  • Board of Public Works recommends a thirty-day extension for Flinn & Treacy's paving contract on Twenty-sixth and Waller streets.
    1906referredJournal 1906 ↗
  • Flinn & Treacy given 90 more days on Castro and Elizabeth Streets
    21 May 1906outcome not readJournal 1906 ↗
  • Flinn & Treacy given 90 more days on Castro and Elizabeth Streets
    28 May 1906passedJournal 1906 ↗
  • Flinn & Treacy given 90 more days on Pacific Street linked by the name only, not checked
    30 Jul 1906outcome not readJournal 1906 ↗
  • Flinn & Treacy given 90 more days on the Seventh Street sewer after the calamity linked by the name only, not checked
    8 Aug 1906outcome not readJournal 1906 ↗
  • Flinn & Treacy given 90 more days on the Seventh Street sewer linked by the name only, not checked
    16 Aug 1906outcome not readJournal 1906 ↗
  • Flinn & Treacy given 90 more days on the Seventh Street sewer linked by the name only, not checked
    29 Oct 1906outcome not readJournal 1906 ↗
  • Flinn & Treacy given 15 more days repaving Pacific Street linked by the name only, not checked
    1 Nov 1906passedJournal 1906 ↗
  • Street levels set on Gladys Street
    5 Nov 1906passedJournal 1906 ↗
  • Payment of $10,831.01 to Flinn & Treacy for street work was passed for printing from the Street Improvement Account. linked by the name only, not checked
    13 Dec 1906passed first readingJournal 1906 ↗
  • $24,296 for sewer work on Howard and Haight Streets linked by the name only, not checked
    20 Dec 1906passedJournal 1906 ↗
  • Flinn & Treacy proposed a 30-day extension to finish a Stevenson Street sewer; sent to the Streets, Sewers and Parks Committee. linked by the name only, not checked
  • Flinn & Treacy allowed blasting for grading on Alabama Street
    14 Jan 1907outcome not readJournal 1907, p. 14 ↗
  • Flinn & Treacy paid $5,450 for the Seventh Street sewer linked by the name only, not checked
    14 Jan 1907passed first readingJournal 1907, p. 20 ↗
  • Flinn & Treacy paid $5,450 for the Seventh Street sewer
    21 Jan 1907outcome not readJournal 1907, p. 28 ↗
  • Flinn & Treacy given thirty more days on Dore Street linked by the name only, not checked
    28 Jan 1907passedJournal 1907, p. 42 ↗
  • Flinn & Treacy given sixty more days for Eighth Avenue sidewalks linked by the name only, not checked
    18 Feb 1907outcome not readJournal 1907, p. 89 ↗
  • Flinn & Treacy given ninety more days on Seventh Street sewer linked by the name only, not checked
    18 Feb 1907outcome not readJournal 1907 ↗
  • Extension of time granted to Flinn & Treacy to finish artificial stone sidewalks on Eighth Avenue. linked by the name only, not checked
    28 Feb 1907passedJournal 1907, p. 111 ↗
  • Flinn & Treacy granted extensions to finish a Seventh street sewer and Eighth avenue sidewalks. linked by the name only, not checked
    15 Apr 1907passedJournal 1907, p. 187 ↗
  • Flinn & Treacy given ninety more days on Seventh Street sewer linked by the name only, not checked
    29 Apr 1907passedJournal 1907, p. 200 ↗
  • Flinn & Treacy paid for the sewer in Dore Street
    3 Jun 1907outcome not readJournal 1907 ↗
  • The Board authorized $13,819.27 from the General Fund for printing, supplies, street work and lumber to several firms. linked by the name only, not checked
    9 Jul 1907passedJournal 1907, p. 314 ↗
  • Flinn & Treacy paid $2,356.35 for repaving Golden Gate Avenue linked by the name only, not checked
    16 Jul 1907outcome not readJournal 1907, p. 334 ↗
  • Contractor given thirty more days for Greenwich Street curbs and sidewalks linked by the name only, not checked
    27 Aug 1907passedJournal 1907, p. 466 ↗
  • Flinn & Treacy paid for paving Golden Gate Avenue near Laguna linked by the name only, not checked
    27 Aug 1907outcome not readJournal 1907, p. 481 ↗
  • $12,177.22 paid for resurfacing Market Street from Second to Twelfth
    16 Sep 1907outcome not readJournal 1907, p. 600 ↗
  • Flinn & Treacy given thirty more days on Stevenson Street
    16 Sep 1907outcome not readJournal 1907, p. 599 ↗
  • Payment approved for repairing Market Street from Second to Twelfth linked by the name only, not checked
    16 Sep 1907outcome not readJournal 1907, p. 580 ↗
  • Flinn & Treacy paid for paving Golden Gate Avenue crossings linked by the name only, not checked
    16 Sep 1907passedJournal 1907, p. 522 ↗
  • Flinn & Treacy given ninety more days to pave Mission Street linked by the name only, not checked
    16 Sep 1907passedJournal 1907, p. 528 ↗
  • Flinn & Treacy granted 80 more days to finish a Stevenson street sewer contract. linked by the name only, not checked
    16 Sep 1907passedJournal 1907, p. 580 ↗
  • Flinn & Treacy paid for paving Golden Gate Avenue near Laguna linked by the name only, not checked
    16 Sep 1907outcome not readJournal 1907, p. 522 ↗
  • Flinn & Treacy paid for sewers along Market Street to Jones linked by the name only, not checked
    16 Sep 1907outcome not readJournal 1907, p. 599 ↗
  • Extension granted because the contractor could not get materials linked by the name only, not checked
    16 Sep 1907passed first readingJournal 1907, p. 580 ↗
  • Flinn & Treacy paid for repairs on Golden Gate Avenue
    21 Oct 1907outcome not readJournal 1907, p. 620 ↗
  • Flinn & Treacy were proposed for payment for bituminous street repairs, passed for printing.
    21 Oct 1907passed first readingJournal 1907, p. 621 ↗
  • Flinn & Treacy was paid $10,983.59 for repaving several city streets, including Market, Turk and Golden Gate avenue. linked by the name only, not checked
    28 Oct 1907passedJournal 1907, p. G32 ↗
  • Flinn & Treacy paid for repaving Seventh Street with basalt blocks linked by the name only, not checked
    28 Oct 1907outcome not readJournal 1907, p. G37 ↗
  • Flinn & Treacy given thirty more days for Greenwich Street curbs linked by the name only, not checked
    5 Nov 1907outcome not readJournal 1907, p. 442 ↗
  • Flinn & Treacy paid for repaving Seventh Street with basalt blocks linked by the name only, not checked
    18 Nov 1907outcome not readJournal 1907, p. G70 ↗
  • Flinn & Treacy paid $2,805.48 for the Stevenson Street sewers linked by the name only, not checked
    16 Dec 1907outcome not readJournal 1907, p. 755 ↗
  • Payments from the General Fund to vendors including C. F. Weber & Co. for school desks and Flinn & Treacy for Golden Gate Avenue paving.
    3 Feb 1908outcome not readJournal 1908, p. 92 ↗
  • Flinn & Treacy allowed an asphalt boiler on Harrison Street linked by the name only, not checked
    10 Feb 1908outcome not readJournal 1908, p. 115 ↗
  • Flinn & Treacy allowed an oil tank on Harrison Street linked by the name only, not checked
    10 Feb 1908outcome not readJournal 1908, p. 115 ↗
  • Flinn & Treacy given thirty more days at Twenty-sixth and Bryant linked by the name only, not checked
    17 Feb 1908passedJournal 1908, p. 133 ↗
  • Flinn & Treacy allowed an asphalt boiler on Harrison Street linked by the name only, not checked
    17 Feb 1908outcome not readJournal 1908, p. 131 ↗
  • Flinn & Treacy allowed an oil tank on Harrison Street linked by the name only, not checked
    17 Feb 1908passedJournal 1908, p. 131 ↗
  • Flinn & Treacy given thirty more days at Twenty-sixth and Bryant linked by the name only, not checked
    19 Feb 1908outcome not readJournal 1908, p. 117 ↗
  • Public Works recommended giving contractor Flinn & Treacy ninety more days to finish paving Mission Street between Twentieth and Army. linked by the name only, not checked
    2 Mar 1908referredJournal 1908, p. 166 ↗
  • Flinn & Treacy were granted a sixty-day extension to finish paving Mission Street between Twentieth and Army streets. linked by the name only, not checked
    23 Mar 1908passedJournal 1908, p. 243 ↗
  • Street levels set on Stanyan Street between Eighteenth and Twentieth streets linked by the name only, not checked
    23 Mar 1908passedJournal 1908, p. 232 ↗
  • Flinn & Treacy given thirty more days on Twenty-fifth Street linked by the name only, not checked
    30 Mar 1908outcome not readJournal 1908, p. 271 ↗
  • Flinn & Treacy given thirty more days on Twenty-fifth Street linked by the name only, not checked
    6 Apr 1908passedJournal 1908, p. 281 ↗
  • Flinn & Treacy given thirty more days on Mission Street linked by the name only, not checked
    4 May 1908outcome not readJournal 1908, p. 357 ↗
  • Flinn & Treacy granted thirty more days to finish paving Mission Street between Twentieth and Army streets. linked by the name only, not checked
    12 May 1908passedJournal 1908, p. 368 ↗
  • Board of Public Works recommended giving Flinn & Treacy 60 more days to finish grading and paving Union street.
    15 Jun 1908referredJournal 1908, p. 564 ↗
  • Flinn & Treacy given sixty more days on Union Street linked by the name only, not checked
    22 Jun 1908passed first readingJournal 1908, p. 594 ↗
  • Flinn & Treacy paid $37,861.10 for paving Mission Street linked by the name only, not checked
    22 Jun 1908passedJournal 1908, p. 596 ↗
  • Flinn & Treacy given ninety more days on Union Street linked by the name only, not checked
    8 Sep 1908outcome not readJournal 1908, p. 762 ↗
  • Flinn & Treacy given ninety more days on Union Street linked by the name only, not checked
    21 Sep 1908outcome not readJournal 1908, p. 808 ↗
  • Flinn & Treacy given thirty more days on Union Street
    30 Nov 1908outcome not readJournal 1908, p. 1061 ↗
  • Nine payments totalling $10,726.33 for hospital supplies, paving repairs, printing, lumber and license plates are passed for printing. linked by the name only, not checked
    30 Nov 1908passed first readingJournal 1908, p. 1055 ↗
  • A resolution on extensions of time for street work is proposed; its outcome continues on the next page.
    7 Dec 1908outcome not readJournal 1908, p. 1074 ↗
  • Flinn & Treacy allowed to blast for a Tilden Street sewer linked by the name only, not checked
    21 Feb 1909outcome not readJournal 1909, p. 1191 ↗
  • Flinn & Treacy paid $2,666.47 for paving Pine Street linked by the name only, not checked
    24 May 1909outcome not readJournal 1909, p. 491 ↗
  • Payments totalling $11,782.30 to several firms for hospital, street, police and fire house work passed for printing.
    7 Jun 1909passed first readingJournal 1909, p. 563 ↗
  • Resolution granting contractor Flinn & Treacy thirty more days to finish granite curbs on Eighteenth street, passed for printing. linked by the name only, not checked
    7 Jun 1909passed first readingJournal 1909, p. 570 ↗
  • Flinn & Treacy given thirty more days on Eighteenth Street sidewalks linked by the name only, not checked
    14 Jun 1909passedJournal 1909, p. 601 ↗
  • City approved payments totaling $11,782.30 to suppliers and contractors, including a chemical engine house on Twenty-second Street. linked by the name only, not checked
    14 Jun 1909passedJournal 1909, p. 596 ↗
  • Flinn & Treacy given thirty more days on Eighteenth Street
    12 Jul 1909passedJournal 1909, p. 700 ↗
  • Flinn & Treacy given thirty more days on Eighteenth Street
    19 Jul 1909tabledJournal 1909, p. 718 ↗
  • Miller & Lux paid $612.85 for meat at the county hospital
    26 Jul 1909outcome not readJournal 1909, p. 737 ↗
  • Flinn & Treacy paid first installment on new fire cisterns
    16 Aug 1909outcome not readJournal 1909, p. 779 ↗
  • Flinn & Treacy paid $10,000 for paving Polk Street
    23 Aug 1909outcome not readJournal 1909, p. 783 ↗
  • Payments totaling $64,601.32 approved for fire cisterns, fireboats, pipe freight and an auxiliary water system.
    23 Aug 1909passedJournal 1909, p. 783 ↗
  • Spring Valley Water paid $10,462.50 for July fire hydrant water
    23 Aug 1909outcome not readJournal 1909, p. 783 ↗
  • Board of Public Works recommended a final payment of $10,587.99 to Flinn & Treacy for paving Polk Street between Post and Sacramento streets. linked by the name only, not checked
    30 Aug 1909referredJournal 1909, p. 795 ↗
  • Flinn & Treacy given sixty more days on Tilden Street linked by the name only, not checked
    29 Nov 1909outcome not readJournal 1909, p. 1094 ↗
  • Flinn & Treacy given sixty more days on Tilden Street linked by the name only, not checked
    6 Dec 1909outcome not readJournal 1909, p. 1119 ↗
  • Flinn and Treacy allowed to blast for a Tilden Street sewer linked by the name only, not checked
    13 Dec 1909passedJournal 1909, p. 1162 ↗
  • Flinn & Treacy were granted a sixty-day extension to finish repaving Polk Street from Sacramento to Pacific Streets. linked by the name only, not checked
  • Resolution authorizes Board of Public Works payments for street paving, school removal and Battery No. 4 work; vote continues on next page. linked by the name only, not checked
    10 Jan 1910outcome not readJournal 1910, p. 68 ↗
  • Flinn & Treacy given sixty more days grading Fifteenth Street linked by the name only, not checked
    31 Jan 1910outcome not readJournal 1910, p. 144 ↗
  • Flinn & Treacy granted ninety more days, from April 1, 1910, to finish grading Fifteenth street. linked by the name only, not checked
    15 Mar 1910outcome not readJournal 1910, p. 269 ↗
  • Flinn & Treacy given sixty more days on Fifteenth Street
    28 Mar 1910outcome not readJournal 1910, p. 321 ↗
  • Flinn & Treacy to blast for grading on De Haro Street linked by the name only, not checked
    18 Apr 1910outcome not readJournal 1910, p. 402 ↗
  • Flinn and Treacy given sixty more days to grade Fifteenth Street linked by the name only, not checked
    23 May 1910outcome not readJournal 1910, p. 515 ↗
  • A resolution extending the time for certain street work was introduced; its outcome is printed on the next page. linked by the name only, not checked
    31 May 1910outcome not readJournal 1910, p. 539 ↗
  • Flinn and Treacy paid $3,694.18 for paving on Broderick Street linked by the name only, not checked
    11 Jul 1910outcome not readJournal 1910, p. 701 ↗
  • Flinn and Treacy paid $3,694.18 for paving on Broderick Street linked by the name only, not checked
    18 Jul 1910outcome not readJournal 1910, p. 715 ↗
  • Flinn & Treacy were paid $1000.00 for curbs and paving on Athens Street between Brazil and Persia avenues.
    1 Aug 1910passedJournal 1910, p. 768 ↗
  • Payments totalling $1,891.80 covered Excelsior Avenue paving and iron for monument covers, passed for printing. linked by the name only, not checked
    1 Aug 1910passed first readingJournal 1910, p. 774 ↗
  • Flinn & Treacy were paid $1,180.00 for paving Excelsior avenue, and Ajax Foundry $711.80 for survey monument covers. linked by the name only, not checked
    8 Aug 1910passedJournal 1910, p. 796 ↗
  • A payment of $1,309.35 for street and sewer work was proposed; the outcome is on the next page. linked by the name only, not checked
    1 Sep 1910outcome not readJournal 1910, p. 967 ↗
  • Flinn & Treacy given ninety more days on Lapidge Street linked by the name only, not checked
    6 Sep 1910outcome not readJournal 1910, p. 885 ↗
  • Flinn & Treacy given ninety more days on McAllister Street linked by the name only, not checked
    6 Sep 1910passedJournal 1910, p. 886 ↗
  • Flinn & Treacy granted a ninety-day extension to finish curbing and paving Lapidge street between Eighteenth and Nineteenth streets. linked by the name only, not checked
    19 Sep 1910outcome not readJournal 1910, p. 918 ↗
  • Flinn & Treacy granted ninety more days to finish paving McAllister Street between Willard Street and Arguello Boulevard. linked by the name only, not checked
    19 Sep 1910passedJournal 1910, p. 919 ↗
  • A payment for street and sewer work was proposed; its outcome is printed on the next page. linked by the name only, not checked
    10 Oct 1910outcome not readJournal 1910, p. 981 ↗
  • First installment to Flinn & Treacy for yard work at the Oceanside school was passed for printing. linked by the name only, not checked
    31 Oct 1910passed first readingJournal 1910, p. 1074 ↗
  • Flinn & Treacy given 90 more days on Stockton Street
  • Second installment of $2,806.44 approved to Flinn & Treacy for paving Stockton Street between Sacramento and Pacific streets. linked by the name only, not checked
    7 Nov 1910outcome not readJournal 1910, p. 1093 ↗
  • Board granted ninety-day extensions to contractors on McKinley and Oceanside schools and Hall of Justice; advertising charges remitted.
    14 Nov 1910passedJournal 1910, p. 1109 ↗
  • Resolutions proposed paying Standard Oil and Flinn & Treacy $3,627.55 for boulevard oil and Lapidge street paving.
    14 Nov 1910outcome not readJournal 1910, p. 1105 ↗
  • Flinn & Treacy paid $2,806.44 for paving Stockton Street linked by the name only, not checked
    21 Nov 1910passedJournal 1910, p. 1125 ↗
  • Standard Oil Co. paid $559.55 for oiling Sloat Boulevard
    21 Nov 1910outcome not readJournal 1910, p. 1124 ↗
  • The Board granted ninety-day extensions to three contractors building the McKinley Primary School, Oceanside School and Hall of Justice.
    21 Nov 1910passedJournal 1910, p. 1128 ↗
  • Flinn & Treacy given 90 more days on McAllister Street linked by the name only, not checked
    28 Nov 1910passed first readingJournal 1910, p. 1148 ↗
  • Board granted Flinn & Treacy ninety more days to finish paving McAllister Street and curbs on Seventeenth Street. linked by the name only, not checked
    5 Dec 1910outcome not readJournal 1910, p. 1168 ↗
  • City proposed payments totalling $6,183.64 to several contractors for street paving and moving Adams School buildings. linked by the name only, not checked
    27 Dec 1910outcome not readJournal 1910, p. 34 ↗
  • Flinn & Treacy granted ninety more days to curb and pave McAllister street, as its lines are in litigation.
  • Payments totalling $3,915 proposed to McCabe & Brown and Flinn & Treacy for yard work at three schools. linked by the name only, not checked
    1911outcome not readJournal 1911 ↗
  • Flinn & Treacy would receive a ninety-day extension from March 1, 1911, to finish curbing and paving at Seventeenth street crossings. linked by the name only, not checked
    1911outcome not readJournal 1911 ↗
  • Flinn & Treacy were granted ninety more days to finish curbs and asphalt on McAllister Street. linked by the name only, not checked
  • Flinn & Treacy sought ninety more days to finish several Seventeenth Street intersection works. linked by the name only, not checked
    1911outcome not readJournal 1911 ↗
  • Flinn & Treacy granted ninety more days to finish curbing and paving McAllister Street, between Willard Street and Arguello Boulevard. linked by the name only, not checked
  • Payments totaling $1,982.87 to Flinn & Treacy for sewer and grading work in front of city property were approved.
  • Proposes paying three paving firms $2,254 total for street work in front of city property. linked by the name only, not checked
    1911outcome not readJournal 1911 ↗
  • Resolution granting Flinn & Treacy ninety more days to finish curbing, paving and sewering Twentieth and Douglass streets. linked by the name only, not checked
    1911outcome not readJournal 1911 ↗
  • Flinn & Treacy were granted ninety more days to finish curbs and asphalt paving on McAllister Street. linked by the name only, not checked
    1911outcome not readJournal 1911 ↗
  • Flinn and Treacy granted thirty more days to finish school yard work at Pacific Heights School.
  • Proposed fifth progress payment to Flinn & Treacy for paving Stockton Street between Sacramento and Pacific streets. linked by the name only, not checked
    1911outcome not readJournal 1911 ↗
  • City paid three contractors $2,254 for street paving work on Sixth Avenue, Seventh Avenue and Twenty-fifth Street. linked by the name only, not checked
  • Resolution proposes paying Flinn & Treacy $1,875.00 from the School Construction Account for yard work at Bay View School. linked by the name only, not checked
    1911outcome not readJournal 1911 ↗
  • Flinn & Treacy granted ninety more days to finish curbing, paving and sewering Twentieth and Douglass streets.
  • Flinn & Treacy granted ninety more days to finish curbing and paving the Excelsior Avenue and Paris Street crossing. linked by the name only, not checked
  • A $1,500 first installment for yard work at Bay View School was authorized for contractor Flinn & Treacy. linked by the name only, not checked
  • Flinn & Treacy would receive a ninety-day extension, from February 20, 1911, to finish curbing and paving McAllister street. linked by the name only, not checked
    1911outcome not readJournal 1911 ↗
  • Flinn & Treacy were paid $1,125 for the second installment of yard work at Oceanside School. linked by the name only, not checked
  • Flinn & Treacy were granted ninety more days to finish the Excelsior avenue and Paris street crossing contract. linked by the name only, not checked
  • Flinn & Treacy was approved for $8,529.47 for second-installment paving work on Mission Street between Spear and Beale streets. linked by the name only, not checked
    1911passed first readingJournal 1911 ↗
  • Approved $753.21 to Flinn & Treacy for extra curb and pavement work on Mission Street between Spear and Beale. linked by the name only, not checked
  • Flinn & Treacy granted ninety more days to finish curbing and paving five Seventeenth Street intersections, delayed by fire water mains. linked by the name only, not checked
  • Final payments totalling $2,861 proposed to Flinn & Treacy for yard work at the Oceanside and Bay View schools. linked by the name only, not checked
    1911outcome not readJournal 1911 ↗
  • Payment of $753.21 proposed to Flinn & Treacy for extra curb and paving work on Mission Street. linked by the name only, not checked
    1911outcome not readJournal 1911 ↗
  • A first payment of $675 approved to Flinn & Treacy for yard work at the Holly Park School.
    1911outcome not readJournal 1911 ↗
  • Resolution granting Flinn & Treacy ninety more days to curb and pave McAllister street, delayed by litigation.
    1911outcome not readJournal 1911 ↗
  • City approved a $1,500 first installment to Flinn & Treacy for yard work at Bay View School. linked by the name only, not checked
  • Flinn and Treacy were granted ninety more days, from January 3, 1911, to finish Stockton Street paving. linked by the name only, not checked
  • Proposed second installment payment to Flinn & Treacy for yard work at the Oceanside School. linked by the name only, not checked
    1911outcome not readJournal 1911 ↗
  • Flinn & Treacy granted thirty-day extensions to finish several street paving and curbing contracts delayed by weather. linked by the name only, not checked
    1911outcome not readJournal 1911 ↗
  • Flinn & Treacy were paid $1,050 as first installment for paving Mission Street between Spear and Beale streets. linked by the name only, not checked
  • Payment of $1,050 to Flinn & Treacy for paving Mission Street between Spear and Beale proposed. linked by the name only, not checked
    1911outcome not readJournal 1911 ↗
  • Flinn & Treacy were granted a thirty-day extension to finish their contract for yards at the Pacific Heights School. linked by the name only, not checked
  • Flinn & Treacy were granted ninety more days to finish curbing and paving Stockton Street between Sacramento and Pacific.
  • Passed for printing: $1,982.87 to Flinn & Treacy for city property share of sewer and grading work on two streets. linked by the name only, not checked
    3 Jan 1911passed first readingJournal 1911 ↗
  • Board of Public Works recommended giving Flinn & Treacy a ninety-day extension to finish Stockton Street paving work. linked by the name only, not checked
    16 Jan 1911outcome not readJournal 1911 ↗
  • Payment of $1,838.03 proposed to Flinn & Treacy for paving and curbing Stockton Street between Sacramento and Pacific streets. linked by the name only, not checked
    14 Feb 1911outcome not readJournal 1911 ↗
  • Board of Public Works recommended giving Flinn & Treacy ninety more days to finish yard work at Pacific Heights School; referred. linked by the name only, not checked
    24 Feb 1911referredJournal 1911 ↗
  • Flinn & Treacy was proposed for a ninety-day extension to finish street work at Brazil avenue and Vienna street.
    13 Mar 1911outcome not readJournal 1911 ↗
  • A payment of $1,875 to Flinn & Treacy for yard work at Bay View School was finally passed.
    29 May 1911passedJournal 1911 ↗
  • Progress payments totalling $3,915 for yard work at the Sutro, Ocean Side and Bay View schools were approved. linked by the name only, not checked
    26 Jun 1911passedJournal 1911 ↗
  • $8,529.47 second installment approved to Flinn & Treacy for basalt block paving on Mission Street.
    24 Jul 1911passedJournal 1911 ↗
  • The Board approved final payments totaling $2,861 to Flinn & Treacy for yard work at Oceanside and Bay View schools. linked by the name only, not checked
    24 Jul 1911passedJournal 1911 ↗
  • Payments to about eighteen city vendors and claimants were passed for printing in a resolution authorizing city expenditures.
    1912passed first readingJournal 1912, p. 243 ↗
  • First $675 payment for Holly Park school yard approved linked by the name only, not checked
    4 Jan 1912passedJournal 1912, p. 18 ↗
  • Expenditures for plumbing, paving, electrical work and furniture at several named schools were passed for printing.
    13 Feb 1912passed first readingJournal 1912, p. 125 ↗
  • O. C. Holt paid $7,410 for work on John Swett School
    26 Feb 1912outcome not readJournal 1912, p. 148 ↗
  • Final payment of $1,646 to Flinn & Treacy for paving in front of McKinley School was approved.
    8 Apr 1912passedJournal 1912, p. 253 ↗
  • $12,000 set aside to resurvey the Excelsior and Mission districts
    9 Jul 1912outcome not readJournal 1912, p. 591 ↗
  • Board passed for printing a resolution authorizing nine payments to contractors and claimants totaling about $29,000. linked by the name only, not checked
    15 Jul 1912passed first readingJournal 1912, p. 603 ↗
  • Board authorized payments on many city claims, including Pacific Gas & Electric, Spring Valley Water, Mahoney Bros and Girls' High School contractors. linked by the name only, not checked
    5 Aug 1912outcome not readJournal 1912, p. 635 ↗
  • Pacific Gas & Electric paid $34,521.13 for lighting the streets linked by the name only, not checked
    12 Aug 1912outcome not readJournal 1912, p. 652 ↗
  • City sets aside $2,500 for further Civic Center plans linked by the name only, not checked
    19 Aug 1912passed first readingJournal 1912, p. 683 ↗
  • Board authorized payment of city claims to lumber, printing, water and other suppliers, totalling about $47,000, in final passage.
    26 Aug 1912passedJournal 1912, p. 701 ↗
  • Flinn & Treacy to rebuild Geary Street from Buchanan to Divisadero linked by the name only, not checked
    2 Dec 1912outcome not readJournal 1912, p. 1093 ↗
  • Flinn & Treacy to rebuild Geary Street from Buchanan to Divisadero
    9 Dec 1912outcome not readJournal 1912, p. 1114 ↗
  • Flinn & Treacy allowed to blast for a States Street sewer
    6 Jan 1913passedJournal 1913, p. 7 ↗
  • F. Rolandi paid $11,044 for the Geary Street car barn linked by the name only, not checked
    10 Feb 1913outcome not readJournal 1913, p. 144 ↗
  • F. Rolandi paid $11,044 for the Geary Street car barn
    18 Feb 1913outcome not readJournal 1913, p. 169 ↗
  • City approved payment of claims for paving, police station work, utilities, supplies and Civic Center land, including $198,977 to G. G. Burnett Estate Co.
    18 Feb 1913passedJournal 1913, p. 170 ↗
  • Expenditures for parks, water, Municipal Railway cars, school plumbing, sewers and paving claims passed for printing.
    3 Mar 1913passed first readingJournal 1913, p. 401 ↗
  • Union Iron Works paid $57,750 for Municipal Railway cars
    28 Apr 1913outcome not readJournal 1913, p. 415 ↗
  • Henry Kruse's appeal against a Peralta Avenue street assessment was sustained, and Public Works was directed to issue a new assessment. linked by the name only, not checked
    30 Jun 1913passedJournal 1913, p. 689 ↗
  • Flinn & Treacy given 60 more days on Buena Vista Avenue linked by the name only, not checked
    27 Oct 1913passedJournal 1913, p. 1068 ↗
  • Board authorized a long list of claim payments from city bond and general funds to contractors, utilities and railways. linked by the name only, not checked
    1914outcome not readJournal 1914, p. 386 ↗
  • Bion J. Arnold paid $3,345.79 for his city transportation report
    26 Jan 1914outcome not readJournal 1914, p. 94 ↗
  • Board is authorizing payments to city suppliers and contractors, including PG&E lighting and Edison School work; outcome continues on next page. linked by the name only, not checked
    12 Feb 1914outcome not readJournal 1914, p. 69 ↗
  • Flinn & Treacy given ninety more days on Ocean Avenue linked by the name only, not checked
    24 Feb 1914passedJournal 1914, p. 147 ↗
  • Flinn & Treacy given more time at Buena Vista Park
    9 Mar 1914passedJournal 1914, p. 262 ↗
  • Flinn & Treacy were proposed for street-work time extensions; the vote is printed on the next page. linked by the name only, not checked
    23 Mar 1914outcome not readJournal 1914, p. 312 ↗
  • Flinn & Treacy given 120 days to blast on Seward Street
    14 Apr 1914outcome not readJournal 1914, p. 391 ↗
  • Flinn & Treacy given 120 days to blast on Seward Street
    20 Apr 1914outcome not readJournal 1914, p. 404 ↗
  • Supervisors approved a batch of General Fund payments, including street paving, fire equipment, lighting and a right-of-way purchase. linked by the name only, not checked
    20 Apr 1914passedJournal 1914, p. 399 ↗
  • Flinn & Treacy given 30 more days on Chenery Street
    18 May 1914passedJournal 1914, p. 499 ↗
  • Flinn & Treacy given thirty more days on Onondaga Avenue
    8 Jun 1914outcome not readJournal 1914, p. 664 ↗
  • Flinn & Treacy allowed to blast on Russia Avenue linked by the name only, not checked
    21 Jul 1914outcome not readJournal 1914, p. 814 ↗
  • Flinn & Treacy allowed to blast rock on States Street
    21 Jul 1914outcome not readJournal 1914, p. 814 ↗
  • Flinn & Treacy allowed to blast on Russia Avenue
    27 Jul 1914passedJournal 1914, p. 828 ↗
  • Flinn & Treacy given fifteen more days on three street jobs
    17 Aug 1914passedJournal 1914, p. 791 ↗
  • Flinn & Treacy allowed to blast rock on Upper Terrace linked by the name only, not checked
    14 Sep 1914outcome not readJournal 1914, p. 998 ↗
  • Flinn & Treacy given sixty more days on Russia Avenue linked by the name only, not checked
    14 Sep 1914passedJournal 1914, p. 997 ↗
  • Flinn & Treacy given sixty more days on States Street
    14 Sep 1914passedJournal 1914, p. 997 ↗
  • Flinn & Treacy allowed to blast rock on Upper Terrace
    28 Sep 1914passedJournal 1914, p. 1031 ↗
  • Flinn & Treacy given sixty more days on Ney, Russia and Folsom
    28 Sep 1914passedJournal 1914, p. 1039 ↗
  • Flinn & Treacy given sixty more days on Seventeenth Street
    28 Sep 1914passedJournal 1914, p. 1076 ↗
  • Flinn & Treacy given ninety more days on Downey Street linked by the name only, not checked
    13 Oct 1914passedJournal 1914, p. 1183 ↗
  • Flinn & Treacy given ninety more days on State Street linked by the name only, not checked
    26 Oct 1914passedJournal 1914, p. 1248 ↗
  • Western Fish Company allowed a boiler for cooking crabs
    16 Nov 1914outcome not readJournal 1914, p. 1322 ↗
  • Flinn & Treacy given sixty more days on Folsom Street
    16 Nov 1914passedJournal 1914, p. 1328 ↗
  • Flinn & Treacy given ninety more days on Nye Street
    23 Nov 1914outcome not readJournal 1914, p. 1375 ↗
  • Stetson-Renner Drayage allowed ninety-eight horses at 1037 Bryant Street
    23 Nov 1914outcome not readJournal 1914, p. 1341 ↗
  • Flinn & Treacy finish paving San Bruno Avenue at Olmstead
    14 Dec 1914outcome not readJournal 1914, p. 1433 ↗
  • City's share paid for paving San Bruno Avenue at Olmstead linked by the name only, not checked
    14 Dec 1914outcome not readJournal 1914, p. 1433 ↗
  • $3,750 for plague work; fire escape plans for six schools
    14 Dec 1914outcome not readJournal 1914, p. 1433 ↗
  • Flinn & Treacy allowed ninety days of blasting on Woolsey Street linked by the name only, not checked
    21 Dec 1914outcome not readJournal 1914, p. 1470 ↗
  • $3,750 for plague work; fire escape plans for six schools
    21 Dec 1914passedJournal 1914, p. 1458 ↗
  • City's share paid for paving San Bruno Avenue at Olmstead
    21 Dec 1914outcome not readJournal 1914, p. 1458 ↗
  • Flinn & Treacy given sixty more days on Russia Avenue
    28 Dec 1914passedJournal 1914, p. 1492 ↗
  • Flinn & Treacy's blasting permit for Lombard and Montgomery Streets was put off. linked by the name only, not checked
  • Flinn & Treacy's blasting permit for Rhode Island Street was put off. linked by the name only, not checked
  • Flinn & Treacy allowed ninety days of blasting on Woolsey Street
    4 Jan 1915passedJournal 1915 ↗
  • Flinn & Treacy given ninety more days on Woolsey Street
    11 Jan 1915outcome not readJournal 1915, p. 40 ↗
  • Flinn & Treacy allowed blasting at Lombard and Montgomery streets
    17 Jan 1915outcome not readJournal 1915, p. 1403 ↗
  • Church & Clark are proposed for a fifteen-day extension from February 3, 1915 to complete a street contract. linked by the name only, not checked
    8 Feb 1915outcome not readJournal 1915, p. 197 ↗
  • Flinn & Treacy were granted extensions of time to finish street paving contracts on St. Mary's and Russia avenues. linked by the name only, not checked
    8 Feb 1915passedJournal 1915, p. 197 ↗
  • Flinn & Treacy given thirty more days on Downey Street linked by the name only, not checked
    15 Feb 1915outcome not readJournal 1915, p. 213 ↗
  • Flinn & Treacy given ninety more days on Corbett Avenue
    15 Mar 1915outcome not readJournal 1915, p. 345 ↗
  • Flinn & Treacy given thirty more days on Ney Street linked by the name only, not checked
    15 Mar 1915passedJournal 1915, p. 292 ↗
  • Flinn & Treacy given sixty more days on Buena Vista Avenue linked by the name only, not checked
    5 Apr 1915passedJournal 1915, p. 382 ↗
  • Flinn & Treacy given sixty more days on Woolsey Street
    12 Apr 1915passedJournal 1915, p. 430 ↗
  • Flinn & Treacy given forty more days on Arlington Street
    19 Apr 1915passedJournal 1915, p. 457 ↗
  • Flinn & Treacy given thirty more days on Park Street
    3 May 1915passedJournal 1915, p. 494 ↗
  • Flinn & Treacy given sixty more days on Park Street linked by the name only, not checked
    1 Jun 1915passedJournal 1915, p. 584 ↗
  • Street levels abolished on Twenty-eighth through Thirty-first avenues
    28 Jun 1915passedJournal 1915, p. 678 ↗
  • City spends $429 on two bathrooms at the Tuberculosis Hospital
    28 Jun 1915passedJournal 1915, p. 668 ↗
  • Flinn & Treacy given ninety more days on Corbett Avenue
    19 Jul 1915passedJournal 1915, p. 844 ↗
  • Federal Construction paid $2,469.32 for the Foerster Street storm sewer linked by the name only, not checked
    26 Jul 1915passed first readingJournal 1915, p. 856 ↗
  • $2,469.32 paid Federal Construction for the Foerster Street storm sewer linked by the name only, not checked
    2 Aug 1915outcome not readJournal 1915, p. 875 ↗
  • Property owners appealed acceptance of street work on Folsom Street between Cortland and Eugenia Avenues; the hearing was held. linked by the name only, not checked
    9 Aug 1915outcome not readJournal 1915 ↗
  • Flinn & Treacy given ninety more days on Silver Avenue linked by the name only, not checked
    16 Aug 1915passedJournal 1915, p. 929 ↗
  • Flinn & Treacy given sixty more days at France and Paris linked by the name only, not checked
    23 Aug 1915passedJournal 1915, p. 891 ↗
  • Flinn & Treacy given 60 more days on Buena Vista Avenue
    7 Sep 1915passedJournal 1915, p. 998 ↗
  • Flinn & Treacy given 15 more days at France Avenue
  • Flinn & Treacy given fifteen more days on Paris Avenue linked by the name only, not checked
    18 Oct 1915passedJournal 1915, p. 1107 ↗
  • Flinn & Treacy given thirty more days on Castro Street
    25 Oct 1915outcome not readJournal 1915, p. 1136 ↗
  • Flinn & Treacy allowed to blast at Lombard and Montgomery Streets linked by the name only, not checked
    25 Oct 1915outcome not readJournal 1915, p. 1128 ↗
  • Flinn & Treacy given thirty more days on Castro Street
    25 Oct 1915outcome not readJournal 1915, p. 1132 ↗
  • Flinn & Treacy allowed to blast at Lombard and Montgomery Streets linked by the name only, not checked
    1 Nov 1915outcome not readJournal 1915, p. 1153 ↗
  • Street levels changed on Van Ness Avenue near North Point Street linked by the name only, not checked
    1 Nov 1915outcome not readJournal 1915, p. 1152 ↗
  • Flinn & Treacy allowed to blast on Railroad Avenue for grading
    1 Nov 1915outcome not readJournal 1915, p. 1152 ↗
  • Flinn & Treacy allowed to blast at Duboce Avenue and Divisadero linked by the name only, not checked
    1 Nov 1915outcome not readJournal 1915, p. 1152 ↗
  • Flinn & Treacy allowed 90 days blasting on Rhode Island Street linked by the name only, not checked
    8 Nov 1915passed first readingJournal 1915, p. 1165 ↗
  • Flinn & Treacy given 60 more days on Buena Vista Avenue linked by the name only, not checked
    8 Nov 1915outcome not readJournal 1915, p. 1166 ↗
  • Flinn & Treacy given 15 more days at France and Paris
  • Flinn & Treacy allowed 90 days blasting on Railroad Avenue
    10 Nov 1915passedJournal 1915, p. 1172 ↗
  • Flinn & Treacy allowed blasting at Duboce Avenue and Divisadero Street
    10 Nov 1915passedJournal 1915, p. 1172 ↗
  • Flinn & Treacy allowed 90 days blasting on Rhode Island Street linked by the name only, not checked
    16 Nov 1915outcome not readJournal 1915, p. 1202 ↗
  • Flinn & Treacy allowed 90 days blasting at Lombard and Montgomery linked by the name only, not checked
    22 Nov 1915outcome not readJournal 1915, p. 1254 ↗
  • Flinn & Treacy given 30 more days on McAllister Street
    22 Nov 1915passedJournal 1915, p. 1255 ↗
  • Flinn & Treacy allowed 90 days blasting at Lombard and Montgomery linked by the name only, not checked
    29 Nov 1915outcome not readJournal 1915, p. 1196 ↗
  • Supervisor Power moved to summon Flinn & Treacy to explain unpaid rebates for Folsom Street work; the motion carried.
    3 Jan 1916passedJournal 1916 ↗
  • Flinn & Treacy given 90 more days on Rhode Island Street
    4 Jan 1916passedJournal 1916, p. 6 ↗
  • Flinn & Treacy given 90 more days on Nineteenth Avenue
    17 Jan 1916passedJournal 1916, p. 92 ↗
  • Flinn & Treacy allowed ninety days of blasting on Valley Street
    14 Feb 1916outcome not readJournal 1916, p. 176 ↗
  • Flinn & Treacy allowed ninety days of blasting on Valley Street linked by the name only, not checked
    21 Feb 1916outcome not readJournal 1916, p. 186 ↗
  • Board proposed a $499.65 tax refund to Title Insurance and Guaranty Company for Church Street railway property.
    6 Mar 1916outcome not readJournal 1916, p. 229 ↗
  • Flinn & Treacy given ninety more days blasting on Rhode Island
    27 Mar 1916passedJournal 1916, p. 277 ↗
  • Flinn & Treacy given ninety more days at Silver and Vienna
    27 Mar 1916outcome not readJournal 1916, p. 305 ↗
  • Flinn & Treacy given thirty more days on Fairfax Avenue
    17 Apr 1916outcome not readJournal 1916, p. 383 ↗
  • Flinn & Treacy allowed blasting for a sewer in Staples Avenue
    17 Apr 1916passed first readingJournal 1916, p. 382 ↗
  • Flinn & Treacy allowed blasting for a sewer in Staples Avenue
    24 Apr 1916passedJournal 1916, p. 385 ↗
  • Flinn & Treacy given ninety more days on Rhode Island Street linked by the name only, not checked
    1 May 1916passedJournal 1916, p. 431 ↗
  • Flinn & Treacy given ninety more days on Valley Street
    8 May 1916passedJournal 1916, p. 451 ↗
  • Flinn & Treacy allowed to blast on Twenty-fourth Street
    12 Jun 1916outcome not readJournal 1916, p. 644 ↗
  • Flinn & Treacy allowed to blast on Twenty-fourth Street
    19 Jun 1916passedJournal 1916, p. 666 ↗
  • Flinn & Treacy given ninety more days on Quint Street
    26 Jun 1916passedJournal 1916, p. 645 ↗
  • Flinn & Treacy given thirty more days on Rhode Island Street
    17 Jul 1916passedJournal 1916, p. 786 ↗
  • Flinn & Treacy given 90 more days on Valley Street
    31 Jul 1916passedJournal 1916, p. 843 ↗
  • Flinn & Treacy given 15 more days on Willard Street
    7 Aug 1916passedJournal 1916, p. 845 ↗
  • Resolution authorizes payments to contractors, suppliers and others from city funds, including street and sewer work claims.
    7 Aug 1916outcome not readJournal 1916, p. 854 ↗
  • City bills paid, including $1,800 for two health department automobiles
    14 Aug 1916outcome not readJournal 1916, p. 859 ↗
  • Flinn & Treacy given 90 more days on Clarendon and Burnett
    11 Sep 1916passedJournal 1916, p. 925 ↗
  • Flinn & Treacy given ninety more days on Twenty-fourth Street
    25 Sep 1916passedJournal 1916, p. 1002 ↗
  • Flinn & Treacy allowed to blast on Rhode Island Street
    2 Oct 1916outcome not readJournal 1916, p. 1055 ↗
  • Flinn & Treacy allowed to blast on Rhode Island Street
    2 Oct 1916outcome not readJournal 1916, p. 1001 ↗
  • Flinn & Treacy given sixty more days on Quint Street
    23 Oct 1916passedJournal 1916, p. 1113 ↗
  • Flinn & Treacy seek to blast on Farallones Street
    13 Nov 1916passed first readingJournal 1916, p. 1162 ↗
  • Supervisor Welch presented a resolution on extensions of time; its text and outcome continue on the next page.
    20 Nov 1916outcome not readJournal 1916, p. 1199 ↗
  • Flinn & Treacy allowed ninety days of blasting on Farallones Street
    20 Nov 1916passedJournal 1916, p. 1190 ↗
  • Flinn & Treacy given ninety more days on Farallones Street
    11 Dec 1916passedJournal 1916, p. 1262 ↗
  • Flinn & Treacy given sixty more days on Clarendon Avenue linked by the name only, not checked
    11 Dec 1916passedJournal 1916, p. 1248 ↗
  • Flinn & Treacy given thirty more days on Quint Street
    26 Dec 1916passedJournal 1916, p. 1310 ↗
  • Flinn & Treacy given 30 more days on Athens Street
    15 Jan 1917passedJournal 1917, p. 93 ↗
  • Flinn & Treacy given 60 more days on Quint Street
    22 Jan 1917passedJournal 1917, p. 120 ↗
  • Flinn & Treacy given 30 more days on San Bruno Avenue linked by the name only, not checked
    5 Feb 1917outcome not readJournal 1917, p. 166 ↗
  • Flinn & Treacy given 90 more days on Ord Street
    5 Feb 1917outcome not readJournal 1917, p. 166 ↗
  • Flinn & Treacy given 90 more days on Corbett Avenue
    5 Feb 1917passedJournal 1917, p. 167 ↗
  • Flinn & Treacy given 90 more days on Parallones Street linked by the name only, not checked
    19 Feb 1917passedJournal 1917, p. 216 ↗
  • Flinn & Treacy given 90 more days on Castro Street
    12 Mar 1917passedJournal 1917, p. 306 ↗
  • Eaton & Smith to be paid $1,875.89 for paving Potrero Avenue linked by the name only, not checked
    19 Mar 1917passed first readingJournal 1917, p. 328 ↗
  • Eaton & Smith paid $1,875.89 for paving Potrero Avenue linked by the name only, not checked
    26 Mar 1917outcome not readJournal 1917, p. 353 ↗
  • Flinn & Treacy given sixty more days on Oakdale Avenue
    7 May 1917passedJournal 1917, p. 583 ↗
  • Flinn & Treacy given sixty more days on Oakdale Avenue
    21 May 1917outcome not readJournal 1917, p. 616 ↗
  • Flinn & Treacy given sixty more days on Latona Street
    28 May 1917passedJournal 1917, p. 719 ↗
  • Flinn & Treacy given sixty more days on Gladys Street
    4 Jun 1917passedJournal 1917, p. 763 ↗
  • Engine House No. 37 to be built at Vermont and Twenty-fifth linked by the name only, not checked
    18 Jun 1917outcome not readJournal 1917, p. 831 ↗
  • Engine House No. 37 to be built at Vermont and Twenty-fifth
    25 Jun 1917outcome not readJournal 1917 ↗
  • Flinn & Treacy given thirty more days on Thomas Avenue linked by the name only, not checked
    30 Jul 1917outcome not readJournal 1917, p. 1011 ↗
  • $1,395 paid to J. F. Dowling for work on Newcomb Avenue linked by the name only, not checked
    30 Jul 1917outcome not readJournal 1917, p. 997 ↗
  • Flinn & Treacy given sixty more days on Diamond Street
  • $1,375 for trolley parts for the outer Market Street tracks
    24 Sep 1917passedJournal 1917, p. 1200 ↗
  • R. C. Storrie & Co. paid $100,000 for Twin Peaks tunnel
    3 Oct 1917passed first readingJournal 1917, p. 1243 ↗
  • R. C. Storrie & Co. paid $100,000 for Twin Peaks tunnel
    9 Oct 1917outcome not readJournal 1917, p. 1265 ↗
  • Flinn & Treacy given ninety more days on Hancock Street
    22 Oct 1917passedJournal 1917, p. 1334 ↗
  • $5,000 set aside to grade and sewer Hawes Street
    22 Oct 1917passedJournal 1917, p. 1317 ↗
  • Flinn & Treacy was paid $1,393.75 to improve San Bruno avenue between Cortland avenue and Steuben street. linked by the name only, not checked
  • Supervisor Power moved to pass for printing a resolution authorizing payments to many claimants, including schools, transit and fire work. linked by the name only, not checked
    5 Nov 1917passed first readingJournal 1917, p. 1354 ↗
  • $7,149.48 more spent finishing Railroad Avenue between Ingerson and San Bruno
    19 Nov 1917passedJournal 1917, p. 1388 ↗
  • Flinn & Treacy given 90 more days on Clayton Street
    31 Dec 1917passedJournal 1917, p. 1530 ↗
  • Flinn & Treacy given 90 more days on Raymond Avenue
    7 Jan 1918passedJournal 1918, p. 15 ↗
  • Flinn & Treacy given a third extension on Francisco Street
    25 Feb 1918outcome not readJournal 1918, p. 170 ↗
  • Flinn & Treacy's Silliman Street paving contract cancelled
    25 Feb 1918passedJournal 1918, p. 141 ↗
  • Flinn & Treacy given a fourth extension on Francisco Street
    18 Mar 1918passedJournal 1918, p. 230 ↗
  • Flinn & Treacy given sixty more days on Clayton Street
    25 Mar 1918passedJournal 1918, p. 260 ↗
  • Time extensions granted to Mangrum & Otter for San Francisco Hospital kitchen and Flinn & Treacy for Fairmount School yard paving. linked by the name only, not checked
    29 Apr 1918passedJournal 1918, p. 342 ↗
  • A resolution authorizing payments to contractors and suppliers for hospital, sewer and railway work was passed for printing.
    6 May 1918passed first readingJournal 1918, p. 356 ↗
  • Payments to contractors and suppliers for hospital, sewer, railway and Hetch Hetchy work are listed for authorization; final vote not printed here.
    13 May 1918outcome not readJournal 1918, p. 385 ↗
  • Western Contracting Co. paid $47,668.01 for the Market Street railway extension
    20 May 1918outcome not readJournal 1918, p. 407 ↗
  • Flinn & Treacy given thirty more days on Clayton Street
    27 May 1918passedJournal 1918, p. 431 ↗
  • Flinn & Treacy's appeal of Francisco Street assessments was referred to the Streets Committee. linked by the name only, not checked
    24 Jun 1918referredJournal 1918, p. 533 ↗
  • Flinn & Treacy was granted a 90-day extension to finish its contract for paving Lane street and McKinnon avenue.
    12 Aug 1918outcome not readJournal 1918, p. 721 ↗
  • Flinn & Treacy's Lane Street contract cancelled by the city
    28 Oct 1918outcome not readJournal 1918, p. 889 ↗
  • Flinn & Treacy's Mendell Street improvement contract cancelled
    28 Oct 1918passedJournal 1918, p. 889 ↗
  • Contractor given 60 more days to finish Wolfe Street work
  • Supervisor McLeran presented an appropriations resolution; its text continues onto the next page. linked by the name only, not checked
    24 Feb 1919outcome not readJournal 1919, p. 113 ↗
  • $3,000 set aside for Flinn and Treacy's Tenth Street work
    10 Mar 1919outcome not readJournal 1919, p. 161 ↗
  • $3,000 set aside for Flinn and Treacy's Tenth Street work
    17 Mar 1919outcome not readJournal 1919, p. 175 ↗
  • Flinn and Treacy given sixty more days on Bacon and Lakeview
    7 Apr 1919passedJournal 1919, p. 242 ↗
  • Flinn & Treacy's Wolfe Street contract cancelled over a faulty description
    14 Jul 1919outcome not readJournal 1919, p. 595 ↗
  • Resolution No. 17004 introduced; its text and outcome continue on the next page. linked by the name only, not checked
    28 Jul 1919outcome not readJournal 1919, p. 631 ↗
  • Flinn & Treacy given sixty more days on Fifteenth Street
    28 Jul 1919passedJournal 1919, p. 631 ↗
  • Board passed for printing a resolution authorizing $98,163.51 in payments to contractors and suppliers for sewers, parks, Hetch Hetchy and transit.
    28 Jul 1919passed first readingJournal 1919, p. 628 ↗
  • Hickey & Harmon paid $810 for the Euclid Avenue sewer linked by the name only, not checked
    4 Aug 1919passedJournal 1919, p. 647 ↗
  • Montague Pipe & Steel paid $8,102.10 for Hetch Hetchy air pipe
    18 Aug 1919outcome not readJournal 1919, p. 688 ↗
  • Resolution proposing to set aside city funds for listed purposes; its outcome appears on the next page.
    25 Aug 1919outcome not readJournal 1919, p. 705 ↗
  • Proposed by Supervisor McLeran; its amounts and vote fall on the next page.
    15 Sep 1919outcome not readJournal 1919, p. 761 ↗
  • Flinn & Treacy given ninety more days on Fifteenth Street
    29 Sep 1919passedJournal 1919, p. 806 ↗
  • Flinn & Treacy given ninety more days on Caledonia Alley linked by the name only, not checked
    27 Oct 1919passedJournal 1919, p. 694 ↗
  • Flinn & Treacy given ninety more days on Fifteenth Street linked by the name only, not checked
    22 Dec 1919passedJournal 1919, p. 1121 ↗
  • Flinn & Treacy given sixty more days on Caledonia Alley
    26 Jan 1920passedJournal 1920, p. 94 ↗
  • Felix McHugh & Son given thirty more days on Forty-second Avenue
    16 Feb 1920outcome not readJournal 1920, p. 145 ↗
  • Flinn & Treacy given sixty more days on Wolfe Street
    1 Mar 1920passedJournal 1920, p. 177 ↗
  • Flinn & Treacy given sixty more days on Wolfe Street
    3 May 1920passedJournal 1920, p. 366 ↗
  • Street levels to change on Garden Street between Divisadero and Broderick
    24 May 1920outcome not readJournal 1920, p. 447 ↗
  • Flinn & Treacy given 60 more days on London Street after labor trouble linked by the name only, not checked
    7 Jun 1920passedJournal 1920, p. 407 ↗
  • Flinn & Treacy given ninety more days on Wolfe Street linked by the name only, not checked
    6 Jul 1920passedJournal 1920, p. 585 ↗
  • Wolfe Street paving deadline extended thirty more days
    27 Sep 1920passedJournal 1920, p. 821 ↗
  • Carley & Hamilton allowed 45 horses at Twentieth and Tennessee streets
    26 Mar 1923outcome not readJournal 1923, p. 284 ↗
  • Carley & Hamilton allowed 45 horses at Twentieth and Tennessee streets linked by the name only, not checked
    2 Apr 1923passedJournal 1923, p. 299 ↗
  • Flinn & Treacy paid $250 for work on Grant Street
    11 Feb 1924passedJournal 1924, p. 149 ↗