about 130 Board decisions about Keystone Construction, in date order. Each links to its printed page.

  • The Board of Public Works recommended giving Keystone Construction Company sixty more days to finish fire cisterns; referred to committee.
  • $779 to Keystone for fire cisterns at Forty-seventh Avenue and Ninth Avenue
    11 Jan 1909outcome not readJournal 1909, p. 25 ↗
  • Keystone Construction given 90 more days on the Florida Street sidewalks linked by the name only, not checked
    18 Jan 1909passedJournal 1909, p. 51 ↗
  • Coghill and Keystone Construction paid $2,687.04 for building fire cisterns linked by the name only, not checked
    27 Jan 1909outcome not readJournal 1909, p. 112 ↗
  • Coghill and Keystone Construction paid $2,687.04 for building fire cisterns linked by the name only, not checked
    11 Feb 1909outcome not readJournal 1909, p. 89 ↗
  • Keystone Construction Company paid again for its new fire cisterns
    23 Feb 1909passedJournal 1909, p. 181 ↗
  • Keystone Construction Company given sixty more days on its fire cisterns linked by the name only, not checked
    4 Mar 1909outcome not readJournal 1909, p. 205 ↗
  • Keystone Construction Company given sixty more days on its fire cisterns
    8 Mar 1909outcome not readJournal 1909, p. 227 ↗
  • Proposed payments to C. Coghill and Keystone Construction Company for fire cisterns at four intersections, totalling $2,710.35. linked by the name only, not checked
    11 Mar 1909outcome not readJournal 1909, p. 253 ↗
  • Keystone Construction paid $1,110 for three fire cisterns in the avenues linked by the name only, not checked
    12 Mar 1909outcome not readJournal 1909, p. 158 ↗
  • Progress payments for fire cisterns at several streets proposed; the vote continues on the next page. linked by the name only, not checked
    22 Mar 1909outcome not readJournal 1909, p. 270 ↗
  • Four contractors were paid a total of $13,926.83 in progress payments to build fire cisterns. linked by the name only, not checked
    24 May 1909passedJournal 1909, p. 527 ↗
  • Resolution authorizing progress payments to three contractors for building fire cisterns was passed for printing. linked by the name only, not checked
    24 May 1909passed first readingJournal 1909, p. 497 ↗
  • Keystone Construction Company paid $4,428.60, its second installment, for constructing fire cisterns. linked by the name only, not checked
    14 Jun 1909passedJournal 1909, p. 605 ↗
  • Keystone Construction given ninety more days on three fire cisterns linked by the name only, not checked
    14 Jun 1909outcome not readJournal 1909, p. 607 ↗
  • Board approved a $4,428.60 second payment to Keystone Construction Company for building fire cisterns. linked by the name only, not checked
    21 Jun 1909passedJournal 1909, p. 623 ↗
  • Keystone Construction given ninety more days on three fire cisterns
    21 Jun 1909outcome not readJournal 1909, p. 624 ↗
  • Fire cistern construction payments of $4,968.93 and $951.23 were authorized to Healy-Tibbitts and Keystone at various street corners. linked by the name only, not checked
    19 Jul 1909passedJournal 1909, p. 720 ↗
  • Healy-Tibbitts Construction Co. paid $5,050.65 for five fire cisterns
    26 Jul 1909outcome not readJournal 1909, p. 738 ↗
  • Flinn & Treacy paid first installment on new fire cisterns
    16 Aug 1909outcome not readJournal 1909, p. 779 ↗
  • Payments totaling $64,601.32 approved for fire cisterns, fireboats, pipe freight and an auxiliary water system.
    23 Aug 1909passedJournal 1909, p. 783 ↗
  • Board of Public Works recommended paying Keystone Construction Company $1,637.68 for a fire cistern; referred to committee. linked by the name only, not checked
    30 Aug 1909referredJournal 1909, p. 793 ↗
  • Payments totalling $23,429.84 to several contractors for fire cisterns at many city street corners were proposed.
    13 Sep 1909outcome not readJournal 1909, p. 823 ↗
  • Payments for fire cistern construction at many San Francisco street corners proposed, with the vote continuing on the next page. linked by the name only, not checked
    20 Sep 1909outcome not readJournal 1909, p. 839 ↗
  • A resolution authorizing payments for fire cisterns from the Fire Protection Account was proposed and continues onto the next page. linked by the name only, not checked
    25 Oct 1909outcome not readJournal 1909, p. 956 ↗
  • Keystone Construction may blast for a fire cistern on Kansas Street linked by the name only, not checked
    15 Nov 1909passedJournal 1909, p. 1021 ↗
  • Keystone Construction paid for fire cisterns at Thirteenth and Folsom Streets
    15 Nov 1909outcome not readJournal 1909, p. 1029 ↗
  • Keystone Construction paid $5,081.02 for fire cisterns at Thirteenth and Folsom
    26 Nov 1909outcome not readJournal 1909, p. 1065 ↗
  • Keystone Construction allowed to blast for a cistern on Kansas Street linked by the name only, not checked
    29 Nov 1909outcome not readJournal 1909, p. 1005 ↗
  • Keystone Construction paid $4,890.33 for fire cisterns at Sixteenth and Capp
    13 Dec 1909outcome not readJournal 1909, p. 1151 ↗
  • Keystone Construction paid $4,890.33 for fire cisterns at Sixteenth and Capp
    20 Dec 1909outcome not readJournal 1909, p. 1174 ↗
  • Keystone Construction Company allowed to blast for a Sansome Street sewer linked by the name only, not checked
    27 Dec 1909passed first readingJournal 1909, p. 1222 ↗
  • Sewer contractors would be paid $40,594.56 in progress payments on several city sewer projects, passed for printing.
    1910passed first readingJournal 1910, p. 700 ↗
  • A resolution authorizing $78,097.14 in sewer construction progress payments to several contractors was passed for printing. linked by the name only, not checked
    1910passed first readingJournal 1910, p. 573 ↗
  • Board of Public Works fixed a $10,000 blasting bond for Keystone Construction Company on the North Point sewer; referred to committee. linked by the name only, not checked
    3 Jan 1910referredJournal 1910, p. 3 ↗
  • The Keystone Construction Company was granted revocable permission to blast on Sansome Street for the North Point Sewer. linked by the name only, not checked
    5 Jan 1910passedJournal 1910, p. 42 ↗
  • Payments authorized to Union Iron Works and Keystone Construction for fire hydrants and cisterns at Thirteenth and Folsom streets.
    10 Jan 1910passedJournal 1910, p. 74 ↗
  • Payments approved for fire hydrants, pipe freight and fire cisterns, including at Thirteenth and Folsom streets.
    17 Jan 1910passedJournal 1910, p. 81 ↗
  • Payments to four contractors for fire cisterns, pipe and gate valves were passed for printing from the Fire Protection Account.
    14 Feb 1910passed first readingJournal 1910, p. 180 ↗
  • Payments to Keystone, Pittsburg Valve and Buena Vista for fire cisterns and pipe were approved. linked by the name only, not checked
    21 Feb 1910passedJournal 1910, p. 202 ↗
  • Keystone Construction to get a final payment for five fire cisterns linked by the name only, not checked
    1 Mar 1910outcome not readJournal 1910, p. 224 ↗
  • City authorizes progress payments to several contractors for sewer construction on Division, Fifth, M and other streets. linked by the name only, not checked
    9 Mar 1910outcome not readJournal 1910, p. 262 ↗
  • City authorizes progress payments to Metropolis and Keystone Construction for fire cisterns at many San Francisco intersections. linked by the name only, not checked
    9 Mar 1910outcome not readJournal 1910, p. 262 ↗
  • Metropolis Construction to be paid $18,263 for sixteen fire cisterns
    15 Mar 1910outcome not readJournal 1910, p. 271 ↗
  • Contra Costa to be paid $16,060.35 for the Division Street sewer linked by the name only, not checked
    15 Mar 1910outcome not readJournal 1910, p. 270 ↗
  • Payments for fire cisterns to Keystone Construction and freight to Southern Pacific were passed for printing. linked by the name only, not checked
    11 Apr 1910passed first readingJournal 1910, p. 368 ↗
  • Keystone Construction paid $1,063.37 for fire cisterns in the avenues
    18 Apr 1910outcome not readJournal 1910, p. 395 ↗
  • Keystone Construction Co. was paid for fire cisterns and Southern Pacific was paid freight charges for fire water pipe.
    18 Apr 1910passedJournal 1910, p. 386 ↗
  • Keystone Construction paid $1,063.37 for fire cisterns in the avenues linked by the name only, not checked
    25 Apr 1910outcome not readJournal 1910, p. 412 ↗
  • Keystone Construction paid $7,918.40 for fire cisterns at Folsom and Capp
    2 May 1910outcome not readJournal 1910, p. 439 ↗
  • Keystone Construction paid $7,918.40 for fire cisterns at Folsom and Capp
    9 May 1910passedJournal 1910, p. 456 ↗
  • Eureka Construction paid $10,070.80 for the East Potrero sewer linked by the name only, not checked
    13 Jun 1910outcome not readJournal 1910, p. 582 ↗
  • Resolution authorizing sewer construction bond payments, on the City Engineer's recommendation, continues onto the next page. linked by the name only, not checked
    15 Jul 1910outcome not readJournal 1910, p. 751 ↗
  • Progress payments on the Division Street and Lincoln Way sewers
    18 Jul 1910outcome not readJournal 1910, p. 712 ↗
  • Keystone Construction Co. and Healy-Tibbitts Construction Co. were paid $14,024.91 for sewer construction work on two city sewers. linked by the name only, not checked
    1 Aug 1910passedJournal 1910, p. 767 ↗
  • Public Works recommends giving contractor W. C. Raisch more time to finish grading and sewering Fourth Avenue near Kirkham Street. linked by the name only, not checked
    8 Aug 1910outcome not readJournal 1910, p. 793 ↗
  • Keystone Construction Co. paid for work on the Mission Street viaduct
    12 Sep 1910outcome not readJournal 1910, p. 894 ↗
  • Caldwell & Co. paid $8,250 to start the Spring Valley School linked by the name only, not checked
    12 Sep 1910outcome not readJournal 1910, p. 786 ↗
  • Healy-Tibbitts paid $25,209.11 for the Yerba Buena district sewer
    12 Sep 1910outcome not readJournal 1910, p. 892 ↗
  • Keystone Construction Co. paid for work on the Mission Street viaduct linked by the name only, not checked
    19 Sep 1910passedJournal 1910, p. 910 ↗
  • Healy-Tibbitts paid $25,209.11 for the Yerba Buena district sewer linked by the name only, not checked
    19 Sep 1910outcome not readJournal 1910, p. 906 ↗
  • Proposed payments totaling $52,285 to three contractors for gate valves and pipe work on the Auxiliary Water Supply System were posted for printing.
    24 Oct 1910passed first readingJournal 1910, p. 1036 ↗
  • Payments totalling $52,285 were approved to three contractors for gate valves, pumping station equipment and pipe laying for the fire water system. linked by the name only, not checked
    31 Oct 1910passedJournal 1910, p. 1052 ↗
  • Resolution proposes paying Metropolis Construction Co. $10,864.57 for third progress payment on Lower Sunset District sewers.
    21 Nov 1910outcome not readJournal 1910, p. 1119 ↗
  • Resolution proposed to pay $10,003.27 for a Chemical Engine House and a Mission Street viaduct.
    27 Dec 1910outcome not readJournal 1910, p. 1250 ↗
  • Keystone Construction Co. to receive $18,503 in progress payments for North Point and Mission Street sewers; passed for printing. linked by the name only, not checked
    1911passed first readingJournal 1911 ↗
  • Board approved about $12,400 in payments for asphalt, sand, a safety station, Truck No. 14 and Mission street viaduct work.
  • Resolution proposes $12,451.42 in General Fund payments for asphalt, a safety station and a fire engine house.
    1911outcome not readJournal 1911 ↗
  • Keystone Construction Co. was paid $3,378.22 sixth installment for fire-protection water mains in Section No. 1.
  • Proposed $620.25 sixth installment to Keystone Construction Co. for sewer work on Mission street.
    1911outcome not readJournal 1911 ↗
  • Keystone Construction Company was offered a sixty-day extension to complete its contract, outcome not yet printed. linked by the name only, not checked
    1911outcome not readJournal 1911 ↗
  • Keystone Construction Company was granted a ninety-day blasting permit for sewer excavation at the Mission viaduct, subject to a $2500 bond. linked by the name only, not checked
  • Resolution passed for printing to pay sewer contractors progress payments, including $8,935.91 to Healy-Tibbitts for the North Point Main Sewer.
    1911passed first readingJournal 1911 ↗
  • Board approved $1,217.25 fifth installment to Keystone Construction Co. for the southerly section of the Mission Street viaduct.
  • Board approved $1,164.84 fifth installment to Keystone Construction Co. for high pressure fire protection water mains. linked by the name only, not checked
  • The Keystone Construction Company was granted sixty more days to finish the North Point Main Sewer Section B. linked by the name only, not checked
  • Sewer construction payments to contractors including Storrie and Keystone were introduced and passed for printing from the Sewer Construction Account.
    1911passed first readingJournal 1911 ↗
  • Board annulled Keystone Construction Company's contract for high-pressure water mains near Powell and Market Streets, and authorized rebidding the unfinished work. linked by the name only, not checked
  • Board approved a $1,217.25 payment to Keystone Construction Co. for the southerly section of the Mission Street viaduct.
  • Keystone Construction Co. was to receive $5,478.45 as a sixth installment on the North Point Main Sewer contract. linked by the name only, not checked
    1911outcome not readJournal 1911 ↗
  • The Board granted Keystone Construction Company a sixty-day extension to finish North Point main sewer work in Section B. linked by the name only, not checked
  • Progress payments to sewer contractors on North Point, Ingleside, Mission and Seventh street sewers proposed; passed for printing.
    1911passed first readingJournal 1911 ↗
  • Payment of $3,378.22 to Keystone Construction Co. approved for sixth installment on fire-protection water mains. linked by the name only, not checked
    1911outcome not readJournal 1911 ↗
  • Keystone Construction Company was granted a 90-day permit to blast while building the Mission viaduct sewer. linked by the name only, not checked
  • Keystone Construction Company was granted sixty more days to finish North Point main sewers, after weather delays. linked by the name only, not checked
    1911outcome not readJournal 1911 ↗
  • Proposed payments to Keystone Construction Co. and Bennett Bros. for Mission Street viaduct work and street repairs. linked by the name only, not checked
    1911outcome not readJournal 1911 ↗
  • Resolution authorizes $1,164.84 fifth installment to Keystone Construction Co. for high pressure fire-protection water mains. linked by the name only, not checked
    1911outcome not readJournal 1911 ↗
  • Progress payments totalling $58,597.78 for Auxiliary Water Supply System pipe work were passed for printing. linked by the name only, not checked
    1911passed first readingJournal 1911 ↗
  • Resolution introduced and passed for printing to pay sewer contractors from the Sewer Construction Account. linked by the name only, not checked
    1911passed first readingJournal 1911 ↗
  • Resolution introduced and passed for printing to pay contractors for the auxiliary fire water supply system.
    1911passed first readingJournal 1911 ↗
  • Progress payments for North Point, Yerba Buena and Seventh Street sewer contracts were proposed from the Sewer Construction Account. linked by the name only, not checked
    1911outcome not readJournal 1911 ↗
  • Progress payments of $2,243.15 and $885.38 for sewer contracts proposed, passed for printing. linked by the name only, not checked
    1911passed first readingJournal 1911 ↗
  • Payments went to Raisch Improvement Co. and Keystone Construction for laying high-pressure fire protection water mains. linked by the name only, not checked
    1911outcome not readJournal 1911 ↗
  • Payments totalling $10,003.27 from the General Fund were approved for a fire engine house and a Mission Street viaduct.
    9 Jan 1911passedJournal 1911 ↗
  • City paid $9,999.28 to two contractors for laying high-pressure fire water mains in the auxiliary water system. linked by the name only, not checked
    23 Jan 1911passedJournal 1911 ↗
  • City paid Keystone Construction Co. $5,478.45 for a sixth installment on North Point Main Sewer work. linked by the name only, not checked
    23 Jan 1911passedJournal 1911 ↗
  • Board approved $25,914.54 in progress payments to contractors building North Point, Yerba Buena and Hunters Point sewers.
    14 Feb 1911passedJournal 1911 ↗
  • Board of Public Works recommended giving Keystone Construction Company sixty more days to finish Section B of the North Point main sewer; referred.
    24 Feb 1911referredJournal 1911 ↗
  • Payments from the Sewer Construction Account for sewer construction work are proposed; the vote and amounts continue on the next page. linked by the name only, not checked
    13 Mar 1911outcome not readJournal 1911 ↗
  • Payments totaling $58,597.78 to five contractors for Auxiliary Water Supply System pipes and Pumping Station No. 1 were approved. linked by the name only, not checked
    13 Mar 1911passedJournal 1911 ↗
  • Payments of $2,243.15 to C. J. Harney and $885.38 to Keystone Construction Co. for sewer work were proposed.
    20 Mar 1911outcome not readJournal 1911 ↗
  • Payments for North Point and Yerba Buena sewer construction contracts were approved, paid from the Sewer Construction Account. linked by the name only, not checked
    17 Apr 1911passedJournal 1911 ↗
  • Payments for pipe and work on the Auxiliary Water Supply System for fire protection were proposed, with the vote not yet shown. linked by the name only, not checked
    17 Apr 1911outcome not readJournal 1911 ↗
  • Keystone Construction Co. received a third progress payment for building the southerly section of the Mission Street viaduct. linked by the name only, not checked
    1 May 1911passedJournal 1911 ↗
  • Keystone Construction Co. was paid $629.25 as sixth installment on a Mission Street sewer between Silver Avenue and Bosworth Street. linked by the name only, not checked
    1 May 1911passedJournal 1911 ↗
  • Board authorized sewer construction payments to contractors Healy-Tibbitts, Keystone and Rolandi from the Public Building Fund. linked by the name only, not checked
    15 May 1911outcome not readJournal 1911 ↗
  • Sewer construction payments to Keystone and Metropolis Construction Co. were proposed under a 1908 resolution, outcome continues on the next page. linked by the name only, not checked
    19 Jun 1911outcome not readJournal 1911 ↗
  • Clerk ordered to prepare resolutions annulling contracts with Foster & Vogt and Keystone Construction Company for auxiliary water system work.
    31 Jul 1911referredJournal 1911 ↗
  • Gas and Electric Company filed a $47.75 claim against Keystone Construction for gas main repair at Stockton and Sacramento streets.
    20 Nov 1911outcome not readJournal 1911 ↗
  • Baker & Hamilton claims $771.98 for hardware used on the Mission viaduct built by Keystone Construction Company.
    18 Dec 1911referredJournal 1911 ↗
  • Resolution authorizing dozens of city claims for supplies, construction and utilities, including Pacific Gas and Electric and Spring Valley Water.
    8 Apr 1912outcome not readJournal 1912, p. 256 ↗
  • J. F. O'Brien Co. paid $8,142.56 for the Brannan Street sewer linked by the name only, not checked
    17 Jun 1912outcome not readJournal 1912, p. 514 ↗
  • Payment of nine claims totalling $75,293.98 for sewers, paving, printing and supplies was approved.
    31 Mar 1913passedJournal 1913, p. 303 ↗
  • $2,500 paid for the city's Fourth of July celebration
    7 Jul 1913outcome not readJournal 1913, p. 721 ↗
  • Keystone Construction Company given ninety more days on Berry Street linked by the name only, not checked
    21 Jun 1926passedJournal 1926, p. 1081 ↗
  • Keystone Construction given sixty more days on Nineteenth Street linked by the name only, not checked
  • Payment approved for land the city needs for school purposes linked by the name only, not checked
    20 Sep 1926outcome not readJournal 1926, p. 1489 ↗
  • $49,700 for Harrison Street and $13,500 for Telegraph Hill Boulevard linked by the name only, not checked
    29 Sep 1926outcome not readJournal 1926, p. 1542 ↗
  • Keystone Construction given sixty more days on Berry Street linked by the name only, not checked
  • T. M. Gallagher paid $492.50 for work on Silver Avenue
  • Keystone Construction Company given 90 more days on Rutland Street
    22 Nov 1926outcome not readJournal 1926, p. 1840 ↗
  • A resolution authorizes payments to contractors and suppliers from park, school, road, transit and bond funds; its final vote is not shown. linked by the name only, not checked
    6 Dec 1926outcome not readJournal 1926, p. 1911 ↗
  • Spencer Planing Mill paid $560 for millwork at Lincoln Park Clubhouse linked by the name only, not checked
    13 Dec 1926outcome not readJournal 1926 ↗
  • Keystone Construction given sixty more days on Douglass Street
    10 Jan 1927passedJournal 1927, p. 50 ↗
  • Keystone Construction given 60 more days on Rutland Street linked by the name only, not checked
    21 Feb 1927passedJournal 1927, p. 311 ↗
  • Authorizes listed payments from school, fire, park, Hetch Hetchy and tuberculosis funds to named contractors and suppliers; passed for printing. linked by the name only, not checked
    7 Mar 1927outcome not readJournal 1927, p. 373 ↗
  • Keystone Construction Co. was owed a final payment of $1,344.68 for improving Telegraph Hill boulevard.
    14 Mar 1927outcome not readJournal 1927, p. 411 ↗
  • City pays for street work in front of its own property linked by the name only, not checked
    8 Aug 1927outcome not readJournal 1927, p. 1473 ↗
  • Keystone Construction Co. was paid a final $8,690.33 for improving Douglass Street between Twentieth and Twenty-first Streets.
  • Kezar Playfield contractor and Hetch Hetchy suppliers paid their claims linked by the name only, not checked
    6 Sep 1927outcome not readJournal 1927, p. 1660 ↗