Qipudata
San Francisco · v0.7.1

All decisions

about 1,100 Board decisions about Department of Public Works, in date order. Each links to its printed page.

  • Charter amendment creating a Director of Public Works to replace the Board of Public Works was adopted.
    5 Nov 1912passedJournal 1912 ↗
  • Western Pacific Railway paid for freight on City Hall steel
    25 Nov 1913outcome not readJournal 1913, p. 1208 ↗
  • Supervisor Power presented a resolution proposed to appropriate small sums for City Hall work, equipment and an assistant in irrigation matters.
    20 Mar 1916outcome not readJournal 1916, p. 269 ↗
  • $56,003 set aside for street paving and repairs in October
    25 Sep 1916outcome not readJournal 1916, p. 995 ↗
  • $56,003 set aside for street paving and repairs in October
  • Appropriations totaling $951.55 approved for Exposition Auditorium lamps, garbage studies, Hall of Justice door and a Fairfax Avenue pump.
    8 Jan 1917passedJournal 1917, p. 33 ↗
  • Appropriations adopted for hospital equipment, jail concrete, street curbing and holiday platforms, 18 ayes.
    15 Jan 1917passedJournal 1917, p. 83 ↗
  • Resolution 13848 proposes setting aside and appropriating city funds; its outcome continues on the next page.
    22 Jan 1917outcome not readJournal 1917, p. 108 ↗
  • $2,517.66 for street work along the new Church Street railway line
    13 Jun 1917outcome not readJournal 1917, p. 797 ↗
  • Supervisor Power proposed $4,730 for brickwork and carpentry at County Jails 2 and 3; passed for printing.
    9 Oct 1917passed first readingJournal 1917, p. 1288 ↗
  • Resolution approves $4,730 for brickwork and carpentry at County Jails 2 and 3, paid to Anderson and Ringrose and Public Works.
    22 Oct 1917passedJournal 1917, p. 1319 ↗
  • A resolution proposing $8,594 for supplies and maintenance of the Department of Public Works was passed for printing. linked by the name only, not checked
    17 Dec 1917passed first readingJournal 1917, p. 1500 ↗
  • Board laid over for one week a proposal to set aside $8,594 for Public Works supplies and maintenance. linked by the name only, not checked
    26 Dec 1917continuedJournal 1917, p. 1522 ↗
  • Resolution providing $8,594 for supplies and maintenance of the Department of Public Works was finally passed. linked by the name only, not checked
    31 Dec 1917passedJournal 1917, p. 1528 ↗
  • Board set aside $500 from the garbage bond fund for Public Works investigations into garbage disposal problems. linked by the name only, not checked
    23 Dec 1918passedJournal 1918, p. 1051 ↗
  • Payments totalling $62,478.14 to utilities, contractors and suppliers were passed for printing as a resolution authorizing expenditure. linked by the name only, not checked
    8 Sep 1919passed first readingJournal 1919, p. 744 ↗
  • Board approved $181.50 for Public Works staff work on the City's exhibits at the Land Show, Exposition Auditorium.
  • Appropriation of $11,288.35 proposed to pay increased wages to Municipal Railway platform and track men.
    29 Dec 1919outcome not readJournal 1919, p. 1154 ↗
  • Resolution appropriating $5,000 for plans to level Rincon Hill was passed for printing.
    9 Feb 1920passed first readingJournal 1920, p. 131 ↗
  • Board appropriated $10,516.45 from the Municipal Railway depreciation fund to pay raised wages to railway platform and track workers. linked by the name only, not checked
    22 Mar 1920passedJournal 1920, p. 235 ↗
  • Department of Public Works is to paint several bridges, with $7,000 set aside for the work. linked by the name only, not checked
    5 Apr 1920outcome not readJournal 1920, p. 287 ↗
  • $3,800 set aside to paint the Exposition Auditorium
    12 Apr 1920passedJournal 1920, p. 297 ↗
  • $8,500 to cost out streetcar extensions into the Sunset District
    1 Feb 1921outcome not readJournal 1921, p. 107 ↗
  • $8,500 to cost out streetcar extensions into the Sunset District linked by the name only, not checked
    15 Feb 1921outcome not readJournal 1921, p. 131 ↗
  • $150 to clean and paint Lotta's Fountain at Market and Kearny
    19 Dec 1921passedJournal 1921, p. 1053 ↗
  • $450 for a stairway on Twenty-fourth Street at De Haro
    12 Jan 1925passedJournal 1925, p. 57 ↗
  • $7,312.97 to improve Forty-eighth Avenue between Santiago and Taraval streets linked by the name only, not checked
    9 Feb 1925outcome not readJournal 1925, p. 198 ↗
  • $7,312.97 to improve Forty-eighth Avenue between Santiago and Taraval streets linked by the name only, not checked
    9 Feb 1925outcome not readJournal 1925, p. 198 ↗
  • Payments to suppliers and contractors for water, hospitals, schools and railway work are authorized, with the final vote on the next page.
    24 Feb 1925outcome not readJournal 1925, p. 232 ↗
  • Department of Public Works is listed for $3,661.40 for labor and materials furnished to San Francisco Hospital.
    18 May 1925outcome not readJournal 1925, p. 696 ↗
  • Board approved a $3,661.40 payment for labor and materials at San Francisco Hospital.
    25 May 1925passedJournal 1925, p. 729 ↗
  • The Department of Public Works was paid $3,682.75 for labor and repairs at San Francisco Hospital.
    10 May 1926outcome not readJournal 1926, p. 715 ↗
  • $1,000 to clear sand from Thirty-eighth Avenue and Irving Street linked by the name only, not checked
    7 Sep 1926outcome not readJournal 1926, p. 1427 ↗
  • James M. Smith gets $85,000 for the Market Street extension linked by the name only, not checked
    13 Sep 1926outcome not readJournal 1926, p. 1438 ↗
  • Public Works was reimbursed $1,046.56 for block book expenditures.
    25 Oct 1926outcome not readJournal 1926, p. 1671 ↗
  • $2,600 for new sidewalks around Washington Square linked by the name only, not checked
    6 Dec 1926outcome not readJournal 1926, p. 1914 ↗
  • $2,600 for new sidewalks around Washington Square linked by the name only, not checked
    13 Dec 1926outcome not readJournal 1926, p. 1931 ↗
  • Payment of $3,852 to the Department of Public Works for labor at San Francisco Hospital was approved. linked by the name only, not checked
    3 Jan 1927passedJournal 1927 ↗
  • Payment of $682.24 to the Department of Public Works for materials for San Francisco Hospital was approved. linked by the name only, not checked
    3 Jan 1927passedJournal 1927 ↗
  • Resolution authorizing dozens of city payments to suppliers and contractors for Hetch Hetchy, schools, streets and hospitals, passed for printing.
    3 Jan 1927outcome not readJournal 1927, p. 11 ↗
  • Supervisors appropriated $24,000 across several funds for a school plumbing job, a police station design, a fire house repair and Relief Home equipment. linked by the name only, not checked
    7 Feb 1927outcome not readJournal 1927, p. 228 ↗
  • Transfers totalling $31,070 from the General Fund approved to Public Works budget items for 1926-1927.
    21 Feb 1927passedJournal 1927, p. 281 ↗
  • Resolution authorizing about two dozen city payments to contractors and suppliers, including parks, schools, Hetch Hetchy and Municipal Railway, was passed for printing. linked by the name only, not checked
    18 Apr 1927passed first readingJournal 1927, p. 659 ↗
  • Board authorizes payments to dozens of city suppliers and contractors from park, school, Hetch Hetchy, and Municipal Railway funds. linked by the name only, not checked
    25 Apr 1927outcome not readJournal 1927, p. 674 ↗
  • Clinton Construction paid $7,424.70 for the Relief Home buildings linked by the name only, not checked
    2 May 1927outcome not readJournal 1927, p. 720 ↗
  • Granfield, Farrar & Carlin paid $9,900 for grading the Municipal Airport
    16 May 1927outcome not readJournal 1927, p. 842 ↗
  • Payments totalling $100,382.53 are authorised to contractors and suppliers for library, school, water and transit work. linked by the name only, not checked
    22 Aug 1927outcome not readJournal 1927, p. 1540 ↗
  • The Board transferred $8,402.71 from Public Health appropriations to Public Works for labor and materials supplied to Public Health. linked by the name only, not checked
    6 Feb 1928passedJournal 1928, p. 209 ↗
  • Traffic signal accounts pay $885.18 for labour and material used to paint curbing for traffic regulation. linked by the name only, not checked
    12 Mar 1928passedJournal 1928, p. 408 ↗
  • A $6,500 resolution with no subject on this page
    12 Mar 1928passedJournal 1928, p. 409 ↗
  • Resolution transferred $499.50 for labor and $230.64 for materials to reimburse Public Works for curb painting.
    19 Mar 1928passedJournal 1928, p. 464 ↗
  • Money set aside for rebuilding Beale Street from Mission to Embarcadero
    30 Apr 1928outcome not readJournal 1928, p. 758 ↗
  • Public Works was reimbursed $375 for labor and $219.88 for materials used painting traffic curbs in March 1928.
    7 May 1928passedJournal 1928, p. 773 ↗
  • $988.59 set aside for painting curbs for traffic control
    21 May 1928outcome not readJournal 1928, p. 882 ↗
  • $988.59 set aside to paint curbs for traffic rules
    28 May 1928passedJournal 1928, p. 1054 ↗
  • Authorizes $810 payment to American Building Maintenance Co. for Public Libraries janitor service. linked by the name only, not checked
    18 Jun 1928outcome not readJournal 1928, p. 1229 ↗
  • Claim of $1,832.69 for road repairs at Laguna Honda Home, paid to the Department of Public Works.
    18 Jun 1928outcome not readJournal 1928, p. 1231 ↗
  • Finance Committee recommended authorizing payments from listed city accounts to named claimants; the final vote is on the next page. linked by the name only, not checked
    25 Jun 1928outcome not readJournal 1928, p. 1290 ↗
  • Public Works was paid $1,704.97 for alterations and repairs at San Francisco Hospital.
    13 Aug 1928outcome not readJournal 1928, p. 1648 ↗
  • The Department of Public Works was paid $1,704.97 for alterations and repairs at San Francisco Hospital.
    20 Aug 1928passedJournal 1928, p. 1683 ↗
  • $1,480.19 was transferred to the Department of Public Works to repay painting of traffic lanes in August 1928.
    29 Oct 1928passedJournal 1928, p. 2317 ↗
  • Small payments from the Spring Valley rate litigation fund went to S. G. Clowd for salary and Oak Blue Print Co. for maps.
    5 Nov 1928outcome not readJournal 1928, p. 2388 ↗
  • Health Department hospital accounts reimbursed Public Works for work it performed for the Health Department.
    18 Feb 1929outcome not readJournal 1929, p. 313 ↗
  • Department of Public Works is reimbursed $1,366.25 for repairs to San Francisco Hospital in spring 1929.
    29 Jul 1929outcome not readJournal 1929, p. 1499 ↗
  • Department of Public Works is reimbursed $711.00 for repairs to the Laguna Honda Home.
    29 Jul 1929outcome not readJournal 1929, p. 1499 ↗
  • Public Works claim of $859.80 for asphalt repairs to the Municipal Railway right of way. linked by the name only, not checked
    17 Feb 1930outcome not readJournal 1930, p. 302 ↗
  • Board adopted a $2,500 appropriation from County Road Fund to hire a bricklayer and hod carrier for sewer repair.
    24 Feb 1930passedJournal 1930, p. 578 ↗
  • Resolution to appropriate $3,770 for reconstructing floors in County Jail No. 1 was passed for printing.
    24 Feb 1930passed first readingJournal 1930, p. 578 ↗
  • Proposed $955.67 reimbursement to Public Works for gilding City Hall ornamental ironwork; outcome not shown on this page. linked by the name only, not checked
    24 Feb 1930outcome not readJournal 1930, p. 579 ↗
  • Proposed $2,500 from County Road Fund to hire a hod carrier and bricklayer for sewer repair work.
    3 Mar 1930outcome not readJournal 1930, p. 740 ↗
  • A $275 appropriation was approved for wiring and fixtures in the Women's Jail.
    3 Mar 1930passedJournal 1930, p. 753 ↗
  • $3,770 was appropriated to rebuild the floors in the Federal and felony wings of County Jail No. 1.
    3 Mar 1930passedJournal 1930, p. 741 ↗
  • $988.67 was set aside to reimburse Public Works for gilding ornamental iron work at City Hall.
    3 Mar 1930outcome not readJournal 1930, p. 741 ↗
  • The Board authorized ten payments from city funds to suppliers and contractors, including library books and Hetch Hetchy castings.
    24 Mar 1930outcome not readJournal 1930 ↗
  • Public Works was reimbursed $585.40 for painting material used on traffic painting.
    24 Mar 1930passedJournal 1930, p. 867 ↗
  • Public Works was reimbursed $1,140.83 for covering main sewers during March 1930. linked by the name only, not checked
    28 Apr 1930passedJournal 1930, p. 1072 ↗
  • Sewer work from McAllister and Larkin to the Civic Center repaid
    7 Jul 1930outcome not readJournal 1930, p. 1660 ↗
  • Health Department reimbursed the Board of Public Works about $842 for services and materials furnished to city hospitals.
    27 Oct 1930passedJournal 1930, p. 2442 ↗
  • Public Works is reimbursed $1,241 from health budget items for repairs it did for the Department of Public Health.
    24 Nov 1930passedJournal 1930, p. 2619 ↗
  • Public Works shifts repair money between its own budget items
    2 Mar 1931outcome not readJournal 1931, p. 522 ↗
  • Resolution 33417 adopted appropriating $300 to fix ventilation flues in cells at County Jail No. 1.
    2 Mar 1931passedJournal 1931, p. 520 ↗
  • Public Works budget items were transferred to credit equipment repair reimbursements; the vote continues on the next page.
    23 Mar 1931outcome not readJournal 1931, p. 647 ↗
  • Budget funds of $682.23 moved to Public Works as reimbursement for work done in the Department of Public Health.
    27 Jul 1931passedJournal 1931, p. 2536 ↗
  • Proposed reimbursement of Department of Public Works budget items from another budget; outcome continues on next page.
    24 Aug 1931outcome not readJournal 1931, p. 2700 ↗
  • Proposed transfer of Health Department budget funds to the Board of Public Works; the resolution continues on the next page.
    21 Sep 1931outcome not readJournal 1931, p. 2821 ↗
  • Transfer of $525 to the Department of Public Works for street opening expenses listed for approval.
    21 Sep 1931outcome not readJournal 1931, p. 2811 ↗
  • Claims paid for water, street, power and railway costs, including Upper Alameda Creek Dam and Alabama Street work.
    28 Sep 1931outcome not readJournal 1931, p. 2857 ↗
  • Public Health Department reimbursed Public Works $1,668.82 for repairs and construction work furnished.
    26 Oct 1931passedJournal 1931, p. 3029 ↗
  • Transfer of Public Works budget amounts totalling $701.04 and $54.61 proposed to Budget Items 420 and 421.
    26 Oct 1931outcome not readJournal 1931, p. 3029 ↗
  • A resolution would credit Public Works budget item 402 for work it performed for Public Health; outcome continues on the next page.
    21 Dec 1931outcome not readJournal 1931, p. 3409 ↗
  • Resolution would pay $4,981.90 to California Academy of Sciences for Steinhart Aquarium maintenance, December 1931.
    11 Jan 1932outcome not readJournal 1932, p. 172 ↗
  • Resolution 39 proposes transferring salary funds after Civil Service moved various city employments between departments; outcome continues on next page.
    8 Feb 1932outcome not readJournal 1932, p. 314 ↗
  • Warrants of the Islais Creek Reclamation District approved, including payments to J. B. West and Western Pacific Railroad.
    8 Feb 1932passedJournal 1932, p. 300 ↗
  • Western Pacific Railroad paid $16,236.12 from Islais Creek district funds
    7 Mar 1932outcome not readJournal 1932, p. 435 ↗
  • Acceptance of the Widmans' $150 offer for land needed to realign Cayuga Avenue is proposed.
    7 Mar 1932outcome not readJournal 1932, p. 435 ↗
  • Public Health Department to reimburse Public Works $1,466.13 for labor and repairs at its institutions.
    28 Mar 1932passedJournal 1932, p. 542 ↗
  • Transfer of $2,330.91 from the Department of Public Health reimburses the Department of Public Works for November 1931 repairs, material and labor.
    18 Apr 1932outcome not readJournal 1932, p. 654 ↗
  • Warrants totaling $1,894.11 from Islais Creek Reclamation District funds approved, paid to J. B. West and the Islais Company.
    16 May 1932passedJournal 1932, p. 802 ↗
  • The Board approved seven Islais Creek Reclamation District warrants, totaling about $6,711, paid to city and private payees.
  • Proposed ordinance sets Department of Public Works fees for building permits, moving buildings, billboards and patent chimneys; passed for second reading.
    5 Jul 1932passed first readingJournal 1932, p. 1200 ↗
  • Supervisors passed rules and fees requiring street-visible numbers on buildings and separate apartments, collected by the Department of Public Works.
  • Five Islais Creek Reclamation District warrants approved for payment, including to J. B. West and J. H. Baxter & Co.
    11 Jul 1932passedJournal 1932, p. 1218 ↗
  • Passed ordinance setting Public Works fees for building, moving, billboard and patent chimney permits, effective on passage.
    18 Jul 1932passedJournal 1932, p. 1239 ↗
  • Proposed ordinance sets Public Works fees for numbering building entrances and separate apartments; text continues on next page.
    18 Jul 1932outcome not readJournal 1932, p. 1239 ↗
  • Approves Islais Creek Reclamation District warrants paying Southern Pacific, The Islais Co. and J. B. West, totaling $30,971.61.
  • Supervisors adopted warrants paying Islais Creek Reclamation District bills, including $1,247.10 to C. L. Tilden.
  • Approval of six Islais Creek Reclamation District warrants to several payees is proposed; the outcome continues on the next page.
    7 Nov 1932outcome not readJournal 1932, p. 1625 ↗
  • Islais Creek Reclamation District warrants totalling about $7,900 were approved for payment to several payees, including a $7,000 land company payment.
    12 Dec 1932outcome not readJournal 1932, p. 1741 ↗
  • Six Islais Creek Reclamation District warrants approved for payment, including to Meyer Rosenberg and J. B. West.
    16 Jan 1933passedJournal 1933, p. 63 ↗
  • Public Works gets $427,178.81 from the 1927 Boulevard Bond Fund to finish boulevard projects.
    27 Feb 1933passedJournal 1933, p. 254 ↗
  • Proposed $427,178.81 from 1927 boulevard bond fund to Public Works to finish boulevard projects, passed first reading.
    27 Feb 1933passed first readingJournal 1933, p. 253 ↗
  • Board approved $4,394.05 in Islais Creek Reclamation District warrant payments to contractors and landowners.
    6 Mar 1933passedJournal 1933, p. 290 ↗
  • Ordinance proposed to appropriate $427,178.81 from the 1927 Boulevard Bond Fund to Public Works for boulevard projects.
    13 Mar 1933outcome not readJournal 1933, p. 333 ↗
  • Proposed ordinance would set building permit fees collected by the Department of Public Works; passed for second reading.
    20 Mar 1933passed first readingJournal 1933, p. 388 ↗
  • Islais Creek district pays its bills, $2,000 to The Islais Co.
    10 Apr 1933passedJournal 1933, p. 548 ↗
  • Several Islais Creek Reclamation District warrants approved for payment to named payees; decision continues on next page.
    12 Jun 1933outcome not readJournal 1933, p. 1115 ↗
  • Resolution approved seven Islais Creek Reclamation District warrants, totaling $3,640.42, for payment from district funds.
    12 Jun 1933passedJournal 1933, p. 1116 ↗
  • Four Islais Creek Reclamation District warrants totalling $1,187.46 approved, paid to Public Works, J. B. West and H. Windt.
    24 Jul 1933passedJournal 1933, p. 1430 ↗
  • The Board approved $1,200 in Islais Creek Reclamation District warrants paid to West, Windt and the Public Works Director.
    14 Aug 1933passedJournal 1933, p. 1528 ↗
  • Board approved $5,000 from the emergency reserve for Public Works to survey dangerous parapets, fire escapes and balconies.
    28 Aug 1933passedJournal 1933, p. 1578 ↗
  • Board approved $5,000 from the emergency reserve for Public Works to survey dangerous parapets, fire escapes and balconies.
    11 Sep 1933passedJournal 1933, p. 1627 ↗
  • Resolution approves Islais Creek Reclamation District payments totaling $405.70, including warrants to J. B. West and the Director of Public Works.
    11 Sep 1933outcome not readJournal 1933, p. 1633 ↗
  • Seventeen Islais Creek Reclamation District bills approved for payment
    9 Oct 1933outcome not readJournal 1933, p. 1761 ↗
  • Board approved warrants of the Islais Creek Reclamation District paying seven payees from district funds.
    13 Nov 1933passedJournal 1933, p. 1871 ↗
  • Ordinance adopted amending Building Law fees for using sidewalks and streets, with a $4 fee for other purposes.
  • Approved payment of five Islais Creek Reclamation District warrants, including $285.68 to the Director of Public Works.
    11 Dec 1933passedJournal 1933, p. 1983 ↗
  • Islais Creek district pays $4,150 to the estate of M. Dore
    22 Jan 1934outcome not readJournal 1934, p. 112 ↗
  • Ordinance authorizes $5,000 for preliminary engineering on sewer and high pressure projects funded by 1933 bonds.
    22 Jan 1934passedJournal 1934, p. 114 ↗
  • Krieg Tanning Company paid $5,120 from the Islais Creek district
    5 Feb 1934outcome not readJournal 1934, p. 165 ↗
  • The Board approved reclamation district warrants totalling about $9,000 paid to Islais Creek contractors, landholders and others.
    5 Mar 1934passedJournal 1934, p. 333 ↗
  • $8,000 rushed to repair the caved-in sewer under Oakdale Avenue
    26 Mar 1934outcome not readJournal 1934, p. 469 ↗
  • $8,000 rushed to repair the caved-in sewer under Oakdale Avenue
    26 Mar 1934outcome not readJournal 1934, p. 471 ↗
  • Supervisors passed on first reading a $5,000 expenditure for preliminary engineering of sewer and high pressure projects.
    26 Mar 1934passed first readingJournal 1934, p. 472 ↗
  • Board approves eighteen Islais Creek Reclamation District warrants paid to contractors, suppliers and landowners, totalling about $9,000.
    9 Apr 1934passedJournal 1934, p. 507 ↗
  • Approved district warrants totaling $6,175.44 from Islais Creek Reclamation District funds to various payees.
    7 May 1934passedJournal 1934, p. 617 ↗
  • Ten Islais Creek Reclamation District warrants, paid to contractors and creditors, totaling about $11,500, were approved for payment.
    11 Jun 1934passedJournal 1934, p. 898 ↗
  • The Board approved Islais Creek Reclamation District warrants paying several contractors and suppliers from district funds.
    9 Jul 1934passedJournal 1934, p. 997 ↗
  • Payment of Islais Creek Reclamation District warrants, including to J. B. West, proposed; outcome continues on next page.
    6 Aug 1934outcome not readJournal 1934, p. 1109 ↗
  • Eleven Islais Creek Reclamation District warrants to various payees, including Ludwig Rom and J. B. West, were approved for payment.
    11 Sep 1934passedJournal 1934, p. 1308 ↗
  • Board approved ten Islais Creek Reclamation District warrants to various payees, totalling about $5,000. linked by the name only, not checked
    22 Oct 1934passedJournal 1934, p. 1464 ↗
  • Board is considering approval of eleven Islais Creek Reclamation District warrants paid to several payees, including Southern Pacific Company.
    13 Nov 1934outcome not readJournal 1934, p. 1529 ↗
  • Board approved Islais Creek Reclamation District warrants totaling about $11,000 for contractors and suppliers, payable from district funds.
  • Resolution 1743 proposed to authorize payment of Islais Creek Reclamation District warrants to numerous payees, including Southern Pacific Company.
    14 Jan 1935outcome not readJournal 1935, p. 77 ↗
  • Resolution 1789 authorizes payment of Islais Creek Reclamation District warrants totalling $555.50 to the Director of Works and J. B. West.
    11 Feb 1935outcome not readJournal 1935, p. 161 ↗
  • Resolution to pay seven Islais Creek Reclamation District warrants, totalling about $2,541, was proposed and its vote is continued.
    18 Mar 1935outcome not readJournal 1935, p. 310 ↗
  • Islais Creek Reclamation District warrants totalling several payees approved for payment from district funds.
    15 Apr 1935passedJournal 1935, p. 428 ↗
  • Islais Creek Reclamation District warrants to seven payees, totalling $2,763.71, were approved for payment.
    13 May 1935passedJournal 1935, p. 505 ↗
  • Islais Creek Reclamation District bills paid, $3,028.55 to Allen G. Wright linked by the name only, not checked
    24 Jun 1935outcome not readJournal 1935, p. 882 ↗
  • Approved eight warrants paying Islais Creek Reclamation District bills to contractors, a printer and the Director of Public Works.
    19 Aug 1935passedJournal 1935, p. 1194 ↗
  • Islais Creek Reclamation District bills paid, $243 to Reinhart Lumber
    7 Oct 1935outcome not readJournal 1935, p. 1417 ↗
  • Resolution approves twelve Islais Creek Reclamation District warrants to contractors and companies, totalling about $9,000.
    12 Nov 1935passedJournal 1935, p. 1526 ↗
  • Islais Creek Reclamation District warrants totalling about $17,000 paid to contractors and payees; outcome continues on next page.
    9 Dec 1935outcome not readJournal 1935, p. 1640 ↗
  • Board approved fourteen Islais Creek Reclamation District warrants totaling $6,500.09 paid to contractors and firms.
    13 Jan 1936passedJournal 1936, p. 91 ↗
  • Payment of Islais Creek Reclamation District warrants, including $424.47 to the Director of Public Works, is proposed.
    10 Feb 1936outcome not readJournal 1936, p. 190 ↗
  • Islais Creek Reclamation District warrants totalling about $6,300 approved for payment to contractors and suppliers.
    9 Mar 1936outcome not readJournal 1936, p. 287 ↗
  • Resolution proposed by Supervisor Shannon to relieve expected traffic concentration at the Fifth and Harrison Streets terminal.
    13 Apr 1936outcome not readJournal 1936 ↗
  • The Board instructed the Clerk to order Public Works photographs of overhead wires at an estimated cost of $7.
    13 Apr 1936passedJournal 1936, p. 376 ↗
  • The Board approved six Islais Creek Reclamation District warrants, totalling about $1,116, paid from district funds.
    27 Apr 1936passedJournal 1936, p. 408 ↗
  • Seven Islais Creek Reclamation District warrants were approved for payment to named payees, including Keuffel & Esser Co and P. F. Reilly.
    8 Jun 1936passedJournal 1936, p. 890 ↗
  • Proposed amendment to the building fee ordinance sets $2 permit fees for moving buildings, billboards and flues, and a $300 annual flue-work option.
    15 Jun 1936outcome not readJournal 1936, p. 983 ↗
  • Supervisors voted 8 to 0 to amend building permit fees, setting $2 for flue and chimney permits and a $300 annual option, with 3 absent.
    6 Jul 1936outcome not readJournal 1936, p. 1082 ↗
  • Board approved six Islais Creek Reclamation District warrants, including payments to Anglo California National Bank and the S. F. Chronicle.
    13 Jul 1936passedJournal 1936, p. 1116 ↗
  • Board approved two Islais Creek Reclamation District warrants, $334.05 and $687.25, one payable to Henry Windt.
    10 Aug 1936passedJournal 1936, p. 1331 ↗
  • The Board approved seven Islais Creek Reclamation District warrants to various payees, totalling $4,307.38.
    21 Sep 1936passedJournal 1936, p. 1505 ↗
  • Seven Islais Creek Reclamation District warrants approved, including $3,000 to Elizabeth Del Carlo-Frank Del Carlo.
  • Board approved two Islais Creek Reclamation District warrants of $194.91 and $334.05 payable to the Director of Public Works.
    28 Dec 1936passedJournal 1936, p. 2124 ↗
  • Board advanced a $10,500 appropriation for Department of Public Works truck hire to final passage.
    4 Jan 1937outcome not readJournal 1937, p. 20 ↗
  • Twelve Islais Creek Reclamation District warrants paying various private and city payees were approved.
    25 Jan 1937passedJournal 1937, p. 191 ↗
  • Supervisors approved two Islais Creek Reclamation District warrants, totalling $463.92, for Public Works and a private payee.
    8 Mar 1937passedJournal 1937, p. 363 ↗
  • The city ordered payment of a series of Islais Creek Reclamation District warrants to contractors and suppliers; the list continues on the next page.
    5 Apr 1937outcome not readJournal 1937, p. 511 ↗
  • Board approves 21 Islais Creek Reclamation District warrants paid to firms and individuals, including the Chronicle and Islais Co.
    10 May 1937passedJournal 1937, p. 617 ↗
  • Twelve Islais Creek district warrants approved for payment
    15 Jun 1937passedJournal 1937, p. 933 ↗
  • Islais Creek Reclamation District warrants approved, $1,287.21 to H. Moffat Co.
    12 Jul 1937passedJournal 1937, p. 1202 ↗
  • Board approved Islais Creek Reclamation District warrants totalling about $1,090 for district payments and payees.
    16 Aug 1937passedJournal 1937, p. 1416 ↗
  • Three Islais Creek Reclamation District warrants were approved for payment to Reinhart Lumber, the Taaffes and the Director of Works.
    20 Sep 1937passedJournal 1937, p. 1571 ↗
  • Board approved six small Islais Creek Reclamation District warrants, totalling about $838, payable to various payees.
  • Finance Committee's $200 sick-leave appropriation for Public Works telephone operators was laid over one week for lack of votes. linked by the name only, not checked
    24 Jan 1938continuedJournal 1938 ↗
  • Proposed emergency appropriation of $46,500 to staff the new Richmond Sunset Sewage Treatment Plant. linked by the name only, not checked
    19 Dec 1938outcome not readJournal 1938, p. 2116 ↗
  • City takes over Teresita Boulevard after Meyer Brothers put up $6,000
    24 Jul 1939outcome not readJournal 1939, p. 1441 ↗
  • City takes over the roadway of Teresita Boulevard
    7 Aug 1939outcome not readJournal 1939, p. 1570 ↗
  • Proposed ordinance would change Municipal Code rules on chimney installer registration and inspection fees; the outcome continues on the next page.
    18 Sep 1939outcome not readJournal 1939, p. 1870 ↗
  • A proposed amendment would replace chimney ordinance fees with a competency certificate, examination, and a $2.50 flue permit fee.
    9 Oct 1939outcome not readJournal 1939, p. 1941 ↗
  • Part of Bay Shore Boulevard to be closed, water pipe moved
    6 Nov 1939outcome not readJournal 1939, p. 2139 ↗
  • Proposed $5,330 transfer from surplus funds the Richmond Sunset Sewage Treatment Plant's salaries and heating costs.
    20 May 1940outcome not readJournal 1940, p. 965 ↗
  • Proposed charter amendment would put the City Engineer under civil service and appoint the incumbent to that position.
    16 Sep 1940outcome not readJournal 1940, p. 2155 ↗
  • A proposed charter amendment on civil service status for the City Engineer is put to voters; the outcome continues on the next page.
    20 Sep 1940outcome not readJournal 1940, p. 2174 ↗
  • Public Works reappropriation of $612.50 for a bookkeeper and general clerk positions; outcome continues on next page.
    17 Mar 1941outcome not readJournal 1941, p. 465 ↗
  • $49,000 voted for traffic signals on Lombard Street and Nineteenth Avenue linked by the name only, not checked
    25 Aug 1941outcome not readJournal 1941, p. 1723 ↗
  • $49,000 voted for traffic signals on Lombard Street and Nineteenth Avenue linked by the name only, not checked
    8 Sep 1941outcome not readJournal 1941, p. 1780 ↗
  • $40,000 to fit up 585 Bush Street for Public Welfare, referred
    8 Sep 1941referredJournal 1941, p. 1813 ↗
  • Public Welfare must quit its offices to the government by October
    15 Sep 1941outcome not readJournal 1941, p. 1922 ↗
  • $40,000 voted to fit up 585 Bush Street for Public Welfare
    22 Sep 1941outcome not readJournal 1941, p. 1934 ↗
  • $49,000 voted for traffic signals on Lombard Street and Nineteenth Avenue
    22 Sep 1941outcome not readJournal 1941, p. 1929 ↗
  • A proposed $1,745.84 supplemental appropriation for Public Works photostat equipment, lighting and lab repairs was passed for second reading.
    3 Nov 1941passed first readingJournal 1941, p. 2159 ↗
  • Supplemental appropriation of $1,745.84 for Public Works Blueprint Division photostat equipment, lighting and laboratory repairs; finally passed.
    17 Nov 1941passedJournal 1941, p. 2197 ↗
  • Public Works appropriates $5,400 from surplus to retitle its chief clerk post as assistant director; passed.
    15 Dec 1941passedJournal 1941, p. 2302 ↗
  • The Board approved seven Islais Creek Reclamation District warrants paying various creditors from district funds.
    23 Mar 1942passedJournal 1942, p. 438 ↗
  • Proposed ordinance creates a $1,000 revolving fund for Public Works petty purchases, pending Board vote.
    1 Jun 1942outcome not readJournal 1942, p. 1309 ↗
  • Ordinance proposed to appropriate $1,200 for Public Works to survey playgrounds and public air raid shelters.
    8 Mar 1943outcome not readJournal 1943, p. 464 ↗
  • Board postponed a $638,000 request from Public Works for storm and sanitary sewers until May 20, 1943. linked by the name only, not checked
    19 May 1943continuedJournal 1943, p. 1116-61 ↗
  • The Board approved a $638,000 supplemental appropriation for sewer needs requested by Public Works' Engineering Division.
  • $12,800 for road machinery put off until June 5 linked by the name only, not checked
    12 Jun 1944outcome not readJournal 1944, p. 1293 ↗
  • $7,500 sought for traffic signs and control devices
    4 Feb 1946outcome not readJournal 1946, p. 202 ↗
  • Brown moves to cut the $600,000 Public Works yard building item to $30,000; Sullivan proposes $300,000 instead.
    21 May 1946outcome not readJournal 1946, p. 1465 ↗
  • Emergency appropriation of $200 for temporary telephone exchange salaries at City Hall is proposed.
    3 Jun 1946outcome not readJournal 1946, p. 1826 ↗
  • Proposed $1,900 emergency funds for heat and power at the Richmond-Sunset Sewage Treatment Plant for the rest of the fiscal year.
    3 Jun 1946outcome not readJournal 1946, p. 1823 ↗
  • Proposed $12,500 appropriation from the General Fund Reserve to refurnish, paint and decorate twelve Municipal Court chambers and courtrooms.
    3 Jun 1946outcome not readJournal 1946, p. 1819 ↗
  • Proposed $12,500 from city reserve to refurnish and repaint twelve Municipal Court chambers and courtrooms.
    17 Jun 1946outcome not readJournal 1946, p. 2001 ↗
  • Merchants Ice and Cold Storage gets a Greenwich Street spur track linked by the name only, not checked
    15 Jul 1946outcome not readJournal 1946, p. 2262 ↗
  • Merchants Ice and Cold Storage allowed a track on Greenwich Street
    29 Jul 1946outcome not readJournal 1946, p. 2361 ↗
  • Proposed charter amendment letting Public Works spend up to $500 on unaccepted streets was refused submission to voters.
    20 Sep 1946refusedJournal 1946, p. 2862 ↗
  • $10,000 added to the public works stores revolving fund
    7 Apr 1947outcome not readJournal 1947, p. 746 ↗
  • Appropriates $11,000 to Public Works to build a blueprint filing room in the City Hall basement; passed for second reading. linked by the name only, not checked
    30 Jun 1947passed first readingJournal 1947, p. 1578 ↗
  • Passed an $11,000 appropriation for Public Works to build a blueprint filing room in City Hall's basement. linked by the name only, not checked
    14 Jul 1947passedJournal 1947, p. 1623 ↗
  • Finance Committee proposes the Controller refund illegally collected and duplicate tax payments under Revenue and Taxation Code Section 5096.
    14 Jul 1947outcome not readJournal 1947, p. 1623 ↗
  • $12,500 appropriated to the Department of Public Works to install traffic regulatory signs, finally passed 10-0.
    10 Nov 1947passedJournal 1947, p. 1928 ↗
  • $25,000 for curb painting and a pick-up truck passed second reading
    16 Feb 1948passed first readingJournal 1948, p. 95 ↗
  • Ordinance funding Public Works repairs on buildings held for future street rights of way passed first reading.
    16 Feb 1948passed first readingJournal 1948, p. 95 ↗
  • Ordinance appropriating $3,000 for repairs on buildings held for future street rights of way passed first reading.
    16 Feb 1948passed first readingJournal 1948, p. 95 ↗
  • Supervisor Gallagher asked Public Works to survey dilapidated street garbage cans for replacement, and the request went to committee.
    22 Nov 1948referredJournal 1948, p. 837 ↗
  • Public Works appropriation of $69,000 for street maintenance and traffic signals was adopted. linked by the name only, not checked
    14 Mar 1949passedJournal 1949, p. 186 ↗
  • Public Works appropriation of $16,000 for traffic striping and pedestrian lane painting passed first reading.
    14 Mar 1949passed first readingJournal 1949, p. 186 ↗
  • $16,000 appropriated to the Department of Public Works for traffic striping and school pedestrian lane painting; outcome not shown.
    28 Mar 1949outcome not readJournal 1949, p. 209 ↗
  • Board of Supervisors passed $69,000 for Public Works to maintain traffic signals and striping on major streets.
    28 Mar 1949passedJournal 1949, p. 210 ↗
  • A final passage vote with no subject on this page
    12 Sep 1949passedJournal 1949 ↗
  • A second reading vote with no subject on this page
    19 Dec 1949passed first readingJournal 1949, p. 1020 ↗
  • $45,000 voted to realign El Camino Del Mar through Lincoln Park linked by the name only, not checked
    6 Mar 1950passed first readingJournal 1950, p. 179 ↗
  • Board finally passed a $7,158 emergency appropriation for Public Works street cleaning gasoline, supplies and truck hire.
    13 Mar 1950passedJournal 1950, p. 213 ↗
  • $25,165 for road crew overtime and materials approved linked by the name only, not checked
    27 Mar 1950passedJournal 1950, p. 254 ↗
  • $22,000 for traffic signals and road markings approved linked by the name only, not checked
    17 Apr 1950passedJournal 1950, p. 332 ↗
  • $800 voted for a portable scaffold for building repairs
    7 Aug 1950outcome not readJournal 1950, p. 693 ↗
  • $566,500 approved to repave streets outside streetcar tracks
    5 Feb 1951passedJournal 1951 ↗
  • $43,500 for traffic signals at school crossings passed for second reading
    5 Feb 1951outcome not readJournal 1951, p. 108 ↗
  • $43,500 approved for new signals at school crossings
    19 Feb 1951passedJournal 1951, p. 155 ↗
  • Board finally passed an ordinance appropriating $1,450 for Public Works to replace painters' equipment.
    7 May 1951passedJournal 1951, p. 420 ↗
  • A $1,430 emergency appropriation for power at the sewage pumping station was referred to Finance Committee.
    11 Jun 1951referredJournal 1951, p. 619 ↗
  • Board passed on first reading a $55,000 Public Works appropriation correcting 1939 ordinance and a $10,000 stores fund increase.
    25 Jun 1951passed first readingJournal 1951, p. 653 ↗
  • $2,200 for a concrete stairway from Alemany Boulevard to Cayuga Avenue
    31 Dec 1951passed first readingJournal 1951, p. 1131 ↗
  • A final passage vote with no subject on this page
    14 Jan 1952passedJournal 1952, p. 24 ↗
  • Southern Pacific allowed a spur track on Hawthorne Street
    25 Feb 1952passedJournal 1952, p. 117 ↗
  • $50,000 voted to extend Winston Drive to Lake Merced Boulevard
    3 Mar 1952passedJournal 1952 ↗
  • Motion to rescind the continuance of a $600 demolition transfer at Lakeview and Plymouth Avenues was withdrawn.
    10 Mar 1952withdrawnJournal 1952, p. 166 ↗
  • Transfer of $600 within Public Works funds was approved to demolish condemned buildings at Lakeview and Plymouth Avenues.
    24 Mar 1952passedJournal 1952, p. 218 ↗
  • Public Works receives $10,310 in emergency reserve funds for sewer repair overtime, contractual services, truck hire and fuel.
    5 May 1952passedJournal 1952, p. 358 ↗
  • A final passage vote with no subject on this page linked by the name only, not checked
    19 May 1952passedJournal 1952, p. 395 ↗
  • $3,000 finally voted to widen Garden Street at Broderick Street linked by the name only, not checked
    19 May 1952passedJournal 1952, p. 395 ↗
  • $5,000 emergency appropriation for Public Works telephone expense referred to Finance Committee.
    26 May 1952referredJournal 1952, p. 428 ↗
  • Public Works receives $53,000 from the Special Road Improvement Fund to channelize Lincoln Way and Main Drive intersections with Great Highway, finally passed.
    23 Jun 1952passedJournal 1952, p. 488 ↗
  • $35,000 set aside to repair the Laguna Honda Boulevard slope
    23 Jun 1952passedJournal 1952, p. 488 ↗
  • The Board finally passed a $2,216,000 appropriation from the 1944 sewer bond fund for sewer construction across San Francisco.
    16 Feb 1953passedJournal 1953 ↗
  • Proposed $3,400 appropriation for Public Works telephone expenses was referred to Finance Committee. linked by the name only, not checked
    9 Mar 1953referredJournal 1953, p. 164 ↗
  • The Board rescinded its earlier final passage of a $3,400 Public Works telephone expense appropriation, with no objection, to reconsider it.
    16 Mar 1953outcome not readJournal 1953, p. 181 ↗
  • $2,500 proposed for benches at the Central Fire Alarm Station
    16 Mar 1953passed first readingJournal 1953, p. 179 ↗
  • Public Works funding of $6,500 to landscape Sloat Boulevard between Great Highway and Junipero Serra passed for second reading.
    16 Mar 1953passed first readingJournal 1953, p. 179 ↗
  • Laguna Honda Boulevard widening between Dewey Boulevard and Clarendon Avenue, $140,000 from gas tax fund, passed on first reading. linked by the name only, not checked
    23 Mar 1953passed first readingJournal 1953, p. 204 ↗
  • $20,000 proposed for curb painting after a committee amendment
    23 Mar 1953passedJournal 1953, p. 204 ↗
  • $2,500 for work benches and shelves at fire alarm station approved
    23 Mar 1953passedJournal 1953, p. 200 ↗
  • $5,000 to extend pavement on Francisco Street to The Embarcadero passed for second reading.
    6 Apr 1953passed first readingJournal 1953, p. 249 ↗
  • $54,441 voted for street upkeep as an emergency measure
    4 May 1953referredJournal 1953, p. 349 ↗
  • $10,700 for truck hire and street repair sent to committee
    4 May 1953referredJournal 1953, p. 349 ↗
  • $1.8M appropriation from the 1948 Sewage Treatment Bond Fund for Public Works sewer construction passed for second reading.
    25 May 1953passed first readingJournal 1953, p. 425 ↗
  • $800 voted for equipment at San Francisco Hospital
    1 Jun 1953passedJournal 1953, p. 437 ↗
  • Ordinance passed appropriating $80,432.50 from the Special Road Improvement Fund for traffic signals at intersections across the city. linked by the name only, not checked
    15 Jun 1953passedJournal 1953, p. 483 ↗
  • Ordinance appropriating $750 for Public Works temporary salaries was passed for second reading.
    17 Aug 1953passed first readingJournal 1953, p. 666 ↗
  • $15,000 voted to extend Jessie Street between Ninth and Tenth
    17 Aug 1953passedJournal 1953, p. 659 ↗
  • $90,000 finally passed for traffic signals in the Western Addition linked by the name only, not checked
    17 Aug 1953outcome not readJournal 1953, p. 659 ↗
  • Board passed as amended a $15,000 appropriation for pedestrian traffic signals on Montgomery Street between Sutter and California Streets.
    28 Sep 1953passed first readingJournal 1953, p. 806 ↗
  • Public Works received $6,000 from the Special Road Improvement Fund to repair Goettingen Street between Wilde and Campbell Avenues, passed on final vote.
    28 Sep 1953passedJournal 1953, p. 799 ↗
  • [name withheld] buys city land at Mason Street for $16,900
    28 Sep 1953passedJournal 1953, p. 802 ↗
  • City puts $7,000 into widening Laurel Street at Mayfair Drive
    2 Nov 1953passedJournal 1953, p. 873 ↗
  • City puts $5,000 into a tool shed on Sunset Boulevard linked by the name only, not checked
    14 Dec 1953passed first readingJournal 1953, p. 975 ↗
  • Money to extend Geneva Avenue from San Jose Avenue to Tara Street passed for second reading.
    25 Jan 1954passed first readingJournal 1954, p. 67 ↗
  • $13,000 voted to widen Pine Street between Larkin and Franklin
    23 Feb 1954passed first readingJournal 1954, p. 170 ↗
  • $7,480 voted for four new Public Works building-repair jobs
    23 Feb 1954passed first readingJournal 1954, p. 170 ↗
  • $13,000 voted to widen Pine Street between Larkin and Franklin
    1 Mar 1954passedJournal 1954, p. 185 ↗
  • Proposed $6,400 for sewers on Twenty-third Street to connect the Potrero Annex housing project, passed for second reading.
    22 Mar 1954passed first readingJournal 1954, p. 261 ↗
  • $6,400 voted for Twenty-third Street sewers serving the Potrero Annex
    29 Mar 1954passedJournal 1954, p. 290 ↗
  • Public Works would receive $2,721 to prepare plans for City Hall basement alterations for the Municipal Court Warrant Bureau; referred to committee.
    19 Apr 1954referredJournal 1954 ↗
  • Board passed on first reading $90,000 from the 1944 Sewer Bond Fund to build section C of the Ingleside sewer.
    26 Apr 1954passed first readingJournal 1954, p. 370 ↗
  • Public Works appropriation of $90,000 from the 1944 Sewer Bond Fund for Ingleside Sewer Section C was finally passed.
    3 May 1954passedJournal 1954 ↗
  • Board passed a $2,400 appropriation for Public Works to plan alterations and remodel the Hall of Justice courtroom.
    3 May 1954passedJournal 1954, p. 377 ↗
  • A final passage vote with no subject on this page
    3 May 1954passedJournal 1954, p. 377 ↗
  • Passed a $300 Public Works appropriation to maintain the Farmers' Market through June 30, 1954.
    17 May 1954passedJournal 1954 ↗
  • A $1,355,000 appropriation for firehouse construction and reconstruction was passed for second reading, with Public Works asking for a delay.
    16 Aug 1954passed first readingJournal 1954 ↗
  • $350,000 voted for traffic signals on Oak, Fell and Turk Streets
    27 Sep 1954outcome not readJournal 1954, p. 750 ↗
  • $1,975 voted to tear down the condemned 3125 Turk Street building
    27 Sep 1954referredJournal 1954, p. 755 ↗
  • $1,975 voted to tear down the condemned 3125 Turk Street building
    4 Oct 1954passedJournal 1954, p. 763 ↗
  • $3,300 voted for Water Department land to realign Portola Drive
    18 Oct 1954passed first readingJournal 1954, p. 791 ↗
  • $3,300 voted for Water Department land to realign Portola Drive
    25 Oct 1954passedJournal 1954 ↗
  • $4,000 voted to move hydrants on Twenty-fifth Street linked by the name only, not checked
    8 Nov 1954passedJournal 1954, p. 823 ↗
  • $500,000 voted to widen Market Street and Portola Drive linked by the name only, not checked
    15 Nov 1954passed first readingJournal 1954, p. 840 ↗
  • Supervisors passed on first reading $12.6M from the 1954 Sewer Bond Fund for sewage collection and disposal works.
    15 Nov 1954passed first readingJournal 1954, p. 840 ↗
  • Market Street and Portola Drive widening money put off again linked by the name only, not checked
    22 Nov 1954continuedJournal 1954, p. 857 ↗
  • Board passed on first reading $1,200 for Public Works maintenance and repair at Log Cabin Ranch School.
    3 Jan 1955passed first readingJournal 1955, p. 8 ↗
  • Passed final: $1,200 for Public Works maintenance and repair at Log Cabin Ranch School.
    10 Jan 1955passedJournal 1955, p. 20 ↗
  • Board finally passed an ordinance appropriating $600 to Public Works for temporary salaries.
    17 Jan 1955passedJournal 1955 ↗
  • $7,500 voted to move a sewer south of San Marcos Avenue
    21 Feb 1955passedJournal 1955, p. 116 ↗
  • The Board finally passed a $7,500 appropriation from the 1944 Sewer Bond Fund to relocate a sewer near San Marcos Avenue.
    28 Feb 1955passedJournal 1955 ↗
  • The Board passed on first reading $3,275,000 from the Exhibit Hall Bond Fund to build an exhibit hall.
    4 Apr 1955passed first readingJournal 1955, p. 217 ↗
  • A $6,880 emergency appropriation for fuel oil heating City Hall and other city buildings was referred to Finance Committee. linked by the name only, not checked
    18 Apr 1955referredJournal 1955, p. 244 ↗
  • $55,700 for new lanes and lights at Crescent and Alemany
    16 May 1955passedJournal 1955, p. 335 ↗
  • $202,000 for traffic signals
    16 May 1955passedJournal 1955, p. 333 ↗
  • $20,000 voted to extend the wall along Crisp Road
    16 May 1955passedJournal 1955, p. 333 ↗
  • $10,000 from the emergency reserve for Public Works sewage plant heat, light and power; finally passed.
    16 May 1955passedJournal 1955, p. 338 ↗
  • $2,560 from the emergency reserve for Public Works sewer repair truck hire and overtime; finally passed.
    16 May 1955passedJournal 1955, p. 338 ↗
  • Board finally passed $35,000 from Public Works to complete fire roads at San Francisco Hospital.
    13 Jun 1955passedJournal 1955, p. 385 ↗
  • The Board passed on second reading $12,000 from the 1944 Sewer Bond Fund to repair the Lake Merced sewer trestle.
    27 Jun 1955passed first readingJournal 1955, p. 420 ↗
  • Appropriation of $12,000 from the 1944 Sewer Bond Fund for repair of the Lake Merced sewer trestle awaits final passage.
    5 Jul 1955outcome not readJournal 1955, p. 429 ↗
  • Board finally passed an ordinance appropriating $9,231 to create and abolish Public Works clerical and accounting positions. linked by the name only, not checked
    6 Sep 1955passedJournal 1955 ↗
  • $2,800 voted for an outlet sewer on LaGrande Avenue
    12 Sep 1955passed first readingJournal 1955, p. 654 ↗
  • $300,000 voted to widen Webster Street between Eddy and Golden Gate
    12 Sep 1955passed first readingJournal 1955, p. 654 ↗
  • $2,800 voted for an outlet sewer on LaGrande Avenue
    19 Sep 1955passedJournal 1955 ↗
  • $300,000 voted to widen Webster Street between Eddy and Golden Gate
    19 Sep 1955passedJournal 1955 ↗
  • Passed for second reading a $1,000 appropriation from Public Works for traffic signs warning of runaway parked vehicles on hills.
    3 Jan 1956passed first readingJournal 1956, p. 3 ↗
  • Finally passed a $1,590 appropriation from Public Works for toilet facilities in a Superior Court judge's chambers.
    3 Jan 1956passedJournal 1956, p. 3 ↗
  • Emergency funds for correcting unsafe conditions at 150 Otis Street were cut to $14,215 and finally passed as amended.
    20 Feb 1956passedJournal 1956, p. 103 ↗
  • Board finally passed $1,704,000 for widening and realigning Market Street from Hattie Street to Portola Drive, over Dobbs's no vote.
    9 Apr 1956passedJournal 1956, p. 199 ↗
  • Consideration continued one week, with no subject on this page linked by the name only, not checked
    20 Aug 1956continuedJournal 1956, p. 510 ↗
  • Consideration of a $3,010 emergency appropriation for an electrician at the Civic Auditorium was continued one week.
    20 Aug 1956continuedJournal 1956, p. 510 ↗
  • Consideration continued one week, with no subject on this page linked by the name only, not checked
    27 Aug 1956continuedJournal 1956, p. 521 ↗
  • Real Estate Department's $3,010 appropriation for an electrician at Civic Auditorium was continued one week.
    27 Aug 1956continuedJournal 1956, p. 521 ↗
  • Public Works' $500 request for temporary salaries at sewage pumping stations was referred to the Finance Committee. linked by the name only, not checked
    22 Oct 1956referredJournal 1956, p. 627 ↗
  • The Board finally passed $7,700 from the 1944 Sewer Bond Fund to finish the Lake Merced sewer trestle work.
    22 Oct 1956passedJournal 1956 ↗
  • Passed for second reading, with no subject on this page
    31 Dec 1956passed first readingJournal 1956, p. 742 ↗
  • Passed for second reading, with no subject on this page
    31 Dec 1956passed first readingJournal 1956, p. 742 ↗
  • Money for Western Freeway studies
    8 Apr 1957passedJournal 1957 ↗
  • $1,300 from a street bond fund approved to remove steel arches at Twenty-fifth and Mission Streets.
    8 Apr 1957passedJournal 1957, p. 208 ↗
  • Ordinance passed appropriating $202,247 for Public Works construction of Phase I of the Purchaser's Consolidated Shops.
    15 Apr 1957passedJournal 1957, p. 228 ↗
  • Public Works would receive $13,572 to convert Exhibit Hall's north wall into a future garage wall; passed for second reading.
    29 Apr 1957passed first readingJournal 1957, p. 257 ↗
  • $45,000 for Western Freeway studies passed for second reading linked by the name only, not checked
    29 Apr 1957passed first readingJournal 1957, p. 257 ↗
  • Board passed an ordinance appropriating $2,200 for alterations to Polk Hall in the Civic Auditorium.
    6 May 1957passedJournal 1957, p. 269 ↗
  • Board passed an ordinance appropriating $976 for equipment at the Yosemite Pumping Station.
    6 May 1957passedJournal 1957, p. 269 ↗
  • Board passed on first reading a $5,600 appropriation for fluorescent lighting in the Controller's payroll office.
    3 Jun 1957passed first readingJournal 1957, p. 393 ↗
  • Board finally passed a $5,600 appropriation for fluorescent lighting in the Controller's Payroll Division.
    10 Jun 1957passedJournal 1957, p. 403 ↗
  • Ordinance appropriating $30,000 for a temporary parking lot near the new Hall of Justice site passed for second reading.
    24 Jun 1957passed first readingJournal 1957, p. 432 ↗
  • $5,000 for sidewalks along the [name withheld] passes second reading
    22 Jul 1957passed first readingJournal 1957, p. 500 ↗
  • Emergency $5,500 appropriation for demolishing the McCreery Branch Library was referred to the Finance Committee.
    14 Oct 1957referredJournal 1957, p. 706 ↗
  • Two thousand dollars from the 1944 Sewer Bond Fund was appropriated to build a sewer on Bernal Heights Access Road.
    4 Nov 1957passedJournal 1957 ↗
  • $122,400 approved for eight street lighting projects
    12 Nov 1957passedJournal 1957, p. 752 ↗
  • Proposed $12,700 emergency appropriation for Public Works sewage and waste treatment plants, referred to Finance Committee.
    17 Mar 1958referredJournal 1958, p. 151 ↗
  • Supervisors passed on first reading a $3,215 appropriation for treating sewage from the [name withheld].
    31 Mar 1958passed first readingJournal 1958, p. 189 ↗
  • $4,905 for repairs to movable bridges passes second reading
    31 Mar 1958passed first readingJournal 1958, p. 189 ↗
  • Public Works is given $12,400 from the Special Road Improvement Fund for city aid on street projects; passed for second reading.
    19 May 1958passed first readingJournal 1958, p. 332 ↗
  • Board finally passed a $10,000 ordinance for lighting and air conditioning the police radio room at the Hall of Justice.
    26 May 1958passedJournal 1958, p. 354 ↗
  • Supervisors finally passed a $1,800 emergency appropriation to Public Works for light, heat and power.
    2 Jun 1958passedJournal 1958, p. 368 ↗
  • Ordinance appropriating $138,840 from the 1954 Hospital Bond Fund for two fire towers at San Francisco Hospital passed second reading.
    30 Jun 1958passed first readingJournal 1958, p. 421 ↗
  • Fire cistern to be installed in Hamilton Square Playground
    7 Jul 1958passedJournal 1958, p. 438 ↗
  • Passed: Public Works may run a temporary right of way across Hamilton Square Playground during the Geary Street underpass work.
    7 Jul 1958passedJournal 1958, p. 439 ↗
  • Public Works' $3,845 emergency request for temporary salaries was put off one week for lack of members.
    6 Oct 1958continuedJournal 1958, p. 659 ↗
  • $26,000 for resurfacing streets passes second reading
    6 Oct 1958passed first readingJournal 1958, p. 659 ↗
  • $15,815,700 from the 1956 Hall of Justice Bond Fund was proposed for construction of the Hall of Justice; passed for second reading.
    20 Oct 1958passed first readingJournal 1958, p. 686 ↗
  • Public Works seeks $3,700 more from the emergency reserve for Hall of Justice air conditioning and electrical work; vote pending.
    10 Nov 1958outcome not readJournal 1958, p. 723 ↗
  • $3,915 for street repair [name withheld] passes second reading
    1 Dec 1958passedJournal 1958, p. 768 ↗
  • The Board passed on first reading $173,500 to build a maximum security cottage at the Youth Guidance Center.
    26 Jan 1959passed first readingJournal 1959 ↗
  • $9,150 voted to rebuild the stairway at the Stockton Street Tunnel linked by the name only, not checked
    9 Feb 1959passed first readingJournal 1959, p. 73 ↗
  • Public Works appropriation of $9,150 to modify the east stairway at the Stockton Street Tunnel's south portal was finally passed.
    16 Feb 1959passedJournal 1959, p. 87 ↗
  • Public Works gets $22,430 from the Special Road Improvement Fund to pay power for traffic signals.
    9 Mar 1959passed first readingJournal 1959, p. 131 ↗
  • Public Works gets $7,500 to alter the payroll division of the Controller's Office.
    9 Mar 1959passed first readingJournal 1959, p. 131 ↗
  • Public Works gets $7,500 for alterations to the Controller's payroll division, passed on final reading.
    16 Mar 1959passedJournal 1959, p. 148 ↗
  • $22,430 for power to run traffic signals approved
    16 Mar 1959passedJournal 1959, p. 147 ↗
  • Board passed first reading of $3,000 to maintain houses on land bought for the Southern and Crosstown Freeways.
    11 May 1959passed first readingJournal 1959, p. 268 ↗
  • $300,000 voted to buy property for the Webster Street widening
    11 May 1959passed first readingJournal 1959, p. 268 ↗
  • $433,250 voted to build the Civic Center Plaza
    11 May 1959passed first readingJournal 1959, p. 267 ↗
  • $433,250 for building the Civic Center Plaza put off
    18 May 1959passedJournal 1959, p. 328 ↗
  • Supervisors finally passed $840 to create an assistant superintendent post in the Bureau of Building Inspection.
    25 May 1959passedJournal 1959, p. 350 ↗
  • $5,000 voted for a stairway on Glendale Street
    8 Jun 1959passed first readingJournal 1959, p. 386 ↗
  • $5,000 voted for a stairway on Glendale Street
    15 Jun 1959passedJournal 1959, p. 398 ↗
  • $100,000 for voting machine storage sent to the Finance Committee
    27 Jul 1959referredJournal 1959, p. 503 ↗
  • Downtown Market Street Improvement Association gives $6,500 for a traffic island linked by the name only, not checked
    27 Jul 1959passed first readingJournal 1959, p. 503 ↗
  • A $2,800 emergency appropriation to relocate Bureau of Building Inspection services was referred to the Finance Committee.
    27 Jul 1959referredJournal 1959, p. 503 ↗
  • $15,000 voted to enlarge the Market Street traffic island linked by the name only, not checked
    3 Nov 1959passedJournal 1959, p. 508 ↗
  • Public Works' $1,458 emergency appropriation for materials and supplies was referred to Finance Committee.
    28 Dec 1959referredJournal 1959, p. 757 ↗
  • $6,400 for sewage plant equipment repairs approved
    11 Apr 1960passedJournal 1960, p. 210 ↗
  • $7,700 Candlestick Park repair money put off a week.
    16 May 1960pendingJournal 1960 ↗
  • A second reading vote with no subject on this page linked by the name only, not checked
    13 Jun 1960passed first readingJournal 1960, p. 372 ↗
  • A final passage vote with no subject on this page linked by the name only, not checked
    20 Jun 1960passedJournal 1960, p. 381 ↗
  • $32,000 to widen Harriet Street and build a Clarendon Avenue overpass
    26 Sep 1960passedJournal 1960 ↗
  • Public Works emergency appropriation of $2,500 to demolish non-complying houseboats was referred to Finance Committee. linked by the name only, not checked
    17 Oct 1960referredJournal 1960, p. 601 ↗
  • Public Works proposed $2,500 to demolish non-complying houseboats on Hudson Avenue; the Board refused passage, then postponed the measure.
    12 Dec 1960continuedJournal 1960, p. 685 ↗
  • $2,500 voted again to tear down the Hudson Avenue houseboats
    12 Dec 1960outcome not readJournal 1960, p. 694 ↗
  • New explosives rules, permit fees and insurance proposed.
    12 Jun 1961pendingJournal 1961, p. 306 ↗
  • Lawsuit settlement with [name withheld], $350, awaits final vote.
    22 Jan 1962pendingJournal 1962, p. 44 ↗
  • More time asked to start the Drumm Street pumping station
    10 Dec 1962passed first readingJournal 1962, p. 614 ↗
  • [name withheld] to run children's rides in Golden Gate Park
    2 Jan 1963refusedJournal 1963 ↗
  • $100,500 for extra automatic sprinkler work sent to committee.
    2 Mar 1964pendingJournal 1964, p. 149 ↗
  • Final approval of money for temporary staff and a waste survey
    6 Apr 1964passedJournal 1964 ↗
  • Cable TV company granted right to run lines on city streets
    13 Apr 1964passedJournal 1964, p. 247 ↗
  • $75,000 set aside for the Market Street design project
    21 Dec 1964passed first readingJournal 1964 ↗
  • Money for many city departments; final vote not shown.
    28 Dec 1964outcome not readJournal 1965 ↗
  • $34,000 for city hiring and medical-exam room approved
    3 May 1965passedJournal 1965, p. 229 ↗
  • City gets bank land free for Clement and Eighth parking linked by the name only, not checked
    19 Jul 1965passedJournal 1965, p. 418 ↗
  • City departments get $28,240 for equipment and improvements linked by the name only, not checked
    26 Jul 1965passedJournal 1965, p. 428 ↗
  • $100,000 Golden Gate Freeway study sent back to committee
    25 Oct 1965pendingJournal 1965, p. 642 ↗
  • City pays [name withheld] $24,000 to widen Bosworth Street
    8 Nov 1965passedJournal 1965 ↗
  • Proposed $8,990 appropriation for Public Works to resurface the Civic Center Auto Park parking lot; passed first reading.
    23 May 1966passed first readingJournal 1966, p. 391 ↗
  • Replacement welfare checks for lost ones passed first reading.
    18 Jul 1966pendingJournal 1966, p. 512 ↗
  • $68,800 for extra courtroom at City Hall; sent to committee.
    8 Aug 1966pendingJournal 1966, p. 565 ↗
  • Phone system expansion turned down, then later approved
    6 Sep 1966passedJournal 1966, p. 751 ↗
  • $1,875 voted for equipment for the Market Street Design Project
    12 Sep 1966outcome not readJournal 1966 ↗
  • $33,700 for stairway railing, airport nursery, judges' costs awaits final vote.
    3 Oct 1966pendingJournal 1966, p. 805 ↗
  • $33,700 for stairway railing, judges' costs approved
    10 Oct 1966passedJournal 1966, p. 822 ↗
  • Passed final: $2,636,800 appropriated to several departments for a heliport, street land purchases, War Memorial renovation and salaries. linked by the name only, not checked
    9 Jan 1967passedJournal 1967, p. 19 ↗
  • Consideration of a $57,000 appropriation for architectural embellishment of Forest Knolls stairways was continued to February 27, 1967.
    20 Feb 1967continuedJournal 1967, p. 129 ↗
  • Money for decorative work on Forest Knolls stairways approved
    6 Mar 1967passedJournal 1967, p. 155 ↗
  • Proposed ordinance appropriates $540,900 to Juvenile Court and Public Works, rescinds $452,800, passed for second reading.
    24 Apr 1967passed first readingJournal 1967, p. 268 ↗
  • Ordinance appropriating $540,900 for Juvenile Court and Public Works passed on first reading, with a $452,800 rescission. linked by the name only, not checked
    24 Apr 1967passed first readingJournal 1967, p. 267 ↗
  • Part of Arguello Boulevard closed for good to widen Carl Street linked by the name only, not checked
    1 May 1967passedJournal 1967 ↗
  • $314,000 for city hospital equipment and repairs linked by the name only, not checked
    12 Jun 1967passedJournal 1967 ↗
  • Money for interview rooms at Youth Guidance Center sent to committee.
    19 Jun 1967pendingJournal 1967, p. 432 ↗
  • $101,800 for Fifth Street extension land and Engine Company firehouses.
    12 Sep 1967outcome not readJournal 1967 ↗
  • Public Works would receive $268,200 for various improvements at the Hall of Justice, pending final passage.
    18 Sep 1967outcome not readJournal 1967, p. 750 ↗
  • An adoption vote on one lot in Block 351.
    9 Oct 1967passed first readingJournal 1967, p. 811 ↗
  • $25,300 for city lawsuit costs and overtime; final vote pending.
    27 Nov 1967pendingJournal 1967, p. 911 ↗
  • Proposed appropriation of $91,644.75 across several city departments for equipment, salaries and services; vote not shown here. linked by the name only, not checked
    26 Dec 1967outcome not readJournal 1967, p. 981 ↗
  • City liability insurance rules still need final vote.
    15 Jan 1968pendingJournal 1968, p. 39 ↗
  • Proposed $37,500 payment to settle lawsuit with M & K Corporation. linked by the name only, not checked
    5 Feb 1968pendingJournal 1968, p. 83 ↗
  • $25,000 for Charter Revision Committee work; awaiting final vote.
    6 May 1968pendingJournal 1968, p. 357 ↗
  • 1968-69 city pay changes put off to July
    24 Jun 1968pendingJournal 1968, p. 532 ↗
  • Islais Creek sewer outfall money cut to $188,000 proposed.
    4 Nov 1968pendingJournal 1968, p. 862 ↗
  • Traffic signals approved for Jefferson and Taylor Streets
    12 May 1969passedJournal 1969 ↗
  • Ordinance proposing $22,000 to appraise and lease Alcatraz Island was referred to Finance Committee.
    22 Jul 1969referredJournal 1969, p. 644 ↗
  • Surplus Property Authority receives $22,000 to appraise and propose leasing Alcatraz Island; Health Center No. 4 equipment funds rescinded.
    4 Aug 1969passedJournal 1969 ↗
  • Changes to city salary rules for 1969-70 approved linked by the name only, not checked
    27 Oct 1969passedJournal 1969, p. 885 ↗
  • $200,000 added to Port's working fund; final approval
    1 Dec 1969passedJournal 1969 ↗
  • Lyon Street sewage plant permit approved, 9 to 2
    1 Dec 1969passedJournal 1969, p. 969 ↗
  • Protective screens for Jail No. 2 windows move toward final vote.
    4 May 1970pendingJournal 1970, p. 348 ↗
  • Lake Merced boat rental lease moves toward final vote. linked by the name only, not checked
    11 May 1970pendingJournal 1970, p. 363 ↗
  • Funds for tax office work, a school water line and claims approved
    29 Jun 1970passedJournal 1970, p. 536 ↗
  • Business tax rates raised, effective September 1, 1970. linked by the name only, not checked
    24 Aug 1970passed first readingJournal 1970, p. 689 ↗
  • Deadline extended for Legion of Honor outdoor lighting contract
    13 Oct 1970passedJournal 1970, p. 834 ↗
  • Supervisors' staff pay schedule changed; proposed. linked by the name only, not checked
    25 Jan 1971pendingJournal 1971, p. 48 ↗
  • A $2.8M appropriation for various city departments' operations and capital improvements is proposed; the vote continues on the next page. linked by the name only, not checked
    7 Jun 1971outcome not readJournal 1971, p. 423 ↗
  • $37,500 paid to Corwin Development for a Seward Street minipark
    14 Jun 1971passedJournal 1971, p. 434 ↗
  • Proposed $280,902 appropriation for various city departments, including $8,000 protective work at Mission Police Station. linked by the name only, not checked
    21 Jun 1971outcome not readJournal 1971, p. 453 ↗
  • $11,500 moved from Public Works capital work to court security linked by the name only, not checked
    28 Jun 1971passedJournal 1971, p. 478 ↗
  • Plan to spend $51,664 on police dogs, a community center, court repairs.
    4 Oct 1971pendingJournal 1971, p. 710 ↗
  • Spending of $51,664 for various departments' operations and capital work approved
    12 Oct 1971passedJournal 1971 ↗
  • Public Works money voted for a retaining wall on Elsie Street
    31 Jan 1972outcome not readJournal 1972, p. 78 ↗
  • $1.15 million street work money: first vote passed.
    28 Feb 1972pendingJournal 1972, p. 157 ↗
  • Money for Marina harbor insurance and water fees approved
    6 Mar 1972passedJournal 1972, p. 171 ↗
  • Police and other department budget changes: first vote only.
    3 Apr 1972pendingJournal 1972, p. 268 ↗
  • Fairfax Avenue between Phelps and Quint Streets ordered closed linked by the name only, not checked
    3 Apr 1972passedJournal 1972 ↗
  • Tax Collector's office rebuilt; court funds approved
    17 Apr 1972passedJournal 1972, p. 314 ↗
  • $7,600 for budget printing and $630 traffic fuel proposed.
    5 Jun 1972outcome not readJournal 1972, p. 478 ↗
  • $7,600 for budget printing and $630 traffic fuel proposed.
    12 Jun 1972outcome not readJournal 1972, p. 491 ↗
  • City plans to sell surplus public works lot for $850.
    3 Jul 1972pendingJournal 1972, p. 574 ↗
  • Board sets aside $2.7M to move the Howard Street sewer linked by the name only, not checked
    3 Jul 1972outcome not readJournal 1972, p. 576 ↗
  • $51,000 for city tourism promotion proposed
    17 Jul 1972outcome not readJournal 1972, p. 609 ↗
  • Decision not shown in this record linked by the name only, not checked
    24 Jul 1972outcome not readJournal 1972, p. 637 ↗
  • $284,000 moved from street lights to street and curb work
    11 Sep 1972pendingJournal 1972, p. 807 ↗
  • Gilman Playground upgrade money moves toward final approval.
    24 Oct 1972pendingJournal 1972, p. 956 ↗
  • Proposal: $20,000 for Gilman Playground, moved from Bayview centre plan. linked by the name only, not checked
    6 Nov 1972outcome not readJournal 1972 ↗
  • About $2 million for airport and street work moves forward.
    20 Nov 1972pendingJournal 1972, p. 1009 ↗
  • Board shifts $215,000 from the Geary underpass to St. Francis Circle
    27 Nov 1972passedJournal 1972, p. 1026 ↗
  • $2.06 million for capital works; some street funds shifted
    27 Nov 1972passedJournal 1972, p. 1021 ↗
  • About $2.36 million for Airport work moves forward, not yet final.
    11 Dec 1972pendingJournal 1972, p. 1059 ↗
  • Job reclassifications for 203 city jobs, not yet final.
    11 Dec 1972pendingJournal 1972, p. 1060 ↗
  • Board votes $1.4M for airport plans and Highland Avenue bridge repairs linked by the name only, not checked
    26 Dec 1972passed first readingJournal 1972, p. 1094 ↗
  • Disability program funds of $20,000 proposed.
    2 Jan 1973pendingJournal 1973, p. 15 ↗
  • Police cars bought and traffic signal repairs funded
    20 Feb 1973passedJournal 1973, p. 131 ↗
  • Small Public Works funds for copying and car use postponed to March 19. linked by the name only, not checked
    12 Mar 1973pendingJournal 1973, p. 226 ↗
  • Public Works gets $2,000 for copying and $1,500 for staff car use linked by the name only, not checked
    19 Mar 1973passedJournal 1973, p. 239 ↗
  • Subject only here; outcome not shown in this entry. linked by the name only, not checked
    23 Apr 1973outcome not readJournal 1973, p. 381 ↗
  • Board passed on second reading, as amended, an ordinance appropriating $23,000 for street lighting upkeep and $6,360 for Recreation and Park pay. linked by the name only, not checked
    23 Apr 1973passed first readingJournal 1973, p. 381 ↗
  • Emergency $60,000 for security measures at Youth Guidance Center proposed.
    23 Apr 1973outcome not readJournal 1973, p. 378 ↗
  • Money for water pollution control and police dog program proposed.
    30 Apr 1973outcome not readJournal 1973, p. 407 ↗
  • Money for park pay and street light repairs proposed.
    30 Apr 1973outcome not readJournal 1973, p. 407 ↗
  • $5,567,000 sought for airport improvements and money for other departments linked by the name only, not checked
    7 May 1973outcome not readJournal 1973, p. 424 ↗
  • Gas tax and road money for city Summer Youth Program approved linked by the name only, not checked
    14 May 1973passedJournal 1973, p. 444 ↗
  • Money for several day care programs; outcome not shown in record.
    4 Jun 1973outcome not readJournal 1973, p. 529 ↗
  • Revenue-sharing $1.7 million for arts, fire, opera house
    18 Jun 1973pendingJournal 1973, p. 568 ↗
  • Revenue-sharing $1.7 million for arts, fire, opera house
    18 Jun 1973pendingJournal 1973, p. 577 ↗
  • Proposed: fire inspection hires cut to one lieutenant
    18 Jun 1973pendingJournal 1973, p. 578 ↗
  • City departments get $140,330 for operations and equipment
    18 Jun 1973passedJournal 1973, p. 565 ↗
  • Proposes $1.7 million for arts, fire gear, opera house and War Memorial.
    25 Jun 1973outcome not readJournal 1973, p. 601 ↗
  • $464,000 for sewage plant and pumping station upgrades proposed.
    2 Jul 1973outcome not readJournal 1973, p. 623 ↗
  • Money to rebuild and upgrade sewage plants and pump stations approved linked by the name only, not checked
    27 Aug 1973passedJournal 1973, p. 830 ↗
  • $129,300 voted for relocation aid on the Washington Street widening
    4 Sep 1973outcome not readJournal 1973, p. 857 ↗
  • $129,300 voted for relocation aid on the Washington Street widening linked by the name only, not checked
    11 Sep 1973passedJournal 1973, p. 875 ↗
  • Would spend $8,039 on emergency repairs to Marina pumping station. linked by the name only, not checked
    11 Sep 1973outcome not readJournal 1973, p. 881 ↗
  • $129,300 voted for relocation aid on the Washington Street widening linked by the name only, not checked
    11 Sep 1973passedJournal 1973, p. 875 ↗
  • Would accept $6,000 gift for engineering checks at Palace of [name withheld].
    11 Sep 1973outcome not readJournal 1973, p. 877 ↗
  • Gift of $6,000 for engineering checks on Palace of [name withheld] work.
    11 Sep 1973outcome not readJournal 1973, p. 877 ↗
  • $32,022 for elderly self-help program sent to committee.
    17 Sep 1973pendingJournal 1973, p. 914 ↗
  • $48,900 voted for bicycle paths around Lake Merced
    24 Sep 1973passedJournal 1973, p. 924 ↗
  • Proposal of $8,039 emergency sewer repair at Marina pumping station. linked by the name only, not checked
    24 Sep 1973outcome not readJournal 1973, p. 929 ↗
  • Public Works program money change; the record shows no vote. linked by the name only, not checked
    15 Oct 1973outcome not readJournal 1973, p. 1004 ↗
  • $4,500,900 sought for public works capital improvement projects
    15 Oct 1973passedJournal 1973, p. 1001 ↗
  • Plan to spend on emergency sewer and City Hall elevator repairs. linked by the name only, not checked
    3 Dec 1973outcome not readJournal 1973, p. 1163 ↗
  • Emergency sewer repairs, City Hall elevator rebuild, and office move funded linked by the name only, not checked
    10 Dec 1973passedJournal 1973, p. 1177 ↗
  • Emergency sewer repairs, City Hall elevator rebuild, and office move funded. linked by the name only, not checked
    10 Dec 1973passedJournal 1973, p. 1179 ↗
  • Street-cleaning parking signs plan sent back to committee.
    14 Jan 1974pendingJournal 1974, p. 48 ↗
  • Board votes $154,300 to repair the Third Street Bridge at Channel
    21 Jan 1974passed first readingJournal 1974, p. 86 ↗
  • Hod carriers' pay rate set, retroactive to July 1973
    4 Feb 1974passedJournal 1974, p. 119 ↗
  • Proposed money for police building studies and other offices. linked by the name only, not checked
    4 Feb 1974outcome not readJournal 1974, p. 124 ↗
  • Police building seismic studies money sent to committee.
    11 Feb 1974pendingJournal 1974 ↗
  • Several department budget changes await final vote. linked by the name only, not checked
    11 Feb 1974pendingJournal 1974 ↗
  • Earthquake checks for Hall of Justice move to next vote.
    11 Mar 1974pendingJournal 1974, p. 295 ↗
  • Money for noise monitoring work; decision in next entry.
    25 Mar 1974outcome not readJournal 1974, p. 357 ↗
  • Noise monitoring work for $25,000 still awaiting final vote.
    15 Apr 1974pendingJournal 1974, p. 430 ↗
  • $25,000 for city noise monitoring considered. linked by the name only, not checked
    22 Apr 1974outcome not readJournal 1974, p. 463 ↗
  • Board finally passed a $667,047 appropriation for Public Works' [name withheld] as an emergency measure. linked by the name only, not checked
    29 Apr 1974passedJournal 1974, p. 494 ↗
  • Consideration of a $23,022 appropriation for various departments was continued, as an emergency measure.
    28 May 1974continuedJournal 1974, p. 595 ↗
  • Charges adopted for burying electric service lines on Monterey Boulevard
    22 Jul 1974outcome not readJournal 1974, p. 781 ↗
  • Proposed $200,000 for 2,000 police bullet-resistant vests.
    28 Oct 1974outcome not readJournal 1974, p. 1153 ↗
  • Mayor's office asked to run year-round part-time youth jobs
    18 Nov 1974passedJournal 1974, p. 1234 ↗
  • Money for several departments' operations and equipment proposed.
    19 May 1975outcome not readJournal 1975, p. 508 ↗
  • Public Works gets $49,200 to operate; final vote still needed. linked by the name only, not checked
    16 Jun 1975pendingJournal 1975, p. 646 ↗
  • $70,000 for Haight-Ashbury Free Clinic still needs final vote. linked by the name only, not checked
    23 Jun 1975pendingJournal 1975, p. 678 ↗
  • Public Works gets $49,200 more for day-to-day operations
    23 Jun 1975passedJournal 1975, p. 669 ↗
  • Only the next item's title appears here; no vote
    30 Jun 1975outcome not readJournal 1975, p. 711 ↗
  • Resolution accepting a gift from Standard Oil Company; the outcome continues on the next page.
    30 Jun 1975outcome not readJournal 1975, p. 717 ↗
  • Clinic funding of $70,000 still under debate. linked by the name only, not checked
    14 Jul 1975pendingJournal 1975, p. 763 ↗
  • Clinic and Public Works money put off, then split up. linked by the name only, not checked
    14 Jul 1975pendingJournal 1975, p. 762 ↗
  • Group gives city 100 sidewalk litter bins worth $10,000
    8 Sep 1975passedJournal 1975, p. 992 ↗
  • Proposed: two city jobs get new titles and pay.
    29 Sep 1975pendingJournal 1975, p. 1111 ↗
  • Job title and pay changes at Public Works and Health proposed.
    6 Oct 1975outcome not readJournal 1975, p. 1130 ↗
  • $4,132 for slide-area road upkeep shifted; vote not shown here.
    14 Oct 1975outcome not readJournal 1975, p. 1150 ↗
  • $93,500 voted to buy trees for Market Street linked by the name only, not checked
    17 Nov 1975passedJournal 1975, p. 1238 ↗
  • $7,493 shifted between departments for job program proposed.
    22 Dec 1975pendingJournal 1975, p. 1339 ↗
  • $7,493 shifted between departments as local match for jobs program.
    29 Dec 1975outcome not readJournal 1975, p. 1358 ↗
  • Road fund money for repairs to city structures sent to committee. linked by the name only, not checked
    1 Jun 1976pendingJournal 1976, p. 518 ↗
  • Southeast sewage plant work money sent to committee
    14 Jun 1976pendingJournal 1976, p. 578 ↗
  • $1.2 million for Southeast sewage plant engineering approved linked by the name only, not checked
    21 Jun 1976passedJournal 1976, p. 624 ↗
  • $13,023 shifted between public works building projects; result not shown. linked by the name only, not checked
    12 Oct 1976outcome not readJournal 1976, p. 1122 ↗
  • Four lots on Rotteck and Bosworth Streets sold to high bidders
    15 Nov 1976passedJournal 1976, p. 1230 ↗
  • $82,000 moved from the Haight Street Theater to street improvements
    20 Dec 1976passed first readingJournal 1976, p. 1351 ↗
  • $82,000 proposed to move from Haight Street Theater to street work
    17 Jan 1977vetoedJournal 1977, p. 43 ↗
  • $82,000 moved from the Haight Street Theater to street improvements
    28 Feb 1977passed first readingJournal 1977, p. 175 ↗
  • $82,000 moved from the Haight Street Theater to street improvements
    7 Mar 1977passedJournal 1977, p. 191 ↗
  • $3,385 moved within Public Works office salaries; passed first reading. linked by the name only, not checked
    11 Apr 1977pendingJournal 1977, p. 309 ↗
  • Public Works pay budget shift of $3,385; outcome not shown. linked by the name only, not checked
    18 Apr 1977outcome not readJournal 1977 ↗
  • $850 for planting crew equipment; the record does not show the result.
    23 May 1977outcome not readJournal 1977, p. 459 ↗
  • Street cleaning crews' overtime money proposed; not yet decided.
    23 May 1977pendingJournal 1977, p. 459 ↗
  • $78,000 for water-saving cooling at City Hall computer center linked by the name only, not checked
    31 May 1977passedJournal 1977, p. 481 ↗
  • Proposed: $5.4 million for improvements at Richmond-Sunset sewage plant.
    31 May 1977pendingJournal 1977, p. 487 ↗
  • Moves $200,000 for Public Works audit, sent to committee.
  • Westside sewer transport design gets $2.825 million in grants
    3 Jan 1978passedJournal 1978, p. 9 ↗
  • Street light structures get $75,000 for repairs linked by the name only, not checked
    3 Jan 1978passedJournal 1978, p. 9 ↗
  • $20,000 voted to rebuild the Vallejo Street steps and slope
    30 Jan 1978referredJournal 1978, p. 135 ↗
  • Proposed: County Clerk's office reclassifies five jobs; pay change.
    27 Feb 1978pendingJournal 1978, p. 223 ↗
  • Street repair pay money shifted from permanent to temporary jobs; not final. linked by the name only, not checked
    27 Feb 1978pendingJournal 1978, p. 223 ↗
  • $200,000 Public Works audit money cleared first vote.
    13 Mar 1978pendingJournal 1978, p. 285 ↗
  • Overtime and [name withheld] for public works crafts workers proposed.
    27 Mar 1978outcome not readJournal 1978, p. 366 ↗
  • $3,000 mail survey of Area A parking zone residents moves forward
    5 Jun 1978pendingJournal 1978, p. 692 ↗
  • Money for three new Public Works jobs headed for a later vote. linked by the name only, not checked
    11 Dec 1978pendingJournal 1978, p. 1453 ↗
  • $70,000 audit of Controller's books moves to final vote. linked by the name only, not checked
    2 Jan 1979pendingJournal 1979, p. 10 ↗
  • $1.8 million for wastewater program overhead costs; sent to committee.
    12 Jun 1979pendingJournal 1979, p. 712 ↗
  • Bayside sewer plant planning money sent to committee. linked by the name only, not checked
    18 Jun 1979pendingJournal 1979, p. 748 ↗
  • Public Works building-repair job restored; first vote only.
    30 Jul 1979pendingJournal 1979, p. 915 ↗
  • Bayside sewer planning money moves toward final approval. linked by the name only, not checked
    6 Aug 1979pendingJournal 1979, p. 963 ↗
  • Sanchez Street returns to two-way traffic between Liberty and 20th Streets
    13 Aug 1979passedJournal 1979, p. 989 ↗
  • Public Works gets $13,000 for communication equipment linked by the name only, not checked
    10 Dec 1979passedJournal 1979, p. 1424 ↗
  • $22,678 for city facilities upkeep still awaiting final vote. linked by the name only, not checked
    25 Feb 1980pendingJournal 1980, p. 192 ↗
  • Public Works appropriation of $23,700 for street cleaning and scavenger service passed for second reading.
    27 Oct 1980passed first readingJournal 1980, p. 1141 ↗
  • Public Works Engineering Division received a $25,000 appropriation for capital projects; finally passed. linked by the name only, not checked
  • Public Works appropriation of $89,595 for street cleaning and planting passed for second reading. linked by the name only, not checked
    24 Nov 1980passed first readingJournal 1980, p. 1220 ↗
  • Ordinance appropriating $5,400,000 for the Clean Water Program passed for second reading.
    5 Jan 1981passed first readingJournal 1981, p. 11 ↗
  • Ordinance appropriating $22,438,000 for the Clean Water Program is proposed; its outcome continues on the next page.
    5 Jan 1981outcome not readJournal 1981, p. 11 ↗
  • Clean Water Program appropriation of $88,550 for Public Works continued to January 19, 1981.
    12 Jan 1981continuedJournal 1981, p. 33 ↗
  • Clean Water Program appropriation of $5.4M for Public Works continued to January 19, 1981 after Finance Committee discussion.
    12 Jan 1981continuedJournal 1981, p. 33 ↗
  • Board finally passed an $88,550 appropriation to Public Works for the Clean Water Program capital budget.
    26 Jan 1981passedJournal 1981, p. 67 ↗
  • Capital budget of $192.4M for Southwest Ocean Outfall sewer construction under the Clean Water Program is finally passed.
    13 Apr 1981passedJournal 1981, p. 345 ↗
  • Public Works' Clean Water Program received a transfer of $2,940 in its capital projects budget, passed as final.
    20 Apr 1981passedJournal 1981, p. 367 ↗
  • Ordinance finally passed appropriating $42,470 for Public Works street cleaning and planting contracts.
    27 Jul 1981passedJournal 1981 ↗
  • Ordinance appropriating $29,066 for Public Works Building Inspection salaries and equipment passed for second reading.
    23 Feb 1982passed first readingJournal 1982 ↗
  • Federal court case linked by the name only, not checked
    21 Jun 1982passedJournal 1982 ↗
  • Approves $77,829 for Public Health venereal disease control, paid to Public Works, offset by cutting permanent salaries.
    28 Jun 1982passedJournal 1982 ↗
  • A proposed $11,109 appropriation for Public Works sewer replacement under the Clean Water Program was introduced, with its vote on the next page. linked by the name only, not checked
    20 Sep 1982outcome not readJournal 1982 ↗
  • Public Works received $11,109 to replace a sewer under the Clean Water Program; the ordinance was finally passed.
    27 Sep 1982passedJournal 1982 ↗
  • Public Works received $571,100 for sewer reconstruction and replacement under the Clean Water Program; the ordinance was finally passed. linked by the name only, not checked
    27 Sep 1982passedJournal 1982 ↗
  • Public Works appropriation of $17,520 for machinery under the Street Cleaning Sign Program passed for second reading. linked by the name only, not checked
    6 Dec 1982passed first readingJournal 1982 ↗
  • Controller's $390,000 appropriation for Public Works engineering and street cleaning passed for second reading.
    20 Dec 1982passed first readingJournal 1982 ↗
  • An ordinance appropriating $115,000 for a Public Works facilities maintenance project passed for second reading.
    22 Feb 1983passed first readingJournal 1983 ↗
  • $2,500,000 appropriated for the North Shore Pump Station under the city's Clean Water Program, finally passed.
    16 May 1983passedJournal 1983 ↗
  • Board passed for second reading an $11,800,000 appropriation for Public Works sewer overflow control under the Clean Water Program.
    13 Jun 1983passed first readingJournal 1983 ↗
  • Board finally passed an $11.8 million appropriation for Public Works' combined sewer overflow program.
    20 Jun 1983passedJournal 1983 ↗
  • Sewer to be replaced on Sutter Street between Montgomery and Sansome
    6 Sep 1983passedJournal 1983 ↗
  • $52,000 voted for traffic signals at Fourth and Clara Streets
    13 Nov 1984passedJournal 1984 ↗
  • Board adopted a resolution letting Public Works accept and spend $84,000 in state funds for 1985-86 bicycle projects.
    4 Mar 1985passedJournal 1985 ↗
  • Supervisor Renne asked to release $411,408 held in reserve for Public Works computer equipment; referred to Finance Committee.
    15 Oct 1985referredJournal 1985, p. 1337 ↗
  • Ordinance proposed to raise the Department of Public Works cash revolving fund from $40,000 to $55,000; final vote continues next page.
    22 Sep 1986outcome not readJournal 1986, p. 1054 ↗
  • Extra $152,537 for street rebuilding contract approved.
    15 Dec 1986passedJournal 1987 ↗
  • Money moved for Public Works overtime pay; not final.
    22 Dec 1986pendingJournal 1987 ↗
  • Public Works overtime paid for with money moved from salaries.
    8 Jan 1987passedJournal 1987 ↗
  • $1.7M in federal money accepted to design the Embarcadero rebuild
    2 Mar 1987passedJournal 1987 ↗
  • $39,266 sought for tennis court work in Golden Gate Park
    30 Mar 1987passed first readingJournal 1987 ↗
  • $62,278 for public works worker injuries; not final yet.
    30 Mar 1987pendingJournal 1987 ↗
  • Public Works was authorized to accept $833,000 in federal railroad safety funds to repair spur tracks on City streets. linked by the name only, not checked
    15 Jun 1987passedJournal 1987, p. 1008 ↗
  • Board passed an ordinance appropriating $450,000 for a Public Works construction services center capital project.
    8 Sep 1987passedJournal 1987 ↗
  • $69,332 approved to widen Elsie Street
    15 Dec 1987passedJournal 1987 ↗
  • Board passed an ordinance appropriating $1,556,382 for Public Works telephone services in fiscal 1987-88. linked by the name only, not checked
    2 May 1988passedJournal 1988 ↗
  • $842,700 in federal funds accepted to rebuild Broadway from the Embarcadero
    29 Aug 1988passedJournal 1988, p. 1128 ↗
  • Ordinance appropriating $1,534,000 for a Public Works capital project at 450 McAllister and 1680 Mission Streets passed for second reading. linked by the name only, not checked
    29 Aug 1988passed first readingJournal 1988, p. 1116 ↗
  • The Board adopted a resolution letting Public Works accept $37,260 from property owners for ornamental streetlight poles in Upper Ashbury.
    19 Sep 1988passedJournal 1988, p. 1207 ↗
  • City passed an appropriation of $15,000 for accessible toilet facilities at City Hall.
    31 Oct 1988passedJournal 1988, p. 1326 ↗
  • An ordinance would appropriate $25,000 to Public Works Architecture for a study on removing architectural barriers.
    14 Nov 1988outcome not readJournal 1988, p. 1393 ↗
  • Ordinance passed appropriating $25,000 for an architectural barriers study by Public Works, funded by rescinding street rehabilitation money.
    28 Nov 1988passedJournal 1988 ↗
  • Public Works director is authorized to apply for and accept up to $8,673,950 in state grant funds for City street repairs.
    17 Apr 1989outcome not readJournal 1989 ↗
  • An appropriation of $93,658 for Public Works to remove and repair railroad spur tracks passed for second reading.
    1 May 1989passed first readingJournal 1989 ↗
  • Controller's $159,000 appropriation for Public Works office leasing and equipment passed on first reading.
    1 May 1989passed first readingJournal 1989 ↗
  • Proposed ordinance would appropriate $60,000 to Public Works for removing architectural barriers; passed on first reading.
    12 Jun 1989passed first readingJournal 1989 ↗
  • Board passed on first reading a $12,000,000 appropriation to Public Works for fiscal 1989-90 street reconstruction and safety projects.
    30 Oct 1989passed first readingJournal 1989, p. 1064 ↗
  • Board finally passed a $12M ordinance for Public Works street reconstruction and safety projects in fiscal 1989-90.
  • Public Works may accept a $5,000 cash gift from India Basin Maintenance Association for the Adopt-A-Tree Program; continued to November 13, 1989.
    6 Nov 1989continuedJournal 1989, p. 1099 ↗
  • Public Works $5,000 appropriation for the Adopt-A-Tree capital improvement project, fiscal 1989-90, proposed.
    6 Nov 1989outcome not readJournal 1989, p. 1099 ↗
  • Public Works accepted a $5,000 cash gift from the India Basin Maintenance Association for the Adopt-A-Tree Program.
    13 Nov 1989passedJournal 1989 ↗
  • A $5,000 appropriation for Public Works' Adopt-A-Tree project passed for second reading. linked by the name only, not checked
    13 Nov 1989passed first readingJournal 1989 ↗
  • Federal disaster money sought to repair earthquake-damaged streets
    18 Dec 1989passedJournal 1989, p. 1234 ↗
  • Ordinance proposed to appropriate $22,730 to Public Works for one new position, passed for second reading as amended.
    22 Jan 1990passed first readingJournal 1990, p. 65 ↗
  • Board passed an ordinance appropriating $595,089 to Public Works for air toxics work in the Cleanwater Program.
    26 Feb 1990passedJournal 1990 ↗
  • Board passed on second reading a $153,400 appropriation for Public Works freight, copy machine and furniture costs.
    23 Apr 1990passed first readingJournal 1990, p. 430 ↗
  • Ordinance appropriating $153,400 to Public Works for office equipment, communications and building maintenance awaits final passage.
    30 Apr 1990outcome not readJournal 1990, p. 453 ↗
  • Interim 1990-91 city budget ordinance passed for second reading as amended, moving $60,000 to Parking and Traffic.
    15 Jun 1990passed first readingJournal 1990, p. 610 ↗
  • Earthquake relief fund spending of $130,000 was adopted for Public Works traffic mitigation and a soil study.
    18 Jun 1990passedJournal 1990, p. 639 ↗
  • Controller's $3,000,000 appropriation for Richmond Transport Design passed second reading, with $620,000 placed on reserve.
    1 Oct 1990passed first readingJournal 1990 ↗
  • Ordinance appropriating $3.6M for Public Works capital projects, including building improvements and DPW planning, passed finally.
    1 Oct 1990passedJournal 1990 ↗
  • Supervisors passed an ordinance reducing the Public Works department's cash revolving fund from $55,000 to $50,500.
    19 Nov 1990passedJournal 1990 ↗
  • The Public Works Director may apply for and spend $1,490,000 in federal funds to repave several streets and build wheelchair ramps.
    3 Dec 1990passedJournal 1990 ↗
  • Public Works may spend up to $2,874,199 of state money on city street roadwork; the resolution was adopted.
    4 Feb 1991passedJournal 1991 ↗
  • Public Works capital improvement spending of $2,328,354 for fiscal 1990-91 passed for second reading, with $1,060,775 placed on reserve.
    25 Mar 1991passed first readingJournal 1991 ↗
  • Department of Public Works may apply for $1,250,000 in state grant money for Embarcadero Surface Roadway environmental improvements.
    1 Apr 1991passedJournal 1991 ↗
  • Ordinance proposed to appropriate $74.6M for the Oceanside Water Pollution Control Plant, passed for second reading.
    6 May 1991passed first readingJournal 1991 ↗
  • Ordinance proposed to appropriate $6.1M for Islais Creek sewage transport work, passed for second reading.
    6 May 1991passed first readingJournal 1991 ↗
  • Department of Public Works may spend $481,000 from the Mayor's Earthquake Relief Fund on Embarcadero Freeway replacement planning, to be reimbursed.
    17 Jun 1991passedJournal 1991 ↗
  • Public Works to accept $9,800 from property owners for upgraded streetlight poles in Upper Ashbury was sent to committee.
    5 Aug 1991referredJournal 1991 ↗
  • $453,392 accepted to earthquake-proof six pedestrian bridges across the city
    9 Dec 1991passedJournal 1991 ↗
  • Proposed $4,491,000 appropriation for Public Works' Islais Pump Station and Southeast Plant design; sent to Finance Committee.
    9 Dec 1991referredJournal 1991 ↗
  • Public Works may spend up to $1,641,494 in state funds on City street roadway work, sent to Finance Committee.
    16 Dec 1991referredJournal 1991 ↗
  • Public Works receives $200,000 for Civic Center Power House safety improvements, with $160,000 held in reserve, finally passed.
    16 Dec 1991passedJournal 1991 ↗
  • The Board passed on first reading an ordinance appropriating $4,750,000 for Islais Pump Station and [name withheld] design.
    21 Jan 1992passed first readingJournal 1992 ↗
  • Public Works was appropriated $4,750,000 for Islais Pump Station and [name withheld] design, with $250,000 placed on reserve; finally passed.
    27 Jan 1992passedJournal 1992 ↗
  • Board adopted authority for Public Works to accept $500,000 from the State Resources Agency for Embarcadero Surface Roadway environmental improvements.
    3 Feb 1992passedJournal 1992 ↗
  • Public Works' $1,346,000 appropriation for the Wastewater Reclamation Master Plan was referred to Finance Committee.
    2 Mar 1992referredJournal 1992 ↗
  • Public Works' $1.0M street reconstruction appropriation was referred to the Finance Committee.
    23 Mar 1992referredJournal 1992 ↗
  • Ordinance appropriating $1,100,257 for street reconstruction, with $585,000 placed on reserve, passed for second reading.
    6 Apr 1992passed first readingJournal 1992 ↗
  • Ordinance appropriating $1,451,885 to Public Works for the Wastewater Reclamation Master Plan passed for second reading.
    6 Apr 1992passed first readingJournal 1992 ↗
  • The Board finally passed an ordinance appropriating $1,451,885 to Public Works for the Wastewater Reclamation Master Plan.
    13 Apr 1992passedJournal 1992 ↗
  • Board approved $1,100,267 for Public Works street reconstruction and renovation in fiscal 1991-92, with $585,000 placed on reserve. linked by the name only, not checked
    13 Apr 1992passedJournal 1992 ↗
  • Board finally passed a $1,451,885 appropriation for Public Works' wastewater reclamation master plan project.
    13 Apr 1992passedJournal 1992 ↗
  • Proposed $64,763,480 appropriation for Department of Public Works improvement projects was referred to the Finance Committee.
    1 Jun 1992referredJournal 1992 ↗
  • Proposed $22,266 appropriation for Department of Public Works traffic signal installations at various locations.
    1 Jun 1992outcome not readJournal 1992 ↗
  • Supervisors passed on first reading an ordinance appropriating $286,000 for Public Works repair and demolition work.
    15 Jun 1992passed first readingJournal 1992 ↗
  • Supervisors passed on first reading a $22,266 overage for traffic signal installations at various locations.
    15 Jun 1992passed first readingJournal 1992 ↗
  • Controller's $22,266 appropriation to cover a traffic signal contract overage was finally passed by the Board.
    22 Jun 1992passedJournal 1992 ↗
  • Board appropriates $58.6M to Public Works for various improvement projects, placing $45.8M on reserve.
    22 Jun 1992passedJournal 1992 ↗
  • Controller proposes appropriating $135,778 to Public Works for various purposes; referred to Finance Committee.
    13 Jul 1992referredJournal 1992 ↗
  • Proposal to authorize Public Works emergency sewer cleaning on Fifth Street between Folsom and Bryant Streets for $75,000.
    13 Jul 1992referredJournal 1992 ↗
  • Proposal to authorize Public Works emergency replacement of the failing sewer on Stockton Street for $74,940; referred to Finance Committee.
    13 Jul 1992referredJournal 1992 ↗
  • Public Works may accept and spend $7,257,000 in federal funds to renovate pavement on various city streets.
    13 Jul 1992passedJournal 1992 ↗
  • Controller proposes appropriating $6,100,000 to Public Works for various capital improvement projects; referred to Finance Committee.
    13 Jul 1992referredJournal 1992 ↗
  • $107,034 to replace the failing Stockton Street sewer
    20 Jul 1992passedJournal 1992 ↗
  • Proposed $9,916 appropriation to cover overage on the Hall of Justice parking lot expansion; sent to Finance Committee.
    20 Jul 1992referredJournal 1992 ↗
  • Ordinance passed appropriating $135,778 to Public Works for code enforcement, rehabilitation loans and data processing equipment.
    3 Aug 1992passedJournal 1992 ↗
  • Controller's ordinance appropriates $9,916 for Hall of Justice parking lot expansion overage, passed for second reading.
    3 Aug 1992passed first readingJournal 1992 ↗
  • Ordinance passed appropriating $6,100,000 to Public Works for capital projects, with $5,259,420 placed on reserve.
    3 Aug 1992passedJournal 1992 ↗
  • Board finally passed an ordinance appropriating $9,916 for Hall of Justice parking lot expansion cost overage.
    10 Aug 1992passedJournal 1992 ↗
  • Public Works may spend up to $1,044,335 in state funds on city street roadway work, with $847,832 placed on reserve.
    14 Dec 1992passedJournal 1992 ↗
  • Public Works may apply for and spend a $350,000 state grant for environmental improvements on The Embarcadero Surface Roadway Project.
    14 Dec 1992passedJournal 1992 ↗
  • Proposed $1,500,000 for Public Works' Bayside treatment disposal evaluation; referred to Budget Committee.
    8 Feb 1993referredJournal 1993 ↗
  • Ordinance passed: $1.3M appropriated to Public Works for the Bayside treatment disposal evaluation, with $225,229 held in reserve.
    1 Mar 1993passedJournal 1993 ↗
  • Proposed $77,131 appropriation for Public Works repair and demolition work; referred to Budget Committee.
    19 Apr 1993referredJournal 1993 ↗
  • Proposed $32,440 appropriation for Public Works facilities maintenance; referred to Budget Committee. linked by the name only, not checked
    19 Apr 1993referredJournal 1993 ↗
  • A $15,430,000 appropriation for Public Works capital projects, including Fire Department and Fine Arts Museum work, was referred to the Budget Committee.
    3 May 1993referredJournal 1993 ↗
  • Public Works may accept a $3,510 grant to hire a staff assistant for the Citizens Tree Advisory Board; sent to committee.
    3 May 1993referredJournal 1993 ↗
  • Public Works may accept a $228,800 federal highway grant for landscaping at mass transit facilities; sent to committee.
    3 May 1993referredJournal 1993 ↗
  • A $62,017 Public Works capital overage appropriation, ratifying earlier action, was referred to the Budget Committee.
    3 May 1993referredJournal 1993 ↗
  • Proposed $21,901 to cover a ten percent overage on public works projects, ratifying earlier action; referred to Budget committee.
    10 May 1993referredJournal 1993 ↗
  • Ordinance 160-93 appropriates $15,430,000 to Public Works for capital projects at the Fire Department and Fine Arts Museum, passed finally.
    24 May 1993passedJournal 1993 ↗
  • Ordinance 161-93 appropriates $62,017 to Public Works to cover a ten percent overage on a capital project, passed finally.
    24 May 1993passedJournal 1993 ↗
  • Public Works gets $64.8M for various capital projects, with $38.1M placed on reserve.
    1 Jun 1993passedJournal 1993 ↗
  • Pacific Avenue closed for the Meriwa Restaurant grand opening
    7 Jun 1993passedJournal 1993 ↗
  • $170,341 public works project cost overrun; not yet voted.
    9 Aug 1993pendingJournal 1994 ↗
  • Resolution to accept a steam cleaner valued near $30,000 from Neighbors for Neighborhoods was sent to committee.
    23 Aug 1993referredJournal 1993 ↗
  • Proposed appropriation of $25,835 to Public Works to cover a capital project overage was referred to the Budget Committee.
    20 Sep 1993referredJournal 1993 ↗
  • A $363,000 appropriation for Department of Public Works temporary salaries and equipment was referred to the Budget Committee.
    27 Sep 1993referredJournal 1993 ↗
  • Proposed ordinance would appropriate $114,167 to the Department of Public Works for permanent salaries and fringe benefits; referred to committee.
    27 Sep 1993referredJournal 1993 ↗
  • A proposed $1,040,722 appropriation for Fire Department capital improvements was referred to the Budget Committee.
    27 Sep 1993referredJournal 1993 ↗
  • Board passed on first reading a proposed $1,040,722 appropriation for Fire Department capital improvement projects.
    18 Oct 1993passed first readingJournal 1993 ↗
  • Board finally passed a $123,592 Public Works appropriation to cover a ten percent capital project overage.
    18 Oct 1993passedJournal 1993 ↗
  • Ordinance appropriating $114,167 for Department of Public Works salaries and fringe benefits passed for second reading.
    18 Oct 1993passed first readingJournal 1993 ↗
  • The Board finally passed an ordinance appropriating $114,167 for Public Works Department permanent salaries and mandatory fringe benefits.
    25 Oct 1993passedJournal 1993 ↗
  • Ordinance appropriating $1.0M to Public Works for Fire Department capital improvement projects passed, Ordinance 345-93.
    25 Oct 1993passedJournal 1993 ↗
  • Consideration was continued on a $300,000 emergency appropriation for a Telegraph Hill rockfall barrier fence.
    15 Nov 1993continuedJournal 1993 ↗
  • Proposed: Public Works may apply for and spend $750,000 in federal funds to retrofit Oakdale Avenue Bridge; sent to committee. linked by the name only, not checked
    22 Nov 1993referredJournal 1993 ↗
  • Proposed: Public Works may retroactively apply for and spend $1,317,000 in federal funds for curb ramps; sent to committee. linked by the name only, not checked
    22 Nov 1993referredJournal 1993 ↗
  • Proposed $135,000 for Public Works street cleaning salaries sent to Budget Committee.
    13 Dec 1993referredJournal 1993 ↗
  • $94,063 more for the Arkansas and Freelon Streets sewer job
    10 Jan 1994passed first readingJournal 1994 ↗
  • City would add $4.4 million for police pay and overtime.
    10 Jan 1994pendingJournal 1994 ↗
  • Extra $48,841 for a public works project proposed.
    14 Feb 1994pendingJournal 1994 ↗
  • Passed for second reading: $1.4M from earthquake bond interest for fire station capital improvements.
    14 Mar 1994passed first readingJournal 1994 ↗
  • Passed for second reading: $24M for Rankin Pump Station and Southeast sewage plant improvements.
    14 Mar 1994passed first readingJournal 1994 ↗
  • Health department lease at 1372 Mission Street sent to committee
    11 Apr 1994referredJournal 1994 ↗
  • Public Works may retroactively apply for a $410,000 state environmental enhancement grant for its projects.
    25 Apr 1994passedJournal 1994 ↗
  • Public Works appropriation of $89,606 for a capital project overage was referred to Budget Committee.
    9 May 1994referredJournal 1994 ↗
  • $650,000 to finish the Candlestick Park project sent to committee
    16 May 1994referredJournal 1994 ↗
  • Passed for second reading: $89,606 covers a ten percent overage on the Traffic Signal Improvements Project.
    31 May 1994passed first readingJournal 1994, p. 9 ↗
  • An ordinance appropriating $1,545,654 for Public Works is printed here; its outcome continues on the next page.
    20 Jun 1994outcome not readJournal 1994 ↗
  • An ordinance appropriating $92,166 for a Public Works capital project was referred to the Budget Committee.
    20 Jun 1994referredJournal 1994 ↗
  • Public Works may spend $1,545,654 in earthquake bond interest on Legion of Honor capital improvements; ordinance finally passed.
    1 Aug 1994passedJournal 1994 ↗
  • The Director of Public Works was authorized to apply for and spend $400,000 in state transportation funds for public works projects.
    12 Sep 1994passedJournal 1994 ↗
  • Muni's lease at 100 McAllister Street to be extended
    3 Oct 1994referredJournal 1994 ↗
  • $71,596 appropriated to Public Works for a capital improvement overage was referred to Budget Committee.
    11 Oct 1994referredJournal 1994 ↗
  • A proposed ordinance appropriates $70,585 to Public Works for a capital project overage, referred to Budget Committee.
    24 Oct 1994referredJournal 1994 ↗
  • A proposed resolution would let Public Works spend up to $1,267,425 in state funds on City street roadway work, referred to committee.
    24 Oct 1994referredJournal 1994 ↗
  • A $300,000 transfer from the North Point treatment plant project to a Bay Area water reuse project was sent to committee.
    31 Oct 1994referredJournal 1994 ↗
  • Proposed $269,771 appropriation for Public Works salaries and overhead; referred to Budget Committee.
    7 Nov 1994referredJournal 1994 ↗
  • $70,585 more voted for repaving Harrison Street
    14 Nov 1994passedJournal 1994 ↗
  • Board finally passed a $114,824 Public Works budget appropriation, also rescinding $46,811 from [name withheld].
    12 Dec 1994passedJournal 1994 ↗
  • Ordinance proposed appropriating $18,022,000 of earthquake bond money for City Hall seismic upgrade and Zoo construction; referred to committee.
    19 Dec 1994referredJournal 1994 ↗
  • Resolution proposed letting Public Works accept a $30,000 state grant for Bernal Heights landscaping; referred to committee.
    19 Dec 1994referredJournal 1994 ↗
  • Ordinance proposed moving $77,000 to Telegraph Hill rockfall remediation work under Public Works; referred to committee.
    19 Dec 1994referredJournal 1994 ↗
  • Department of Public Works was authorized to accept a $235,814 state grant for used oil recycling, with $195,521 placed on reserve.
    3 Jan 1995passedJournal 1995 ↗
  • Resolution lets Public Works apply for and accept a $30,000 state grant to landscape Bernal Heights, adopted.
    3 Jan 1995passedJournal 1995 ↗
  • Board passed on first reading $77,000 from general funds for Telegraph Hill rockfall remediation by Public Works.
    17 Jan 1995passed first readingJournal 1995 ↗
  • A proposed $26,364 overage for sewer repair work by Public Works was referred to the Budget Committee.
    27 Mar 1995referredJournal 1995 ↗
  • A substitute resolution would transfer $600,000 to Public Works to partly renovate Peace Plaza in Western Addition A-1, referred to committee.
    27 Mar 1995referredJournal 1995 ↗
  • $600,000 proposed to renovate the Peace Plaza
    10 Apr 1995passedJournal 1995 ↗
  • Catellus to pay $1,015,190 toward sewers for the King Street roadway
    17 Apr 1995passedJournal 1995 ↗
  • Proposed $3.98M appropriation from the Clean Water fund for Public Works debt payments; referred to Budget Committee.
    1 May 1995referredJournal 1995 ↗
  • Board passed on first reading an ordinance appropriating $3,978,141 from the Clean Water fund for Public Works debt payments.
    15 May 1995passed first readingJournal 1995 ↗
  • Proposed $4,494,000 from earthquake bonds for branch library renovations and inspections was sent to budget committee.
    22 May 1995referredJournal 1995 ↗
  • $745,139 proposed to repair the Early Intake Access Road
    30 May 1995passed first readingJournal 1995 ↗
  • Supervisor Shelley proposed $200,000 in parking revenue for a Clay/Washington parcel rezoning project; referred to Budget Committee.
    26 Jun 1995referredJournal 1995 ↗
  • $49,101 for Candlestick Park lane signals sent to committee
    10 Jul 1995outcome not readJournal 1995 ↗
  • $6,100 more for the Capitol Avenue sewer repair sent to committee
    10 Jul 1995outcome not readJournal 1995 ↗
  • Parking revenue of $200,000 appropriated to Public Works for a Clay/Washington Street parcel project.
    24 Jul 1995passedJournal 1995 ↗
  • Resolution to retroactively apply for $951,606 in federal grant funds for the City Base Map was referred to committee.
    24 Jul 1995referredJournal 1995 ↗
  • Ordinance appropriating $4,145,000 to demolish the Richmond Sunset Treatment Plant was referred to Budget Committee.
    31 Jul 1995referredJournal 1995 ↗
  • $49,101 proposed for the Candlestick Park overhead lane signals
    31 Jul 1995passed first readingJournal 1995 ↗
  • $49,101 proposed for the Candlestick Park overhead lane signals
    7 Aug 1995passedJournal 1995 ↗
  • Police Chief asks to sign an agreement with the Park Police
    18 Sep 1995passedJournal 1995 ↗
  • Ordinance passed appropriating $4,133,730 to demolish the Richmond Sunset Treatment Plant for fiscal year 1995-96.
    10 Oct 1995passedJournal 1995 ↗
  • Public Works may accept $1,192,278 federal grant for Embarcadero historic signage and downtown signage; referred to committee.
    6 Nov 1995referredJournal 1995 ↗
  • Hsieh proposed $1,742,790 from general fund reserve for City Hall non-seismic improvements; referred to Budget Committee.
    13 Nov 1995referredJournal 1995 ↗
  • Ordinance appropriating $1,528,855 for City Hall non-seismic improvements passed for second reading.
    4 Dec 1995passed first readingJournal 1995 ↗
  • A state grant of up to $492,312 for city street roadway work was sent to the Government Efficiency/Labor Committee.
    4 Dec 1995referredJournal 1995 ↗
  • A $20,000 state grant for integrated pest management was sent to the Government Efficiency/Labor Committee.
    4 Dec 1995referredJournal 1995 ↗
  • The Board adopted a resolution letting Public Works accept and spend a $500,000 federal grant for Embarcadero gateways in Chinatown and North Beach.
    11 Dec 1995passedJournal 1995 ↗
  • City to extend the Chinatown Branch Library's lease on Grant Avenue
    2 Jan 1996passedJournal 1996 ↗
  • $450,000 for Mission Street lighting sent to committee
    6 May 1996referredJournal 1996 ↗
  • Public Works would accept a one-year $20,000 state pest management grant contract requiring city indemnity; referred to committee.
    6 May 1996referredJournal 1996 ↗
  • $50,000 for Mission Street lighting sent to committee
    20 May 1996referredJournal 1996 ↗
  • $212,937 emergency sewer work on Stockton and Laguna Streets
    3 Jun 1996passedJournal 1996 ↗
  • An ordinance passed for second reading, subject not on this page
    3 Jun 1996passed first readingJournal 1996 ↗
  • Resolution approves the DPT variant of the Mid-Embarcadero roadway and terminal separator project and accepts $65.6 million in federal funds.
    4 Nov 1996passedJournal 1996 ↗
  • Public Works' proposed $21,875 state grant to plant 500 trees in Bernal Heights was referred to committee.
    16 Dec 1996referredJournal 1996 ↗
  • Department of Public Works accepted $21,875 from the state to plant 500 trees in Bernal Heights.
    21 Jan 1997passedJournal 1997 ↗
  • Application to accept up to $3,336,825 in federal Surface Transportation Program funds was referred to committee.
    10 Mar 1997referredJournal 1997 ↗
  • Public Works would accept street furniture and maintenance from [name withheld] San Francisco worth over $500,000; referred to Rules Committee.
    24 Mar 1997referredJournal 1997 ↗
  • The Board accepted a gift of street furniture worth over $500,000 from [name withheld] San Francisco, Inc. for Public Works.
    14 Apr 1997passedJournal 1997 ↗
  • Public Works was authorized to seek a $50,000 state rubberized asphalt grant, matched by $50,000, with $100,000 reserved.
    27 May 1997outcome not readJournal 1997 ↗
  • The Board passed on first reading $1.5M to renovate the Mission Branch Library.
    18 Aug 1997passed first readingJournal 1997 ↗
  • $250,000 sought to build the Civic Center Plaza Playground
    18 Aug 1997passedJournal 1997 ↗
  • Mission Branch Library renovation funded with $1,457,295 from library and earthquake bond interest, finally passed.
    25 Aug 1997passedJournal 1997 ↗
  • Pacific Gas and Electric's $87,000 gift for gas and electric service at the 911 Emergency Communications Center was referred to Rules Committee.
    15 Sep 1997referredJournal 1997 ↗
  • Public Works may accept and spend an $87,000 gift from PG&E for emergency communications center utility services.
    14 Oct 1997passedJournal 1997 ↗
  • Proposed resolution would accept eleven hazard mitigation grants totaling $6,394,394 for Public Works; sent to committee.
    14 Oct 1997referredJournal 1997 ↗
  • More wires to go underground near Alpine Terrace, sent to committee
    27 Oct 1997referredJournal 1997 ↗
  • The Board authorized Public Works to accept and spend $6.2M in state hazard mitigation grants, with $4.2M placed on reserve.
    10 Nov 1997passedJournal 1997 ↗
  • $755,000 set aside for Bayview and Tenderloin street cleaning
    24 Nov 1997passed first readingJournal 1997 ↗
  • Proposed $25.2M from City Hall bond proceeds for non-seismic City Hall improvements was referred to Finance Committee.
    8 Dec 1997referredJournal 1997 ↗
  • A proposed $10,790,000 appropriation for new utility systems at the San Francisco Zoo was referred to the Finance Committee.
    15 Dec 1997referredJournal 1997 ↗
  • Mayor's proposed $1,235,093 appropriation for Civic Center Courthouse operations was referred to the Finance Committee.
    15 Dec 1997referredJournal 1997 ↗
  • Ordinance appropriating $25,192,702 from City Hall bond proceeds for non-seismic City Hall improvements passed on first reading.
    22 Dec 1997passed first readingJournal 1997 ↗
  • Up to $2 million state money for city street work.
    6 Jan 1998outcome not readBoard minutes 1999 ↗
  • Ordinance moves $1,140,840 from the [name withheld] budget to run the New Civic Center Courthouse; finally passed.
    12 Jan 1998passedJournal 1998 ↗
  • $3.5M set aside to build the Hyde Street fishing harbor
    12 Jan 1998passed first readingJournal 1998 ↗
  • $500,000 gift for Coit Tower's Pioneer Park sent to committee
    2 Feb 1998outcome not readJournal 1998 ↗
  • $500,000 gift sought for Pioneer Park improvements at Coit Tower
    2 Mar 1998passedJournal 1998 ↗
  • The Board finally passed a $200,000 appropriation from [name withheld] Lot revenues for the county transportation plan.
    9 Mar 1998passedJournal 1998 ↗
  • Ordinance appropriating $1,073,109 for a Public Works anti-litter street cleaning team passed on first reading.
    20 Apr 1998passed first readingJournal 1998 ↗
  • Public Works gets $1,073,109 for an anti-litter street and sidewalk cleaning team and 37 new positions.
    27 Apr 1998passedJournal 1998 ↗
  • Passed on first reading: $22,477,779 from the General Fund Reserve appropriated to Public Works to fund City Hall construction.
    11 May 1998passed first readingJournal 1998 ↗
  • The Board finally passed $16,898,894 in zoo bond money for capital repairs and the Zoo Master Plan Phase II.
  • Public Works proposed accepting a gift of up to $500,000 to improve Pioneer Park beside Coit Tower.
    1999outcome not readBoard minutes 1999, p. 3 ↗
  • Ordinance proposed to appropriate $16,898,894 of zoo bond proceeds for San Francisco Zoo capital improvements; sent to Finance and Labor Committee. linked by the name only, not checked
  • Committee recommended that Public Works accept up to $500,000 in gifts to improve Pioneer Park at Coit Tower.
    1999outcome not readBoard minutes 1999 ↗
  • Port would lease Broadway Parcel 3 to a developer at fair market rent for a hotel, with revenue share funding Embarcadero Roadway maintenance.
    6 Jan 1999outcome not readBoard minutes 1999, p. 27 ↗
  • Department of Public Works would accept a $236,328 ABAG grant for Bay Trail infrastructure improvements, pending committee review.
    9 Feb 1999outcome not readBoard minutes 1999 ↗
  • $87,267 more sought for the Ashbury water storage tank
    17 Feb 1999referredJournal 1999, p. 137 ↗
  • Money for Ashbury water tank raised to $89,967; not final yet.
    10 Mar 1999pendingBoard minutes 1999 ↗
  • $550,000 gift for the Japantown Peace Plaza sent to committee
    19 Jul 1999outcome not readJournal 1999, p. 901 ↗
  • $110,027 for hillside repair on San Jose Avenue sent to committee
    19 Jul 1999referredJournal 1999, p. 901 ↗
  • Peace Plaza gift of $550,000 put off to August
    4 Aug 1999outcome not readBoard minutes 1999 ↗
  • The Department of Public Works was authorized to accept a $1,351,552 federal-state grant to seismically strengthen Fire Station No. 35 and Fireboat Headquarters.
    16 Aug 1999passedJournal 1999, p. 989 ↗
  • $550,000 gift proposed to renovate the Japantown Peace Plaza
    18 Aug 1999outcome not readBoard minutes 1999 ↗
  • Finance and Labor Committee recommends, as amended, accepting a $550,000 gift from Western Addition Parking Corporation to renovate Peace Plaza.
    18 Aug 1999amendedBoard minutes 1999 ↗
  • $550,000 gift for Peace Plaza renovation passed on first reading
    23 Aug 1999outcome not readJournal 1999, p. 1026 ↗
  • Japan Center garages leased as Western Addition Parking Corporation is dissolved
    13 Sep 1999passedJournal 1999, p. 1056 ↗
  • An approval vote with no subject on this page
  • $350,000 federal grant sought for the Pioneer Park project
    19 Oct 1999referredBoard minutes 1999 ↗
  • IBM and ESRI gifts worth $10,527 for Public Works computers and software were sent to the Audit and Government Efficiency Committee.
  • Proposed resolution would accept $32,750 in computer software and hardware from ESRI for the Department of Public Works, sent to committee.
  • Treasure Island Development Authority requests release of up to $200,000 to extend Geomatrix's Navy environmental clean-up oversight contract.
    2000outcome not readBoard minutes 2000 ↗
  • Proposed: Public Works accepts $10,527 in IBM and ESRI gifts.
    24 Jan 2000pendingBoard minutes 2000 ↗
  • Public Works accepts $10,527 in computer and software gifts from IBM and ESRI; resolution adopted.
  • City accepts $10,527 in computer gifts for Public Works.
    7 Feb 2000passedBoard minutes 2000 ↗
  • Public Works may accept $32,750 in free software and hardware. linked by the name only, not checked
    28 Feb 2000pendingBoard minutes 2000 ↗
  • Public Works accepts $32,750 in free computer software and equipment.
    13 Mar 2000passedBoard minutes 2000 ↗
  • Public Works accepted $32,750 in donated software and hardware from Environmental Systems Research Institute, approved by resolution. linked by the name only, not checked
  • Public Works proposed accepting a $102,200 state grant to place sand on Ocean Beach to prevent erosion; referred to committee.
  • Public Works may accept and spend a $102,200 state grant to place sand on Ocean Beach, adopted.
  • Public Works may accept and spend a $102,200 state grant to place sand on Ocean Beach and prevent erosion.
  • An adoption vote with no subject on this page
  • Public Works may accept and spend a $3.98M federal grant to resurface pavement at Lake Merced.
  • Public Works acceptance of $10,000 from the Peninsula Corridor Joint Powers Board for the Salinas Avenue retaining wall was sent to committee.
  • $10,000 sought for the Salinas Avenue retaining wall
    18 Sep 2000outcome not readBoard minutes 2000, p. 997 ↗
  • A resolution adopted with no subject on this page
  • Resolution to accept and spend $936,325 in federal funds for Civic Center-United Nations Plazas improvements was continued to September 24, 2001.
  • Mayor and Supervisor Newsom proposed appropriating $9,021,349 for local street and road repairs; sent to Finance Committee.
  • Public Works authorized to accept and spend a $7,630,000 regional transportation grant for capital projects.
  • Ordinance appropriating $9,021,349 for local streets and roads rehabilitation passed on first reading.
    12 Mar 2001passed first readingBoard minutes 2001, p. 364 ↗
  • Proposed $9,021,349 appropriation to rehabilitate local streets and roads; passed on first reading.
    12 Mar 2001passed first readingBoard minutes 2001, p. 364 ↗
  • Ordinance finally passed appropriating $9,021,349 to the Department of Public Works for local streets and roads rehabilitation projects.
  • The Board finally passed an ordinance appropriating $9,021,349 to the Department of Public Works for local street and road rehabilitation.
    19 Mar 2001passedBoard minutes 2001 ↗
  • Proposed $352,000 from former Central Freeway parking lot lease revenues for Octavia Boulevard road improvements, sent to Finance Committee. linked by the name only, not checked
  • Public Works proposed accepting a $2.3M federal grant to resurface 3rd Street for light rail; sent to committee.
  • Mayor's ordinance would appropriate $38,676 of GIS license fee revenue for Public Works' Geographic Data Services Program; sent to Finance Committee.
  • Ordinance proposed to appropriate $38,676 in GIS license fee revenue for the Public Works data program; sent to Finance Committee.
  • $348,196 voted for road work on Octavia Boulevard
    23 Apr 2001outcome not readBoard minutes 2001, p. 526 ↗
  • Controller's ordinance to appropriate $348,196 for Octavia Boulevard road work passed on first reading.
    23 Apr 2001passed first readingBoard minutes 2001, p. 526 ↗
  • $348,196 of freeway parcel rents proposed for Octavia Boulevard
  • Ordinance appropriating $37,600 in GIS license fee revenue for Public Works data services passed on first reading.
    7 May 2001passed first readingBoard minutes 2001, p. 598 ↗
  • $37,600 appropriation from GIS license fees for Public Works' Geographic Data Services Program passed first reading.
    7 May 2001passed first readingBoard minutes 2001, p. 598 ↗
  • Ordinance appropriating $37,600 from geographic information licence fees for the Public Works data services program was finally passed.
  • Ordinance appropriates $37,600 of GIS license fee revenue to Public Works for its Geographic Data Services Program.
  • Public Works may accept and spend a $2,342,000 federal grant, plus $303,431 local match, for 3rd Street light rail resurfacing.
  • Federal grant sought to repave streets for Third Street light rail
  • City may accept and spend a $1,000,000 state grant for Ocean Beach erosion control and beach nourishment.
    25 Jun 2001passedBoard minutes 2001 ↗
  • [name withheld]/LEM [name withheld] granted permission to occupy Natoma Street during 1166 Howard Street construction, with a $4,000 inspection cap.
  • An adoption vote with no subject on this page
  • Supervisor Ammiano proposed accepting $15,983 in federal emergency funds to rebuild the San Jose Avenue hillside; referred.
  • The Department of Public Works was authorized to accept a $100,000 state grant to study coastal erosion at Ocean Beach.
  • Public Works sought a $9,400,000 federal Transportation Equity Act grant for the South Basin Project, approved by the funding agency. linked by the name only, not checked
    2002outcome not readBoard minutes 2002, p. 21 ↗
  • Public Works proposed accepting a $500,000 state grant for cleaning illegal dumping sites; sent to committee.
  • Supervisor Ammiano proposed moving $2,795,000 for street resurfacing in Districts 4 and 7, referred to Finance Committee.
  • Carnegie Mission Branch Library at 300 Bartlett Street proposed as landmark linked by the name only, not checked
  • Ordinance proposed to appropriate $66,255 from excavation fees for Public Works' Street Construction Coordination Center; sent to Finance Committee.
  • $2,795,000 for street resurfacing passes first reading
    25 Feb 2002passed first readingBoard minutes 2002, p. 173 ↗
  • Public Works supplemental appropriation moves $2,795,000 for street resurfacing projects, passed on first reading.
    25 Feb 2002passed first readingBoard minutes 2002, p. 173 ↗
  • Public Works money moved from Third Street and Taraval Street resurfacing projects to various street projects; passed as ordinance.
  • $2.8M to be moved from Taraval and Third Street repaving
    4 Mar 2002passedBoard minutes 2002 ↗
  • Proposed $100,000 state grant for Ocean Beach erosion control.
  • Public Works was authorized to accept and spend a $100,000 state grant to study and control erosion at Ocean Beach.
  • $9.4M in federal money to study a South Basin Bridge
    16 Oct 2002outcome not readBoard minutes 2002, p. 12 ↗
  • $20.9M in grants sought to retrofit the Fourth Street Bridge
    21 Jan 2003outcome not readBoard minutes 2003 ↗
  • Public Works proposed accepting $20.9M in federal and state grants to seismically retrofit the Fourth Street Bridge; referred.
  • An amended adoption vote with no subject on this page
  • Board referred a resolution to accept and spend $20,911,134 in federal and state grants to retrofit the Fourth Street Bridge.
    27 Jan 2003referredBoard minutes 2003 ↗
  • Public Works may accept and spend a $20,911,134 grant to seismically retrofit the Fourth Street Bridge, which was adopted.
    11 Feb 2003passedBoard minutes 2003 ↗
  • $20.9M in grants sought to retrofit the Fourth Street Bridge
    11 Feb 2003outcome not readBoard minutes 2003 ↗
  • Mayor proposed appropriating $2,155,617 for two asphalt storage silos for Public Works; sent to Finance and Audits Committee.
    18 Mar 2003referredBoard minutes 2003 ↗
  • $14.0M for Octavia Boulevard construction sent to committee linked by the name only, not checked
    30 Sep 2003outcome not readBoard minutes 2003, p. 52 ↗
  • Supervisor Dufty proposed $14,010,630 to fund construction of Octavia Boulevard; sent to Finance and Audits Committee.
  • Ordinance proposed to appropriate $14,010,630 for building Octavia Boulevard, sent to Finance and Audits Committee.
    30 Sep 2003referredBoard minutes 2003 ↗
  • The Board passed on first reading an ordinance appropriating $14,010,630 to build Octavia Boulevard, using Redevelopment Agency land sale money.
    18 Nov 2003passed first readingBoard minutes 2003, p. 1212 ↗
  • Octavia Boulevard project funding and special fund come up
    18 Nov 2003passed first readingBoard minutes 2003, p. 1203 ↗
  • Ordinance appropriates $14,010,630 from land sales and lease revenues to build Octavia Boulevard; passed final.
    25 Nov 2003passedBoard minutes 2003 ↗
  • $14.0M for building Octavia Boulevard and nearby works
    25 Nov 2003outcome not readBoard minutes 2003, p. 1232 ↗
  • $5.3M in federal funds proposed for repaving 16th and Valencia Streets
    26 Oct 2004referredBoard minutes 2004 ↗
  • Supervisors Daly, Dufty and Mirkarimi propose accepting and spending a gift; details continue on the next page.
    2005outcome not readBoard minutes 2005 ↗
  • Public Works may accept $780,675 federal and $101,145 state grants for Stockton Street Tunnel lighting and pedestrian improvements; referred. linked by the name only, not checked
  • Public Works may accept and spend a $115,000 gift from the San Francisco Foundation for United Nations Plaza improvements. linked by the name only, not checked
    2005outcome not readBoard minutes 2005 ↗
  • Mayor's proposed cable television franchise amendments appear under committee reports; no outcome printed here.
    2005outcome not readBoard minutes 2005 ↗
  • Proposal to accept up to $250,000 from the San Francisco Parks Trust for a playground at Sunnydale, referred for adoption. linked by the name only, not checked
  • Public Works may apply for and accept a $298,010 state grant to enforce proper disposal of waste tires; referred for adoption.
  • Board to commend Chinese medicine practitioners' group for tenth installation.
    4 Jan 2005pendingBoard minutes 2005 ↗
  • Chinese medicine practitioners' group honored at installation. linked by the name only, not checked
  • $780,675 adopted for Stockton Street Tunnel lighting and walkways
    11 Jan 2005outcome not readBoard minutes 2005 ↗
  • State grant of $298,010 sought to enforce proper tire disposal.
    25 Jan 2005pendingBoard minutes 2005 ↗
  • $115,000 gift offered for work at United Nations Plaza
    8 Feb 2005outcome not readBoard minutes 2005 ↗
  • $115,000 gift offered for work at United Nations Plaza
    15 Feb 2005outcome not readBoard minutes 2005 ↗
  • Proposed: $2 million federal money for Broadway street upgrades. linked by the name only, not checked
    10 May 2005pendingBoard minutes 2005 ↗
  • City takes $2 million federal grant to improve Broadway streets. linked by the name only, not checked
    17 May 2005passedBoard minutes 2005 ↗
  • City accepts up to $250,000 gift for Sunnydale children's playground.
    26 Jul 2005passedBoard minutes 2005 ↗
  • The Board accepted a $250,000 gift from the San Francisco Parks Trust for a children's playground at Sunnydale Housing Project.
  • Supervisor Elsbernd proposed appropriating about $108.3M of general obligation bond money for the Laguna Honda Replacement Program; sent to committee.
  • $39 million for Laguna Honda hospital rebuild sent to committee.
    26 Jul 2005pendingBoard minutes 2005 ↗
  • An approved motion with no subject on this page linked by the name only, not checked
    9 Aug 2005outcome not readBoard minutes 2005 ↗
  • $99.4M in bond money approved to rebuild Laguna Honda hospital. linked by the name only, not checked
    16 Aug 2005passedBoard minutes 2005 ↗
  • Ordinance appropriates $39,328,014 of bond proceeds to replace Laguna Honda and cover Public Works bond costs. linked by the name only, not checked
    16 Aug 2005outcome not readBoard minutes 2005 ↗
  • Up to $250,000 gift for a Sunnydale children's playground; not yet voted. linked by the name only, not checked
    8 Nov 2005pendingBoard minutes 2005 ↗
  • Public Works may accept and spend a $75,243 grant from Caltrans to develop a city bridge maintenance plan. linked by the name only, not checked
  • Proposed $850,000 from surplus property sale for Geneva Avenue [name withheld] repairs and Alemany Boulevard greening. linked by the name only, not checked
    2006outcome not readBoard minutes 2006 ↗
  • Board passed a $5.2M appropriation for Department of Public Works street repairs and the 4th Street Bridge.
  • Supervisors propose $27.9M from the General Fund for street resurfacing; the ordinance was referred to the Small Business Commission. linked by the name only, not checked
  • The Mayor proposed appropriating $1,277,584 for the Department of Public Works sidewalk inspection and repair program; it was sent to Budget and Finance Committee.
  • Ordinance proposed to appropriate $5.2M in state traffic congestion relief funds for street and 4th Street Bridge repairs.
    2006outcome not readBoard minutes 2006 ↗
  • Public Works may accept and spend a $75,243 state grant to develop a city bridge maintenance plan. linked by the name only, not checked
  • Ordinance proposed to appropriate $6.6M for the Juvenile Hall Youth Guidance Center and Fire Station No. 24.
    2006outcome not readBoard minutes 2006 ↗
  • Mayor proposes $6.6M for the Juvenile Hall Youth Guidance Center and $1.9M for Fire Station No. 24; referred to Budget Committee.
  • Mayor proposed $1.3M for sidewalk inspection and repair; received and sent to Budget and Finance Committee.
  • Public Works asked to accept a $342,000 Caltrans grant to build a bus pad at Ingerson Avenue and Griffith Street; sent to committee. linked by the name only, not checked
  • $5.2 million for street repairs and 4th Street Bridge sent to committee.
    24 Jan 2006pendingBoard minutes 2006 ↗
  • Mayor's ordinance appropriating $5,216,754 in state traffic relief funds for street and 4th Street Bridge repairs was sent to committee.
    24 Jan 2006referredBoard minutes 2006 ↗
  • Broadway and Sansome land to be sold for $1.5M linked by the name only, not checked
    28 Feb 2006outcome not readBoard minutes 2006 ↗
  • Mayor's ordinance appropriating $5,216,754 in state traffic relief funds for street and 4th Street Bridge repairs passed first reading.
    28 Feb 2006passed first readingBoard minutes 2006 ↗
  • Street performers' amplified-sound sales areas delayed to March 28. linked by the name only, not checked
    28 Feb 2006pendingBoard minutes 2006 ↗
  • $5.2M state funds for street and 4th Street Bridge repairs; not final.
    28 Feb 2006pendingBoard minutes 2006 ↗
  • Proposed sale of city-owned land at Broadway and Sansome Streets to the Redevelopment Agency for $1,500,000 for affordable housing. linked by the name only, not checked
    28 Feb 2006outcome not readBoard minutes 2006 ↗
  • The Board adopted a resolution letting Public Works accept and spend $6,110,000 in federal funds for SOMA and Cortland Avenue repaving.
  • Ordinance to spend $5,216,754 on street repairs and the 4th Street Bridge was put off until March 21, 2006.
    7 Mar 2006continuedBoard minutes 2006 ↗
  • Proposed $5.2 million for street and bridge repairs postponed to March 21.
    7 Mar 2006pendingBoard minutes 2006 ↗
  • Mayor's ordinance to spend $5.2M in state traffic funds on street and 4th Street Bridge repairs was continued to March 21.
    7 Mar 2006continuedBoard minutes 2006, p. 3 ↗
  • The Board finally passed an ordinance appropriating $5,216,754 in state traffic relief funds for street and 4th Street Bridge repairs.
    21 Mar 2006passedBoard minutes 2006 ↗
  • $6.5 million for juvenile hall youth center; final vote still due.
    21 Mar 2006pendingBoard minutes 2006 ↗
  • $5.2 million for repairing city streets and the 4th Street Bridge.
    21 Mar 2006passedBoard minutes 2006 ↗
  • Ordinance passed appropriating $6.6 million for the Juvenile Hall Youth Guidance Center and $1.9 million for Fire Station No. 24.
    28 Mar 2006passedBoard minutes 2006 ↗
  • Board finally passed $6,565,452 for the Juvenile Hall Youth Guidance Center and $1,900,000 for Fire Station No. 24.
    28 Mar 2006passedBoard minutes 2006 ↗
  • Money approved to build Juvenile Hall youth center and fire station.
    28 Mar 2006passedBoard minutes 2006 ↗
  • Ordinance appropriating $15M of General Fund money for street resurfacing by Public Works passed on first reading.
    4 Apr 2006passed first readingBoard minutes 2006, p. 12 ↗
  • $15 million for street repaving; first vote passed. linked by the name only, not checked
    4 Apr 2006pendingBoard minutes 2006 ↗
  • $15 million for citywide street repaving approved.
    11 Apr 2006passedBoard minutes 2006 ↗
  • Broadway and Sansome site to be sold for affordable housing, $1.5M linked by the name only, not checked
    2 May 2006passed first readingBoard minutes 2006 ↗
  • Broadway and Sansome property sold to the Redevelopment Agency for $1.5 million for affordable housing; passed first reading.
    2 May 2006passed first readingBoard minutes 2006 ↗
  • Proposed $4.3 million state traffic money to repair city streets. linked by the name only, not checked
    15 Aug 2006pendingBoard minutes 2006 ↗
  • Public Works may accept and spend a $75,243 federal grant from Caltrans to develop a bridge maintenance plan.
    12 Sep 2006passedBoard minutes 2006 ↗
  • Ordinance appropriating $4,295,259 in state traffic congestion relief funds for street repair by Public Works passed on first reading.
    19 Sep 2006passed first readingBoard minutes 2006 ↗
  • Ordinance appropriating $4,295,259 in state congestion relief funds for street repair was passed on first reading. linked by the name only, not checked
    19 Sep 2006passed first readingBoard minutes 2006 ↗
  • Public Works receives $4,295,259 in state traffic congestion relief funds for street repairs in fiscal 2006-2007. linked by the name only, not checked
    26 Sep 2006passedBoard minutes 2006 ↗
  • Ordinance appropriating $4,295,259 in state traffic congestion relief funds for street and road repairs was finally passed.
    26 Sep 2006passedBoard minutes 2006 ↗
  • $850,000 proposed for [name withheld] repairs and Alemany greening linked by the name only, not checked
    7 Nov 2006outcome not readBoard minutes 2006 ↗
  • Proposed $1,277,584 appropriation for the Sidewalk Inspection and Repair Program passed on first reading.
    2007passed first readingBoard minutes 2007 ↗
  • Proposed ordinance appropriates $8,890,628 in state Proposition 1B funds for street resurfacing projects by Public Works.
    2007outcome not readBoard minutes 2007 ↗
  • Proposed $27.55 million appropriation for affordable housing, public housing repairs and tenant ownership, sent to Budget Committee. linked by the name only, not checked
  • Proposed acceptance of a $482,040 federal grant to upgrade guardrails on Twin Peaks, O'Shaughnessy and Portola roads. linked by the name only, not checked
  • Public hearing held on a proposed appropriation for Geneva Avenue [name withheld] repairs and Alemany Boulevard greening. linked by the name only, not checked
    2007outcome not readBoard minutes 2007 ↗
  • Supervisor Daly's ordinance appropriating $1,074,490 for Geneva Avenue [name withheld] repairs and Alemany Boulevard greening was assigned to the Board as a committee of the whole.
  • Ordinance proposed to appropriate $1,344,490 for Geneva Avenue [name withheld] repairs and Alemany Boulevard greening passed on first reading. linked by the name only, not checked
    2007passed first readingBoard minutes 2007 ↗
  • Ordinance proposed appropriating $1,344,490 from the General Fund Reserve for Geneva Avenue [name withheld] repairs and Alemany Boulevard greening; sent to committee. linked by the name only, not checked
  • $342,000 taken for a new bus pad at Ingerson and Griffith
  • Public Works may accept and spend a $342,000 Caltrans grant to build a bus pad at Ingerson Avenue and Griffith Street.
  • The Department of Public Works was authorized to accept a $342,000 California Transportation grant to build a bus pad at Ingerson and Griffith.
    23 Jan 2007passedBoard minutes 2007 ↗
  • Appropriates $1.3M for Public Works sidewalk inspection and repair; final vote continues on the next page.
    30 Jan 2007outcome not readBoard minutes 2007 ↗
  • $1.3 million proposed for car barn repairs and Alemany greening linked by the name only, not checked
    27 Feb 2007pendingBoard minutes 2007 ↗
  • $1.6M federal grant sought for the Leland Avenue streetscape linked by the name only, not checked
    27 Feb 2007referredBoard minutes 2007 ↗
  • Federal and state grants for Leland Avenue street upgrades; sent to committee.
    27 Feb 2007pendingBoard minutes 2007 ↗
  • Board sits as Committee of the Whole to hear an ordinance appropriating $1,074,490 for Geneva Avenue [name withheld] repairs and Alemany Boulevard greening. linked by the name only, not checked
    27 Feb 2007referredBoard minutes 2007 ↗
  • Public Works was sent to Budget and Finance Committee on a $1.76M grant package for Leland Avenue streetscape work.
    27 Feb 2007referredBoard minutes 2007 ↗
  • $1.3M sought for Geneva Avenue [name withheld] repairs and Alemany greening linked by the name only, not checked
    27 Feb 2007outcome not readBoard minutes 2007 ↗
  • Public hearing held on an ordinance appropriating about $1.3 million for Geneva Avenue [name withheld] repairs and Alemany Boulevard greening. linked by the name only, not checked
    6 Mar 2007outcome not readBoard minutes 2007 ↗
  • Public Works may accept $1.5M in federal and state grants for Valencia Street streetscape improvements.
  • $1.6M accepted for Leland Avenue streetscape improvements
    13 Mar 2007outcome not readBoard minutes 2007, p. 8 ↗
  • $27.6M for affordable housing sent to the budget committee linked by the name only, not checked
    27 Mar 2007outcome not readBoard minutes 2007 ↗
  • Supportive housing borrowing sent to budget committee. linked by the name only, not checked
    24 Apr 2007pendingBoard minutes 2007 ↗
  • 47 parks and 20 public works positions added; sent to committee. linked by the name only, not checked
    26 Apr 2007pendingBoard minutes 2007 ↗
  • San Francisco Giants give $100,000 for trees and hanging baskets linked by the name only, not checked
    22 May 2007outcome not readBoard minutes 2007 ↗
  • Public Works may accept a $100,000 gift from the San Francisco Giants for street baskets, a magnolia tree and banners.
    22 May 2007passedBoard minutes 2007 ↗
  • $2.3 million for new Youth Guidance Center building; vote not shown. linked by the name only, not checked
    5 Jun 2007outcome not readBoard minutes 2007 ↗
  • $482,040 accepted for new guardrails on Twin Peaks Boulevard
    25 Sep 2007passedBoard minutes 2007 ↗
  • Public Works may accept and spend a $482,040 state grant to upgrade guardrails on several city roads.
    25 Sep 2007passedBoard minutes 2007 ↗
  • $8.9M in state money proposed for repaving city streets linked by the name only, not checked
    6 Nov 2007outcome not readBoard minutes 2007 ↗
  • $8,890,628 of state bond funds for street resurfacing passed first reading
    4 Dec 2007passed first readingBoard minutes 2007, p. 20 ↗
  • Proposed $8.9M appropriation of state Proposition 1B funds for street resurfacing passed on first reading.
    4 Dec 2007passed first readingBoard minutes 2007, p. 19 ↗
  • $8.9 million state money set aside for street repaving. linked by the name only, not checked
    11 Dec 2007passedBoard minutes 2007 ↗
  • Resolution referred to Budget and Finance Committee to accept and spend $450,000 in state funds for pedestrian projects.
  • Ordinance proposed to appropriate about $51.3M for the Laguna Honda Hospital replacement, funded by tobacco revenue and bond interest.
    2008outcome not readBoard minutes 2008 ↗
  • Proposed ordinance appropriates $51.3M for the Laguna Honda Hospital replacement project through Public Works for fiscal 2008-09.
    2008outcome not readBoard minutes 2008 ↗
  • Board lets Public Works accept and spend $450,000 in state transportation funds for citywide pedestrian projects.
  • Public Works was authorized to accept and spend a $1,475,675 federal Justice Department grant; the item was sent to committee. linked by the name only, not checked
  • Two more deputy chief posts sought in the Police Department
    29 Jul 2008referredBoard minutes 2008 ↗
  • American Express offers $100,000 to plant trees on Sunset Boulevard
    29 Jul 2008outcome not readBoard minutes 2008 ↗
  • Public Works may accept a $100,000 American Express gift to plant about 1,000 trees on Sunset Boulevard, as amended.
  • American Express offers $100,000 to plant trees on Sunset Boulevard linked by the name only, not checked
    12 Aug 2008outcome not readBoard minutes 2008 ↗
  • Board authorized Public Works to accept and spend $450,000 in state funds for various pedestrian projects.
    12 Aug 2008passedBoard minutes 2008 ↗
  • $11,756,665 of state road money sent to Budget and Finance
    9 Sep 2008outcome not readBoard minutes 2008 ↗
  • Ordinance appropriating $110,632 from impact fees for Leland Avenue streetscape work in Visitacion Valley, passed on first reading. linked by the name only, not checked
    16 Sep 2008passed first readingBoard minutes 2008, p. 4 ↗
  • $110,632 for Leland Avenue streetscape passes first reading
    16 Sep 2008passed first readingBoard minutes 2008 ↗
  • Appropriation of $110,632 for Leland Avenue streetscape improvements in Visitacion Valley finally passed.
    23 Sep 2008passedBoard minutes 2008 ↗
  • $11,756,665 of state road money passed on first reading linked by the name only, not checked
    7 Oct 2008outcome not readBoard minutes 2008 ↗
  • $11.8 million for street repaving linked by the name only, not checked
    21 Oct 2008passedBoard minutes 2008 ↗
  • Passed on final reading an ordinance giving $13.0M in state road funds to Public Works for street resurfacing.
    21 Oct 2008passedBoard minutes 2008 ↗
  • Board passed an ordinance appropriating $51,336,923 for the Laguna Honda Hospital replacement project in Public Works.
    21 Oct 2008passedBoard minutes 2008 ↗
  • $13,222,746 of state street funds sent to Budget and Finance
    21 Oct 2008outcome not readBoard minutes 2008 ↗
  • Proposed ordinance appropriates $13.2M in state Proposition 1B funds for street resurfacing; passed on first reading.
    18 Nov 2008passed first readingBoard minutes 2008, p. 7 ↗
  • Proposed sale of lease revenue bonds to finance Branch Library Improvement Program projects; vote continues on next page. linked by the name only, not checked
    18 Nov 2008outcome not readBoard minutes 2008 ↗
  • $13.2M state money for citywide road resurfacing approved
    25 Nov 2008passedBoard minutes 2008 ↗
  • Public Works may accept and spend $408,123 federal and $552,877 state grants for Point Lobos streetscape improvements.
  • Public Works may accept and spend a $1,475,675 federal [name withheld] grant from the Justice Department.
    6 Jan 2009passedBoard minutes 2009 ↗
  • Public Works may retroactively accept and spend a $1,475,675 federal Justice Department grant.
    31 Mar 2009passedBoard minutes 2009 ↗
  • The Board adopted a resolution letting Public Works apply for federal American Recovery and Reinvestment Act grant funds. linked by the name only, not checked
    14 Apr 2009passedBoard minutes 2009 ↗
  • Ordinance setting a $250 fee for inspecting blighted properties under the Community Preservation and Blight Reduction Act passed first reading.
    5 May 2009passed first readingBoard minutes 2009 ↗
  • Board passed on first reading an ordinance setting a $250 fee for inspecting blighted properties under the blight reduction act. linked by the name only, not checked
    5 May 2009passed first readingBoard minutes 2009 ↗
  • Board referred a resolution letting Public Works accept and spend $461,000 in federal and state grants for Point Lobos streetscape work.
    10 Nov 2009referredBoard minutes 2009 ↗
  • Public Works was authorized to accept $461,000 in federal and state grants for the Point Lobos streetscape project.
  • $85 million earthquake repairs and upgrades sent to committee.
  • City may take up to $350,000 state money to clear illegal dumping.
  • Federal money for the Corbin Place stairs sent to committee
    2 Nov 2010outcome not readBoard minutes 2010, p. 636 ↗
  • Up to $350,000 grant to clean illegal dumping sites citywide; approved
  • $85 million for earthquake-safety repairs cleared first vote.
  • City would take $11.5 million in federal road and transit money.
  • Board backs $2.4M for the Visitacion Valley library and Leland Avenue
    14 Dec 2010passed first readingBoard minutes 2010, p. 1107 ↗
  • Board adopts Resolution No. 169-11 ahead of a stairway grant
  • Visitacion Valley fees fund the branch library and Leland Avenue wires
    2011outcome not readBoard minutes 2011 ↗
  • $2.4M voted for the Visitacion Valley library and Leland Avenue wires
    4 Jan 2011outcome not readBoard minutes 2011, p. 1 ↗
  • City accepts $11.5 million federal money for transport projects
  • City accepts $11.5 million federal transport money for road projects. linked by the name only, not checked
  • $2.8M sought for Fourth Street Bridge lawsuit costs
  • $1.1M grant sought for the Arelious Walker Drive stairway
    8 Feb 2011outcome not readBoard minutes 2011, p. 122 ↗
  • $97,339 grant sought for the Marina Green bicycle trail
    8 Mar 2011outcome not readBoard minutes 2011, p. 231 ↗
  • $2.8M for Fourth Street Bridge lawsuit costs passes first reading
    8 Mar 2011passed first readingBoard minutes 2011, p. 220 ↗
  • $2.8M set aside for Fourth Street Bridge lawsuit costs
    15 Mar 2011passed first readingBoard minutes 2011, p. 5 ↗
  • $97,339 accepted for the Marina Green bicycle trail
    22 Mar 2011outcome not readBoard minutes 2011, p. 249 ↗
  • Presidio branch library reopening honored
  • $2.8M voted for Fourth Street Bridge lawsuit costs
  • $1.1M federal grant taken for the Arelious Walker Drive stairway
  • $696,000 state grant for pedestrian and bike projects accepted linked by the name only, not checked
  • $192,000,000 of earthquake safety bonds asked for public works linked by the name only, not checked
  • $74,000,000 of road repaving bonds asked for street work
    15 Nov 2011outcome not readBoard minutes 2011, p. 1056 ↗
  • $192M in earthquake safety bond money for Public Works sent to committee
  • $192 million for earthquake safety work; not yet law.
  • $76.5M in street repaving bond money passes on first reading
    24 Jan 2012passed first readingBoard minutes 2012, p. 33 ↗
  • $76.5M in street repaving bond money proposed linked by the name only, not checked
  • $962,038 sought to design the Jefferson Street streetscape
    7 Feb 2012outcome not readBoard minutes 2012, p. 87 ↗
  • $706,500 passed for the Jefferson Street streetscape design
    6 Mar 2012outcome not readBoard minutes 2012, p. 137 ↗
  • $706,500 set aside to design the Jefferson Street streetscape
    13 Mar 2012outcome not readBoard minutes 2012, p. 153 ↗
  • $907,824 state funds for walking and bike projects sent to committee.
  • $4 million state grant for [name withheld] Park and clubhouse approved
  • Laguna Honda hospital construction contract raised to $16.8 million, proposed.
  • Laguna Honda hospital rebuild contract raised $111,312
  • Board authorized Public Works to accept and spend $17,026,221 in OneBayArea Grant funds awarded through the Metropolitan Transportation Commission.
  • Financial Aid Awareness Week proposed for early February
  • An adoption vote with no subject on this page
    5 Mar 2013outcome not readBoard minutes 2013, p. 124 ↗
  • Plans $31.9 million from earthquake bonds for repairs and seismic upgrades.
  • Proposed $31.9 million for earthquake repairs and upgrades.
  • $133 million for street repaving and safety work; sent to committee.
  • Proposed $133 million for street repaving and safety work.
  • $3.4M federal grant for Islais Creek Bridge sent to committee
    7 May 2013outcome not readBoard minutes 2013, p. 275 ↗
  • City sells up to $31.9 million in earthquake safety bonds.
    21 May 2013passed first readingBoard minutes 2013, p. 313 ↗
  • $133 million for road repaving and sidewalks awaits final vote.
  • $133 million road repaving and street safety money proposed.
    4 Jun 2013outcome not readBoard minutes 2013, p. 330 ↗
  • $19.5M in bonds for 71 flats at 1100 Ocean Avenue
  • Walking and biking projects to get $865,864 state grant; vote not shown.
    16 Jul 2013outcome not readBoard minutes 2013, p. 475 ↗
  • $17 million regional transport grant still in committee.
  • $881,721 state grant for walking and biking projects sent to committee.
  • Feb 14 declared [name withheld] day against violence to women
  • Proclaims Feb 14 a day against violence toward women
  • Asks for $17,861 grant to landscape Bret Harte Elementary School.
  • $881,721 state funds for walking and biking projects.
  • $57.8M in earthquake safety bonds passed on first reading
    29 Jul 2014outcome not readBoard minutes 2014, p. 597 ↗
  • Board passed on first reading a $57.84M earthquake safety bond appropriation for Public Works seismic repairs.
    29 Jul 2014passed first readingBoard minutes 2014, p. 597 ↗
  • Proposed city task force to cut gun violence; not yet voted.
  • $106 million quake bond money for seismic repairs and upgrades
  • Up to $1.19 billion to buy 260 new Muni light rail vehicles
  • $57.8M in earthquake safety bond money proposed for city repairs
    4 Nov 2014outcome not readBoard minutes 2014, p. 548 ↗
  • Mayor and Chiu propose appropriating $106,095,000 of earthquake bond proceeds to Public Works; sent to Budget and Finance Committee.
  • Proposed $6.4 million for city earthquake repairs and upgrades.
  • City adopts ten-year building projects plan through 2025
  • $6.4 million for earthquake repairs to city buildings; first vote only.
  • $6.4 million for earthquake repairs to city buildings; final vote passed
  • $30,000 proposed to settle a minor's lawsuit against the City
    28 Apr 2015outcome not readBoard minutes 2015, p. 280 ↗
  • $67.5M in road bonds for Better Market Street and Muni proposed
    5 May 2015outcome not readBoard minutes 2015, p. 310 ↗
  • Board passed on first reading a $67.54M bond appropriation for Muni, Better Market Street and pedestrian safety projects.
    2 Jun 2015passed first readingBoard minutes 2015, p. 6 ↗
  • $67,540,000 of road bonds for Better Market Street passed first reading
    2 Jun 2015outcome not readBoard minutes 2015, p. 362 ↗
  • Ordinance appropriating $67.54M of 2015 transportation bond proceeds for Muni, Caltrain and Better Market Street projects was finally passed.
  • Proposed $1,014,983 state grant for walking and bike projects.
  • Public Works may take $3.8 million for walking and biking; pending.
  • Public Works may take $1.91 million transport grant; pending. linked by the name only, not checked
  • Mayor's ordinance to appropriate $29,673,553 in bond money for Public Works earthquake repairs was sent to the Budget and Finance Committee.
  • $111M quake-safety repairs sent to budget committee.
  • $29.7 million for earthquake-safety repairs; first vote only.
  • Proposed sale of up to $111 million in earthquake bonds.
    22 Mar 2016outcome not readBoard minutes 2016, p. 188 ↗
  • $29.7 million for earthquake repairs and seismic upgrades approved
  • $29.7 million for earthquake repairs and seismic upgrades approved
  • Proposed $200,000 BART grant for Pit Stop public toilets