Qipudata
San Francisco · v0.7.1

All decisions

about 140 Board decisions about McSheehy Brothers, in date order. Each links to its printed page.

  • $808 for bookcases and tables at the San Francisco Law Library linked by the name only, not checked
    13 Jan 1908outcome not readJournal 1908 ↗
  • Payments of $1,125 and $7,954 authorized from the School Construction Account for moving Golden Gate School and completing Oceanside School. linked by the name only, not checked
    1 Jun 1908outcome not readJournal 1908, p. 517 ↗
  • McSheehy Bros. paid $7,954.00 for finishing the Oceanside School
    8 Jun 1908outcome not readJournal 1908, p. 541 ↗
  • McSheehy Bros. paid $8,569.00 for the Bergerot and Berkshire schools linked by the name only, not checked
    22 Jun 1908outcome not readJournal 1908, p. 589 ↗
  • McSheehy Bros. paid $8,569.00 for the Bergerot and Berkshire schools linked by the name only, not checked
    29 Jun 1908outcome not readJournal 1908, p. 600 ↗
  • Supervisor Jennings introduced a resolution authorizing General Fund payments to named claimants for services rendered. linked by the name only, not checked
    7 Dec 1908outcome not readJournal 1908, p. 1075 ↗
  • City approved payments totaling $33,473.38 to printers, water suppliers, contractors and others for city services. linked by the name only, not checked
    14 Dec 1908passedJournal 1908, p. 1089 ↗
  • McSheehy Bros. paid to start the Twenty-second Street engine house
    11 Mar 1909outcome not readJournal 1909, p. 253 ↗
  • First payment to McSheehy Bros. approved for erecting a fire engine house on Twenty-second Street. linked by the name only, not checked
    22 Mar 1909passedJournal 1909, p. 271 ↗
  • McSheehy Bros. paid for walls and yards at the Bergerot School
    26 Apr 1909outcome not readJournal 1909, p. 406 ↗
  • McSheehy Bros. paid for walls and yards at the Bergerot School
    3 May 1909outcome not readJournal 1909, p. 432 ↗
  • McSheehy Bros. given fifty more days on Chemical Engine House 11 linked by the name only, not checked
    10 May 1909outcome not readJournal 1909, p. 476 ↗
  • McSheehy Bros. given fifty more days on Chemical Engine House 11 linked by the name only, not checked
    24 May 1909passedJournal 1909, p. 494 ↗
  • Payments totalling $11,782.30 to several firms for hospital, street, police and fire house work passed for printing.
    7 Jun 1909passed first readingJournal 1909, p. 563 ↗
  • City approved payments totaling $11,782.30 to suppliers and contractors, including a chemical engine house on Twenty-second Street. linked by the name only, not checked
    14 Jun 1909passedJournal 1909, p. 596 ↗
  • McSheehy Bros. paid $14,090.25 for building the South End School
    14 Jun 1909outcome not readJournal 1909, p. 604 ↗
  • Board approved a $14,690.25 first payment to McSheehy Bros. for building the South End School.
    21 Jun 1909passedJournal 1909, p. 622 ↗
  • Board adopted a resolution paying McSheehy Bros. $1249.30 for erecting and repairing election booths.
    12 Jul 1909passedJournal 1909, p. 703 ↗
  • A $1,249.36 payment to McSheehy Bros. for election booths was taken up for final passage.
    19 Jul 1909outcome not readJournal 1909, p. 713 ↗
  • McSheehy Bros. paid $3,636.25 finishing Chemical Engine House No. 11
    26 Jul 1909outcome not readJournal 1909, p. 751 ↗
  • Board authorized payment from the School Construction Account for extra work on a school building; outcome continues on next page. linked by the name only, not checked
    2 Aug 1909outcome not readJournal 1909, p. 756 ↗
  • McSheehy Bros. paid $3,636.25 finishing Chemical Engine House No. 11 linked by the name only, not checked
    2 Aug 1909outcome not readJournal 1909, p. 758 ↗
  • McSheehy Bros. paid the balance on Chemical Engine House No. 11 linked by the name only, not checked
    7 Sep 1909outcome not readJournal 1909, p. 814 ↗
  • Payment of $11,418.00 to McSheehy Bros. for the South End School construction was passed for printing.
    13 Sep 1909passed first readingJournal 1909, p. 829 ↗
  • Payment of $11,418 to McSheehy Bros. as third progress payment on the South End School construction approved.
    20 Sep 1909passedJournal 1909, p. 843 ↗
  • McSheehy Bros. paid for the engine house on Twenty-second Street linked by the name only, not checked
    20 Sep 1909outcome not readJournal 1909, p. 838 ↗
  • McSheehy Bros. was paid $1,154 under contract for raising and adding rooms to the temporary Jean Parker Grammar School. linked by the name only, not checked
    1 Nov 1909passedJournal 1909 ↗
  • Board approved $1,154 from the School Construction Account to McSheehy Bros. for additions to the temporary Jean Parker Grammar School. linked by the name only, not checked
    8 Nov 1909passedJournal 1909, p. 997 ↗
  • Board adopted a ninety-day extension for McSheehy Bros to finish building the South End School. linked by the name only, not checked
    26 Nov 1909passedJournal 1909, p. 1078 ↗
  • Ralston Iron Works and McSheehy Bros. were paid for school building work at Hancock and South End Primary Schools. linked by the name only, not checked
  • Resolution granted McSheehy Bros. ninety more days to finish the South End School construction contract.
  • Proposed payments totalling $17,059.25 to contractors for school construction work, passed for printing. linked by the name only, not checked
    1910passed first readingJournal 1910, p. 1092 ↗
  • Resolution to pay McSheehy Bros. $2,600 for yard work at the Winfield Scott School Building was passed for printing. linked by the name only, not checked
    1910passed first readingJournal 1910, p. 72 ↗
  • Board approved a $16,000.25 fourth payment to McSheehy Bros. for building the South End Primary School. linked by the name only, not checked
    24 Jan 1910passedJournal 1910, p. 103 ↗
  • Payments from school bond funds were proposed to contractors for work at Hancock and South End schools. linked by the name only, not checked
    1 Feb 1910passed first readingJournal 1910, p. 145 ↗
  • Fourth installment payment to McSheehy Bros. for building the South End Primary School was proposed from the School Construction Account. linked by the name only, not checked
    8 Feb 1910outcome not readJournal 1910, p. 85 ↗
  • Board approved $20,348 in payments to J. E. O'Mara and McSheehy Bros. for school plumbing and construction work. linked by the name only, not checked
    10 Feb 1910passedJournal 1910, p. 158 ↗
  • Payment resolution proposed to McSheehy Bros. and Golden Gate Brick Co. for election booths and asphalt plant sand. linked by the name only, not checked
    14 Feb 1910outcome not readJournal 1910, p. 182 ↗
  • Payments from the school construction account to McSheehy Bros. and Henning & Burke for West End and Washington school work.
    14 Feb 1910outcome not readJournal 1910, p. 181 ↗
  • First construction payments approved for the West End Primary School and yard work at Washington Grammar School.
    21 Feb 1910passedJournal 1910, p. 203 ↗
  • Payments from the school construction account go to contractors for work at several San Francisco schools. linked by the name only, not checked
    2 May 1910outcome not readJournal 1910, p. 433 ↗
  • McSheehy Bros. and Ahlbach & Mayer were granted extensions to finish school building contracts; passed for printing. linked by the name only, not checked
    20 Jun 1910passed first readingJournal 1910, p. 632 ↗
  • The Board of Public Works recommended a sixty-day time extension for McSheehy Brothers to finish a city contract. linked by the name only, not checked
    20 Jun 1910outcome not readJournal 1910, p. 613 ↗
  • McSheehy Bros. and Ahlbach & Mayer were each granted extra time to finish their school building contracts; advertising fees were waived. linked by the name only, not checked
    27 Jun 1910passedJournal 1910, p. 646 ↗
  • Foster & Vogt and McSheehy Bros. were granted extra time to finish fireproofing the San Francisco Hospital and the West End School. linked by the name only, not checked
    5 Jul 1910passedJournal 1910, p. 676 ↗
  • McSheehy Bros. was paid $1,900 as first installment for a toboggan slide at the Mason and Lombard streets playground. linked by the name only, not checked
    15 Jul 1910passedJournal 1910, p. 745 ↗
  • Resolution authorizing school construction bond payments to several contractors for work at San Francisco schools was passed for printing. linked by the name only, not checked
    15 Jul 1910passed first readingJournal 1910, p. 751 ↗
  • A $1,900 first installment to McSheehy Bros. for a toboggan slide at Mason and Lombard Streets playground was proposed. linked by the name only, not checked
    18 Jul 1910outcome not readJournal 1910, p. 726 ↗
  • Six school construction contractors were paid a total of $31,654.25 from the 1908 school bond fund.
    1 Aug 1910passedJournal 1910, p. 766 ↗
  • School building payments totalling $59,595.25 to several contractors were passed for printing.
    17 Oct 1910passed first readingJournal 1910, p. 988 ↗
  • Payments approved for the Denman, McKinley and Adams school contracts linked by the name only, not checked
    24 Oct 1910outcome not readJournal 1910, p. 1020 ↗
  • Payments totalling $17,059.25 to contractors for work at six San Francisco schools were approved from bond funds.
    21 Nov 1910passedJournal 1910, p. 1121 ↗
  • Payments totalling $37,336.25 to contractors for school buildings from the School Construction Account were passed for printing.
    28 Nov 1910passed first readingJournal 1910, p. 1143 ↗
  • Board authorized $37,336.25 in bond-fund payments to contractors for work on several city primary schools. linked by the name only, not checked
  • Payment of $1,464.30 to McSheehy Bros. for Peabody School foundation reinforcement was proposed and passed for printing. linked by the name only, not checked
    19 Dec 1910passed first readingJournal 1910, p. 1236 ↗
  • The Board approved $1,454.30 paid to McSheehy Bros. for reinforcing the foundations of the Peabody School. linked by the name only, not checked
    27 Dec 1910passedJournal 1910, p. 1247 ↗
  • Resolution proposed to pay five contractors a total of $37,300 for school construction work.
    27 Dec 1910outcome not readJournal 1910, p. 1250 ↗
  • McSheehy Bros. and Rincon Publishing Co. were paid $3,743.74 for election supplies and printing the Municipal Record. linked by the name only, not checked
  • Resolution proposing $17,032 in payments to contractors for work on six school buildings, passed for printing. linked by the name only, not checked
    1911passed first readingJournal 1911 ↗
  • Resolution proposed to pay $8,769 for elevators and alterations at the Hall of Justice, passed for printing.
    1911passed first readingJournal 1911 ↗
  • Extensions of time granted to McSheehy Bros. for Peabody School and to Henning & Burke for Denman School construction. linked by the name only, not checked
  • Progress payments totalling $9,207 were approved to three contractors building the Clement and Peabody primary schools.
  • Resolution passed for printing to pay McSheehy Bros. $4,080 as a sixth installment on building the Peabody School. linked by the name only, not checked
    1911passed first readingJournal 1911 ↗
  • Resolution proposed paying five contractors $14,988 for work on San Francisco school buildings from the 1908 bond fund.
    1911passed first readingJournal 1911 ↗
  • Payments totalling $26,871.75 to contractors for school buildings were passed for printing, funded from the School Construction Account.
    1911passed first readingJournal 1911 ↗
  • The city authorized $5,869.66 in payments for office rent, Jackson Park playground contracts, and Police Department expenses. linked by the name only, not checked
    1911outcome not readJournal 1911 ↗
  • The city authorized a $2,898 installment to McSheehy Bros. for alterations and additions at the Hall of Justice. linked by the name only, not checked
    1911outcome not readJournal 1911 ↗
  • The city authorized a $2,055 first installment to McSheehy Bros. for interior finish work at San Francisco Hospital.
    1911outcome not readJournal 1911 ↗
  • Contractors granted extensions of time to finish plumbing and construction at San Francisco hospital, schools, jail and Hall of Justice. linked by the name only, not checked
  • A $10,870 payment from the School Construction Account is proposed to McSheehy Bros. for building the Peabody School.
    1911outcome not readJournal 1911 ↗
  • Resolution grants McSheehy Bros. ninety days and Henning & Bauke twenty-five days extra to finish school construction work. linked by the name only, not checked
    1911outcome not readJournal 1911 ↗
  • Board approved payments for work at San Francisco Hospital, including sterilizers and the Nurses' Home interior finish. linked by the name only, not checked
  • A fourth payment of $1,419 to McSheehy Bros. for alterations at the Hall of Justice was approved. linked by the name only, not checked
  • The city approved a $4,080 sixth payment to McSheehy Bros. for construction of the Peabody School.
  • The city approved $7,704.80 in payments for supplies, rent and a Jackson Park playground contract. linked by the name only, not checked
  • Payments totalling $6,375 to Otis Elevator Co. and McSheehy Bros. for Hall of Justice elevators and alterations were passed for printing. linked by the name only, not checked
    1911passed first readingJournal 1911 ↗
  • Payments totaling $9,207 to three contractors for school building work at Clement and Peabody schools were passed for printing.
    1911passed first readingJournal 1911 ↗
  • Payments of about $21,910 from the School Construction Account for work on several city school buildings were passed for printing.
    1911passed first readingJournal 1911 ↗
  • Payments totalling $1,935 approved for electrical work at the County Jail and alterations at the Hall of Justice. linked by the name only, not checked
  • City paid McSheehy Bros. for election supplies and Rincon Publishing Co. for printing the Municipal Record. linked by the name only, not checked
    1911outcome not readJournal 1911 ↗
  • Proposed fifth installment of $4,005 to McSheehy Bros. for building the Peabody School.
    1911passed first readingJournal 1911 ↗
  • Walters Surgical Co. and McSheehy Bros. were paid for work at San Francisco Hospital, including the Nurses' Home finishing. linked by the name only, not checked
  • Resolution authorizes a $1,419 fourth installment to McSheehy Bros. for alterations at the Hall of Justice. linked by the name only, not checked
    1911outcome not readJournal 1911 ↗
  • Passed for printing: $56,491 in payments for sterilizers and hospital building work at San Francisco Hospital.
    1911passed first readingJournal 1911 ↗
  • Board of Public Works extensions of time granted to ten contractors finishing city school, hospital, jail and Hall of Justice work.
  • Five payments totalling $37,300 were approved from the School Construction Account to contractors building several city schools.
    9 Jan 1911passedJournal 1911 ↗
  • City approved payments for construction and electrical work at the Clement, Peabody and Burnett schools. linked by the name only, not checked
    6 Mar 1911passedJournal 1911 ↗
  • Board adopted $7,633.25 in progress payments to three contractors building the Jean Parker, John Swett and Harrison schools. linked by the name only, not checked
    3 Apr 1911passedJournal 1911 ↗
  • City paid McSheehy Bros. $4,005 as fifth installment for construction of the Peabody School.
    10 Apr 1911passedJournal 1911 ↗
  • Resolution would pay Wittman Lyman & Co. $2,747.50 and F. H. Born $1,000 for Lake View and Hancock school work.
    24 Apr 1911outcome not readJournal 1911 ↗
  • Two payments totalling $6,375 approved for elevators and alterations at the Hall of Justice. linked by the name only, not checked
    22 May 1911passedJournal 1911 ↗
  • Columbia Marble Company protested the Hall of Justice marble contract given to McSheehy Bros; referred to Public Works.
    12 Jun 1911referredJournal 1911 ↗
  • Board approved $14,983 in contractor payments for Grattan, Adams, Peabody and Spring Valley school buildings. linked by the name only, not checked
    17 Jul 1911passedJournal 1911 ↗
  • Payments totaling $8,769.00 for elevators and alterations at the Hall of Justice were adopted.
    31 Jul 1911passedJournal 1911 ↗
  • Progress payments of $504 and $1,431 approved for electrical and alteration work at the County Jail and Hall of Justice. linked by the name only, not checked
    11 Sep 1911passedJournal 1911 ↗
  • Approved $10,870 ninth installment to McSheehy Bros. for construction of the Peabody School.
    25 Sep 1911passedJournal 1911 ↗
  • McSheehy Bros. paid $2,055 as first instalment on interior finish at San Francisco Hospital.
    6 Nov 1911passedJournal 1911 ↗
  • McSheehy Bros. paid $2,898 as fifth instalment on alterations at the Hall of Justice. linked by the name only, not checked
    6 Nov 1911passedJournal 1911 ↗
  • Payments totalling $5,869.66 approved for Hewes Building rent, Jackson Park playground work, and Police Department expenses.
    6 Nov 1911passedJournal 1911 ↗
  • Routine payments totalling about $10,000 for supplies, rent and work, including Eddy Street rent, were sent to print.
    13 Nov 1911passed first readingJournal 1911 ↗
  • Payments to McSheehy Bros, Pacific Gas and Electric and an animal society were passed for printing.
    4 Dec 1911passed first readingJournal 1911 ↗
  • The Board proposed payments of $4440.48 to McSheehy Bros. for election booths and $32422.98 to Pacific Gas and Electric for November utilities.
    11 Dec 1911outcome not readJournal 1911 ↗
  • Board sends to print a resolution authorizing payments from city funds to many suppliers and contractors for hospitals, sewers, schools and streets.
    1912passed first readingJournal 1912, p. 284 ↗
  • Payments totaling $8,682 to contractors for plumbing and interior work at San Francisco Hospital were finally passed.
    15 Jan 1912passedJournal 1912, p. 49 ↗
  • McLeran and Peterson paid $8,022 for the Polytechnic shop building linked by the name only, not checked
    13 Feb 1912outcome not readJournal 1912, p. 117 ↗
  • Board approved payments from school, hospital, jail and water accounts to contractors and claimants, including Healy-Tibbitts Construction Co.
    25 Mar 1912passedJournal 1912, p. 221 ↗
  • McSheehy Bros. is granted ninety more days to finish interior carpentry at San Francisco Hospital's Nurses' Home and ward buildings. linked by the name only, not checked
    1 Apr 1912outcome not readJournal 1912, p. 241 ↗
  • Ralston Iron Works and McSheehy Bros. granted time extensions on Girls' High School and San Francisco Hospital contracts. linked by the name only, not checked
    8 Apr 1912passedJournal 1912, p. 211 ↗
  • Payments to contractors and suppliers for schools, hospitals, the jail and Pumping Station No. 1 were put forward for printing.
    8 Apr 1912passed first readingJournal 1912, p. 208 ↗
  • City sets aside $19,000 to repave Howard Street with basalt blocks linked by the name only, not checked
    8 Apr 1912passed first readingJournal 1912, p. 208 ↗
  • Sewer contractors paid, including $24,160.05 to Federal Construction Co.
    8 Apr 1912outcome not readJournal 1912, p. 199 ↗
  • Board authorized payment of many city claims, including hospital supplies, sewer and street work, and Lowell High School construction.
    22 Apr 1912passedJournal 1912, p. 295 ↗
  • Board passed for printing a resolution authorizing payments to contractors and suppliers from named city bond and fund accounts.
    27 May 1912passed first readingJournal 1912, p. 432 ↗
  • McSheehy Bros. given 90 more days on the San Francisco Hospital
    10 Jun 1912passedJournal 1912, p. 473 ↗
  • The Board is authorizing city fund payments to contractors and suppliers for sewers, elections, hospitals, paving and rent.
    18 Nov 1912outcome not readJournal 1912, p. 1057 ↗
  • John Daniel paid $25,621.61 for the North Point main sewer linked by the name only, not checked
    25 Nov 1912passedJournal 1912, p. 1074 ↗
  • $40,000 set aside for December street paving and repairs linked by the name only, not checked
    2 Dec 1912outcome not readJournal 1912, p. 1092 ↗
  • Caldwell & Co. proposed to receive $10,018.49 for the eighth payment on Pumping Station No. 2. linked by the name only, not checked
    9 Dec 1912outcome not readJournal 1912, p. 1109 ↗
  • Board authorizes a long list of payments to contractors and claimants for police, school, transit and street work. linked by the name only, not checked
    1913outcome not readJournal 1913, p. 635 ↗
  • Board authorizes payment of many city claims to suppliers, contractors and hospitals, including sewer, fire and hospital bills.
    1913outcome not readJournal 1913, p. 368 ↗
  • Board passed for printing authorizations of payments for water investigation, streetcars, schools, a hospital and minors' maintenance.
    5 Feb 1913passed first readingJournal 1913, p. 118 ↗
  • Resolution 9984 authorizes payments to Hazen & Whipple for water source study and to Bakewell & Brown for New City Hall plans.
    10 Feb 1913outcome not readJournal 1913, p. 137 ↗
  • Gorrill Bros. paid $9,924.56 for the Fillmore Street sewer linked by the name only, not checked
    3 Mar 1913outcome not readJournal 1913, p. 393 ↗
  • Resolution authorizing 1913 payments from bond funds for sewers, a police station, street lighting and Civic Center land was passed for printing.
    10 Mar 1913passed first readingJournal 1913, p. 233 ↗
  • Resolution authorizes payments to several contractors and claimants for library books, school work, water mains and a pumping station. linked by the name only, not checked
    17 Mar 1913outcome not readJournal 1913 ↗
  • The Board authorized payments of $36,901.95 to Pacific Gas & Electric and $794.50 to the SF SPCA from the General Fund. linked by the name only, not checked
    14 Apr 1913outcome not readJournal 1913, p. 358 ↗
  • $30,000 set aside for cleaning and sprinkling streets in June linked by the name only, not checked
    2 Jun 1913outcome not readJournal 1913, p. 563 ↗
  • St. Vincent's Asylum paid $1,870.01 for the care of children linked by the name only, not checked
    5 Jun 1913outcome not readJournal 1913, p. 644 ↗
  • Commary-Peterson paid $8,293 to finish the North End Police Station linked by the name only, not checked
    9 Jun 1913outcome not readJournal 1913, p. 592 ↗
  • Board authorized payment of many city claims to contractors and suppliers for hospitals, schools, reservoirs, streets and offices.
    9 Jun 1913outcome not readJournal 1913, p. 580 ↗
  • A resolution authorizes General Fund payments to a newspaper, an indexing firm and several orphan asylums; the list continues. linked by the name only, not checked
    30 Jun 1913outcome not readJournal 1913, p. 665 ↗
  • $12,000 set aside to restore surveys in the Excelsior and Mission
    14 Jul 1913outcome not readJournal 1913, p. 747 ↗
  • Final passage of Resolution 10288 authorizing city payments to contractors, suppliers and claimants from bond and general funds.
    21 Jul 1913passedJournal 1913, p. 760 ↗
  • Demands paid, including $825 for pipe at North Beach Playgrounds
    28 Jul 1913outcome not readJournal 1913, p. 768 ↗
  • Demands paid, including $825 for pipe at North Beach Playgrounds
    4 Aug 1913outcome not readJournal 1913, p. 776 ↗
  • Board authorizes expenditures to a list of city claimants for paving, lighting, supplies and printing; vote continues on next page. linked by the name only, not checked
    2 Sep 1913outcome not readJournal 1913, p. 859 ↗
  • The Board passed for printing a resolution authorizing payments to contractors for sewers, schools, a hospital, streets and supplies.
    6 Oct 1913passed first readingJournal 1913, p. 974 ↗
  • $400 for a sidewalk at Garfield Square on Twenty-fifth Street
    24 Apr 1916outcome not readJournal 1916, p. 387 ↗