  • Payments totalling $1,431.02 for lumber and Sixth street bridge repairs were passed for printing.
    30 Jul 1906passed first readingJournal 1906 ↗
  • $1431 for lumber and repairs to the Sixth Street bridge
    8 Aug 1906outcome not readJournal 1906 ↗
  • Healy-Tibbitts paid for the bridge at Mount Vernon and San Jose Avenues linked by the name only, not checked
    20 Sep 1906passed first readingJournal 1906 ↗
  • Contract payment of $11,156 to Healy-Tibbitts Construction Company for the Mount Vernon Avenue bridge was finally passed. linked by the name only, not checked
    1 Oct 1906passedJournal 1906 ↗
  • Surplus Fund pays Healy-Tibbitts Construction Company $10,950.93 for building the Third Street bridge approaches. linked by the name only, not checked
    1 Nov 1906passedJournal 1906 ↗
  • Proposed $10,956.93 payment to Healy-Tibbitts Construction Company for building approaches to the Third Street Bridge. linked by the name only, not checked
    1 Nov 1906passed first readingJournal 1906 ↗
  • Public Works recommended giving Healy, Tibbitts Construction Company 90 more days to finish the Bacon street sewer contract.
    3 Dec 1906outcome not readJournal 1906 ↗
  • Healy-Tibbitts given 90 more days on the Baker Street sewer
    20 Dec 1906passedJournal 1906 ↗
  • Public Works recommended giving Healy-Tibbitts Construction Company more time to finish the Baker Street sewer, referred to committee. linked by the name only, not checked
    15 Feb 1907referredJournal 1907 ↗
  • Healy-Tibbitts Construction Company paid $47,208.82 for the Baker Street sewers linked by the name only, not checked
    1 Jul 1907outcome not readJournal 1907, p. 302 ↗
  • Healy-Tibbitts Construction Company paid $47,208.82 for the Baker Street sewers linked by the name only, not checked
    9 Jul 1907passedJournal 1907, p. 314 ↗
  • The Healy-Tibbitts Construction Company asked permission to blast concrete foundations at Beale and Mission streets; referred. linked by the name only, not checked
    18 Nov 1907referredJournal 1907 ↗
  • The Board granted Healy-Tibbitts Construction Company permission to blast concrete foundations at Mission and Beale streets, under a $5,000 bond. linked by the name only, not checked
    16 Dec 1907passedJournal 1907, p. 757 ↗
  • Healy-Tibbitts paid for repairing the earthquake-damaged Baker Street sewer linked by the name only, not checked
    6 Jan 1908outcome not readJournal 1908, p. 15 ↗
  • Healy-Tibbitts given forty more days on the Van Ness Avenue cistern
    8 Jan 1908outcome not readJournal 1908, p. 1138 ↗
  • Healy-Tibbitts paid for repairing the earthquake-damaged Baker Street sewer
    13 Jan 1908outcome not readJournal 1908 ↗
  • Healy-Tibbitts allowed to blast for grading on Bush Street linked by the name only, not checked
    8 Jun 1908outcome not readJournal 1908, p. 318 ↗
  • Resolution authorizing general fund payments for supplies, hospital care and sewer construction was passed for printing.
    21 Sep 1908passed first readingJournal 1908, p. 809 ↗
  • Healy-Tibbitts Construction Company was recommended for a ninety-day extension to build a sewer on Commercial Street. linked by the name only, not checked
    28 Sep 1908outcome not readJournal 1908, p. 845 ↗
  • Resolution proposes General Fund payments to claimants for supplies and services, including G. H. Timbson. linked by the name only, not checked
    28 Sep 1908outcome not readJournal 1908, p. 848 ↗
  • Healy-Tibbitts Construction Company asked permission to blast while building fire cisterns; the request went to committee. linked by the name only, not checked
    14 Dec 1908referredJournal 1908, p. 1087 ↗
  • Healy-Tibbitts allowed to blast for fire cisterns at Sutter and Octavia linked by the name only, not checked
    21 Dec 1908outcome not readJournal 1908, p. 1121 ↗
  • Healy-Tibbitts allowed to blast for fire cisterns at Sutter and Octavia linked by the name only, not checked
    4 Jan 1909passedJournal 1909, p. 10 ↗
  • Healy-Tibbitts given 40 more days on the Van Ness and Market cistern
    11 Jan 1909outcome not readJournal 1909, p. 28 ↗
  • Healy-Tibbitts Construction Company petitioned to blast for grading at California and Powell Streets; referred to committee. linked by the name only, not checked
    25 Jan 1909referredJournal 1909, p. 62 ↗
  • Healy-Tibbitts given forty more days for the Van Ness Avenue cistern linked by the name only, not checked
    27 Jan 1909passed first readingJournal 1909, p. 127 ↗
  • Healy-Tibbitts paid $5,352.39 to finish the Commercial Street sewer
    27 Jan 1909referredJournal 1909, p. 129 ↗
  • Healy-Tibbitts allowed sixty days of blasting at California and Powell linked by the name only, not checked
    11 Feb 1909outcome not readJournal 1909, p. 90 ↗
  • Flinn & Treacy given sixty more days on Polk Street linked by the name only, not checked
    21 Feb 1909passed first readingJournal 1909, p. 1200 ↗
  • Eureka Construction Company given ninety more days on the Potrero sewer linked by the name only, not checked
    21 Feb 1909passed first readingJournal 1909, p. 1200 ↗
  • Healy-Tibbitts given forty more days on a Van Ness Avenue cistern linked by the name only, not checked
    23 Feb 1909passedJournal 1909, p. 181 ↗
  • Ordinance against animals and vehicles left loose passed for printing
    22 Mar 1909passed first readingJournal 1909, p. 283 ↗
  • Board of Public Works recommended giving Healy-Tibbitts Construction Company thirty more days to finish fire cisterns; sent to Fire Committee. linked by the name only, not checked
    22 Mar 1909referredJournal 1909, p. 266 ↗
  • Healy-Tibbitts Construction paid for fire cisterns at Sutter and Octavia Streets linked by the name only, not checked
    22 Mar 1909outcome not readJournal 1909, p. 274 ↗
  • Healy-Tibbitts Construction paid for fire cisterns at Sutter and Octavia Streets
    29 Mar 1909outcome not readJournal 1909, p. 290 ↗
  • A payment for constructing fire cisterns is proposed; its outcome appears on the next page. linked by the name only, not checked
    29 Mar 1909outcome not readJournal 1909, p. 291 ↗
  • Healy-Tibbitts given thirty more days on its fire cisterns linked by the name only, not checked
    5 Apr 1909passed first readingJournal 1909, p. 306 ↗
  • Payments for building fire cisterns at several San Francisco street intersections were passed for printing. linked by the name only, not checked
    10 Apr 1909passed first readingJournal 1909, p. 377 ↗
  • The Board granted Healy-Tibbitts Construction Company thirty more days to finish fire cisterns at several downtown intersections. linked by the name only, not checked
    12 Apr 1909passedJournal 1909, p. 327 ↗
  • Four contractors were paid a total of $13,926.83 in progress payments to build fire cisterns. linked by the name only, not checked
    24 May 1909passedJournal 1909, p. 527 ↗
  • Healy-Tibbitts Construction Company asked to keep a temporary stable for ten horses on San Bruno Avenue; referred to committee. linked by the name only, not checked
    24 May 1909referredJournal 1909, p. 522 ↗
  • Healy-Tibbitts allowed a ten-horse stable on San Bruno Avenue linked by the name only, not checked
    7 Jun 1909passedJournal 1909, p. 559 ↗
  • Healy-Tibbitts allowed to blast for fire cisterns at seven crossings linked by the name only, not checked
    14 Jun 1909passedJournal 1909, p. 602 ↗
  • Healy-Tibbitts Construction Company was granted temporary permission to blast at seven San Francisco intersections while building fire cisterns, subject to a $5,000 bond. linked by the name only, not checked
    14 Jun 1909passed first readingJournal 1909, p. 585 ↗
  • Healy-Tibbitts given sixty more days on four fire cisterns linked by the name only, not checked
    21 Jun 1909passedJournal 1909, p. 635 ↗
  • Healy-Tibbitts Construction Co. paid for five new fire cisterns linked by the name only, not checked
    24 Jun 1909outcome not readJournal 1909, p. 673 ↗
  • Healy-Tibbitts given sixty more days on four fire cisterns
    28 Jun 1909outcome not readJournal 1909, p. 650 ↗
  • Board approved a $28,375 payment to Healy-Tibbitts Construction Co. for excavation and foundation work on the Hall of Justice. linked by the name only, not checked
    6 Jul 1909passedJournal 1909, p. 670 ↗
  • Eureka Construction Co. paid $11,000.87 for the East Potrero sewer linked by the name only, not checked
    19 Jul 1909outcome not readJournal 1909, p. 720 ↗
  • Fire cistern construction payments of $4,968.93 and $951.23 were authorized to Healy-Tibbitts and Keystone at various street corners. linked by the name only, not checked
    19 Jul 1909passedJournal 1909, p. 720 ↗
  • Eureka Construction Co. paid $11,000.87 for the East Potrero sewer linked by the name only, not checked
    26 Jul 1909outcome not readJournal 1909, p. 738 ↗
  • Healy-Tibbitts Construction Co. paid $5,050.65 for five fire cisterns
    26 Jul 1909outcome not readJournal 1909, p. 738 ↗
  • Flinn & Treacy paid first installment on new fire cisterns
    16 Aug 1909outcome not readJournal 1909, p. 779 ↗
  • Payments totaling $64,601.32 approved for fire cisterns, fireboats, pipe freight and an auxiliary water system.
    23 Aug 1909passedJournal 1909, p. 783 ↗
  • Healy-Tibbitts allowed to blast out the old Division Street sewer
    30 Aug 1909outcome not readJournal 1909, p. 802 ↗
  • Board of Public Works recommended a sixty-day extension for Healy-Tibbitts to finish fire cisterns; sent to Fire Committee.
    30 Aug 1909referredJournal 1909, p. 793 ↗
  • Healy-Tibbitts given sixty more days to finish five fire cisterns
    7 Sep 1909passed first readingJournal 1909, p. 816 ↗
  • Healy-Tibbitts allowed to blast out the old Division Street sewer linked by the name only, not checked
    7 Sep 1909passedJournal 1909, p. 813 ↗
  • Healy-Tibbitts paid $10,063.67 for a second batch of fire cisterns linked by the name only, not checked
    13 Sep 1909outcome not readJournal 1909, p. 823 ↗
  • Sewer construction payments of about $40,441 to contractors for several city street sewers were authorized from the Sewer Construction Account. linked by the name only, not checked
    13 Sep 1909outcome not readJournal 1909, p. 823 ↗
  • Payments totalling $23,429.84 to several contractors for fire cisterns at many city street corners were proposed.
    13 Sep 1909outcome not readJournal 1909, p. 823 ↗
  • Healy-Tibbitts given sixty more days to finish its fire cisterns linked by the name only, not checked
    20 Sep 1909outcome not readJournal 1909, p. 844 ↗
  • Payments for fire cistern construction at many San Francisco street corners proposed, with the vote continuing on the next page. linked by the name only, not checked
    20 Sep 1909outcome not readJournal 1909, p. 839 ↗
  • Board is paying Healy-Tibbitts Construction Co. $8,067.04 first installment for Section 6 of the Division Street sewer.
    20 Sep 1909outcome not readJournal 1909, p. 838 ↗
  • $5,223.13 paid to Healy-Tibbitts for piles under the Wyoming Avenue sewer
    4 Oct 1909outcome not readJournal 1909, p. 907 ↗
  • $5,223.13 paid for driving piles under the Wyoming Avenue sewer linked by the name only, not checked
    11 Oct 1909outcome not readJournal 1909, p. 913 ↗
  • A first payment of $31,992.19 to Healy-Tibbitts Construction for the North Beach main intercepting sewer was passed for printing. linked by the name only, not checked
    11 Oct 1909passed first readingJournal 1909, p. 927 ↗
  • Healy-Tibbitts paid $14,058.34 for work on the Division Street sewer linked by the name only, not checked
    11 Oct 1909outcome not readJournal 1909, p. 919 ↗
  • Healy-Tibbitts Construction Company asked to run steam boilers for sewer construction; referred to the Fire Committee. linked by the name only, not checked
    18 Oct 1909referredJournal 1909, p. 933 ↗
  • Healy-Tibbitts paid $4,723.50 for sewers on Lombard Street linked by the name only, not checked
    18 Oct 1909outcome not readJournal 1909, p. 939 ↗
  • Healy-Tibbitts paid $14,058.34 for work on the Division Street sewer linked by the name only, not checked
    25 Oct 1909outcome not readJournal 1909, p. 956 ↗
  • Healy-Tibbitts paid $4,728.50 for sewers on Lombard Street linked by the name only, not checked
    25 Oct 1909outcome not readJournal 1909, p. 958 ↗
  • The city paid Healy-Tibbitts Construction Co. $11,992.19 for the first stage of the main intercepting sewer in North Beach. linked by the name only, not checked
    25 Oct 1909passedJournal 1909, p. 956 ↗
  • A resolution authorizing payments for fire cisterns from the Fire Protection Account was proposed and continues onto the next page. linked by the name only, not checked
    25 Oct 1909outcome not readJournal 1909, p. 956 ↗
  • Resolution authorizes sewer construction payments from the Sewer Construction Account, including one to Healy-Tibbitts Construction Company. linked by the name only, not checked
    15 Nov 1909outcome not readJournal 1909, p. 1027 ↗
  • Passed progress payments to Healy-Tibbitts Construction Co. for sewers on Fifth Street and Division Street. linked by the name only, not checked
    15 Nov 1909passedJournal 1909, p. 1017 ↗
  • Healy-Tibbitts and Buena Vista paid for fire cisterns across the city
    15 Nov 1909outcome not readJournal 1909, p. 1028 ↗
  • Healy-Tibbitts paid $4,727.05 for sewers on Lombard Street linked by the name only, not checked
    22 Nov 1909outcome not readJournal 1909, p. 1063 ↗
  • Healy-Tibbitts and Buena Vista paid for fire cisterns across the city linked by the name only, not checked
    26 Nov 1909outcome not readJournal 1909, p. 1064 ↗
  • Healy-Tibbitts Construction Co. granted temporary permission to keep a twenty-horse stable on Utah Street. linked by the name only, not checked
    26 Nov 1909passedJournal 1909, p. 1069 ↗
  • Payments from the Sewer Construction Account for sewer work were proposed; the list continues on the next page. linked by the name only, not checked
    29 Nov 1909outcome not readJournal 1909, p. 1011 ↗
  • Healy-Tibbitts paid $5,467.47 for fire cisterns at Laguna and Union linked by the name only, not checked
    29 Nov 1909outcome not readJournal 1909, p. 1095 ↗
  • Healy-Tibbitts Construction allowed to blast on a Fremont Street lot linked by the name only, not checked
    6 Dec 1909outcome not readJournal 1909, p. 1125 ↗
  • Healy-Tibbitts paid $5,467.47 for fire cisterns at Laguna and Union linked by the name only, not checked
    6 Dec 1909outcome not readJournal 1909, p. 1104 ↗
  • Healy-Tibbitts paid $9,896.42 for fire cisterns at Mariposa and Missouri streets
    7 Dec 1909outcome not readJournal 1909, p. 1133 ↗
  • Healy-Tibbitts paid $23,091.81 for the Division Street and North Beach sewers linked by the name only, not checked
    7 Dec 1909outcome not readJournal 1909, p. 1133 ↗
  • Healy-Tibbitts paid for fire cisterns at Mariposa and Missouri streets linked by the name only, not checked
    13 Dec 1909outcome not readJournal 1909, p. 1141 ↗
  • Resolution proposes payments from the sewer construction account to Healy-Tibbitt; the outcome appears on the next page. linked by the name only, not checked
    13 Dec 1909outcome not readJournal 1909, p. 1140 ↗
  • Healy-Tibbitts Construction Company's blasting permit request for the Grace Episcopal Cathedral site was sent to the Fire Committee. linked by the name only, not checked
  • Resolution authorizes $43,900.60 in sewer construction payments to Healy-Tibbitts Construction Co. for Yerba Buena and North Point sewers; passed for printing.
    1910passed first readingJournal 1910, p. 1098 ↗
  • Sewer contractors would be paid $40,594.56 in progress payments on several city sewer projects, passed for printing.
    1910passed first readingJournal 1910, p. 700 ↗
  • Payments from the fire protection account were authorized for the auxiliary water supply system, including a $23,378.81 pumping station payment. linked by the name only, not checked
    1910outcome not readJournal 1910, p. 1231 ↗
  • Healy-Tibbitts Construction Company was proposed thirty more days to finish repairing and painting the Third Street Bridge. linked by the name only, not checked
    1910outcome not readJournal 1910, p. 25 ↗
  • Resolution proposed to pay about $31,991 in progress payments for sewer construction contractors on several streets. linked by the name only, not checked
    1910passed first readingJournal 1910, p. 463 ↗
  • Healy-Tibbitts Construction Co. would receive $12,747.00 as its second installment for the Twin Peaks Reservoir, passed for printing.
    1910passed first readingJournal 1910, p. 700 ↗
  • A resolution authorizing $78,097.14 in sewer construction progress payments to several contractors was passed for printing. linked by the name only, not checked
    1910passed first readingJournal 1910, p. 573 ↗
  • Healy-Tibbitts Construction Company was granted an extension of time to build the Fifth Street sewer. linked by the name only, not checked
  • Board of Public Works recommends sixty more days for Healy-Tibbitts Construction Company to finish certain sewer work; referred to committee. linked by the name only, not checked
    3 Jan 1910referredJournal 1910, p. 3 ↗
  • Healy-Tibbitts given sixty more days on the Lombard Street sewer linked by the name only, not checked
    10 Jan 1910outcome not readJournal 1910, p. 74 ↗
  • Resolution authorizes $23,007.52 in sewer construction payments to Healy-Tibbitts and Hanrahan & Ehrhart, passed by 18 ayes. linked by the name only, not checked
    10 Jan 1910passedJournal 1910, p. 68 ↗
  • Payments from the Sewer Construction Account to four firms for testing machines and sewer work were passed on final vote.
    17 Jan 1910passedJournal 1910, p. 80 ↗
  • William Heafey paid $6,418.28 for sewers in the Harbor View district linked by the name only, not checked
    17 Jan 1910outcome not readJournal 1910, p. 80 ↗
  • Healy-Tibbitts given sixty more days on the Third Street Bridge linked by the name only, not checked
    31 Jan 1910outcome not readJournal 1910, p. 136 ↗
  • The Healy-Tibbitts Construction Company was granted sixty more days to finish sewers on Lombard and Laguna streets. linked by the name only, not checked
    8 Feb 1910passedJournal 1910, p. 84 ↗
  • Healy-Tibbitts Construction Company and others protested the water rate charged for construction use; referred to the Water Rates Committee. linked by the name only, not checked
    8 Feb 1910referredJournal 1910, p. 155 ↗
  • Healy-Tibbitts to be paid $17,257.57 for the Division Street sewer linked by the name only, not checked
    10 Feb 1910outcome not readJournal 1910, p. 169 ↗
  • Whosoever Will Rescue Mission allowed a laundry at 884 Folsom Street linked by the name only, not checked
    14 Feb 1910passedJournal 1910, p. 184 ↗
  • Healy-Tibbitts Construction Company's petition to blast at a pumping station at Second and Townsend was referred to the Fire Committee. linked by the name only, not checked
    14 Feb 1910referredJournal 1910, p. 175 ↗
  • Healy-Tibbitts allowed to blast on the Olympic Club site
    21 Feb 1910passed first readingJournal 1910, p. 217 ↗
  • Healy-Tibbitts Construction Company was permitted to blast at Twin Peaks while building a reservoir, under a $4,000 bond. linked by the name only, not checked
    21 Feb 1910passedJournal 1910, p. 209 ↗
  • Healy-Tibbitts Construction Company was granted permission to blast at Second and Townsend streets for a pumping station. linked by the name only, not checked
    21 Feb 1910passedJournal 1910, p. 221 ↗
  • Healy-Tibbitts to be paid $17,257.57 for the Division Street sewer
    21 Feb 1910outcome not readJournal 1910, p. 201 ↗
  • Healy-Tibbitts Construction Company was given an extension to finish sewer work in Laguna and Lombard streets. linked by the name only, not checked
    7 Mar 1910passedJournal 1910, p. 238 ↗
  • Healy-Tibbitts Construction Company applied to keep eight horses in a stable on Bay Street; referred to committee. linked by the name only, not checked
    7 Mar 1910referredJournal 1910, p. 234 ↗
  • Board of Public Works recommends a sixty-day time extension for Healy-Tibbitts Construction Company; the text continues on the next page. linked by the name only, not checked
    7 Mar 1910outcome not readJournal 1910, p. 237 ↗
  • Healy-Tibbitts allowed to blast on the Olympic Club site linked by the name only, not checked
    9 Mar 1910passedJournal 1910, p. 245 ↗
  • City authorizes progress payments to several contractors for sewer construction on Division, Fifth, M and other streets. linked by the name only, not checked
    9 Mar 1910outcome not readJournal 1910, p. 262 ↗
  • Contra Costa to be paid $16,060.35 for the Division Street sewer linked by the name only, not checked
    15 Mar 1910outcome not readJournal 1910, p. 270 ↗
  • Healy-Tibbitts given sixty more days for the Laguna Street sewer linked by the name only, not checked
    21 Mar 1910outcome not readJournal 1910, p. 304 ↗
  • Healy-Tibbitts given sixty more days for the Laguna Street sewer linked by the name only, not checked
    21 Mar 1910passedJournal 1910, p. 286 ↗
  • Healy-Tibbitts and J. L. Kidwell refused stable permits
    21 Mar 1910refusedJournal 1910, p. 308 ↗
  • Healy-Tibbitts given thirty more days to paint the Third Street Bridge
    28 Mar 1910outcome not readJournal 1910, p. 328 ↗
  • Healy-Tibbitts paid $7,002.17 for the Lombard and Laguna Street sewers linked by the name only, not checked
    11 Apr 1910outcome not readJournal 1910, p. 369 ↗
  • Healy-Tibbitts paid $3,785.50 for fire cisterns on Van Ness Avenue linked by the name only, not checked
    11 Apr 1910outcome not readJournal 1910, p. 370 ↗
  • City pays $47,518.03 for sewer work across the city
    11 Apr 1910outcome not readJournal 1910, p. 378 ↗
  • Healy-Tibbitts paid $4,032.58 to finish the Lombard Street sewer linked by the name only, not checked
    11 Apr 1910outcome not readJournal 1910, p. 370 ↗
  • Healy-Tibbitts paid $942 for fire cisterns on Van Ness Avenue
    11 Apr 1910outcome not readJournal 1910, p. 371 ↗
  • Payment to Healy-Tibbitts Construction Co. for North Beach sewer work, sixth contract installment, passed for printing.
    11 Apr 1910passed first readingJournal 1910, p. 379 ↗
  • Healy-Tibbitts Construction Company seeks a thirty-day extension to clean and paint Third Street Bridge.
    13 Apr 1910outcome not readJournal 1910, p. 349 ↗
  • Sewer contractors were paid $47,518.03 in progress payments for sewer construction in several districts.
    18 Apr 1910passedJournal 1910, p. 386 ↗
  • Healy-Tibbitts paid for fire cisterns at Van Ness Avenue linked by the name only, not checked
    18 Apr 1910outcome not readJournal 1910, p. 390 ↗
  • Healy-Tibbitts paid for the Lombard and Laguna Street sewers
    18 Apr 1910outcome not readJournal 1910, p. 387 ↗
  • Healy-Tibbitts Construction Co. paid for fire cisterns at Van Ness and Washington streets, with lumber for the Auxiliary Water System. linked by the name only, not checked
    18 Apr 1910passedJournal 1910, p. 388 ↗
  • Healy-Tibbitts Construction Company complained of excessive Spring Valley Water Company rates for Laguna street sewer work; referred to Water Rates Committee.
    18 Apr 1910referredJournal 1910, p. 381 ↗
  • Healy-Tibbitts paid $2,440 for painting the Third Street Bridge linked by the name only, not checked
    18 Apr 1910outcome not readJournal 1910, p. 403 ↗
  • Healy-Tibbitts paid $5,315.44 for sewers in the North Beach District linked by the name only, not checked
    18 Apr 1910outcome not readJournal 1910, p. 388 ↗
  • Healy-Tibbitts Construction Co. petitioned to blast rock along the proposed Yerba Buena sewer route; the petition was referred to committee. linked by the name only, not checked
    25 Apr 1910referredJournal 1910, p. 407 ↗
  • The city approved $2,440 paid to Healy-Tibbitts Construction Co. for cleaning and painting the Third Street bridge. linked by the name only, not checked
    25 Apr 1910passedJournal 1910, p. 412 ↗
  • Healy-Tibbitts and John Petrooffsky refused stables on Bay and Valencia
    2 May 1910refusedJournal 1910, p. 444 ↗
  • City Engineer to map the Belle Roche City subdivision
    2 May 1910passedJournal 1910, p. 446 ↗
  • Healy-Tibbitts Construction Company was granted sixty more days to finish its Fifth Street sewer contract. linked by the name only, not checked
    9 May 1910passed first readingJournal 1910, p. 470 ↗
  • Healy-Tibbitts Construction Company was granted revocable permission to blast along the Yerba Buena Sewer route, subject to a $40,000 bond. linked by the name only, not checked
    9 May 1910passedJournal 1910, p. 462 ↗
  • Healy-Tibbitts given sixty more days on the Fifth Street sewer linked by the name only, not checked
    16 May 1910outcome not readJournal 1910, p. 486 ↗
  • Payments totalling $53,848.36 for fire hydrants, gate valves and the Twin Peaks Reservoir were approved. linked by the name only, not checked
    16 May 1910passedJournal 1910, p. 479 ↗
  • Coast Improvement paid $7,457.06 for University Mound and Silver Terrace sewers
    16 May 1910outcome not readJournal 1910, p. 479 ↗
  • Healy-Tibbitts Construction Company asks that Spring Valley Water Company install a water meter for construction at Second and Townsend streets.
    23 May 1910referredJournal 1910, p. 502 ↗
  • Healy-Tibbitts Construction Company asks that Spring Valley Water Company install a meter for water used at the Twin Peaks Reservoir.
    23 May 1910referredJournal 1910, p. 502 ↗
  • City goes to court to buy land for three schools
    7 Jun 1910outcome not readJournal 1910, p. 545 ↗
  • Eureka Construction paid $10,070.80 for the East Potrero sewer linked by the name only, not checked
    13 Jun 1910outcome not readJournal 1910, p. 582 ↗
  • Supervisor Healy moved a resolution denying stable permits; its outcome continues on the next page. linked by the name only, not checked
    13 Jun 1910outcome not readJournal 1910, p. 600 ↗
  • Proposed $10,500 first installment to Healy-Tibbitts Construction Co. for Pumping Station No. 1 for fire protection.
    13 Jun 1910passed first readingJournal 1910, p. 608 ↗
  • Board approved a $10,500 first installment to Healy-Tibbitts Construction Co. for Pumping Station No. 1 of the fire water system.
    20 Jun 1910passedJournal 1910, p. 615 ↗
  • Healy-Tibbitts Construction Company petitioned for a water meter during North Point Sewer construction; referred to the Water Rates Committee. linked by the name only, not checked
    27 Jun 1910referredJournal 1910, p. 661 ↗
  • Healy-Tibbitts given sixty more days on the Fifth Street sewer linked by the name only, not checked
    5 Jul 1910passedJournal 1910, p. 677 ↗
  • Healy-Tibbitts refused a stable for eight horses on Bay Street
    5 Jul 1910refusedJournal 1910, p. 681 ↗
  • Resolution authorizing sewer construction bond payments, on the City Engineer's recommendation, continues onto the next page. linked by the name only, not checked
    15 Jul 1910outcome not readJournal 1910, p. 751 ↗
  • Healy-Tibbitts paid $12,747 for work on Twin Peaks Reservoir linked by the name only, not checked
    18 Jul 1910outcome not readJournal 1910, p. 714 ↗
  • Progress payments on the Division Street and Lincoln Way sewers
    18 Jul 1910outcome not readJournal 1910, p. 712 ↗
  • Healy-Tibbitts Construction allowed to blast at the Grace Episcopal Cathedral site linked by the name only, not checked
    1 Aug 1910passedJournal 1910, p. 777 ↗
  • Keystone Construction Co. and Healy-Tibbitts Construction Co. were paid $14,024.91 for sewer construction work on two city sewers. linked by the name only, not checked
    1 Aug 1910passedJournal 1910, p. 767 ↗
  • Healy-Tibbitts Construction Co. is set to receive $17,506.14 for a twelfth sewer contract installment.
    1 Aug 1910outcome not readJournal 1910, p. 766 ↗
  • Healy-Tibbitts Construction allowed to blast at the Grace Episcopal Cathedral site linked by the name only, not checked
    8 Aug 1910passedJournal 1910, p. 799 ↗
  • Public Works recommends giving contractor W. C. Raisch more time to finish grading and sewering Fourth Avenue near Kirkham Street. linked by the name only, not checked
    8 Aug 1910outcome not readJournal 1910, p. 793 ↗
  • Healy-Tibbitts paid $11,525.62 for work on the Twin Peaks Reservoir
    12 Sep 1910outcome not readJournal 1910, p. 893 ↗
  • Caldwell & Co. paid $8,250 to start the Spring Valley School linked by the name only, not checked
    12 Sep 1910outcome not readJournal 1910, p. 786 ↗
  • Healy-Tibbitts paid $25,209.11 for the Yerba Buena district sewer
    12 Sep 1910outcome not readJournal 1910, p. 892 ↗
  • Healy-Tibbitts paid $11,525.62 for work on the Twin Peaks Reservoir linked by the name only, not checked
    19 Sep 1910outcome not readJournal 1910, p. 907 ↗
  • Healy-Tibbitts paid $25,209.11 for the Yerba Buena district sewer linked by the name only, not checked
    19 Sep 1910outcome not readJournal 1910, p. 906 ↗
  • City paid four contractors a total of $43,072.78 for the auxiliary fire-protection water system, finally passed.
    19 Sep 1910passedJournal 1910, p. 907 ↗
  • Healy-Tibbitts Construction Company was granted permission to blast for the North Point Main Sewer along Sansome Street, adopted. linked by the name only, not checked
    19 Sep 1910passedJournal 1910, p. 931 ↗
  • Healy-Tibbitts Construction Company was granted revocable permission to blast for the North Point Main Sewer along Sansome Street.
    26 Sep 1910passedJournal 1910, p. 946 ↗
  • Board of Public Works recommends a $20,000 bond for Healy-Tibbitts Construction Company to blast on Sansome Street.
    26 Sep 1910referredJournal 1910, p. 937 ↗
  • Sewer construction payments totalling $80,187.27 to several contractors were passed for printing.
    17 Oct 1910passed first readingJournal 1910, p. 988 ↗
  • Payments authorized from the fire-protection water supply fund, including $15,420 to Healy-Tibbitts Construction Co. for Pumping Station No. 1. linked by the name only, not checked
    17 Oct 1910outcome not readJournal 1910, p. 989 ↗
  • Healy-Tibbitts Construction Co. to be paid for the Division Street sewer linked by the name only, not checked
    24 Oct 1910outcome not readJournal 1910, p. 1045 ↗
  • Healy-Tibbitts Construction Co. paid $15,931.63 for the Yerba Buena sewer
    24 Oct 1910outcome not readJournal 1910, p. 1019 ↗
  • Payments of $17,574.16 approved for Auxiliary Water System pumping station construction and pipe freight charges. linked by the name only, not checked
    24 Oct 1910passedJournal 1910, p. 1021 ↗
  • Healy-Tibbitts Construction Co. paid for the Division Street sewer
    31 Oct 1910outcome not readJournal 1910, p. 1053 ↗
  • Payment made for reservoir work in the fire-water system linked by the name only, not checked
    14 Nov 1910passedJournal 1910, p. 1104 ↗
  • Healy-Tibbitts Construction Co. was paid $43,900.60 in sewer progress payments from the Sewer Construction Account.
    21 Nov 1910passedJournal 1910, p. 1120 ↗
  • Healy-Tibbitts Construction Co. paid $14,380.67 for the Twin Peaks Reservoir
    21 Nov 1910outcome not readJournal 1910, p. 1121 ↗
  • A resolution authorizing payment for sewer work is listed; its outcome continues on the next page. linked by the name only, not checked
    5 Dec 1910outcome not readJournal 1910, p. 1170 ↗
  • C. J. Harney paid $10,220.15 for the North Point main sewer
    12 Dec 1910outcome not readJournal 1910, p. 1192 ↗
  • A fourteenth installment payment to Healy-Tibbitts Construction Co. for the Division Street sewer is proposed. linked by the name only, not checked
    12 Dec 1910outcome not readJournal 1910, p. 1186 ↗
  • C. J. Harney paid $10,220.15 for the North Point main sewer
    19 Dec 1910outcome not readJournal 1910, p. 1208 ↗
  • Healy-Tibbitts paid for the North Beach and Laguna Street sewers linked by the name only, not checked
    27 Dec 1910outcome not readJournal 1910, p. 33 ↗
  • City to pay $1,025 to move the old Adams School linked by the name only, not checked
    27 Dec 1910outcome not readJournal 1910, p. 34 ↗
  • Board finally approved $25,176.10 in payments for the auxiliary fire water supply system, including Pumping Station No. 1 construction. linked by the name only, not checked
    27 Dec 1910passedJournal 1910, p. 1244 ↗
  • Healy-Tibbitts Construction Company granted ninety more days to finish its Twin Peaks Reservoir contract. linked by the name only, not checked
  • Payment of $14,188.65 approved to Healy Tibbitts Construction Co. for Division street sewer construction. linked by the name only, not checked
  • Healy-Tibbitts Construction Co. was authorized to receive $2,863.73 for work on the northerly section of Mission Viaduct.
    1911outcome not readJournal 1911 ↗
  • Healy-Tibbitts Construction Co. was authorized to receive an installment payment for work on the Twin Peaks Reservoir. linked by the name only, not checked
    1911outcome not readJournal 1911 ↗
  • The Healy-Tibbitts Construction Company was granted ninety more days to finish Pumping Station No. 1. linked by the name only, not checked
  • Board passed for printing payments totaling $16,978.21 to Healy-Tibbitts and Michael Murphy for the Auxiliary Water Supply System.
    1911passed first readingJournal 1911 ↗
  • Healy-Tibbitts Construction Co. was paid $1,867.50 for the first payment on the northerly Mission Street viaduct. linked by the name only, not checked
  • Board authorized $15,485.96 in payments for pipe and work on the Auxiliary Water Supply System, including the Twin Peaks Reservoir.
  • Healy-Tibbitts Construction Company granted thirty more days to finish Section A of North Point Sewer. linked by the name only, not checked
  • Healy-Tibbitts Construction Company granted thirty more days to finish Section D of Yerba Buena Sewer. linked by the name only, not checked
  • Proposed $7,755.75 payment to Healy-Tibbitts Construction Company for the north end of Mission viaduct.
    1911outcome not readJournal 1911 ↗
  • Payments totalling $23,395.66 to Healy-Tibbitts Construction Co. for the Yerba Buena and Division Street sewers were passed for printing.
    1911passed first readingJournal 1911 ↗
  • Healy-Tibbitts Construction Company granted sixty more days to finish Section D of the Yerba Buena Sewer. linked by the name only, not checked
  • Proposed resolution would give Healy-Tibbitts Construction Company sixty more days to build Section A of the North Point sewer. linked by the name only, not checked
    1911outcome not readJournal 1911 ↗
  • Board authorized payments from the General Fund to Lange & Bergstrom, Hawkins Building Co., Healy-Tibbitts and J. W. Schouten & Co. linked by the name only, not checked
    1911outcome not readJournal 1911 ↗
  • Healy-Tibbitts Construction Company granted ninety days' extension to finish Pumping Station No. 1. linked by the name only, not checked
  • Payments totaling $15,485.96 for the Auxiliary Water Supply System for fire protection were proposed to contractors and suppliers.
    1911passed first readingJournal 1911 ↗
  • Healy-Tibbitts Construction Company was granted thirty more days to finish Section D of the Yerba Buena Sewer. linked by the name only, not checked
  • Payments totalling $43,675.30 for North Point main sewer contractors were passed for printing.
    1911passed first readingJournal 1911 ↗
  • Resolution proposed paying claimants from the 1910-11 General Fund for supplies and services; full list continues on the next page. linked by the name only, not checked
    1911outcome not readJournal 1911 ↗
  • Progress payments for the auxiliary fire-protection water supply system, including the Twin Peaks Reservoir and Townsend Street pumping station, were proposed for printing. linked by the name only, not checked
    1911passed first readingJournal 1911 ↗
  • Healy-Tibbitts Construction Company was granted ninety more days to finish its Twin Peaks Reservoir contract.
  • Healy-Tibbitts Construction Company was granted sixty more days to finish the Auxiliary Water pumping station at Second and Townsend streets. linked by the name only, not checked
    1911outcome not readJournal 1911 ↗
  • Payments for work on the Auxiliary Water Supply System for fire protection were proposed to Michael Murphy and Healy-Tibbitts Construction Co. linked by the name only, not checked
    1911outcome not readJournal 1911 ↗
  • Healy-Tibbitts Construction Co. to receive $4,089.98 and $3,439.65 for extra work on Division street sewer sections. linked by the name only, not checked
    1911outcome not readJournal 1911 ↗
  • Payment of $14,188.65 to Healy Tibbitts Construction Co. proposed for ninth installment on Division Street sewer section C. linked by the name only, not checked
    1911outcome not readJournal 1911 ↗
  • Healy-Tibbitts Construction Co. was paid $52,753.80 as an eleventh installment on the Twin Peaks Reservoir contract.
  • Four named firms were granted revocable permits to keep horses in stables at sites on Douglass, Fifth, Bay and Utah streets.
  • Healy-Tibbitts Construction Company was granted sixty more days to finish Section B of the Townsend Street intake tunnels. linked by the name only, not checked
  • Healy-Tibbitts Construction Company sought a sixty-day extension to finish its Auxiliary Water Supply building at Second and Townsend streets. linked by the name only, not checked
    1911outcome not readJournal 1911 ↗
  • Board of Public Works gave Healy-Tibbitts Construction ninety more days to finish Section C of the Division street sewer. linked by the name only, not checked
  • Resolution passed for printing to pay sewer contractors progress payments, including $8,935.91 to Healy-Tibbitts for the North Point Main Sewer.
    1911passed first readingJournal 1911 ↗
  • Healy-Tibbitts Construction Company was granted ninety more days to finish building the Twin Peaks Reservoir.
  • Resolution proposing $13,504 final payment to Healy-Tibbitts Construction Co. for North Point sewer was passed for printing. linked by the name only, not checked
    1911passed first readingJournal 1911 ↗
  • Resolution proposing $11,479.69 progress payment to Healy-Tibbitts Construction Co. for Yerba Buena sewer was passed for printing. linked by the name only, not checked
    1911passed first readingJournal 1911 ↗
  • A payment of $25,000 was proposed to Healy-Tibbitts Construction Co. for work on the North Point main sewer. linked by the name only, not checked
    1911passed first readingJournal 1911 ↗
  • Passed for printing: $54,833.08 in progress payments to five contractors for the North Point main sewer.
    1911passed first readingJournal 1911 ↗
  • Sewer construction payments to contractors including Storrie and Keystone were introduced and passed for printing from the Sewer Construction Account.
    1911passed first readingJournal 1911 ↗
  • Healy-Tibbitts Construction Company was granted sixty more days, from February 18, 1911, to finish its Second and Townsend building contract. linked by the name only, not checked
  • Board granted Healy-Tibbitts Construction Company revocable permission to blast in Springdale Street for its sewer work. linked by the name only, not checked
  • Healy-Tibbitts Construction Company was granted ninety more days to finish Section C of the Division Street Sewer. linked by the name only, not checked
  • Board approved payments for street cement, a Richmond Police Station contract, a Seventh street fire house wiring job, and Mission viaduct work. linked by the name only, not checked
  • Board is paying contractors for auxiliary fire water supply work, including Twin Peaks reservoir and high-pressure mains.
    1911outcome not readJournal 1911 ↗
  • Healy-Tibbitts Construction Company was granted a 60-day extension to finish Section B of the Townsend Street intake tunnels. linked by the name only, not checked
    1911passed first readingJournal 1911 ↗
  • Healy-Tibbitts Construction Company was granted ninety more days to finish the Twin Peaks Reservoir contract. linked by the name only, not checked
    1911outcome not readJournal 1911 ↗
  • Healy-Tibbitts Construction Company was granted ninety more days to finish Pumping Station No. 1 for fire protection. linked by the name only, not checked
  • Progress payments to sewer contractors on North Point, Ingleside, Mission and Seventh street sewers proposed; passed for printing.
    1911passed first readingJournal 1911 ↗
  • Board of Public Works authorized fire-protection water system payments to Healy-Tibbitts and other contractors, including for the Twin Peaks Reservoir. linked by the name only, not checked
    1911outcome not readJournal 1911 ↗
  • Healy-Tibbitts Construction Co. was granted sixty more days to finish the Auxiliary Water Supply pumping station at Second and Townsend streets. linked by the name only, not checked
  • Payments of about $21,922 from the sewer construction account were proposed to contractors building North Point and Division Street sewers. linked by the name only, not checked
    1911passed first readingJournal 1911 ↗
  • Payments of about $19,352 from the fire protection account were proposed for Twin Peaks reservoir and auxiliary water mains work.
    1911passed first readingJournal 1911 ↗
  • Approved $9,819.76 in payments for auxiliary fire protection water system work at Twin Peaks and Townsend Street. linked by the name only, not checked
  • Resolution proposed on Knowles's motion giving Healy-Tibbitts Construction ninety more days from June 14, 1911 for Twin Peaks Reservoir. linked by the name only, not checked
    1911outcome not readJournal 1911 ↗
  • Healy-Tibbitts Construction Company proposed 30- and 60-day extensions to finish intake tunnel sections for Pumping Station No. 1. linked by the name only, not checked
    1911outcome not readJournal 1911 ↗
  • Sixty-day extension recommended for Healy-Tibbitts Construction Company to finish sewers in Section D of Verba Buena Sewer. linked by the name only, not checked
    1911outcome not readJournal 1911 ↗
  • City paid F. Rolandi and Healy-Tibbitts for a bridge over Southern Pacific tracks at Miguel Street and Mission Street Viaduct work.
    1911outcome not readJournal 1911 ↗
  • Payments totaling $38,019.14 from the Sewer Construction Account went to contractors for sewer work in several districts.
    1911passed first readingJournal 1911 ↗
  • Four applicants sought revocable permits to maintain stables at named Douglass, Fifth, Bay and Utah street locations. linked by the name only, not checked
    1911outcome not readJournal 1911 ↗
  • Healy-Tibbitts Construction Company was granted thirty more days to finish Section A of the North Point Sewer. linked by the name only, not checked
  • Payments totalling $42,481.36 for sewer construction in Lincoln Way, Forty-eighth Avenue and Division Street were passed for printing. linked by the name only, not checked
    1911passed first readingJournal 1911 ↗
  • Healy-Tibbitts Construction Company was granted 30 and 60 day extensions to finish Pumping Station No. 1 intake tunnel sections. linked by the name only, not checked
  • Resolution passed for printing to pay Healy-Tibbitts Construction Company $10,385.29 for a Pumping Station No. 1 installment.
    1911passed first readingJournal 1911 ↗
  • Resolution proposed paying seven sewer contractors a total of $42,773.85 from the 1908 bond sewer account.
    1911passed first readingJournal 1911 ↗
  • Healy-Tibbitts Construction Company was granted sixty more days to finish sewers in Yerba Buena District Section D. linked by the name only, not checked
  • Progress payments for Lower Sunset and North Point Main sewer contracts were proposed for printing, to be paid from the Sewer Construction Account. linked by the name only, not checked
    1911passed first readingJournal 1911 ↗
  • Healy-Tibbitts Construction Co. was paid $2,863.73 as a fourth installment on the northerly Mission Viaduct contract. linked by the name only, not checked
  • Final sewer construction payments for the North Point main sewer were passed from the Sewer Construction Account to several contractors. linked by the name only, not checked
  • Payment of $7,018.50 to Healy-Tibbitts Construction Co. for Pumping Station No. 1 passed for printing.
    1911passed first readingJournal 1911 ↗
  • Payment of $50,000 from the Sewer Construction Account to Healy-Tibbitts Construction Co. for Section D of the Yerba Buena Sewer was passed. linked by the name only, not checked
  • Payment of $10,385.29 from the Fire Protection Account to Healy-Tibbitts Construction Company for Pumping Station No. 1 was passed.
  • Healy-Tibbitts Construction Company granted sixty more days from June 23, 1911 for North Point main sewer; $25 daily penalty waived. linked by the name only, not checked
  • Payments totalling $42,219.91 to contractors and a surety for sewer construction work were introduced for printing.
    1911passed first readingJournal 1911 ↗
  • Payments totalling $30,590.59 to contractors for the auxiliary fire-protection water supply system were introduced for printing.
    1911passed first readingJournal 1911 ↗
  • Healy-Tibbitts Construction Company received 60 and 90-day extensions on its Townsend Street tunnel and Twin Peaks reservoir contracts. linked by the name only, not checked
  • Resolution authorizes $23,389.93 from the General Fund for cement, a police station, a fire house and Mission viaduct work. linked by the name only, not checked
    1911outcome not readJournal 1911 ↗
  • Sewer payments of $12,577.77 and $13,355.20 to Healy-Tibbitts Construction Co. were proposed for Division and North Point sewers. linked by the name only, not checked
    1911passed first readingJournal 1911 ↗
  • Supervisors adopted Resolution 8201, giving Healy-Tibbitts Construction Company sixty more days to finish sewers in Yerba Buena District Section D. linked by the name only, not checked
  • Progress payments totalling $58,597.78 for Auxiliary Water Supply System pipe work were passed for printing. linked by the name only, not checked
    1911passed first readingJournal 1911 ↗
  • Payment of $11,234.18 to Healy-Tibbitts Construction Co. for Mission street curbs and paving was passed for printing. linked by the name only, not checked
    1911passed first readingJournal 1911 ↗
  • Healy-Tibbitts Construction Company was granted ninety more days to finish Section C of the Division Street Sewer. linked by the name only, not checked
  • Healy-Tibbitts Construction Company was granted a sixty-day extension to finish the Twin Peaks division wall contract. linked by the name only, not checked
  • Resolution introduced and passed for printing to pay sewer contractors from the Sewer Construction Account. linked by the name only, not checked
    1911passed first readingJournal 1911 ↗
  • Resolution introduced and passed for printing to pay contractors for the auxiliary fire water supply system.
    1911passed first readingJournal 1911 ↗
  • Progress payments for North Point, Yerba Buena and Seventh Street sewer contracts were proposed from the Sewer Construction Account. linked by the name only, not checked
    1911outcome not readJournal 1911 ↗
  • Healy-Tibbitts Construction Company granted ninety more days to finish the Twin Peaks Reservoir contract, delayed by plan changes. linked by the name only, not checked
  • Healy-Tibbitts Construction Company granted sixty more days to finish its Twin Peaks division wall contract. linked by the name only, not checked
    1911passed first readingJournal 1911 ↗
  • Sewer construction progress payments to several contractors were proposed from the Sewer Construction Account, totalling $41,558.98. linked by the name only, not checked
    1911outcome not readJournal 1911 ↗
  • Routine payments from the General Fund were proposed for gas, a viaduct contract, lumber and advertising, totalling $40,649.24. linked by the name only, not checked
    1911outcome not readJournal 1911 ↗
  • A $7,018.50 fourth installment for Pumping Station No. 1 of the fire water system is proposed for Healy-Tibbitts Construction Co. linked by the name only, not checked
    1911outcome not readJournal 1911 ↗
  • Healy-Tibbitts Construction Company permitted, revocably, to blast on Springdale Street for a sewer, with a $5,000 bond. linked by the name only, not checked
  • Healy-Tibbitts Construction Company granted ninety more days from April 19, 1911 to finish a fire pumping station contract, passed for printing.
    1911passed first readingJournal 1911 ↗
  • Healy-Tibbitts Construction Company was granted extensions of 60 and 90 days on its tunnel and Twin Peaks reservoir contracts. linked by the name only, not checked
    1911passed first readingJournal 1911 ↗
  • Board denied stable permits to five applicants, including Julius Godeau on Ninth Street and David Demartini on Hampshire Street. linked by the name only, not checked
  • Adopted resolution paying Healy-Tibbitts Construction Co. $30,000 as a twelfth instalment on the Yerba Buena Sewer.
  • Resolution finally passed authorizing $38,019 in sewer construction payments to three contractors from the Sewer Construction Account. linked by the name only, not checked
    16 Jan 1911passedJournal 1911 ↗
  • Healy-Tibbitts Construction Company petitioned to keep a stable for eight horses at Utah and Division streets, referred to committee. linked by the name only, not checked
    1 Feb 1911referredJournal 1911 ↗
  • Payment of $7,018.50 to Healy-Tibbitts Construction Co. for Pumping Station No. 1 fire water supply was approved.
    6 Feb 1911passedJournal 1911 ↗
  • Board approved $25,914.54 in progress payments to contractors building North Point, Yerba Buena and Hunters Point sewers.
    14 Feb 1911passedJournal 1911 ↗
  • Board of Public Works recommends giving Healy-Tibbitts Construction Company sixty more days on its power house contract at Second and Townsend streets; referred to committee.
    24 Feb 1911referredJournal 1911 ↗
  • Payments from the Sewer Construction Account for sewer construction work are proposed; the vote and amounts continue on the next page. linked by the name only, not checked
    13 Mar 1911outcome not readJournal 1911 ↗
  • Payments totaling $58,597.78 to five contractors for Auxiliary Water Supply System pipes and Pumping Station No. 1 were approved. linked by the name only, not checked
    13 Mar 1911passedJournal 1911 ↗
  • Payments for North Point and Yerba Buena sewer construction contracts were approved, paid from the Sewer Construction Account. linked by the name only, not checked
    17 Apr 1911passedJournal 1911 ↗
  • Board authorized sewer construction payments to contractors Healy-Tibbitts, Keystone and Rolandi from the Public Building Fund. linked by the name only, not checked
    15 May 1911outcome not readJournal 1911 ↗
  • Board of Public Works recommended giving Healy-Tibbitts Construction Company ninety more days to finish the Twin Peaks reservoir contract. linked by the name only, not checked
    22 May 1911referredJournal 1911 ↗
  • Passed an $11,234.15 payment to Healy-Tibbitts Construction Co. for curbs and paving on Mission Street. linked by the name only, not checked
    29 May 1911passedJournal 1911 ↗
  • The Board approved payments from the 1908 Fire Protection Account to Healy-Tibbitts and Michael Murphy for Auxiliary Water Supply work. linked by the name only, not checked
    19 Jun 1911passedJournal 1911 ↗
  • Payments from the Sewer Construction Account to contractors for North Point sewer work were proposed; the vote continues on the next page. linked by the name only, not checked
    19 Jun 1911outcome not readJournal 1911 ↗
  • Claim of $506.45 by Healy-Tibbitts Construction Company for material used on the Spring Valley School was referred to the Clerk.
    26 Jun 1911referredJournal 1911 ↗
  • Board of Public Works recommended sixty more days for Healy-Tibbitts to finish Section A of the North Point main sewer. linked by the name only, not checked
    26 Jun 1911referredJournal 1911 ↗
  • Public Works recommends a $5000 blasting bond for Healy-Tibbitts Construction Company on Springdale Street. linked by the name only, not checked
    3 Jul 1911referredJournal 1911 ↗
  • Progress payments totalling $42,773.85 to sewer contractors and a surety for several city sewers were approved.
    17 Jul 1911passedJournal 1911 ↗
  • Payments for construction of the Auxiliary Water Supply System were proposed; the vote appears on the next page.
    17 Jul 1911outcome not readJournal 1911 ↗
  • Payments totaling $9,024.48 approved for Auxiliary Water Supply System work, including the Twin Peaks Reservoir.
    24 Jul 1911passedJournal 1911 ↗
  • City approves $41,558.98 in sewer construction payments to four contractors, including work on Seventh and Division streets. linked by the name only, not checked
    14 Aug 1911passedJournal 1911 ↗
  • Proposed resolution would pay San Francisco Gas and Electric Co. $31,122.72 for July 1911 gas and electricity; vote continues next page. linked by the name only, not checked
    14 Aug 1911outcome not readJournal 1911 ↗
  • Payments totalling $9,819.76 for Twin Peaks reservoir and Townsend Street pumping station work were passed for printing.
    14 Aug 1911passed first readingJournal 1911 ↗
  • A $25,000 payment to Healy-Tibbitts Construction Co. for the North Point main sewer was approved. linked by the name only, not checked
    28 Aug 1911passedJournal 1911 ↗
  • City paid Healy-Tibbitts Construction Company $7,825.21 in partial payments for two sections of the intake tunnel.
    28 Aug 1911passedJournal 1911 ↗
  • City approved $7,755.75 second payment to Healy-Tibbitts Construction Company for north end of Mission viaduct. linked by the name only, not checked
    28 Aug 1911passedJournal 1911 ↗
  • Public Works recommends Healy-Tibbitts get sixty more days to finish Section B of the Townsend Street intake tunnels. linked by the name only, not checked
    18 Sep 1911referredJournal 1911 ↗
  • Public Works recommends Healy-Tibbitts get ninety more days to complete the Twin Peaks reservoir contract. linked by the name only, not checked
    18 Sep 1911referredJournal 1911 ↗
  • Resolution 8452 approved $38,174.34 in sewer construction progress payments to several contractors and their surety, from the 1908 bond fund.
    18 Sep 1911passedJournal 1911 ↗
  • Board authorized fire-protection water supply payments for the Townsend Street pumping station, Twin Peaks Reservoir and cast-iron mains.
    18 Sep 1911passedJournal 1911 ↗
  • Board authorized payments for fire station construction on Seventh street and San Bruno avenue, plus Mission Viaduct and street repairs. linked by the name only, not checked
    18 Sep 1911passedJournal 1911 ↗
  • Healy-Tibbitts Construction Co. was paid $25,932.97 for sewer construction on Division Street and the North Point Main Sewer. linked by the name only, not checked
    25 Sep 1911passedJournal 1911 ↗
  • Board finally passed $23,395 in sewer construction payments to Healy-Tibbitts Construction Co. for Yerba Buena and Division Street sewers. linked by the name only, not checked
    9 Oct 1911passedJournal 1911 ↗
  • Fire-protection water system payments to three contractors, including Pumping Station No. 1 on Townsend Street, passed for printing. linked by the name only, not checked
    16 Oct 1911passed first readingJournal 1911 ↗
  • City paid three contractors for pumping station work, gate valves and cast-iron fittings for the Auxiliary Water Supply System for fire protection. linked by the name only, not checked
    23 Oct 1911passedJournal 1911 ↗
  • Board approved $42,219.91 in progress payments to contractors for sewer construction in the Sunset, North Point and Lincoln Way areas.
    23 Oct 1911passedJournal 1911 ↗
  • Payments totalling $30,590.59 for the fire-protection auxiliary water supply system were proposed; the vote continues on the next page.
    23 Oct 1911outcome not readJournal 1911 ↗
  • Board approved final payment of $13,504.00 to Healy-Tibbitts Construction Co. for Section L of the North Point main sewer. linked by the name only, not checked
    30 Oct 1911passedJournal 1911 ↗
  • Board approved a thirteenth progress payment of $11,479.69 to Healy-Tibbitts Construction Co. for Section D of the Yerba Buena sewer. linked by the name only, not checked
    30 Oct 1911passedJournal 1911 ↗
  • Board of Public Works recommends Healy-Tibbitts Construction Company receive sixty more days to finish Intake Tunnel Section B; referred.
    13 Nov 1911referredJournal 1911 ↗
  • City payments for a Southern Pacific rail bridge at Miguel Street and the Mission Viaduct were proposed; the vote continues on the next page.
    20 Nov 1911outcome not readJournal 1911 ↗
  • The Board finally passed payments totalling $43,675.30 to contractors building the North Point main sewer from the bond fund.
    20 Nov 1911passedJournal 1911 ↗
  • The Board finally passed payments totalling $42,486.36 for sewer construction on Lincoln Way, Forty-eighth Avenue, Division Street and the Lower Sunset. linked by the name only, not checked
    20 Nov 1911passedJournal 1911 ↗
  • Payments from the Fire Protection Account for portions of the Auxiliary Water Supply System for fire protection were proposed. linked by the name only, not checked
    20 Nov 1911outcome not readJournal 1911 ↗
  • The Board authorized payments from the General Fund to suppliers for the Relief Home, S. F. Hospital and an engine house.
    1912outcome not readJournal 1912, p. 852 ↗
  • Healy-Tibbitts Construction Co. was paid $9,428.62 for the 13th payment on the northerly Mission Street viaduct.
    1912outcome not readJournal 1912, p. 515 ↗
  • Board authorized payments from city funds to contractors and suppliers for sewers, schools, a hospital, a viaduct and water works.
    1912outcome not readJournal 1912, p. 676 ↗
  • Board sends to print a resolution authorizing payments from city funds to many suppliers and contractors for hospitals, sewers, schools and streets.
    1912passed first readingJournal 1912, p. 284 ↗
  • Payments authorized to named claimants, including Bion J. Arnold's $3,032.10 for June public utilities investigation work. linked by the name only, not checked
    1912outcome not readJournal 1912, p. 619 ↗
  • Healy-Tibbitts paid $719.12 for extra work on the intake tunnel linked by the name only, not checked
    2 Jan 1912outcome not readJournal 1912, p. 15 ↗
  • Healy-Tibbitts paid $8,653.86 for the Townsend Street pumping station tunnel linked by the name only, not checked
    2 Jan 1912outcome not readJournal 1912 ↗
  • Healy-Tibbitts Construction Company granted extra time on its Twin Peaks Reservoir and Pumping Plant No. 1 contracts.
    2 Jan 1912passed first readingJournal 1912, p. 10 ↗
  • Healy-Tibbitts paid $4,089.98 for extra work on the Division Street sewer linked by the name only, not checked
    4 Jan 1912outcome not readJournal 1912, p. 17 ↗
  • Healy-Tibbitts paid $3,439.65 for more work on the Division Street sewer linked by the name only, not checked
    4 Jan 1912passedJournal 1912, p. 17 ↗
  • Karl Erhart paid $1,573.43 for sewer work on Twenty-third Avenue linked by the name only, not checked
    15 Jan 1912outcome not readJournal 1912, p. 56 ↗
  • Healy-Tibbitts paid $8,653.86 for the Townsend Street pumping station tunnel linked by the name only, not checked
    15 Jan 1912outcome not readJournal 1912, p. 50 ↗
  • Healy-Tibbitts paid $719.12 for extra work on the intake tunnel linked by the name only, not checked
    24 Jan 1912outcome not readJournal 1912, p. 68 ↗
  • Caldwell & Company paid $15,972.75 for building the Spring Valley School
    24 Jan 1912outcome not readJournal 1912, p. 71 ↗
  • Karl Erhart paid $1,573.43 for sewer work on Twenty-third Avenue linked by the name only, not checked
    24 Jan 1912outcome not readJournal 1912, p. 66 ↗
  • Six school construction payments to contractors were authorized from the 1908 bond fund, with the final vote on the next page. linked by the name only, not checked
    29 Jan 1912outcome not readJournal 1912, p. 85 ↗
  • Healy-Tibbitts Construction Company was granted extra time to finish the Twin Peaks Reservoir and Pumping Plant No. 1 contracts. linked by the name only, not checked
    13 Feb 1912passedJournal 1912, p. 120 ↗
  • Proposed resolution authorizing payments to contractors for sewers, schools, a hospital and water mains from bond funds.
    19 Feb 1912passed first readingJournal 1912, p. 134 ↗
  • Karl Ehrhart paid $3,505.35 for the Twenty-third Avenue sewer linked by the name only, not checked
    26 Feb 1912outcome not readJournal 1912, p. 146 ↗
  • Karl Ehrhart paid $3,505.35 for the Twenty-third Avenue sewer linked by the name only, not checked
    4 Mar 1912outcome not readJournal 1912, p. 163 ↗
  • Healy-Tibbitts gets more time on the Twin Peaks Reservoir linked by the name only, not checked
    11 Mar 1912outcome not readJournal 1912, p. 178 ↗
  • Board approved payments from school, hospital, jail and water accounts to contractors and claimants, including Healy-Tibbitts Construction Co.
    25 Mar 1912passedJournal 1912, p. 221 ↗
  • Payments to contractors and suppliers for schools, hospitals, the jail and Pumping Station No. 1 were put forward for printing.
    8 Apr 1912passed first readingJournal 1912, p. 208 ↗
  • Resolution authorizing dozens of city claims for supplies, construction and utilities, including Pacific Gas and Electric and Spring Valley Water.
    8 Apr 1912outcome not readJournal 1912, p. 256 ↗
  • Sewer contractors paid, including $24,160.05 to Federal Construction Co.
    8 Apr 1912outcome not readJournal 1912, p. 199 ↗
  • Board authorized payment of many city claims, including hospital supplies, sewer and street work, and Lowell High School construction.
    22 Apr 1912passedJournal 1912, p. 295 ↗
  • The Emporium paid $766.49 for books for the Public Library linked by the name only, not checked
    13 May 1912outcome not readJournal 1912, p. 358 ↗
  • Healy-Tibbitts allowed to blast old footings at Zoe and Bryant Streets linked by the name only, not checked
    20 May 1912outcome not readJournal 1912, p. 393 ↗
  • Healy-Tibbitts allowed to blast old footings at Zoe and Bryant Streets
    27 May 1912passedJournal 1912, p. 426 ↗
  • Board passed for printing a resolution authorizing payments to contractors and suppliers from named city bond and fund accounts.
    27 May 1912passed first readingJournal 1912, p. 432 ↗
  • The Board authorized payments to utilities, charities, contractors and a landlord, including $34,562.55 to PG&E for May 1912 power. linked by the name only, not checked
    17 Jun 1912passedJournal 1912, p. 505 ↗
  • Board passed for printing a resolution authorizing nine payments to contractors and claimants totaling about $29,000. linked by the name only, not checked
    15 Jul 1912passed first readingJournal 1912, p. 603 ↗
  • Healy-Tibbitts Construction Co. disputes sharing repair costs of the leaking Twin Peaks reservoir with the Board of Public Works, seeking prompt payment.
    5 Aug 1912outcome not readJournal 1912, p. 630 ↗
  • Communication on reservoir joint defects, filed; the contractor is to be relieved of responsibility for the joints. linked by the name only, not checked
    5 Aug 1912outcome not readJournal 1912, p. 632 ↗
  • Healy-Tibbitts Construction given ninety more days on the Mission Street Viaduct linked by the name only, not checked
    12 Aug 1912outcome not readJournal 1912, p. 662 ↗
  • City sets aside $2,500 for further Civic Center plans linked by the name only, not checked
    19 Aug 1912passed first readingJournal 1912, p. 683 ↗
  • Healy-Tibbitts Construction given ninety more days on the Mission Street Viaduct linked by the name only, not checked
    19 Aug 1912outcome not readJournal 1912, p. 681 ↗
  • Board authorized payment of city claims to lumber, printing, water and other suppliers, totalling about $47,000, in final passage.
    26 Aug 1912passedJournal 1912, p. 701 ↗
  • A resolution on authorizations was moved by Jennings and passed for printing; its text continues on the next page.
    23 Sep 1912outcome not readJournal 1912, p. 829 ↗
  • Resolution 9748 proposes payment of many city claims to contractors, suppliers and utilities, including $33,848.16 to Pacific Gas and Electric.
    21 Oct 1912outcome not readJournal 1912, p. 946 ↗
  • Spring Valley Water paid $10,950 for water for hydrants
    4 Nov 1912outcome not readJournal 1912, p. 1001 ↗
  • Board authorizes payments from city bond funds to contractors and landowners, including Fire Department engines and San Francisco Hospital work.
    11 Nov 1912outcome not readJournal 1912, p. 1018 ↗
  • Seagrave Company paid $14,562 for fire hose wagons
    20 Nov 1912outcome not readJournal 1912, p. 1053 ↗
  • Board passed for printing an authorization of many city payments, including paving, sewer, school, hospital and library contracts.
    9 Dec 1912passed first readingJournal 1912, p. 1119 ↗
  • Neal Publishing Company paid $2,950 for printing charter amendments
    16 Dec 1912outcome not readJournal 1912, p. 1132 ↗
  • Sale of city junk at auction to Healy-Tibbitts Construction and P. Cooper Iron & Metal for $959.50 confirmed.
  • Board authorizes a long list of payments to contractors and claimants for police, school, transit and street work. linked by the name only, not checked
    1913outcome not readJournal 1913, p. 635 ↗
  • Payments authorized to three contractors for Girls' High School plumbing and North Point Main sewer work, passed for printing.
    1913passed first readingJournal 1913, p. 37 ↗
  • A resolution authorizing expenditures from named accounts to named claimants was taken up; its outcome continues on the next page.
    20 Jan 1913outcome not readJournal 1913, p. 51 ↗
  • $30,000 set aside for cleaning and sprinkling streets in June linked by the name only, not checked
    2 Jun 1913outcome not readJournal 1913, p. 563 ↗
  • C. F. Buckley paid $20,802.72 for land on City Hall Avenue linked by the name only, not checked
    6 Jun 1913outcome not readJournal 1913, p. 529 ↗
  • Board authorized payment of many city claims to contractors and suppliers for hospitals, schools, reservoirs, streets and offices.
    9 Jun 1913outcome not readJournal 1913, p. 580 ↗
  • C. F. Buckley paid $20,802.72 for land on City Hall Avenue linked by the name only, not checked
    9 Jun 1913outcome not readJournal 1913, p. 581 ↗
  • Healy-Tibbitts Construction Co. was authorized a $15,638.88 final payment for the westerly Geary Street Railway extension.
    7 Jul 1913passed first readingJournal 1913, p. 722 ↗
  • Healy-Tibbitts Construction Co. was authorized an $1,800 bonus for the Geary Street Railway extension.
    7 Jul 1913passed first readingJournal 1913, p. 722 ↗
  • $2,500 paid for the city's Fourth of July celebration linked by the name only, not checked
    14 Jul 1913outcome not readJournal 1913, p. 734 ↗
  • Healy-Tibbitts allowed to blast in Baker Street while building a sewer linked by the name only, not checked
    27 Oct 1913passedJournal 1913, p. 1121 ↗
  • Healy-Tibbitts allowed to blast in Baker Street while building a sewer
    3 Nov 1913passed first readingJournal 1913, p. 1069 ↗
  • Commary-Peterson paid $8,995 for building Engine House No. 24 linked by the name only, not checked
    22 Dec 1913passedJournal 1913, p. 1268 ↗
  • Board authorized a long list of claim payments from city bond and general funds to contractors, utilities and railways. linked by the name only, not checked
    1914outcome not readJournal 1914, p. 386 ↗
  • Board authorizes payment of many city claims from bond and general funds, covering schools, street paving, sewers and water.
    1914outcome not readJournal 1914, p. 743 ↗
  • Resolution authorizes payments from library, City Hall, school and fire bond funds to listed claimants; final vote continues next page. linked by the name only, not checked
    1914outcome not readJournal 1914, p. 64 ↗
  • Healy-Tibbitts Construction Co. is listed for an $8,625.16 payment on the Baker Street sewer.
    12 Jan 1914outcome not readJournal 1914, p. 41 ↗
  • Passed for printing a resolution authorizing payments from library, hospital, school, fire, sewer and park funds to various claimants.
    9 Feb 1914passed first readingJournal 1914, p. 142 ↗
  • The White House paid $906.22 for books for the Public Library
    24 Feb 1914outcome not readJournal 1914, p. 185 ↗
  • Healy-Tibbitts given sixty more days on the Baker Street sewer
    2 Mar 1914passedJournal 1914, p. 225 ↗
  • Healy-Tibbitts allowed to blast for a sewer in Fifth Street
    9 Mar 1914outcome not readJournal 1914, p. 1300 ↗
  • Contractors paid from bond funds, including $15,962.45 to F. Rolandi linked by the name only, not checked
    14 Apr 1914passed first readingJournal 1914, p. 385 ↗
  • Resolution authorizes payments to contractors and utilities from bond funds for sewers, schools, City Hall and Municipal Railway work. linked by the name only, not checked
    20 Apr 1914passedJournal 1914, p. 398 ↗
  • Proposed resolution authorizing payment of many city claims from named funds, including Municipal Railway, sewer, school and asylum accounts.
    19 May 1914outcome not readJournal 1914, p. 712 ↗
  • Healy-Tibbitts given 30 more days on the Baker Street sewer linked by the name only, not checked
    22 Jun 1914passedJournal 1914, p. 526 ↗
  • $7,313.90 paid to Pacific Gas & Electric for streetcar current
    29 Jun 1914outcome not readJournal 1914, p. 730 ↗
  • Many city claims were authorized, including sewer, school, library juror and street repair payments to contractors and suppliers.
    9 Jul 1914passedJournal 1914, p. 768 ↗
  • $1,491.50 paid to Cass Gilbert for judging the library design competition
    9 Jul 1914outcome not readJournal 1914 ↗
  • $3,750 set aside for special sanitation by the Board of Health
    28 Sep 1914outcome not readJournal 1914, p. 1023 ↗
  • Healy-Tibbitts allowed to blast for a sewer in Fifth Street
    16 Nov 1914outcome not readJournal 1914, p. 1318 ↗
  • Payments from city bond and fund accounts to contractors and claimants for tunnel, sewer, school and City Hall work proposed for printing.
    1915outcome not readJournal 1915, p. 395 ↗
  • Proposed resolution authorizing bond-fund payments to contractors for hospitals, schools, sewers, transit and Civic Center work.
    1915passed first readingJournal 1915, p. 189 ↗
  • Greenebaum, Weil & Michaels paid $3,556.50 for hospital equipment
    16 Feb 1915passedJournal 1915, p. 242 ↗
  • Clinton Fireproofing Co. paid $23,822.45 for the Seventeenth Street car barn
    8 Mar 1915outcome not readJournal 1915, p. 312 ↗
  • Fourteen payments to contractors and suppliers for library books, car barns, tunnels, sewers and schools are authorized for printing. linked by the name only, not checked
    8 Mar 1915passed first readingJournal 1915, p. 312 ↗
  • Clinton Fireproofing Co. paid $23,822.45 for the Seventeenth Street car barn linked by the name only, not checked
    15 Mar 1915outcome not readJournal 1915, p. 330 ↗
  • Healy-Tibbitts given thirty more days on the Fifth Street sewer linked by the name only, not checked
    5 Apr 1915passedJournal 1915, p. 382 ↗
  • Resolution No. 11668 on authorizations taken up for final passage; outcome continues on the next page.
    12 Apr 1915outcome not readJournal 1915, p. 410 ↗
  • $1,200 to buy right of way on Church Street
    3 May 1915outcome not readJournal 1915, p. 486 ↗
  • Appropriations for City Hall, the main Library, Municipal Railway, street paving and sewer work were listed; the final vote is not printed here. linked by the name only, not checked
    10 May 1915outcome not readJournal 1915, p. 523 ↗
  • City approved payments to contractors and suppliers for books, hospital equipment, sewers, water, and police vehicles.
    10 May 1915passedJournal 1915, p. 515 ↗
  • Proposed appropriations of $17,125 for City Hall hardware and $19,431 for glass work; the vote is not yet printed.
    17 May 1915outcome not readJournal 1915, p. 539 ↗
  • Blanchard-Brown Co. paid $14,409.07 for paving Sloat Boulevard linked by the name only, not checked
    1 Jun 1915passed first readingJournal 1915, p. 596 ↗
  • Resolution authorizes payments from city bond funds to eight contractors and claimants, including Cooper School plumbing work.
    14 Jun 1915passedJournal 1915, p. 650 ↗
  • Blanchard-Brown Co. paid $14,409.07 for paving Sloat Boulevard
    28 Jun 1915outcome not readJournal 1915, p. 650 ↗
  • Neustadter Bros. and Martin-Camm paid for San Francisco Hospital supplies linked by the name only, not checked
    9 Aug 1915passed first readingJournal 1915, p. 905 ↗
  • Resolution 12032 authorizing matters was taken up for final passage; its outcome is printed on the next page.
    16 Aug 1915outcome not readJournal 1915, p. 918 ↗
  • Monson Bros. paid $12,879 for carpentry work at City Hall
    7 Sep 1915outcome not readJournal 1915, p. 988 ↗
  • Contra Costa Construction paid $6,913.87 for the Public Library foundation linked by the name only, not checked
    13 Sep 1915passed first readingJournal 1915, p. 1010 ↗
  • Contra Costa Construction paid $6,913.87 for the Public Library foundation
    20 Sep 1915outcome not readJournal 1915, p. 1022 ↗
  • Monson Bros. paid for carpentry and mill work at City Hall
    20 Sep 1915passedJournal 1915, p. 1021 ↗
  • Sunset Construction allowed ninety days of blasting on Kansas Street linked by the name only, not checked
    11 Oct 1915passedJournal 1915, p. 1095 ↗
  • Board authorizes payments to contractors and suppliers for libraries, schools, City Hall, sewers, streets and transit repairs.
    19 Oct 1915outcome not readJournal 1915, p. 1109 ↗
  • Eaton & Smith allowed 90 days blasting on Paris Street
    22 Nov 1915passedJournal 1915, p. 1240 ↗
  • Pacific Gas & Electric paid $24,169.76 for Municipal Railway current
    30 Nov 1915passedJournal 1915, p. 1374 ↗
  • Healy-Tibbitts paid $1,415.24 for the Fifth Street sewer linked by the name only, not checked
    27 Mar 1916outcome not readJournal 1916, p. 297 ↗
  • Healy-Tibbitts paid $1,415.24 for the Fifth Street sewer linked by the name only, not checked
    3 Apr 1916outcome not readJournal 1916, p. 322 ↗
  • Healy-Tibbitts allowed to blast on Market Street near Steuart linked by the name only, not checked
    28 Aug 1916passedJournal 1916, p. 905 ↗
  • Healy-Tibbitts allowed to blast on Market Street near Steuart
    11 Sep 1916outcome not readJournal 1916, p. 918 ↗
  • $2,000 for Healy-Tibbitts to dredge around the Pierce Street sewer linked by the name only, not checked
    14 May 1917outcome not readJournal 1917, p. 591 ↗
  • $2,000 set aside to dredge around the Pierce Street sewer outfall
    21 May 1917outcome not readJournal 1917, p. 605 ↗
  • Resolution authorizing 29 payments from city funds to suppliers, contractors and institutions was passed for printing.
    16 Jul 1917passed first readingJournal 1917, p. 960 ↗
  • Resolution authorizes payments to several firms, including PG&E, Monson and Western Meat, for parks, hospital and street work.
    23 Jul 1917outcome not readJournal 1917, p. 975 ↗
  • Healy-Tibbitts may blast at the Western Sugar Refinery site
    18 Nov 1918outcome not readJournal 1918, p. 952 ↗
  • Healy-Tibbitts may blast at the Western Sugar Refinery site
    25 Nov 1918outcome not readJournal 1918, p. 967 ↗
  • $23,274 to move the Union Street Municipal Railway line
    16 Jun 1919outcome not readJournal 1919, p. 487 ↗
  • Resolution authorizing further Municipal Railway payments, including $3,750 to Healy-Tibbitts Construction for Union street line. linked by the name only, not checked
    21 Jul 1919outcome not readJournal 1919, p. 607 ↗
  • Board passed resolution authorizing dozens of city claims, including Municipal Railway repairs, library books and Great Highway paving payments.
    18 Aug 1919passedJournal 1919, p. 684 ↗
  • Healy-Tibbitts allowed to set off blasts along Bay and Kearny streets
    25 Aug 1919passedJournal 1919, p. 711 ↗
  • Healy-Tibbitts allowed to set off blasts along Bay and Kearny streets linked by the name only, not checked
    3 Sep 1919passedJournal 1919, p. 727 ↗
  • A schedule of city payments to contractors and suppliers was passed for printing, covering Hetch Hetchy, school, library and Muni work. linked by the name only, not checked
    15 Sep 1919passed first readingJournal 1919, p. 760 ↗
  • Payments of $10,050.38 to General Electric and $1,646.06 to Wm. Cluff Co. for Hetch Hetchy work were proposed.
    22 Sep 1919outcome not readJournal 1919, p. 775 ↗
  • Healy-Tibbitts paid $2,700 to finish moving the Union Street line
    14 Oct 1919outcome not readJournal 1919, p. 839 ↗
  • A resolution authorizing city payments to suppliers, contractors and orphanages from various funds was passed for printing.
    20 Oct 1919passed first readingJournal 1919 ↗
  • Board passed a resolution authorizing dozens of city payments to suppliers, utilities, contractors and orphanages from various funds.
    27 Oct 1919passedJournal 1919, p. 675 ↗
  • Supervisor McLeran proposed $47,000 for an Army Street concrete bulkhead and retaining wall, plus building repairs.
    22 Dec 1919outcome not readJournal 1919, p. 1114 ↗
  • $47,000 set aside for Army Street bulkhead and wall
    30 Dec 1919passedJournal 1919, p. 1188 ↗
  • Resolution authorizes payment of numbered claims to city suppliers, contractors and utilities, including Hetch Hetchy and hospital bills. linked by the name only, not checked
    19 Jan 1920outcome not readJournal 1920, p. 64 ↗
  • Board approved 26 city payment claims, including influenza relief, widows' pensions, hospital supplies and Hetch Hetchy work.
    22 Mar 1920passedJournal 1920, p. 235 ↗
  • Payment authorizations for Hetch Hetchy supplies, a locomotive and library books were listed; final vote continues on the next page.
    19 Apr 1920outcome not readJournal 1920, p. 315 ↗
  • Utah Construction paid $20,250 for work on Hetch Hetchy dam
    17 May 1920passedJournal 1920, p. 395 ↗
  • Raisch Improvement Co. gets $36,072.50 to pave the Great Highway
    14 Jun 1920passedJournal 1920, p. 507 ↗
  • Resolution authorizing 25 payments to 22 claimants from city funds was passed for printing.
    2 Aug 1920passed first readingJournal 1920, p. 645 ↗
  • Twenty-five payments from city funds to suppliers, contractors and utilities, including school architect fees, were finally approved.
    9 Aug 1920passedJournal 1920, p. 656 ↗
  • Payments authorized to contractors and suppliers for Hetch Hetchy, streets, schools, parks, fire and health work. linked by the name only, not checked
    16 Aug 1920passedJournal 1920, p. 668 ↗
  • Healy-Tibbitts to build a railway trestle at Aquatic Park for $18,400 linked by the name only, not checked
    27 Jun 1921outcome not readJournal 1921, p. 550 ↗
  • Board passed for printing a resolution authorizing payments to contractors and suppliers for schools, transit, water and parks.
    10 Oct 1921passed first readingJournal 1921, p. 878 ↗
  • Utah Construction paid $163,710.24 for work on the Hetch Hetchy dam
    24 Oct 1921outcome not readJournal 1921, p. 908 ↗
  • Resolution authorizing payments to contractors and claimants for school work and a locomotive was passed for printing; list continues.
    31 Oct 1921outcome not readJournal 1921, p. 931 ↗
  • $2,000 paid for an electric locomotive for Muni
    7 Nov 1921passedJournal 1921, p. 946 ↗
  • Board passed Resolution 19386 authorizing $2,000 to Petaluma & Santa Rosa Railroad and $6,994.50 to Healy-Tibbitts for Aquatic Park work.
    7 Nov 1921passedJournal 1921, p. 946 ↗
  • Resolution proposed to authorize payments from $896 to $16,825 to suppliers and contractors for transit, water and street work; passed for printing.
    28 Nov 1921passed first readingJournal 1921, p. 1001 ↗
  • Municipal Railway bills approved for payment to Market Street Railway
    5 Dec 1921outcome not readJournal 1921, p. 1010 ↗
  • Resolution authorizing payments to city suppliers and contractors for libraries, Municipal Railway, and school work was passed for printing.
    23 Jan 1922passed first readingJournal 1922 ↗
  • Healy-Tibbitts gets $321.73 more for the Aquatic Park trestle
    23 Jan 1922passedJournal 1922 ↗
  • Board authorized about 38 routine payments from city funds to suppliers, contractors and utilities, including library books, Municipal Railway power and school work.
    30 Jan 1922passedJournal 1922 ↗
  • Resolution proposed to appropriate $60,000 for Section D of the Ocean Beach Esplanade, awarded to Healy-Tibbitts Construction Co.
    5 Sep 1922outcome not readJournal 1922 ↗
  • Appropriated $60,000 to build Section D of the Ocean Beach Esplanade, awarded to Healy-Tibbitts Construction Co. at $54,442. linked by the name only, not checked
    18 Sep 1922passedJournal 1922 ↗
  • Healy-Tibbitts to be allowed blasting at Second and Harrison streets linked by the name only, not checked
    6 Nov 1922outcome not readJournal 1922 ↗
  • Healy-Tibbitts Construction allowed to blast at Second and Harrison Streets
    20 Nov 1922passedJournal 1922 ↗
  • Board passed for printing a resolution authorizing dozens of city payments to contractors, schools, hospitals and suppliers. linked by the name only, not checked
    8 Jan 1923passed first readingJournal 1923, p. 26 ↗
  • Board authorizes payments from city funds to many contractors and suppliers, including school construction, Golden Gate Park and Municipal Railway work. linked by the name only, not checked
    15 Jan 1923outcome not readJournal 1923, p. 39 ↗
  • Proposed payments of city funds to many claimants, including PG&E power, school construction and hospital food; the final vote is not shown here. linked by the name only, not checked
    26 Feb 1923outcome not readJournal 1923, p. 175 ↗
  • Pacific Gas and Electric paid $34,912.09 for Municipal Railway power linked by the name only, not checked
    5 Mar 1923outcome not readJournal 1923, p. 190 ↗
  • Supervisor McLeran moved a resolution of authorizations, passed for printing, with its text continuing on the next page. linked by the name only, not checked
    26 Mar 1923outcome not readJournal 1923, p. 279 ↗
  • Healy-Tibbitts given ninety more days on the Ocean Beach Esplanade
    2 Apr 1923passedJournal 1923, p. 314 ↗
  • Eaton & Smith paid $19,500 for improving Sloat Boulevard linked by the name only, not checked
    2 Apr 1923outcome not readJournal 1923, p. 296 ↗
  • Five thousand dollars appropriated for test piles across San Francisco Bay at Dumbarton Straits for the Hetch Hetchy water supply.
    4 Jun 1923outcome not readJournal 1923, p. 619 ↗
  • Board appropriated $5,000 for test piles across San Francisco Bay at Dumbarton Straits under a Healy-Tibbitts contract.
    11 Jun 1923passedJournal 1923, p. 637 ↗
  • Board authorized payment of city claims for street work, schools, fire hydrants, hospital supplies and Hetch Hetchy items.
    20 Aug 1923passedJournal 1923, p. 887 ↗
  • Healy-Tibbitts Construction Co. to build a sewer on Sixth Street
    1 Oct 1923outcome not readJournal 1923, p. 1079 ↗
  • City pays contractors for schools, sewers and Hetch Hetchy supplies linked by the name only, not checked
    8 Oct 1923outcome not readJournal 1923, p. 1097 ↗
  • Healy-Tibbitts wins the Sixth Street sewer contract for $41,398 linked by the name only, not checked
    8 Oct 1923outcome not readJournal 1923, p. 1095 ↗
  • City pays contractors for schools, sewers and Hetch Hetchy supplies linked by the name only, not checked
    22 Oct 1923outcome not readJournal 1923, p. 1127 ↗
  • Board approved a $9,900 first payment to Healy-Tibbitts Construction Company for the Sixth street sewer.
    10 Dec 1923passedJournal 1923, p. 1283 ↗
  • Committees recommend appropriating $1,250,000 to Healy Tibbitts Construction Company for a Hetch Hetchy bridge substructure across Dumbarton Straits.
    17 Dec 1923outcome not readJournal 1923, p. 1303 ↗
  • Proposed $1,250,000 appropriation from the Water Construction Fund for Dumbarton Straits bridge substructures by Healy Tibbitts Construction Company.
    17 Dec 1923outcome not readJournal 1923, p. 1325 ↗
  • Board set aside $1,250,000 from water bond funds for Healy Tibbitts to build Dumbarton Straits bridge substructures.
    24 Dec 1923passedJournal 1923, p. 1340 ↗
  • Healy-Tibbitts Construction Company was granted two hundred seventy more days to finish a rock fill on the Marina.
    21 Jan 1924outcome not readJournal 1924, p. 65 ↗
  • Healy-Tibbitts given thirty more days on the Sixth Street sewer
    18 Feb 1924outcome not readJournal 1924, p. 185 ↗
  • The Board sent a resolution authorizing payment of dozens of city claims, from library books to hospital supplies, to committee. linked by the name only, not checked
    18 Feb 1924outcome not readJournal 1924, p. 171 ↗
  • Board finally passed payments to dozens of city contractors and suppliers, including sewer, school, transit and hospital work. linked by the name only, not checked
    25 Feb 1924passedJournal 1924, p. 202 ↗
  • A resolution authorizing payments from named funds to named claimants was passed for printing, with its outcome on the next page. linked by the name only, not checked
    25 Feb 1924outcome not readJournal 1924, p. 205 ↗
  • Resolution authorizes many city payments from various funds to suppliers, contractors, pensioners and charities for library, water, school and street work. linked by the name only, not checked
    3 Mar 1924outcome not readJournal 1924, p. 220 ↗
  • Claims for city payments, including PG&E street lighting and parks water and lumber, were approved in one batch. linked by the name only, not checked
    3 Mar 1924passedJournal 1924, p. 223 ↗
  • Resolution authorizes payments to dozens of suppliers and contractors, including $164,171.24 to Western Pipe and Steel for a bay crossing pipe line. linked by the name only, not checked
    3 Mar 1924outcome not readJournal 1924, p. 222 ↗
  • Healy-Tibbitts Construction Co. is listed for final payment on rock fill along Marina Boulevard at Yacht Harbor. linked by the name only, not checked
    10 Mar 1924outcome not readJournal 1924, p. 260 ↗
  • Healy-Tibbitts Construction Co. received a final payment of $37,890.48 for rock fill along Marina Boulevard. linked by the name only, not checked
    17 Mar 1924passedJournal 1924, p. 275 ↗
  • Healy-Tibbitts Construction Company gets a rail spur on North Point Street
    24 Mar 1924outcome not readJournal 1924, p. 317 ↗
  • Healy-Tibbitts Construction Company gets a rail spur on North Point Street linked by the name only, not checked
    7 Apr 1924outcome not readJournal 1924, p. 343 ↗
  • Resolution authorizes payment of 41 claims to suppliers and contractors for schools, Hetch Hetchy water works, parks and fire department. linked by the name only, not checked
    14 Apr 1924passedJournal 1924, p. 379 ↗
  • Board's payment resolution authorizing city claims to contractors and suppliers was adopted by a 17-1 vote. linked by the name only, not checked
    14 Apr 1924passedJournal 1924, p. 380 ↗
  • Healy-Tibbitts Construction Co. was paid $18,625.98 for bridge superstructure work across Dumbarton straits.
    14 Apr 1924outcome not readJournal 1924, p. 390 ↗
  • Resolution authorizes payment of many city claims, including street lighting, bridge contracts, hospital supplies and school paints, pending final adoption. linked by the name only, not checked
    12 May 1924outcome not readJournal 1924, p. 547 ↗
  • Payments from the special school tax were authorized, including $654 to Dan P. Malic Co. for school building paints. linked by the name only, not checked
    19 May 1924outcome not readJournal 1924, p. 620 ↗
  • The Board authorized payments from city funds to orphanages, a school and child agencies for maintaining minors, and a cement supplier. linked by the name only, not checked
    23 Jun 1924outcome not readJournal 1924, p. 734 ↗
  • Resolution authorizing city payments to numbered claimants, including library, Hetch Hetchy contractor and orphanage claims; outcome printed on next page. linked by the name only, not checked
    14 Jul 1924outcome not readJournal 1924, p. 836 ↗
  • Board authorized payments from city funds to many claimants, including library suppliers, Hetch Hetchy contractors, orphanages and San Francisco Hospital suppliers. linked by the name only, not checked
    21 Jul 1924outcome not readJournal 1924, p. 874 ↗
  • Resolution proposed authorizing payments to ten firms and individuals for Hetch Hetchy supplies and Dumbarton bridge work.
    28 Jul 1924passed first readingJournal 1924, p. 916 ↗
  • Grant Smith & Company paid $49,309.60 for the Pulgas Tunnel linked by the name only, not checked
    4 Aug 1924outcome not readJournal 1924 ↗
  • Resolution proposes paying claimants for library books, Galileo High School architecture, and Hetch Hetchy and Bay Crossing water works. linked by the name only, not checked
    18 Aug 1924outcome not readJournal 1924, p. 963 ↗
  • Board authorized dozens of payments to suppliers and contractors, including $112,486.21 to Healy-Tibbitts for Dumbarton bridge work. linked by the name only, not checked
    25 Aug 1924passedJournal 1924, p. 984 ↗
  • Proposed $360,000 to build submarine water pipelines at Dumbarton Strait and Newark Slough, awarded to Healy-Tibbitts Construction Company.
    25 Aug 1924outcome not readJournal 1924, p. 989 ↗
  • The Board appropriated $360,000 for submarine water pipelines at Dumbarton Strait and Newark Slough, awarded to Healy-Tibbitts Construction Company. linked by the name only, not checked
    15 Sep 1924passedJournal 1924, p. 1045 ↗
  • Hetch Hetchy bills paid, including $97,511.74 for the Dumbarton Straits bridge linked by the name only, not checked
    22 Sep 1924outcome not readJournal 1924, p. 1120 ↗
  • Payments to suppliers, contractors and insurers for Hetch Hetchy, Marina boulevard and school work passed for printing. linked by the name only, not checked
    6 Oct 1924passed first readingJournal 1924, p. 1181 ↗
  • Proposed payments from water construction bond funds to several suppliers, including Hetch Hetchy pipe and paint claims. linked by the name only, not checked
    14 Oct 1924outcome not readJournal 1924, p. 1207 ↗
  • Resolution authorizes many city payments to contractors and suppliers, including library books, school architect fees and Hetch Hetchy work. linked by the name only, not checked
    20 Oct 1924outcome not readJournal 1924, p. 1234 ↗
  • Library Fund payments authorized, including $3,484.10 to Foster & Futernick Co. for binding library books. linked by the name only, not checked
    27 Oct 1924outcome not readJournal 1924, p. 1253 ↗
  • Resolution authorizing a long list of city payments to vendors and contractors from various funds, outcome continues on the next page.
    24 Nov 1924outcome not readJournal 1924, p. 1390 ↗
  • Payment of $2,481.30 to Healy-Tibbitts Construction Co. for submarine water pipelines at Dumbarton Straits, listed for payment.
    15 Dec 1924outcome not readJournal 1924, p. 1479 ↗
  • Payment of $25,098.77 to Healy-Tibbitts Construction Co. for bridge substructures across Dumbarton Straits, listed for payment.
    15 Dec 1924outcome not readJournal 1924, p. 1479 ↗
  • San Francisco Symphony paid $4,000 for two November concerts linked by the name only, not checked
    22 Dec 1924passedJournal 1924, p. 1506 ↗
  • Thirty-eight claims are authorized for payment from water, library and Municipal Railway funds to suppliers and utilities. linked by the name only, not checked
    19 Jan 1925outcome not readJournal 1925, p. 86 ↗
  • Resolution authorizes payments from water bond funds to suppliers and contractors for Hetch Hetchy works; vote continues next page. linked by the name only, not checked
    26 Jan 1925outcome not readJournal 1925, p. 110 ↗
  • Payments authorized from city funds to suppliers, contractors and pension system for library, water and Municipal Railway work; vote continues next page. linked by the name only, not checked
    24 Feb 1925outcome not readJournal 1925, p. 234 ↗
  • Ahabot Ackin Congregation paid for land at Burrows and Girard Streets linked by the name only, not checked
    2 Mar 1925outcome not readJournal 1925, p. 277 ↗
  • Board authorizes payments to several firms, including Old Mission Portland Cement Co. for Hetch Hetchy cement, from the Water Construction Fund. linked by the name only, not checked
    9 Mar 1925outcome not readJournal 1925, p. 298 ↗
  • $800 paid to Paul Russo to settle a Municipal Railway claim
    23 Mar 1925passed first readingJournal 1925, p. 372 ↗
  • $800 paid to Paul Russo to settle a Municipal Railway claim linked by the name only, not checked
    30 Mar 1925outcome not readJournal 1925, p. 400 ↗
  • Hetch Hetchy bills paid to Associated Oil and other suppliers linked by the name only, not checked
    13 Apr 1925passed first readingJournal 1925, p. 486 ↗
  • Peter T. Shewbridge paid for school land on Paris Street linked by the name only, not checked
    20 Apr 1925outcome not readJournal 1925, p. 543 ↗
  • Peter T. Shewbridge paid for school land on Paris Street linked by the name only, not checked
    27 Apr 1925outcome not readJournal 1925, p. 564 ↗
  • A resolution authorizing payment of many city claims, including Hetch Hetchy, Municipal Railway and Kezar Stadium work, continues onto the next page. linked by the name only, not checked
    18 May 1925outcome not readJournal 1925, p. 695 ↗
  • Resolution on motion of Supervisor McLeran authorizing payments to contractors and suppliers for Hetch Hetchy work was passed for printing. linked by the name only, not checked
    18 May 1925passed first readingJournal 1925, p. 694 ↗
  • A resolution authorizing payments to many city claimants for library books, Hetch Hetchy work, Municipal Railway power and school construction was passed for printing.
    25 May 1925passed first readingJournal 1925, p. 737 ↗
  • Resolution authorizing city payments to many claimants for Hetch Hetchy, Municipal Railway, school and Kezar Stadium work; final vote continues next page. linked by the name only, not checked
    25 May 1925outcome not readJournal 1925, p. 728 ↗
  • Board authorizes payments from the Water Construction Fund to claimants for Hetch Hetchy construction and supplies; list continues. linked by the name only, not checked
    25 May 1925outcome not readJournal 1925, p. 727 ↗
  • Joseph and Mary Anne Cunningham sell land for widening Market Street linked by the name only, not checked
    8 Jun 1925passedJournal 1925, p. 826 ↗
  • Resolution 24175 on authorizations was up for final passage; its outcome appears on the next page. linked by the name only, not checked
    22 Jun 1925outcome not readJournal 1925, p. 925 ↗
  • Resolution proposed to authorize payments from city funds to contractors and suppliers for Hetch Hetchy, schools, and Municipal Railway work. linked by the name only, not checked
    20 Jul 1925outcome not readJournal 1925, p. 1058 ↗
  • Eaton & Smith to be paid $3,784.15 for Hawes Street work linked by the name only, not checked
    3 Aug 1925outcome not readJournal 1925, p. 1105 ↗
  • Resolution 24373 authorizing listed amounts was up for final passage; its outcome is not printed on this page. linked by the name only, not checked
    10 Aug 1925outcome not readJournal 1925, p. 1148 ↗
  • Resolution lists payments to contractors and suppliers for schools, Hetch Hetchy, Municipal Railways and other city work; passed for printing.
    10 Aug 1925outcome not readJournal 1925, p. 1161 ↗
  • Payments from city funds to contractors, suppliers and charities for playgrounds, transit, water works and street repairs are proposed by resolution. linked by the name only, not checked
    17 Aug 1925passed first readingJournal 1925, p. 1189 ↗
  • Healy-Tibbitts Construction Co. was paid $11,036.16 for extra work on the Hetch Hetchy submarine water pipeline.
    17 Aug 1925outcome not readJournal 1925, p. 1181 ↗
  • Contractor paid $894.97 to clear a Sutro Heights slide linked by the name only, not checked
    24 Aug 1925passedJournal 1925, p. 1215 ↗
  • Claims paid, including $10,500 to Schultze Construction for Roosevelt Way linked by the name only, not checked
    14 Sep 1925outcome not readJournal 1925, p. 1320 ↗
  • Board authorizes a long list of city payments to contractors and suppliers for school construction, Fleishhacker Pool, Harding Park and the Relief Home.
    14 Sep 1925outcome not readJournal 1925, p. 1321 ↗
  • The Board finally passed a resolution authorizing 23 city payments for schools, the Hetch Hetchy pipeline, road work and the Steinhart Aquarium. linked by the name only, not checked
    21 Sep 1925passedJournal 1925, p. 1347 ↗
  • Bills paid for the Municipal Railway, the parks and the schools linked by the name only, not checked
    13 Oct 1925passedJournal 1925, p. 1457 ↗
  • Resolution authorizing payment of 22 claims for libraries, schools, playgrounds, Hetch Hetchy and Municipal Railway work was passed for printing. linked by the name only, not checked
    19 Oct 1925passed first readingJournal 1925, p. 1478 ↗
  • Agnes Isabel Higginson to be paid for Market Street extension land linked by the name only, not checked
    26 Oct 1925outcome not readJournal 1925, p. 1520 ↗
  • Healy-Tibbitts Construction Co. was owed $69,839.82 for bridge substructures across Dumbarton Straits. linked by the name only, not checked
    26 Oct 1925outcome not readJournal 1925, p. 1507 ↗
  • Resolution authorizes payments to many claimants for library books, Hetch Hetchy work, playgrounds, hospitals and schools; final vote continues on next page. linked by the name only, not checked
    26 Oct 1925outcome not readJournal 1925, p. 1504 ↗
  • City pays Pacific Gas and Electric $36,623.31 for railway power linked by the name only, not checked
    2 Nov 1925outcome not readJournal 1925, p. 1535 ↗
  • Market Street Railway paid $2,142.86 for repairs at the ferry loop linked by the name only, not checked
    16 Nov 1925outcome not readJournal 1925, p. 1584 ↗
  • Payments for Municipal Railway tires and repairs and Hetch Hetchy construction were passed for printing. linked by the name only, not checked
    16 Nov 1925passed first readingJournal 1925, p. 1584 ↗
  • Healy-Tibbitts paid $140,723.82 for the submarine pipeline at Dumbarton Straits linked by the name only, not checked
    23 Nov 1925outcome not readJournal 1925, p. 1608 ↗
  • Healy-Tibbitts Construction Co. is to be paid $81,375.21 for bridge substructures across Dumbarton Straits. linked by the name only, not checked
    14 Dec 1925outcome not readJournal 1925, p. 1740 ↗
  • Healy-Tibbitts Construction Co. is to be paid $12,273.52 for a submarine water pipe line at Dumbarton and Newark. linked by the name only, not checked
    14 Dec 1925outcome not readJournal 1925, p. 1740 ↗
  • MacDonald & Kahn paid $38,331.30 for the new Mission High School linked by the name only, not checked
    4 Jan 1926outcome not readJournal 1926 ↗
  • Resolution No. 25023 authorizes payments of about twenty city claims for school construction, parks, water works and publicity. linked by the name only, not checked
    11 Jan 1926outcome not readJournal 1926, p. 46 ↗
  • Barrett & Hilp paid $635 for alterations to the Beach Chalet linked by the name only, not checked
    18 Jan 1926passed first readingJournal 1926, p. 79 ↗
  • Bond Construction Co. paid $16,500 for the San Jose Avenue bridge linked by the name only, not checked
    25 Jan 1926outcome not readJournal 1926, p. 70 ↗
  • Healy-Tibbitts paid $144,452.14 for the Dumbarton Straits bridge foundations linked by the name only, not checked
    25 Jan 1926passedJournal 1926, p. 105 ↗
  • Supervisor McSheehy's resolution authorising payments to contractors and suppliers for parks, schools, water and transit was passed for printing.
    29 Mar 1926passed first readingJournal 1926, p. 481 ↗
  • Knittle Bros. paid $4,349.36 for the Glen Park School heating linked by the name only, not checked
    21 Jun 1926outcome not readJournal 1926, p. 1063 ↗
  • Payments authorized to suppliers and contractors for schools, water, fire and sewer work; the vote continues on the next page. linked by the name only, not checked
    6 Jul 1926outcome not readJournal 1926, p. 1164 ↗
  • Resolution No. 25991 on authorizations was taken up for final passage on this page. linked by the name only, not checked
    2 Aug 1926outcome not readJournal 1926, p. 1254 ↗
  • Money set aside for the Market Street extension near Mono Street linked by the name only, not checked
    30 Aug 1926outcome not readJournal 1926, p. 1390 ↗
  • Frank Labrucherie's land bought for $11,500 to extend Park Street linked by the name only, not checked
    7 Sep 1926outcome not readJournal 1926, p. 1426 ↗
  • Resolution 26148 authorizing certain expenditures was up for final passage; its vote is printed on the next page. linked by the name only, not checked
    13 Sep 1926outcome not readJournal 1926, p. 1436 ↗
  • Board authorizes payments to contractors and suppliers for school buildings, Hetch Hetchy water works, sewers, and a fire engine house. linked by the name only, not checked
    20 Sep 1926outcome not readJournal 1926, p. 1480 ↗
  • Resolution authorizing payments to contractors and suppliers for fire, hospital, school and Hetch Hetchy work was passed for printing.
    11 Oct 1926passed first readingJournal 1926, p. 1621 ↗
  • $4,500 for plumbing at Engine House No. 19 on Third Street linked by the name only, not checked
    25 Oct 1926outcome not readJournal 1926, p. 1669 ↗
  • Authorizes many payments to contractors for schools, Hetch Hetchy works, Relief Home buildings, a hospital ward and a firehouse. linked by the name only, not checked
    25 Oct 1926outcome not readJournal 1926, p. 1670 ↗
  • An ordinance proposed for Vicente Street and Thirty-second Avenue linked by the name only, not checked
    1 Nov 1926passed first readingJournal 1926, p. 1737 ↗
  • Healy-Tibbitts allowed to blast at Third and Arthur streets linked by the name only, not checked
    15 Nov 1926outcome not readJournal 1926, p. 1769 ↗
  • $350,000 from boulevard bonds would be set aside for Section E of the Ocean Beach Esplanade construction.
    12 Mar 1928outcome not readJournal 1928, p. 419 ↗
  • $350,000 from Boulevard Bonds was appropriated to build Section E of the Ocean Beach Esplanade, mainly through a Healy-Tibbitts contract.
    19 Mar 1928passedJournal 1928, p. 455 ↗
  • Payments for the Yacht Harbor piles and the Ocean Beach Esplanade linked by the name only, not checked
    11 Jun 1928passed first readingJournal 1928, p. 1202 ↗
  • Healy-Tibbitts Construction Co. gets $25,500 first payment for Ocean Beach Esplanade, Section E.
    18 Jun 1928passedJournal 1928, p. 1223 ↗
  • Bills paid for Steinhart Aquarium, Ocean Beach Esplanade and school work
    9 Jul 1928outcome not readJournal 1928, p. 1378 ↗
  • Healy-Tibbitts Construction Co. was paid $7,500 as third payment on Ocean Beach Esplanade, section E. linked by the name only, not checked
    13 Aug 1928outcome not readJournal 1928, p. 1648 ↗
  • Healy-Tibbitts Construction Co. was paid $7,500 as third payment for Ocean Beach Esplanade construction. linked by the name only, not checked
    20 Aug 1928passedJournal 1928, p. 1683 ↗
  • Payments to contractors and suppliers for school, boulevard, tunnel and water works authorized from city bond and tax funds.
    4 Sep 1928outcome not readJournal 1928, p. 1789 ↗
  • Payments approved for Sunset tunnel, Hetch Hetchy and boulevard work
    17 Sep 1928outcome not readJournal 1928, p. 1865 ↗
  • Healy-Tibbitts Construction Co. is paid $45,450 for a fifth payment on Esplanade construction. linked by the name only, not checked
    8 Oct 1928outcome not readJournal 1928, p. 2219 ↗
  • Fifth payment of $45,450 to Healy-Tibbitts Construction Co. for Esplanade work is listed for payment. linked by the name only, not checked
    22 Oct 1928outcome not readJournal 1928, p. 2275 ↗
  • Finance Committee proposed paying contractors and claimants for Alemany, Bay Shore, Great Highway and Hetch Hetchy work; the vote is not printed here.
    19 Nov 1928outcome not readJournal 1928, p. 2464 ↗
  • Resolution 29995 authorizes payments for boulevard, highway and Hetch Hetchy work and property taxes to named contractors and collectors.
    26 Nov 1928passedJournal 1928, p. 2491 ↗
  • The Board's December 10, 1928 schedule approves 21 payments, including street, boulevard, school, concert and library claims.
    10 Dec 1928outcome not readJournal 1928, p. 2596 ↗
  • Payment of $37,500.00 to Healy-Tibbitts Construction Co. for the Ocean Beach Esplanade is listed for payment. linked by the name only, not checked
    14 Jan 1929outcome not readJournal 1929, p. 58 ↗
  • A payment of $37,500.00 to Healy-Tibbitts Construction Co. is the eighth for building the Ocean Beach Esplanade. linked by the name only, not checked
    21 Jan 1929outcome not readJournal 1929, p. 105 ↗
  • Ninth payment of $18,000 to Healy-Tibbitts Construction Co. for building the Ocean Beach Esplanade is listed. linked by the name only, not checked
    11 Feb 1929outcome not readJournal 1929, p. 274 ↗
  • Resolution proposes funds for test borings and white uniforms for traffic officers; outcome appears on the next page.
    25 Feb 1929outcome not readJournal 1929, p. 340 ↗
  • Payment of $18,000.00 to Healy-Tibbitts Construction Co., ninth payment on the Ocean Beach Esplanade, Section E. linked by the name only, not checked
    25 Feb 1929outcome not readJournal 1929, p. 338 ↗
  • Resolution authorizing city fund payments to contractors and suppliers for library books, Hetch Hetchy works and boulevards, passed for printing.
    11 Mar 1929passed first readingJournal 1929, p. 473 ↗
  • Resolution authorizes payments from city funds to book dealers, janitorial firms, and concert providers; list continues on next page.
    18 Mar 1929outcome not readJournal 1929 ↗
  • $1,365.68 repaid to the county road fund for covering sidesewers
    1 Apr 1929passed first readingJournal 1929, p. 619 ↗
  • Healy-Tibbitts Construction Co. is listed for $83,300.00, a seventh payment for building the Ocean Beach Esplanade. linked by the name only, not checked
    8 Apr 1929outcome not readJournal 1929, p. 654 ↗
  • Healy-Tibbitts gets $77,704.30 to improve the Great Highway near Fulton Street
    8 Apr 1929outcome not readJournal 1929, p. 656 ↗
  • $1,365.68 approved to cover February sewer trenches in streets
    8 Apr 1929passedJournal 1929 ↗
  • Healy-Tibbitts gets $77,704.30 to improve the Great Highway at Fulton Street
    15 Apr 1929outcome not readJournal 1929, p. 701 ↗
  • A seventh payment of $83,300 to Healy-Tibbitts Construction Co. for building the Ocean Beach Esplanade is listed for payment. linked by the name only, not checked
    15 Apr 1929outcome not readJournal 1929, p. 699 ↗
  • A resolution authorizing dozens of payments to contractors and suppliers for school, boulevard and water work was passed for printing.
    13 May 1929outcome not readJournal 1929, p. 927 ↗
  • Louis J. Conn paid $24,450 for Bayshore Boulevard work
    20 May 1929passedJournal 1929, p. 954 ↗
  • Second payment of $15,000 to Healy-Tibbitts Construction Company for Great Highway construction is listed for payment.
    10 Jun 1929outcome not readJournal 1929, p. 1168 ↗
  • Healy-Tibbitts Construction Company is paid $15,000, a second installment, to build the Great Highway segment.
    17 Jun 1929outcome not readJournal 1929, p. 1229 ↗
  • Resolution authorizing city payments to suppliers, contractors and pension funds, including $15,000 to Healy-Tibbitts for Ocean Beach Esplanade work.
    24 Jun 1929outcome not readJournal 1929, p. 1274 ↗
  • Payment of $15,000 to Healy-Tibbitts Construction Co. listed for improving the Great Highway, Contract 15. linked by the name only, not checked
    8 Jul 1929outcome not readJournal 1929, p. 1361 ↗
  • Healy-Tibbitts Construction Co. was paid $15,000 for the third payment on the Great Highway. linked by the name only, not checked
    15 Jul 1929outcome not readJournal 1929, p. 1387 ↗
  • Land bought for playgrounds from the Hueters and the Archbishop
    29 Jul 1929outcome not readJournal 1929, p. 1507 ↗
  • Board moved to authorize payment of claims to four payees from the Hetch Hetchy Construction Fund, Bond Issue 1928.
    5 Aug 1929outcome not readJournal 1929 ↗
  • Finance Committee's authorizations of street improvement progress payments and a pension payment were passed for printing.
    12 Aug 1929passed first readingJournal 1929, p. 1586 ↗
  • Contractors paid for boulevard work and the De Young Museum
    16 Sep 1929outcome not readJournal 1929, p. 1785 ↗
  • Board appropriated $5,707.85 from the sewer extension budget for three sewer projects, two paid to construction companies.
    16 Sep 1929passedJournal 1929, p. 1788 ↗
  • Board approved $5,707.85 for three sewer constructions, including Mariposa, Rodeo avenue and Thirtieth street works.
    23 Sep 1929passedJournal 1929, p. 1835 ↗
  • Healy Tibbitts Construction Co. was paid $26,700 for a fifth payment on Great Highway paving. linked by the name only, not checked
    23 Sep 1929passedJournal 1929, p. 1831 ↗
  • A $4,000 thirteenth payment to Healy Tibbitts Construction Co. for the Ocean Beach esplanade is listed; approval not printed here.
    4 Nov 1929outcome not readJournal 1929, p. 2092 ↗
  • Sixth payment of $3,000 to Healy-Tibbitts Construction for improving Great Highway between Fulton Street and Lincoln Way.
    2 Dec 1929outcome not readJournal 1929, p. 2238 ↗
  • Payment of $601.77 to Healy-Tibbitts Construction for painted lines on Twin Peaks Boulevard.
    2 Dec 1929outcome not readJournal 1929, p. 2238 ↗
  • A sixth payment of $3,000 to Healy-Tibbitts Construction Company for paving the Great Highway between Fulton Street and Lincoln Way was approved.
  • A $601.77 payment to Healy-Tibbitts Construction Company for painted lines on Twin Peaks Boulevard was approved.
  • Healy-Tibbitts Construction Co. is paid $2,854 in full for building the Mariposa Street outfall sewer. linked by the name only, not checked
    31 Mar 1930outcome not readJournal 1930, p. 914 ↗
  • Final payment of $2,854.00 to Healy-Tibbitts Construction Co. for the Mariposa Street outfall sewer was approved. linked by the name only, not checked
    7 Apr 1930passedJournal 1930, p. 954 ↗
  • Healy-Tibbitts Construction Co. was paid $1,019.84 as final payment for Great Highway improvements. linked by the name only, not checked
    9 Jun 1930outcome not readJournal 1930, p. 1480 ↗
  • Healy-Tibbitts Construction Co. was paid a final $1,019.84 for improving Great Highway near Fulton street.
    16 Jun 1930outcome not readJournal 1930, p. 1517 ↗
  • Healy-Tibbitts Construction is paid $2,920 for piles for a proposed incinerator at Sixteenth and DeHaro.
    8 Sep 1930outcome not readJournal 1930, p. 2105 ↗
  • Proposed $128,493 to Healy-Tibbitts and $41,975.50 to Clarence B. Eaton for Alemany storm drain sections C and D, passed to print. linked by the name only, not checked
    15 Sep 1930passed first readingJournal 1930, p. 2162 ↗
  • Appropriates $128,493 and $41,975.50 from the 1929 Sewer Bond Fund for two Alemany storm drain contracts.
    22 Sep 1930passedJournal 1930, p. 2207 ↗
  • Appropriation of $39,200 proposed for building two wharves at Yacht Harbor.
    27 Oct 1930outcome not readJournal 1930, p. 2421 ↗
  • Seven Islais Creek Reclamation District warrants totalling $87,858.40 to various payees are pending approval.
    10 Nov 1930outcome not readJournal 1930, p. 2513 ↗
  • Approved Islais Creek Reclamation District warrants, including $54,579.15 to Healy-Tibbitts Construction Company and smaller payments to other payees. linked by the name only, not checked
  • Healy-Tibbitts Construction Company was paid $8,760.97 as first payment for wharf and yacht berth construction, from the General Fund. linked by the name only, not checked
    15 Dec 1930outcome not readJournal 1930, p. 2746 ↗
  • Payment to Healy-Tibbitts Construction Company for wharf and yacht berth construction, amount illegible in this scan. linked by the name only, not checked
    22 Dec 1930outcome not readJournal 1930, p. 2777 ↗
  • Healy Tibbitts paid $65,184.97 for Islais Creek reclamation work
    12 Jan 1931outcome not readJournal 1931, p. 82 ↗
  • Healy-Tibbitts Construction Company was paid $25,500 as first payment for Section C of the Alemany storm drain.
    19 Jan 1931outcome not readJournal 1931, p. 129 ↗
  • Board approves eight Islais Creek Reclamation District warrants paying contractors, a railroad and landowners, including $32,657.89 to Healy-Tibbitts.
    9 Feb 1931passedJournal 1931, p. 319 ↗
  • Claim of $16,500 paid to Healy-Tibbitts Construction Company for second payment on Alemany storm drain.
    16 Feb 1931outcome not readJournal 1931, p. 397 ↗
  • Payment of $16,500 to Healy-Tibbitts Construction Company for Alemany storm drain construction authorized under Resolution 33972.
    24 Feb 1931outcome not readJournal 1931, p. 445 ↗
  • Warrants of the Islais Creek Reclamation District totalling about $62,000 to several contractors and firms were approved.
    9 Mar 1931passedJournal 1931, p. 577 ↗
  • Healy-Tibbitts Construction Company is listed for a fifth payment of $35,000 on the Alemany storm drain.
    20 Apr 1931outcome not readJournal 1931, p. 813 ↗
  • Healy-Tibbitts Construction Company is paid $18,000 for a fourth payment on the Alemany storm drain, Section C.
    20 Apr 1931outcome not readJournal 1931, p. 804 ↗
  • Six Islais Creek Reclamation District warrants are approved, including $74,231.73 to Healy-Tibbitts Construction Company.
    11 May 1931passedJournal 1931, p. 977 ↗
  • Healy-Tibbitts Construction Company was paid $3,000.00 for emergency work preventing beach erosion at the Taraval Street underpass.
    11 May 1931outcome not readJournal 1931, p. 951 ↗
  • Payments from the Hetch Hetchy Construction Fund to suppliers including General Electric and Giant Powder are authorized; the list continues.
    13 Jul 1931outcome not readJournal 1931, p. 2399 ↗
  • Healy-Tibbitts Construction Company is listed for a final payment of $1,789.86 on the Alemany Storm Drain, Section C. linked by the name only, not checked
    27 Jul 1931outcome not readJournal 1931, p. 2533 ↗
  • Healy-Tibbitts Construction Company was paid $1,789.86 final sum for the Alemany Storm Drain, Section C. linked by the name only, not checked
    3 Aug 1931outcome not readJournal 1931, p. 2568 ↗
  • Healy-Tibbitts Construction Company, Inc. was paid $674.90 for material and labor at Yacht Harbor.
    10 Aug 1931outcome not readJournal 1931, p. 2595 ↗
  • A resolution authorizing payments to suppliers, contractors and a claimant from city funds was passed for printing.
    5 Oct 1931passed first readingJournal 1931, p. 2902 ↗
  • Ten Hetch Hetchy construction claims totaling $33,112.99 were authorized for payment to vendors and suppliers.
    13 Oct 1931outcome not readJournal 1931, p. 2946 ↗
  • Healy-Tibbitts Construction Company was paid $10,500 for building Section B of the Fifteenth Street sewer.
    9 Nov 1931outcome not readJournal 1931, p. 3064 ↗
  • Fourteen payment claims for San Francisco Hospital supplies, utilities, and an Aquatic Park pier were approved.
    16 Nov 1931passedJournal 1931, p. 3095 ↗
  • Healy-Tibbitts Construction Company's $10,500.00 fifth payment for the Fifteenth Street sewer is listed for payment.
    23 Nov 1931outcome not readJournal 1931, p. 3144 ↗
  • Sixth payment of $28,000 to Healy Tibbitts Construction Company for building the Fifteenth Street sewer. linked by the name only, not checked
    14 Dec 1931outcome not readJournal 1931, p. 3359 ↗
  • Healy Tibbitts Construction Co. was paid $28,000 for the sixth payment on the Fifteenth Street sewer. linked by the name only, not checked
    21 Dec 1931outcome not readJournal 1931, p. 3390 ↗
  • Healy-Tibbitts Construction Company was paid $4,382.71 on account for a recreation pier at Aquatic Park. linked by the name only, not checked
    28 Dec 1931outcome not readJournal 1931, p. 3548 ↗
  • Healy-Tibbitts Construction Company was paid $4,382.71 on account for a recreation pier at Aquatic Park. linked by the name only, not checked
    6 Jan 1932passedJournal 1932, p. 129 ↗
  • Fifteen supervisors vote yes on the final boulevard payment linked by the name only, not checked
    27 Jun 1932passedJournal 1932, p. 1111 ↗
  • Healy-Tibbitts allowed bridge guy wires across Beale and Harrison streets
    21 Aug 1933outcome not readJournal 1933, p. 1564 ↗
  • Healy-Tibbitts allowed spur tracks on Bryant Street for the Bay Bridge
    21 Aug 1933passedJournal 1933, p. 1564 ↗
  • Healy-Tibbitts allowed to shift the Spear Street track for the bridge linked by the name only, not checked
    5 Sep 1933outcome not readJournal 1933, p. 1607 ↗
  • Healy-Tibbitts Construction Company offered to dump Rincon Hill bridge rock on the Marina at 20 cents a ton, referred to committee. linked by the name only, not checked
    20 Mar 1935referredJournal 1935, p. 335 ↗
  • Healy-Tibbitts allowed to block part of Fourth Street for bridge work linked by the name only, not checked
    6 May 1935outcome not readJournal 1935, p. 484 ↗
  • Healy-Tibbitts Construction Company seeks an extension of time to erect false work on Clementina Street.
    17 Feb 1936outcome not readJournal 1936, p. 220 ↗
  • Board confirms the cost assessment for improving Day Street
    15 Jun 1964passedJournal 1964, p. 119 ↗