  • City Construction Company asked to blast for grading at Stockton and Pine streets; the petition went to the Fire Committee. linked by the name only, not checked
    6 Jul 1908referredJournal 1908, p. 617 ↗
  • City Construction Company allowed blasting at Pine and Stockton linked by the name only, not checked
    15 Jul 1908outcome not readJournal 1908, p. 648 ↗
  • School Department allowed an oil tank at the Bay View School
    20 Jul 1908passedJournal 1908, p. 665 ↗
  • The City Construction Company asked to blast to grade a lot at Second and Brannan streets, referred to the Fire Committee. linked by the name only, not checked
    18 Jan 1909referredJournal 1909, p. 43 ↗
  • City Construction Company petitioned to use small blasts in wrecking the Larkin Street wing of City Hall; referred to committee.
    25 Jan 1909referredJournal 1909, p. 62 ↗
  • Resolution 3303 is printed here, but its text and outcome continue on the next page.
    27 Jan 1909outcome not readJournal 1909, p. 114 ↗
  • City Construction Company allowed to blast at Second and Brannan streets linked by the name only, not checked
    11 Feb 1909outcome not readJournal 1909, p. 90 ↗
  • City Construction Company was granted revocable permission to blast at the City Hall site; passed for printing as amended. linked by the name only, not checked
    11 Feb 1909passed first readingJournal 1909, p. 92 ↗
  • Resolution proposed to pay City Construction Company $990 for teaming and hauling for the Children's Playground Commission. linked by the name only, not checked
    26 Apr 1909outcome not readJournal 1909, p. 406 ↗
  • City approved a $990 payment to City Construction Company for teaming and hauling for the Children's Playground Commission. linked by the name only, not checked
    3 May 1909passedJournal 1909, p. 432 ↗
  • City Construction Company was granted a sixty-day extension to finish razing the Larkin Street wing of City Hall.
    13 Sep 1909passed first readingJournal 1909, p. 827 ↗
  • City Construction Company was granted 60 more days to finish razing the Larkin Street wing of City Hall.
    20 Sep 1909passedJournal 1909, p. 847 ↗
  • City Construction Company's request for thirty more days to raze the Larkin Street wing of City Hall was referred.
    15 Nov 1909referredJournal 1909, p. 1056 ↗
  • City Construction Company granted a thirty-day extension to finish razing the Larkin Street wing of City Hall.
    26 Nov 1909passedJournal 1909, p. 1071 ↗
  • City Construction paid $12,884 to raze the old City Hall wing linked by the name only, not checked
    7 Dec 1909outcome not readJournal 1909, p. 1133 ↗
  • Payment for razing the Larkin Street wing of City Hall postponed linked by the name only, not checked
    13 Dec 1909continuedJournal 1909, p. 1141 ↗
  • City Construction paid $12,884 to raze the old City Hall wing linked by the name only, not checked
    20 Dec 1909outcome not readJournal 1909, p. 1175 ↗
  • City Construction Company allowed to blast while grading Twenty-sixth Street
    27 Jun 1921passedJournal 1921, p. 543 ↗
  • City Construction Company allowed to blast while grading Twenty-sixth Street
    1 Aug 1921outcome not readJournal 1921, p. 534 ↗
  • City Construction Company given 90 more days on Twenty-sixth Street
    8 Aug 1921outcome not readJournal 1921, p. 688 ↗
  • City Construction Company given ninety more days on Twenty-sixth Street
    7 Nov 1921passedJournal 1921, p. 959 ↗
  • City Construction Company given sixty more days at Diamond and Surrey
    7 Nov 1921passedJournal 1921, p. 954 ↗
  • City Construction Company given 90 more days on Twenty-sixth Street
    14 Feb 1922passedJournal 1922 ↗
  • City Construction Company given ninety more days on Castro Street linked by the name only, not checked
    20 Feb 1922outcome not readJournal 1922 ↗
  • City Construction Company given ninety more days on Geneva Avenue
    20 Mar 1922outcome not readJournal 1922 ↗
  • City Construction Company given ninety more days on Twenty-sixth Street
    8 May 1922passedJournal 1922 ↗
  • Proposed payments from city funds to contractors and claimants for school construction, transit, parks and other work.
    22 May 1922outcome not readJournal 1922 ↗
  • Board authorized dozens of city payments to contractors, utilities and suppliers for schools, streets, water and departments.
    31 May 1922passedJournal 1922 ↗
  • City Construction Company given more time to widen Castro Street linked by the name only, not checked
    12 Jun 1922passedJournal 1922 ↗
  • City Construction Company given 90 more days on Staples Avenue
    17 Jul 1922passedJournal 1922 ↗
  • City Construction Company given 90 more days on Hearst Avenue
    17 Jul 1922passedJournal 1922 ↗
  • Payments are authorized from the Water Construction Fund to several claimants, including Associated Oil Co., for Hetch Hetchy work.
    21 Aug 1922outcome not readJournal 1922 ↗
  • City Construction Company given ninety more days on Forty-fifth Avenue linked by the name only, not checked
    5 Sep 1922outcome not readJournal 1922 ↗
  • City Construction Company given ninety more days on Anderson Street
    18 Sep 1922outcome not readJournal 1922 ↗
  • John Reid Jr. paid $8,182 for High School of Commerce plans
    18 Sep 1922outcome not readJournal 1922 ↗
  • City Construction Company given ninety more days on Hearst Avenue
    9 Oct 1922passedJournal 1922 ↗
  • City Construction Company's contract at Munich Street and Persia Avenue cancelled linked by the name only, not checked
    23 Oct 1922passedJournal 1922 ↗
  • City Construction Company given ninety more days on Hearst Avenue
    27 Nov 1922passedJournal 1922 ↗
  • City Construction Company granted ninety more days to finish Anderson Street improvements between Cortland and Eugenia avenues.
    18 Dec 1922passedJournal 1922 ↗
  • A resolution authorizes payments from street funds to claimants, including T. M. Gallagher for repaving; outcome continues. linked by the name only, not checked
    22 Jan 1923outcome not readJournal 1923, p. 81 ↗
  • Board authorizes payments from city funds to suppliers, utilities and contractors, including $33,898.25 to Pacific Gas and Electric Co. for railway power. linked by the name only, not checked
    29 Jan 1923outcome not readJournal 1923, p. 95 ↗
  • City Construction Company given ninety more days on Hearst Avenue
    19 Feb 1923passedJournal 1923, p. 158 ↗
  • City Construction Company given 90 more days on Hearst Avenue
    21 May 1923passedJournal 1923, p. 500 ↗
  • City Construction Company given 90 more days on Hearst Street
    4 Jun 1923passedJournal 1923, p. 626 ↗
  • City Construction Company given thirty more days at Persia Avenue linked by the name only, not checked
    25 Jun 1923passedJournal 1923, p. 709 ↗
  • City Construction Company given 90 more days on Bonview Street
    23 Jul 1923outcome not readJournal 1923, p. 823 ↗
  • City Construction Company given 60 more days on Hearst Avenue linked by the name only, not checked
    20 Aug 1923passedJournal 1923, p. 905 ↗
  • City Construction Company given 90 more days on two contracts linked by the name only, not checked
    24 Sep 1923passedJournal 1923, p. 1063 ↗
  • City Construction Company given ninety more days on Bonview Street linked by the name only, not checked
    22 Oct 1923outcome not readJournal 1923, p. 1147 ↗
  • City Construction Company given ninety more days on Collins Street linked by the name only, not checked
  • City Construction Company given more time on Exeter Street linked by the name only, not checked
    11 Dec 1923passedJournal 1923, p. 1332 ↗
  • City Construction Company given more time on Bonview and Twenty-second streets linked by the name only, not checked
    21 Jan 1924passedJournal 1924, p. 65 ↗
  • City Construction Company gets ninety more days on Rhode Island Street linked by the name only, not checked
    10 Mar 1924passedJournal 1924, p. 266 ↗
  • City Construction Company gets sixty more days on Surrey Street linked by the name only, not checked
    7 Apr 1924outcome not readJournal 1924, p. 245 ↗
  • City Construction Company gets sixty more days on Bosworth Street linked by the name only, not checked
    21 Apr 1924passedJournal 1924, p. 449 ↗
  • City Construction Company granted a forty-five day extension to finish the Twenty-second street improvement between Rhode Island and De Haro streets.
    21 Apr 1924passedJournal 1924, p. 449 ↗
  • City Construction Company gets forty-five more days on Twenty-second Street
    21 Apr 1924outcome not readJournal 1924, p. 448 ↗
  • City Construction Company gets thirty more days on Surrey Street linked by the name only, not checked
    5 May 1924outcome not readJournal 1924, p. 513 ↗
  • City Construction Company gets ninety more days on Farallones Street
    5 May 1924passedJournal 1924, p. 514 ↗
  • City Construction given sixty more days on Twenty-second Street linked by the name only, not checked
    16 Jun 1924passedJournal 1924, p. 712 ↗
  • City Construction given sixty more days on Bosworth Street
    16 Jun 1924passedJournal 1924, p. 717 ↗
  • City Construction given sixty more days on Surrey and Diamond streets linked by the name only, not checked
    16 Jun 1924outcome not readJournal 1924, p. 711 ↗
  • City Construction given sixty more days on Rhode Island Street
    16 Jun 1924outcome not readJournal 1924, p. 717 ↗
  • City Construction given ninety more days on Moscow Street
    30 Jun 1924passedJournal 1924, p. 781 ↗
  • City Construction allowed to blast while grading Farallones Street linked by the name only, not checked
    14 Jul 1924outcome not readJournal 1924, p. 845 ↗
  • City Construction Company allowed to blast while grading Farallones Street linked by the name only, not checked
    21 Jul 1924outcome not readJournal 1924, p. 876 ↗
  • City Construction Company given ninety more days on Farallones Street linked by the name only, not checked
    4 Aug 1924outcome not readJournal 1924 ↗
  • Board set October 20, 1924 as the hearing date for City Construction Company's appeal of the Surrey Street improvement assessment. linked by the name only, not checked
  • Resolution authorizes many city payments to contractors and suppliers, including library books, school architect fees and Hetch Hetchy work. linked by the name only, not checked
    20 Oct 1924outcome not readJournal 1924, p. 1234 ↗
  • Library Fund payments authorized, including $3,484.10 to Foster & Futernick Co. for binding library books. linked by the name only, not checked
    27 Oct 1924outcome not readJournal 1924, p. 1253 ↗
  • The City Construction Company's appeal over the Surrey Street improvement assessment was laid over one more week. linked by the name only, not checked
    27 Oct 1924continuedJournal 1924 ↗
  • City Construction given thirty more days on Farallones Street linked by the name only, not checked
  • City Construction's appeal on the Surrey Street assessment denied linked by the name only, not checked
    10 Nov 1924passedJournal 1924, p. 1321 ↗
  • Resolution authorizing payments to named claimants from city accounts was passed for printing; the list continues on the next page. linked by the name only, not checked
    1 Dec 1924passed first readingJournal 1924, p. 1412 ↗
  • Precita Valley Community Club land bought for a school for $7,648
  • The Board authorized payments on dozens of city claims to suppliers and contractors for water, parks, police and hospital work. linked by the name only, not checked
  • Precita Valley Community Club paid $7,648 for its Harrison Street land
    15 Dec 1924outcome not readJournal 1924, p. 1481 ↗
  • City Construction given ninety more days at Twentieth and Mississippi
    15 Dec 1924outcome not readJournal 1924, p. 1493 ↗
  • City Construction given ninety more days on Geary Street
    15 Dec 1924passedJournal 1924, p. 1493 ↗
  • Precita Valley Community Club paid $7,648 for its Harrison Street land
    22 Dec 1924outcome not readJournal 1924, p. 1510 ↗
  • Board authorizes payments to contractors and suppliers for school, fire, sewer, water and street work across the city.
    2 Feb 1925outcome not readJournal 1925, p. 167 ↗
  • The city paid City Construction Co. $2,300 for its share of improving Farallones Street between Capitol and Orizaba avenues. linked by the name only, not checked
    9 Feb 1925passedJournal 1925, p. 191 ↗
  • City Construction Co. was paid $2,300 for the city's share of paving Farallones Street. linked by the name only, not checked
    9 Feb 1925passedJournal 1925, p. 191 ↗
  • City Construction Co. to be heard on its Diamond Street bill
    16 Feb 1925passedJournal 1925, p. 180 ↗
  • City Construction Company given ninety more days on Geary Street linked by the name only, not checked
    9 Mar 1925passedJournal 1925, p. 326 ↗
  • City Construction Company given thirty more days at Twentieth and Mississippi linked by the name only, not checked
    16 Mar 1925passedJournal 1925, p. 350 ↗
  • City Construction Company given sixty more days on Twenty-fifth Street linked by the name only, not checked
    13 Apr 1925passedJournal 1925, p. 500 ↗
  • City Construction Company given thirty more days on Maynard Street
    20 Apr 1925passedJournal 1925, p. 550 ↗
  • City Construction Company given ninety more days on Deming Street linked by the name only, not checked
    1 Jun 1925outcome not readJournal 1925, p. 808 ↗
  • Ninety-day extension proposed for City Construction Company to finish Deming Street improvement between Lower Terrace and Seventeenth Street. linked by the name only, not checked
    1 Jun 1925outcome not readJournal 1925, p. 808 ↗
  • City Construction Company given ninety more days on Geary Street linked by the name only, not checked
    15 Jun 1925passedJournal 1925, p. 884 ↗
  • City Construction Company given 90 more days on Capitol Avenue linked by the name only, not checked
  • City Construction Company's appeal over Diamond Street charges is denied linked by the name only, not checked
    31 Aug 1925outcome not readJournal 1925, p. 1246 ↗
  • City Construction Company given sixty more days on Geary Street linked by the name only, not checked
    28 Sep 1925passedJournal 1925, p. 1406 ↗
  • City Construction Company given 60 more days on Capitol Avenue
    9 Nov 1925outcome not readJournal 1925, p. 1571 ↗
  • Resolution proposes appropriations for street repairs, sewers, and Hall of Justice and City Hall repairs; outcome continues on next page. linked by the name only, not checked
    9 Nov 1925outcome not readJournal 1925, p. 1557 ↗
  • $1,500 set aside to repair Woodside Avenue near Portola Drive linked by the name only, not checked
    23 Nov 1925outcome not readJournal 1925, p. 1614 ↗
  • Contractor given 40 more days to finish Cross Street work linked by the name only, not checked
  • City Construction Company given more time on Twenty-first and Farallones streets linked by the name only, not checked
  • City Construction given thirty more days on Vienna Street
    21 Dec 1925passedJournal 1925, p. 1813 ↗
  • City Construction given a hundred twenty more days on Dublin Street linked by the name only, not checked
    11 Jan 1926passedJournal 1926, p. 61 ↗
  • Supervisors propose authorizing payment of many city claims to utilities, contractors, and suppliers, including Municipal Railways power and hospital food. linked by the name only, not checked
    25 Jan 1926outcome not readJournal 1926, p. 111 ↗
  • United States Steel paid $26,651.13 for the Dumbarton Straits pipeline bridge linked by the name only, not checked
    1 Feb 1926outcome not readJournal 1926, p. 152 ↗
  • City Construction Company given 90 more days on Dublin Street linked by the name only, not checked
    15 Feb 1926passedJournal 1926, p. 243 ↗
  • City Construction given 90 more days on Kansas Street linked by the name only, not checked
    8 Mar 1926passedJournal 1926, p. 360 ↗
  • Capurro estate paid for nine parcels near Cayuga Avenue for schools linked by the name only, not checked
    5 Apr 1926outcome not readJournal 1926, p. 519 ↗
  • City Construction Company given sixty more days on Vienna Street
    12 Apr 1926passedJournal 1926, p. 557 ↗
  • City Construction Company given ninety more days on Mangels Avenue linked by the name only, not checked
    10 May 1926outcome not readJournal 1926, p. 725 ↗
  • City Construction Company given ninety more days on Brazil Avenue linked by the name only, not checked
    17 May 1926passedJournal 1926, p. 797 ↗
  • City Construction Company given ninety more days on Kearny Street linked by the name only, not checked
    1 Jun 1926passedJournal 1926, p. 946 ↗
  • City Construction Company given ninety more days on Twenty-first Street linked by the name only, not checked
    14 Jun 1926passedJournal 1926, p. 1035 ↗
  • O. Monson paid $23,717.40 for building the West Portal School linked by the name only, not checked
    14 Jun 1926outcome not readJournal 1926, p. 1017 ↗
  • Resolution authorizes payments to contractors and suppliers for school construction, park supplies, street work and a Municipal Railway injury settlement. linked by the name only, not checked
    21 Jun 1926passedJournal 1926, p. 1048 ↗
  • The Board approved a batch of routine city claims, including Municipal Railways lamps, Kearny Street work and hydrant resetting. linked by the name only, not checked
    21 Jun 1926passedJournal 1926, p. 1049 ↗
  • City Construction Company given ninety more days on Vienna Street linked by the name only, not checked
    21 Jun 1926passedJournal 1926, p. 1080 ↗
  • City Construction Company given ninety more days on Fifteenth Avenue linked by the name only, not checked
  • Louis J. Cohn paid $14,250 for sewers in the westerly Sunset
  • City Construction Co. was paid $3,000 for improving Kearny Street between Market Street and Columbus Avenue.
    23 Aug 1926passedJournal 1926, p. 1332 ↗
  • City Construction Company given ninety more days on Brazil Avenue
    30 Aug 1926passedJournal 1926, p. 1405 ↗
  • City Construction Company given ninety more days on Mangels Avenue linked by the name only, not checked
    30 Aug 1926passedJournal 1926, p. 1356 ↗
  • Board authorizes payments to contractors and suppliers for school buildings, Hetch Hetchy water works, sewers, and a fire engine house. linked by the name only, not checked
    20 Sep 1926outcome not readJournal 1926, p. 1480 ↗
  • City Construction given sixty more days to widen Kearny Street
    20 Sep 1926outcome not readJournal 1926, p. 1508 ↗
  • City Construction given ninety more days on Twenty-first Street linked by the name only, not checked
  • City Construction given ninety more days on Vienna Street linked by the name only, not checked
  • City Construction Company given 90 more days on Mangels Avenue
    22 Nov 1926passedJournal 1926, p. 1840 ↗
  • $465 for steel partitions and a steel door at the City Prison
    22 Nov 1926passedJournal 1926, p. 1818 ↗
  • City Construction given 90 more days on Mangels Avenue linked by the name only, not checked
    21 Feb 1927passedJournal 1927, p. 311 ↗
  • Fay Improvement Company and others paid for work at city property linked by the name only, not checked
    21 Feb 1927passedJournal 1927, p. 298 ↗
  • City Construction Co. was owed $4,960 for improving Montana Street between Capitol and Plymouth avenues. linked by the name only, not checked
    13 Jun 1927outcome not readJournal 1927, p. 1165 ↗
  • City pays for street work in front of its own property linked by the name only, not checked
    8 Aug 1927outcome not readJournal 1927, p. 1473 ↗
  • Cancellation of 1927 tax sales and assessments on lots held by the Veterans' Welfare Board is proposed by Resolution 29771.
    8 Oct 1928outcome not readJournal 1928, p. 2229 ↗
  • Resolution 1743 proposed to authorize payment of Islais Creek Reclamation District warrants to numerous payees, including Southern Pacific Company.
    14 Jan 1935outcome not readJournal 1935, p. 77 ↗
  • Board approves 21 Islais Creek Reclamation District warrants paid to firms and individuals, including the Chronicle and Islais Co.
    10 May 1937passedJournal 1937, p. 617 ↗
  • Twelve Islais Creek district warrants approved for payment