about 600 Board decisions about Fay Improvement, in date order. Each links to its printed page.

  • Payments from city bond and general funds to suppliers, land sellers and institutions for schools, hospitals, water studies and streets are proposed; vote not printed.
    1912outcome not readJournal 1912, p. 1080 ↗
  • Payments authorized to named claimants, including Bion J. Arnold's $3,032.10 for June public utilities investigation work. linked by the name only, not checked
    1912outcome not readJournal 1912, p. 619 ↗
  • Resolution authorises payments to contractors and suppliers for sewers, Polytechnic High School, the jail and San Francisco Hospital. linked by the name only, not checked
    1912outcome not readJournal 1912, p. 530 ↗
  • The Emporium paid $766.49 for books for the Public Library linked by the name only, not checked
    13 May 1912outcome not readJournal 1912, p. 358 ↗
  • The Board approved a batch of city payment claims for construction, supplies and services, by a vote of 15 to 0. linked by the name only, not checked
    13 May 1912outcome not readJournal 1912, p. 359 ↗
  • Final payment of $3,274.59 to Fay Improvement Co. for street work on California Street was allowed. linked by the name only, not checked
    27 May 1912passedJournal 1912, p. 424 ↗
  • J. F. O'Brien Co. paid $8,142.56 for the Brannan Street sewer linked by the name only, not checked
    17 Jun 1912outcome not readJournal 1912, p. 514 ↗
  • Board passed for printing a resolution authorizing nine payments to contractors and claimants totaling about $29,000. linked by the name only, not checked
    15 Jul 1912passed first readingJournal 1912, p. 603 ↗
  • Expenditures to several contractors and vendors were passed for printing, including $3,032.10 to Bion J. Arnold. linked by the name only, not checked
    22 Jul 1912passed first readingJournal 1912, p. 612 ↗
  • $12,000 set aside to resurvey the city's homestead districts linked by the name only, not checked
    30 Sep 1912outcome not readJournal 1912, p. 857 ↗
  • C. F. Weber & Co. paid $807.75 for Polytechnic High furniture linked by the name only, not checked
    30 Sep 1912passed first readingJournal 1912, p. 856 ↗
  • C. F. Weber & Co. paid $807.75 for Polytechnic High furniture linked by the name only, not checked
    7 Oct 1912outcome not readJournal 1912, p. 884 ↗
  • Resolution authorizes payments from bond funds to George F. Bartlett and Dyer Bros. for Hetch Hetchy and Polytechnic High School work.
    21 Oct 1912outcome not readJournal 1912, p. 944 ↗
  • Resolution 9748 proposes payment of many city claims to contractors, suppliers and utilities, including $33,848.16 to Pacific Gas and Electric.
    21 Oct 1912outcome not readJournal 1912, p. 946 ↗
  • $2,450 paid to Jos. Holle for police motorcycles
    4 Nov 1912passedJournal 1912, p. 993 ↗
  • B. Katchinski paid $96,063.70 for land at Polk and Grove linked by the name only, not checked
    9 Dec 1912outcome not readJournal 1912, p. 1111 ↗
  • Authorizes payments of $1,153.75 to Roebling Construction Co. for San Francisco Hospital work and $1,163.16 to Enterprise Foundry Co. linked by the name only, not checked
    23 Dec 1912outcome not readJournal 1912 ↗
  • Fay Improvement Company granted ninety more days to finish paving and sewering King street between Second and Third.
    30 Dec 1912passedJournal 1912, p. 1166 ↗
  • U.S. Steel Products paid $3,509 for Geary Street Railway trolley poles linked by the name only, not checked
    30 Dec 1912passed first readingJournal 1912, p. 1164 ↗
  • Board authorizes a long list of payments to contractors and claimants for police, school, transit and street work. linked by the name only, not checked
    1913outcome not readJournal 1913, p. 635 ↗
  • Board authorizes payment of many city claims to suppliers, contractors and hospitals, including sewer, fire and hospital bills.
    1913outcome not readJournal 1913, p. 368 ↗
  • U.S. Steel Products paid $3,509 for Geary Street Railway trolley poles linked by the name only, not checked
    13 Jan 1913outcome not readJournal 1913, p. 29 ↗
  • Fay Improvement Company given ninety more days on Sansome Street
    13 Jan 1913outcome not readJournal 1913, p. 44 ↗
  • Fay Improvement Company given 60 more days on King Street linked by the name only, not checked
    17 Feb 1913outcome not readJournal 1913, p. 166 ↗
  • City approved payment of claims for paving, police station work, utilities, supplies and Civic Center land, including $198,977 to G. G. Burnett Estate Co.
    18 Feb 1913passedJournal 1913, p. 170 ↗
  • Expenditures for parks, water, Municipal Railway cars, school plumbing, sewers and paving claims passed for printing.
    3 Mar 1913passed first readingJournal 1913, p. 401 ↗
  • Gorrill Bros. paid $9,924.56 for the Fillmore Street sewer linked by the name only, not checked
    3 Mar 1913outcome not readJournal 1913, p. 393 ↗
  • $63,000 due F. Rolandi for the Geary Street car house linked by the name only, not checked
    17 Mar 1913outcome not readJournal 1913, p. 256 ↗
  • F. Rolandi paid $63,000 for the Geary Street car house
    24 Mar 1913passedJournal 1913, p. 270 ↗
  • Payment of nine claims totalling $75,293.98 for sewers, paving, printing and supplies was approved.
    31 Mar 1913passedJournal 1913, p. 303 ↗
  • Board sent to print a batch of routine city payments for paving, hydrants, water investigation and fire equipment to various firms.
    31 Mar 1913passed first readingJournal 1913, p. 306 ↗
  • Pacific Gas & Electric to be paid $36,901.95 for street lighting linked by the name only, not checked
    7 Apr 1913passed first readingJournal 1913, p. 340 ↗
  • Consolidated Motor Car Company paid $17,674.20 for fire autos linked by the name only, not checked
    7 Apr 1913outcome not readJournal 1913, p. 335 ↗
  • The Board authorized payments of $36,901.95 to Pacific Gas & Electric and $794.50 to the SF SPCA from the General Fund. linked by the name only, not checked
    14 Apr 1913outcome not readJournal 1913, p. 358 ↗
  • Union Iron Works paid $57,750 for Municipal Railway cars
    28 Apr 1913outcome not readJournal 1913, p. 415 ↗
  • Resolution proposes authorizing expenditures from named accounts to named claimants; the outcome continues on the next page.
    12 May 1913outcome not readJournal 1913, p. 460 ↗
  • Proposed resolution authorizes Library Fund payment to Emporium for San Francisco Public Library books; outcome continues on next page.
    12 May 1913outcome not readJournal 1913, p. 466 ↗
  • Bakewell & Brown paid $874.27 for models in stone
    13 May 1913outcome not readJournal 1913, p. 461 ↗
  • The Emporium paid $904.90 for books for the Public Library linked by the name only, not checked
    19 May 1913outcome not readJournal 1913, p. 483 ↗
  • A resolution proposed authorizing listed expenditures to named claimants; the outcome continues on the next page. linked by the name only, not checked
    19 May 1913outcome not readJournal 1914, p. 708 ↗
  • C. F. Buckley paid $20,802.72 for land on City Hall Avenue linked by the name only, not checked
    6 Jun 1913outcome not readJournal 1913, p. 529 ↗
  • Commary-Peterson paid $8,293 to finish the North End Police Station linked by the name only, not checked
    9 Jun 1913outcome not readJournal 1913, p. 592 ↗
  • C. F. Buckley paid $20,802.72 for land on City Hall Avenue linked by the name only, not checked
    9 Jun 1913outcome not readJournal 1913, p. 581 ↗
  • Robert Trost paid $4,912.50 for building the Starr King School
    4 Aug 1913outcome not readJournal 1913, p. 778 ↗
  • City Street Improvement Company paid for drains at Geary car barn
    11 Aug 1913outcome not readJournal 1913, p. 790 ↗
  • Contra Costa Construction paid $2,549.87 for sewer pipes on Fulton Street linked by the name only, not checked
    18 Aug 1913passedJournal 1913, p. 814 ↗
  • Resolution authorizing about $60,000 in city payments to contractors and suppliers was passed for printing.
    18 Aug 1913passed first readingJournal 1913, p. 826 ↗
  • Central California Construction paid $4,335.17 for the Jones Street Tank
    25 Aug 1913outcome not readJournal 1913, p. 840 ↗
  • Wm. Bateman paid $2,722 for work at Girls' High School
    29 Sep 1913outcome not readJournal 1913, p. 940 ↗
  • W. B. Walkup wins his appeal; Fay Improvement Company billed instead linked by the name only, not checked
    29 Sep 1913outcome not readJournal 1913, p. 925 ↗
  • Spring Valley Water Company paid $10,938.50 for hydrant water linked by the name only, not checked
    29 Sep 1913passedJournal 1913, p. 927 ↗
  • Wm. Bateman paid $2,722 for work at Girls' High School
    6 Oct 1913outcome not readJournal 1913, p. 952 ↗
  • The Board passed for printing a resolution authorizing payments to contractors for sewers, schools, a hospital, streets and supplies.
    6 Oct 1913passed first readingJournal 1913, p. 974 ↗
  • McLean, Haggans & Aden paid $4,683.16 for the Islais Creek incinerator
    27 Oct 1913outcome not readJournal 1913, p. 1141 ↗
  • Houghton Sawyer paid $2,232 for architect's work on the Cooper School linked by the name only, not checked
    27 Oct 1913passedJournal 1913, p. 1084 ↗
  • $990 set aside to design the new Potrero Emergency Hospital linked by the name only, not checked
    27 Oct 1913passedJournal 1913, p. 1124 ↗
  • Sutter Street Railway paid $19,518.74 for half the Market Street tracks linked by the name only, not checked
    22 Dec 1913outcome not readJournal 1913, p. 1299 ↗
  • Resolution passed for printing to authorize payment of many city claims for street, water and printing work.
    29 Dec 1913passed first readingJournal 1914, p. 8 ↗
  • Fay Improvement Company granted a forty-day extension to finish Thirteenth Avenue paving contracts delayed by rain. linked by the name only, not checked
  • Board authorizes payment of many city claims from bond and general funds, covering schools, street paving, sewers and water.
    1914outcome not readJournal 1914, p. 743 ↗
  • Resolution authorizes payments from city funds to many contractors and suppliers for libraries, schools, fire, police, streets and transit.
    1914passed first readingJournal 1914, p. 519 ↗
  • Resolution proposed authorizing many 1914 city payments to contractors, suppliers and charities for street, sewer, transit and fire work.
    1914outcome not readJournal 1914, p. 1032 ↗
  • Board authorized payments to contractors, suppliers and utilities for street paving, water, sewers, schools and police needs.
    12 Jan 1914passedJournal 1914, p. 38 ↗
  • Bion J. Arnold paid $3,345.79 for his city transportation report
    26 Jan 1914outcome not readJournal 1914, p. 94 ↗
  • Fay Improvement Company given 60 more days on Balboa Street linked by the name only, not checked
    12 Feb 1914passedJournal 1914, p. 78 ↗
  • Board is authorizing payments to city suppliers and contractors, including PG&E lighting and Edison School work; outcome continues on next page. linked by the name only, not checked
    12 Feb 1914outcome not readJournal 1914, p. 69 ↗
  • A. Seghieri paid $3,500.00 for a lease at 875 Presidio Avenue linked by the name only, not checked
    24 Feb 1914outcome not readJournal 1914, p. 236 ↗
  • Claims authorized for water, electricity, granite and freight payments, plus a Presidio Avenue leasehold purchase, passed for printing.
    24 Feb 1914outcome not readJournal 1914, p. 196 ↗
  • All sixteen supervisors vote in favor
    2 Mar 1914passedJournal 1914, p. 217 ↗
  • Spring Valley Water paid $10,950.01 for water for the hydrants
    9 Mar 1914outcome not readJournal 1914, p. 253 ↗
  • Fay Improvement Company allowed blasting for a sewer in Sansome Street
    23 Mar 1914outcome not readJournal 1914, p. 313 ↗
  • Fay Improvement Company allowed blasting for a sewer in Sansome Street linked by the name only, not checked
    30 Mar 1914passedJournal 1914, p. 342 ↗
  • The Fay Improvement Co. is paid $958.16 for paving at Thirteenth avenue and Geary street.
    18 May 1914outcome not readJournal 1914, p. 497 ↗
  • August E. Wessling allowed forty horses on Geary Street
    18 May 1914passedJournal 1914, p. 516 ↗
  • August E. Wessling allowed forty horses on Geary Street
    18 May 1914outcome not readJournal 1914, p. 498 ↗
  • The Fay Improvement Co. is paid $3,533.70 for curbing and paving Thirteenth avenue between Balboa and Cabrillo streets. linked by the name only, not checked
    18 May 1914outcome not readJournal 1914, p. 497 ↗
  • Board passed for printing a resolution authorizing payment of numerous city claims to contractors, suppliers and charities.
    25 May 1914passed first readingJournal 1914, p. 582 ↗
  • Payments were authorized for library books, completion of the City Morgue, and Polytechnic High School heating work. linked by the name only, not checked
    25 May 1914outcome not readJournal 1914, p. 576 ↗
  • Payments authorized to United Railroads and to Hetch Hetchy power consultants
    10 Aug 1914passedJournal 1914, p. 887 ↗
  • Supervisors authorized about 40 claims for payment to contractors and suppliers for schools, City Hall, the hospital and railways.
    10 Sep 1914outcome not readJournal 1914, p. 977 ↗
  • $3,750 set aside for special sanitation by the Board of Health
    28 Sep 1914outcome not readJournal 1914, p. 1023 ↗
  • Resolution authorizes dozens of city payments to contractors, suppliers and charities from bond and general funds. linked by the name only, not checked
    28 Sep 1914outcome not readJournal 1914, p. 1055 ↗
  • Payments for road grading, high school work, Muni power and transfers
  • Payments for hospital, school, street, water and fire-station work were sent to print for authorization.
    14 Dec 1914passed first readingJournal 1914, p. 1432 ↗
  • A resolution would authorize payments from the Railway Construction Fund, including a freight claim to Western Pacific Railway.
    21 Dec 1914outcome not readJournal 1914, p. 1456 ↗
  • Routine city payments authorized to contractors and suppliers for street repairs, cement, fuel and fire alarm construction. linked by the name only, not checked
    21 Dec 1914passed first readingJournal 1914, p. 1464 ↗
  • Bakewell & Brown paid $20,000 for designing the new City Hall
    28 Dec 1914outcome not readJournal 1914, p. 1385 ↗
  • Board sent to printing authorization of eighteen city claim payments, including San Francisco Hospital equipment and Spring Valley Water investigation. linked by the name only, not checked
    1915passed first readingJournal 1915, p. 666 ↗
  • A resolution authorizing certain expenditures from a city fund was moved by Supervisor Jennings and passed for printing.
    1915outcome not readJournal 1915, p. 573 ↗
  • Decker Electric paid $859 for electrical work at Marshall School linked by the name only, not checked
    4 Jan 1915outcome not readJournal 1915 ↗
  • Bills paid, including $30,000 for City Hall granite linked by the name only, not checked
    8 Feb 1915outcome not readJournal 1915, p. 182 ↗
  • Fay Improvement Company given ninety more days on Fulton Street linked by the name only, not checked
    1 Mar 1915outcome not readJournal 1915, p. 266 ↗
  • Clinton Fireproofing Co. paid $23,822.45 for the Seventeenth Street car barn
    8 Mar 1915outcome not readJournal 1915, p. 312 ↗
  • Resolution 11572 authorizes a list of city expenditures to claimants; the vote continues on the next page. linked by the name only, not checked
    8 Mar 1915outcome not readJournal 1915, p. 301 ↗
  • Clinton Fireproofing Co. paid $23,822.45 for the Seventeenth Street car barn linked by the name only, not checked
    15 Mar 1915outcome not readJournal 1915, p. 330 ↗
  • Fourteen city expenditure claims, totalling about $35,000, were authorized and passed for printing, covering streets, water, schools and fire alarms.
    15 Mar 1915passed first readingJournal 1915, p. 286 ↗
  • Board sent to printing a resolution authorizing payments to contractors and transit firms for parks, hospital, and street work.
    5 Apr 1915outcome not readJournal 1915, p. 371 ↗
  • Authorizes payments to contractors and suppliers for parks, railways, hospital, jail and fire work; the vote is not printed here.
    5 Apr 1915outcome not readJournal 1915, p. 388 ↗
  • Resolution authorizing certain expenditures from a fund was passed for printing, with its text continuing on the next page. linked by the name only, not checked
    12 Apr 1915outcome not readJournal 1915, p. 418 ↗
  • Fay Improvement Company given sixty more days on Fulton Street linked by the name only, not checked
    12 Apr 1915outcome not readJournal 1915, p. 430 ↗
  • Board approved 24 payments from city bond and general funds to contractors and suppliers, including $40,909.35 to Pacific Gas & Electric for lighting. linked by the name only, not checked
    19 Apr 1915passedJournal 1915, p. 436 ↗
  • $1,200 to buy right of way on Church Street
    3 May 1915outcome not readJournal 1915, p. 486 ↗
  • City approved payments to contractors and suppliers for books, hospital equipment, sewers, water, and police vehicles.
    10 May 1915passedJournal 1915, p. 515 ↗
  • P. J. Gartland paid $801.10 for repaving over sewer trenches
    1 Jun 1915outcome not readJournal 1915, p. 588 ↗
  • Fay Improvement Company is proposed for a thirty-day extension to finish curbing work; the vote continues on the next page. linked by the name only, not checked
    21 Jun 1915outcome not readJournal 1915, p. 718 ↗
  • C. L. Wold Co. paid $2,466 for the hospital's new building linked by the name only, not checked
    21 Jun 1915passedJournal 1915, p. 687 ↗
  • City spends $429 on two bathrooms at the Tuberculosis Hospital
    28 Jun 1915passedJournal 1915, p. 668 ↗
  • Progress Laundry Company allowed a laundry at 3080 Seventeenth Street linked by the name only, not checked
    12 Jul 1915outcome not readJournal 1915, p. 809 ↗
  • Resolution authorizing 15 payments to contractors, suppliers and claimants, including library books and hospital equipment, was passed for printing.
    12 Jul 1915passed first readingJournal 1915, p. 808 ↗
  • City pays $1,401.55 to Foster & Futernick for library books
    19 Jul 1915outcome not readJournal 1915, p. 832 ↗
  • Resolution approves payments to many contractors and suppliers for library books, hospitals, schools, paving and City Hall work.
    19 Jul 1915passedJournal 1915, p. 833 ↗
  • Fay Improvement given sixty more days on De Haro Street linked by the name only, not checked
    30 Aug 1915passedJournal 1915, p. 870 ↗
  • The Board sent to print a resolution authorizing thirteen payments from city funds to contractors, suppliers and utilities. linked by the name only, not checked
    20 Sep 1915passed first readingJournal 1915, p. 1032 ↗
  • Sunset Construction allowed ninety days of blasting on Kansas Street linked by the name only, not checked
    11 Oct 1915passedJournal 1915, p. 1095 ↗
  • Payments authorized to city contractors and suppliers for fire apparatus, hospital work, playgrounds and street improvements.
    18 Oct 1915passed first readingJournal 1915, p. 1100 ↗
  • Money set aside for plague work and Polytechnic High School improvements linked by the name only, not checked
    19 Oct 1915outcome not readJournal 1915, p. 1110 ↗
  • Payments to contractors, suppliers and charities for fire, park, transit and hospital work, final vote not printed here. linked by the name only, not checked
    25 Oct 1915outcome not readJournal 1915, p. 1118 ↗
  • Pacific Rolling Mill Company paid $4,175.24 for Public Library steel
    18 Nov 1915passedJournal 1915, p. 1198 ↗
  • Fay Improvement Co. given 30 more days on Balboa Street
    22 Nov 1915passedJournal 1915, p. 1253 ↗
  • Eaton & Smith allowed 90 days blasting on Paris Street
    22 Nov 1915passedJournal 1915, p. 1240 ↗
  • Pacific Gas & Electric paid $24,169.76 for Municipal Railway current
    30 Nov 1915passedJournal 1915, p. 1374 ↗
  • The Board allowed a $1,197.30 claim to Fay Improvement Co. for street repairs.
    20 Dec 1915passedJournal 1915, p. 1428 ↗
  • The Board allowed a $527.24 claim to Fay Improvement Co. for street repairs.
    20 Dec 1915passedJournal 1915, p. 1428 ↗
  • A resolution authorizing twenty payments to firms and individuals for Hetch Hetchy, fire, hospital and relief home work was passed for printing.
    20 Dec 1915passed first readingJournal 1915, p. 1432 ↗
  • Board authorized payments to contractors and utilities, including $2,864.28 to Chas. B. Dunham for Hetch Hetchy work. linked by the name only, not checked
    27 Dec 1915outcome not readJournal 1915, p. 1457 ↗
  • Spring Valley Water Co. paid $11,041.32 for water for the hydrants linked by the name only, not checked
    10 Jan 1916passedJournal 1916, p. 59 ↗
  • Fifteen payments to contractors and suppliers for street, water, marble and building work were passed for printing. linked by the name only, not checked
    31 Jan 1916passed first readingJournal 1916, p. 133 ↗
  • Mysell-Rollins paid $700 to engrave 2,000 Hetch Hetchy bonds
    7 Feb 1916outcome not readJournal 1916, p. 156 ↗
  • Authorizes payment of about twenty city department bills to vendors for fuel, hay, milk, water, and repairs.
    3 Apr 1916outcome not readJournal 1916, p. 330 ↗
  • The Board authorized payment of thirty-three city claims, including $190,000 to McGilvray-Raymond Granite for City Hall granite work.
    10 Apr 1916passedJournal 1916, p. 338 ↗
  • Fay Improvement Company given thirty more days at Twenty-second and Vermont linked by the name only, not checked
    10 Apr 1916passedJournal 1916, p. 351 ↗
  • Payments for library books, street repairs, hospital supplies, City Hall work and a school construction were authorized, passed for printing. linked by the name only, not checked
    24 Apr 1916passed first readingJournal 1916, p. 386 ↗
  • $8,850 paid to John Reid Jr. for hospital wing plans linked by the name only, not checked
    1 May 1916passedJournal 1916, p. 411 ↗
  • Payments to Pacific Gas & Electric, Spring Valley Water and other contractors and charities authorized from city funds, passed for printing.
    15 May 1916passed first readingJournal 1916, p. 496 ↗
  • Proposed resolution authorizing a $1,905.06 payment to Spring Valley Water Co. for park water. linked by the name only, not checked
    22 May 1916outcome not readJournal 1916, p. 538 ↗
  • $250 paid to A. Casanova for damage from a sewer overflow
    17 Jul 1916outcome not readJournal 1916, p. 779 ↗
  • Jean Allec allowed a 400 horsepower boiler on Folsom Street linked by the name only, not checked
    17 Jul 1916outcome not readJournal 1916, p. 780 ↗
  • Expenditures totalling many thousands of dollars to named claimants, including PG&E, Rolandi and orphanages, were passed for printing on Supervisor Power's motion.
    14 Aug 1916passed first readingJournal 1916, p. 864 ↗
  • City bills paid, including $6,750 for the Juvenile Detention Home linked by the name only, not checked
    21 Aug 1916passed first readingJournal 1916, p. 885 ↗
  • Board authorized a long list of city expenditures to named claimants, including utilities, street work, fire supplies and child maintenance payments. linked by the name only, not checked
    21 Aug 1916outcome not readJournal 1916, p. 881 ↗
  • City bills paid, including $6,750 for the Juvenile Detention Home
    28 Aug 1916passedJournal 1916, p. 891 ↗
  • Fay Improvement Company given ninety more days on Morse Street linked by the name only, not checked
    25 Sep 1916passedJournal 1916, p. 1002 ↗
  • Fay Improvement Co. was granted more time for street work on Irving Street.
  • City authorizes payments to contractors and suppliers for sewers, hospitals, schools, library books, and other public works. linked by the name only, not checked
    16 Oct 1916outcome not readJournal 1916, p. 1094 ↗
  • Fay Improvement Company given ninety more days on Irving Street linked by the name only, not checked
    16 Oct 1916passedJournal 1916, p. 1065 ↗
  • Board finally passed a resolution authorizing payments to suppliers, charities and contractors, including North Beach playground paving work. linked by the name only, not checked
    30 Oct 1916outcome not readJournal 1916, p. 1111 ↗
  • Flinn & Treacy paid $593.85 for work on Clarendon Avenue linked by the name only, not checked
    22 Jan 1917outcome not readJournal 1917, p. 107 ↗
  • Board authorizes a batch of payments to contractors and suppliers for sewers, schools, jails, streets and water.
    5 Feb 1917passedJournal 1917, p. 159 ↗
  • Resolution proposed authorizing 32 payments to contractors and suppliers for city construction, schools, sewers and water work.
    13 Feb 1917outcome not readJournal 1917, p. 177 ↗
  • Fay Improvement Company given ninety more days on Irving Street linked by the name only, not checked
    26 Mar 1917passedJournal 1917, p. 374 ↗
  • Hogberg & Ludwig paid $12,000 for brickwork at San Francisco Hospital
    2 Apr 1917outcome not readJournal 1917, p. 408 ↗
  • $455 set aside to extend the sewer at Fairmount School
    2 Apr 1917passedJournal 1917, p. 409 ↗
  • Hogberg & Ludwig paid $12,000 for brickwork at San Francisco Hospital linked by the name only, not checked
    9 Apr 1917outcome not readJournal 1917, p. 451 ↗
  • The Board authorized payments totalling tens of thousands of dollars for schools, hospitals, water works, sewers and charities, passed for printing.
    16 Apr 1917passed first readingJournal 1917, p. 490 ↗
  • Expenditures totalling $60,174.68 were authorized for 20 payments to contractors and suppliers for schools, hospitals, water and parks.
    23 Apr 1917passedJournal 1917, p. 508 ↗
  • A resolution authorizing payments to eight contractors and suppliers, including Pacific Gas & Electric, was passed for printing.
    23 Apr 1917passed first readingJournal 1917, p. 513 ↗
  • MacArthur Bros. Co. paid $12,979.03 for Hetch Hetchy tunnel work
    30 Apr 1917passedJournal 1917, p. 537 ↗
  • Board authorizes payments on dozens of city claims for water, transit, hospital, school and street work.
    14 May 1917outcome not readJournal 1917, p. 589 ↗
  • Fay Improvement Company given sixty more days on Irving Street linked by the name only, not checked
    21 May 1917outcome not readJournal 1917, p. 615 ↗
  • Authorizes about thirty city payments to contractors, suppliers and pensioners for transit, hospital, school and water works. linked by the name only, not checked
    21 May 1917passedJournal 1917, p. 604 ↗
  • Fay Improvement Company given ninety more days on Irving Street linked by the name only, not checked
    28 May 1917passedJournal 1917, p. 714 ↗
  • The Board passed for printing an authorization of payments to many contractors and claimants, including library, fire and hospital works. linked by the name only, not checked
    11 Jun 1917passed first readingJournal 1917, p. 786 ↗
  • Board finally passed Resolution 14469 authorizing thirty city payments to contractors and suppliers, including San Francisco Hospital, Hetch Hetchy, and Fire Department work. linked by the name only, not checked
    18 Jun 1917passedJournal 1917, p. 826 ↗
  • Proposed resolution authorizes payment of 29 city claims from several funds, including fire, parks, water and street work; passed for printing.
    2 Jul 1917passed first readingJournal 1917, p. 886 ↗
  • Twenty-nine city bills and claims for fire, water, street and park supplies were authorized and paid.
    10 Jul 1917passedJournal 1917, p. 926 ↗
  • Fay Improvement Company given ninety more days on Alabama Street linked by the name only, not checked
    23 Jul 1917passedJournal 1917, p. 993 ↗
  • $8,455 for kitchen equipment in the new San Francisco Hospital wing linked by the name only, not checked
    6 Aug 1917passed first readingJournal 1917, p. 1023 ↗
  • Supervisors approved about thirty-five payment claims for street repairs, hospital work, Municipal Railway parts, Hetch Hetchy and utility bills. linked by the name only, not checked
    13 Aug 1917passedJournal 1917, p. 1035 ↗
  • Payments to several contractors and suppliers for a school and Municipal Railway work are proposed. linked by the name only, not checked
    4 Sep 1917outcome not readJournal 1917, p. 1164 ↗
  • Fay Improvement Company given sixty more days on Irving Street
    4 Sep 1917outcome not readJournal 1917, p. 1145 ↗
  • Appropriates small sums for street crossings, an Isolation Hospital fire escape, and Alexander Berkman's return from New York.
    17 Sep 1917passedJournal 1917, p. 1177 ↗
  • City Attorney directed to begin condemnation proceedings
  • $210 set aside for toilet bowls at County Jail
    29 Oct 1917outcome not readJournal 1917, p. 1342 ↗
  • Supervisor Power moved to pass for printing a resolution authorizing payments to many claimants, including schools, transit and fire work. linked by the name only, not checked
    5 Nov 1917passed first readingJournal 1917, p. 1354 ↗
  • $7,149.48 more spent finishing Railroad Avenue between Ingerson and San Bruno
    19 Nov 1917passedJournal 1917, p. 1388 ↗
  • Passed for printing a schedule authorizing payments to 22 claimants, including street repairs, a sewer, transit work and library books.
    10 Dec 1917passed first readingJournal 1917, p. 1470 ↗
  • Supervisors authorized payments totalling several thousand dollars to contractors, suppliers and claimants for city work and supplies.
    17 Dec 1917passedJournal 1917, p. 1491 ↗
  • Proposed appropriations of $1,524.22 and $1,442.58 for street paving on Sehwerin and Alabama streets were passed for printing.
    26 Dec 1917passed first readingJournal 1917, p. 1524 ↗
  • T. A. Clark paid $1,524.22 for paving Schwerin Street linked by the name only, not checked
    7 Jan 1918outcome not readJournal 1918 ↗
  • Fay Improvement Company given ninety more days on Greenwich Street linked by the name only, not checked
    21 Jan 1918passedJournal 1918, p. 61 ↗
  • The Board approved payments of about $58,000 in claims to contractors and suppliers for fire, transit, water, jails and schools. linked by the name only, not checked
    28 Jan 1918passedJournal 1918, p. 72 ↗
  • Scott Company paid $9,300 for plumbing at San Francisco Hospital
    11 Feb 1918passedJournal 1918, p. 123 ↗
  • Resolution authorizing payments of city claims to about a dozen vendors, including the Municipal Railways and County Jails, sent to printing.
    25 Feb 1918passed first readingJournal 1918, p. 167 ↗
  • Payments approved for hospital architecture and Municipal Railway electric current
    4 Mar 1918outcome not readJournal 1918, p. 175 ↗
  • Fay Improvement Company given sixty more days on Mississippi Street linked by the name only, not checked
    18 Mar 1918passedJournal 1918, p. 215 ↗
  • Payment of $565.04 to Fay Improvement Co. for asphalt grouting of streets was approved.
    15 Apr 1918passedJournal 1918, p. 302 ↗
  • Payment of $563.08 to Fay Improvement Co. for asphalt grouting of streets was approved.
    15 Apr 1918passedJournal 1918, p. 302 ↗
  • City pays its share of street work fronting city property linked by the name only, not checked
    13 May 1918outcome not readJournal 1918, p. 391 ↗
  • Fay Improvement Co. was paid $592.71 for asphalt grouting on street repairs.
    13 May 1918passedJournal 1918, p. 386 ↗
  • Fay Improvement Company given ninety more days on Forty-fifth Avenue
    20 May 1918passedJournal 1918, p. 417 ↗
  • Owen McHugh paid $1,992.03 for work on Thirty-sixth Avenue
    20 May 1918passedJournal 1918, p. 408 ↗
  • Fay Improvement Company given ninety more days on Division Street linked by the name only, not checked
    24 Jun 1918passedJournal 1918, p. 546 ↗
  • Fay Improvement given 90 more days on Utah Street, held up by the railroad linked by the name only, not checked
    24 Jun 1918passedJournal 1918, p. 546 ↗
  • Crescent Avenue work handed to the Fay Improvement Company instead
    1 Jul 1918outcome not readJournal 1918, p. 572 ↗
  • Resolution authorizing payments for libraries, streets, sewers, Market Street Railway and Twin Peaks Tunnel was passed for printing.
    8 Jul 1918passed first readingJournal 1918 ↗
  • Bills paid for library books, sewers and the Twin Peaks Tunnel
    15 Jul 1918outcome not readJournal 1918, p. 604 ↗
  • Widows' pensions paid to Catholic Humane Bureau and Associated Charities
    22 Jul 1918outcome not readJournal 1918, p. 626 ↗
  • Fay Improvement given 90 more days on Utah Street linked by the name only, not checked
    30 Sep 1918passedJournal 1918, p. 848 ↗
  • Adeline M. Nelson's Forty-fourth Avenue appeal denied, assessment confirmed
    7 Oct 1918outcome not readJournal 1918, p. 854 ↗
  • Fay Improvement Co. given 120 more days on Division Street linked by the name only, not checked
    11 Nov 1918passedJournal 1918, p. 922 ↗
  • Street work contracts with J. G. Harney on Balboa canceled linked by the name only, not checked
    30 Dec 1918passedJournal 1918, p. 1059 ↗
  • Fay Improvement Company asks to drop the Greenwich Street paving order linked by the name only, not checked
    3 Mar 1919submitted to votersJournal 1919, p. 130 ↗
  • Fay Improvement Company given ninety more days on Vermont Street linked by the name only, not checked
    7 Apr 1919outcome not readJournal 1919, p. 241 ↗
  • Fay Improvement Company paid $423.92 for work on Vermont Street
    4 Aug 1919passedJournal 1919, p. 654 ↗
  • Fay Improvement Company given sixty more days on Army Street linked by the name only, not checked
    8 Sep 1919passedJournal 1919, p. 745 ↗
  • Fay Improvement Company given ninety more days on San Bruno Avenue
    29 Sep 1919passedJournal 1919, p. 802 ↗
  • $495 to repair the gutterways at the City Prison
    14 Oct 1919passedJournal 1919, p. 845 ↗
  • Fay Improvement Company given ninety more days on Pierce Street linked by the name only, not checked
    20 Oct 1919passedJournal 1919, p. 666 ↗
  • $321 for sidewalks in front of the Longfellow School linked by the name only, not checked
  • Payments were authorised for Army Street paving, Twin Peaks and Argonne schools, and Hetch Hetchy water construction contracts.
    15 Dec 1919passed first readingJournal 1919, p. 1096 ↗
  • $633 approved for sidewalks in front of the Farragut School
    15 Dec 1919outcome not readJournal 1919, p. 1091 ↗
  • Utah Construction paid $15,907.50 for work on the Hetch Hetchy dam
    22 Dec 1919outcome not readJournal 1919 ↗
  • Fay Improvement Company given forty more days on San Bruno Avenue linked by the name only, not checked
    29 Dec 1919passedJournal 1919, p. 1156 ↗
  • Payment authorizations to several claimants, including Seagrave Co. and Fay Improvement Co., were passed for printing on McLeran's motion.
    12 Jan 1920passed first readingJournal 1920, p. 54 ↗
  • City pays the Moulins for land on Roosevelt Way linked by the name only, not checked
    19 Jan 1920outcome not readJournal 1920, p. 67 ↗
  • Resolution authorizes payment of numbered claims to city suppliers, contractors and utilities, including Hetch Hetchy and hospital bills. linked by the name only, not checked
    19 Jan 1920outcome not readJournal 1920, p. 64 ↗
  • $300,000 more set aside for Hetch Hetchy water work
    26 Jan 1920outcome not readJournal 1920, p. 82 ↗
  • The Board proposed appropriations of $321,050 for Hetch Hetchy water work, a Great Highway contract and a Board of Education elevator.
    26 Jan 1920outcome not readJournal 1920, p. 82 ↗
  • Fay Improvement given ninety more days on Paul Avenue linked by the name only, not checked
    26 Jan 1920passedJournal 1920, p. 91 ↗
  • Street work proposed on Forty-first Avenue between Balboa and Cabrillo
    9 Feb 1920passedJournal 1920, p. 134 ↗
  • Resolution authorizing payments to many vendors and institutions for Hetch Hetchy, Municipal Railways, fire, police and minors' care was passed for printing.
    24 Feb 1920outcome not readJournal 1920, p. 160 ↗
  • Payments from the Water Construction Fund bond issue to claimants, including Edgewater Steel Co. for steel tires, are authorized.
    2 Mar 1920outcome not readJournal 1920, p. 178 ↗
  • Board adopted appropriations of $494.22 for Ocean Beach convenience station, $346 for hospital repairs, $390 and $250 for police work.
    15 Mar 1920passedJournal 1920, p. 226 ↗
  • Payment authorizations for Hetch Hetchy supplies, a locomotive and library books were listed; final vote continues on the next page.
    19 Apr 1920outcome not readJournal 1920, p. 315 ↗
  • A resolution on McLeran's motion proposed paying city suppliers and contractors, including Spring Valley Water and Standard Oil, from city funds.
    3 May 1920outcome not readJournal 1920, p. 360 ↗
  • Fay Improvement Company given ninety more days on Paul Avenue
    10 May 1920passedJournal 1920, p. 381 ↗
  • City to pay Spring Valley Water Co. $10,988.91 for fire hydrants
    11 May 1920outcome not readJournal 1920, p. 386 ↗
  • Fay Improvement Co. paid $6,670.92 for finishing the Great Highway
    1 Jun 1920passed first readingJournal 1920, p. 461 ↗
  • Board authorizes another set of payments from city funds to named claimants; the list continues on the next page. linked by the name only, not checked
    14 Jun 1920outcome not readJournal 1920, p. 506 ↗
  • Fay Improvement Company to pave the north half of Sloat Boulevard linked by the name only, not checked
    14 Jun 1920outcome not readJournal 1920, p. 513 ↗
  • Fay Improvement Company given 90 more days between Taraval and Ulloa
    21 Jun 1920passedJournal 1920, p. 548 ↗
  • Fay Improvement Company to pave the north half of Sloat Boulevard
    21 Jun 1920outcome not readJournal 1920, p. 529 ↗
  • Utah Construction Co. paid $39,497.62 for the Hetch Hetchy dam
    9 Aug 1920outcome not readJournal 1920, p. 659 ↗
  • Payments authorized to contractors and suppliers for Hetch Hetchy, streets, schools, parks, fire and health work. linked by the name only, not checked
    16 Aug 1920passedJournal 1920, p. 668 ↗
  • Fay Improvement Co. paid $7,527 for work on Sloat Boulevard
    13 Sep 1920outcome not readJournal 1920, p. 762 ↗
  • Fay Improvement Co. paid $7,527 for work on Sloat Boulevard
    20 Sep 1920passed first readingJournal 1920, p. 793 ↗
  • $270 set aside for a coping around Island Park
    4 Oct 1920outcome not readJournal 1920, p. 838 ↗
  • Resolution proposed to grant the Fay Improvement Company an extension of sixty days.
    4 Oct 1920outcome not readJournal 1920, p. 839 ↗
  • Joshua Hendy Iron Works paid $4,250 for ten dump cars
    4 Oct 1920outcome not readJournal 1920, p. 835 ↗
  • Joshua Hendy Iron Works paid $4,250 for ten dump cars
    11 Oct 1920passedJournal 1920, p. 846 ↗
  • Resolution would set aside $270 for coping around island parks; the outcome continues on the next page.
    11 Oct 1920outcome not readJournal 1920, p. 852 ↗
  • Resolution authorizing many city claim payments, including Pacific Gas & Electric street lighting, which was laid over one week.
    25 Oct 1920continuedJournal 1920, p. 888 ↗
  • Neal, Stratford & Kerr paid $13,750 for printing election rosters linked by the name only, not checked
    1 Nov 1920outcome not readJournal 1920, p. 902 ↗
  • Authorizes payments to three firms for Municipal Railway repairs, gasoline and brake shoes, totalling $4,799.15.
    6 Dec 1920outcome not readJournal 1920, p. 971 ↗
  • Resolution 18478, an authorization, was taken up for final passage; its text continues on the next page.
    13 Dec 1920outcome not readJournal 1920, p. 992 ↗
  • Resolution authorizing payments to contractors and suppliers from city funds, including Hetch Hetchy and Jefferson School work, passed for printing.
    10 Jan 1921passed first readingJournal 1921, p. 25 ↗
  • Schultz Construction paid $16,944.75 for the Market Street extension
    17 Jan 1921passedJournal 1921, p. 43 ↗
  • Golf links at Balboa Park proposed for the Park Commissioners
    7 Feb 1921passedJournal 1921, p. 106 ↗
  • Coffin Valve paid $14,520 for the Hetch Hetchy slide gates
    15 Feb 1921outcome not readJournal 1921, p. 129 ↗
  • Fay Improvement Company given ninety more days on La Playa
    21 Feb 1921passedJournal 1921, p. 144 ↗
  • Fay Improvement Company paid directly for Laguna Honda Boulevard work linked by the name only, not checked
    21 Mar 1921passedJournal 1921, p. 193 ↗
  • Supervisor Mulvihill proposed a time extension for Fay improvement work; text continues on the next page.
    11 Apr 1921outcome not readJournal 1921, p. 257 ↗
  • Supervisor McLeran's batch of 33 claim payments for city street, school, water and library work was passed for printing.
    11 Apr 1921passed first readingJournal 1921, p. 251 ↗
  • Resolution authorizes payments to contractors and suppliers for street, school, sewer and Hetch Hetchy work, totalling about $80,000.
    18 Apr 1921passedJournal 1921, p. 269 ↗
  • Board authorized payments to dozens of suppliers and contractors, including Hetch Hetchy works and library book binding; vote continues on next page.
    16 May 1921outcome not readJournal 1921, p. 361 ↗
  • $8,375 for Fay Improvement to pave half of Vermont Street
    23 May 1921continuedJournal 1921, p. 443 ↗
  • Fay Improvement Company to repave Second Street between Folsom and Harrison linked by the name only, not checked
    27 Jun 1921passedJournal 1921, p. 551 ↗
  • Concrete sewer ordered in Woolsey Street between Dartmouth and University
    27 Jun 1921passedJournal 1921, p. 551 ↗
  • Fay Improvement Company given 90 more days on Vermont Street
    15 Aug 1921passedJournal 1921, p. 702 ↗
  • Fay Improvement Company given 90 more days on Plymouth Avenue
    26 Sep 1921passedJournal 1921, p. 844 ↗
  • Resolution authorizes payments from the library and Hetch Hetchy water funds to book sellers, suppliers and contractors, continued on the next page.
    3 Oct 1921outcome not readJournal 1921, p. 855 ↗
  • Board approved a long list of routine payments for school furniture, hospital supplies, Hetch Hetchy and street work, 17 to 0. linked by the name only, not checked
    10 Oct 1921passedJournal 1921, p. 875 ↗
  • Resolution proposed giving Fay Improvement Company thirty more days after November 3, 1921 to finish its contract.
    17 Oct 1921outcome not readJournal 1921, p. 901 ↗
  • Fay Improvement Company given ninety more days on Fairfax Avenue linked by the name only, not checked
    24 Oct 1921passedJournal 1921, p. 922 ↗
  • David Serensky allowed a filling station at Grove and Divisadero linked by the name only, not checked
    24 Oct 1921outcome not readJournal 1921, p. 922 ↗
  • $2,000 paid for an electric locomotive for Muni
    7 Nov 1921passedJournal 1921, p. 946 ↗
  • Resolution proposed to authorize payments from $896 to $16,825 to suppliers and contractors for transit, water and street work; passed for printing.
    28 Nov 1921passed first readingJournal 1921, p. 1001 ↗
  • Municipal Railway bills approved for payment to Market Street Railway
    5 Dec 1921outcome not readJournal 1921, p. 1010 ↗
  • The Board approved a $2,000 payment to Fay Improvement Co. for improving Plymouth avenue from Lakeview to Farallones street. linked by the name only, not checked
    16 Jan 1922passedJournal 1922 ↗
  • Fay Improvement Company given ninety more days on Army Street linked by the name only, not checked
    20 Feb 1922outcome not readJournal 1922 ↗
  • Fay Improvement Company given thirty more days on Ulloa Street
    3 Apr 1922passedJournal 1922 ↗
  • Fay Improvement Company given sixty more days on Twenty-second Street linked by the name only, not checked
    17 Apr 1922outcome not readJournal 1922 ↗
  • Fay Improvement Company given thirty more days on Army Street linked by the name only, not checked
    22 May 1922passedJournal 1922 ↗
  • Fay Improvement Company given 60 more days on Hanover Street linked by the name only, not checked
    19 Jun 1922passedJournal 1922 ↗
  • Payment of $1,341.01 approved to The Fay Improvement Co. for street work at Army and Third streets.
    24 Jul 1922outcome not readJournal 1922 ↗
  • Fay Improvement Company given 60 more days at Mission Terrace linked by the name only, not checked
    7 Aug 1922passedJournal 1922 ↗
  • Resolution authorizing about thirty city payments for water, sewer, street and railway work, passed for printing.
    7 Aug 1922passed first readingJournal 1922 ↗
  • Construction Company of North America paid $24,545.45 for aqueduct tunnels linked by the name only, not checked
    14 Aug 1922passedJournal 1922 ↗
  • The Fay Improvement Company was paid $801.83 to build catchbasins in Mission Terrace. linked by the name only, not checked
    6 Nov 1922passedJournal 1922 ↗
  • Fay Improvement Company given forty-five more days on Taraval Street linked by the name only, not checked
    20 Nov 1922passedJournal 1922 ↗
  • Fay Improvement Company given thirty more days on Taraval Street
    22 Jan 1923passedJournal 1923, p. 88 ↗
  • Fay Improvement Company given ninety more days on Ware Street linked by the name only, not checked
    26 Feb 1923passedJournal 1923, p. 183 ↗
  • Resolution authorizes dozens of city payments to suppliers, utilities, contractors and the employees' pension system, March 1923. linked by the name only, not checked
    26 Mar 1923outcome not readJournal 1923, p. 273 ↗
  • Fay Improvement Company given 90 more days on Goethe Street linked by the name only, not checked
  • Fay Improvement Company given ninety more days on Ulloa Street linked by the name only, not checked
    10 Dec 1923passedJournal 1923, p. 1299 ↗
  • Army Street sewer gets $29,000; Isolation Hospital plumbing gets $1,385 linked by the name only, not checked
    21 Jan 1924outcome not readJournal 1924, p. 48 ↗
  • Fay Improvement Company given ninety more days on Stanyan Street linked by the name only, not checked
    21 Jan 1924passedJournal 1924, p. 65 ↗
  • Board finally passed resolution authorizing payment of over fifty city claims, including PG&E, Market Street Railway and Spring Valley Water. linked by the name only, not checked
    28 Jan 1924passedJournal 1924, p. 86 ↗
  • Fay Improvement Company gets sixty more days on Ulloa Street linked by the name only, not checked
    10 Mar 1924passedJournal 1924, p. 266 ↗
  • Fay Improvement Company given sixty more days on Rhode Island Street linked by the name only, not checked
    26 May 1924passedJournal 1924, p. 645 ↗
  • Fay Improvement Company given ninety more days on Campbell Avenue linked by the name only, not checked
    16 Jun 1924passedJournal 1924, p. 712 ↗
  • A $998.76 payment to The Fay Improvement Company for street work on Rhode Island Street between Mariposa and Eighteenth streets is listed. linked by the name only, not checked
    22 Sep 1924outcome not readJournal 1924, p. 1129 ↗
  • The Fay Improvement Company is paid $998.76 for street work on Rhode Island Street between Mariposa and Eighteenth. linked by the name only, not checked
    29 Sep 1924outcome not readJournal 1924, p. 1155 ↗
  • Fay Improvement Company given ninety more days on Ulloa Street linked by the name only, not checked
  • F. K. Falch paid for Dehon Street land bought for schools linked by the name only, not checked
    10 Nov 1924passedJournal 1924, p. 1323 ↗
  • Resolution authorizing a long list of city payments to vendors and contractors from various funds, outcome continues on the next page.
    24 Nov 1924outcome not readJournal 1924, p. 1390 ↗
  • Board authorised 26 payments totalling $82,583.43 to contractors, suppliers and charities from city funds. linked by the name only, not checked
    24 Nov 1924passedJournal 1924, p. 1374 ↗
  • Fay Improvement given ninety more days on Kirkham Street linked by the name only, not checked
  • A resolution authorizes payment of dozens of city claims from departmental funds, including schools, fire, police, transit and parks bills. linked by the name only, not checked
    22 Dec 1924outcome not readJournal 1924, p. 1517 ↗
  • G. Albert Lansburgh paid $8,727.30 for Alvarado School plans linked by the name only, not checked
    5 Jan 1925passedJournal 1925, p. 18 ↗
  • Fay Improvement Company given ninety more days on Twentieth Street linked by the name only, not checked
    2 Feb 1925passedJournal 1925, p. 179 ↗
  • Fay Improvement Company given ninety more days on Kirkham Street linked by the name only, not checked
    2 Mar 1925passedJournal 1925, p. 284 ↗
  • $800 paid to Paul Russo to settle a Municipal Railway claim
    23 Mar 1925passed first readingJournal 1925, p. 372 ↗
  • Fay Improvement Company given 90 more days on Twenty-second Avenue linked by the name only, not checked
  • Fay Improvement Company given 90 more days on Thirty-sixth Avenue linked by the name only, not checked
  • John T. Mahony to be paid $4,128.77 for Southern Police Station linked by the name only, not checked
    10 Aug 1925passedJournal 1925, p. 1163 ↗
  • Fay Improvement Company given sixty more days on Bacon Street linked by the name only, not checked
    21 Sep 1925passedJournal 1925, p. 1376 ↗
  • Supervisor Rossi presented a resolution appropriating funds for miscellaneous building repairs; the vote continues on the next page. linked by the name only, not checked
    28 Sep 1925outcome not readJournal 1925, p. 1396 ↗
  • Money set aside for sewers and the Harbor Emergency Hospital linked by the name only, not checked
    13 Oct 1925passedJournal 1925, p. 1449 ↗
  • The Fay Improvement Company claim of $2,063.40 for improving Forty-eighth Avenue is listed for payment. linked by the name only, not checked
    26 Oct 1925outcome not readJournal 1925, p. 1520 ↗
  • The Fay Improvement Company was paid $2,063.40 for improving Forty-eighth Avenue between Anza Street and Sutro Avenue. linked by the name only, not checked
  • Resolution proposed to appropriate funds for street and road improvements at several San Francisco sites, including Claremont Circle and Arkansas street.
    7 Dec 1925outcome not readJournal 1925, p. 1706 ↗
  • Eleven street jobs funded, including $2,400 for Claremont Circle
    14 Dec 1925outcome not readJournal 1925, p. 1729 ↗
  • $1,920 asked for street work outside a Bacon Street school
    14 Dec 1925passedJournal 1925, p. 1741 ↗
  • Resolution authorizes payment of many claims from library, Hetch Hetchy, Municipal Railway, park and county road funds to various payees. linked by the name only, not checked
    21 Dec 1925outcome not readJournal 1925, p. 1776 ↗
  • $1,920 asked for street work outside a Bacon Street school
    21 Dec 1925passedJournal 1925, p. 1780 ↗
  • The Fay Improvement Co. was listed for $2,320 for improving Thirty-seventh avenue between Anza and Balboa streets. linked by the name only, not checked
    21 Dec 1925outcome not readJournal 1925, p. 1777 ↗
  • Fay Improvement Company given 90 more days on Chestnut Street linked by the name only, not checked
    18 Jan 1926passedJournal 1926, p. 91 ↗
  • $7,000 set aside for a new sewer on Twenty-sixth Avenue linked by the name only, not checked
    1 Mar 1926outcome not readJournal 1926, p. 304 ↗
  • Paul E. Denivelle paid $1,162.50 for work on Telegraph Hill linked by the name only, not checked
    8 Mar 1926outcome not readJournal 1926, p. 332 ↗
  • Fay Improvement Company given 90 more days on Claremont Circle linked by the name only, not checked
    8 Mar 1926passedJournal 1926, p. 361 ↗
  • Fay Improvement Company given sixty more days on Chestnut Street linked by the name only, not checked
    12 Apr 1926passedJournal 1926, p. 557 ↗
  • Wm. Speck paid $2,500 to repair the Sixth Street bridge carriage linked by the name only, not checked
    19 Apr 1926outcome not readJournal 1926, p. 591 ↗
  • Wm. Speck paid $2,500 to repair the Sixth Street bridge carriage linked by the name only, not checked
    26 Apr 1926outcome not readJournal 1926, p. 622 ↗
  • $72,405.90 to L. J. Cohn for Forty-third Avenue main sewer work linked by the name only, not checked
    3 May 1926outcome not readJournal 1926, p. 668 ↗
  • Board authorized about 38 routine city payments, mostly school construction and Relief Home work, for passage to print. linked by the name only, not checked
    10 May 1926passed first readingJournal 1926, p. 714 ↗
  • Resolution 25700 authorizes payments to suppliers for city parks and Hetch Hetchy construction; the list continues on the next page. linked by the name only, not checked
    24 May 1926outcome not readJournal 1926, p. 854 ↗
  • Knittle Bros. paid $4,349.36 for the Glen Park School heating linked by the name only, not checked
    21 Jun 1926outcome not readJournal 1926, p. 1063 ↗
  • Fay Improvement Company given ninety more days on Divisadero Street linked by the name only, not checked
    21 Jun 1926passedJournal 1926, p. 1080 ↗
  • Western Pipe & Steel paid $45,107.78 for the bay pipeline linked by the name only, not checked
    28 Jun 1926passedJournal 1926, p. 1092 ↗
  • City pays small street-work bills across the numbered avenues linked by the name only, not checked
    20 Sep 1926passedJournal 1926, p. 1490 ↗
  • Fay Improvement Company given sixty more days on Divisadero Street linked by the name only, not checked
    20 Sep 1926passedJournal 1926, p. 1508 ↗
  • Eaton & Smith paid $6,387.16 for street work at Anza Street linked by the name only, not checked
    29 Sep 1926outcome not readJournal 1926, p. 1542 ↗
  • $135,000 set aside for the Bay Shore Highway
    25 Oct 1926outcome not readJournal 1926, p. 1669 ↗
  • Fay Improvement Company sells land for $3,250 for Bay Shore Boulevard
    8 Nov 1926outcome not readJournal 1926, p. 1752 ↗
  • $6,100 paid on a claim dated November 1926
    15 Nov 1926outcome not readJournal 1926, p. 1775 ↗
  • Land paid for along the Bay Shore Highway
    22 Nov 1926outcome not readJournal 1926, p. 1807 ↗
  • A resolution authorizes payments to contractors and suppliers from park, school, road, transit and bond funds; its final vote is not shown. linked by the name only, not checked
    6 Dec 1926outcome not readJournal 1926, p. 1911 ↗
  • Spencer Planing Mill paid $560 for millwork at Lincoln Park Clubhouse linked by the name only, not checked
    13 Dec 1926outcome not readJournal 1926 ↗
  • City authorized seventeen payments to contractors and suppliers for parks, schools, roads, a fire house and a tuberculosis preventorium. linked by the name only, not checked
    10 Jan 1927passed first readingJournal 1927, p. 38 ↗
  • Fay Improvement Company given thirty more days on Baker Street linked by the name only, not checked
    31 Jan 1927passedJournal 1927, p. 189 ↗
  • Resolution authorizing payments from park, Hetch Hetchy, school and Municipal Railway funds was passed for printing.
    31 Jan 1927passed first readingJournal 1927, p. 178 ↗
  • Payments from the Park Fund for gas, water and hay used in city parks were authorized; the final vote continues on the next page. linked by the name only, not checked
    7 Feb 1927outcome not readJournal 1927 ↗
  • Fay Improvement Company and others paid for work at city property linked by the name only, not checked
    21 Feb 1927passedJournal 1927, p. 298 ↗
  • Fay Improvement given 90 more days on Southern Heights Boulevard
    28 Feb 1927passedJournal 1927, p. 331 ↗
  • Bernini family paid for land for the Bernal Cut linked by the name only, not checked
    21 Mar 1927outcome not readJournal 1927, p. 459 ↗
  • Fay Improvement Company paid $792 to grade Tompkins Avenue frontage
    11 Apr 1927outcome not readJournal 1927, p. 603 ↗
  • Fay Improvement Company given sixty more days on Southern Heights Boulevard linked by the name only, not checked
    11 Apr 1927passedJournal 1927, p. 614 ↗
  • Fay Improvement Company paid $792 to pave Tompkins Avenue
    18 Apr 1927outcome not readJournal 1927, p. 647 ↗
  • Fay Improvement Company given ninety more days on Diamond Street linked by the name only, not checked
    25 Apr 1927passedJournal 1927, p. 698 ↗
  • Fay Improvement Company paid $7,591.43 for paving Southern Heights Avenue linked by the name only, not checked
    31 May 1927outcome not readJournal 1927, p. 1077 ↗
  • Payments authorized to many contractors and suppliers for city parks, public libraries, Hetch Hetchy water works and Municipal Railway. linked by the name only, not checked
    20 Jun 1927outcome not readJournal 1927, p. 1225 ↗
  • Youdall and Clifford paid $90,279.30 for the Buena Vista Park tunnel linked by the name only, not checked
    11 Jul 1927passed first readingJournal 1927, p. 1298 ↗
  • A. Guthrie & Co. paid $47,805.47 for Hetch Hetchy aqueduct tunnels linked by the name only, not checked
    13 Jul 1927outcome not readJournal 1927, p. 1255 ↗
  • Board proposed payments to contractors and suppliers for park, school, Muni, Hetch Hetchy and tunnel work; vote continues next page. linked by the name only, not checked
    18 Jul 1927outcome not readJournal 1927, p. 1338 ↗
  • A. Guthrie & Co. paid $49,215.98 for Hetch Hetchy aqueduct tunnels linked by the name only, not checked
    18 Jul 1927outcome not readJournal 1927, p. 1358 ↗
  • City bills paid for Hetch Hetchy tunnels, parks and streetcars linked by the name only, not checked
    25 Jul 1927passedJournal 1927, p. 1379 ↗
  • Miraloma Park deeds accepted and the land declared public streets
    1 Aug 1927passed first readingJournal 1927, p. 1435 ↗
  • Fay Improvement Company's contract at Fourteenth Avenue and Rivera Street cancelled
    8 Aug 1927outcome not readJournal 1927, p. 1483 ↗
  • City pays for street work in front of its own property linked by the name only, not checked
    8 Aug 1927outcome not readJournal 1927, p. 1473 ↗
  • A claim of $6,367.23 was listed for payment to Fay Improvement Co. for playground courts and repairs.
    8 Aug 1927outcome not readJournal 1927, p. 1475 ↗
  • A claim of $876.37 was listed for payment to Fay Improvement Co. for a tennis court addition at Funston playground.
    8 Aug 1927outcome not readJournal 1927, p. 1475 ↗
  • The Fay Improvement Co. was paid $876.37 to add a tennis court at Funston playground.
    15 Aug 1927passedJournal 1927, p. 1511 ↗
  • The Fay Improvement Co. was paid $6,367.23 to build courts at Funston playground and repair James Lick playground.
    15 Aug 1927passedJournal 1927, p. 1511 ↗
  • Fay Improvement Company given 90 more days on Diamond Street
    2 Sep 1927outcome not readJournal 1927, p. 1395 ↗
  • Resolution authorizing payments to contractors and suppliers for street work, museum and other city projects passed for printing.
    31 Oct 1927passed first readingJournal 1927, p. 2081 ↗
  • A. E. Hennessey paid $28,178.48 for the Turk Street improvement linked by the name only, not checked
    7 Nov 1927outcome not readJournal 1927, p. 2138 ↗
  • Fay Improvement Company given sixty more days on Armstrong Avenue linked by the name only, not checked
  • The Board passed for printing a resolution authorizing payments for school, fire and playground work, including Sherman School and Portola Junior High School. linked by the name only, not checked
    9 Jan 1928passed first readingJournal 1928, p. 45 ↗
  • Payments proposed to contractors and suppliers for Galileo and Mission High Schools, Mission Junior High, and Fire Engine House 18; vote continues next page. linked by the name only, not checked
    16 Jan 1928outcome not readJournal 1928, p. 65 ↗
  • Resolution authorizing city payments to contractors and suppliers for parks, schools, highways and transit was passed for printing. linked by the name only, not checked
    23 Jan 1928passed first readingJournal 1928, p. 107 ↗
  • Bills paid for playground tennis courts and violinist George Enesco linked by the name only, not checked
    6 Feb 1928outcome not readJournal 1928, p. 158 ↗
  • Battista Boeto paid for land taken for Bay Shore Boulevard linked by the name only, not checked
    6 Feb 1928outcome not readJournal 1928, p. 199 ↗
  • Bills paid for Engine House No. 18 and the Steinhart Aquarium linked by the name only, not checked
    14 Feb 1928outcome not readJournal 1928, p. 246 ↗
  • Land bought from S. Brizzolara for the Francisco School linked by the name only, not checked
    28 May 1928outcome not readJournal 1928, p. 1077 ↗
  • Bills paid for Hetch Hetchy explosives and the Tehama Street rebuild linked by the name only, not checked
    11 Jun 1928outcome not readJournal 1928, p. 1185 ↗
  • The Fay Improvement Co. gets $7,256.52 for the City's share of improving Montgomery Street. linked by the name only, not checked
    18 Jun 1928passedJournal 1928, p. 1223 ↗
  • Fay Improvement Company's $4,891.91 for West Portal Avenue put off linked by the name only, not checked
    18 Jun 1928outcome not readJournal 1928, p. 1243 ↗
  • A resolution with no subject on this page linked by the name only, not checked
    25 Jun 1928passed first readingJournal 1928, p. 1313 ↗
  • Claim of $1,320 to The Fay Improvement Company for the City's share of Mariposa Street roadway work is listed. linked by the name only, not checked
    6 Aug 1928outcome not readJournal 1928, p. 1601 ↗
  • The Fay Improvement Company claimed $3,160 for the city's share of paving Carolina Street; payment pending. linked by the name only, not checked
    6 Aug 1928outcome not readJournal 1928, p. 1602 ↗
  • Pay Improvement Company given ninety more days at Fourteenth and Rivera
    13 Aug 1928passedJournal 1928, p. 1655 ↗
  • Claim of $4,000 to The Fay Improvement Co. as part payment for improving Parker Avenue, listed for payment. linked by the name only, not checked
    27 Aug 1928outcome not readJournal 1928, p. 1735 ↗
  • Board adopted payment of twenty city claims for Laguna Honda Home supplies, street work, lighting and services in September 1928.
    24 Sep 1928passedJournal 1928, p. 2072 ↗
  • Payment of $1,774 to The Fay Improvement Co. for improving Thirtieth Avenue between Kirkham and Lawton streets was approved. linked by the name only, not checked
  • Payment of $1,882.20 to The Fay Improvement Co. for improving Thirtieth Avenue between Moraga and Noriega streets was approved.
  • Proposed County Road Fund appropriations for paving Santiago Street and other street improvements, including Bay and Lyon streets.
    8 Oct 1928outcome not readJournal 1928, p. 2222 ↗
  • Fay Improvement Company to grade and pave Santiago Street for $13,500
    22 Oct 1928outcome not readJournal 1928, p. 2281 ↗
  • Fay Improvement Co. was paid a first installment for improving Santiago Street between Twenty-second and Twenty-fourth Avenues.
    3 Dec 1928outcome not readJournal 1928, p. 2545 ↗
  • Fay Improvement Co. claim for $4,500.00, first payment for improving Santiago street, listed for payment.
    10 Dec 1928outcome not readJournal 1928, p. 2582 ↗
  • The Board's December 10, 1928 schedule approves 21 payments, including street, boulevard, school, concert and library claims.
    10 Dec 1928outcome not readJournal 1928, p. 2596 ↗
  • Proposed street improvement resolution for Alabama, Beach, Wawona and Portola streets was passed for printing.
    17 Dec 1928passed first readingJournal 1928, p. 2653 ↗
  • Fay Improvement Company given thirty more days on Marina Boulevard
    17 Dec 1928passedJournal 1928, p. 2670 ↗
  • Harney, Lynch, Fay and Holland paid for work on four streets
    24 Dec 1928outcome not readJournal 1928, p. 2687 ↗
  • Fay Improvement Co. claim for $4,287.17 for street frontage work on Twenty-second Avenue is listed for payment.
    24 Dec 1928outcome not readJournal 1928, p. 2711 ↗
  • Finance Committee's resolution authorizes payments to contractors and suppliers for city works, Hetch Hetchy and a junior high school, passed for printing.
    31 Dec 1928passed first readingJournal 1928, p. 2731 ↗
  • Claim of $4,287.17 to Fay Improvement Co. for street work on Twenty-second Avenue between Quintara and Rivera streets.
    3 Jan 1929outcome not readJournal 1929, p. 16 ↗
  • Capital Decorating Co. paid $850 for Market Street electric lights
    14 Jan 1929outcome not readJournal 1929, p. 47 ↗
  • Board authorized about 28 routine claim payments for roads, Municipal Railways, Hetch Hetchy water works and schools; outcome printed on previous page.
    21 Jan 1929outcome not readJournal 1929, p. 116 ↗
  • $42,104.59 paid to Pacific Gas and Electric for Municipal Railway power
    28 Jan 1929outcome not readJournal 1929, p. 148 ↗
  • Fay Improvement paid $525 for school frontage work on Tompkins Street
    4 Feb 1929outcome not readJournal 1929, p. 248 ↗
  • A payment of $919.50 went to The Fay Improvement Co. for sewer work at the Portola Drive and Walthman Way intersection. linked by the name only, not checked
    4 Feb 1929outcome not readJournal 1929, p. 215 ↗
  • Fay Improvement paid $525 for school frontage work on Tompkins Street
    11 Feb 1929outcome not readJournal 1929, p. 268 ↗
  • The Finance Committee's resolution authorizes payments to city contractors and suppliers, including Municipal Railways power and Police Department gasoline; the vote is not printed here.
    25 Feb 1929outcome not readJournal 1929, p. 355 ↗
  • Resolution 30488 authorizes payments to named claimants from the Hetch Hetchy water construction fund and other funds; the list continues.
    4 Mar 1929outcome not readJournal 1929, p. 400 ↗
  • Fay Improvement Company allowed a spur track at Carolina and Fifteenth
    25 Mar 1929outcome not readJournal 1929, p. 578 ↗
  • Fay Improvement Company given ninety more days on Noriega Street
    25 Mar 1929outcome not readJournal 1929, p. 588 ↗
  • Fay Improvement Company allowed a spur track at Carolina and Fifteenth
    1 Apr 1929outcome not readJournal 1929, p. 613 ↗
  • The Fay Improvement Co. is listed for $2,000.00 for improving Euclid Avenue east of Parker Street. linked by the name only, not checked
    8 Apr 1929outcome not readJournal 1929, p. 654 ↗
  • A $2,000 payment to The Fay Improvement Co. for improving Euclid Avenue east of Parker Street is listed for payment. linked by the name only, not checked
    15 Apr 1929outcome not readJournal 1929, p. 699 ↗
  • Payment of $1,384.34 to The Fay Improvement Co. for asphalting tennis courts at Mission Playground.
    29 Apr 1929outcome not readJournal 1929, p. 801 ↗
  • Fay Improvement Company given thirty more days on Harrison Street
    6 May 1929outcome not readJournal 1929, p. 906 ↗
  • Fay Improvement Co. was owed $1,384.34 for asphalting tennis courts at Mission Playground.
    6 May 1929outcome not readJournal 1929, p. 890 ↗
  • Payment of $1,632.88 to The Fay Improvement Company for widening Taraval Street fronting City property is listed for approval.
    10 Jun 1929outcome not readJournal 1929, p. 1167 ↗
  • Fay Improvement Company given 30 more days on Forty-first Avenue linked by the name only, not checked
    10 Jun 1929outcome not readJournal 1929, p. 971 ↗
  • The Fay Improvement Company is paid $1,632.88 for widening the roadway on Taraval street.
    17 Jun 1929outcome not readJournal 1929, p. 1229 ↗
  • Fay Improvement Company to rebuild Portola Drive for $125,083.60 linked by the name only, not checked
    15 Jul 1929outcome not readJournal 1929, p. 1396 ↗
  • Fay Improvement Company to rebuild Portola Drive for $125,083.60 linked by the name only, not checked
    22 Jul 1929outcome not readJournal 1929, p. 1457 ↗
  • Land bought for playgrounds from the Hueters and the Archbishop
    29 Jul 1929outcome not readJournal 1929, p. 1507 ↗
  • Oil tank permits granted, the largest to the Fay Improvement Company
    5 Aug 1929outcome not readJournal 1929, p. 1543 ↗
  • The Fay Improvement Co. is paid $519.20 for repaving Hayes and Polk streets near Market Street.
    5 Aug 1929outcome not readJournal 1929, p. 1531 ↗
  • Fay Improvement Company given thirty more days on Noriega Street
    5 Aug 1929outcome not readJournal 1929, p. 1557 ↗
  • $235.31 for the crossing at Payson Street and St. Charles Avenue
    12 Aug 1929passedJournal 1929, p. 1594 ↗
  • Oil tank permits granted, the largest to the Fay Improvement Company
    12 Aug 1929outcome not readJournal 1929, p. 1575 ↗
  • The Fay Improvement Co. was paid $4,500 for improving Portola drive from Twenty-fourth street to Fowler avenue.
    12 Aug 1929outcome not readJournal 1929, p. 1587 ↗
  • Finance Committee's authorizations of street improvement progress payments and a pension payment were passed for printing.
    12 Aug 1929passed first readingJournal 1929, p. 1586 ↗
  • Twenty oil tanks approved, plus a boiler at 1300 Sixteenth Street
    19 Aug 1929outcome not readJournal 1929, p. 1635 ↗
  • Macdonald & Kahn paid $45,600 for work on the Bernal Cut
    19 Aug 1929passedJournal 1929, p. 1616 ↗
  • Finance Committee resolution authorizing payment of fifteen city claims, including Spring Valley Water main work, was passed for printing.
    19 Aug 1929passed first readingJournal 1929, p. 1627 ↗
  • Twenty oil tanks approved, plus a boiler at 1300 Sixteenth Street
    26 Aug 1929passedJournal 1929, p. 1666 ↗
  • Claim of $1,660.13 to The Fay Improvement Co. for Harrison Street paving assessment was listed for payment.
    26 Aug 1929outcome not readJournal 1929, p. 1675 ↗
  • The Fay Improvement Company paid $699.55 for widening Ocean Avenue
    26 Aug 1929outcome not readJournal 1929 ↗
  • The Fay Improvement Co. claim of $1,660.13 for improving Harrison Street between Fifteenth and Sixteenth is listed for payment.
    3 Sep 1929outcome not readJournal 1929, p. 1709 ↗
  • Payment of $12,000 to Fay Improvement Co. for the second installment on Portola Drive improvement is listed.
    16 Sep 1929outcome not readJournal 1929, p. 1786 ↗
  • Fay Improvement Co. was paid $12,000 for a second payment on Portola drive improvements.
    23 Sep 1929passedJournal 1929, p. 1831 ↗
  • Bills paid for Hetch Hetchy supplies and Golden Gate Park paving
    21 Oct 1929passedJournal 1929, p. 2018 ↗
  • Passed for printing: authorizes payments of 17 claims to contractors and suppliers, including Fay Improvement Co.'s $39,000 Portola drive payment.
    18 Nov 1929passed first readingJournal 1929, p. 2138 ↗
  • Thollander Construction paid $8,154.35 for Engine House No. 47
    25 Nov 1929outcome not readJournal 1929, p. 2186 ↗
  • California Pacific Title paid $167.50 for the Wolf property purchase
    9 Dec 1929outcome not readJournal 1929, p. 2312 ↗
  • Agostino and Maria Calcagno paid for damage from Bay Shore Boulevard
    9 Dec 1929outcome not readJournal 1929, p. 2311 ↗
  • Payment of $1,709.55 to Fay Improvement Co. for beacon lights at Market Street safety stations.
    16 Dec 1929outcome not readJournal 1929, p. 2352 ↗
  • Fay Improvement Company was paid $28,500 for the fifth payment on Portola Drive improvement. linked by the name only, not checked
    23 Dec 1929outcome not readJournal 1929, p. 2391 ↗
  • Payment of $1,709.55 approved to Fay Improvement Co. for beacon lights at Market Street safety stations.
    23 Dec 1929passedJournal 1929, p. 2392 ↗
  • Board proposed paying city contractors and suppliers for school, street, library and Hetch Hetchy work, passed for printing.
    20 Jan 1930passed first readingJournal 1930, p. 158 ↗
  • Fay Improvement Company gets sixty more days on Portola Drive
    3 Feb 1930outcome not readJournal 1930, p. 257 ↗
  • A seventh payment of $20,000 to The Fay Improvement Company for improving Portola drive from Twenty-fourth street to Fowler avenue is listed. linked by the name only, not checked
    10 Feb 1930outcome not readJournal 1930, p. 275 ↗
  • The Fay Improvement Company was paid $20,000 for the seventh payment on Portola drive from Twenty-fourth street to Fowler avenue. linked by the name only, not checked
    24 Feb 1930passedJournal 1930, p. 570 ↗
  • Fay Improvement Company granted ninety more days on Belle Avenue linked by the name only, not checked
    3 Mar 1930outcome not readJournal 1930, p. 756 ↗
  • Pacific Gas & Electric paid for Civic Auditorium gas and light
    31 Mar 1930passedJournal 1930, p. 903 ↗
  • Claim of $2,046.66 to The Fay Improvement Co. for resurfacing park tennis courts is listed; outcome on next page.
    12 May 1930outcome not readJournal 1930, p. 1181 ↗
  • Fay Improvement Company granted a 60-day extension to finish Bay Shore Avenue work between Wheeler and Tunnel Avenues.
    12 May 1930passedJournal 1930, p. 1196 ↗
  • The Fay Improvement Co. was paid $2,046.66 for resurfacing asphalt tennis courts.
    19 May 1930outcome not readJournal 1930, p. 1249 ↗
  • Fay Improvement Co. was paid $1,350.62 as final payment for Portola drive improvements.
    9 Jun 1930outcome not readJournal 1930, p. 1480 ↗
  • Fay Improvement Co. was paid a final $1,350.62 for improving Portola drive from Twenty-fourth street to Fowler avenue. linked by the name only, not checked
    16 Jun 1930outcome not readJournal 1930, p. 1517 ↗
  • Final payment of $1,915.54 to Fay Improvement Co. for airport macadam work is listed.
    7 Jul 1930outcome not readJournal 1930, p. 1658 ↗
  • Fay Improvement Company given 90 more days on Utah Street
    25 Aug 1930passedJournal 1930, p. 2040 ↗
  • Finance Committee's payment authorizations to many claimants from city funds, including Muni, Hetch Hetchy and school equipment, were passed for printing.
    22 Sep 1930passed first readingJournal 1930, p. 2231 ↗
  • Fay Improvement Company proposed a 90-day extension to finish Harrison Street work between Second and Third Streets.
    29 Sep 1930outcome not readJournal 1930, p. 2283 ↗
  • Park and playground bills paid to fence, lumber and oil suppliers
    29 Sep 1930outcome not readJournal 1930, p. 2258 ↗
  • First payment of $5,100.00 to Fay Improvement Co. for improving Harrison Street between Second and Third Streets is listed for payment.
    27 Oct 1930outcome not readJournal 1930, p. 2415 ↗
  • Second payment of $2,700.00 to Fay Improvement Company for improving Utah and Nineteenth streets is listed. linked by the name only, not checked
    3 Nov 1930outcome not readJournal 1930, p. 2477 ↗
  • Second payment of $3,900.00 to Fay Improvement Company for improving Harrison street between Second and Third streets. linked by the name only, not checked
    3 Nov 1930outcome not readJournal 1930, p. 2477 ↗
  • Fay Improvement Company given 90 more days on Utah Street
  • Fay Improvement Company was paid $2,550, the city's third share, for improving Utah and Nineteenth streets.
  • Third payment of $2,550 to Fay Improvement Company for paving Utah Street between Eighteenth and Nineteenth Streets.
    8 Dec 1930outcome not readJournal 1930, p. 2683 ↗
  • Resolution authorizing payments to many city claimants from park, road, railway, school and sewer funds was passed for printing.
    15 Dec 1930passed first readingJournal 1930, p. 2745 ↗
  • Finance Committee's park and street claims to contractors and suppliers were passed for printing.
    15 Dec 1930passed first readingJournal 1930, p. 2744 ↗
  • Fay Improvement Company given ninety more days on Harrison Street
    12 Jan 1931passedJournal 1931, p. 97 ↗
  • Fay Improvement Company is paid $3,300 as third payment for improving Harrison Street between Second and Third. linked by the name only, not checked
    19 Jan 1931outcome not readJournal 1931, p. 139 ↗
  • Jacks & Irvine paid $16,051.75 for the Portola field house
    26 Jan 1931outcome not readJournal 1931, p. 204 ↗
  • The Board authorized payments from city funds to several claimants, including work at Fleishhacker Pool. linked by the name only, not checked
    2 Feb 1931outcome not readJournal 1931, p. 263 ↗
  • Resolution 34052 authorizes payments to suppliers and contractors for streets, water pipe, school supplies and tax installments.
    9 Mar 1931outcome not readJournal 1931, p. 566 ↗
  • Fay Improvement Company given ninety more days on Harrison Street
    6 Apr 1931passedJournal 1931, p. 759 ↗
  • The Board authorized payments from the Library Fund to several suppliers, including book sellers and a janitorial company, for library work.
    18 May 1931outcome not readJournal 1931, p. 996 ↗
  • The Fay Improvement Company is authorized to be paid $714.60 for repaving playground courts.
    22 Jun 1931outcome not readJournal 1931, p. 2249 ↗
  • $2,609.30 to Golden State Milk Products for park ice cream
    29 Jun 1931outcome not readJournal 1931, p. 2295 ↗
  • Fay Improvement Company given 90 more days on Harrison Street
  • Resolution passed for printing authorizes payments to contractors and suppliers for library, street, sewer, water and power work.
    13 Jul 1931passed first readingJournal 1931, p. 2417 ↗
  • $1,643.70 for library books from G. E. Stechert & Co.
    20 Jul 1931outcome not readJournal 1931, p. 2449 ↗
  • Resolution passed for printing authorizing $2,199.77 in Playground Fund payments to three claimants for supplies, repairs and equipment.
    17 Aug 1931passed first readingJournal 1931, p. 2644 ↗
  • Fifteen claims for payment from city funds, including Palace of Fine Arts reconstruction, were passed for printing.
    24 Aug 1931passed first readingJournal 1931, p. 2697 ↗
  • Paul Denivelle paid for rebuilding the Palace of Fine Arts
    31 Aug 1931outcome not readJournal 1931, p. 2721 ↗
  • Payment of $3,900 to Fay Improvement Company for street improvements on Harrison, Hawthorne and Vassar Place.
    28 Sep 1931outcome not readJournal 1931, p. 2870 ↗
  • Finance Committee recommends paying city claims to suppliers and contractors, including Hetch Hetchy and Municipal Railway bills, for passage to print.
    28 Sep 1931outcome not readJournal 1931, p. 2869 ↗
  • Resolution proposes paying 18 claimants from the Hetch Hetchy Construction Fund for supplies and services.
    5 Oct 1931outcome not readJournal 1931, p. 2893 ↗
  • Fay Improvement Company gets the Alemany Boulevard job for $22,424 linked by the name only, not checked
    13 Oct 1931outcome not readJournal 1931, p. 2952 ↗
  • B. Miles given ninety more days on Sunnydale Avenue linked by the name only, not checked
    19 Oct 1931passedJournal 1931, p. 2984 ↗
  • Authorizes payment of many claims for parks, playgrounds, streets and water to suppliers and contractors, sent forward for printing.
    26 Oct 1931outcome not readJournal 1931, p. 3025 ↗
  • Fay Improvement Company paid $5,000 as fifth instalment for improving Harrison Street between Second and Third Streets. linked by the name only, not checked
    2 Nov 1931outcome not readJournal 1931, p. 3045 ↗
  • Fay Improvement Company gets the Alemany Boulevard job for $22,424 linked by the name only, not checked
    2 Nov 1931outcome not readJournal 1931, p. 2925 ↗
  • A $4,650.00 first payment to The Fay Improvement Company for Alemany boulevard section B was listed on the Boulevard Bond Fund schedule. linked by the name only, not checked
    16 Nov 1931outcome not readJournal 1931, p. 3101 ↗
  • Claim of $4,650 to Fay Improvement Company for first payment on Alemany boulevard improvement, contract No. 32. linked by the name only, not checked
    23 Nov 1931outcome not readJournal 1931, p. 3148 ↗
  • Finance Committee recommended paying 20 claims, including symphony, Municipal Railway and Hetch Hetchy bills; outcome continues next page.
    30 Nov 1931outcome not readJournal 1931, p. 3218 ↗
  • Symphony and opera bills paid, including $2,000 to the Musical Association
    7 Dec 1931outcome not readJournal 1931, p. 3247 ↗
  • F. Rynveld & Sons paid $2,690.30 for bulbs for the parks
    21 Dec 1931outcome not readJournal 1931, p. 3388 ↗
  • Fay Improvement Company granted sixty more days on Alemany Boulevard
    4 Jan 1932outcome not readJournal 1932, p. 22 ↗
  • Fay Improvement Company to build Sunset Boulevard for $117,077.87
    31 May 1932outcome not readJournal 1932, p. 970 ↗
  • Fay Improvement Company to build Sunset Boulevard for $117,077.87
    6 Jun 1932outcome not readJournal 1932, p. 1009 ↗
  • Fay Improvement Company given sixty more days on Clement Street
    5 Sep 1933outcome not readJournal 1933, p. 1607 ↗
  • Fay Improvement Company given ninety more days on Woodside Avenue
    5 Sep 1933outcome not readJournal 1933, p. 1607 ↗
  • Fay Improvement Company given 45 more days on Woodside Avenue
    22 Jan 1934outcome not readJournal 1934, p. 124 ↗
  • Hawkins Improvement Company to be heard on the Woodside Avenue bill
    26 Mar 1934outcome not readJournal 1934, p. 463 ↗
  • Woodside Avenue appeal put off at attorney Theo. Savage's request
    2 Apr 1934passedJournal 1934, p. 479 ↗
  • Appeals by Hawkins Improvement Company and J. V. Campbell against a Woodside Avenue paving assessment were put off one week.
    9 Apr 1934continuedJournal 1934, p. 503 ↗
  • Woodside Avenue paving appeal taken up in the afternoon session
    16 Apr 1934passedJournal 1934, p. 522 ↗
  • No property owner protested the street work assessment on Williams Avenue between Third and Newhall streets, so the Public Works Department was informed.
    10 Jan 1938outcome not readJournal 1938, p. 35 ↗
  • A hearing on property owners' protests against paving assessments on Funston Avenue drew none, so Public Works was told to proceed.
    17 Jan 1938outcome not readJournal 1938 ↗
  • Hearing on paving assessments for Thirty-fifth avenue and Quintara found no protest, so Public Works was notified.
    7 Feb 1938outcome not readJournal 1938 ↗
  • No protests were made at the hearing on the Girard and Mansell street improvement assessment, so Public Works was notified to proceed with the Fay Improvement Company contract.
    28 Mar 1938outcome not readJournal 1938 ↗
  • No protest filed against the cost of Chas. Harney's street work
    23 May 1938outcome not readJournal 1938 ↗
  • Assessments for paving work on Quintara Street and Twenty-fourth Avenue by Fay Improvement Company were confirmed; no protests received. linked by the name only, not checked
    14 Jul 1941outcome not readJournal 1941 ↗
  • Hearing on protests against a paving assessment for Fifteenth Avenue near Lake Street; outcome continues on next page.
    25 Aug 1941outcome not readJournal 1941 ↗
  • The Board confirmed the assessment for paving Thirty-eighth Avenue between Taraval and Ulloa Streets after no protests were received.
    15 Sep 1941outcome not readJournal 1941 ↗
  • Assessment for paving Thirty-seventh Avenue between Moraga and Noriega Streets by The Fay Improvement Company was approved.
    8 Jun 1942passedJournal 1942 ↗
  • Assessment for paving Sunnydale Avenue between Hahn and Schwerin Streets by The Fay Improvement Company was confirmed; no protests filed.
    20 Jul 1942passedJournal 1942 ↗
  • Assessment for paving Melrose and Stillings Avenues by Fay Improvement Company was confirmed, as no protests were made.
    14 Dec 1942outcome not readJournal 1942 ↗
  • Board confirmed the paving assessment on Visitacion Avenue between Hahn and Schwerin Streets after no protests were made.
    22 Mar 1943outcome not readJournal 1943, p. 604 ↗
  • No protests, so the Ulloa Street paving assessment is confirmed
    17 May 1943outcome not readJournal 1943 ↗
  • Assessment for paving Ulloa Street between Forty-second and Forty-third Avenues confirmed, with no protests, for Fay Improvement Company.
    24 May 1943outcome not readJournal 1943 ↗
  • Fay Improvement Company and Benjamin Serbin sell a Sunset school site
    30 Oct 1944passedJournal 1944, p. 2232 ↗
  • Seven erroneous tax payments, refunds of $20.64 to $106.46, proposed for named property owners.
    25 Jun 1945outcome not readJournal 1945, p. 1686 ↗
  • Fay Improvement Company's $717.64 damage claim over Rochambeau Playground work is proposed for payment from the Recreation fund.
    28 Jan 1946outcome not readJournal 1946, p. 164 ↗
  • Assessment for paving Carroll Avenue between Third and Jennings Streets was confirmed with no protests.
    15 Jul 1946passedJournal 1946, p. 2235 ↗
  • Hearing on assessment for paving Thirty-sixth Avenue between Pacheco and Quintara; no protests; referred to Public Works.
    31 Mar 1947referredJournal 1947 ↗
  • Paving bills confirmed on Thirty-eighth Avenue, Girard and Rivera Streets
    8 Dec 1947referredJournal 1947 ↗
  • No one protests Fay Improvement Company's paving bill on Tunnel Avenue linked by the name only, not checked
    2 Feb 1948passed first readingJournal 1948, p. 55 ↗
  • Fay Improvement Company paid $2,500 for land for the Alemany viaduct linked by the name only, not checked
    17 May 1948passedJournal 1948, p. 321 ↗
  • The Board confirmed the assessment for paving Lathrop Avenue between Peninsula and Tocoloma Avenues and referred it to Public Works. linked by the name only, not checked
    26 Jul 1948referredJournal 1948 ↗
  • Board hears property owners' protests against paving work on Barneveld Avenue and Loomis Street; outcome continues on next page.
    8 Nov 1948outcome not readJournal 1948 ↗
  • Fay Improvement Company's Arkansas Street paving assessment confirmed without protest
    28 Feb 1949outcome not readJournal 1949 ↗
  • Assessment for Elmira Street sewer and street work by Fay Improvement Company was confirmed after no protests and sent to Public Works.
    12 Sep 1949referredJournal 1949 ↗
  • Board opened a hearing on protests against the Elmira Street sewer and street improvement assessment between Industrial Street and Shaffer Avenue.
    26 Sep 1949outcome not readJournal 1949 ↗
  • No protests were made, so the paving assessment for Goettingen Street was confirmed and sent to Public Works.
    7 Nov 1949referredJournal 1949 ↗
  • Palou Avenue paving assessment by Fay Improvement Company was confirmed after no protests and referred to Public Works. linked by the name only, not checked
    21 Nov 1949referredJournal 1949 ↗
  • Ban on job discrimination refused, then reopened for another vote linked by the name only, not checked
    23 Jan 1950refusedJournal 1950 ↗
  • Board confirmed the assessment for paving Silliman Street between Amherst and Princeton by Fay Improvement Company and referred it to Public Works.
    6 Mar 1950referredJournal 1950, p. 175 ↗
  • The assessment for paving the west half of Colby Street near Silver Avenue was confirmed with no protests and referred to Public Works.
    22 May 1950referredJournal 1950, p. 480 ↗
  • Assessment for paving Knox Street between Felton and Burrows Streets was confirmed without protest and referred to Public Works.
    10 Jul 1950referredJournal 1950, p. 618 ↗
  • Assessment for paving Quintara Street between Twenty-eighth and Twenty-ninth Avenues confirmed with no protests and sent to Public Works.
    7 Aug 1950referredJournal 1950, p. 689 ↗
  • Paving assessment for Farnum and Moffitt Streets by Fay Improvement Company was confirmed and sent to Public Works. linked by the name only, not checked
    14 Aug 1950referredJournal 1950, p. 710 ↗
  • No protests were made, so the paving of part of Ina Court by The Fay Improvement Company went to Public Works.
    28 Aug 1950referredJournal 1950, p. 763 ↗
  • No protests were filed, so the Elmira Street paving by Fay Improvement Company was confirmed and sent to Public Works.
    9 Oct 1950referredJournal 1950, p. 900 ↗
  • No one protests the Excelsior Avenue paving at Munich Street
    30 Oct 1950outcome not readJournal 1950, p. 937 ↗
  • No protests were filed, so the Bowdoin Street paving assessment by Fay Improvement Company was confirmed and sent to Public Works.
    13 Nov 1950referredJournal 1950 ↗
  • Property owners protested assessments for paving part of Leland Avenue, and the protests were re-referred to committee.
    18 Dec 1950referredJournal 1950 ↗
  • Board to hear protests on proposed improvement of the Leland Avenue intersections at Hahn and Sawyer Streets.
    26 Dec 1950outcome not readJournal 1950, p. 1067 ↗
  • Assessment for paving Twenty-second Street between De Haro and Carolina Streets was confirmed and sent to Public Works.
    15 Jan 1951referredJournal 1951 ↗
  • Assessment for paving the Leland Avenue intersections at Hahn and Sawyer Streets was confirmed and sent to Public Works.
    15 Jan 1951passedJournal 1951, p. 48 ↗
  • Paving assessment for Pennsylvania Avenue between Mariposa and Eighteenth confirmed with no protests and sent to Public Works.
    26 Feb 1951outcome not readJournal 1951 ↗
  • Assessment confirmed for paving part of Athens Street linked by the name only, not checked
    9 Apr 1951referredJournal 1951 ↗
  • Visitacion Avenue improvement by The Fay Improvement Company confirmed with no protests and sent to Public Works.
    23 Apr 1951referredJournal 1951 ↗
  • Peru Avenue, Valmar Terrace and Moscow Street intersection improvement by The Fay Improvement Company confirmed with no protests and sent to Public Works.
    23 Apr 1951referredJournal 1951 ↗
  • No protests, so Fay Improvement's Trumbull Street bill is confirmed linked by the name only, not checked
    23 Jul 1951outcome not readJournal 1951 ↗
  • Board heard no written protests against the assessment for paving the Bowdoin and Dwight Streets crossing by Fay Improvement Company.
    22 Oct 1951outcome not readJournal 1951 ↗
  • Protests against the street improvement of Brussels Street between Mansell and Ordway Streets were scheduled for hearing.
    24 Dec 1951outcome not readJournal 1951 ↗
  • [name withheld] and [name withheld] protest the Shafter Avenue paving
    24 Mar 1952referredJournal 1952, p. 218 ↗
  • $268.45 paid to one firm to replace a lost street bond coupon
    11 May 1953passedJournal 1953, p. 366 ↗
  • The Fay Improvement Company was authorized to receive $268.45 after a lost street assessment bond coupon was waived.
    18 May 1953passedJournal 1953, p. 409 ↗
  • Protests by two Grand View Terrace lot owners against paving costs were referred to the Streets Committee.
    2 Aug 1954referredJournal 1954 ↗
  • Fay Improvement Company gets $397.38 more for Twenty-seventh Avenue work
    17 Jan 1955passed first readingJournal 1955, p. 41 ↗
  • Fay Improvement Company gets $397.38 more for Twenty-seventh Avenue work
    24 Jan 1955passedJournal 1955, p. 51 ↗
  • Board overruled [name withheld] protest and confirmed the assessment for improving Powhattan and Peralta Avenues.
    22 Apr 1957passedJournal 1957 ↗
  • Board sustained protests and cancelled street improvement assessments on Sixteenth Street, with the City bearing the cost. linked by the name only, not checked
    5 May 1958passedJournal 1958, p. 257 ↗
  • Protest overruled on the Minerva Street sewer bill
    18 Aug 1958passedJournal 1958 ↗
  • The Board confirmed the assessment for the sewer and street improvement of Prague Street between Brazil and Excelsior Avenues.
    10 Nov 1958passedJournal 1958 ↗
  • Board confirmed the assessment for the Fay Improvement Company's work improving Mendell Street between Williams and Yosemite Avenues.
    30 Mar 1959passedJournal 1959, p. 175 ↗
  • Hearing on protests against the Rosenkranz Street sewer and street improvement by Fay Improvement Company, paid by assessment, was held.
    15 Jun 1959outcome not readJournal 1959 ↗
  • Owners' bill confirmed for the Hanover Street improvement linked by the name only, not checked
    29 Jun 1959passedJournal 1959 ↗
  • Owners' bill confirmed for the Concord Street improvement linked by the name only, not checked
    6 Jul 1959passedJournal 1959, p. 441 ↗
  • Bill confirmed for improving Burnett Avenue south of Hopkins Avenue linked by the name only, not checked
    4 Jan 1960outcome not readJournal 1960 ↗
  • Mansell Street paving bill confirmed and handed to the contractor linked by the name only, not checked
    7 Nov 1960passedJournal 1960 ↗
  • A resolution to vacate a portion of Grand View Avenue was taken up after a public hearing, with the outcome continuing on the next page.
    7 Nov 1960outcome not readJournal 1960 ↗
  • Raymond Avenue paving bill confirmed and handed to the contractor linked by the name only, not checked
    5 Dec 1960passedJournal 1960 ↗
  • Los Palmos Drive paving assessment confirmed and sent to the contractor linked by the name only, not checked
    23 Jan 1961passedJournal 1961, p. 27 ↗
  • Ordway Street paving assessment confirmed and sent to the contractor
    13 Mar 1961outcome not readJournal 1961 ↗
  • Army Street paving assessment confirmed and sent to the contractor linked by the name only, not checked
    3 Apr 1961passedJournal 1961, p. 152 ↗
  • Wayland Street crossings paving assessment confirmed and sent to the contractor
    23 Oct 1961passedJournal 1961, p. 551 ↗
  • No one protests Fay Improvement Company's crossing at Armstrong and Ingalls
    27 Nov 1961continuedJournal 1961, p. 592 ↗
  • Cost of the Armstrong Avenue crossing confirmed for the contractor linked by the name only, not checked
    27 Nov 1961outcome not readJournal 1961, p. 592 ↗
  • Cost of the Van Dyke Avenue paving confirmed for the contractor linked by the name only, not checked
    18 Dec 1961passedJournal 1961, p. 623 ↗
  • Cost of the Ankeny Street crossings confirmed for the contractor linked by the name only, not checked
    30 Apr 1962passedJournal 1962 ↗
  • No one protests the Gellert Bros. paving of Allison Street linked by the name only, not checked
    7 May 1962passedJournal 1962, p. 217 ↗
  • Part of Fremont Street closed for good southeast of Harrison Street
    21 May 1962passedJournal 1962 ↗
  • Bill for the Patterson Street paving put before the Board linked by the name only, not checked
    25 May 1962outcome not readJournal 1962 ↗
  • Cost of the Bradford Street paving confirmed for the contractor linked by the name only, not checked
    25 Jun 1962passedJournal 1962 ↗
  • Griffith Street paving bill [name withheld] another week linked by the name only, not checked
    9 Jul 1962continuedJournal 1962, p. 351 ↗
  • Cost of the Griffith Street paving confirmed for the contractor linked by the name only, not checked
    16 Jul 1962passedJournal 1962, p. 365 ↗
  • Board to hear property owners' protests against the improvement of Velasco Avenue between Santos and Carrizal Streets.
    19 Nov 1962outcome not readJournal 1962 ↗
  • Board held a protest hearing on the Velasco Avenue improvement between Santos and Carrizal Streets by Fay Improvement Company.
    19 Nov 1962passedJournal 1962, p. 576 ↗
  • [name withheld] land to be bought for the Excelsior library linked by the name only, not checked
    26 Aug 1963passedJournal 1963 ↗
  • Board confirms the cost assessment for improving Velasco Avenue linked by the name only, not checked
    4 May 1964passedJournal 1964, p. 291 ↗
  • Board confirms the cost assessment for improving Burrows and Bowdoin Streets linked by the name only, not checked
    20 Jul 1964outcome not readJournal 1964, p. 520 ↗
  • Homes must be heated to seventy degrees under new city rule
    26 Jul 1965passedJournal 1965, p. 428 ↗
  • Protests heard over the improvement of Yosemite Avenue at Ingalls Street
    13 Dec 1965outcome not readJournal 1965 ↗
  • Bill confirmed for improving Gennessee Street between Mangels and Melrose Avenues linked by the name only, not checked
    13 Dec 1965passedJournal 1965, p. 718 ↗
  • Bill confirmed for improving Yosemite Avenue east of Ingalls Street linked by the name only, not checked
    13 Dec 1965passedJournal 1965, p. 717 ↗
  • No one protests the Fay Improvement Company's work on Castro Street linked by the name only, not checked
    3 Jan 1966passedJournal 1966 ↗
  • Paving bill for Castro Street confirmed and sent to the contractor linked by the name only, not checked
    3 Jan 1966outcome not readJournal 1966 ↗
  • Paving bills confirmed for Burnett Avenue north of Dixie Alley linked by the name only, not checked
    11 Mar 1968outcome not readJournal 1968, p. 179 ↗