
- A resolution proposed to spend $1,371.91 on blackboards for Patrick Henry School from school bond proceeds. passed Record · Journal page ↗
- Board adopted a resolution directing the City Attorney to condemn a Greenwich Street lot as an additional site for Cooper School. passed Record · Journal page ↗
- Expenditures for parks, water, Municipal Railway cars, school plumbing, sewers and paving claims passed for printing. first reading Record · Journal page ↗
- City buys land for the Washington Irving School for $5,375 Record · Journal page ↗
- $1,000 set aside to finish the stage at Girls' High School passed Record · Journal page ↗
- $1,371.91 approved for blackboards at Patrick Henry School, paid from 1904 school bond proceeds. passed Record · Journal page ↗
- City to pay $485 toward the sewer on Cambridge Street Record · Journal page ↗
- Le Conte School proposed at Norwich, Alabama and Harrison Streets referred Record · Journal page ↗
- Sidewalks ordered in front of Dudley Stone School on Haight Street passed Record · Journal page ↗
- Columbus School ordered built at 12th Avenue and Kirkham passed Record · Journal page ↗
- Ordinance ordering construction of Edison School at Twenty-second and Church streets passed for printing. first reading Record · Journal page ↗
- Order to build Glen Park School at Bosworth and Lippard Streets; passed first reading only, finally passed later Record · Journal page ↗
- Payment of $17,150 to Wm. A. Newson for the Patrick Henry School; no vote on record; approved later. Record · Journal page ↗
- The Board finally passed an ordinance ordering construction of the Washington Irving School on Broadway west of Sansome street. passed Record · Journal page ↗
- A resolution asking the Board of Education to recommend building Le Conte School was refused adoption. refused Record · Journal page ↗
- Marshall Primary School ordered built at Fifteenth and Capp Streets Record · Journal page ↗
- Board turns down a request for the Le Conte School Record · Journal page ↗
- Whitaker & Ray-Wiggin Co. was granted a 45-day extension to install slate blackboards at Girls' High School. passed Record · Journal page ↗
- Board adopted resolution repealing $55,000 funding for Le Conte School construction after East Mission Improvement Club protested. passed Record · Journal page ↗
- Mayor authorized to sell at public auction a school-owned building on Eighteenth Street near Church Street. passed Record · Journal page ↗
- Payment of $17,150 to Wm. A. Newson for the Patrick Henry School approved. Record · Journal page ↗
- Order to build Marshall Primary School at Fifteenth and Capp Streets; passed first reading only first reading Record · Journal page ↗
- Washington Irving School ordered built on Broadway west of Sansome Street Record · Journal page ↗
- Columbus School ordered built at 12th Avenue and Kirkham Street passed Record · Journal page ↗
- Payment of $624.50 to Bausch & Lomb for microscopes at Lowell High School approved. Record · Journal page ↗
- Offer from Francis de Souza Bettencourt to sell land for $3,500 as an additional Cooper School site proposed for adoption. passed Record · Journal page ↗
- $222,000 was approved from the Polytechnic High School bond fund for its academic building. passed Record · Journal page ↗
- Supervisors appropriated $222,000 from the Polytechnic High School Bond Fund for its new academic building. passed Record · Journal page ↗
- Supervisor McLeran's resolution asks the City Attorney to seek offers for land for a Polytechnic High School playground; sent to committee. referred Record · Journal page ↗
- Resolution asks the Board of Education to report on the change of plans for Polytechnic High School; adopted. passed Record · Journal page ↗
- A resolution authorizing a list of city payments to named claimants was introduced; its final vote is not on this page. Record · Journal page ↗
- Federation asks the Board to restore $55,000 set aside for Le Conte school; the request was referred to the Public Buildings Committee. referred Record · Journal page ↗
- $84,500 set aside to build the Glen Park School passed Record · Journal page ↗
- Proposal to ask the City Attorney to seek offers for land near Golden Gate Park for the Polytechnic High School playground; action deferred. Record · Journal page ↗
- Robt. Trost to be authorized a $4,000.50 fifth payment for construction of Starr King School; passed first reading only first reading Record · Journal page ↗
- W. P. Fuller & Co. to be authorized a $1,474 final payment for painting Lowell High School; passed first reading only first reading Record · Journal page ↗
- Supervisor Koshland's resolution urging school buildings be used as election booths was referred to the Public Welfare Committee. referred Record · Journal page ↗
- Supervisors approved payments for school repairs, Lincoln way, the Mission Viaduct, animal impounding and other city expenses. passed Record · Journal page ↗
- Resolution proposed to set aside Polytechnic High School Bond Fund money for heating and ventilating the Academic Building. Record · Journal page ↗
- The Board recommended that the Board of Education allow school buildings to be used for election purposes. passed Record · Journal page ↗
- The Board granted member James E. Powers of the Board of Education a ten-day leave of absence to leave the state. passed Record · Journal page ↗
- Mayor to auction off the shack in Glen Park School yard passed Record · Journal page ↗
- $10,000 set aside to heat and ventilate Polytechnic High School passed Record · Journal page ↗
- Passed for printing an ordinance ordering improvement of Hayes Street in front of Lowell High School. first reading Record · Journal page ↗
- Ordinance proposes placing unsold school and hospital bonds on sale at the City Treasurer's office. Record · Journal page ↗
- Hayes Street improved in front of Lowell High School, Masonic to Ashbury passed Record · Journal page ↗
- Hayes Street between Masonic avenue and Ashbury street, in front of Lowell High School, ordered improved by contract. passed Record · Journal page ↗
- Unsold school, hospital and City Hall bonds ordered placed on sale at the Treasurer's office; vote continues on next page. Record · Journal page ↗
- Treasurer authorized to sell unsold hospital, school and City Hall bonds at face value, plus accrued interest. passed Record · Journal page ↗
- Street and sidewalk work appropriations at several San Francisco locations, including near Bay View and Agassiz schools, were adopted. passed Record · Journal page ↗
- Payment of $1,339.50 to Elmer Carlson for extra work at Lowell High School passed first reading only, approved later. first reading Record · Journal page ↗
- Payment of $1,339.50 to Elmer Carlson for extra work at Lowell High School approved. Record · Journal page ↗
- Board of Education was asked to investigate and pave the yard of the Bernal School. passed Record · Journal page ↗
- Payment of $2,722 to Wm. Bateman for work at Girls' High School passed first reading only, approved later. first reading Record · Journal page ↗
- Payment of $16,725 to Newsom, Wold & Kohn for Polytechnic High School approved. passed Record · Journal page ↗
- Baptist groups' protest against mixed public dances in public schools was referred to the Board of Education. referred Record · Journal page ↗
- Payment of $2,722 to Wm. Bateman for work at Girls' High School approved. Record · Journal page ↗
- Payment of $6,150 to Carnahan & Mulford for the Glenn Park School; no vote on record; approved later. Record · Journal page ↗
- Resolution authorizing payments for City Hall work and Starr King School was taken up; its final vote is on the next page. passed Record · Journal page ↗
- Proposed payments for Cooper, Edison and Polytechnic school construction, a Forty-eighth Avenue sewer and a Geary car barn. first reading Record · Journal page ↗
- Payment of $2,232 to Houghton Sawyer for architect's work on the Cooper School passed first reading only, approved later. first reading Record · Journal page ↗
- Payment of $2,232 to Houghton Sawyer for architect's work on the Cooper School approved. passed Record · Journal page ↗
- Four bidders offered to buy $3,000,000 of 1908 school bonds; the proposals were referred to the Finance Committee. referred Record · Journal page ↗
- Unsold 1908 school bonds worth $287,000 to be placed on sale at the Treasurer's office; passed first reading only, later finally passed first reading Record · Journal page ↗
- Proposed ordinance would place unsold 1908 school bonds on sale at the City Treasurer's office at a set price. Record · Journal page ↗
- Resolution proposes about $35,000 in payments to contractors for sewers and Edison and Glen Park school construction. passed Record · Journal page ↗
- Resolution appropriates $475 to move Washington Irving School and $277 for a pulmotor at Harbor Emergency Hospital. passed Record · Journal page ↗
- The Board granted Board of Education member Sarah J. Jones two weeks' leave of absence from December 22, 1913, with permission to leave the State. passed Record · Journal page ↗
- Masonic Avenue paved in front of Lowell High School passed Record · Journal page ↗
- Dyer Brothers were granted ninety more days to finish installing fire escapes on the Yerba Buena School. passed Record · Journal page ↗
- Oriental School to be built at 929 Clay Street for $120,800 Record · Journal page ↗
- City and County of San Francisco (High School of Commerce) allowed an oil storage tank (3,000 gallons) at the northeast corner of Franklin Street and Fell Street passed Record · Journal page ↗
- Board appropriated $24,591 for school, hospital and sewer repairs, plus legal costs on the [name withheld] water condemnation. passed Record · Journal page ↗
- $120,800 to build the Oriental School at 929 Clay Street passed Record · Journal page ↗
- Ordinance to build the Oriental School at 929 Clay Street, costing $120,800, was indefinitely postponed by the Board. refused Record · Journal page ↗
- Supervisor Bancroft proposed an ordinance to build the Oriental School on Washington Street, moved for printing; residents objected. Record · Journal page ↗
- Substitute offered after the Oriental School at 929 Clay Street passes Record · Journal page ↗
- North Beach objects to the Oriental School site on Washington Street Record · Journal page ↗
- [name withheld] asked the Board to act on damage claims from construction of Edison School; the matter was referred to committees. referred Record · Journal page ↗
- Board authorized payments to contractors, suppliers and utilities for street paving, water, sewers, schools and police needs. passed Record · Journal page ↗
- Resolution, passed for printing, authorizes payments to libraries, schools, contractors and sewer builders from bond funds. first reading Record · Journal page ↗
- Cooper School proposed at the corner of Lombard and Jones streets first reading Record · Journal page ↗
- Cooper School approved at the corner of Lombard and Jones streets Record · Journal page ↗
- Appropriations approved for City Hall plumbing work by Alexander Coleman, a leasehold purchase from S. Hersko, and Edison School roof repairs. passed Record · Journal page ↗
- Greenwich Street lot bought for $4,500 for the Cooper School Record · Journal page ↗
- Cooper School proposed at the corner of Lombard and Jones streets passed Record · Journal page ↗
- Proposed $250 iron fence for Edison School was recommitted to the Building Committee after Supervisor Walsh proposed $125. referred Record · Journal page ↗
- Board of Education asked to let the Publicity Committee use public school auditoriums for civic lectures. passed Record · Journal page ↗
- Proposed ordinance to build the Oriental School on Washington Street for $120,800 passed for printing; one supervisor opposed. first reading Record · Journal page ↗
- Motions to move the Oriental School from its Washington Street site and to cap its cost at $90,000 were defeated. refused Record · Journal page ↗
- Ordinance for construction of the Oriental School on Washington Street passed finally by a 13 to 4 vote. passed Record · Journal page ↗
- Supervisor Power proposed $250 for an iron fence at Edison School; the vote is not shown on this page. referred Record · Journal page ↗
- Proposed $250 iron fence for Edison School grounds was indefinitely postponed after committee review. Record · Journal page ↗
- Stone sidewalks and curbs ordered around the Yerba Buena School passed Record · Journal page ↗
- $171 approved for paving in front of a school lot on Minerva Street between Plymouth and Capitol avenues. passed Record · Journal page ↗
- $171 set aside to improve school lot on Minerva Street passed Record · Journal page ↗
- Board set aside funds for school equipment, Hetch Hetchy roads, City Hall electric works and Union street railway wiring. passed Record · Journal page ↗
- Ordinance proposed to order construction of a pergola at Edison School, paid from School Bond Fund. Record · Journal page ↗
- $365.00 set aside for a sidewalk at Francis Scott Key School Record · Journal page ↗
- Board ordered a pergola built at Edison School, with work to be paid from the 1904 school bond fund. passed Record · Journal page ↗
- Funds were appropriated for High School of Commerce, Edison School, City Hall water, sewers and street paving, approved 12 to 5. passed Record · Journal page ↗
- Monson Bros granted extensions of time to finish construction of the Edison School, citing concrete and plasterers' strike delays. passed Record · Journal page ↗
- The Board of Education was asked to transfer a school lot on Golden Gate Avenue to the Department of Electricity for a machine shop. passed Record · Journal page ↗
- Claim payments for Municipal Railway rails, Marshall School construction and City Hall work were proposed for approval. Record · Journal page ↗
- Resolution authorizes payments to contractors and utilities from bond funds for sewers, schools, City Hall and Municipal Railway work. passed Record · Journal page ↗
- Board passed for printing a resolution authorizing payments to contractors and suppliers for railway, sewer and school construction. first reading Record · Journal page ↗
- Local Council of Women urged a bond issue to build an annex to Mission High School; the matter was referred to the Public Buildings Committee. referred Record · Journal page ↗
- Payments were authorized from city bond funds to contractors and railways for track, sewer and Polytechnic High School work. passed Record · Journal page ↗
- Appropriated $12,000 for appraising Spring Valley Water Co. properties and $1,222 to glaze Polytechnic High School skylights. passed Record · Journal page ↗
- Resolution to transfer a school lot, moved by Supervisor Bancroft, continues on the next page. Record · Journal page ↗
- Supervisor Power moved to reduce money for School Department buildings; the outcome continues on the next page. passed Record · Journal page ↗
- Board approved $6,000 to buy additional land for the Sherman School yard. passed Record · Journal page ↗
- Proposed resolution authorizing payment of many city claims from named funds, including Municipal Railway, sewer, school and asylum accounts. Record · Journal page ↗
- Superintendent of Schools to be allowed a paid secretary first reading Record · Journal page ↗
- 25th Avenue paved in front of Rochambeau School, between California and Lake streets passed Record · Journal page ↗
- Supervisor Power withdrew his proposal to add a $4,000 school athletics and physical training budget item. Record · Journal page ↗
- A $1,500 bookkeeper salary for the Board of Education's Supply Department was approved after a motion to strike it failed. passed Record · Journal page ↗
- School athletics and physical training budget was raised from $3,000 to $7,000 by amendment and approved. passed Record · Journal page ↗
- A proposed $3,500 for additional kindergartens was passed temporarily. Record · Journal page ↗
- A $1500 stenographer clerk position for the Superintendent of Schools was added to the budget. passed Record · Journal page ↗
- Funding of $3500 for kindergartens was added to the budget and approved. passed Record · Journal page ↗
- Superintendent of Schools Alfred Roncovieri asks for a new office secretary position; the request was referred to the Finance Committee. referred Record · Journal page ↗
- $22,615.03 for work under way at Polytechnic High School passed Record · Journal page ↗
- Proposed ordinance ordering electric wiring of the Academic Building at Polytechnic High School, paid from its 1910 bond fund. Record · Journal page ↗
- Academic building at Polytechnic High School to be lathed and plastered Record · Journal page ↗
- Board authorized many city payments for street repairs, Polytechnic High School, Municipal Railway, the new Public Library and hospital supplies. passed Record · Journal page ↗
- Supervisors proposed $284,594.10 for hospital screens, Cooper School, a sewage station and the Stockton Street rail line. Record · Journal page ↗
- Academic building at Polytechnic High School to be lathed and plastered passed Record · Journal page ↗
- Payment of $1,839 to Alexander Coleman for the second plumbing payment at Marshall School approved. passed Record · Journal page ↗
- Payment of $651 to Decker Electric Construction Co. for first electric work payment at Marshall School approved. passed Record · Journal page ↗
- Payment of $14,080 to Monson Bros. as the final payment for building Edison School approved. passed Record · Journal page ↗
- $97,500 set aside to build the Cooper School passed Record · Journal page ↗
- The Board passed an ordinance letting the Superintendent of Common Schools appoint a secretary and set that pay. passed Record · Journal page ↗
- Many city claims were authorized, including sewer, school, library juror and street repair payments to contractors and suppliers. passed Record · Journal page ↗
- A resolution proposes appropriating funds for street, bridge, school, fire station and hospital repairs, with a Polytechnic High School completion. first reading Record · Journal page ↗
- Monthly appropriations for street repair, sewers and school buildings were laid over until July 13, 1914. Record · Journal page ↗
- Payment of $6,228.00 to R. Ringrose & Son for the fourth payment on building the Marshall School; listed, no vote found. Record · Journal page ↗
- Board adopted a resolution honouring the late school director Mary W. Kincaid, a former Board of Education member. passed Record · Journal page ↗
- $53,696 to be paid to Newsom, Wold & Kohn for Polytechnic High School; passed first reading only, no final passage found first reading Record · Journal page ↗
- $16,500 left over from the Oriental School goes back unspent Record · Journal page ↗
- $53,696 paid to Newsom, Wold & Kohn for Polytechnic High School Record · Journal page ↗
- $175 set aside to run water to the Glen Park School Record · Journal page ↗
- Contract proposed to finish building Polytechnic High School first reading Record · Journal page ↗
- Ordinance orders completion of Polytechnic High School construction and directs a contract; the vote continues on the next page. Record · Journal page ↗
- The Board recommended that the Board of Education and Playground Commission cooperate to create a downtown playground at Bush and Stockton streets. passed Record · Journal page ↗
- Payment of $1,019.75 to C. F. Weber & Co. for desks and furniture for Edison School; listed, no vote found. Record · Journal page ↗
- Payment of $11,886 to Frank M. Garden & Co. for construction of Washington Irving School; no vote on record. Record · Journal page ↗
- Payment of $7,440 to R. Ringrose & Son as a fifth payment for construction of Marshall School; no vote on record. Record · Journal page ↗
- Payment of $24,014.00 to Carnahan & Mulford for building the Columbus School passed first reading only. first reading Record · Journal page ↗
- Resolution urging the Board of Education to restore seven dismissed school janitors was refused adoption. refused Record · Journal page ↗
- Payment of $4,281.00 to James H. Pinkerton for plumbing at Polytechnic High School passed first reading only, approved later. first reading Record · Journal page ↗
- Supervisors appropriated about $170,000 for September 1914 street, school, railway and fire-facility work, including Stockton Street. passed Record · Journal page ↗
- Resolution asking Public Works to estimate cost of school slow-down signs, with a bill adding a school speed rule, referred to Streets Committee. referred Record · Journal page ↗
- Payment of $4,281.00 to James H. Pinkerton for plumbing at Polytechnic High School approved. passed Record · Journal page ↗
- $1,500 voted for Polytechnic High School equipment, $500 for bridge plans Record · Journal page ↗
- $15,000 to pay United Railroads to pull up Stockton Street tracks Record · Journal page ↗
- Board adopted an ordinance ordering metal fire escapes built on the Burnett School building and directing Public Works to contract. passed Record · Journal page ↗
- Ordinance ordering metal fire escapes built on the Burnett School building was passed on first reading by the Board. first reading Record · Journal page ↗
- Board of Public Works asked to estimate the cost of slow-down signs on the corners of every school block. passed Record · Journal page ↗
- Board of Education asked to lease the Stockton and Bush lot Record · Journal page ↗
- Resolution proposed to accept Edward N. Wilcox's $7,500 offer of land for Sherman School; the vote continues on next page. Record · Journal page ↗
- Proposal asking the Board of Education to consider leasing the school lot at Stockton and Bush streets was laid over one week. Record · Journal page ↗
- Victor Engineering Company was granted a 15-day extension to finish its heating and ventilating contract at Marshall School. passed Record · Journal page ↗
- A. Coleman was granted a 45-day extension to finish his plumbing and gasfitting contract at Marshall School. passed Record · Journal page ↗
- Decker Electric Company was granted a 45-day extension to complete its electric work at Marshall School. passed Record · Journal page ↗
- Money set aside to pave the Polytechnic High School yard Record · Journal page ↗
- Board ordered a $573.90 payment to Bennett Bros. for repairs to school buildings. passed Record · Journal page ↗
- Money set aside to pave the Polytechnic High School yard Record · Journal page ↗
- Payment of $2889 to Frank M. Garden & Co. for construction of Washington Irving School was approved from the school bond fund. passed Record · Journal page ↗
- Dyer Brothers received a final payment of $1,010 for fire escapes at Yerba Buena School. passed Record · Journal page ↗
- $16,490 for electrical work at Polytechnic High School Record · Journal page ↗
- Payment of $14,395 to J. Pinkerton to finish Polytechnic High School plumbing approved. Record · Journal page ↗
- Board adopted appropriations for Polytechnic High School, Municipal Railway, San Francisco Hospital, the fire alarm station, and November repairs. passed Record · Journal page ↗
- Proposed appropriation of $14,395 for plumbing at Polytechnic High School's academic building, with the vote on the next page. Record · Journal page ↗
- $16,490 for electrical work at Polytechnic High School Record · Journal page ↗
- $424.65 for stone sidewalks in front of Bernal School passed Record · Journal page ↗
- Payment of $969.85 to Tiernan & Beronio for repairs to school buildings approved. passed Record · Journal page ↗
- Expenditures from the School Bond Fund authorized, including $1,267.50 to [name withheld] for plumbing at Oriental School. Record · Journal page ↗
- Board approved a batch of city payment claims for libraries, schools, sewers and railway work. passed Record · Journal page ↗
- Payments for hospital, school, street, water and fire-station work were sent to print for authorization. first reading Record · Journal page ↗
- $2,500 proposed for new plumbing and wiring at Polytechnic High School; passed first reading only, no final passage found first reading Record · Journal page ↗
- $275 for new sidewalks in front of Rochambeau School passed Record · Journal page ↗
- Four contractors for the Washington Irving School were each granted 75-day extensions on their construction contracts. passed Record · Journal page ↗
- City authorized about 24 payments from various bond and general funds to contractors, utilities and suppliers for schools, transit, fire and streets. passed Record · Journal page ↗
- City set aside about $7,100 for Polytechnic High School, City Hall, Geary Street car barn and street and bridge works. passed Record · Journal page ↗
- A letter about a deficiency in the school fund was printed on this page; no Board action appears here. Record · Journal page ↗
- Ordinance proposing metal fire escapes on five school buildings was passed for printing. first reading Record · Journal page ↗
- Payment of $2,700 to Greenback Plastering Co. for plastering Polytechnic High School was approved. passed Record · Journal page ↗
- Ordinance ordering metallic fire escapes installed on Sherman, Dudley Stone, Emerson, Laguna Honda and Rochambeau schools was passed. passed Record · Journal page ↗
- Board appropriated funds for San Francisco Hospital equipment, Polytechnic High School, the Car Barn, and San Bruno Avenue paving. passed Record · Journal page ↗
- Supervisor Power presented a proposed Charter amendment making the Superintendent of Schools elected at a four thousand dollar salary. refused Record · Journal page ↗
- Proposed charter amendment would give the Superintendent of Schools a vote on the Board of Education. Record · Journal page ↗
- $8,500 to repair school buildings in February 1915 passed Record · Journal page ↗
- $8,500 to repair school buildings in February 1915 Record · Journal page ↗
- $354 for a sewer and curbs at the Twelfth Avenue school Record · Journal page ↗
- Mission Promotion Association's request to delay action on using part of Balboa Park for schools was laid over two weeks. Record · Journal page ↗
- The Board asked the Park Commission to set aside about 250 feet of Balboa Park frontage on Ocean Avenue for a school. passed Record · Journal page ↗
- City sets aside about $99,000 for Polytechnic High School, hospital equipment, school fire escapes and Lyon Street sidewalks. passed Record · Journal page ↗
- South of Army Street Association protests a school in Balboa Park Record · Journal page ↗
- $90,000 set aside to finish the Polytechnic High School academic building Record · Journal page ↗
- Committee recommended indefinitely postponing a proposal to spend $9000 from the 1904 bonds for Monroe School yard land. Record · Journal page ↗
- Park Commission asked to set aside a 250-foot strip of Balboa Park on Ocean Avenue for a school; adopted. passed Record · Journal page ↗
- A resolution to build a school in Balboa Park was referred to the Building Committee, as the Park Commission will not act until a full Board sits. referred Record · Journal page ↗
- Payment of $3,000.00 to Greenback Plastering Co. as a second payment for plastering Polytechnic High School approved. passed Record · Journal page ↗
- Proposal to dedicate part of W. A. Block No. 73 in the Civic Center to the Board of Education was deferred to April 5, 1915. Record · Journal page ↗
- Franklin Street land set aside for the School of Commerce Record · Journal page ↗
- Proposal to set aside Western Addition Block 73, occupied by the High School of Commerce, for school use was sent back to committee. referred Record · Journal page ↗
- Murdoch's motion to give the whole block to the Board of Education for a playground was sent back to the Buildings Committee. referred Record · Journal page ↗
- Resolution passed for printing authorizing city payments for Twin Peaks tunnel, Sloat Boulevard, Mile Rock sewer and Washington Irving School work. first reading Record · Journal page ↗
- $19,000 set aside for linoleum at Polytechnic High School Record · Journal page ↗
- $19,000 set aside for linoleum at Polytechnic High School Record · Journal page ↗
- City to condemn [name withheld] land on Shotwell Street passed Record · Journal page ↗
- Payments totaling $25,573.25 approved to contractors for Civic Center, Polytechnic, Oriental and Cooper schools and S. F. Hospital. passed Record · Journal page ↗
- Supervisor Bancroft's resolution asks the Park Commission to set aside part of Balboa Park for a school; laid over one week. Record · Journal page ↗
- Board adopted resolution appropriating $90,000 to complete the Polytechnic High School academic building, awarded to P. F. Reilly. passed Record · Journal page ↗
- Golden Gate Iron Works to build fire escapes at city schools passed Record · Journal page ↗
- Repeals the $3,000 appropriation for linoleum for Cooper School, made under Resolution 11669. passed Record · Journal page ↗
- Park Commissioners took under advisement a request to allow part of Balboa Park for a school house; the matter was referred to the Public Buildings Committee. referred Record · Journal page ↗
- Board adopted small appropriations for school boilers, street and sewer work, and diphtheria antitoxin. passed Record · Journal page ↗
- $500 for boiler plans at Polytechnic High School Record · Journal page ↗
- The $40,000 for Polytechnic High School equipment was referred to the Buildings Committee for further report. referred Record · Journal page ↗
- Board sustained Supervisor Gallagher's appeal against the Chair's ruling on the Polytechnic High School equipment resolution. passed Record · Journal page ↗
- Board passed resolution setting aside $40,000 for equipment for the Polytechnic High School, after amendment. passed Record · Journal page ↗
- Board rejects $30,000 for more land at the Monroe School Record · Journal page ↗
- Board set aside $40,000 from school building funds for Polytechnic High School equipment; final vote follows. Record · Journal page ↗
- Supervisor Power proposed plans and specifications for Junipero Serra School using about $44,000 left from the 1908 bond issue. referred Record · Journal page ↗
- Payment of $2,658, to Greenback Plastering Co. its fourth payment for plastering Polytechnic High School approved. passed Record · Journal page ↗
- Supervisors raised the school building repair and portables appropriation to $111,400, with final action not shown here. Record · Journal page ↗
- Motion to cut the Redding School building appropriation to $90,000 failed; the final budget decision is not shown here. Record · Journal page ↗
- Land for school yards at Adams, Fremont and Hancock schools was proposed at a total of $46,500. Record · Journal page ↗
- Teachers' salary appropriation was proposed at $1,670,000, plus new funds for elementary and high school teachers and experience. Record · Journal page ↗
- Daniel Webster School's new building and adjoining land appropriation was fixed at $120,000 by amendment. Record · Journal page ↗
- Land for the Adams, Fremont and Hancock school yards was fixed at a combined $46,500 by amendment. Record · Journal page ↗
- A new school site and building for Monroe, Balboa Park or Bernal district was added at $10,700 on Education Board advice. passed Record · Journal page ↗
- Supervisor Power proposed adding $60,000 for new elementary school teachers; the vote is not shown here. passed Record · Journal page ↗
- $25,000 allowance for teachers' outside experience added on Supervisor Power's motion, 16 to 2. passed Record · Journal page ↗
- Superintendent's auto allowance raised from $550 to $850 by amendment on Supervisor Power's motion. Record · Journal page ↗
- Proposed resolution would dedicate part of Western Addition Block 73, occupied by the High School of Commerce, as school property. Record · Journal page ↗
- The Board declared public interest requires the City to acquire lots 4 and 5 on Delano Avenue for school purposes, and instructed the City Attorney to begin condemnation. passed Record · Journal page ↗
- The Board accepted Stuart F. Smith's offer to sell land at San Jose and Seneca Avenues for $1650 for school purposes. passed Record · Journal page ↗
- Resolution 11804 proposes condemnation of land at Delano and Seneca Avenues for school purposes; its outcome is not printed on this page. Record · Journal page ↗
- Payment of $1,650 to Stuart F. Smith for school land at Seneca Avenue; no vote on record; approved later. Record · Journal page ↗
- Payment of $2,700 to Clarence E. Wickert for Folsom Street land for a school was passed for printing. first reading Record · Journal page ↗
- Resolution to accept J. Farren's $2,600 offer of Folsom Street land for a school is pending. passed Record · Journal page ↗
- The Board accepted Clarence E. Wickert's offer to sell a Folsom Street parcel to the city for $2,700 for a school. passed Record · Journal page ↗
- A proposal to finish yard work at Junipero Serra School using about $44,000 of bond money was indefinitely postponed. tabled Record · Journal page ↗
- City accepts H. R. Williams' $5,700 offer of school land passed Record · Journal page ↗
- City accepts John Christenson's $1,650 offer of Folsom Street school land passed Record · Journal page ↗
- Board finally passed payments to contractors and suppliers for sewers, paving, school repairs, water and police expenses. passed Record · Journal page ↗
- Payment of $1,650 to Stuart F. Smith for school land at Seneca Avenue approved. Record · Journal page ↗
- Payment of $2,700 to Clarence E. Wickert for school land on Folsom Street approved. Record · Journal page ↗
- $305 set aside for pipes and doors at Polytechnic High School Record · Journal page ↗
- Payment of $1,200 to Butte Engineering & Electric Co. for a fifth payment on electrical wiring at Polytechnic High School approved. passed Record · Journal page ↗
- Payment of $23,423 to Elmer Carlson for building the Oriental School approved. Record · Journal page ↗
- $30,000 given to the schools to replace the abolished poll tax passed Record · Journal page ↗
- Golden Gate Iron Works was granted 30 more days to finish installing fire escapes at Dudley Stone School. Record · Journal page ↗
- Sidewalk and curbs ordered at the Sarah B. Cooper School Record · Journal page ↗
- Resolution approves payments to many contractors and suppliers for library books, hospitals, schools, paving and City Hall work. passed Record · Journal page ↗
- Preliminary plans funded for Redding School, Fire Department buildings, a San Francisco Hospital wing, and Portola Drive improvements; outcome not printed here. Record · Journal page ↗
- Resolution finally passed after dropping a $1,000 hospital wing design item; funds school, fire station and road plans. passed Record · Journal page ↗
- Supervisors appropriated small sums for curbs, sidewalks, paving and sewers at several city street sites, adopted by 16 votes. passed Record · Journal page ↗
- $1,000 set aside for plans for the Redding School Record · Journal page ↗
- $10,000 set aside for school building repairs during August Record · Journal page ↗
- Proposes appropriating $28,758.22 for repairs to hospitals, police, fire and school buildings, plus sewers and surveys. Record · Journal page ↗
- $10,000 set aside for school building repairs during August Record · Journal page ↗
- Payment of $1,455 to Chas. Wright for plumbing at the Oriental School passed first reading only. first reading Record · Journal page ↗
- County Jail work funded, plus sidewalks at Sarah B. Cooper School Record · Journal page ↗
- City sets aside $16,500 for Hayes Street work under Rolandi contract passed Record · Journal page ↗
- Chas. Wright is authorized to receive $1,455 as final payment for plumbing at Oriental School. Record · Journal page ↗
- A payment of $16,500 to Wm. John and others for land for Adams School yard space was proposed. Record · Journal page ↗
- Resolution proposes accepting a $16,500 offer from William and Louise John for school land in Western Addition. Record · Journal page ↗
- County Jail work funded, plus sidewalks at Sarah B. Cooper School Record · Journal page ↗
- $154.32 for a new sink in the City Hall recorder's shop passed Record · Journal page ↗
- The Board proposed accepting Jacob Przyborowski's offer to sell land on Folsom Street for $2,150 for a school. passed Record · Journal page ↗
- Payment of $16,500 to William and Louise John for Adams School yard approved. Record · Journal page ↗
- Payment of $2,150 to Jacob Przyborowski for school land on Folsom Street; no vote on record; approved later. Record · Journal page ↗
- Action on P. Broderick's offer of land on San Jose Avenue for a school was deferred. Record · Journal page ↗
- Appropriation of funds to buy land from Jacob Przyborowski on Folsom Street for schools. passed Record · Journal page ↗
- Proposes a $2500 payment to Henry Von Hofen for Banks Street land needed for school purposes. Record · Journal page ↗
- Henry Von Hofen's offer to sell a small Banks Street parcel for a school for $2500 was before the Board. passed Record · Journal page ↗
- Board deferred action on buying land from P. Broderick for $11,312 for a school, until September 13, 1915. Record · Journal page ↗
- City buys land from Mrs. M. Rafael for a school, $2,450 passed Record · Journal page ↗
- City buys San Jose Avenue land for a school, $11,312 passed Record · Journal page ↗
- The Board re-adopted a resolution paying P. Broderick $11,312 for San Jose Avenue land needed for a school. passed Record · Journal page ↗
- Michael and Mary Coffey's Banks Street land bought for $3,600 passed Record · Journal page ↗
- The Board of Education asked Supervisors to consider building a primary school on land it bought in the Bernal district; referred to Public Building Committee. referred Record · Journal page ↗
- Resolution proposed to pay Mrs. M. Rafael $2,450 for Banks Street land required for school purposes. Record · Journal page ↗
- Appropriates $3,600 to pay Michael and Mary Coffey for land on Banks Street needed for a school. Record · Journal page ↗
- Offer from Giovanni Tomasello to sell Banks Street land for $900 for school use was put forward. passed Record · Journal page ↗
- Board of Public Works authorized to prepare plans for a primary school on Banks Street, costing up to $20,000. passed Record · Journal page ↗
- $11,312 set aside to pay P. Broderick for school land Record · Journal page ↗
- $2,500 set aside to pay Henry Von Hofen for school land Record · Journal page ↗
- City buys more land on Banks Street for a school Record · Journal page ↗
- $900 set aside to pay Giovanni Tomasello for school land Record · Journal page ↗
- An appropriation for lab table connections and water heaters at Polytechnic High School is listed in the index. Record · Journal page ↗
- Payments for Polytechnic and Washington Irving schools, park water, street paving, lighting and orphanage care were approved from city funds. passed Record · Journal page ↗
- Resolution approved $900 payment to Giovanni Tomasello for Banks Street land required for school purposes. passed Record · Journal page ↗
- Payment of $560.55 to Union Woodworking Co. for cabinets at Polytechnic High School approved. passed Record · Journal page ↗
- Payment of $518.85 to Spencer Street Planing Mill for tables and shelves at Polytechnic High School approved. passed Record · Journal page ↗
- Payment of $1,000 to Frederick H. Meyer for architectural services on the Redding School approved. passed Record · Journal page ↗
- Payment of $2,410 to Scott Co. as final payment for heating and ventilating at Polytechnic High School approved. passed Record · Journal page ↗
- Payment of $3,600 to P. A. Smith Co. as first payment for hardware at Polytechnic High School approved. passed Record · Journal page ↗
- City buys more land on Banks Street for a school Record · Journal page ↗
- Payment of $660 to Spencer Street Planing Mill for desks at Polytechnic High School; listed, no vote found. Record · Journal page ↗
- Payment of $1,153.60 to Bausch & Lomb Optical Co. for equipment at Polytechnic High School; listed, no vote found. Record · Journal page ↗
- Board rescinded $1,200 from the School Bond Fund for an auditorium at Marshall School. passed Record · Journal page ↗
- Money set aside for plague work and Polytechnic High School improvements passed Record · Journal page ↗
- Board authorizes payments to contractors and suppliers for libraries, schools, City Hall, sewers, streets and transit repairs. Record · Journal page ↗
- $4,681.25 paid C. F. Weber for Polytechnic High School tables Record · Journal page ↗
- Money set aside for plague work and Polytechnic High School improvements Record · Journal page ↗
- School Board says the proposed Daniel Webster School site is unsuitable, costing about $46,000 with bulkheading and lease expenses. Record · Journal page ↗
- Several small city appropriations were adopted for a car barn, Glen Park School, a county office and a Juvenile Detention Home. passed Record · Journal page ↗
- Index lists library money, Daniel Webster School sites and dental equipment Record · Journal page ↗
- Proposal for a retaining wall at the McKinley School on Henry Street; passed first reading only. first reading Record · Journal page ↗
- Redding School ordered built at Pine and Larkin Streets Record · Journal page ↗
- Plan No. 1, a Twentieth Street site between Texas and Missouri streets, approved for the new Daniel Webster School. passed Record · Journal page ↗
- Board approved Plan No. 1 as the site for a new neighborhood school, by 16 votes to none. passed Record · Journal page ↗
- Board urged that the next budget include an appropriation to complete the Daniel Webster School. passed Record · Journal page ↗
- Supervisor McCarthy presented an offer by Methodist churches' society to sell land to the city for $7,000 for school use. Record · Journal page ↗
- Ordinance ordering a retaining wall at the Henry Street frontage of McKinley School was passed. passed Record · Journal page ↗
- Ordinance ordering construction of the Redding School at Pine and Larkin streets was passed. passed Record · Journal page ↗
- Index lists the Daniel Webster School site and time extensions Record · Journal page ↗
- Payment of $2,750 to Henry C. Barner for land for the Hawthorne School; no vote on record; approved later. Record · Journal page ↗
- Index lists Hancock School land and Hetch Hetchy rights of way Record · Journal page ↗
- Approves $7,000 payment to the Church Extension Society for land at Roach and Filbert streets for Hancock School. passed Record · Journal page ↗
- Approves $2,750 payment to Henry C. Barner for a Shotwell Street lot for Hawthorne School's additional site. passed Record · Journal page ↗
- $1,818.77 set aside to pave Moultrie Street at Bernal School Record · Journal page ↗
- The Board accepted D. J. Counihan's offer to sell land on Missouri Street north of Twentieth Street. passed Record · Journal page ↗
- The Board accepted D. J. Counihan's offer to sell land on Missouri Street north of Twentieth Street for school purposes. passed Record · Journal page ↗
- Committee recommends building an 18-classroom Redding School at Pine and Larkin streets, needing about $40,000 to $45,000 beyond budget. passed Record · Journal page ↗
- Board approved plans for an eighteen-classroom Redding School building and directed the Board of Education to start construction. passed Record · Journal page ↗
- D. J. Counihan offered to sell land for $3600 for a school; the Board's decision is not printed on this page. Record · Journal page ↗
- School land offers from John Reis and D. J. Counihan accepted Record · Journal page ↗
- A resolution proposed setting aside $8,250 from a school budget item to buy additional land for school yards. Record · Journal page ↗
- Payment of $7,200 to Daniel J. Counihan for Daniel Webster School land passed first reading only, approved later. first reading Record · Journal page ↗
- Proposed appropriations for Redding and McKinley schools, San Francisco Hospital, South Bay View sewers, City Hall and fire buildings, continued on next page. Record · Journal page ↗
- Resolution proposed accepting H. Kohler Company's offer to sell Taylor Street land for school purposes at $8500. Record · Journal page ↗
- Mayor authorized to sell at public auction a cottage on school land on Moultrie Street behind Bernal School. passed Record · Journal page ↗
- Payment of $6,000 to John Reis for Daniel Webster School land; no vote on record. Record · Journal page ↗
- Index lists money for Redding School masonry, steel and heating Record · Journal page ↗
- Payment of $7,200 to Daniel J. Counihan for Daniel Webster School land approved. Record · Journal page ↗
- $8,250 paid for [name withheld] land condemned for the Adams School Record · Journal page ↗
- C. L. Wold to build Redding School at Pine and Larkin Record · Journal page ↗
- Resolution pays John Reis $6,000 for land on Texas Street for the Daniel Webster School. passed Record · Journal page ↗
- Golden Gate Iron Works to frame the Redding School for $24,000 Record · Journal page ↗
- Land for school yards at Adams, Fremont and Hancock schools was bought, with lots for Adams School costing $16,500 and $8,250. passed Record · Journal page ↗
- Monthly allowances for reconstruction and repairs to school buildings were approved from July through December. passed Record · Journal page ↗
- The Mayor favours a school bond issue to build new schools in growing districts and modernise old ones.',' Record · Journal page ↗
- Board proposed $2,500 from school buildings funds to repair schools damaged by a recent storm, passed for printing. first reading Record · Journal page ↗
- C. L. Wold to build Redding School at Pine and Larkin passed Record · Journal page ↗
- The Board appropriated $2,500 from the School Buildings fund to repair school buildings damaged by a recent storm. passed Record · Journal page ↗
- A resolution proposes appropriating $2,500 for plague measures and repairs to fire, police and school buildings in January 1916. Record · Journal page ↗
- Board of Education was asked to furnish data on school buildings inadequately protected from fire; the request was referred. referred Record · Journal page ↗
- Offer from Bertha E. Borgen et al. to sell land for school purposes was presented; the vote is not on this page. Record · Journal page ↗
- Index page: hospital plans, Hetch Hetchy money, school fire protection Record · Journal page ↗
- Index page: reporters' room in City Hall, school fire escapes, sewers Record · Journal page ↗
- $8,500 to Bertha Borger and Etta Axton for Hancock School land; passed first reading only first reading Record · Journal page ↗
- Fire escapes installed on schools with $7,250 already spent Record · Journal page ↗
- Index page listing time extensions and Hancock School land purchase Record · Journal page ↗
- $8,500 to Bertha Borger and Etta Axton for Hancock School land passed Record · Journal page ↗
- Proposed ordinance orders concrete curbs and sidewalks built at Glen Park School's Brompton Avenue frontage. first reading Record · Journal page ↗
- Finance Committee recommends $16,700 for school repairs and fire protection, including exits, hoses and stairways at many schools. Record · Journal page ↗
- Curbs and sidewalks ordered outside the Glen Park School Record · Journal page ↗
- Finance Committee recommends $10,000 for school repairs, additional exits and fire protection; the outcome is on the next page. Record · Journal page ↗
- A resolution to set aside $10,000 for school painting, repairs and fire protection was passed for printing. first reading Record · Journal page ↗
- Board accepted W. H. Dodd's $2,600 offer to sell land on Texas Street for Daniel Webster School. passed Record · Journal page ↗
- Board endorsed using school buildings for public use and polling places wherever located; adopted under suspension of rules. passed Record · Journal page ↗
- Sarah B. Cooper School architect paid a final $106.55 passed Record · Journal page ↗
- Junipero Serra School yard improvement proposed Record · Journal page ↗
- Finance Committee recommends $3,000 more for school repairs and painting; the outcome is not printed on this page. Record · Journal page ↗
- Joint committee reports inspecting forty-three school buildings for inadequate fire escapes; the motion to adopt the report is pending. referred Record · Journal page ↗
- Resolution proposed approving the Board of Education's plan to spend excess common school fund money this fiscal year. passed Record · Journal page ↗
- Stairways, platforms and exits for twelve named public schools were recommitted to the Buildings Committee. referred Record · Journal page ↗
- Resolution asks the Fire Chief to inspect all city school buildings for fire escapes; referred to the Public Buildings Committee. referred Record · Journal page ↗
- Index entries on school exits, extensions of time and Hetch Hetchy Record · Journal page ↗
- An index of school and sewer items with no subject referred Record · Journal page ↗
- $3,000 set aside for painting and repairs to school buildings Record · Journal page ↗
- Junipero Serra School yard improvement finally passed Record · Journal page ↗
- Board set aside $3,000 from the school building budget for painting and repairs to school buildings. passed Record · Journal page ↗
- Supervisor Power's resolution authorizing city payments, including to PG&E and C. L. Wold Co., was passed for printing. first reading Record · Journal page ↗
- Proposed appropriations for railway material, City Hall skylight glass, and a Glen Park School sidewalk on Brompton Avenue. Record · Journal page ↗
- Marie C. Erickson offered to sell Mission Street land for $3,500 so the city could build Daniel Webster School. Record · Journal page ↗
- The Mayor vetoed a bill ordering improvement of the yard of Junipero Serra School. vetoed Record · Journal page ↗
- Mayor Rolph vetoed the ordinance ordering improvement of the Junipero Serra School yard, saying school funds must come through the Board of Education. Record · Journal page ↗
- Three city appropriations were set aside, including $800 for sidewalks at Glen Park School on Brompton Avenue. passed Record · Journal page ↗
- City accepts $7,500 offer from Adolf and Hilda Hultgren for Missouri Street land needed for Daniel Webster School. passed Record · Journal page ↗
- City accepts A. Brander's $2,500 offer for Texas Street land needed for Daniel Webster School. passed Record · Journal page ↗
- Mayor vetoes Junipero Serra yard work, wanting a Paul Revere School Record · Journal page ↗
- The resolution for a Pacific Telephone switchboard in the Board of Education rooms was refused adoption. refused Record · Journal page ↗
- Bill to build Paul Revere School on Tompkins street was laid over one week, then passed for printing. first reading Record · Journal page ↗
- Patrick Howard's offer to sell land on Texas Street for Daniel Webster School for $10,000 was accepted. passed Record · Journal page ↗
- Hugh G. Hamilton's offer to sell land at Twentieth and Missouri streets for Daniel Webster School for $10,500 was accepted. passed Record · Journal page ↗
- $3,300 paid to Margaret J. T. Reid for Fremont School land passed Record · Journal page ↗
- Index entries on school land, permits and the Mayor's veto Record · Journal page ↗
- Ordinance to improve the Junipero Serra School yard and let its contract was laid over one week again. Record · Journal page ↗
- Finance Committee refers, without recommendation, a request for $87,000 more to build Daniel Webster School. Record · Journal page ↗
- Board added $87,000 to the budget for building the Daniel Webster School, the amount amended from $45,000. Record · Journal page ↗
- Paul Revere School proposed on Tompkins Street between Folsom and Banks Record · Journal page ↗
- Board of Public Works contract to build Paul Revere School was deferred. Record · Journal page ↗
- Mayor's veto concerning Junipero Serra School was deferred. Record · Journal page ↗
- An ordinance to improve the Junipero Serra School yard was again laid over for one week. Record · Journal page ↗
- Resolution proposes the City Attorney start condemnation proceedings to acquire land on Texas Street for Daniel Webster School. Record · Journal page ↗
- Index entries on the Market Street railway and school painting Record · Journal page ↗
- Paul Revere School on Tompkins Street put off again Record · Journal page ↗
- Improvement of the Junipero Serra School yard was laid over one week for later consideration. Record · Journal page ↗
- The Mayor's veto of the Junipero Serra School yard improvement bill was sustained by the Board, so the bill failed. Record · Journal page ↗
- Ordinance to construct the Daniel Webster School on Twentieth Street between Texas and Missouri streets was passed for printing. first reading Record · Journal page ↗
- Ordinance for construction of Paul Revere School on Tompkins Street was passed for printing on first reading. first reading Record · Journal page ↗
- $137 more paid to A. Brander for the Texas Street lot Record · Journal page ↗
- Proposed $87,000 to complete the Daniel Webster School. Record · Journal page ↗
- Proposed $115,000 for construction and repairs to school buildings and portables. Record · Journal page ↗
- Board approved $115,000 for school building construction, repairs and fire escapes, to be expended by Public Works under Board of Education direction. passed Record · Journal page ↗
- Parkside and Edison school parents ask for more classrooms passed Record · Journal page ↗
- A motion on School Department budget matters was made; its outcome appears on the next page. Record · Journal page ↗
- The Board approved an extra $45,000 to complete the Redding School building. passed Record · Journal page ↗
- The Board approved $87,000 to complete an addition to the Daniel Webster School. passed Record · Journal page ↗
- Board took up funding for four health inspectors of schools at $900 each; outcome not yet shown. passed Record · Journal page ↗
- The pupil nurse appropriation was raised from $15,000 to $22,464 and approved by the Board. passed Record · Journal page ↗
- The Finance Committee's report on the Board of Education budget was taken up, with salary lines for commissioners, deputies and teachers listed. Record · Journal page ↗
- Supervisor Gallagher proposes a 5-cent school tax per $100 of assessed value, about $270,000, for school buildings and land. Record · Journal page ↗
- The Board continued debate on the proposed 1916-1917 city budget, with school funding requests under discussion. Record · Journal page ↗
- Board adopted a 5-cent per $100 special tax levy to fund San Francisco school department needs. passed Record · Journal page ↗
- Board rejected the itemized school projects recommended in the report by a vote of 6 to 12. refused Record · Journal page ↗
- Board approved a lump sum of $2,250,000 for the school department, with the dental clinic funded from it. passed Record · Journal page ↗
- Board rejected a motion to provide $4,500 for additional land for the Edison School. refused Record · Journal page ↗
- Board approved $3,000 set aside for a dental clinic to be run under the Board of Education. passed Record · Journal page ↗
- Board approved $1,200 for the Superintendent's traveling and incidental expenses. passed Record · Journal page ↗
- Board approved $6,000 to buy additional land for the Sherman School. passed Record · Journal page ↗
- $1,200 for school superintendent travel and incidentals amended into the budget, 18 to 0; no final vote found Record · Journal page ↗
- Construction of the Paul Revere School on Tompkins Street between Folsom and Banks streets ordered and contracted. passed Record · Journal page ↗
- $7,194.75 paid to Golden Gate Iron Works for Redding School steel Record · Journal page ↗
- Daniel Webster School ordered built on Twentieth Street Record · Journal page ↗
- Supervisor Power's resolution asks the Board of Education to report unused school lots in Richmond, Sunset and Potrero for exchange, referred to committees. referred Record · Journal page ↗
- Julia U. Miser's land bought for $2,600 for Daniel Webster School Record · Journal page ↗
- $2,600 for school land on Texas Street near 20th; no status on record. Record · Journal page ↗
- Funds of $9,000 for School Department building repairs and $1,000 for police, fire and municipal buildings were appropriated for June 1916. passed Record · Journal page ↗
- $10,500 paid to Marie C. Erickson for a school site Record · Journal page ↗
- $3,500 paid to Julia U. Miser for a school lot Record · Journal page ↗
- Marie C. Erickson's Missouri Street lot bought for Daniel Webster School Record · Journal page ↗
- $4,150 paid to Albert Johnson for Daniel Webster School land passed Record · Journal page ↗
- $2,600 paid for Texas Street land for Daniel Webster School passed Record · Journal page ↗
- $2,600 paid to Patrick Howard for Daniel Webster School lot on Texas Street passed Record · Journal page ↗
- Auditor and Treasurer were directed to merge leftover School Bond Fund 1904 money into the 1908 school bond fund. passed Record · Journal page ↗
- A $62,713 resolution would fund construction of the Daniel Webster School through several city contracts. Record · Journal page ↗
- A $30,000 resolution would fund construction of the Paul Revere School by contractor M. G. Zelinsky. Record · Journal page ↗
- Ordinance ordering sixteen urinal stalls installed at Irving M. Scott School passed for printing. first reading Record · Journal page ↗
- Board accepted Charles Michael Young's offer to sell a small Texas Street lot for $1,500 as the Daniel Webster School site. passed Record · Journal page ↗
- $10,500 paid to Marie C. Erickson for a school site Record · Journal page ↗
- $3,500 paid to Julia U. Miser for a school lot Record · Journal page ↗
- Marie C. Erickson's Missouri Street lot bought for Daniel Webster School passed Record · Journal page ↗
- Supervisors finally passed authorizations paying 22 city claims, including Municipal Railway power, San Francisco Hospital supplies and Fremont School land. passed Record · Journal page ↗
- Supervisors finally passed appropriations of $2,307.50 for the City Hall clock, $3,960 for Redding School heating and $675 for lockers. passed Record · Journal page ↗
- Board appropriated $62,713 from the Daniel Webster School budget to pay construction contracts and architect's fee. passed Record · Journal page ↗
- Board set aside $30,000 from the School Bond Fund to build Paul Revere School, with a contract to M. G. Zelinsky. passed Record · Journal page ↗
- Board ordered sixteen white porcelain urinal stalls installed at Irving M. Scott School, with contract work by Public Works. passed Record · Journal page ↗
- Resolution proposed asking the Board of Education to identify unused school lots for exchange in Richmond and Sunset. Record · Journal page ↗
- Board to authorize 26 payments from city funds to contractors and suppliers, including hospital, school, fire and transit work; passed first reading only first reading Record · Journal page ↗
- Proposed $600 appropriation for drafting plans for a Mission High School annex was deferred. Record · Journal page ↗
- $1,500 paid to Albert Johnson for Daniel Webster School land Record · Journal page ↗
- Old buildings on the Daniel Webster School site to be auctioned passed Record · Journal page ↗
- $4,470 paid to [name withheld] for Daniel Webster School land Record · Journal page ↗
- City and County of San Francisco (Redding Grammar School) allowed an oil storage tank (1500 gallons) at the southeast corner of Pine Street and Larkin Street passed Record · Journal page ↗
- $600 appropriated for drafting plans for an annex to Mission High School. passed Record · Journal page ↗
- $1,500 paid to Albert Johnson for Daniel Webster School land passed Record · Journal page ↗
- Board authorized eight payments for library books, a truck, advertising and widows' pensions; the final vote continues on the next page. passed Record · Journal page ↗
- Proposed appropriation of $56,500 to finish the Redding Grammar School building, with construction and electrical contracts. Record · Journal page ↗
- $64,579 to C. L. Wold Company for the Daniel Webster School Record · Journal page ↗
- Board passed $56,500 to finish Redding Grammar School, including contracts with C. L. Wold Co. and Globe Electric Co. passed Record · Journal page ↗
- Supervisor Power proposed paying [name withheld] $4,470 for land and completion of the Daniel Webster School. passed Record · Journal page ↗
- Board appropriated city funds for City Hall lighting, a Board of Education room, filing cabinets, and sidewalk and curbing repairs. passed Record · Journal page ↗
- City Attorney instructed to condemn Chenery and Randall Street land for the Fairmount School site. passed Record · Journal page ↗
- Board approves $4,470 paid to [name withheld] for land and completion of the Daniel Webster School. passed Record · Journal page ↗
- Board of Public Works directed to include sidewalks in contracts for all school and public buildings being erected. passed Record · Journal page ↗
- Ordinance for an addition to Mission High School at Eighteenth and Church streets passed for printing. first reading Record · Journal page ↗
- Addition to Mission High School ordered at Eighteenth and Church Record · Journal page ↗
- Proposed appropriations cover San Francisco Hospital work, police, fire and school building repairs, and street work on Buena Vista and San Bruno avenues. Record · Journal page ↗
- $485 for a retaining wall in front of Harrison School passed Record · Journal page ↗
- Proposed appropriations fund school building repairs, Polytechnic High School yard work, and a Railroad avenue sewer by Tibbitts-Pacific Co. Record · Journal page ↗
- $6,500 set aside for school building repairs in October Record · Journal page ↗
- $6,500 set aside for school building repairs in October Record · Journal page ↗
- Charter change proposed for school lots west of Arguello Boulevard Record · Journal page ↗
- $24,250 set aside for the Mission High School Annex passed Record · Journal page ↗
- Payment of $6,897 to C. L. Wold Co. for the second payment on completing the Redding School approved. passed Record · Journal page ↗
- $24,250 set aside for the Mission High School Annex Record · Journal page ↗
- $4,000 to buy Green Street land for the Sherman School; passed first reading only first reading Record · Journal page ↗
- E. C. Burr's Green Street land bought for the Sherman School Record · Journal page ↗
- Proposed $4,000 payment to S. E. Burr for a triangular land parcel for Sherman School; outcome continues next page. Record · Journal page ↗
- The Finance Committee report on the Parkside School building, a $4420 contract to F. Warden, was read and approved. passed Record · Journal page ↗
- Finance Committee recommends deferring construction of the Parkside School until a permanent building can be started. Record · Journal page ↗
- Claim of $624 paid to Globe Electric Co. for electric work at Redding School. passed Record · Journal page ↗
- Land bought from James P. Kane for the Fairmount School passed Record · Journal page ↗
- Eighteen payments authorized from city funds to contractors and suppliers, including school and hospital construction work, for amounts totalling several thousand dollars each. Record · Journal page ↗
- Resolution proposes appropriating funds for street paving, water main extension, sewers and Polytechnic High School work; outcome continues on the next page. Record · Journal page ↗
- Resolution proposes paying $1,850 to James and Mary Kane for land for the Fairmount School; outcome continues on the next page. Record · Journal page ↗
- The Board of Education asked that Excelsior avenue and Paris street be closed to traffic at noon for Monroe School pupils. passed Record · Journal page ↗
- An index of sewer and school items with no subject Record · Journal page ↗
- Purchase price for land owned by Jas. Kane and others for the Fairmount School was approved. passed Record · Journal page ↗
- The Board of Education hearing on Parkside School was deferred. Record · Journal page ↗
- Board of Education hearing on Parkside School was postponed because the Board's president could not attend. Record · Journal page ↗
- Pays $1,850 to James and Mary Kane for a Randall Street lot added to the Fairmount School site. passed Record · Journal page ↗
- Declares the Superintendent of Schools' travel allowance part of the General Fund for 1916-1917. passed Record · Journal page ↗
- T. Matheson's Chenery Street land bought for $6,000 for Fairmount School passed Record · Journal page ↗
- Daniel McDonald's land bought for $1,800 for the Fairmount School Record · Journal page ↗
- D. Foley's Chenery Street land bought for $6,650 for Fairmount School passed Record · Journal page ↗
- M. E. Gray invited Supervisors to attend the opening of Polytechnic High School's new buildings. Record · Journal page ↗
- A resolution authorizing fourteen city payments, including Redding School, Paul Revere School and San Francisco Hospital work, was passed for printing on Supervisor Power's motion. first reading Record · Journal page ↗
- The Board moved to accept an offer from Ella M. Leigh and Margaret E. Lees to sell land for Fairmount School for $5,750. Record · Journal page ↗
- Offer from Josephine M. Olmo to sell Randall Street land for $1,900 for Fairmount School is before the Board. passed Record · Journal page ↗
- T. H. Kortick's land bought for $17,000 for the Fairmount School passed Record · Journal page ↗
- Payment of $6,000 to Thomas and Margaret Mathison for their Chenery Street lot passed first reading only, approved later. first reading Record · Journal page ↗
- Board proposed paying Thomas H. Kortick $17,000 for land needed for the Fairmount School. Record · Journal page ↗
- Board proposed paying Louis and Filomena Nessier $7,152.50 for land added to the Fairmount School site. Record · Journal page ↗
- Supervisor Power's appropriations of $417 for Polytechnic High School, $92.50 for the hospital incinerator, $32.55 for City Hall, and $300 for Chenery Street were adopted. passed Record · Journal page ↗
- Mayor to auction the old Parkside School on Taraval Street; put over to a later meeting Record · Journal page ↗
- The Board approved paying Thomas and Margaret Mathison for a lot on Chenery street for the Fairmount School site. passed Record · Journal page ↗
- Board authorized payments to contractors for Twin Peaks Tunnel, Municipal Railways, Paul Revere School and hospital work; list continues. first reading Record · Journal page ↗
- Supervisor Power proposed $5,650 to buy a Chenery Street lot from Denis and Pauline Foley for Fairmount School; passed for printing. first reading Record · Journal page ↗
- Land bought from D. Foley on Chenery Street for Fairmount School Record · Journal page ↗
- Mayor to sell city buildings at Taraval Street and 31st Avenue passed Record · Journal page ↗
- Six public-work contractors were granted time extensions on the Juvenile Court building and Daniel Webster School work. passed Record · Journal page ↗
- Joseph L. Feerick and wife's offer to sell land on Chenery Street for $5,225 for Fairmount School was accepted. passed Record · Journal page ↗
- City budgeted $115,000 for school building repairs and temporary schools and spent $60,610. Record · Journal page ↗
- City budgeted $87,000 to complete Daniel Webster School and has spent $6,713.01 on it. Record · Journal page ↗
- City to budget $6,000 for land for Sherman School and pay $4,035, including $4,000 to Edmund C. Burr; no decision on record. Record · Journal page ↗
- Board adopted a $5,650 payment to Denis and Pauline Foley for a 25-by-125-foot lot for Fairmount School. passed Record · Journal page ↗
- Board adopted a $17,000 payment to Thomas H. Kortick for land required for the Fairmount School. passed Record · Journal page ↗
- Board is paying $7,152.50 to Louis and Filomena Nessier for land added to the Fairmount School site. Record · Journal page ↗
- Henry Klahn sells Chenery Street land for the Fairmount School, $4,400 Record · Journal page ↗
- Bill proposed construction and plumbing of lavatory buildings in the Monroe School yard, passed for printing. first reading Record · Journal page ↗
- Journal index lists Fairmount School land and contractors' extensions of time Record · Journal page ↗
- Payment of $4,658 to Michael and Ane Tomasich for Chenery Street land; no vote on record; approved later. Record · Journal page ↗
- Payment of $6,750 to Ella Leigh and Margaret Lees for Fairmount School land; no vote on record; approved later. Record · Journal page ↗
- M. Tomasich sells Chenery Street land for the Fairmount School, $4,658 passed Record · Journal page ↗
- Contractor given 20 more days on Polytechnic High School yard passed Record · Journal page ↗
- Ordinance ordered construction and plumbing of lavatory buildings in the yard of the Monroe School. passed Record · Journal page ↗
- A resolution to spend $5,720 on lavatories at Francis Scott Key School was passed for printing. first reading Record · Journal page ↗
- The Board accepted C. and A. McDonald's $3500 offer to sell land on Chenery Street for Fairmount School. passed Record · Journal page ↗
- Payment of $6,750 to Ella Leigh and Margaret Lees for Fairmount School land approved. Record · Journal page ↗
- Pays $1,900 to Peter J. and Josephine M. Olmo for land added to the Fairmount School site on Randall Street. passed Record · Journal page ↗
- Board appropriated $5,720 for constructing lavatories at the Francis Scott Key School under the Board of Public Works. passed Record · Journal page ↗
- Proposed ordinance would order construction of Fairmount School at Chenery and Randall streets. Record · Journal page ↗
- Construction of the Fairmount School at the northeast corner of Chenery and Randall streets was ordered. passed Record · Journal page ↗
- The Board authorized payments from city bond and general funds to contractors for Hetch Hetchy, Daniel Webster School, Sanchez Street and San Francisco Hospital work. Record · Journal page ↗
- Ralston Iron Works was granted extensions of time to install metal fire escapes on five school buildings, due to steel shortages. passed Record · Journal page ↗
- $1,800 paid to Daniel and Julia McDonald for Fairmount School land Record · Journal page ↗
- $2,500 paid to John and Bridget Brennan for Fairmount School land Record · Journal page ↗
- Resolution proposed setting aside $2,300 to move buildings and portables on the proposed Fairmount School site. Record · Journal page ↗
- Board credited $3,053 from sales of houses on Fairmount School site lands to the School Construction Fund. passed Record · Journal page ↗
- Proposed bill requiring a school officer's statement before dealers buy second-hand textbooks was laid over one week. Record · Journal page ↗
- Supervisors approved $1,800 payment to Daniel and Julia McDonald for a 25-by-125-foot lot added to Fairmount School on Chenery Street. passed Record · Journal page ↗
- Supervisors approved $2,500 payment to John and Bridget Brennan for land added to Fairmount School along Randall Street. passed Record · Journal page ↗
- Passed for printing a bill ordering lavatories built at Francis Scott Key School on Forty-second Avenue. first reading Record · Journal page ↗
- Proposed ordinance regulating second-hand school book sales passed for printing on Lahaney's motion. first reading Record · Journal page ↗
- Nineteen city payments totalling about $47,000 for hospitals, streets, schools and supplies were finally passed. passed Record · Journal page ↗
- Resolution approved $2,300 to move buildings and portables on the proposed Fairmount School site. passed Record · Journal page ↗
- Ordinance orders lavatories built at Francis Scott Key School on Forty-second Avenue, with Board of Public Works to contract. passed Record · Journal page ↗
- Ordinance passed requiring second-hand dealers to obtain and post the Board of Education's list of school textbooks before buying. passed Record · Journal page ↗
- A resolution to set aside $110,062 for construction of the Fairmount School, with contracts to several firms, passed for printing. first reading Record · Journal page ↗
- Supervisor McLeran proposed a policy for a bond issue to build needed school buildings; the proposal was referred to committee. referred Record · Journal page ↗
- Index lists Hetch Hetchy work and Francis Scott Key School lavatories Record · Journal page ↗
- Old Redding School buildings to be sold at auction passed Record · Journal page ↗
- Board appropriated $110,062 to build the Fairmount School through four awarded contracts. passed Record · Journal page ↗
- Supervisor Power's appropriations for Fairmount School work and Potrero avenue improvements were passed for printing. first reading Record · Journal page ↗
- Index lists Monroe School lavatories and the Pelicano street deed Record · Journal page ↗
- Tax sale cancelled on part of the Washington Irving School lot passed Record · Journal page ↗
- Resolution for $9,000 in architect's fees and inspection for Fairmount School was passed for printing. first reading Record · Journal page ↗
- Contractors on Engine Houses 4 and 17, Central Emergency Hospital and Paul Revere School granted extensions of time to finish work. passed Record · Journal page ↗
- $15,162 set aside for plumbing at the Fairmount School Record · Journal page ↗
- Schoolyard to be ordered improved at Junipero Serra School on Holly Park Avenue; passed first reading only. Record · Journal page ↗
- Resolution 14138 set aside $9,000 for architect's fees and inspection of the Fairmount School. passed Record · Journal page ↗
- Work ordered on the Junipero Serra School yard, Holly Park Avenue passed Record · Journal page ↗
- Supervisors adopted Resolution 14187, appropriating about $1,235 for water works, Fairmount School sewer, City Hall and street paving. passed Record · Journal page ↗
- Resolution authorizing dozens of city payments to contractors and payees, including hospital, library, school, sewer and street work. Record · Journal page ↗
- The Board passed for printing authorizations for payments to contractors and suppliers for school, Hetch Hetchy water and park work. first reading Record · Journal page ↗
- The Board authorized payments totalling tens of thousands of dollars for schools, hospitals, water works, sewers and charities, passed for printing. first reading Record · Journal page ↗
- Board of Education was granted the Exposition Auditorium Main Hall on May 7, 1917 to show Yosemite Valley films free. passed Record · Journal page ↗
- Board of Supervisors endorsed the Board of Education's rules democratizing city schools, including uniform graduation dress. passed Record · Journal page ↗
- Board of Education was asked to report which persons or groups may solicit donations from public school pupils. passed Record · Journal page ↗
- Payment of $1,800 to Scott Co. for heating at Daniel Webster School; no vote on record. Record · Journal page ↗
- Mayor allowed to sign railroad sewer deal for Fairmount School passed Record · Journal page ↗
- Special session considered Supervisor McLaren's proposed bond issue for school construction; outcome continues on next page. Record · Journal page ↗
- Joint committee majority recommends adopting Supervisor McLeran's resolution for a school bond issue. Record · Journal page ↗
- Supervisor Power's minority report urging a 15-cent school tax instead of a bond issue was defeated, 12 to 5. refused Record · Journal page ↗
- The Board adopted a resolution declaring its policy to seek a bond issue for construction of San Francisco school buildings. passed Record · Journal page ↗
- Board adopted a policy to issue bonds for new school buildings, rejecting the proposed 15-cent special tax. passed Record · Journal page ↗
- Finance Committee recommends a $125,000 increase for the School Department, funding 75 grade teachers and 15 high school teachers. Record · Journal page ↗
- The Finance Committee chairman favours a 5-cent school building tax, but the other two members did not concur. Record · Journal page ↗
- Resolution 14338 authorizes 1917 city spending on fire, schools, libraries and parks; the final vote is on the next page. Record · Journal page ↗
- Board authorizes payments on dozens of city claims for water, transit, hospital, school and street work. Record · Journal page ↗
- C. L. Wold Co. received an $11,517 fifth payment for general construction of the Daniel Webster School. Record · Journal page ↗
- L. Heckenroth was due a final payment of $1,475 for lavatories at the Monroe School; listed for payment, no vote found. Record · Journal page ↗
- The city's 1917 appropriation schedule, covering public works, schools, parks and libraries, passed by a 15 to 2 vote. Record · Journal page ↗
- A bill ordering the Board of Public Works to prepare plans for ungraded primary schools was referred to the Finance Committee. referred Record · Journal page ↗
- Payments approved for hospital brickwork, Hetch Hetchy wire and school plumbing passed Record · Journal page ↗
- Finance Committee urged plans for an ungraded school on Union Street be drawn in the City Architect's office; report referred to committees. referred Record · Journal page ↗
- Proposed $14,039 for yard work at Fairmount School, including excavating, paving and fencing. Record · Journal page ↗
- Proposed $543 added to Daniel Webster School construction funds, passed for printing. first reading Record · Journal page ↗
- Supervisor Nelson's bill to fund city school buildings by bond issue was referred to the Finance Committee. referred Record · Journal page ↗
- Engine House No. 37 to be built at Vermont and Twenty-fifth Record · Journal page ↗
- A primary school to be built on Union Street near Kearny Record · Journal page ↗
- Plans ordered for primary schools passed Record · Journal page ↗
- Board set aside $543 to complete the Daniel Webster School. passed Record · Journal page ↗
- Budget appropriation for Daniel Webster School construction cut by $750 to $63,829. passed Record · Journal page ↗
- Engine House No. 37 to be built at Vermont and Twenty-fifth Record · Journal page ↗
- $8,000 for school repairs and $7,635.31 for the Union Street school; passed first reading only. first reading Record · Journal page ↗
- Primary school building to be built on Union Street between Kearny and Montgomery passed Record · Journal page ↗
- North Beach Promotion Association asked for better lighting on Columbus and Stockton and a school bond vote in October; referred to committees. referred Record · Journal page ↗
- Board appropriates $15,635 for June school repairs and a partial build of a school on Union Street. passed Record · Journal page ↗
- A declaratory ordinance proposing a bond issue for city public school buildings and land was passed for printing. first reading Record · Journal page ↗
- Golden Gate Iron Works granted a 45-day extension to finish structural steel and iron work on the Fairmount School. Record · Journal page ↗
- Superintendent of Schools Alfred Roncovieri granted thirty days leave Record · Journal page ↗
- $1,850 paid to Michael and Bridget Gilbride for Fairmount School land Record · Journal page ↗
- Ordinance declares public interest in building public schools and directs Public Works to prepare plans and cost estimates. passed Record · Journal page ↗
- $1,850 paid to Michael and Bridget Gilbride for Fairmount School land Record · Journal page ↗
- Payment of $7311.75 to C. L. Wold Co. for the sixth construction payment on Daniel Webster School approved. passed Record · Journal page ↗
- Payment of $6888.75 to Elmer Carlson for the fourth construction payment on Fairmount School approved. passed Record · Journal page ↗
- Payment of $1091.04 to John Reid, Jr. for architectural services on Fairmount School approved. passed Record · Journal page ↗
- Board of Public Works sent its estimate of the proposed school bond issue's cost to Finance and Education Committees. referred Record · Journal page ↗
- The Board of Public Works sent the City Engineer's estimate of $3,500,000 for school buildings and lands to committees. referred Record · Journal page ↗
- $1,896.30 final payment to Scott Company for Daniel Webster School heating Record · Journal page ↗
- Finance Committee reported a dispute with the Board of Education over spending $115,000 on school repairs, asking the Board to decide. Record · Journal page ↗
- Supervisors urge the Board of Education to pay teachers' scheduled salary increases, pledging up to $45,000 if needed. Record · Journal page ↗
- Board of Education member Agnes G. Regan granted thirty days' leave of absence from September 5, 1917, with permission to leave the state. passed Record · Journal page ↗
- Resolution proposed authorizing $1,851.59 in payments to A. E. Olson and Frederick Post Co. for Cleveland School buildings. first reading Record · Journal page ↗
- Resolution proposed authorizing over $40,000 in city fund payments for schools, Muni, Hetch Hetchy water, fire and parks. first reading Record · Journal page ↗
- Board authorized $1,100, $749 and $2.59 payments for temporary frame buildings at Cleveland School. passed Record · Journal page ↗
- Payments to several contractors and suppliers for a school and Municipal Railway work are proposed. Record · Journal page ↗
- The Board of Education asked for $60,000 to raise teacher and janitor salaries; referred to Finance Committee, outcome pending. referred Record · Journal page ↗
- Supervisor McLeran proposed calling a $3.5 million school bond election on October 30, 1917 for new public school buildings. Record · Journal page ↗
- $3.5M school bond ordinance passed for printing, a first step toward a later vote. first reading Record · Journal page ↗
- Gallagher of the Board of Education urges an October bond election passed Record · Journal page ↗
- Board of Education's request for $57,696 for teacher and janitor salary increases was referred to the Finance Committee. referred Record · Journal page ↗
- Supervisor McLeran proposed $1000 for a campaign informing voters on the school bond election, referred to Finance Committee. referred Record · Journal page ↗
- Supervisors pledged to fund a $45,000 salary increase for school teachers and staff, adopted unanimously on 17 ayes. passed Record · Journal page ↗
- Board of Supervisors urged the Board of Education to pay the salary increases for school teachers and janitors as scheduled. passed Record · Journal page ↗
- Finance Committee recommended transferring $60,000 from the General Fund to the School Fund for teacher and janitor raises. Record · Journal page ↗
- Ordinance 4326 calls a special October 30, 1917 election on a $3,500,000 bond issue for public school buildings. passed Record · Journal page ↗
- Resolution authorizing $58,732.59 in payments to fifteen contractors and suppliers for schools, hospital, water and transit was passed for printing. first reading Record · Journal page ↗
- Board asked the Mayor to appoint a hundred-member citizens' committee campaigning for a $3.5M school bond. passed Record · Journal page ↗
- Board of Education president asked to furnish an itemized list of planned salary increases for this year. passed Record · Journal page ↗
- $300,000 for schools and $92,000 for Aquatic Park laid over Record · Journal page ↗
- Finance Committee proposed spending $392,000 from the South Beach land sale to Southern Pacific: $300,000 for schools, $92,000 for an aquatic park; laid over. Record · Journal page ↗
- Finance Committee report on raising school teacher and janitor salaries was taken up; outcome continues to next page. Record · Journal page ↗
- Supervisor Power's resolution would set aside $60,000 for teacher and janitor pay increases; the Board postponed action one week. Record · Journal page ↗
- Proposed $1,000 for school bond issue campaign expenses, passed for printing. first reading Record · Journal page ↗
- Supervisor McLeran moved notice of an October 30, 1917 special election on a bond for public school buildings and land. Record · Journal page ↗
- Ordinance calling a special election on a $3,500,000 bond for public school buildings and land passed, 15 ayes to none. passed Record · Journal page ↗
- The Board adopted a $60,000 General Fund transfer to raise teachers' and janitors' salaries in the School Department. passed Record · Journal page ↗
- Proposed notice of a special election on October 30, 1917 for a bond issue to fund public school buildings and land. Record · Journal page ↗
- Ordinance calling a bond election for $3,500,000 for public school buildings, sites and equipment, passed by the Board. passed Record · Journal page ↗
- $1,899 set aside for two portable buildings at Cleveland School Record · Journal page ↗
- Old Fairmount School buildings to be sold passed Record · Journal page ↗
- Proposed resolution would set aside $392,073.30 from the Southern Pacific land sale for schools and Aquatic Park; laid over again. Record · Journal page ↗
- Resolution 14992 appropriates city funds for dental work, staff pay increases and an automobile for several departments. passed Record · Journal page ↗
- The Board declared that voters approved a $3.5 million bond for school buildings and land, with 37,619 votes in favour. passed Record · Journal page ↗
- The Board directed the Clerk and City Attorney to retain attorney John C. Thompson of New York to opine on the school bonds. passed Record · Journal page ↗
- Miss Burke's School, Inc allowed an oil storage tank (1500 gallons) on the south side of Jackson Street, 125 feet west of Baker Street passed Record · Journal page ↗
- Proposed ordinance would issue $3.5M in school bonds for public school buildings and land acquisition. Record · Journal page ↗
- Ordinance creating the 1918 school building bond issue, with redemption and construction funds, passed. passed Record · Journal page ↗
- Resolution urging a High School building in North Beach was referred to the Buildings and Education Committees. referred Record · Journal page ↗
- $300,000 for schools and $92,000 for Aquatic Park laid over Record · Journal page ↗
- Payment of $22,423.70 to E. Carlson for building the Fairmount School; no vote on record; approved later. Record · Journal page ↗
- Bill No. 4743 proposes $3,500,000 in bonds to build and equip public school buildings; its final vote is not on this page. Record · Journal page ↗
- Ordinance for a 1918 school building bond issue, with interest coupons and a school construction fund, passed with fifteen ayes. passed Record · Journal page ↗
- New York attorney John C. Thomson was hired for $2,000 to examine the validity of $3,500,000 school bonds. passed Record · Journal page ↗
- Resolution authorizing payments to National Ice Cream Co., C. Peterson and A. Lettich, including ungraded school plumbing and heating work. Record · Journal page ↗
- California College of Chiropody refused a school at 1315 Gough Street refused Record · Journal page ↗
- High School of Commerce to be built at Fell and Franklin first reading Record · Journal page ↗
- Richmond School to be built on Nineteenth Avenue Record · Journal page ↗
- Board of Education requested $50,000 for school bond plans; the request was referred to the Public Buildings Committee. referred Record · Journal page ↗
- Four firms submitted bids to lithograph 3500 school bonds, and the proposals were referred to the Supplies Committee. referred Record · Journal page ↗
- An ordinance proposes ordering preparation of plans for the High School of Commerce building. Record · Journal page ↗
- Richmond School to be built on Nineteenth Avenue Record · Journal page ↗
- California College of Chiropody refused a school at 1315 Gough Street refused Record · Journal page ↗
- Payments authorized to contractors and claimants for fire, school and Municipal Railways work, passed finally. passed Record · Journal page ↗
- Supervisor Power's proposal urging competitive plans for school buildings was referred to the Public Buildings Committee. referred Record · Journal page ↗
- City Attorney recommended a resolution to acquire lands and build permanent public schools; sent to Buildings and Education Committees. referred Record · Journal page ↗
- Mayor Rolph vetoed two ordinances authorizing school house construction contracts; the veto message was laid over one week. vetoed Record · Journal page ↗
- Resolution 15185 adopted $794.40 for paving at a school lot on Kansas Street, between Eighteenth and Nineteenth streets. passed Record · Journal page ↗
- Mayor Rolph vetoed ordinances authorizing two new schools, saying the Board of Education must request the plans. vetoed Record · Journal page ↗
- Mayor's veto of ordinances for the High School of Commerce and Richmond School construction was sustained, and the override failed. vetoed Record · Journal page ↗
- $150 for artificial stone sidewalks in front of Paul Revere School on Folsom Street passed Record · Journal page ↗
- Two organizations, including the School Department and the Labor Council, were granted free use of Auditorium halls in February 1918. passed Record · Journal page ↗
- Resolution providing for acquisition, construction and equipment of permanent school buildings and their lands was adopted. passed Record · Journal page ↗
- $330 from sale of old Fairmount School buildings moved to the school's construction account. passed Record · Journal page ↗
- Plans for a school near Monroe School on Excelsior Avenue were laid over two weeks by motion. Record · Journal page ↗
- Resolution for plans of a school in the Richmond District was recommitted to the Public Buildings Committee. referred Record · Journal page ↗
- Resolution for plans of a school building on Harrison Street between Tenth and Eleventh was presented. first reading Record · Journal page ↗
- Resolution proposed asking the Board of Education to set aside half-days so school children can attend Edwin Lemare's organ recitals. referred Record · Journal page ↗
- City rents Southern Pacific land for the Fairmount School fence passed Record · Journal page ↗
- Plans ordered for a new school on Harrison Street Record · Journal page ↗
- Board of Public Works asked to prepare plans for a new school near the present Monroe School, with $8,924.15 provided. Record · Journal page ↗
- School on Harrison Street proposed, with $4,952.83 for the plans Record · Journal page ↗
- City offers school bonds for sale to fund schools passed Record · Journal page ↗
- Payment of $724.50 to Elmer Carlson for extra work at Fairmount School; no vote on record; approved later. Record · Journal page ↗
- Board authorizes claim payments, including $724.50 to Elmer Carlson for extra work at Fairmount School. passed Record · Journal page ↗
- Proposed appropriation from Polytechnic High School bond fund for school work, including blower system installation; outcome continues on next page. Record · Journal page ↗
- The Noe Valley Mothers' Club asked for $25,000 for a playground beside James Lick School; no decision was recorded. Record · Journal page ↗
- Chas. McComb asked that $115,000 of a $200,000 school repair appropriation go to school repairs and $85,000 to temporary buildings; no decision recorded. Record · Journal page ↗
- The South Beach Lands Fund surplus of $50,000 was approved for investment in city school bonds. passed Record · Journal page ↗
- Board of Education was asked to notify school children of the Paulist Choral Society concert at the Auditorium. passed Record · Journal page ↗
- Board passed for printing $8,924.15 from school construction bond funds for plans for the proposed Monroe School. first reading Record · Journal page ↗
- Nelson proposed regulating schools that teach dramatic art, and the bill was referred to the Police Committee. referred Record · Journal page ↗
- No bids were received when the city offered $435,000 of school bonds for sale. Record · Journal page ↗
- Board sets aside $8,924.15 from school construction bond funds for plans for the proposed Monroe School. passed Record · Journal page ↗
- Resolution proposed to spend $50,681.25 from South Beach Lands Fund to buy school bonds. Record · Journal page ↗
- $435,000 of unsold school bonds placed on sale with the Treasurer passed Record · Journal page ↗
- Board directed the Treasurer to invest $25,000 of surplus South Beach Lands Fund money in city school bonds. passed Record · Journal page ↗
- A resolution proposes setting aside $25,325 from South Beach Lands Fund to buy school bonds. Record · Journal page ↗
- Board set aside $25,325 from the South Beach Lands Fund to buy school bonds, including accrued interest. passed Record · Journal page ↗
- Board transferred $580.61 from a school building account to a school repairs account. passed Record · Journal page ↗
- Resolution providing $7,188.70 for plans for the proposed Richmond District School passed for printing under suspension of rules. first reading Record · Journal page ↗
- The Board finally passed $7,188.70 from the school bond fund for plans for a proposed Richmond District School. passed Record · Journal page ↗
- Monroe School to be built at Excelsior Avenue and Madrid Street passed Record · Journal page ↗
- Annie H. Moran's offer of land for the Monroe School accepted Record · Journal page ↗
- Monroe School to be built at Excelsior Avenue and Madrid Street passed Record · Journal page ↗
- Bill No. 5033 proposes a four-classroom school building on city property bounded by Cambridge, Silliman, Yale and Pioche streets. first reading Record · Journal page ↗
- The Board urged the Board of Education to use State school surplus funds to raise janitors' and janitresses' salaries. passed Record · Journal page ↗
- Supervisor McSheehy charged the Board of Public Works with improperly appointing architect J. Reed Jr. for the Monroe School building. referred Record · Journal page ↗
- Supervisor McSheehy's resolution on architect John Reid's Monroe School work was referred to the Public Buildings Committee for investigation. referred Record · Journal page ↗
- Four classroom school to be built at Cambridge and Yale streets Record · Journal page ↗
- Proposed ordinance to install plumbing fixtures at Washington Grammar, Michael Angelo and Buena Vista schools was passed for printing. first reading Record · Journal page ↗
- Annie H. Moran sells land for the Monroe School, $19,650 Record · Journal page ↗
- Lodovina Paola sells Madrid Street land to the schools for $2,500 passed Record · Journal page ↗
- Proposed $19,650 payment to Annie H. Moran for land for Monroe School, passed for printing. first reading Record · Journal page ↗
- Ordinance proposed to order iron fences and iron work at Washington Grammar School, Washington and Mason streets. first reading Record · Journal page ↗
- Board ordered plumbing fixtures for repairs and alterations at the Washington Grammar, Michael Angelo and Buena Vista schools. passed Record · Journal page ↗
- Board approved $19,650 paid to Annie H. Moran for land required for the Monroe School. passed Record · Journal page ↗
- Iron fence ordered around the Washington Grammar School passed Record · Journal page ↗
- $15,784 set aside for a school at Cambridge and Silliman Streets Record · Journal page ↗
- Board set aside $15,784 for construction of a new school at Cambridge and Silliman streets under the Monson contract. passed Record · Journal page ↗
- Charter amendment proposed to voters to sell certain school lots west of Arguello Boulevard; outcome continues on next page. sent to voters Record · Journal page ↗
- Board rescinded the $7,188.70 appropriation for plans for the proposed Richmond School, adopted by resolution. passed Record · Journal page ↗
- $177,725 set aside to build Monroe School on Excelsior Avenue passed Record · Journal page ↗
- Board appropriated $177,725 from the 1918 school bond fund to build the Monroe School in Excelsior. Record · Journal page ↗
- Supervisor Suhr proposed paying Lodovina Paola $2,500 from the school bond fund for land on Madrid Street. first reading Record · Journal page ↗
- A $2,500 payment to Lodovina Paola was approved for a Madrid Street lot bought for school purposes. passed Record · Journal page ↗
- Board to send $1,140 from the school bond fund to the Mannixes for land for Monroe School; passed first reading only first reading Record · Journal page ↗
- Board of Education president proposed distributing influenza pamphlets in homes, using Emergency Fund; referred to Finance Committee. referred Record · Journal page ↗
- Payment of $2,280 to O. Monson for the Cambridge and Silliman school; no vote on record. Record · Journal page ↗
- $1,140 paid to Dennis and Annie Mannix for Monroe School land Record · Journal page ↗
- Resolution proposed paying Conservative Building and Investment Company $6,500 for school land in Twin Peaks Terrace, passed for printing. first reading Record · Journal page ↗
- Resolution adopted accepting Conservative Building and Investment Company's offer to sell Twin Peaks Terrace lots for a school for $6,500. passed Record · Journal page ↗
- Proposed ordinance would order plans and construction of a six-classroom school on Twin Peaks Terrace. Record · Journal page ↗
- Six-classroom school planned at Corbett and Font Avenues Record · Journal page ↗
- Proposed $2,000 payment from the school construction fund to New York attorney John C. Thompson for bond legal work; passed for printing. first reading Record · Journal page ↗
- $4,740 to be set aside for Hetch Hetchy blowers from Harron-Rickard & McCone; passed first reading only first reading Record · Journal page ↗
- $6,500 approved to buy Twin Peaks Terrace lots from Conservative Building and Investment Company for a public school. passed Record · Journal page ↗
- Appropriations proposed for $3,500 public buildings maintenance and $4,460.22 for school building plumbing and repairs. Record · Journal page ↗
- Board postponed for over one week a bill ordering plans and construction of a six-classroom school at Twin Peaks Terrace. Record · Journal page ↗
- Resolution proposes paying Inez L. Brown $3,500 for land on Lisbon Street for the Monroe School. Record · Journal page ↗
- The Board accepted Emile and Elsie Nelson's offer to sell land on Madrid Street for $700 for school use. passed Record · Journal page ↗
- Six-classroom school approved for Corbett Avenue and Iron Alley passed Record · Journal page ↗
- $700 paid to Emil and Elsie Nelson for Monroe School land Record · Journal page ↗
- City accepts Inez L. Brown's Lisbon Street land for a school Record · Journal page ↗
- Appropriates $3,500 from school bond funds to buy land from Inez L. Brown for the Monroe School on Lisbon Street. passed Record · Journal page ↗
- Proposed $700 payment to Emil and Elsie Nelson for land for the Monroe School. Record · Journal page ↗
- Payment of $2,000 to John C. Thompson, a New York attorney, from school bond funds for an opinion on bond validity approved. passed Record · Journal page ↗
- The Board ordered plans and construction of a six-classroom school between Corbett and Fout avenues, with progressive payments. passed Record · Journal page ↗
- $7,188.70 set aside for plans for the Richmond District School Record · Journal page ↗
- The Board appropriated $7,188.70 from school bond funds for plans for the proposed Richmond District School. passed Record · Journal page ↗
- Payment of $146,027.95 to Seagrave Company for sixteen fire engines approved. Record · Journal page ↗
- Appropriations of $26,609 for Twin Peaks Primary School construction and $879 for Washington Giammar School fencing were passed for printing. first reading Record · Journal page ↗
- Jno. Reid Jr. paid $1,416 for Park-Presidio school plans Record · Journal page ↗
- $26,609 for building the Twin Peaks Primary School on Corbett Avenue Record · Journal page ↗
- The S. F. Labor Council asked that public school grounds be opened to children as playgrounds after school hours; referred to committee. referred Record · Journal page ↗
- Resolution proposes accepting Louise Laville's offer to sell land for a school at $3,500. Record · Journal page ↗
- Louise Laville's Lisbon Street land to be bought for Monroe School first reading Record · Journal page ↗
- $3,500 from the School Construction Fund was approved to pay Louise Laville for land for Monroe School on Lisbon Street. passed Record · Journal page ↗
- The Board confirmed Staples & Pfeiffer's $2,395 contract to replace oil-burning equipment at Polytechnic High School. passed Record · Journal page ↗
- Supervisor Schmitz moved that Public Works repair the streets in front of Adams School on Eddy Street; motion carried. passed Record · Journal page ↗
- Contractor B. F. Blair granted a 60-day extension to finish a school plumbing fixture contract. passed Record · Journal page ↗
- Mayor Rolph appointed Alice Rose Power, principal of Washington Irving School, to the Board of Education; Supervisor Gallagher moved to honour former member Regan. Record · Journal page ↗
- Board adopted resolution directing advertisement for sealed bids on $3,015,000 school bonds, with bids received May 12, 1919. passed Record · Journal page ↗
- Supervisor Brandon presented a resolution to accept J. W. Egan's offer to sell land on Cabrillo Street for a school for $38,500. passed Record · Journal page ↗
- Proposed private sale of city-owned land on Eighteenth Avenue in the Richmond District, released by the Board of Education as unsuitable for a school. first reading Record · Journal page ↗
- Eighteenth Avenue lot to be sold after school board rejects it Record · Journal page ↗
- Surplus school land at Eighteenth avenue and Cabrillo street in the Richmond District is proposed for private cash sale. Record · Journal page ↗
- The City Attorney was directed to dismiss the condemnation suit for certain parcels wanted for school purposes. passed Record · Journal page ↗
- The City accepted J. A. Beck's offer to sell land on Clipper Street near Noe Street for $4,495 for a school. passed Record · Journal page ↗
- Park-Presidio School ordered built on Cabrillo Street Record · Journal page ↗
- Supervisor Nelson introduced an ordinance to build the Park-Presidio School on Cabrillo Street; outcome not yet printed. first reading Record · Journal page ↗
- Supervisor Power's resolution backing teachers' salary increase was laid over one week, with teachers told they need not fund publicity. Record · Journal page ↗
- Payment of $9,774.75 to Anderson and Ringrose for building the Monroe School; no vote on record; approved later. Record · Journal page ↗
- Park-Presidio School to be built on Cabrillo Street passed Record · Journal page ↗
- Board authorized a batch of routine city claim payments, including Hetch Hetchy supplies, Municipal Railways bills and a school lands purchase. Record · Journal page ↗
- The Board proposed accepting Annie Turner's offer to sell land on Clipper Street for school purposes at $4,295. passed Record · Journal page ↗
- J. M. Reardon and wife's offer to sell Clipper Street land for $4,200 for a school was accepted. passed Record · Journal page ↗
- Resolution backing a salary increase for San Francisco teachers was amended to include janitors; final vote not shown. Record · Journal page ↗
- Resolution pledging to cut other city expenses to fund teacher salary increases adopted by voice vote. passed Record · Journal page ↗
- An Exposition Auditorium ante-room was set aside as headquarters for the high school Reserve Officers' Training Camp. passed Record · Journal page ↗
- Payment of $9,774.75 to Anderson and Ringrose for building the Monroe School approved. Record · Journal page ↗
- Park-Presidio School to be built on Cabrillo Street Record · Journal page ↗
- Ordinance passed ordering construction of the Park-Presidio School on Cabrillo Street, paid from the 1918 school bond fund. passed Record · Journal page ↗
- Resolution proposing $38,500 to buy J. W. Egan's Cabrillo street land for a school, passed for printing. first reading Record · Journal page ↗
- Board urges San Francisco's legislators to support state measures keeping a naval training school fund for the city. passed Record · Journal page ↗
- $38,500 approved to buy Cabrillo street land from J. W. Egan for school purposes, with $18,000 held in escrow. passed Record · Journal page ↗
- The City accepted Annie Cahill's offer to sell Clipper Street land for a school site for $4,305. passed Record · Journal page ↗
- $4,345 paid to Annie Turner for Clipper Street school land Record · Journal page ↗
- Offer of Clipper Street land for school purposes, 85 feet west of Noe Street passed Record · Journal page ↗
- J. D. Egan bid $18,000 for city school property on Eighteenth avenue; the bid was spread in the Journal. Record · Journal page ↗
- Payment of $4,295 for school land on Clipper Street, west of Noe Street passed Record · Journal page ↗
- Payment of $4,345 for school land on Clipper Street, west of Noe Street passed Record · Journal page ↗
- Reardon couple's land on Clipper Street, 210 feet from Noe Street, was to be acquired for school purposes for $4,200. Record · Journal page ↗
- The Board authorized twelve city payments to the railways, contractors, landowners and suppliers, including Monroe School and Hetch Hetchy work. passed Record · Journal page ↗
- $4,345 paid to Annie Turner for Clipper Street school land Record · Journal page ↗
- California Federation of Women's Clubs backs a raise for school teachers passed Record · Journal page ↗
- Roof repairs ordered at the Oriental School on Washington Street passed Record · Journal page ↗
- Hawthorne Mothers' Club and Carmel Institute No. 2 endorsed a $20 monthly teacher salary increase; the matter was referred to the Finance Committee. referred Record · Journal page ↗
- Payments approved for Hetch Hetchy work and a Municipal Railway extension Record · Journal page ↗
- Roof repairs ordered at the Oriental School on Washington Street Record · Journal page ↗
- $4,305 paid to Wiesers for school land on Clipper Street passed Record · Journal page ↗
- $112,768 to build Argonne School on Cabrillo Street passed Record · Journal page ↗
- Supervisor Schmitz's proposal to cut the school repairs budget item to $150,000 was defeated. Record · Journal page ↗
- Power proposed raising the Department of Education kindergarten budget to $11,000 for ten kindergartens, referred to the Finance Committee. referred Record · Journal page ↗
- The Board granted Board of Education member Sarah J. Jones a sixty-day leave of absence to leave California. passed Record · Journal page ↗
- Board appropriated $112,768 from school bond funds to build the Argonne School on Cabrillo Street. passed Record · Journal page ↗
- The Board's 1919 city budget vote recorded 12 ayes and 2 noes, with four supervisors absent, covering schools, playgrounds and the library fund. Record · Journal page ↗
- Bill confirming the $18,000 sale of former school-set-aside land on Eighteenth Avenue to J. W. Egan passes first reading. first reading Record · Journal page ↗
- City land on Eighteenth Avenue, formerly set aside for schools, sold to John W. Egan for $18,000. passed Record · Journal page ↗
- Ordinance proposed to build Domestic Science and Manual Training rooms at Farragut School, Capitol and Faxon avenues; action deferred. first reading Record · Journal page ↗
- Supervisor Kortick presented an ordinance to place unsold $3,015,000 school bonds on sale with the Treasurer; passed first reading only Record · Journal page ↗
- $4,345 paid to Annie Turner for Clipper Street school land Record · Journal page ↗
- Cooking and shop rooms to be built at the Farragut School passed Record · Journal page ↗
- Orders $1,015,000 of unsold school bonds placed on sale at face value with the City Treasurer. passed Record · Journal page ↗
- Buildings on Clipper Street to be sold at public auction passed Record · Journal page ↗
- The Board of Public Works asked for $4,430 to build a domestic science and manual training room at Farragut School, referred to the Finance Committee. referred Record · Journal page ↗
- Anglo and London Paris National Bank offered $600,000 for school bonds in exchange for a bond option; Kortick moved referral to Finance Committee. referred Record · Journal page ↗
- Appropriation of $4,430 for Farragut School domestic science and manual training rooms passed for printing. first reading Record · Journal page ↗
- Payments authorized for library books and $2,019.38 electric work at Monroe School, with more library and school claims listed. Record · Journal page ↗
- Proposed appropriations of $1,776 for Municipal Railway trolley wire and $12,000 for Monroe School equipment. Record · Journal page ↗
- The Board adopted a resolution asking police to enforce fast-driving laws and the Board of Education to teach children street safety. passed Record · Journal page ↗
- The Board of Education asked supervisors to set a school tax rate covering the City's common school fund share; referred to Finance Committee. referred Record · Journal page ↗
- Appropriated $1,776 for Municipal Railway trolley wire and $12,000 to equip Monroe School. passed Record · Journal page ↗
- A $4,430 appropriation to build domestic science and manual training rooms at Farragut School is proposed. Record · Journal page ↗
- Ordinance approving a Board of Education lease to the Players' Club was laid over one week. Record · Journal page ↗
- Supervisor McLeran's resolution to pay architects for Galileo and Jefferson schools was refused consideration by the Board. refused Record · Journal page ↗
- Payment of $1,205.66 to architect James R. Miller for first work on Jefferson School was approved from the School Bond Fund. passed Record · Journal page ↗
- John Reid Jr.'s $504.32 architectural fee for Monroe School was passed for printing after reconsideration. first reading Record · Journal page ↗
- The Board of Education's five-year lease of part of a Bush Street school lot to the Players' Club was laid over again one week. Record · Journal page ↗
- $915 for a new roof on the Oriental School building; passed first reading only first reading Record · Journal page ↗
- John Reid, Jr. was approved for $504.32 in architectural fees for Monroe School, paid from school bond funds. passed Record · Journal page ↗
- Payment of $1,205.66 to architect James R. Miller for Jefferson School was moved; outcome continues on next page. first reading Record · Journal page ↗
- Board passed for printing $27,792.45 for Galileo School and $6,028.30 for Jefferson School architectural services. first reading Record · Journal page ↗
- $915 for a new roof on the Oriental School building passed Record · Journal page ↗
- $2,900 set aside to equip the new Twin Peaks School Record · Journal page ↗
- Payment of fourteen claims totalling $22,196.50 for schools, jails, the Auditorium and Hetch Hetchy works was authorized. passed Record · Journal page ↗
- The Board set aside $27,792.45 for Galileo School and $6,028.30 for Jefferson School architectural services. passed Record · Journal page ↗
- The Board authorized a $1,205.66 first payment to architect James R. Miller for the Jefferson School. passed Record · Journal page ↗
- Board of Education lease of part of a school lot and church building on Bush Street to the Players' Club approved. passed Record · Journal page ↗
- Board of Public Works extended 40-day contract deadlines for four firms building the Monroe School. passed Record · Journal page ↗
- $2,900 set aside to equip the new Twin Peaks School Record · Journal page ↗
- A schedule of city payments to contractors and suppliers was passed for printing, covering Hetch Hetchy, school, library and Muni work. first reading Record · Journal page ↗
- Appropriations for repairs to jails, police, fire and emergency hospital buildings passed for printing; the Harrison Street school item went to Finance Committee. first reading Record · Journal page ↗
- Nine payments to be authorized from city funds, including Farragut and Argonne school work, Municipal Railways supplies and a Lincoln Park stairway; passed first reading only first reading Record · Journal page ↗
- Turk Street land bought for a school, $12,000 Record · Journal page ↗
- Committee requested to appoint a campaign committee to sell unsold school bonds, funding urgently needed new schools. passed Record · Journal page ↗
- Board authorized a $2,500 payment to O. Monson for Farragut School work, plus further school and Municipal Railway payments. Record · Journal page ↗
- Resolution proposes accepting Adele Keyser's $12,000 offer for Turk Street land for school purposes. passed Record · Journal page ↗
- Matilda A. Fiimer's offer to sell land at Nineteenth Avenue and Irving Street for a school at $12,500 was approved. passed Record · Journal page ↗
- Blanche Brassy's offer to sell Harrison Street land for a school at $3,000 is still pending. passed Record · Journal page ↗
- Laura and Lottie Perine sell Harrison Street land for $4,000 passed Record · Journal page ↗
- Land at 19th Avenue and Irving bought for a school, $12,500 passed Record · Journal page ↗
- Powell Street school lot given to library for a branch passed Record · Journal page ↗
- Proposed $6,000 for Hetch Hetchy Railroad ballast and $1,600 for repairs to three police stations. passed Record · Journal page ↗
- $31,500 set aside to buy school land, including Matilda Filmer's lot Record · Journal page ↗
- Proposal to buy Carl G. Larsen's land at Eighteenth avenue and Irving street for a school for $9,000. passed Record · Journal page ↗
- School block at Bay and Polk streets bought for $112,000 passed Record · Journal page ↗
- City buys Eighteenth Avenue land from R. D. Faulkner for school passed Record · Journal page ↗
- Payments to contractors and suppliers from bond funds for San Francisco Hospital, Hetch Hetchy water, Municipal Railways and schools were authorized. passed Record · Journal page ↗
- Supervisor McLeran proposed moving small sums between budget items for school, public building, fire and police repairs. Record · Journal page ↗
- Appropriation for repairs to school buildings and construction of Grant School passed for printing. first reading Record · Journal page ↗
- Payment of $13,353.75 to Anderson & Ringrose for building the Argonne School approved. Record · Journal page ↗
- Payment set for the school block at Bay and Polk streets Record · Journal page ↗
- Land on Juniper Street offered by Lillie Faubel for a school passed Record · Journal page ↗
- Menton estate land on Nineteenth Avenue bought for a school, $2,000 Record · Journal page ↗
- Resolution proposes $2,441.41 to improve Army Street and $633 for sidewalks at Farragut School. passed Record · Journal page ↗
- Board authorized $25 blind pensions each for four named claimants for November and December 1919. passed Record · Journal page ↗
- Bill 5377 to build a freight elevator in the Board of Education warehouse on Sutter Street was passed for printing. first reading Record · Journal page ↗
- Payment made for the school block bounded by Bay and Polk passed Record · Journal page ↗
- $11,150.95 set aside for plans for the Grant School passed Record · Journal page ↗
- $290 for a new sidewalk at the Dudley Stone School passed Record · Journal page ↗