  • Board authorized payments to contractors, pensioners and claimants for hospital, City Hall, sewer, Hetch Hetchy and street work, passed for printing.
    29 Nov 1915passed first readingJournal 1915, p. 1362 ↗
  • Monson Bros. paid $11,723.62 for City Hall carpentry and mill work
    6 Dec 1915outcome not readJournal 1915, p. 1391 ↗
  • Payments to contractors and suppliers for hospital, streetcar, water and street work were passed for printing.
    10 Jun 1918passed first readingJournal 1918, p. 469 ↗
  • J. B. McSheehy paid $38,591.58 for the San Francisco Hospital wing
    17 Jun 1918passedJournal 1918, p. 492 ↗
  • Board laid over authorization of Hetch Hetchy construction equipment purchases and contracts for one week.
    23 Sep 1918continuedJournal 1918, p. 826 ↗
  • Board ordered Hetch Hetchy construction equipment and supplies purchased through contracts, approved by 14 votes. linked by the name only, not checked
    30 Sep 1918passedJournal 1918, p. 844 ↗
  • Board authorized payment of many claims from city funds, including Hetch Hetchy supplies, Municipal Railway printing, and county jail meats.
    3 Mar 1919passedJournal 1919, p. 133 ↗
  • Authorizations paying Spring Valley Water, United Railroads, hospital suppliers and others were passed for printing. linked by the name only, not checked
    3 Mar 1919passed first readingJournal 1919, p. 137 ↗
  • Resolution authorizes payment of many city claims to vendors for water, police, hospital and Relief Home supplies; final vote continues next page.
    10 Mar 1919outcome not readJournal 1919, p. 152 ↗
  • Board authorized a batch of routine city claim payments, including Hetch Hetchy supplies, Municipal Railways bills and a school lands purchase. linked by the name only, not checked
    31 Mar 1919outcome not readJournal 1919, p. 219 ↗
  • Anderson and Ringrose paid $9,774.75 for building the Monroe School
    31 Mar 1919outcome not readJournal 1919, p. 212 ↗
  • Resolution proposes paying $1,000 to Frank Buss and other claimants from Municipal Railway and Hetch Hetchy funds.
    31 Mar 1919passed first readingJournal 1919, p. 218 ↗
  • The Board authorizes payment of many claims to contractors and claimants, including Hetch Hetchy construction and Municipal Railways damage and supplies.
    7 Apr 1919outcome not readJournal 1919, p. 232 ↗
  • Hercules Powder paid $5,719.13 for powder at Hetch Hetchy
    14 Apr 1919outcome not readJournal 1919, p. 264 ↗
  • Hercules Powder paid $5,719.13 for powder at Hetch Hetchy
    21 Apr 1919outcome not readJournal 1919, p. 277 ↗
  • Mayor vetoed Item 33 of a resolution authorizing city payments to claimants, including Hetch Hetchy construction and street lighting bills.
    5 May 1919vetoedJournal 1919, p. 310 ↗
  • Kortick's resolution authorizing many city payments, including Hetch Hetchy water and Great Highway work, was passed for printing.
    16 Jun 1919passed first readingJournal 1919, p. 486 ↗
  • Board passed resolution authorizing dozens of city claims, including Municipal Railway repairs, library books and Great Highway paving payments.
    18 Aug 1919passedJournal 1919, p. 684 ↗
  • Payment of fourteen claims totalling $22,196.50 for schools, jails, the Auditorium and Hetch Hetchy works was authorized.
    18 Aug 1919passedJournal 1919 ↗
  • A resolution authorizing payment of listed claims for Hetch Hetchy water construction and city supplies was passed for printing.
    3 Sep 1919passed first readingJournal 1919, p. 728 ↗
  • Payment of 31 claims for supplies, Hetch Hetchy water construction and city expenses approved.
    15 Sep 1919passedJournal 1919, p. 756 ↗
  • Anderson & Ringrose paid $15,645 for building the Argonne School
    29 Sep 1919outcome not readJournal 1919, p. 797 ↗
  • Board authorized a $2,500 payment to O. Monson for Farragut School work, plus further school and Municipal Railway payments.
    6 Oct 1919outcome not readJournal 1919, p. 814 ↗
  • Resolution authorizes payments totalling several thousand dollars to vendors and claimants for Municipal Railways, Hetch Hetchy and street repairs.
    3 Nov 1919passedJournal 1919, p. 698 ↗
  • Anderson & Ringrose due $13,353.75 for building the Argonne School
    17 Nov 1919outcome not readJournal 1919, p. 935 ↗
  • Thirty-one city payments to railway suppliers, water contractors and children's charities were passed for printing on McLeran's motion.
    1 Dec 1919passed first readingJournal 1919, p. 1057 ↗
  • Payments of city funds to many suppliers and charities, including Municipal Railway vendors, listed; approval continues on next page.
    8 Dec 1919outcome not readJournal 1919, p. 1067 ↗
  • Proposed payments from water and general funds to about twenty claimants, mostly for Hetch Hetchy supplies, were passed for printing.
    29 Dec 1919passed first readingJournal 1919, p. 1153 ↗
  • The Board authorized payments totalling over $40,000 to suppliers and contractors for Hetch Hetchy water works and city offices.
    8 Jan 1920passedJournal 1920 ↗
  • Eaton & Smith paid $1,252.85 for paving Ocean Avenue
    1 Mar 1920outcome not readJournal 1920, p. 152 ↗
  • Resolution authorizes a payment to the Utah Construction Co. for Contract 61 water supply construction from the 1910 bond fund.
    15 Mar 1920outcome not readJournal 1920, p. 214 ↗
  • O. Monson paid $15,955.35 for work on the Harrison Street School
    16 Aug 1920passed first readingJournal 1920, p. 670 ↗
  • Authorizes payment of routine city claims for Hetch Hetchy, Municipal Railways, schools, hospitals, relief homes and the Fire Department.
    23 Aug 1920outcome not readJournal 1920, p. 688 ↗
  • Payments totalling about $100,000 for school construction, streetcars, Hetch Hetchy supplies and orphanage care were passed.
    23 Aug 1920passedJournal 1920, p. 681 ↗
  • Resolution authorizes payments from city funds, including $859.10 to A. Meister & Sons Co. for a Municipal Railways car.
    25 Oct 1920outcome not readJournal 1920, p. 878 ↗
  • Resolution authorizing payments to contractors and suppliers from city funds, including Hetch Hetchy and Jefferson School work, passed for printing.
    10 Jan 1921passed first readingJournal 1921, p. 25 ↗
  • Resolution authorizes payment of city claims to suppliers and contractors for Hetch Hetchy, Jefferson School, Municipal Railways and police. linked by the name only, not checked
    17 Jan 1921outcome not readJournal 1921, p. 51 ↗
  • Payment of $1,335.45 to Ingersoll Rand Co. of California for Hetch Hetchy parts passed for printing. linked by the name only, not checked
    17 Jan 1921passed first readingJournal 1921, p. 50 ↗
  • Supervisor McLeran moved a resolution authorizing payments from named accounts to claimants; it was passed for printing. linked by the name only, not checked
    24 Jan 1921outcome not readJournal 1921, p. 74 ↗
  • Payments authorized to contractors and suppliers for Hetch Hetchy, Jefferson School, Municipal Railways and city departments. linked by the name only, not checked
    24 Jan 1921outcome not readJournal 1921, p. 71 ↗
  • Board finally passed resolution authorizing payments to suppliers and contractors for Hetch Hetchy, Municipal Railway and library books.
    31 Jan 1921passedJournal 1921, p. 88 ↗
  • Board passed for printing payment authorizations to many claimants, mostly for Hetch Hetchy supplies, schools and San Francisco Hospital.
    31 Jan 1921passed first readingJournal 1921, p. 94 ↗
  • Golf links at Balboa Park proposed for the Park Commissioners
    7 Feb 1921passedJournal 1921, p. 106 ↗
  • $5,493 paid for a White auto for Hetch Hetchy linked by the name only, not checked
    7 Feb 1921outcome not readJournal 1921, p. 102 ↗
  • Authorizes payments to contractors and suppliers for Hetch Hetchy water works, street work, a school, and city hospital groceries.
    7 Mar 1921outcome not readJournal 1921, p. 160 ↗
  • John Reid Jr. paid $1,066.87 for designing the Harrison School
    21 Mar 1921outcome not readJournal 1921, p. 187 ↗
  • Eight claim payments totaling $12,104.78 for library books, Muni parts, school desks and Hetch Hetchy supplies were passed for printing.
    4 Apr 1921passed first readingJournal 1921, p. 228 ↗
  • Shell gets a filling station at Fourteenth and Valencia streets
    11 Apr 1921passedJournal 1921, p. 247 ↗
  • Payments were authorized from library, Municipal Railway, school and Hetch Hetchy funds to named claimants and suppliers.
    11 Apr 1921passedJournal 1921, p. 246 ↗
  • Supervisor McLeran's batch of 33 claim payments for city street, school, water and library work was passed for printing.
    11 Apr 1921passed first readingJournal 1921, p. 251 ↗
  • Resolution authorizes payments to contractors and suppliers for street, school, sewer and Hetch Hetchy work, totalling about $80,000.
    18 Apr 1921passedJournal 1921, p. 269 ↗
  • Henry C. Hagensen allowed a public garage on Valencia Street
    23 May 1921outcome not readJournal 1921, p. 443 ↗
  • Four suppliers are authorized to be paid for Hetch Hetchy equipment, drill steel, blankets and butter claims. linked by the name only, not checked
    6 Jun 1921outcome not readJournal 1921, p. 471 ↗
  • The Board took up a resolution authorizing payments to suppliers and contractors for Hetch Hetchy and school works; final vote is on the next page.
    13 Jun 1921outcome not readJournal 1921, p. 489 ↗
  • The Board passed for printing a resolution authorizing payments to suppliers and contractors, mostly for Hetch Hetchy works, totalling over $50,000.
    20 Jun 1921passed first readingJournal 1921, p. 513 ↗
  • Payments authorized to claimants including plumbing at Commodore Sloat School and supplies for Hetch Hetchy; final vote continues on next page.
    27 Jun 1921outcome not readJournal 1921, p. 540 ↗
  • Routine payments to vendors and claimants for parks, Hetch Hetchy and Municipal Railways were passed for printing by Supervisor McLeran.
    5 Jul 1921passed first readingJournal 1921, p. 582 ↗
  • Spring Valley Water Company paid $2,655.25 for water for the parks
    18 Jul 1921outcome not readJournal 1921, p. 631 ↗
  • Resolution authorizes payment of about $50,000 in claims for Jefferson School, Municipal Railways and Hetch Hetchy, passed for printing.
    1 Aug 1921passed first readingJournal 1921, p. 669 ↗
  • Nineteen Hetch Hetchy water-system payments to suppliers and contractors were passed for printing.
    29 Aug 1921passed first readingJournal 1921, p. 740 ↗
  • State Compensation Insurance Fund paid $16,903.44 for Hetch Hetchy premiums
    6 Sep 1921outcome not readJournal 1921, p. 752 ↗
  • Resolution authorizing about $50,000 in city payments for Hetch Hetchy works, schools, fire equipment and hospitals was passed for printing.
    12 Sep 1921passed first readingJournal 1921, p. 777 ↗
  • Board authorized payments of about $54,000 total to contractors and suppliers for Hetch Hetchy, schools, hospital and fire needs.
    19 Sep 1921passedJournal 1921, p. 805 ↗
  • Authorizes payment of listed claims to suppliers, institutions and others from city funds, including Hetch Hetchy and water-related bills.
    17 Oct 1921outcome not readJournal 1921, p. 896 ↗
  • The Board authorized dozens of city payments to suppliers, orphanages, contractors and claimants from several city funds.
    24 Oct 1921passedJournal 1921, p. 907 ↗
  • $2,000 paid for an electric locomotive for Muni
    7 Nov 1921passedJournal 1921, p. 946 ↗
  • A resolution authorizes many city fund payments to suppliers and contractors for schools, Municipal Railway and water work; the list continues.
    7 Nov 1921outcome not readJournal 1921, p. 951 ↗
  • Resolution authorizing payments from city funds to named claimants for Municipal Railway, Hetch Hetchy and elections was passed for printing. linked by the name only, not checked
    21 Nov 1921passed first readingJournal 1921, p. 984 ↗
  • Marion Steam Shovel Company paid $19,503 for a Hetch Hetchy shovel
  • Routine city payments to suppliers and contractors totalling tens of thousands of dollars were proposed for authorization and passed for printing.
    5 Dec 1921passed first readingJournal 1921, p. 1019 ↗
  • Payments from the Water Construction Fund to suppliers and a land purchase for the Amazon reservoir site were passed for printing.
    5 Dec 1921passed first readingJournal 1921, p. 1018 ↗
  • Resolution authorizing payments to city vendors and claimants, including $10,936.40 to Spring Valley Water Co. and land for Amazon reservoir.
    12 Dec 1921outcome not readJournal 1921, p. 1032 ↗
  • Market Street Railway paid $1,892.56 for Taraval Street line track repairs
    19 Dec 1921outcome not readJournal 1921, p. 1047 ↗
  • Payments from city funds to contractors, suppliers, and orphanages are authorized, including $263,633 to Utah Construction Co. for the Hetch Hetchy dam.
    27 Dec 1921passedJournal 1921, p. 1067 ↗
  • United States Steel Products wins $60,000 for Municipal Railway track material
    23 Jan 1922outcome not readJournal 1922 ↗
  • Board authorized about 38 routine payments from city funds to suppliers, contractors and utilities, including library books, Municipal Railway power and school work.
    30 Jan 1922passedJournal 1922 ↗
  • Payments to dozens of city suppliers, contractors and institutions authorized, including Hetch Hetchy dam work and school construction.
    13 Mar 1922passed first readingJournal 1922 ↗
  • Healy-Tibbitts gets $6,500 to extend the Third Street sewer outlet linked by the name only, not checked
    20 Mar 1922outcome not readJournal 1922 ↗
  • Resolution authorizes dozens of city payments to suppliers and contractors, including the Hetch Hetchy dam and school construction work.
    20 Mar 1922outcome not readJournal 1922 ↗
  • Board authorized construction and architect payments for several San Francisco schools, including Horace Mann, Commodore Sloat, Columbus, McKinley and Adams.
    27 Mar 1922outcome not readJournal 1922 ↗
  • $413,386 set aside to build the Horace Mann School
    17 Apr 1922outcome not readJournal 1922 ↗
  • Resolution authorizes payment of many city bills to suppliers, contractors and claimants for Hetch Hetchy, schools, libraries and transit.
    24 Apr 1922outcome not readJournal 1922 ↗
  • Hetch Hetchy bills paid, including $16,352.20 to Dennis & Wilson
    1 May 1922outcome not readJournal 1922 ↗
  • Authorized payment of 28 claims for school construction, water, police, fire and hospital supplies to contractors and suppliers.
    8 May 1922passedJournal 1922 ↗
  • City pays $272.46 toward paving Balboa Street beside school property
    15 May 1922passedJournal 1922 ↗
  • City bills paid, including $64,665 for steel rail joint plates
    12 Jun 1922passed first readingJournal 1922 ↗
  • Supervisor Rossi moved a resolution authorizing dozens of city claim payments, including Hetch Hetchy, schools, libraries and street repairs; passed for printing.
    26 Jun 1922outcome not readJournal 1922 ↗
  • Authorizes payment of many listed claims to suppliers and contractors, including Hetch Hetchy and school construction work. linked by the name only, not checked
    7 Aug 1922outcome not readJournal 1922 ↗
  • Resolution authorizing about thirty city payments for water, sewer, street and railway work, passed for printing.
    7 Aug 1922passed first readingJournal 1922 ↗
  • Resolution authorizing payment of many city claims to suppliers and contractors, including library, school and park accounts, passed for printing.
    28 Aug 1922passed first readingJournal 1922 ↗
  • Board sent to print a resolution authorizing about $74,000 in payments to contractors and suppliers for schools, Hetch Hetchy and the city.
    18 Sep 1922passed first readingJournal 1922 ↗
  • Board authorises payments to several claimants, including library book binding and school construction work.
    25 Sep 1922outcome not readJournal 1922 ↗
  • $5,000 for a livestock show building at Twelfth and Market Streets
    25 Sep 1922outcome not readJournal 1922 ↗
  • Resolution authorizes payments to many suppliers and firms from Hetch Hetchy water and Municipal Railway funds.
    30 Oct 1922outcome not readJournal 1922 ↗
  • The Board authorises dozens of payments to contractors and suppliers for Hetch Hetchy, Municipal Railway, schools, fire houses and pensions.
    13 Nov 1922outcome not readJournal 1922 ↗
  • Taylor & Jackson paid $984.25 for the Lincoln Park shelter house
    15 Nov 1922outcome not readJournal 1922 ↗
  • Board authorized payments to Hetch Hetchy aqueduct and dam contractors and suppliers, led by Utah Construction Co.'s $237,501.02.
    20 Nov 1922outcome not readJournal 1922 ↗
  • The Board approved payments to 24 claimants for schools, Hetch Hetchy works, library books, and city supplies. linked by the name only, not checked
    5 Feb 1923passedJournal 1923, p. 114 ↗
  • The Board authorizes payment of many claims to suppliers and contractors for school buildings, the Municipal Railway and Hetch Hetchy. linked by the name only, not checked
    5 Feb 1923outcome not readJournal 1923, p. 120 ↗
  • $116,784 set aside to extend the Army Street sewer linked by the name only, not checked
    13 Feb 1923passedJournal 1923, p. 132 ↗
  • Theodora Austand to be paid for the James Lick schoolyard land linked by the name only, not checked
    12 Mar 1923outcome not readJournal 1923, p. 237 ↗
  • Water Construction Fund payments authorized to 31 claimants for supplies, power plant parts and San Mateo County aqueduct lands. linked by the name only, not checked
    12 Mar 1923outcome not readJournal 1923, p. 226 ↗
  • Resolution authorizing payments of listed amounts to named claimants; the outcome continues on the next page. linked by the name only, not checked
    19 Mar 1923outcome not readJournal 1923, p. 247 ↗
  • $675 paid for land for Pioneer Park and Telegraph Hill Boulevard linked by the name only, not checked
    2 Apr 1923outcome not readJournal 1923, p. 301 ↗
  • Money set aside to pay Margaret Dougherty for Roosevelt Way land linked by the name only, not checked
    9 Apr 1923outcome not readJournal 1923, p. 325 ↗
  • Resolution authorizing payments to many city contractors and suppliers from listed funds was passed for printing; outcome not shown here. linked by the name only, not checked
    9 Apr 1923outcome not readJournal 1923, p. 334 ↗
  • Resolution authorizing payments from the Water Construction Fund to claimants Eugene L. Amann and Anna Amann for land. linked by the name only, not checked
    16 Apr 1923outcome not readJournal 1923, p. 354 ↗
  • Resolution moved by McLeran would authorize payments from the Water Construction Fund to suppliers including Old Mission Portland Cement Co., passed for printing. linked by the name only, not checked
    16 Apr 1923passed first readingJournal 1923, p. 358 ↗
  • Board authorized payments from the Water Construction Fund to about 21 suppliers and insurers, including Old Mission Portland Cement and Hetch Hetchy insurance premiums. linked by the name only, not checked
    23 Apr 1923outcome not readJournal 1923, p. 380 ↗
  • Dozens of city claims to suppliers and contractors, including school, Hetch Hetchy and Municipal Railway work, were passed for printing. linked by the name only, not checked
    30 Apr 1923passed first readingJournal 1923, p. 416 ↗
  • Resolution authorizing Water Construction Fund payments to several suppliers, including Associated Oil and Goodyear Rubber, continues onto the next page. linked by the name only, not checked
    30 Apr 1923outcome not readJournal 1923, p. 415 ↗
  • Resolution No. 21095 authorizes payments from city accounts to named claimants; final vote not printed on this page. linked by the name only, not checked
    7 May 1923outcome not readJournal 1923, p. 438 ↗
  • Supervisor McLeran's resolution to authorize about $60,000 in Hetch Hetchy water bond payments was passed for printing. linked by the name only, not checked
    14 May 1923passed first readingJournal 1923, p. 492 ↗
  • Board proposed paying claims to many landowners and suppliers, mostly for Hetch Hetchy water works, pending final passage.
    21 May 1923outcome not readJournal 1923, p. 535 ↗
  • Payments totalling $111,214.13 to 39 suppliers and contractors are authorized for city departments. linked by the name only, not checked
    9 Jul 1923outcome not readJournal 1923, p. 747 ↗
  • Board authorizes payments from city funds to more than thirty suppliers, contractors and claimants, including Utah Construction Co. linked by the name only, not checked
    16 Jul 1923outcome not readJournal 1923, p. 772 ↗
  • Resolution authorizing dozens of city payments to suppliers and contractors for library, water, school, jail, police and fire needs. linked by the name only, not checked
    20 Aug 1923outcome not readJournal 1923, p. 893 ↗
  • Board authorizes many payments to suppliers and contractors, including school construction and county jail bread, from city funds. linked by the name only, not checked
    27 Aug 1923outcome not readJournal 1923, p. 920 ↗
  • Supervisor McGregor moved a resolution authorizing expenditure of certain amounts, passed for printing. linked by the name only, not checked
    27 Aug 1923outcome not readJournal 1923, p. 929 ↗
  • Board to authorize payments to thirty claimants for Hetch Hetchy supplies and a New Mission High School architect; final vote follows. linked by the name only, not checked
    4 Sep 1923outcome not readJournal 1923, p. 966 ↗
  • Resolution authorizing payments to contractors and suppliers for libraries, schools, Hetch Hetchy and streets was passed for printing. linked by the name only, not checked
    17 Sep 1923outcome not readJournal 1923, p. 1025 ↗
  • An ordinance passed with no subject on this page linked by the name only, not checked
    24 Sep 1923passedJournal 1923, p. 1041 ↗
  • A resolution authorizing payments from the Water Construction Fund for Hetch Hetchy supplies and lands was passed for printing. linked by the name only, not checked
    24 Sep 1923passed first readingJournal 1923, p. 1053 ↗
  • Payments from the Water Construction Fund for Hetch Hetchy oil, machine parts and right-of-way land; final vote not printed here. linked by the name only, not checked
    1 Oct 1923outcome not readJournal 1923, p. 1068 ↗
  • Board authorized payments to about 34 suppliers and utilities from Water and Railway funds; list continues next page. linked by the name only, not checked
    1 Oct 1923outcome not readJournal 1923, p. 1078 ↗
  • Resolution authorizing Water Construction Fund payments to about twenty suppliers for Hetch Hetchy work; final passage begun, vote not printed here. linked by the name only, not checked
    8 Oct 1923outcome not readJournal 1923, p. 1094 ↗
  • Payments from city accounts authorized to dozens of suppliers and claimants for schools, water, parks and Municipal Railway. linked by the name only, not checked
    29 Oct 1923passed first readingJournal 1923, p. 1166 ↗
  • Payments authorized to a dozen suppliers and claimants, including for Municipal Railways work and school urinals and roofing. linked by the name only, not checked
    5 Nov 1923outcome not readJournal 1923, p. 1184 ↗
  • Conrad B. Sovig gets $18,890 to paint the city's bridges linked by the name only, not checked
    5 Nov 1923outcome not readJournal 1923, p. 1181 ↗
  • Bethlehem Steel paid $511 for switch parts for the Municipal Railway linked by the name only, not checked
    19 Nov 1923passedJournal 1923, p. 1204 ↗
  • Board proposes paying about thirty claimants for Hetch Hetchy land, school construction and Municipal Railway supplies. linked by the name only, not checked
    3 Dec 1923outcome not readJournal 1923, p. 1258 ↗
  • G. E. Stechert & Co. paid $7,829.98 for library books linked by the name only, not checked
    24 Dec 1923passed first readingJournal 1923, p. 1343 ↗
  • Payments authorized to suppliers, utilities and agencies from city funds, including Municipal Railway and Relief Home claims; final vote continues on next page. linked by the name only, not checked
    24 Dec 1923outcome not readJournal 1923, p. 1337 ↗
  • Payments of 38 claims passed for library, hospital, Municipal Railway and other city bills, including $54,342.59 to Union Construction. linked by the name only, not checked
  • Supervisor McLeran moved to authorize payment of many city claims, including PG&E, orphanages and a Funston Playground contractor; passed for printing. linked by the name only, not checked
    14 Apr 1924passed first readingJournal 1924, p. 389 ↗
  • Resolution authorizes payment of listed claims to city suppliers and utilities, including $47,407.44 to PG&E for street lighting. linked by the name only, not checked
    21 Apr 1924outcome not readJournal 1924, p. 433 ↗
  • The Board authorized payments to Del Monte Meat Co. and General Electric Co. from the Water Construction Fund for Hetch Hetchy supplies. linked by the name only, not checked
    23 Jun 1924outcome not readJournal 1924, p. 743 ↗
  • McLeran moved a resolution authorizing about $270,000 in Hetch Hetchy water payments to contractors and suppliers, passed for printing. linked by the name only, not checked
    14 Oct 1924passed first readingJournal 1924, p. 1219 ↗
  • Ingersoll-Rand Co. of California is paid $647.75 for pipe fittings. linked by the name only, not checked
    3 Nov 1924outcome not readJournal 1924, p. 1310 ↗
  • Park and Hetch Hetchy suppliers paid, from bread to explosives linked by the name only, not checked
    17 May 1926passed first readingJournal 1926, p. 788 ↗
  • Resolution 25700 authorizes payments to suppliers for city parks and Hetch Hetchy construction; the list continues on the next page. linked by the name only, not checked
    24 May 1926outcome not readJournal 1926, p. 854 ↗
  • Payments of 28 city claims, mainly for parks, schools, Hetch Hetchy and Municipal Railways, finally passed. linked by the name only, not checked
    14 Jun 1926passedJournal 1926, p. 1006 ↗
  • A resolution proposes authorizing payments for park supplies, library books, Municipal Railways work and Hetch Hetchy construction. linked by the name only, not checked
    21 Jun 1926outcome not readJournal 1926, p. 1049 ↗
  • Payments authorized to suppliers and contractors for schools, water, fire and sewer work; the vote continues on the next page. linked by the name only, not checked
    6 Jul 1926outcome not readJournal 1926, p. 1164 ↗
  • Municipal Construction Company gets $11,500 to improve Stanyan Street linked by the name only, not checked
    2 Aug 1926outcome not readJournal 1926, p. 1261 ↗
  • Board authorized payments from park, school and Hetch Hetchy bond funds to named contractors and suppliers, with the vote on the next page. linked by the name only, not checked
    9 Aug 1926outcome not readJournal 1926, p. 1291 ↗
  • Resolution authorizes dozens of payments to listed contractors and suppliers for schools, Hetch Hetchy, parks, libraries and transit. linked by the name only, not checked
    30 Aug 1926passedJournal 1926, p. 1368 ↗
  • Money set aside for the Market Street extension near Mono Street linked by the name only, not checked
    30 Aug 1926outcome not readJournal 1926, p. 1390 ↗
  • California Baking Co. paid $1,075.80 for bread furnished to the parks linked by the name only, not checked
    30 Aug 1926outcome not readJournal 1926, p. 1370 ↗
  • Proposed resolution authorizing payments to suppliers and contractors for Hetch Hetchy, school, park and health work.
    13 Sep 1926outcome not readJournal 1926, p. 1453 ↗
  • Resolution 26148 authorizing certain expenditures was up for final passage; its vote is printed on the next page. linked by the name only, not checked
    13 Sep 1926outcome not readJournal 1926, p. 1436 ↗
  • The Board authorizes payments from the Hetch Hetchy bond fund to suppliers of explosives, machinery, tires and food for construction. linked by the name only, not checked
    20 Sep 1926outcome not readJournal 1926, p. 1481 ↗
  • C. B. Eaton paid $9,300 for sewers in the Sunset District linked by the name only, not checked
    18 Oct 1926passed first readingJournal 1926, p. 1638 ↗
  • Board authorizes city payments for Municipal Railway, Hetch Hetchy, fire, sewer and charity claims; final vote continues on next page. linked by the name only, not checked
    25 Oct 1926outcome not readJournal 1926, p. 1666 ↗
  • Resolution authorizing payments to claimants for parks, taxes, fire engine house, and Hetch Hetchy work was started on this page. linked by the name only, not checked
    15 Nov 1926outcome not readJournal 1926, p. 1772 ↗
  • The Board authorized payments for park manure, a tax refund, fire engine house architects, and Hetch Hetchy machinery and pipe. linked by the name only, not checked
    22 Nov 1926outcome not readJournal 1926, p. 1801 ↗
  • Authorizes payment of city bills to suppliers and contractors, including hospital food, Hetch Hetchy construction supplies and Municipal Railway power. linked by the name only, not checked
    6 Dec 1926outcome not readJournal 1926, p. 1886 ↗
  • Resolution authorizes dozens of city payments to suppliers and contractors from library, Hetch Hetchy, park, Municipal Railway, school and fire funds. linked by the name only, not checked
    20 Dec 1926passed first readingJournal 1926, p. 1982 ↗
  • Payments totaling $46,773.21 to suppliers for library books and Hetch Hetchy construction were finally passed. linked by the name only, not checked
    3 Jan 1927passedJournal 1927 ↗
  • E. K. Nelson paid $8,043.38 for the addition to Madison School linked by the name only, not checked
    17 Jan 1927outcome not readJournal 1927, p. 76 ↗
  • Resolution authorizing payments from park, Hetch Hetchy, school and Municipal Railway funds was passed for printing.
    31 Jan 1927passed first readingJournal 1927, p. 178 ↗
  • Payments from the Park Fund for gas, water and hay used in city parks were authorized; the final vote continues on the next page. linked by the name only, not checked
    7 Feb 1927outcome not readJournal 1927 ↗
  • City pays $28,700 for basketball pavilion at Kezar Stadium linked by the name only, not checked
    21 Feb 1927passedJournal 1927, p. 288 ↗
  • The Board proposed payments for the Kezar Stadium basketball pavilion and park supplies to contractors and payees, with the vote continuing on the next page. linked by the name only, not checked
    7 Mar 1927outcome not readJournal 1927, p. 352 ↗
  • A resolution proposed authorizing about two dozen payments from city funds to suppliers, contractors and claimants, passed for printing.
    28 Mar 1927passed first readingJournal 1927, p. 490 ↗
  • The Board finally passed a resolution authorizing payments from Hetch Hetchy, Municipal Railway and school funds to contractors and suppliers. linked by the name only, not checked
    11 Apr 1927passedJournal 1927, p. 590 ↗
  • Board authorized payment of 27 city claims for park, sewer, Hetch Hetchy, school and Municipal Railway work.
    11 Apr 1927outcome not readJournal 1927, p. 601 ↗
  • Board authorizes payments to contractors and suppliers for parks, schools, sewers and Hetch Hetchy works, awaiting final vote. linked by the name only, not checked
    18 Apr 1927outcome not readJournal 1927, p. 644 ↗
  • Clinton Construction paid $7,424.70 for the Relief Home buildings linked by the name only, not checked
    2 May 1927outcome not readJournal 1927, p. 720 ↗
  • Ingersoll-Rand Co. of California is paid $549.97 for machinery parts for Hetch Hetchy construction. linked by the name only, not checked
    9 May 1927outcome not readJournal 1927, p. 779 ↗
  • Ingersoll-Rand Co. of California is paid $549.97 for machinery parts used in Hetch Hetchy construction. linked by the name only, not checked
    16 May 1927outcome not readJournal 1927, p. 842 ↗
  • Board authorized payments to contractors and suppliers for parks, Municipal Railways, Hetch Hetchy works and school projects. linked by the name only, not checked
    13 Jun 1927outcome not readJournal 1927, p. 1166 ↗
  • Proposed resolution authorizes 28 payments to suppliers, contractors and one settlement, for parks, Hetch Hetchy and schools.
    13 Jun 1927passed first readingJournal 1927, p. 1187 ↗
  • Board authorizes city payments to many claimants, including Hetch Hetchy construction suppliers and school construction contractors. linked by the name only, not checked
    20 Jun 1927outcome not readJournal 1927, p. 1217 ↗
  • Payments authorized to many firms and departments, including library books, school construction, Hetch Hetchy and County Jail supplies; outcome continues on next page. linked by the name only, not checked
    25 Jul 1927outcome not readJournal 1927, p. 1386 ↗
  • Payment of $529.60 to Ingersoll-Rand Co. of California for furnace linings. linked by the name only, not checked
    1 Aug 1927outcome not readJournal 1927, p. 1424 ↗
  • City pays for library books, painting and janitor service linked by the name only, not checked
  • The Board authorizes payment of dozens of claims to suppliers and contractors for parks, schools, Hetch Hetchy, Municipal Railway and hospital supplies. linked by the name only, not checked
    29 Aug 1927outcome not readJournal 1927, p. 1609 ↗
  • Kezar Playfield contractor and Hetch Hetchy suppliers paid their claims linked by the name only, not checked
    6 Sep 1927outcome not readJournal 1927, p. 1660 ↗
  • Youdall and Clifford paid $71,068.50 for the Buena Vista Park tunnel linked by the name only, not checked
    19 Sep 1927outcome not readJournal 1927, p. 1732 ↗
  • Resolution authorises payments from park and Hetch Hetchy funds to suppliers and contractors, passed for printing on McSheehy's motion. linked by the name only, not checked
    26 Sep 1927outcome not readJournal 1927, p. 1823 ↗
  • Resolution proposed authorizing tens of thousands in payments to contractors and suppliers for schools, Hetch Hetchy, fire and parks. linked by the name only, not checked
    10 Oct 1927outcome not readJournal 1927, p. 1939 ↗
  • Youdall Construction paid $42,313.50 for the tunnel under Buena Vista Park linked by the name only, not checked
    24 Oct 1927outcome not readJournal 1927, p. 2013 ↗
  • Resolution authorizing payments to contractors and suppliers for street work, museum and other city projects passed for printing.
    31 Oct 1927passed first readingJournal 1927, p. 2081 ↗
  • Resolution 27991 authorizing matters was taken up for final passage; its text continues on the next page. linked by the name only, not checked
    31 Oct 1927outcome not readJournal 1927, p. 2062 ↗
  • $5,656.88 paid to Hercules Powder for Hetch Hetchy explosives linked by the name only, not checked
    12 Dec 1927passed first readingJournal 1927, p. 2287 ↗
  • $4,960 paid for chairs for the Galileo High School linked by the name only, not checked
    3 Jan 1928outcome not readJournal 1928, p. 25 ↗
  • City pays $4,960 for Galileo High School chairs linked by the name only, not checked
    16 Jan 1928passedJournal 1928, p. 64 ↗
  • Resolution 28347 authorizes payments to claimants for hospital, Laguna Honda, school, water and orphanage costs, passed on final vote. linked by the name only, not checked
    23 Jan 1928passedJournal 1928, p. 102 ↗
  • $3,125 paid to the San Francisco Symphony for The Messiah linked by the name only, not checked
    30 Jan 1928outcome not readJournal 1928, p. 175 ↗
  • Routine payments to claimants from park, playground, Hetch Hetchy and other city funds were proposed in a resolution passed for printing. linked by the name only, not checked
    30 Jan 1928passed first readingJournal 1928, p. 175 ↗
  • City pays $3,125 to Symphony for The Messiah linked by the name only, not checked
    6 Feb 1928passedJournal 1928, p. 193 ↗
  • Resolution authorizing payments from city funds to several firms and the Symphony was passed for printing. linked by the name only, not checked
    20 Feb 1928passed first readingJournal 1928, p. 290 ↗
  • The Board resolved to authorize a long list of payments for Hetch Hetchy works, school construction and a pop concert. linked by the name only, not checked
    1 Mar 1928outcome not readJournal 1928, p. 331 ↗
  • Five claims totalling about $3,488 for Hetch Hetchy water construction supplies were authorized for payment to named vendors. linked by the name only, not checked
    1 Mar 1928outcome not readJournal 1928, p. 329 ↗
  • Board finally passed authorization of about 28 payments to suppliers and utilities for parks, playgrounds and Hetch Hetchy works. linked by the name only, not checked
    12 Mar 1928passedJournal 1928, p. 404 ↗
  • Finance Committee's resolution authorizing dozens of city payments, including library books and Hetch Hetchy supplies, passed for printing. linked by the name only, not checked
    9 Apr 1928passed first readingJournal 1928, p. 622 ↗
  • Board finally passed payments to about sixteen claimants from library, aquarium and Hetch Hetchy water construction funds. linked by the name only, not checked
    16 Apr 1928passedJournal 1928, p. 645 ↗
  • Ingersoll-Rand Co. of California gets $578.35 for machine parts paid from the Hetch Hetchy water fund.
    18 Jun 1928passedJournal 1928, p. 1223 ↗
  • Ingersoll-Rand Co. of California is paid $1,216.10 for machinery parts for Hetch Hetchy construction.
  • Payment of $658.05 to Ingersoll-Rand Co. of California for machinery parts charged to Hetch Hetchy water bonds.
    15 Oct 1928outcome not readJournal 1928, p. 2248 ↗
  • Bills paid for library books, playground chairs and street gravel
    22 Oct 1928outcome not readJournal 1928, p. 2276 ↗
  • Resolution proposes payments to seventeen claimants, including the California Academy of Sciences and Standard Oil Co.
    22 Oct 1928outcome not readJournal 1928, p. 2272 ↗
  • Finance Committee's resolution authorizing payments to named claimants for parks, Steinhart Aquarium and Hetch Hetchy works was passed for printing. linked by the name only, not checked
    5 Nov 1928passed first readingJournal 1928, p. 2384 ↗
  • Authorizes payment of twenty-one city claims to vendors, including Kleiber Motor Co. trucks for the Fire Department.
    13 Nov 1928outcome not readJournal 1928, p. 2407 ↗
  • Finance Committee recommends a resolution authorizing payments to 21 claimants for parks, Kezar Stadium and Hetch Hetchy water works.
    19 Nov 1928outcome not readJournal 1928, p. 2453 ↗
  • $960.82 paid for a field cover for Kezar Stadium
    26 Nov 1928passedJournal 1928, p. 2489 ↗
  • Board authorizes payments to lumber, cement and supply companies and an easement for the Hetch Hetchy water project.
    17 Dec 1928outcome not readJournal 1928, p. 2647 ↗
  • Payment claims for Hetch Hetchy water supplies, contractors and an easement owner were taken up for final passage.
    24 Dec 1928outcome not readJournal 1928 ↗
  • Thirteen Water Construction Fund payments for lumber, gravel and aqueduct work are authorized, with the list continuing on the next page.
    24 Dec 1928outcome not readJournal 1928, p. 2708 ↗
  • Payments to five suppliers for gravel, lumber and equipment from the Water Construction Fund are authorized.
    3 Jan 1929outcome not readJournal 1929, p. 13 ↗
  • Proposed resolution would authorize payments to suppliers, contractors and agencies for parks, playgrounds, a school and tunnel work.
    7 Jan 1929outcome not readJournal 1929 ↗
  • Authorizes payments to library book and supply firms and Hetch Hetchy water construction suppliers; the item continues onto the next page. linked by the name only, not checked
    14 Jan 1929outcome not readJournal 1929, p. 56 ↗
  • Resolution authorizing payment of sixteen supplier claims for library books, lumber, sand, gravel and cement.
    21 Jan 1929outcome not readJournal 1929, p. 103 ↗
  • Proposed resolution authorizing dozens of payments to suppliers and contractors for libraries, playgrounds, Hetch Hetchy and schools, passed for printing.
    11 Feb 1929passed first readingJournal 1929, p. 273 ↗
  • Payments authorized to suppliers and contractors for libraries, playgrounds, Hetch Hetchy works and schools; final vote not printed here.
    25 Feb 1929outcome not readJournal 1929, p. 337 ↗
  • Resolution authorizes payments from city funds to many contractors and suppliers, including aqueduct tunnel and Alemany Boulevard work, passed for printing.
    18 Mar 1929outcome not readJournal 1929, p. 519 ↗
  • Board authorizes 21 claim payments to suppliers and contractors for water supply, parks and street work.
    25 Mar 1929passedJournal 1929, p. 551 ↗
  • $1,365.68 repaid to the county road fund for covering sidesewers
    1 Apr 1929passed first readingJournal 1929, p. 619 ↗
  • $1,365.68 approved to cover February sewer trenches in streets
    8 Apr 1929passedJournal 1929 ↗
  • Proposed payments to suppliers and contractors for Hetch Hetchy, Great Highway, Bay Shore boulevard and Muni.
    22 Apr 1929outcome not readJournal 1929, p. 743 ↗
  • T. E. Connolly paid $8,000 for a Hetch Hetchy electric locomotive
    29 Apr 1929outcome not readJournal 1929 ↗
  • Proposed resolution authorizes payment of dozens of supplier claims, including cement, gasoline, lumber, and San Francisco Hospital supplies.
    6 May 1929outcome not readJournal 1929, p. 896 ↗
  • Ingersoll Rand Company of California claim for $1,175.45 for machinery parts is listed for payment.
    13 May 1929outcome not readJournal 1929, p. 928 ↗
  • Ingersoll Rand Company of California claim for $1,761.03 for machinery parts is listed for payment.
    13 May 1929outcome not readJournal 1929, p. 928 ↗
  • Finance Committee recommended a resolution authorizing listed amounts; its final vote appears on the next page.
    13 May 1929outcome not readJournal 1929, p. 919 ↗
  • Claim of $560.92 to Ingersoll-Rand Co. of California for pipe fittings for Hetch Hetchy construction listed for payment.
    3 Jun 1929outcome not readJournal 1929, p. 1123 ↗
  • Claims paid for Hetch Hetchy cement, lumber and machinery
    3 Jun 1929passed first readingJournal 1929, p. 1119 ↗
  • Payments for Hetch Hetchy cement, lumber and machinery approved
    10 Jun 1929passedJournal 1929, p. 1150 ↗
  • Payment of $560.92 to Ingersoll-Rand Co. of California for pipe fittings on Hetch Hetchy construction was approved.
    10 Jun 1929passedJournal 1929, p. 1154 ↗
  • Finance Committee recommended authorizing payments to claimants, including California Academy of Sciences for aquarium maintenance; outcome not printed here.
    17 Jun 1929outcome not readJournal 1929, p. 1225 ↗
  • Resolution authorizing city payments to suppliers, contractors and pension funds, including $15,000 to Healy-Tibbitts for Ocean Beach Esplanade work.
    24 Jun 1929outcome not readJournal 1929, p. 1274 ↗
  • Finance Committee recommends authorizing payments to named suppliers and claimants from Municipal Railway, County Road and Hetch Hetchy funds.
    1 Jul 1929outcome not readJournal 1929, p. 1318 ↗
  • Payments from Hetch Hetchy fund, including $3,077.66 for cement, approved
  • Resolution passed for printing authorizing payments to nineteen claimants, including library book vendors and Hetch Hetchy suppliers. linked by the name only, not checked
    8 Jul 1929passed first readingJournal 1929, p. 1359 ↗
  • Anderson & Ringrose paid $17,070 for the Marina Elementary School
    15 Jul 1929outcome not readJournal 1929, p. 1393 ↗
  • The Board authorized payments to about two dozen claimants, including library book suppliers, Hetch Hetchy funds and a $15,000 summer concert publicity grant.
    15 Jul 1929passedJournal 1929, p. 1385 ↗
  • D. McDonald paid $3,911.21 for filling at St. Mary's Park playground
    22 Jul 1929outcome not readJournal 1929, p. 1454 ↗
  • Payments to 22 suppliers and claimants from the Hetch Hetchy Construction Fund were passed for printing.
    29 Jul 1929passed first readingJournal 1929, p. 1505 ↗
  • Board moved to authorize payment of claims to four payees from the Hetch Hetchy Construction Fund, Bond Issue 1928.
    5 Aug 1929outcome not readJournal 1929 ↗
  • Payment of $1,840.45 to Ingersoll-Rand Co. of California for machinery parts, claim dated August 7, 1929.
    19 Aug 1929outcome not readJournal 1929, p. 1619 ↗
  • Resolution authorizing $26,000-plus in Hetch Hetchy Construction Fund payments to lumber, cement and equipment suppliers was passed for printing.
    26 Aug 1929passed first readingJournal 1929, p. 1674 ↗
  • Board finally passed Resolution 31351 authorizing payments to twenty claimants for Hetch Hetchy supplies, equipment and services.
  • Payments to suppliers and the Board of Public Works for street and Municipal Railway supplies are authorized; final vote continues on next page.
    16 Sep 1929outcome not readJournal 1929 ↗
  • Twenty claims totalling $27,644.12 for supplies, works and decorations were passed for printing, pending authorization.
    14 Oct 1929passed first readingJournal 1929, p. 1991 ↗
  • Resolution 31538 authorizes payment of dozens of supplier and contractor claims, including $44,250 to MacDonald & Kahn for Bernal Cut.
    21 Oct 1929outcome not readJournal 1929, p. 2015 ↗
  • Youdall and Clifford paid $19,788.43 for the Sunset Tunnel
    18 Nov 1929outcome not readJournal 1929, p. 2128 ↗
  • Claims totalling $31,431.81 for park and Hetch Hetchy supplies, trucks and equipment were passed for printing.
    16 Dec 1929passed first readingJournal 1929, p. 2350 ↗
  • Payments to suppliers and claimants for parks, Hetch Hetchy and street work are proposed in a resolution, totalling many thousands of dollars.
    6 Jan 1930outcome not readJournal 1930, p. 25 ↗
  • Finance Committee's resolution authorizes payment of claims to contractors and suppliers, including school construction work at Roosevelt, Park-Presidio and Geary Street schools.
    13 Jan 1930outcome not readJournal 1930, p. 125 ↗
  • Resolution authorizes payments to utilities, suppliers and the California Academy of Sciences for park upkeep, including Steinhart Aquarium maintenance.
    13 Jan 1930outcome not readJournal 1930, p. 108 ↗
  • Board proposed paying city contractors and suppliers for school, street, library and Hetch Hetchy work, passed for printing.
    20 Jan 1930passed first readingJournal 1930, p. 158 ↗
  • Finance Committee resolution authorizes 27 claim payments, mostly for Hetch Hetchy construction; the final vote is not shown on this page.
    20 Jan 1930outcome not readJournal 1930, p. 149 ↗
  • Hetch Hetchy suppliers paid, from Ingersoll-Rand to Del Monte Meat
    27 Jan 1930passed first readingJournal 1930, p. 216 ↗
  • Resolution authorizing $30,071.59 in Hetch Hetchy Construction Fund payments to eighteen suppliers and claimants.
    3 Feb 1930outcome not readJournal 1930, p. 239 ↗
  • Hetch Hetchy bond-fund payments to suppliers and claimants were passed for printing; the list continues past this page.
    3 Feb 1930passed first readingJournal 1930, p. 247 ↗
  • Resolution authorizes payments to suppliers and contractors for Hetch Hetchy water supply work, including the San Miguel Reservoir land.
    10 Feb 1930outcome not readJournal 1930 ↗
  • The Board authorized fourteen supplier payments totaling about $27,000 from the Hetch Hetchy Water Construction Fund bond issue.
    24 Feb 1930passedJournal 1930, p. 568 ↗
  • Board authorized payments to contractors and suppliers for school construction, a concert, and the Bernal Cut improvement.
    24 Feb 1930passedJournal 1930, p. 569 ↗
  • Twenty city payments to suppliers and claimants, including $43,899 to PG&E for Municipal Railways electricity, were passed for printing.
    24 Feb 1930passed first readingJournal 1930, p. 574 ↗
  • $3,000 for 4,500 lamps on the Panhandle Christmas trees
    3 Mar 1930passedJournal 1930, p. 730 ↗
  • Authorizes 28 payments from park and Hetch Hetchy funds to suppliers, employees and others; passed for printing.
    3 Mar 1930outcome not readJournal 1930, p. 748 ↗
  • Resolution 32116 authorizes payments to suppliers and contractors from city funds, including Hetch Hetchy, transit, school and playground accounts.
    3 Mar 1930outcome not readJournal 1930, p. 733 ↗
  • Ingersoll Rand Company of California is paid $2,578.30 for a pump, drifters and parts.
    10 Mar 1930outcome not readJournal 1930, p. 787 ↗
  • The Finance Committee recommended a resolution authorizing amounts whose figures are not printed on this page.
    10 Mar 1930outcome not readJournal 1930, p. 785 ↗
  • Payment of $807.87 listed to Ingersoll-Rand Company of California for machinery parts.
    10 Mar 1930outcome not readJournal 1930, p. 802 ↗
  • Resolution proposed to authorize payments to book sellers, suppliers and contractors from library, museum and Hetch Hetchy funds.
    17 Mar 1930passed first readingJournal 1930, p. 833 ↗
  • The Board authorized ten payments from city funds to suppliers and contractors, including library books and Hetch Hetchy castings.
    24 Mar 1930outcome not readJournal 1930 ↗
  • Resolution proposed authorizing about $60,000 in Hetch Hetchy construction claims to lumber, cement and equipment suppliers.
    31 Mar 1930passed first readingJournal 1930, p. 912 ↗
  • Finance Committee resolution authorizes payments from the Hetch Hetchy bond fund to many suppliers and contractors; final vote continues on next page.
    7 Apr 1930outcome not readJournal 1930, p. 952 ↗
  • Expense claims for school construction and supplies, including Park-Presidio and Roosevelt Junior High payments, are authorized for payment; the vote continues.
    7 Apr 1930outcome not readJournal 1930, p. 967 ↗
  • Resolution authorizing payments to four claimants, including $4,037.96 to the California Academy of Sciences, was passed for printing.
    7 Apr 1930passed first readingJournal 1930, p. 966 ↗
  • Resolution authorizes payments to several claimants, including $4,037.96 to the California Academy of Sciences for Steinhart Aquarium.
    14 Apr 1930outcome not readJournal 1930, p. 991 ↗
  • Ingersoll-Rand Co. of Calif. is paid $2,932.40 for machine parts, per a claim dated April 4, 1930. linked by the name only, not checked
    14 Apr 1930outcome not readJournal 1930, p. 1003 ↗
  • Sather Gate Book Shop paid $2,707.77 for library books linked by the name only, not checked
    21 Apr 1930outcome not readJournal 1930, p. 1031 ↗
  • Finance Committee's resolution authorizes payments to many suppliers and claimants for parks, Hetch Hetchy and other city work; the vote is not printed here.
    28 Apr 1930outcome not readJournal 1930, p. 1078 ↗
  • Resolution 32481 authorizes $28,974.01 from the Hetch Hetchy construction fund to nineteen suppliers and contractors.
    12 May 1930outcome not readJournal 1930, p. 1155 ↗
  • Park and Hetch Hetchy suppliers paid for lumber, powder and cement
    12 May 1930outcome not readJournal 1930 ↗
  • Resolution proposed to authorize payment of many supply, school and water department claims, passed for printing.
    12 May 1930passed first readingJournal 1930, p. 1179 ↗
  • Finance Committee's resolution authorizing payments to eight suppliers from the Hetch Hetchy Construction Fund was passed for printing.
    12 May 1930passed first readingJournal 1930, p. 1178 ↗
  • Resolution authorizing payment of 23 claims to suppliers, libraries, playgrounds, parks and Hetch Hetchy was passed for printing.
    19 May 1930passed first readingJournal 1930, p. 1263 ↗
  • Payments to named claimants from listed city funds authorized, on Finance Committee recommendation. linked by the name only, not checked
    19 May 1930outcome not readJournal 1930, p. 1246 ↗
  • Payment of $848.08 to Ingersoll-Rand Co. of California for machinery parts, from the Hetch Hetchy fund, is listed.
    26 May 1930outcome not readJournal 1930, p. 1328 ↗
  • Finally passed claims authorizing payments to suppliers for library books, playground work and Hetch Hetchy construction. linked by the name only, not checked
    26 May 1930outcome not readJournal 1930, p. 1320 ↗
  • Finance Committee resolution authorizes payment of claims, including a $4,993.95 tax refund to Pacific Products Co. and playground lumber from Loop Lumber Co.
    9 Jun 1930outcome not readJournal 1930, p. 1447 ↗
  • Payments to dozens of suppliers and contractors from city funds, including Hetch Hetchy construction, were proposed for authorization.
    9 Jun 1930outcome not readJournal 1930, p. 1479 ↗
  • Ingersoll-Rand Co. is paid $2,150.50 for an oil furnace and machinery parts.
    9 Jun 1930outcome not readJournal 1930, p. 1481 ↗
  • Ingersoll-Rand Co. of California was paid $628.50 for steel, hose and valves.
    16 Jun 1930outcome not readJournal 1930, p. 1532 ↗
  • Hetch Hetchy suppliers paid, including $5,218.30 to Hercules Powder
    16 Jun 1930outcome not readJournal 1930, p. 1516 ↗
  • Ingersoll-Rand Co. of California was paid $1,370.98 for jackhammers and machinery parts. linked by the name only, not checked
    16 Jun 1930outcome not readJournal 1930, p. 1532 ↗
  • Payment of $503.07 to Ingersoll-Rand Co. of California for machinery parts, charged to the Hetch Hetchy fund. linked by the name only, not checked
    30 Jun 1930outcome not readJournal 1930, p. 1594 ↗
  • Payment of $1,805.05 to Ingersoll-Rand Co. for machinery parts is listed in the claims schedule.
    30 Jun 1930outcome not readJournal 1930, p. 1600 ↗
  • Payment of $1,066.45 to Ingersoll-Rand Co. of California for machinery parts, charged to the Hetch Hetchy fund. linked by the name only, not checked
    30 Jun 1930outcome not readJournal 1930, p. 1594 ↗
  • Resolution would authorize payment of claims from the Hetch Hetchy Construction Fund to suppliers and contractors; vote continues on next page.
    15 Jul 1930outcome not readJournal 1930, p. 1751 ↗
  • Catherine Sullivan paid $7,250 for the death of Michael Sullivan
    15 Jul 1930outcome not readJournal 1930, p. 1749 ↗
  • Resolution authorizing twelve payments to named suppliers and contractors from city bond and appropriation funds was passed for printing.
    4 Aug 1930passed first readingJournal 1930, p. 1912 ↗
  • Finance Committee resolution authorizes $3,866.04 to the California Academy of Sciences for July aquarium maintenance. linked by the name only, not checked
    11 Aug 1930outcome not readJournal 1930 ↗
  • Resolution authorizing payment of listed library, Hetch Hetchy and other claims, passed for printing; the vote is not on this page.
    11 Aug 1930outcome not readJournal 1930, p. 1954 ↗
  • Resolution authorizes payments to about twenty suppliers for library books, supplies, lumber and cement, awaiting final vote on the next page. linked by the name only, not checked
    18 Aug 1930outcome not readJournal 1930 ↗
  • Board finally passed Resolution 33000 authorizing twenty claim payments to suppliers and contractors, mostly from Hetch Hetchy and Water Revenue funds.
    25 Aug 1930passedJournal 1930, p. 2010 ↗
  • Resolution 33121 authorizes payments to suppliers and contractors for school, street, sewer, water and Hetch Hetchy work.
    22 Sep 1930outcome not readJournal 1930, p. 2204 ↗
  • Board authorizes payments to 26 claimants for library books, museum work and Hetch Hetchy construction supplies and services.
    22 Sep 1930outcome not readJournal 1930, p. 2198 ↗
  • Resolution authorizes payment of about two dozen city claims for gasoline, cement, sewers, electricity and other services.
    20 Oct 1930outcome not readJournal 1930, p. 2376 ↗
  • Payment of $691.83 authorised to Ingersoll-Rand Co. of California for machinery parts for Hetch Hetchy. linked by the name only, not checked
    27 Oct 1930outcome not readJournal 1930, p. 2417 ↗
  • John Bjorkman paid for building the restaurant at Harding Park
    27 Oct 1930outcome not readJournal 1930, p. 2412 ↗
  • Payment of $3,856.58 to Ingersoll-Rand Co. of California for Hetch Hetchy compressors and drills was approved.
    3 Nov 1930passedJournal 1930 ↗
  • Payment of $860.30 to Ingersoll-Rand Company of California for machinery parts is listed in the claims schedule. linked by the name only, not checked
    3 Nov 1930outcome not readJournal 1930, p. 2477 ↗
  • Payment of $2,260.20 to Ingersoll-Rand Co. of California for machinery parts was approved.
    3 Nov 1930passedJournal 1930 ↗
  • Claim of $860.30 listed for payment to Ingersoll-Rand Company of California for machinery parts. linked by the name only, not checked
    12 Nov 1930outcome not readJournal 1930, p. 2541 ↗
  • Ingersoll-Rand Company of California was paid $553.10 for machine parts.
    17 Nov 1930outcome not readJournal 1930, p. 2554 ↗
  • Parks bills paid for manure, ice cream, bread and tobacco
    24 Nov 1930outcome not readJournal 1930, p. 2615 ↗
  • Pays Ingersoll-Rand Company of California $553.10 for machine parts.
    24 Nov 1930outcome not readJournal 1930, p. 2606 ↗
  • Ingersoll-Rand Company of California is listed for $835.36 payment for machinery parts under a November 19, 1930 claim.
    1 Dec 1930outcome not readJournal 1930, p. 2656 ↗
  • Ingersoll-Rand Company is listed for $731.15 payment for trench diggers and tampers.
    1 Dec 1930outcome not readJournal 1930, p. 2656 ↗
  • Ingersoll-Rand Company was paid $731.15 for trench diggers and tampers. linked by the name only, not checked
  • Resolution 3559 authorizes $548.83 to The Duncanson-Harrelson Company for an outlet and inlet at Fleishhacker Pool. linked by the name only, not checked
    8 Dec 1930outcome not readJournal 1930, p. 2680 ↗
  • Resolution authorizing payments to suppliers for library books and Hetch Hetchy supplies was passed for printing.
    8 Dec 1930passed first readingJournal 1930, p. 2699 ↗
  • Finance Committee resolution authorizes claim payments for library books and Hetch Hetchy supplies, final vote on next page.
    15 Dec 1930outcome not readJournal 1930, p. 2729 ↗
  • Finance Committee resolution authorizes payments to eight suppliers from the Hetch Hetchy Construction Fund; final vote not shown on this page.
    3 Jan 1931outcome not readJournal 1931 ↗
  • Ingersoll-Rand Company of California is listed for $829.55 for machinery parts. linked by the name only, not checked
    19 Jan 1931outcome not readJournal 1931, p. 139 ↗
  • Ingersoll-Rand Company is listed for $605 for hose fittings.
    19 Jan 1931outcome not readJournal 1931, p. 139 ↗
  • Jacks & Irvine paid $16,051.75 for the Portola field house
    26 Jan 1931outcome not readJournal 1931, p. 204 ↗
  • Claim of $998.20 to Ingersoll-Rand Company of California for machine parts, listed for payment.
    2 Feb 1931outcome not readJournal 1931, p. 265 ↗
  • Resolution authorizing payments to suppliers from city funds, including utilities, lumber, steel and explosives, was passed for printing. linked by the name only, not checked
    2 Feb 1931passed first readingJournal 1931, p. 275 ↗
  • Payment claims to suppliers and contractors for Hetch Hetchy and Auditorium work were finally passed by resolution.
    9 Feb 1931passedJournal 1931, p. 306 ↗
  • Finance Committee recommends paying about $80,000 in city claims to vendors, contractors and parks and transit suppliers. linked by the name only, not checked
    9 Feb 1931outcome not readJournal 1931, p. 313 ↗
  • Resolutions authorizing payments to suppliers, contractors and tax-judgment creditors were passed for printing. linked by the name only, not checked
    16 Feb 1931passed first readingJournal 1931, p. 396 ↗
  • Resolution authorizes payments including $3,710.66 to California Academy of Sciences for Steinhart Aquarium maintenance.
    24 Feb 1931outcome not readJournal 1931, p. 440 ↗
  • Resolution authorizes payments from city funds to contractors and suppliers for parks, libraries, boulevards and other work, passed for printing.
    9 Mar 1931outcome not readJournal 1931, p. 573 ↗
  • Ingersoll Rand Company of California was paid $1,285.37 for machinery parts.
    9 Mar 1931outcome not readJournal 1931, p. 574 ↗
  • Board passed resolution authorizing payments to 20 suppliers and contractors, including $368,769.01 to Western Pipe & Steel for the Newark-San Lorenzo pipe line.
    9 Mar 1931passedJournal 1931, p. 565 ↗
  • Board authorized payments to fourteen companies for gas, cement, rubber goods and machinery parts, including Municipal Railway brake shoes.
    6 Apr 1931outcome not readJournal 1931, p. 735 ↗
  • Claim for $563.79 to Ingersoll-Rand Company of California for machinery parts, listed for payment.
    13 Apr 1931outcome not readJournal 1931, p. 782 ↗
  • Park Fund payments to Duncanson-Harrelson, Pacific Gas and Electric and others were authorized; final vote appears on the next page.
    13 Apr 1931outcome not readJournal 1931, p. 770 ↗
  • Ingersoll-Rand Company of California is paid $563.79 for machinery parts.
    20 Apr 1931outcome not readJournal 1931, p. 804 ↗
  • Finance Committee-recommended resolution authorizing about two dozen payments to suppliers and claimants from Hetch Hetchy and Municipal Railway funds.
    20 Apr 1931outcome not readJournal 1931, p. 812 ↗
  • Proposed payment of 21 Hetch Hetchy supplier claims totaling $33,282.96 for lumber, cement and equipment; vote on next page.
    27 Apr 1931outcome not readJournal 1931, p. 845 ↗
  • Finance Committee recommended paying Hetch Hetchy construction claims to suppliers and truckers; list continues on the next page.
    4 May 1931outcome not readJournal 1931, p. 891 ↗
  • Ingersoll-Rand Co. of California was paid $794.69 for machinery parts under a city claim.
    11 May 1931outcome not readJournal 1931, p. 974 ↗
  • Ingersoll-Rand Co. of California was paid $794.69 for machinery parts charged to the Hetch Hetchy Construction Fund. linked by the name only, not checked
    18 May 1931outcome not readJournal 1931, p. 998 ↗
  • Board authorizes payments to many city suppliers and contractors from bond and fund accounts, including architects for hospital buildings.
    25 May 1931outcome not readJournal 1931, p. 2034 ↗
  • Recommended payment of $607 from the Auditorium Fund to Majestic Press for Music Week signs; outcome not shown on this page. linked by the name only, not checked
    8 Jun 1931outcome not readJournal 1931, p. 2154 ↗
  • The Finance Committee proposed authorizing twelve claims from the Hetch Hetchy Construction Fund to suppliers, passed for printing.
    29 Jun 1931passed first readingJournal 1931, p. 2306 ↗
  • Payments to dozens of claimants for supplies, cement and hospital construction work were passed for printing.
    6 Jul 1931outcome not readJournal 1931, p. 2365 ↗
  • Payments from the Hetch Hetchy Construction Fund to suppliers including General Electric and Giant Powder are authorized; the list continues.
    13 Jul 1931outcome not readJournal 1931, p. 2399 ↗
  • Finance Committee resolution authorizes payments to fifteen suppliers and contractors for Hetch Hetchy construction work.
    27 Jul 1931outcome not readJournal 1931, p. 2517 ↗
  • Resolution authorizes payments from the 1928 Hetch Hetchy Construction Fund to 23 named suppliers and claimants, passed for printing.
    27 Jul 1931passed first readingJournal 1931, p. 2532 ↗
  • Board authorizes payment of claims from Hetch Hetchy and other city funds to 26 named suppliers and service providers.
    3 Aug 1931outcome not readJournal 1931, p. 2567 ↗
  • A resolution authorizing twenty payments from library, park and Hetch Hetchy funds was passed for printing.
    10 Aug 1931passed first readingJournal 1931, p. 2604 ↗
  • Finance Committee proposed payments for library books, janitor service, a sedan and branch library furnaces; final vote continues next page.
    17 Aug 1931outcome not readJournal 1931 ↗
  • Board authorizes payments totaling $31,054.27 from the Hetch Hetchy Construction Fund to nineteen claimants and suppliers.
    10 Sep 1931outcome not readJournal 1931, p. 2757 ↗
  • Finance Committee recommends paying city claims to suppliers and contractors, including Hetch Hetchy and Municipal Railway bills, for passage to print.
    28 Sep 1931outcome not readJournal 1931, p. 2869 ↗
  • Passed for printing: payments from the Hetch Hetchy Construction Fund to eight named suppliers and contractors. linked by the name only, not checked
    28 Sep 1931passed first readingJournal 1931, p. 2868 ↗
  • Resolution proposes paying 18 claimants from the Hetch Hetchy Construction Fund for supplies and services.
    5 Oct 1931outcome not readJournal 1931, p. 2893 ↗
  • Resolution authorizing payment of city claims for parks, Hetch Hetchy water pipelines and Municipal Railway supplies was passed for printing.
    13 Oct 1931passed first readingJournal 1931, p. 2956 ↗
  • Finance Committee proposes paying vendors for library books, Hetch Hetchy pipe line work, airport alterations and street materials.
    16 Nov 1931outcome not readJournal 1931, p. 3099 ↗
  • Ingersoll-Rand Company of California was listed for payment of $1,028.36 for machine parts.
    23 Nov 1931outcome not readJournal 1931, p. 3146 ↗
  • Payment of $4,114.02 to the California Academy of Sciences for October 1931 Steinhart Aquarium maintenance; the vote is on the next page.