All decisions
about 350 Board decisions about Flinn & Treacy, in date order. Each links to its printed page.
- Board of Public Works recommends a thirty-day extension for Flinn & Treacy's paving contract on Twenty-sixth and Waller streets.
- Flinn & Treacy given 90 more days on Castro and Elizabeth Streets
- Flinn & Treacy given 90 more days on Castro and Elizabeth Streets
- Flinn & Treacy given 90 more days on Pacific Street linked by the name only, not checked
- Flinn & Treacy given 90 more days on the Seventh Street sewer after the calamity linked by the name only, not checked
- Flinn & Treacy given 90 more days on the Seventh Street sewer linked by the name only, not checked
- Flinn & Treacy given 90 more days on the Seventh Street sewer linked by the name only, not checked
- Flinn & Treacy given 15 more days repaving Pacific Street linked by the name only, not checked
- Street levels set on Gladys Street
- Payment of $10,831.01 to Flinn & Treacy for street work was passed for printing from the Street Improvement Account. linked by the name only, not checked
- $24,296 for sewer work on Howard and Haight Streets linked by the name only, not checked
- Flinn & Treacy proposed a 30-day extension to finish a Stevenson Street sewer; sent to the Streets, Sewers and Parks Committee. linked by the name only, not checked
- Flinn & Treacy allowed blasting for grading on Alabama Street
- Flinn & Treacy paid $5,450 for the Seventh Street sewer linked by the name only, not checked
- Flinn & Treacy paid $5,450 for the Seventh Street sewer
- Flinn & Treacy given thirty more days on Dore Street linked by the name only, not checked
- Flinn & Treacy given sixty more days for Eighth Avenue sidewalks linked by the name only, not checked
- Flinn & Treacy given ninety more days on Seventh Street sewer linked by the name only, not checked
- Extension of time granted to Flinn & Treacy to finish artificial stone sidewalks on Eighth Avenue. linked by the name only, not checked
- Flinn & Treacy granted extensions to finish a Seventh street sewer and Eighth avenue sidewalks. linked by the name only, not checked
- Flinn & Treacy given ninety more days on Seventh Street sewer linked by the name only, not checked
- Flinn & Treacy paid for the sewer in Dore Street
- The Board authorized $13,819.27 from the General Fund for printing, supplies, street work and lumber to several firms. linked by the name only, not checked
- Flinn & Treacy paid $2,356.35 for repaving Golden Gate Avenue linked by the name only, not checked
- Contractor given thirty more days for Greenwich Street curbs and sidewalks linked by the name only, not checked
- Flinn & Treacy paid for paving Golden Gate Avenue near Laguna linked by the name only, not checked
- $12,177.22 paid for resurfacing Market Street from Second to Twelfth
- Flinn & Treacy given thirty more days on Stevenson Street
- Payment approved for repairing Market Street from Second to Twelfth linked by the name only, not checked
- Flinn & Treacy paid for paving Golden Gate Avenue crossings linked by the name only, not checked
- Flinn & Treacy given ninety more days to pave Mission Street linked by the name only, not checked
- Flinn & Treacy granted 80 more days to finish a Stevenson street sewer contract. linked by the name only, not checked
- Flinn & Treacy paid for paving Golden Gate Avenue near Laguna linked by the name only, not checked
- Flinn & Treacy paid for sewers along Market Street to Jones linked by the name only, not checked
- Extension granted because the contractor could not get materials linked by the name only, not checked
- Flinn & Treacy paid for repairs on Golden Gate Avenue
- Flinn & Treacy were proposed for payment for bituminous street repairs, passed for printing.
- Flinn & Treacy was paid $10,983.59 for repaving several city streets, including Market, Turk and Golden Gate avenue. linked by the name only, not checked
- Flinn & Treacy paid for repaving Seventh Street with basalt blocks linked by the name only, not checked
- Flinn & Treacy given thirty more days for Greenwich Street curbs linked by the name only, not checked
- Flinn & Treacy paid for repaving Seventh Street with basalt blocks linked by the name only, not checked
- Flinn & Treacy paid $2,805.48 for the Stevenson Street sewers linked by the name only, not checked
- Payments from the General Fund to vendors including C. F. Weber & Co. for school desks and Flinn & Treacy for Golden Gate Avenue paving.
- Flinn & Treacy allowed an asphalt boiler on Harrison Street linked by the name only, not checked
- Flinn & Treacy allowed an oil tank on Harrison Street linked by the name only, not checked
- Flinn & Treacy given thirty more days at Twenty-sixth and Bryant linked by the name only, not checked
- Flinn & Treacy allowed an asphalt boiler on Harrison Street linked by the name only, not checked
- Flinn & Treacy allowed an oil tank on Harrison Street linked by the name only, not checked
- Flinn & Treacy given thirty more days at Twenty-sixth and Bryant linked by the name only, not checked
- Public Works recommended giving contractor Flinn & Treacy ninety more days to finish paving Mission Street between Twentieth and Army. linked by the name only, not checked
- Flinn & Treacy were granted a sixty-day extension to finish paving Mission Street between Twentieth and Army streets. linked by the name only, not checked
- Street levels set on Stanyan Street between Eighteenth and Twentieth streets linked by the name only, not checked
- Flinn & Treacy given thirty more days on Twenty-fifth Street linked by the name only, not checked
- Flinn & Treacy given thirty more days on Twenty-fifth Street linked by the name only, not checked
- Flinn & Treacy given thirty more days on Mission Street linked by the name only, not checked
- Flinn & Treacy granted thirty more days to finish paving Mission Street between Twentieth and Army streets. linked by the name only, not checked
- Board of Public Works recommended giving Flinn & Treacy 60 more days to finish grading and paving Union street.
- Flinn & Treacy given sixty more days on Union Street linked by the name only, not checked
- Flinn & Treacy paid $37,861.10 for paving Mission Street linked by the name only, not checked
- Flinn & Treacy given ninety more days on Union Street linked by the name only, not checked
- Flinn & Treacy given ninety more days on Union Street linked by the name only, not checked
- Flinn & Treacy given thirty more days on Union Street
- Nine payments totalling $10,726.33 for hospital supplies, paving repairs, printing, lumber and license plates are passed for printing. linked by the name only, not checked
- A resolution on extensions of time for street work is proposed; its outcome continues on the next page.
- Flinn & Treacy allowed to blast for a Tilden Street sewer linked by the name only, not checked
- Flinn & Treacy paid $2,666.47 for paving Pine Street linked by the name only, not checked
- Payments totalling $11,782.30 to several firms for hospital, street, police and fire house work passed for printing.
- Resolution granting contractor Flinn & Treacy thirty more days to finish granite curbs on Eighteenth street, passed for printing. linked by the name only, not checked
- Flinn & Treacy given thirty more days on Eighteenth Street sidewalks linked by the name only, not checked
- City approved payments totaling $11,782.30 to suppliers and contractors, including a chemical engine house on Twenty-second Street. linked by the name only, not checked
- Flinn & Treacy given thirty more days on Eighteenth Street
- Flinn & Treacy given thirty more days on Eighteenth Street
- Miller & Lux paid $612.85 for meat at the county hospital
- Flinn & Treacy paid first installment on new fire cisterns
- Flinn & Treacy paid $10,000 for paving Polk Street
- Payments totaling $64,601.32 approved for fire cisterns, fireboats, pipe freight and an auxiliary water system.
- Spring Valley Water paid $10,462.50 for July fire hydrant water
- Board of Public Works recommended a final payment of $10,587.99 to Flinn & Treacy for paving Polk Street between Post and Sacramento streets. linked by the name only, not checked
- Flinn & Treacy given sixty more days on Tilden Street linked by the name only, not checked
- Flinn & Treacy given sixty more days on Tilden Street linked by the name only, not checked
- Flinn and Treacy allowed to blast for a Tilden Street sewer linked by the name only, not checked
- Flinn & Treacy were granted a sixty-day extension to finish repaving Polk Street from Sacramento to Pacific Streets. linked by the name only, not checked
- Resolution authorizes Board of Public Works payments for street paving, school removal and Battery No. 4 work; vote continues on next page. linked by the name only, not checked
- Flinn & Treacy given sixty more days grading Fifteenth Street linked by the name only, not checked
- Flinn & Treacy granted ninety more days, from April 1, 1910, to finish grading Fifteenth street. linked by the name only, not checked
- Flinn & Treacy given sixty more days on Fifteenth Street
- Flinn & Treacy to blast for grading on De Haro Street linked by the name only, not checked
- Flinn and Treacy given sixty more days to grade Fifteenth Street linked by the name only, not checked
- A resolution extending the time for certain street work was introduced; its outcome is printed on the next page. linked by the name only, not checked
- Flinn and Treacy paid $3,694.18 for paving on Broderick Street linked by the name only, not checked
- Flinn and Treacy paid $3,694.18 for paving on Broderick Street linked by the name only, not checked
- Flinn & Treacy were paid $1000.00 for curbs and paving on Athens Street between Brazil and Persia avenues.
- Payments totalling $1,891.80 covered Excelsior Avenue paving and iron for monument covers, passed for printing. linked by the name only, not checked
- Flinn & Treacy were paid $1,180.00 for paving Excelsior avenue, and Ajax Foundry $711.80 for survey monument covers. linked by the name only, not checked
- A payment of $1,309.35 for street and sewer work was proposed; the outcome is on the next page. linked by the name only, not checked
- Flinn & Treacy given ninety more days on Lapidge Street linked by the name only, not checked
- Flinn & Treacy given ninety more days on McAllister Street linked by the name only, not checked
- Flinn & Treacy granted a ninety-day extension to finish curbing and paving Lapidge street between Eighteenth and Nineteenth streets. linked by the name only, not checked
- Flinn & Treacy granted ninety more days to finish paving McAllister Street between Willard Street and Arguello Boulevard. linked by the name only, not checked
- A payment for street and sewer work was proposed; its outcome is printed on the next page. linked by the name only, not checked
- First installment to Flinn & Treacy for yard work at the Oceanside school was passed for printing. linked by the name only, not checked
- Flinn & Treacy given 90 more days on Stockton Street
- Second installment of $2,806.44 approved to Flinn & Treacy for paving Stockton Street between Sacramento and Pacific streets. linked by the name only, not checked
- Board granted ninety-day extensions to contractors on McKinley and Oceanside schools and Hall of Justice; advertising charges remitted.
- Resolutions proposed paying Standard Oil and Flinn & Treacy $3,627.55 for boulevard oil and Lapidge street paving.
- Flinn & Treacy paid $2,806.44 for paving Stockton Street linked by the name only, not checked
- Standard Oil Co. paid $559.55 for oiling Sloat Boulevard
- The Board granted ninety-day extensions to three contractors building the McKinley Primary School, Oceanside School and Hall of Justice.
- Flinn & Treacy given 90 more days on McAllister Street linked by the name only, not checked
- Board granted Flinn & Treacy ninety more days to finish paving McAllister Street and curbs on Seventeenth Street. linked by the name only, not checked
- City proposed payments totalling $6,183.64 to several contractors for street paving and moving Adams School buildings. linked by the name only, not checked
- Flinn & Treacy granted ninety more days to curb and pave McAllister street, as its lines are in litigation.
- Payments totalling $3,915 proposed to McCabe & Brown and Flinn & Treacy for yard work at three schools. linked by the name only, not checked
- Flinn & Treacy would receive a ninety-day extension from March 1, 1911, to finish curbing and paving at Seventeenth street crossings. linked by the name only, not checked
- Flinn & Treacy were granted ninety more days to finish curbs and asphalt on McAllister Street. linked by the name only, not checked
- Flinn & Treacy sought ninety more days to finish several Seventeenth Street intersection works. linked by the name only, not checked
- Flinn & Treacy granted ninety more days to finish curbing and paving McAllister Street, between Willard Street and Arguello Boulevard. linked by the name only, not checked
- Payments totaling $1,982.87 to Flinn & Treacy for sewer and grading work in front of city property were approved.
- Proposes paying three paving firms $2,254 total for street work in front of city property. linked by the name only, not checked
- Resolution granting Flinn & Treacy ninety more days to finish curbing, paving and sewering Twentieth and Douglass streets. linked by the name only, not checked
- Flinn & Treacy were granted ninety more days to finish curbs and asphalt paving on McAllister Street. linked by the name only, not checked
- Flinn and Treacy granted thirty more days to finish school yard work at Pacific Heights School.
- Proposed fifth progress payment to Flinn & Treacy for paving Stockton Street between Sacramento and Pacific streets. linked by the name only, not checked
- City paid three contractors $2,254 for street paving work on Sixth Avenue, Seventh Avenue and Twenty-fifth Street. linked by the name only, not checked
- Resolution proposes paying Flinn & Treacy $1,875.00 from the School Construction Account for yard work at Bay View School. linked by the name only, not checked
- Flinn & Treacy granted ninety more days to finish curbing, paving and sewering Twentieth and Douglass streets.
- Flinn & Treacy granted ninety more days to finish curbing and paving the Excelsior Avenue and Paris Street crossing. linked by the name only, not checked
- A $1,500 first installment for yard work at Bay View School was authorized for contractor Flinn & Treacy. linked by the name only, not checked
- Flinn & Treacy would receive a ninety-day extension, from February 20, 1911, to finish curbing and paving McAllister street. linked by the name only, not checked
- Flinn & Treacy were paid $1,125 for the second installment of yard work at Oceanside School. linked by the name only, not checked
- Flinn & Treacy were granted ninety more days to finish the Excelsior avenue and Paris street crossing contract. linked by the name only, not checked
- Flinn & Treacy was approved for $8,529.47 for second-installment paving work on Mission Street between Spear and Beale streets. linked by the name only, not checked
- Approved $753.21 to Flinn & Treacy for extra curb and pavement work on Mission Street between Spear and Beale. linked by the name only, not checked
- Flinn & Treacy granted ninety more days to finish curbing and paving five Seventeenth Street intersections, delayed by fire water mains. linked by the name only, not checked
- Final payments totalling $2,861 proposed to Flinn & Treacy for yard work at the Oceanside and Bay View schools. linked by the name only, not checked
- Payment of $753.21 proposed to Flinn & Treacy for extra curb and paving work on Mission Street. linked by the name only, not checked
- A first payment of $675 approved to Flinn & Treacy for yard work at the Holly Park School.
- Resolution granting Flinn & Treacy ninety more days to curb and pave McAllister street, delayed by litigation.
- City approved a $1,500 first installment to Flinn & Treacy for yard work at Bay View School. linked by the name only, not checked
- Flinn and Treacy were granted ninety more days, from January 3, 1911, to finish Stockton Street paving. linked by the name only, not checked
- Proposed second installment payment to Flinn & Treacy for yard work at the Oceanside School. linked by the name only, not checked
- Flinn & Treacy granted thirty-day extensions to finish several street paving and curbing contracts delayed by weather. linked by the name only, not checked
- Flinn & Treacy were paid $1,050 as first installment for paving Mission Street between Spear and Beale streets. linked by the name only, not checked
- Payment of $1,050 to Flinn & Treacy for paving Mission Street between Spear and Beale proposed. linked by the name only, not checked
- Flinn & Treacy were granted a thirty-day extension to finish their contract for yards at the Pacific Heights School. linked by the name only, not checked
- Flinn & Treacy were granted ninety more days to finish curbing and paving Stockton Street between Sacramento and Pacific.
- Passed for printing: $1,982.87 to Flinn & Treacy for city property share of sewer and grading work on two streets. linked by the name only, not checked
- Board of Public Works recommended giving Flinn & Treacy a ninety-day extension to finish Stockton Street paving work. linked by the name only, not checked
- Payment of $1,838.03 proposed to Flinn & Treacy for paving and curbing Stockton Street between Sacramento and Pacific streets. linked by the name only, not checked
- Board of Public Works recommended giving Flinn & Treacy ninety more days to finish yard work at Pacific Heights School; referred. linked by the name only, not checked
- Flinn & Treacy was proposed for a ninety-day extension to finish street work at Brazil avenue and Vienna street.
- A payment of $1,875 to Flinn & Treacy for yard work at Bay View School was finally passed.
- Progress payments totalling $3,915 for yard work at the Sutro, Ocean Side and Bay View schools were approved. linked by the name only, not checked
- $8,529.47 second installment approved to Flinn & Treacy for basalt block paving on Mission Street.
- The Board approved final payments totaling $2,861 to Flinn & Treacy for yard work at Oceanside and Bay View schools. linked by the name only, not checked
- Payments to about eighteen city vendors and claimants were passed for printing in a resolution authorizing city expenditures.
- First $675 payment for Holly Park school yard approved linked by the name only, not checked
- Expenditures for plumbing, paving, electrical work and furniture at several named schools were passed for printing.
- O. C. Holt paid $7,410 for work on John Swett School
- Final payment of $1,646 to Flinn & Treacy for paving in front of McKinley School was approved.
- $12,000 set aside to resurvey the Excelsior and Mission districts
- Board passed for printing a resolution authorizing nine payments to contractors and claimants totaling about $29,000. linked by the name only, not checked
- Board authorized payments on many city claims, including Pacific Gas & Electric, Spring Valley Water, Mahoney Bros and Girls' High School contractors. linked by the name only, not checked
- Pacific Gas & Electric paid $34,521.13 for lighting the streets linked by the name only, not checked
- City sets aside $2,500 for further Civic Center plans linked by the name only, not checked
- Board authorized payment of city claims to lumber, printing, water and other suppliers, totalling about $47,000, in final passage.
- Flinn & Treacy to rebuild Geary Street from Buchanan to Divisadero linked by the name only, not checked
- Flinn & Treacy to rebuild Geary Street from Buchanan to Divisadero
- Flinn & Treacy allowed to blast for a States Street sewer
- F. Rolandi paid $11,044 for the Geary Street car barn linked by the name only, not checked
- F. Rolandi paid $11,044 for the Geary Street car barn
- City approved payment of claims for paving, police station work, utilities, supplies and Civic Center land, including $198,977 to G. G. Burnett Estate Co.
- Expenditures for parks, water, Municipal Railway cars, school plumbing, sewers and paving claims passed for printing.
- Union Iron Works paid $57,750 for Municipal Railway cars
- Henry Kruse's appeal against a Peralta Avenue street assessment was sustained, and Public Works was directed to issue a new assessment. linked by the name only, not checked
- Flinn & Treacy given 60 more days on Buena Vista Avenue linked by the name only, not checked
- Board authorized a long list of claim payments from city bond and general funds to contractors, utilities and railways. linked by the name only, not checked
- Bion J. Arnold paid $3,345.79 for his city transportation report
- Board is authorizing payments to city suppliers and contractors, including PG&E lighting and Edison School work; outcome continues on next page. linked by the name only, not checked
- Flinn & Treacy given ninety more days on Ocean Avenue linked by the name only, not checked
- Flinn & Treacy given more time at Buena Vista Park
- Flinn & Treacy were proposed for street-work time extensions; the vote is printed on the next page. linked by the name only, not checked
- Flinn & Treacy given 120 days to blast on Seward Street
- Flinn & Treacy given 120 days to blast on Seward Street
- Supervisors approved a batch of General Fund payments, including street paving, fire equipment, lighting and a right-of-way purchase. linked by the name only, not checked
- Flinn & Treacy given 30 more days on Chenery Street
- Flinn & Treacy given thirty more days on Onondaga Avenue
- Flinn & Treacy allowed to blast on Russia Avenue linked by the name only, not checked
- Flinn & Treacy allowed to blast rock on States Street
- Flinn & Treacy allowed to blast on Russia Avenue
- Flinn & Treacy given fifteen more days on three street jobs
- Flinn & Treacy allowed to blast rock on Upper Terrace linked by the name only, not checked
- Flinn & Treacy given sixty more days on Russia Avenue linked by the name only, not checked
- Flinn & Treacy given sixty more days on States Street
- Flinn & Treacy allowed to blast rock on Upper Terrace
- Flinn & Treacy given sixty more days on Ney, Russia and Folsom
- Flinn & Treacy given sixty more days on Seventeenth Street
- Flinn & Treacy given ninety more days on Downey Street linked by the name only, not checked
- Flinn & Treacy given ninety more days on State Street linked by the name only, not checked
- Western Fish Company allowed a boiler for cooking crabs
- Flinn & Treacy given sixty more days on Folsom Street
- Flinn & Treacy given ninety more days on Nye Street
- Stetson-Renner Drayage allowed ninety-eight horses at 1037 Bryant Street
- Flinn & Treacy finish paving San Bruno Avenue at Olmstead
- City's share paid for paving San Bruno Avenue at Olmstead linked by the name only, not checked
- $3,750 for plague work; fire escape plans for six schools
- Flinn & Treacy allowed ninety days of blasting on Woolsey Street linked by the name only, not checked
- $3,750 for plague work; fire escape plans for six schools
- City's share paid for paving San Bruno Avenue at Olmstead
- Flinn & Treacy given sixty more days on Russia Avenue
- Flinn & Treacy's blasting permit for Lombard and Montgomery Streets was put off. linked by the name only, not checked
- Flinn & Treacy's blasting permit for Rhode Island Street was put off. linked by the name only, not checked
- Flinn & Treacy allowed ninety days of blasting on Woolsey Street
- Flinn & Treacy given ninety more days on Woolsey Street
- Flinn & Treacy allowed blasting at Lombard and Montgomery streets
- Church & Clark are proposed for a fifteen-day extension from February 3, 1915 to complete a street contract. linked by the name only, not checked
- Flinn & Treacy were granted extensions of time to finish street paving contracts on St. Mary's and Russia avenues. linked by the name only, not checked
- Flinn & Treacy given thirty more days on Downey Street linked by the name only, not checked
- Flinn & Treacy given ninety more days on Corbett Avenue
- Flinn & Treacy given thirty more days on Ney Street linked by the name only, not checked
- Flinn & Treacy given sixty more days on Buena Vista Avenue linked by the name only, not checked
- Flinn & Treacy given sixty more days on Woolsey Street
- Flinn & Treacy given forty more days on Arlington Street
- Flinn & Treacy given thirty more days on Park Street
- Flinn & Treacy given sixty more days on Park Street linked by the name only, not checked
- Street levels abolished on Twenty-eighth through Thirty-first avenues
- City spends $429 on two bathrooms at the Tuberculosis Hospital
- Flinn & Treacy given ninety more days on Corbett Avenue
- Federal Construction paid $2,469.32 for the Foerster Street storm sewer linked by the name only, not checked
- $2,469.32 paid Federal Construction for the Foerster Street storm sewer linked by the name only, not checked
- Property owners appealed acceptance of street work on Folsom Street between Cortland and Eugenia Avenues; the hearing was held. linked by the name only, not checked
- Flinn & Treacy given ninety more days on Silver Avenue linked by the name only, not checked
- Flinn & Treacy given sixty more days at France and Paris linked by the name only, not checked
- Flinn & Treacy given 60 more days on Buena Vista Avenue
- Flinn & Treacy given 15 more days at France Avenue
- Flinn & Treacy given fifteen more days on Paris Avenue linked by the name only, not checked
- Flinn & Treacy given thirty more days on Castro Street
- Flinn & Treacy allowed to blast at Lombard and Montgomery Streets linked by the name only, not checked
- Flinn & Treacy given thirty more days on Castro Street
- Flinn & Treacy allowed to blast at Lombard and Montgomery Streets linked by the name only, not checked
- Street levels changed on Van Ness Avenue near North Point Street linked by the name only, not checked
- Flinn & Treacy allowed to blast on Railroad Avenue for grading
- Flinn & Treacy allowed to blast at Duboce Avenue and Divisadero linked by the name only, not checked
- Flinn & Treacy allowed 90 days blasting on Rhode Island Street linked by the name only, not checked
- Flinn & Treacy given 60 more days on Buena Vista Avenue linked by the name only, not checked
- Flinn & Treacy given 15 more days at France and Paris
- Flinn & Treacy allowed 90 days blasting on Railroad Avenue
- Flinn & Treacy allowed blasting at Duboce Avenue and Divisadero Street
- Flinn & Treacy allowed 90 days blasting on Rhode Island Street linked by the name only, not checked
- Flinn & Treacy allowed 90 days blasting at Lombard and Montgomery linked by the name only, not checked
- Flinn & Treacy given 30 more days on McAllister Street
- Flinn & Treacy allowed 90 days blasting at Lombard and Montgomery linked by the name only, not checked
- Supervisor Power moved to summon Flinn & Treacy to explain unpaid rebates for Folsom Street work; the motion carried.
- Flinn & Treacy given 90 more days on Rhode Island Street
- Flinn & Treacy given 90 more days on Nineteenth Avenue
- Flinn & Treacy allowed ninety days of blasting on Valley Street
- Flinn & Treacy allowed ninety days of blasting on Valley Street linked by the name only, not checked
- Board proposed a $499.65 tax refund to Title Insurance and Guaranty Company for Church Street railway property.
- Flinn & Treacy given ninety more days blasting on Rhode Island
- Flinn & Treacy given ninety more days at Silver and Vienna
- Flinn & Treacy given thirty more days on Fairfax Avenue
- Flinn & Treacy allowed blasting for a sewer in Staples Avenue
- Flinn & Treacy allowed blasting for a sewer in Staples Avenue
- Flinn & Treacy given ninety more days on Rhode Island Street linked by the name only, not checked
- Flinn & Treacy given ninety more days on Valley Street
- Flinn & Treacy allowed to blast on Twenty-fourth Street
- Flinn & Treacy allowed to blast on Twenty-fourth Street
- Flinn & Treacy given ninety more days on Quint Street
- Flinn & Treacy given thirty more days on Rhode Island Street
- Flinn & Treacy given 90 more days on Valley Street
- Flinn & Treacy given 15 more days on Willard Street
- Resolution authorizes payments to contractors, suppliers and others from city funds, including street and sewer work claims.
- City bills paid, including $1,800 for two health department automobiles
- Flinn & Treacy given 90 more days on Clarendon and Burnett
- Flinn & Treacy given ninety more days on Twenty-fourth Street
- Flinn & Treacy allowed to blast on Rhode Island Street
- Flinn & Treacy allowed to blast on Rhode Island Street
- Flinn & Treacy given sixty more days on Quint Street
- Flinn & Treacy seek to blast on Farallones Street
- Supervisor Welch presented a resolution on extensions of time; its text and outcome continue on the next page.
- Flinn & Treacy allowed ninety days of blasting on Farallones Street
- Flinn & Treacy given ninety more days on Farallones Street
- Flinn & Treacy given sixty more days on Clarendon Avenue linked by the name only, not checked
- Flinn & Treacy given thirty more days on Quint Street
- Flinn & Treacy given 30 more days on Athens Street
- Flinn & Treacy given 60 more days on Quint Street
- Flinn & Treacy given 30 more days on San Bruno Avenue linked by the name only, not checked
- Flinn & Treacy given 90 more days on Ord Street
- Flinn & Treacy given 90 more days on Corbett Avenue
- Flinn & Treacy given 90 more days on Parallones Street linked by the name only, not checked
- Flinn & Treacy given 90 more days on Castro Street
- Eaton & Smith to be paid $1,875.89 for paving Potrero Avenue linked by the name only, not checked
- Eaton & Smith paid $1,875.89 for paving Potrero Avenue linked by the name only, not checked
- Flinn & Treacy given sixty more days on Oakdale Avenue
- Flinn & Treacy given sixty more days on Oakdale Avenue
- Flinn & Treacy given sixty more days on Latona Street
- Flinn & Treacy given sixty more days on Gladys Street
- Engine House No. 37 to be built at Vermont and Twenty-fifth linked by the name only, not checked
- Engine House No. 37 to be built at Vermont and Twenty-fifth
- Flinn & Treacy given thirty more days on Thomas Avenue linked by the name only, not checked
- $1,395 paid to J. F. Dowling for work on Newcomb Avenue linked by the name only, not checked
- Flinn & Treacy given sixty more days on Diamond Street
- $1,375 for trolley parts for the outer Market Street tracks
- R. C. Storrie & Co. paid $100,000 for Twin Peaks tunnel
- R. C. Storrie & Co. paid $100,000 for Twin Peaks tunnel
- Flinn & Treacy given ninety more days on Hancock Street
- $5,000 set aside to grade and sewer Hawes Street
- Flinn & Treacy was paid $1,393.75 to improve San Bruno avenue between Cortland avenue and Steuben street. linked by the name only, not checked
- Supervisor Power moved to pass for printing a resolution authorizing payments to many claimants, including schools, transit and fire work. linked by the name only, not checked
- $7,149.48 more spent finishing Railroad Avenue between Ingerson and San Bruno
- Flinn & Treacy given 90 more days on Clayton Street
- Flinn & Treacy given 90 more days on Raymond Avenue
- Flinn & Treacy given a third extension on Francisco Street
- Flinn & Treacy's Silliman Street paving contract cancelled
- Flinn & Treacy given a fourth extension on Francisco Street
- Flinn & Treacy given sixty more days on Clayton Street
- Time extensions granted to Mangrum & Otter for San Francisco Hospital kitchen and Flinn & Treacy for Fairmount School yard paving. linked by the name only, not checked
- A resolution authorizing payments to contractors and suppliers for hospital, sewer and railway work was passed for printing.
- Payments to contractors and suppliers for hospital, sewer, railway and Hetch Hetchy work are listed for authorization; final vote not printed here.
- Western Contracting Co. paid $47,668.01 for the Market Street railway extension
- Flinn & Treacy given thirty more days on Clayton Street
- Flinn & Treacy's appeal of Francisco Street assessments was referred to the Streets Committee. linked by the name only, not checked
- Flinn & Treacy was granted a 90-day extension to finish its contract for paving Lane street and McKinnon avenue.
- Flinn & Treacy's Lane Street contract cancelled by the city
- Flinn & Treacy's Mendell Street improvement contract cancelled
- Contractor given 60 more days to finish Wolfe Street work
- Supervisor McLeran presented an appropriations resolution; its text continues onto the next page. linked by the name only, not checked
- $3,000 set aside for Flinn and Treacy's Tenth Street work
- $3,000 set aside for Flinn and Treacy's Tenth Street work
- Flinn and Treacy given sixty more days on Bacon and Lakeview
- Flinn & Treacy's Wolfe Street contract cancelled over a faulty description
- Resolution No. 17004 introduced; its text and outcome continue on the next page. linked by the name only, not checked
- Flinn & Treacy given sixty more days on Fifteenth Street
- Board passed for printing a resolution authorizing $98,163.51 in payments to contractors and suppliers for sewers, parks, Hetch Hetchy and transit.
- Hickey & Harmon paid $810 for the Euclid Avenue sewer linked by the name only, not checked
- Montague Pipe & Steel paid $8,102.10 for Hetch Hetchy air pipe
- Resolution proposing to set aside city funds for listed purposes; its outcome appears on the next page.
- Proposed by Supervisor McLeran; its amounts and vote fall on the next page.
- Flinn & Treacy given ninety more days on Fifteenth Street
- Flinn & Treacy given ninety more days on Caledonia Alley linked by the name only, not checked
- Flinn & Treacy given ninety more days on Fifteenth Street linked by the name only, not checked
- Flinn & Treacy given sixty more days on Caledonia Alley
- Felix McHugh & Son given thirty more days on Forty-second Avenue
- Flinn & Treacy given sixty more days on Wolfe Street
- Flinn & Treacy given sixty more days on Wolfe Street
- Street levels to change on Garden Street between Divisadero and Broderick
- Flinn & Treacy given 60 more days on London Street after labor trouble linked by the name only, not checked
- Flinn & Treacy given ninety more days on Wolfe Street linked by the name only, not checked
- Wolfe Street paving deadline extended thirty more days
- Carley & Hamilton allowed 45 horses at Twentieth and Tennessee streets
- Carley & Hamilton allowed 45 horses at Twentieth and Tennessee streets linked by the name only, not checked
- Flinn & Treacy paid $250 for work on Grant Street