about 150 Board decisions about Monson Brothers, in date order. Each links to its printed page.

  • Payments authorized from bond and general funds to contractors and suppliers for sewer, school, hospital and library work. linked by the name only, not checked
    1913passed first readingJournal 1913, p. 793 ↗
  • Monson Brothers paid $1,500 for the Mission Park convenience station linked by the name only, not checked
    17 Feb 1913outcome not readJournal 1913, p. 162 ↗
  • Monson Brothers paid $1,500 for the Mission Park convenience station
    25 Feb 1913outcome not readJournal 1913, p. 197 ↗
  • Claims for city bills were listed, including $5,250 rent to the Whitcomb Estate for temporary City Hall.
    25 Feb 1913outcome not readJournal 1913, p. 198 ↗
  • Expenditures for parks, water, Municipal Railway cars, school plumbing, sewers and paving claims passed for printing.
    3 Mar 1913passed first readingJournal 1913, p. 401 ↗
  • Union Iron Works paid $57,750 for Municipal Railway cars
    28 Apr 1913outcome not readJournal 1913, p. 415 ↗
  • $30,000 set aside for cleaning and sprinkling streets in June linked by the name only, not checked
    2 Jun 1913outcome not readJournal 1913, p. 563 ↗
  • Board authorized payment of many city claims to contractors and suppliers for hospitals, schools, reservoirs, streets and offices.
    9 Jun 1913outcome not readJournal 1913, p. 580 ↗
  • Newsom, Wold & Kohn paid $16,725 for Polytechnic High School linked by the name only, not checked
    15 Sep 1913outcome not readJournal 1913, p. 905 ↗
  • Newsom, Wold & Kohn paid $16,725 for Polytechnic High School linked by the name only, not checked
    29 Sep 1913passedJournal 1913, p. 926 ↗
  • Proposed payments for Cooper, Edison and Polytechnic school construction, a Forty-eighth Avenue sewer and a Geary car barn.
    14 Oct 1913outcome not readJournal 1913, p. 1059 ↗
  • Houghton Sawyer paid $2,232 for architect's work on the Cooper School linked by the name only, not checked
    27 Oct 1913passedJournal 1913, p. 1084 ↗
  • Carnahan & Mulford paid $8,520 for the Glen Park School linked by the name only, not checked
    25 Nov 1913outcome not readJournal 1913, p. 1200 ↗
  • Commary-Peterson paid $8,995 for building Engine House No. 24 linked by the name only, not checked
    22 Dec 1913passedJournal 1913, p. 1268 ↗
  • Resolution authorizes payments from city funds to many contractors and suppliers for libraries, schools, fire, police, streets and transit.
    1914passed first readingJournal 1914, p. 519 ↗
  • Resolution authorizes payments from library, City Hall, school and fire bond funds to listed claimants; final vote continues next page. linked by the name only, not checked
    1914outcome not readJournal 1914, p. 64 ↗
  • Monson Bros granted extensions of time to finish construction of the Edison School, citing concrete and plasterers' strike delays. linked by the name only, not checked
  • Carnahan & Mulford paid $9,909 for building the Columbus School
    12 Jan 1914outcome not readJournal 1914, p. 40 ↗
  • Bion J. Arnold paid $3,345.79 for his city transportation report
    26 Jan 1914outcome not readJournal 1914, p. 94 ↗
  • Board is authorizing payments to city suppliers and contractors, including PG&E lighting and Edison School work; outcome continues on next page. linked by the name only, not checked
    12 Feb 1914outcome not readJournal 1914, p. 69 ↗
  • City takes over roadways on Third and Twenty-sixth Avenues
    9 Mar 1914outcome not readJournal 1914, p. 262 ↗
  • F. Rolandi paid $17,831.23 for the Golden Gate Park sewer linked by the name only, not checked
    16 Mar 1914outcome not readJournal 1914, p. 267 ↗
  • Payments were authorized for library books, completion of the City Morgue, and Polytechnic High School heating work. linked by the name only, not checked
    25 May 1914outcome not readJournal 1914, p. 576 ↗
  • Monson Bros. was paid $14,080 as the final payment for building Edison School. linked by the name only, not checked
    15 Jun 1914passedJournal 1914, p. 670 ↗
  • Carnahan & Mulford paid $24,014.00 for building the Columbus School linked by the name only, not checked
    17 Aug 1914passed first readingJournal 1914, p. 917 ↗
  • $5,000 to light the arches on Mission Street
    24 Aug 1914passedJournal 1914, p. 935 ↗
  • The Board finally passed payments from city funds to contractors and the Spring Valley Water Company for school, park and City Hall work.
    24 Aug 1914passedJournal 1914, p. 933 ↗
  • $197,586.00 set aside for Monson Brothers' carpentry work at City Hall
    28 Sep 1914outcome not readJournal 1914, p. 1056 ↗
  • $197,586.00 set aside for Monson Brothers' carpentry work at City Hall linked by the name only, not checked
    28 Sep 1914outcome not readJournal 1914, p. 1033 ↗
  • Resolution proposed to authorize more than thirty city payments to contractors and suppliers for jail, hospital, transit, sewer and water work.
    20 Oct 1914outcome not readJournal 1914, p. 1214 ↗
  • Harry C. Christen drops his protest against paving Twenty-ninth Avenue
    9 Nov 1914outcome not readJournal 1914, p. 1289 ↗
  • Board authorizes bond-fund payments to contractors for City Hall, San Francisco Hospital, and Municipal Railway construction work, including Van Ness avenue. linked by the name only, not checked
    16 Nov 1914outcome not readJournal 1914, p. 1309 ↗
  • Payment of $2,895 to Monson Bros. for carpentry at City Hall was listed for payment.
    28 Dec 1914outcome not readJournal 1914, p. 1397 ↗
  • A resolution proposed authorizing thirteen payments for City Hall, a school, park water and Richmond wells, passed for printing.
    1915passed first readingJournal 1915, p. 157 ↗
  • Board moves to authorize many city payments for libraries, City Hall work, tunnels, sewers, schools, and utilities, with the list continuing on the next page. linked by the name only, not checked
    1915outcome not readJournal 1915, p. 629 ↗
  • Payments from city bond and fund accounts to contractors and claimants for tunnel, sewer, school and City Hall work proposed for printing.
    1915outcome not readJournal 1915, p. 395 ↗
  • Resolution authorizing payment of 27 city claims to contractors, suppliers and others, passed for printing.
    4 Jan 1915passed first readingJournal 1915 ↗
  • Board authorized payment of claims for railway freight, cable and brake equipment, school land, and hospital supplies.
    11 Jan 1915outcome not readJournal 1915, p. 19 ↗
  • Bills paid, including $30,000 for City Hall granite linked by the name only, not checked
    8 Feb 1915outcome not readJournal 1915, p. 182 ↗
  • Clinton Fireproofing Co. paid $23,822.45 for the Seventeenth Street car barn
    8 Mar 1915outcome not readJournal 1915, p. 312 ↗
  • Clinton Fireproofing Co. paid $23,822.45 for the Seventeenth Street car barn linked by the name only, not checked
    15 Mar 1915outcome not readJournal 1915, p. 330 ↗
  • Supervisor Jennings proposed appropriating funds for Civic Center trees, City Hall carpentry, sewers, and Relief Home repairs.
    5 Apr 1915outcome not readJournal 1915, p. 370 ↗
  • $960 set aside for trees in the Civic Center
    5 Apr 1915outcome not readJournal 1915, p. 387 ↗
  • Resolution No. 11668 on authorizations taken up for final passage; outcome continues on the next page.
    12 Apr 1915outcome not readJournal 1915, p. 410 ↗
  • Proposed resolution would authorize payment of 33 claims for hospital, jail, fire, railway, park and school work and supplies.
    26 Apr 1915outcome not readJournal 1915, p. 461 ↗
  • $1,000 for boilers at the Civic Center power house
    3 May 1915outcome not readJournal 1915, p. 478 ↗
  • Resolution 11759 authorizes twelve City Hall construction payments from the Civic Center bond fund to contractors and suppliers. linked by the name only, not checked
    17 May 1915outcome not readJournal 1915, p. 538 ↗
  • Resolution authorizing city payments for library books, City Hall contractors and tunnel work; outcome continues on next page.
    14 Jun 1915outcome not readJournal 1915, p. 651 ↗
  • City spends $429 on two bathrooms at the Tuberculosis Hospital
    28 Jun 1915passedJournal 1915, p. 668 ↗
  • Progress Laundry Company allowed a laundry at 3080 Seventeenth Street linked by the name only, not checked
    12 Jul 1915outcome not readJournal 1915, p. 809 ↗
  • Resolution approves payments to many contractors and suppliers for library books, hospitals, schools, paving and City Hall work.
    19 Jul 1915passedJournal 1915, p. 833 ↗
  • Neustadter Bros. and Martin-Camm paid for San Francisco Hospital supplies linked by the name only, not checked
    9 Aug 1915passed first readingJournal 1915, p. 905 ↗
  • Chas. Wright paid $1,455 for plumbing at the Oriental School linked by the name only, not checked
    16 Aug 1915passed first readingJournal 1915, p. 924 ↗
  • Resolution 12032 authorizing matters was taken up for final passage; its outcome is printed on the next page.
    16 Aug 1915outcome not readJournal 1915, p. 918 ↗
  • Chas. Wright is authorized to receive $1,455 as final payment for plumbing at Oriental School. linked by the name only, not checked
    23 Aug 1915outcome not readJournal 1915, p. 936 ↗
  • Monson Bros. paid $12,879 for carpentry work at City Hall
    7 Sep 1915outcome not readJournal 1915, p. 988 ↗
  • F. P. Walsh paid $6,675 for boilers at Polytechnic High School linked by the name only, not checked
    20 Sep 1915outcome not readJournal 1915, p. 1032 ↗
  • The Board sent to print a resolution authorizing thirteen payments from city funds to contractors, suppliers and utilities. linked by the name only, not checked
    20 Sep 1915passed first readingJournal 1915, p. 1032 ↗
  • Monson Bros. paid for carpentry and mill work at City Hall
    20 Sep 1915passedJournal 1915, p. 1021 ↗
  • Monson Bros. was paid $2,344.35 for the third payment on Third Street bridge repairs. linked by the name only, not checked
    27 Sep 1915passedJournal 1915, p. 1052 ↗
  • Resolution authorizing payments to six claimants, including school boiler and electric work; final vote continues on next page. linked by the name only, not checked
    27 Sep 1915outcome not readJournal 1915 ↗
  • Payments for Polytechnic and Washington Irving schools, park water, street paving, lighting and orphanage care were approved from city funds. linked by the name only, not checked
    27 Sep 1915passedJournal 1915, p. 1044 ↗
  • Resolution authorizes 26 claim payments to contractors, suppliers and utilities for City Hall and other city work.
  • Board finally passed a resolution authorizing dozens of city payments to contractors and suppliers for hospitals, fire stations, schools, streets and water. linked by the name only, not checked
  • Sunset Construction allowed ninety days of blasting on Kansas Street linked by the name only, not checked
    11 Oct 1915passedJournal 1915, p. 1095 ↗
  • Money set aside for street cleaning, sewer repairs and traffic signals linked by the name only, not checked
    11 Oct 1915passedJournal 1915, p. 1092 ↗
  • Payments authorized to city contractors and suppliers for fire apparatus, hospital work, playgrounds and street improvements.
    18 Oct 1915passed first readingJournal 1915, p. 1100 ↗
  • Board authorizes payments to contractors and suppliers for libraries, schools, City Hall, sewers, streets and transit repairs.
    19 Oct 1915outcome not readJournal 1915, p. 1109 ↗
  • Payments to contractors, suppliers and charities for fire, park, transit and hospital work, final vote not printed here. linked by the name only, not checked
    25 Oct 1915outcome not readJournal 1915, p. 1118 ↗
  • The Board approved payment of 29 city claims, including Pacific Gas and Electric lighting and work on City Hall and San Francisco Hospital.
    22 Nov 1915passedJournal 1915, p. 1235 ↗
  • $11,723.62 paid Monson Brothers for carpentry at City Hall linked by the name only, not checked
    29 Nov 1915outcome not readJournal 1915, p. 1361 ↗
  • Board authorized payments to contractors, pensioners and claimants for hospital, City Hall, sewer, Hetch Hetchy and street work, passed for printing.
    29 Nov 1915passed first readingJournal 1915, p. 1362 ↗
  • Monson Bros. paid $11,723.62 for City Hall carpentry and mill work
    6 Dec 1915outcome not readJournal 1915, p. 1391 ↗
  • Authorizes payment of dozens of city bills for City Hall work, street repairs, Hetch Hetchy water and Municipal Railway supplies.
    6 Dec 1915outcome not readJournal 1915, p. 1394 ↗
  • Board began authorizing a list of expenditures from city funds; the amounts continue on the next page.
    13 Dec 1915outcome not readJournal 1915, p. 1413 ↗
  • Board authorized twenty payments from city funds to vendors and utilities, including Spring Valley Water and United Railroads, passed for printing.
    3 Jan 1916passed first readingJournal 1916 ↗
  • Supervisor Power proposed a resolution authorizing thirty payments for City Hall, sewers, libraries and a Geary Street carbarn.
    10 Jan 1916outcome not readJournal 1916, p. 61 ↗
  • Spring Valley Water Co. paid $11,041.32 for water for the hydrants linked by the name only, not checked
    10 Jan 1916passedJournal 1916, p. 59 ↗
  • Board passed resolution authorizing dozens of payments to contractors and suppliers for City Hall, library, hospital, street and sewer work. linked by the name only, not checked
    17 Jan 1916passedJournal 1916, p. 78 ↗
  • Fifteen payments to contractors and suppliers for street, water, marble and building work were passed for printing. linked by the name only, not checked
    31 Jan 1916passed first readingJournal 1916, p. 133 ↗
  • Mysell-Rollins paid $700 to engrave 2,000 Hetch Hetchy bonds
    7 Feb 1916outcome not readJournal 1916, p. 156 ↗
  • Resolution authorizing payments from city bond funds to contractors and suppliers for City Hall, libraries, a hospital and water works was passed for printing.
    7 Feb 1916passed first readingJournal 1916, p. 159 ↗
  • Money set aside for Hetch Hetchy camps and City Hall furniture linked by the name only, not checked
    15 Feb 1916outcome not readJournal 1916, p. 180 ↗
  • The Board authorized nine claims for city expenses, including hospital supplies, Engine House No. 3 work, playground and Municipal Railway items.
    21 Feb 1916passed first readingJournal 1916, p. 187 ↗
  • A. Kohn paid $5,583 for building Engine House No. 3
    29 Feb 1916outcome not readJournal 1916, p. 219 ↗
  • Authorizes $68,328 in payments for City Hall work, hospital supplies and other city accounts; passed for printing.
    6 Mar 1916passed first readingJournal 1916, p. 228 ↗
  • Board authorized 27 routine city payments to contractors and suppliers for City Hall, the hospital, water, streets and fire house work. linked by the name only, not checked
    13 Mar 1916passedJournal 1916, p. 254 ↗
  • Board appropriated City Hall bond funds for small extra work, including desks, locks, shelving and steam maintenance, paid to several contractors.
    27 Mar 1916passedJournal 1916, p. 299 ↗
  • Monson Bros. granted a 45-day extension to finish excavation and foundation work on the northeast wing of San Francisco Hospital.
    27 Mar 1916passedJournal 1916, p. 301 ↗
  • Sarah B. Cooper School architect paid a final $106.55
    3 Apr 1916passedJournal 1916, p. 331 ↗
  • Expenditures from several city funds were authorized for payments to contractors on City Hall work and Hetch Hetchy water supply.
    3 Apr 1916passed first readingJournal 1916, p. 329 ↗
  • The Board authorized payment of thirty-three city claims, including $190,000 to McGilvray-Raymond Granite for City Hall granite work.
    10 Apr 1916passedJournal 1916, p. 338 ↗
  • Daniel L. Bienfield paid $1,927.88 for work on Corbett Avenue linked by the name only, not checked
    17 Apr 1916outcome not readJournal 1916, p. 366 ↗
  • A resolution proposed setting aside named amounts for appropriations; the vote appears on the next page.
    1 May 1916outcome not readJournal 1916, p. 411 ↗
  • Fifteen claims and payments totalling about $29,000 were authorized for passage to print, including settlements for retaining wall damage on Ord Street.
    22 May 1916passed first readingJournal 1916, p. 544 ↗
  • $7,194.75 paid to Golden Gate Iron Works for Redding School steel linked by the name only, not checked
    29 May 1916outcome not readJournal 1916, p. 569 ↗
  • Passed for printing: authorization of $1155.89 from the Library Fund for books bought from G. E. Stechert & Co.
    17 Jul 1916outcome not readJournal 1916, p. 777 ↗
  • $10,000 set aside for school building repairs and fire escapes
    24 Jul 1916outcome not readJournal 1916, p. 810 ↗
  • $4,565 paid to C. C. Morehouse for plastering City Hall linked by the name only, not checked
    28 Aug 1916passed first readingJournal 1916, p. 898 ↗
  • Board authorizes payments from city funds to many contractors and suppliers, including City Hall work and hospital supplies. linked by the name only, not checked
    11 Sep 1916outcome not readJournal 1916, p. 916 ↗
  • Resolution proposed to authorize payments to contractors and utilities, including $17,075.24 to PG&E.
    25 Sep 1916passed first readingJournal 1916, p. 994 ↗
  • City payments authorized, including $17,075.24 to Pacific Gas & Electric linked by the name only, not checked
    2 Oct 1916outcome not readJournal 1916, p. 1050 ↗
  • City authorizes payments to contractors and suppliers for sewers, hospitals, schools, library books, and other public works. linked by the name only, not checked
    16 Oct 1916outcome not readJournal 1916, p. 1094 ↗
  • Church Street paved in front of city property for $498.75 linked by the name only, not checked
    26 Dec 1916passedJournal 1916, p. 1305 ↗
  • Board authorizes a batch of payments to contractors and suppliers for sewers, schools, jails, streets and water.
    5 Feb 1917passedJournal 1917, p. 159 ↗
  • Resolution proposed authorizing 32 payments to contractors and suppliers for city construction, schools, sewers and water work.
    13 Feb 1917outcome not readJournal 1917, p. 177 ↗
  • Monson Brothers paid $8,290.21 for extra carpentry at City Hall
    20 Feb 1917passedJournal 1917, p. 224 ↗
  • Anderson & Ringrose paid $10,035 for the Central Emergency Hospitals
    5 Mar 1917outcome not readJournal 1917, p. 264 ↗
  • Anderson & Ringrose paid $10,035 for the Central Emergency Hospitals linked by the name only, not checked
    12 Mar 1917outcome not readJournal 1917, p. 292 ↗
  • Board passed for printing payments to utilities and contractors for park, library, school, road and sewer work.
    20 Aug 1917passed first readingJournal 1917, p. 1058 ↗
  • $900 to McGilvray-Raymond Granite for sculpture on the main Library linked by the name only, not checked
    27 Aug 1917outcome not readJournal 1917, p. 1099 ↗
  • Ten payments authorized to claimants for San Francisco Hospital, City Hall, water and parks work, with the vote still to come.
    1 Jul 1918outcome not readJournal 1918, p. 572 ↗
  • A resolution authorizes payments to several contractors and suppliers for San Francisco Hospital, Hetch Hetchy and park water work.
    9 Jul 1918outcome not readJournal 1918, p. 588 ↗
  • A resolution authorizing certain amounts to be spent was passed for printing, text continues on the next page.
    3 Nov 1919outcome not readJournal 1919, p. 703 ↗
  • $12,500 approved for a new street car from A. Meister
    17 Nov 1919passedJournal 1919, p. 932 ↗
  • $413,386 set aside to build the Horace Mann School
    17 Apr 1922outcome not readJournal 1922 ↗
  • Resolution authorizes payment of many city bills to suppliers, contractors and claimants for Hetch Hetchy, schools, libraries and transit.
    24 Apr 1922outcome not readJournal 1922 ↗
  • Associated Oil gets a filling station on Potrero Avenue
    18 Dec 1922outcome not readJournal 1922 ↗
  • Associated Oil gets a filling station on Potrero Avenue
    26 Dec 1922passedJournal 1922 ↗
  • Payments authorized to a dozen suppliers and claimants, including for Municipal Railways work and school urinals and roofing. linked by the name only, not checked
    5 Nov 1923outcome not readJournal 1923, p. 1184 ↗
  • Bethlehem Steel paid $511 for switch parts for the Municipal Railway linked by the name only, not checked
    19 Nov 1923passedJournal 1923, p. 1204 ↗
  • Golden Eagle Soap allowed a 100 horsepower boiler on Beach Street linked by the name only, not checked
    4 Aug 1924outcome not readJournal 1924 ↗
  • Golden Eagle Soap allowed a 100 horsepower boiler on Beach Street linked by the name only, not checked
    11 Aug 1924outcome not readJournal 1924, p. 934 ↗
  • Notre Dame College allowed a 1,500-gallon oil tank on Dolores Street linked by the name only, not checked
    19 Jan 1925outcome not readJournal 1925, p. 80 ↗
  • Cliff Little allowed a filling station at Thirty-ninth Avenue and Balboa
    22 Jun 1925outcome not readJournal 1925, p. 938 ↗
  • Silky Sheen Corporation allowed an oil tank on Pacific Street linked by the name only, not checked
    29 Jun 1925passedJournal 1925, p. 958 ↗
  • Resolution 24603 authorizes payments to Haskins & Sells, Spring Valley Water Co., American Brake Shoe and Standard Underground Cable for city work. linked by the name only, not checked
    13 Oct 1925outcome not readJournal 1925, p. 1447 ↗
  • Resolution on oil and boiler permits, revoking permits; the vote is not printed on this page.
    7 Feb 1927outcome not readJournal 1927, p. 221 ↗
  • Resolution lists payments to contractors and suppliers for park, school, fire station and sanitarium work; outcome continues on next page. linked by the name only, not checked
    9 May 1927outcome not readJournal 1927, p. 778 ↗
  • Board passed payments to contractors and suppliers for schools, parks, a fire house, a sanitarium and the Sunset tunnel. linked by the name only, not checked
    16 May 1927passedJournal 1927, p. 841 ↗
  • Oil tank permits granted, plus boilers at Cavanaugh Overall Factory linked by the name only, not checked
    6 Sep 1927outcome not readJournal 1927, p. 1690 ↗
  • Oil tank permits granted, plus boilers at Cavanaugh Overall Factory linked by the name only, not checked
    19 Sep 1927passedJournal 1927, p. 1734 ↗
  • Payment claims for city departments, hospitals and suppliers approved, 13 ayes and 5 absent, including Spring Valley Water Co. and Monson Bros.
  • A. E. Hennessey paid $28,178.48 for the Turk Street improvement linked by the name only, not checked
    7 Nov 1927outcome not readJournal 1927, p. 2138 ↗
  • City pays $4,960 for Galileo High School chairs linked by the name only, not checked
    16 Jan 1928passedJournal 1928, p. 64 ↗
  • Monson Bros. is paid $6,789 for repairs to the Palace of Fine Arts, in a January 1928 claims schedule.
    23 Jan 1928outcome not readJournal 1928, p. 108 ↗
  • Paid $909.20 to Monson Bros. for extra work on Portola Junior High School.
    1 Mar 1928passedJournal 1928, p. 354 ↗
  • Paid $13,516.50 to Monson Bros. for a second contract on Palace of Fine Arts repairs. linked by the name only, not checked
    1 Mar 1928passedJournal 1928, p. 354 ↗
  • Paid $12,100 to Monson Bros., final payment for repairs to the Palace of Fine Arts.
    1 Mar 1928passedJournal 1928, p. 354 ↗
  • Resolution proposes payments to eleven claimants for library, playground, aquarium and fire engine house costs. linked by the name only, not checked
    7 May 1928outcome not readJournal 1928, p. 769 ↗
  • California Academy of Sciences paid $3,886.43 for the Steinhart Aquarium linked by the name only, not checked
    14 May 1928outcome not readJournal 1928, p. 786 ↗
  • Resolution authorizes payment of about thirty city claims to utilities, suppliers, and others from park, railway, and water funds. linked by the name only, not checked
    23 Jul 1928passed first readingJournal 1928, p. 1530 ↗
  • Monson Bros. was owed $10,455.46 balance on oil contracts for rehabilitating the Palace of Fine Arts.
    30 Jul 1928outcome not readJournal 1928, p. 1551 ↗
  • Monson Bros. was paid $668.40 for extra cleaning and painting of the Palace of Fine Arts.
    4 Sep 1928outcome not readJournal 1928, p. 1791 ↗
  • Claim of $668.40 to Monson Bros. for extra cleaning and painting of the Palace of Fine Arts is listed for payment.
    17 Sep 1928outcome not readJournal 1928, p. 1867 ↗
  • Monson Bros. was paid $1,223.75 for removing the old floor at the Palace of Fine Arts.
    10 Dec 1928passedJournal 1928, p. 2597 ↗
  • Monson Bros. was paid $1,223.75 for removing an old floor at the Palace of Fine Arts.
    17 Dec 1928outcome not readJournal 1928, p. 2640 ↗
  • A claim paid, its subject not named on this page
  • Second payment of $12,751.76 to Monson Bros. under the Palace of Fine Arts repair contract was approved.
    28 Jul 1930passedJournal 1930, p. 1836 ↗
  • Monson Bros. is paid $3,978.95 for repairs to the Palace of Fine Arts. linked by the name only, not checked
    8 Sep 1930outcome not readJournal 1930, p. 2105 ↗
  • A final payment of $7,305.60 to Monson Brothers for rehabilitating the Palace of Fine Arts was allowed. linked by the name only, not checked
    20 Apr 1931passedJournal 1931, p. 805 ↗