about 120 Board decisions about Clinton Construction, in date order. Each links to its printed page.

  • Revocable garage, boiler and oil storage permits for six named businesses were passed for printing; one garage permit is revoked.
    25 Sep 1916passed first readingJournal 1916, p. 997 ↗
  • Crown Oil gets a filling station at Golden Gate and Larkin
  • $425 set aside for a sidewalk at the Farragut School
    23 Oct 1916passedJournal 1916, p. 1099 ↗
  • $36,500 set aside for the La Playa and Great Highway sewers
    30 Oct 1916outcome not readJournal 1916, p. 1112 ↗
  • Eaton & Smith paid $3,958.13 for the Potrero Avenue streetcar extension linked by the name only, not checked
    15 Jan 1917passedJournal 1917, p. 72 ↗
  • R. C. Storrie & Co. paid $107,500 for Twin Peaks Tunnel
    5 Feb 1917outcome not readJournal 1917, p. 158 ↗
  • Resolution proposed authorizing 32 payments to contractors and suppliers for city construction, schools, sewers and water work.
    13 Feb 1917outcome not readJournal 1917, p. 177 ↗
  • Resolution authorizing dozens of city payments to contractors, utilities and pensions, including hospital, school, library and sewer work, pending final passage. linked by the name only, not checked
    19 Mar 1917outcome not readJournal 1917, p. 324 ↗
  • Clinton Construction given 30 more days on the Great Highway sewer
    19 Mar 1917passedJournal 1917, p. 340 ↗
  • The Board authorized payments totalling tens of thousands of dollars for schools, hospitals, water works, sewers and charities, passed for printing.
    16 Apr 1917passed first readingJournal 1917, p. 490 ↗
  • $2,000 for Healy-Tibbitts to dredge around the Pierce Street sewer linked by the name only, not checked
    14 May 1917outcome not readJournal 1917, p. 591 ↗
  • Proposed payments to many claimants and contractors for care, supplies, street repairs and sewers, pending adoption.
    21 May 1917outcome not readJournal 1917, p. 609 ↗
  • $2,000 set aside to dredge around the Pierce Street sewer outfall
    21 May 1917outcome not readJournal 1917, p. 605 ↗
  • Spring Valley Water Co. paid $1,844.36 for water in the parks
    28 May 1917passedJournal 1917, p. 705 ↗
  • Ventelli's permit for a stable at 126 Vermont Street revoked
    20 Aug 1917outcome not readJournal 1917, p. 1060 ↗
  • Hind Company allowed an oil tank at 175 Sixth Street
    27 Aug 1917outcome not readJournal 1917, p. 1101 ↗
  • Proposed appropriations for Hetch Hetchy dam valves, slide-gates and Ocean Beach Esplanade were referred to the Finance Committee. linked by the name only, not checked
    29 Aug 1921referredJournal 1921, p. 741 ↗
  • Funds set aside for Hetch Hetchy dam valves, slide gates, O'Shaughnessy's revolving fund and Ocean Beach Esplanade work.
    6 Sep 1921passedJournal 1921, p. 753 ↗
  • Board is authorizing 16 payments to contractors and suppliers for schools, Lincoln Park, Point Lobos avenue and Ocean Beach Esplanade. linked by the name only, not checked
    9 Jan 1922outcome not readJournal 1922 ↗
  • Board passed Resolution 19768 authorizing payments to suppliers and contractors for schools, fire, transit, water and hospital supplies.
    13 Mar 1922passedJournal 1922 ↗
  • Utah Construction paid $95,696.22 for building the dam
    10 Apr 1922outcome not readJournal 1922 ↗
  • Payments from city funds were authorized to contractors, suppliers and charities, including Hetch Hetchy and Ocean Beach work. linked by the name only, not checked
    17 Apr 1922passedJournal 1922 ↗
  • Clinton Construction Co. was paid $11,175 for the fourth payment on Section C of Ocean Beach Esplanade.
    15 May 1922passedJournal 1922 ↗
  • Resolution 20038 (New Series) is set out in full, with its outcome printed on the following page. linked by the name only, not checked
    19 Jun 1922outcome not readJournal 1922 ↗
  • More money for Eaton & Smith's extra work on Taraval Street
    24 Jul 1922outcome not readJournal 1922 ↗
  • The Board approved a long list of city payments to contractors and suppliers for schools, transit, parks and other departments. linked by the name only, not checked
    31 Jul 1922passedJournal 1922 ↗
  • Resolution would authorize city payments to contractors, suppliers and orphanages for schools, library books, Hetch Hetchy works and police vehicles.
    16 Oct 1922outcome not readJournal 1922 ↗
  • Resolution authorizes payments to C. L. Wold and John Morton for Pacific Heights and Oral Deaf school construction; final vote not shown.
    23 Oct 1922outcome not readJournal 1922 ↗
  • Clinton Construction Co. gets $115,784.50 for the Army Street sewer
    5 Feb 1923outcome not readJournal 1923, p. 121 ↗
  • The Board approved a batch of routine city payments for hospitals, relief homes, sewer work, water and school construction.
    14 May 1923passedJournal 1923, p. 488 ↗
  • Eaton & Smith paid $7,800 for work on Sloat Boulevard linked by the name only, not checked
    18 Jun 1923passedJournal 1923, p. 660 ↗
  • Payments totalling $111,214.13 to 39 suppliers and contractors are authorized for city departments. linked by the name only, not checked
    9 Jul 1923outcome not readJournal 1923, p. 747 ↗
  • $29,825 more for the Army Street sewer, built by Clinton Construction
    23 Jul 1923outcome not readJournal 1923, p. 816 ↗
  • $29,825 more for the Army Street sewer, built by Clinton Construction
    30 Jul 1923outcome not readJournal 1923, p. 829 ↗
  • Board authorized payment of city claims for street work, schools, fire hydrants, hospital supplies and Hetch Hetchy items.
    20 Aug 1923passedJournal 1923, p. 887 ↗
  • Resolution authorizing payments to contractors and suppliers for libraries, schools, Hetch Hetchy and streets was passed for printing. linked by the name only, not checked
    17 Sep 1923outcome not readJournal 1923, p. 1025 ↗
  • An ordinance passed with no subject on this page linked by the name only, not checked
    24 Sep 1923passedJournal 1923, p. 1041 ↗
  • Board allowed a $9,750 sixth payment to Clinton Construction Co. for an extension of the Army street sewer. linked by the name only, not checked
    22 Oct 1923outcome not readJournal 1923, p. 1129 ↗
  • Payments authorized to a dozen suppliers and claimants, including for Municipal Railways work and school urinals and roofing. linked by the name only, not checked
    5 Nov 1923outcome not readJournal 1923, p. 1184 ↗
  • Bethlehem Steel paid $511 for switch parts for the Municipal Railway linked by the name only, not checked
    19 Nov 1923passedJournal 1923, p. 1204 ↗
  • $22,241.45 paid to Clinton Construction for the Army Street sewer linked by the name only, not checked
    10 Dec 1923passedJournal 1923, p. 1283 ↗
  • Western Pipe & Steel paid $199,105.54 for the bay crossing pipeline
    17 Dec 1923outcome not readJournal 1923, p. 1305 ↗
  • Army Street sewer gets $29,000; Isolation Hospital plumbing gets $1,385 linked by the name only, not checked
    28 Jan 1924outcome not readJournal 1924, p. 87 ↗
  • Resolution appropriating $1,845,530 for Relief Home construction was laid over one week. linked by the name only, not checked
    22 Sep 1924continuedJournal 1924, p. 1130 ↗
  • Appropriations of about $1.7 million for Relief Home construction, including a $1,410,000 general construction contract, passed for printing.
    29 Sep 1924passed first readingJournal 1924, p. 1165 ↗
  • $1,845,530 appropriated to build Relief Home buildings on the Relief Home Tract, mainly by Clinton Construction Company. linked by the name only, not checked
    14 Oct 1924passedJournal 1924, p. 1207 ↗
  • Revocable permission proposed for Clinton Construction Company to blast while grading property in the Relief Home Tract. linked by the name only, not checked
    24 Nov 1924outcome not readJournal 1924, p. 1395 ↗
  • Farrar & Carlin allowed to blast at Second and Bryant streets linked by the name only, not checked
  • Supervisor McLeran's resolution authorizing about 28 city payments, including library, school and police supplies, was passed for printing. linked by the name only, not checked
    12 Jan 1925passed first readingJournal 1925, p. 56 ↗
  • Roberts Manufacturing paid $1,396 for Public Library lighting fixtures linked by the name only, not checked
    19 Jan 1925outcome not readJournal 1925, p. 78 ↗
  • Board authorizes payments to contractors and suppliers for school, fire, sewer, water and street work across the city.
    2 Feb 1925outcome not readJournal 1925, p. 167 ↗
  • Board authorized payments from city funds to about two dozen private claimants for fuel, cement, architecture, paint and construction work. linked by the name only, not checked
    9 Feb 1925passedJournal 1925, p. 190 ↗
  • $7,312.97 to improve Forty-eighth Avenue between Santiago and Taraval streets linked by the name only, not checked
    9 Feb 1925outcome not readJournal 1925, p. 198 ↗
  • $7,312.97 to improve Forty-eighth Avenue between Santiago and Taraval streets linked by the name only, not checked
    9 Feb 1925outcome not readJournal 1925, p. 198 ↗
  • Payment of 26 claims totalling $74,488.49 to contractors and suppliers for Hetch Hetchy, schools, and streets approved. linked by the name only, not checked
    9 Feb 1925passedJournal 1925, p. 190 ↗
  • Payments to suppliers and contractors for water, hospitals, schools and railway work are authorized, with the final vote on the next page.
    24 Feb 1925outcome not readJournal 1925, p. 232 ↗
  • Wilhamina Furst objects; R. Del Prete's filling station put off linked by the name only, not checked
    6 Apr 1925passed first readingJournal 1925, p. 456 ↗
  • Board authorized about $119,243.32 in payments to contractors and claimants for school, Muni and Hetch Hetchy work. linked by the name only, not checked
    13 Apr 1925outcome not readJournal 1925, p. 480 ↗
  • Supervisor McLeran's resolution authorizing payments to many contractors and suppliers for police, water, schools and street work was passed for printing. linked by the name only, not checked
    11 May 1925passed first readingJournal 1925, p. 659 ↗
  • C. Boccone paid for Montana Street land for Ocean View Playground linked by the name only, not checked
    18 May 1925outcome not readJournal 1925, p. 684 ↗
  • A resolution proposing payments to contractors and suppliers for city works, schools and the Municipal Railway was passed for printing.
    8 Jun 1925passed first readingJournal 1925, p. 834 ↗
  • Resolution authorizes payments to contractors and suppliers for schools, Relief Home, Hetch Hetchy and other city works; final vote not on this page. linked by the name only, not checked
    15 Jun 1925outcome not readJournal 1925, p. 858 ↗
  • Resolution authorizes $826.07 from the Water Construction Fund to M. M. O'Shaughnessy for revolving fund expenditures. linked by the name only, not checked
    13 Jul 1925outcome not readJournal 1925, p. 1007 ↗
  • Resolution lists payments to contractors and suppliers for schools, Hetch Hetchy, Municipal Railways and other city work; passed for printing.
    10 Aug 1925outcome not readJournal 1925, p. 1161 ↗
  • Clinton Construction Co. was paid $44,415 on its seventh payment for Relief Home buildings. linked by the name only, not checked
    17 Aug 1925outcome not readJournal 1925, p. 1181 ↗
  • Board authorizes a long list of city payments to contractors and suppliers for school construction, Fleishhacker Pool, Harding Park and the Relief Home.
    14 Sep 1925outcome not readJournal 1925, p. 1321 ↗
  • Eighth payment of $51,142.50 to Clinton Construction Co. for Relief Home buildings is listed for approval. linked by the name only, not checked
    21 Sep 1925outcome not readJournal 1925, p. 1348 ↗
  • Bills paid for the Municipal Railway, the parks and the schools linked by the name only, not checked
    13 Oct 1925passedJournal 1925, p. 1457 ↗
  • Clinton Construction Co. was owed $39,315 for general construction of Relief Home buildings. linked by the name only, not checked
    26 Oct 1925outcome not readJournal 1925, p. 1507 ↗
  • Market Street Railway paid $2,142.86 for repairs at the ferry loop linked by the name only, not checked
    16 Nov 1925outcome not readJournal 1925, p. 1584 ↗
  • Healy-Tibbitts paid $140,723.82 for the submarine pipeline at Dumbarton Straits linked by the name only, not checked
    23 Nov 1925outcome not readJournal 1925, p. 1608 ↗
  • Oil tank allowed at St. Anthony parish house on Folsom Street linked by the name only, not checked
    30 Nov 1925outcome not readJournal 1925, p. 1665 ↗
  • Oil tank permits granted to Clinton Construction and ten others linked by the name only, not checked
  • Clinton Construction Co. is to be paid $51,071.25 for building work on the Relief Home.
    14 Dec 1925outcome not readJournal 1925, p. 1740 ↗
  • Bond Construction Co. paid $16,500 for the San Jose Avenue bridge linked by the name only, not checked
    25 Jan 1926outcome not readJournal 1926, p. 70 ↗
  • Resolution authorizing payments to suppliers, contractors and a land seller from Hetch Hetchy, school and relief home funds was passed for printing. linked by the name only, not checked
    8 Feb 1926passed first readingJournal 1926, p. 203 ↗
  • Authorizes many payments from city bond and general funds to contractors, suppliers and claimants for Hetch Hetchy, schools and buildings. linked by the name only, not checked
    23 Feb 1926outcome not readJournal 1926, p. 253 ↗
  • Payments for school construction, Hetch Hetchy water works and park work were sent to print for authorization.
    8 Mar 1926passed first readingJournal 1926, p. 349 ↗
  • Clinton Construction Co. was paid $48,547.50 for a fourteenth payment on new Relief Home buildings. linked by the name only, not checked
    15 Mar 1926passedJournal 1926, p. 375 ↗
  • Resolution proposed authorizing payments to many city contractors and suppliers for schools, Relief Home, Hetch Hetchy and street work; passed for printing. linked by the name only, not checked
    12 Apr 1926outcome not readJournal 1926, p. 547 ↗
  • Board authorized city fund payments to contractors and suppliers for school buildings, parks, Municipal Railway, Relief Home and Hetch Hetchy works. linked by the name only, not checked
    19 Apr 1926passedJournal 1926, p. 572 ↗
  • $72,405.90 to L. J. Cohn for Forty-third Avenue main sewer work linked by the name only, not checked
    3 May 1926outcome not readJournal 1926, p. 668 ↗
  • Board authorized about 38 routine city payments, mostly school construction and Relief Home work, for passage to print. linked by the name only, not checked
    10 May 1926passed first readingJournal 1926, p. 714 ↗
  • Clinton Construction Co.'s extra work on the new Relief Home was passed for printing, then withheld from final passage.
    17 May 1926tabledJournal 1926, p. 782 ↗
  • Clinton Construction Co. listed for a $15,450 seventeenth payment on new Relief Home buildings. linked by the name only, not checked
    21 Jun 1926outcome not readJournal 1926, p. 1050 ↗
  • Bills proposed for library books and Legion of Honor floodlights linked by the name only, not checked
    19 Jul 1926outcome not readJournal 1926, p. 1213 ↗
  • Resolution authorizing Library Fund payments to claimants, including $700 to American Building Maintenance Co. for library janitor service. linked by the name only, not checked
    26 Jul 1926outcome not readJournal 1926, p. 1231 ↗
  • Resolution authorizing payments from library, park and Relief Home funds to named claimants was passed for printing. linked by the name only, not checked
    23 Aug 1926passed first readingJournal 1926, p. 1334 ↗
  • The Board finally passed Resolution 26102 authorizing twelve payments for library books, park supplies, Kezar clubhouse and Relief Home construction, totaling about $54,000. linked by the name only, not checked
    30 Aug 1926passedJournal 1926, p. 1367 ↗
  • Guerin Brothers paid $6,570 for grading Capitol Avenue linked by the name only, not checked
    20 Sep 1926outcome not readJournal 1926, p. 1487 ↗
  • Guerin Brothers paid $6,570 for grading Capitol Avenue linked by the name only, not checked
    29 Sep 1926outcome not readJournal 1926, p. 1539 ↗
  • Chinatown playground finished, $1,200.19 in final payment
    1 Nov 1926passed first readingJournal 1926, p. 1717 ↗
  • Payments to suppliers and contractors for parks, schools, Municipal Railway and water mains were authorized; final vote is on the next page. linked by the name only, not checked
    15 Nov 1926outcome not readJournal 1926, p. 1767 ↗
  • Resolution authorizing payments to claimants for parks, taxes, fire engine house, and Hetch Hetchy work was started on this page. linked by the name only, not checked
    15 Nov 1926outcome not readJournal 1926, p. 1772 ↗
  • The Board authorized payments for park manure, a tax refund, fire engine house architects, and Hetch Hetchy machinery and pipe. linked by the name only, not checked
    22 Nov 1926outcome not readJournal 1926, p. 1801 ↗
  • Resolution proposed to authorize claims to contractors and suppliers for parks, playgrounds, transit and schools. linked by the name only, not checked
    13 Dec 1926outcome not readJournal 1926, p. 1934 ↗
  • Board authorizes about forty December 1926 city payments to contractors, schools, Hetch Hetchy suppliers and charities. linked by the name only, not checked
    20 Dec 1926outcome not readJournal 1926, p. 1958 ↗
  • Resolution authorizes dozens of city payments to suppliers and contractors from library, Hetch Hetchy, park, Municipal Railway, school and fire funds. linked by the name only, not checked
    20 Dec 1926passed first readingJournal 1926, p. 1982 ↗
  • Board authorizes payments from city funds to dozens of claimants, including library book suppliers, Hetch Hetchy contractors, and Muni and fire vendors.
    3 Jan 1927outcome not readJournal 1927 ↗
  • Passed for printing: a resolution authorizing payments to many suppliers and contractors for libraries, parks, schools, Hetch Hetchy and Municipal Railway work. linked by the name only, not checked
    17 Jan 1927outcome not readJournal 1927, p. 91 ↗
  • Payments authorized from city funds to suppliers and contractors for libraries, schools, Hetch Hetchy and Municipal Railway work. linked by the name only, not checked
    24 Jan 1927passedJournal 1927, p. 127 ↗
  • Board passed for printing a McSheehy resolution authorizing payments to contractors and suppliers for parks, schools, sewers and paving. linked by the name only, not checked
    28 Feb 1927passed first readingJournal 1927, p. 324 ↗
  • Clinton Construction paid $365,010.56 for the new Relief Home linked by the name only, not checked
    28 Feb 1927outcome not readJournal 1927, p. 324 ↗
  • Resolution authorizing many city claim payments, including $365,010.56 to Clinton Construction for the Relief Home, continues to next page. linked by the name only, not checked
    7 Mar 1927outcome not readJournal 1927, p. 351 ↗
  • Resolution authorizing about two dozen city payments to contractors and suppliers, including parks, schools, Hetch Hetchy and Municipal Railway, was passed for printing. linked by the name only, not checked
    18 Apr 1927passed first readingJournal 1927, p. 659 ↗
  • Board authorizes payments to dozens of city suppliers and contractors from park, school, Hetch Hetchy, and Municipal Railway funds. linked by the name only, not checked
    25 Apr 1927outcome not readJournal 1927, p. 674 ↗
  • Clinton Construction paid $7,424.70 for the Relief Home buildings linked by the name only, not checked
    2 May 1927outcome not readJournal 1927, p. 720 ↗
  • Proposed resolution authorizes 28 payments to suppliers, contractors and one settlement, for parks, Hetch Hetchy and schools.
    13 Jun 1927passed first readingJournal 1927, p. 1187 ↗
  • Board authorizes city payments to many claimants, including Hetch Hetchy construction suppliers and school construction contractors. linked by the name only, not checked
    20 Jun 1927outcome not readJournal 1927, p. 1217 ↗
  • $126,581.10 to Clinton Construction for the Alemany Boulevard storm drain
    18 Nov 1929outcome not readJournal 1929, p. 2142 ↗
  • $126,581.10 to Clinton Construction for the Alemany Boulevard storm drain
    25 Nov 1929outcome not readJournal 1929, p. 2191 ↗
  • First payment of $7,500 to Clinton Construction Company for an Alemany Boulevard storm drain. linked by the name only, not checked
    10 Mar 1930outcome not readJournal 1930, p. 802 ↗
  • Resolution authorizing payment of many city claims for libraries, railway, streets, and Hetch Hetchy works was passed for printing.
    14 Apr 1930passed first readingJournal 1930, p. 1002 ↗
  • Sather Gate Book Shop paid $2,707.77 for library books linked by the name only, not checked
    21 Apr 1930outcome not readJournal 1930, p. 1031 ↗
  • Clinton Construction Co. claim of $42,000.00 for third payment on Alemany avenue storm drain listed for payment.
    12 May 1930outcome not readJournal 1930, p. 1180 ↗
  • Clinton Construction Co. was paid $42,000.00 for a third payment on the Alemany Avenue storm drain.
    19 May 1930outcome not readJournal 1930, p. 1248 ↗
  • Clinton Construction Co. was paid $18,000 for the fourth payment on the Alemany boulevard storm drain. linked by the name only, not checked
    9 Jun 1930outcome not readJournal 1930, p. 1480 ↗
  • Clinton Construction Co. was paid $18,000 for a fourth payment on the Alemany boulevard storm drain, Section A.
    16 Jun 1930outcome not readJournal 1930, p. 1517 ↗
  • A $37,000 fifth payment to Clinton Construction Co. for the Alemany Avenue storm drain is listed for payment. linked by the name only, not checked
    30 Jun 1930outcome not readJournal 1930, p. 1600 ↗
  • Clinton Construction Co. is listed for a $37,000 fifth payment on the Alemany avenue storm drain; the outcome is not printed here. linked by the name only, not checked
    15 Jul 1930outcome not readJournal 1930, p. 1750 ↗
  • Board authorized payment of park supplier, utility and contractor claims, including H. C. Vensano & Co. for a reservoir, from city funds.
    4 Aug 1930outcome not readJournal 1930, p. 1898 ↗
  • Clinton Construction Company's New San Francisco Appraisers Building is about 90 per cent complete, expected ready May 1944.
    3 Jan 1944outcome not readJournal 1944, p. 39 ↗
  • Settlement drawn with Clinton Construction over Washington Street track damage
    3 Jul 1944outcome not readJournal 1944, p. 1525 ↗