All decisions
about 180 Board decisions about Old Mission Portland Cement, in date order. Each links to its printed page.
- John Proctor's garage permit on Sacramento Street revoked
- Payments to four suppliers totalling $3,043.47 for Hetch Hetchy supplies await a final vote.
- $7,000 set aside to furnish the new Harrison Street School linked by the name only, not checked
- Pacific Gas & Electric to be paid $31,849.86 for railway power
- William P. Filmer paid for land for the Parkside School linked by the name only, not checked
- Board authorized payments to dozens of suppliers and contractors, including Hetch Hetchy works and library book binding; vote continues on next page.
- Henry C. Hagensen allowed a public garage on Valencia Street
- Four suppliers are authorized to be paid for Hetch Hetchy equipment, drill steel, blankets and butter claims. linked by the name only, not checked
- The Board passed for printing a resolution authorizing payments to suppliers and contractors, mostly for Hetch Hetchy works, totalling over $50,000.
- Payments authorized to claimants including plumbing at Commodore Sloat School and supplies for Hetch Hetchy; final vote continues on next page.
- Lumber and sewer material contracts awarded to Beronio Lumber and others
- Board allowed a batch of supply and utility claims, including lighting for public libraries and a $1,000 Auditorium deposit refund. linked by the name only, not checked
- Resolution proposed to authorize payments from $896 to $16,825 to suppliers and contractors for transit, water and street work; passed for printing.
- Municipal Railway bills approved for payment to Market Street Railway
- Marion Steam Shovel Company paid $19,503 for a Hetch Hetchy shovel
- Resolution authorizes payments from city funds to many claimants, including Utah Construction Co. and Pacific Gas and Electric Co., for Hetch Hetchy and city services.
- Six cement companies bid to supply the City through June 30, 1922; the bids were referred to the Supplies Committee.
- City pays for Hetch Hetchy tunnels and school plumbing
- Old Mission Portland Cement Company is proposed for a cement supply contract running to June 30, 1922.
- Pacific Gas and Electric paid $29,563.62 for power
- Payments to dozens of city suppliers, contractors and institutions authorized, including Hetch Hetchy dam work and school construction.
- Resolution authorizes dozens of city payments to suppliers and contractors, including the Hetch Hetchy dam and school construction work.
- Board authorized construction and architect payments for several San Francisco schools, including Horace Mann, Commodore Sloat, Columbus, McKinley and Adams.
- Old Mission Portland Cement Co. was paid $3,273 for cement supplied to the Public Works department.
- Board authorized dozens of city payments to contractors, utilities and suppliers for schools, streets, water and departments.
- Payments authorized from city funds to contractors and claimants for school building, Taraval transit line and Hetch Hetchy dam work. linked by the name only, not checked
- Resolution authorizes payments to dozens of city suppliers and contractors for schools, parks, Municipal Railways and Hetch Hetchy.
- Resolution 20038 (New Series) is set out in full, with its outcome printed on the following page. linked by the name only, not checked
- A resolution proposed authorizing payments from the Water Construction Fund to many suppliers for Hetch Hetchy works.
- Resolution authorizes payments to many suppliers and firms from Hetch Hetchy water and Municipal Railway funds.
- The Board authorises dozens of payments to contractors and suppliers for Hetch Hetchy, Municipal Railway, schools, fire houses and pensions.
- A schedule of city claims for schools, Hetch Hetchy supplies and San Francisco Hospital bills is listed for payment, continuing onto the next page. linked by the name only, not checked
- Resolution passed authorizing payments to contractors and suppliers for schools, Hetch Hetchy works and the Municipal Railway. linked by the name only, not checked
- Board passed for printing an authorization of payments to many claimants, including $114,617.18 to Utah Construction Co. for the Hetch Hetchy dam. linked by the name only, not checked
- Resolution authorizing payments to suppliers and contractors for Hetch Hetchy, tunnel, school and railway works; final vote continues beyond this page. linked by the name only, not checked
- Water Construction Fund payments authorized to 31 claimants for supplies, power plant parts and San Mateo County aqueduct lands. linked by the name only, not checked
- Payments totalling $123,077.99 authorized to suppliers and contractors, including $76,127.13 to Utah Construction Co. for Hetch Hetchy dam. linked by the name only, not checked
- Resolution authorizes dozens of city payments to suppliers, utilities, contractors and the employees' pension system, March 1923. linked by the name only, not checked
- Resolution moved by McLeran would authorize payments from the Water Construction Fund to suppliers including Old Mission Portland Cement Co., passed for printing. linked by the name only, not checked
- Payments authorised to city suppliers and contractors for water, library, school, park and fire work, passed for printing. linked by the name only, not checked
- Board authorized payments from the Water Construction Fund to about 21 suppliers and insurers, including Old Mission Portland Cement and Hetch Hetchy insurance premiums. linked by the name only, not checked
- Dozens of city claims to suppliers and contractors, including school, Hetch Hetchy and Municipal Railway work, were passed for printing. linked by the name only, not checked
- City pays $3,118.71 to improve Pomona Street by Bay View School
- Board finally passed Resolution 21119 authorizing 21 payments totalling $74,746 for water, schools, library and street work. linked by the name only, not checked
- Supervisor McLeran's resolution to authorize about $60,000 in Hetch Hetchy water bond payments was passed for printing. linked by the name only, not checked
- Supervisor McLeran moves to authorize payments to dozens of claimants for library books, Hetch Hetchy works, Municipal Railway power and school construction. linked by the name only, not checked
- Board proposed paying claims to many landowners and suppliers, mostly for Hetch Hetchy water works, pending final passage.
- Eaton & Smith paid $7,800 for work on Sloat Boulevard linked by the name only, not checked
- Resolution to pay about twenty suppliers and landowners for Hetch Hetchy and right-of-way work was passed for printing on McLeran's motion. linked by the name only, not checked
- Resolution 21297 authorizes payments for Hetch Hetchy water works equipment, cement, supplies and rights of way to named claimants. linked by the name only, not checked
- Payments totalling $111,214.13 to 39 suppliers and contractors are authorized for city departments. linked by the name only, not checked
- Resolution authorizing payments to 18 claimants, including Hetch Hetchy tunnel and Municipal Railway car bodies, was passed for printing. linked by the name only, not checked
- Board authorizes payments from city funds to more than thirty suppliers, contractors and claimants, including Utah Construction Co. linked by the name only, not checked
- Grant Smith & Co. paid $31,100.58 for the Pulgas Tunnel linked by the name only, not checked
- Old Mission Portland Cement Co. was authorized to be paid $5,955.65 for cement.
- Old Mission Portland Cement Co. was authorized to be paid $2,182.03 for cement.
- Resolution authorizing dozens of city payments to suppliers and contractors for library, water, school, jail, police and fire needs. linked by the name only, not checked
- Eleven payments to suppliers and contractors for public library and water works were passed for printing.
- Old Mission Portland Cement Co. was authorized to be paid $7,732.77 for cement.
- Old Mission Portland Cement Co. was authorized to be paid $3,759.62 for cement.
- Board authorizes many payments to suppliers and contractors, including school construction and county jail bread, from city funds. linked by the name only, not checked
- Board approved payments to several firms, including $2,295 to Maundrell & Bowen for public library painting. linked by the name only, not checked
- Supervisor McGregor moved a resolution authorizing expenditure of certain amounts, passed for printing. linked by the name only, not checked
- Board to authorize payments to thirty claimants for Hetch Hetchy supplies and a New Mission High School architect; final vote follows. linked by the name only, not checked
- Board authorizes payments to landowners for Hetch Hetchy water right-of-way lands in San Mateo and Stanislaus counties. linked by the name only, not checked
- Payments from the Water Construction Fund for Hetch Hetchy oil, machine parts and right-of-way land; final vote not printed here. linked by the name only, not checked
- Board authorized payments to about 34 suppliers and utilities from Water and Railway funds; list continues next page. linked by the name only, not checked
- Resolution authorizing Water Construction Fund payments to about twenty suppliers for Hetch Hetchy work; final passage begun, vote not printed here. linked by the name only, not checked
- Board passed for printing a resolution authorizing payments to suppliers and contractors for water, transit and school work. linked by the name only, not checked
- $10,000 set aside for furniture at Galileo High School linked by the name only, not checked
- Payments to suppliers, utilities, contractors and pension funds from city accounts are authorized, passed 17 to none. linked by the name only, not checked
- Payments from city accounts authorized to dozens of suppliers and claimants for schools, water, parks and Municipal Railway. linked by the name only, not checked
- Payments authorized to a dozen suppliers and claimants, including for Municipal Railways work and school urinals and roofing. linked by the name only, not checked
- Conrad B. Sovig gets $18,890 to paint the city's bridges linked by the name only, not checked
- Bethlehem Steel paid $511 for switch parts for the Municipal Railway linked by the name only, not checked
- Resolution authorizing payments to city suppliers and claimants, including library books and Hetch Hetchy supplies, was passed for printing. linked by the name only, not checked
- Board proposes paying about thirty claimants for Hetch Hetchy land, school construction and Municipal Railway supplies. linked by the name only, not checked
- Five payments totalling $15,341.89 authorized for library books, Hetch Hetchy groceries and drill steel; final vote on next page. linked by the name only, not checked
- G. E. Stechert & Co. paid $7,829.98 for library books linked by the name only, not checked
- Payments of 38 claims passed for library, hospital, Municipal Railway and other city bills, including $54,342.59 to Union Construction. linked by the name only, not checked
- Supervisor McLeran's resolution authorizing water fund payments to suppliers such as Old Mission Portland Cement was passed for printing. linked by the name only, not checked
- Board finally passed resolution authorizing payment of over fifty city claims, including PG&E, Market Street Railway and Spring Valley Water. linked by the name only, not checked
- Board finally passed payments to suppliers and insurers from the Water Construction Fund, including Hetch Hetchy items. linked by the name only, not checked
- Resolution authorizing payment of 35 city claims to suppliers and contractors for water, parks, schools and streets. linked by the name only, not checked
- Resolution authorizes $1,084.65 to H. A. Levy & J. Zentner Co. and $1,456.76 to M. M. O'Shaughnessy from water funds. linked by the name only, not checked
- Payments from library and water funds for books, painting, land rights and cement passed for printing. linked by the name only, not checked
- Resolution authorizes many city payments from various funds to suppliers, contractors, pensioners and charities for library, water, school and street work. linked by the name only, not checked
- Payments from the Water Construction Fund for Hetch Hetchy supplies and Alameda County land were passed for printing. linked by the name only, not checked
- Resolution authorizes payments to dozens of suppliers and contractors, including $164,171.24 to Western Pipe and Steel for a bay crossing pipe line. linked by the name only, not checked
- Board passed payment of claims to suppliers and contractors, including Hetch Hetchy, Municipal Railway and school construction.
- $1,127.40 set aside to improve Seneca Avenue at school property linked by the name only, not checked
- A resolution authorizes payments from the Water Construction Fund to several suppliers, including cement for Hetch Hetchy work. linked by the name only, not checked
- Resolution authorizes payment of many city claims to suppliers and contractors from several city funds, including Hetch Hetchy construction. linked by the name only, not checked
- Supervisor McLeran moved to authorize payment of many city claims, including PG&E, orphanages and a Funston Playground contractor; passed for printing. linked by the name only, not checked
- Resolution authorizes payment of listed claims to city suppliers and utilities, including $47,407.44 to PG&E for street lighting. linked by the name only, not checked
- The Board authorizes payments to many vendors for school equipment, Municipal Railway power, and Hetch Hetchy supplies and construction. linked by the name only, not checked
- Board authorized payments to suppliers for library books, Auditorium utility service, and Municipal Railway supplies, with the full list continuing.
- Payments from the Water Construction Fund for Hetch Hetchy supplies, including lumber and cement, were passed for printing.
- Charles L. Harney paid for land taken for Roosevelt Way linked by the name only, not checked
- Seventeen Hetch Hetchy construction payments to suppliers were authorized for printing, totalling about $38,000 in claims. linked by the name only, not checked
- Sixteen supplier claims for Hetch Hetchy construction, including $10,861.76 to Old Mission Portland Cement Co., finally passed. linked by the name only, not checked
- Payments authorised to dozens of suppliers and contractors for Hetch Hetchy, school and Municipal Railway work, June 1924.
- Resolution authorizing city payments to numbered claimants, including library, Hetch Hetchy contractor and orphanage claims; outcome printed on next page. linked by the name only, not checked
- Board authorized payments from city funds to many claimants, including library suppliers, Hetch Hetchy contractors, orphanages and San Francisco Hospital suppliers. linked by the name only, not checked
- Grant Smith & Company paid $49,309.60 for the Pulgas Tunnel linked by the name only, not checked
- Board began authorizing payments from the Water Construction Fund to suppliers including Old Mission Portland Cement Co.
- Board authorizes payments from the Water Construction Fund to many suppliers, including cement, groceries and Hetch Hetchy hauling; vote continues on next page. linked by the name only, not checked
- Old Mission Portland Cement paid for cement for Hetch Hetchy linked by the name only, not checked
- Resolution proposes paying claimants for library books, Galileo High School architecture, and Hetch Hetchy and Bay Crossing water works. linked by the name only, not checked
- Board authorized dozens of payments to suppliers and contractors, including $112,486.21 to Healy-Tibbitts for Dumbarton bridge work. linked by the name only, not checked
- Resolution authorizing payment of 28 named claims from city funds, including Hetch Hetchy valves and school and fire station work, passed for printing. linked by the name only, not checked
- Supervisor McLeran's resolution authorizes payments from water and Municipal Railway funds to cement, oil, insurance and utility suppliers; passed for printing.
- Hetch Hetchy bills paid, including $97,511.74 for the Dumbarton Straits bridge linked by the name only, not checked
- Resolution authorizing amounts to be spent from named city funds was taken up for final passage; the vote continues on the next page. linked by the name only, not checked
- Payments from water and Municipal Railway funds to cement, oil, lumber and power suppliers were put forward for final passage.
- Board passed for printing a resolution authorizing payments to suppliers and contractors for Hetch Hetchy, Municipal Railway and schools.
- Proposed resolution authorizing 27 payments to suppliers and contractors for railway, Hetch Hetchy water and school work. linked by the name only, not checked
- Resolution authorizes payment of 39 claims to suppliers, contractors and utilities, including Hetch Hetchy and Municipal Railway costs. linked by the name only, not checked
- Old Mission Portland Cement Co. is paid $4,476 for cement.
- A resolution authorizing Hetch Hetchy water construction payments to many contractors was passed for printing. linked by the name only, not checked
- Board authorized seven claim payments from city funds, including to Edgewater Steel Co. and Old Mission Portland Cement Co. linked by the name only, not checked
- Resolution authorizing a long list of city payments to vendors and contractors from various funds, outcome continues on the next page.
- Payments to suppliers and contractors for Hetch Hetchy water works and Municipal Railway projects were authorized, continuing on the next page. linked by the name only, not checked
- San Francisco News Co. paid $2,860.36 for library books linked by the name only, not checked
- Claim of $8,952 to Old Mission Portland Cement Co. for cement, listed for payment. linked by the name only, not checked
- Claim of $8,206 to Old Mission Portland Cement Co. for cement, listed for payment. linked by the name only, not checked
- Claim of $3,730 to Old Mission Portland Cement Co. for cement, listed for payment. linked by the name only, not checked
- Claim of $4,476 to Old Mission Portland Cement Co. for cement, listed for payment. linked by the name only, not checked
- Claim of $882.64 to Old Mission Portland Cement Co. for cement, listed for payment. linked by the name only, not checked
- Claim of $3,270.50 to Old Mission Portland Cement Co. for cement, listed for payment. linked by the name only, not checked
- Claim of $3,826.98 to Old Mission Portland Cement Co. for cement, listed for payment. linked by the name only, not checked
- Thirty-eight claims are authorized for payment from water, library and Municipal Railway funds to suppliers and utilities. linked by the name only, not checked
- Twenty payments from city funds were proposed for Hetch Hetchy water works, supplies, legal and engineering work, and a Lincoln Park boulevard job. linked by the name only, not checked
- Resolution authorizes payments from water bond funds to suppliers and contractors for Hetch Hetchy works; vote continues next page. linked by the name only, not checked
- The Board moves to authorize Hetch Hetchy water construction fund payments to Del Monte Meat Co., M. M. O'Shaughnessy, Robert M. Searls and others. linked by the name only, not checked
- Board authorizes payments to contractors and suppliers for school, fire, sewer, water and street work across the city.
- Payments to suppliers and insurers for Hetch Hetchy water works are authorized from the Water Construction Fund. linked by the name only, not checked
- Board authorized payments from city funds to about two dozen private claimants for fuel, cement, architecture, paint and construction work. linked by the name only, not checked
- Payment of 26 claims totalling $74,488.49 to contractors and suppliers for Hetch Hetchy, schools, and streets approved. linked by the name only, not checked
- Payments authorized from city funds to suppliers, contractors and pension system for library, water and Municipal Railway work; vote continues next page. linked by the name only, not checked
- Ahabot Ackin Congregation paid for land at Burrows and Girard Streets linked by the name only, not checked
- Board authorizes payments to several firms, including Old Mission Portland Cement Co. for Hetch Hetchy cement, from the Water Construction Fund. linked by the name only, not checked
- Resolution proposed authorizing payments from city bond funds to suppliers and contractors for schools and water works; passed for printing. linked by the name only, not checked
- Payments to suppliers including Standard Oil and Del Monte for Hetch Hetchy water construction were authorized; final vote continues next page. linked by the name only, not checked
- $800 paid to Paul Russo to settle a Municipal Railway claim
- $800 paid to Paul Russo to settle a Municipal Railway claim linked by the name only, not checked
- Supervisors passed for printing a resolution authorising payments of about 38 city claims to named contractors and suppliers.
- John Reinhard paid for his land at Burrows and Brussels Streets linked by the name only, not checked
- John Reinhard paid for his land at Burrows and Brussels Streets linked by the name only, not checked
- Hetch Hetchy bills paid to Associated Oil and other suppliers linked by the name only, not checked
- Pending resolution would authorize payments to vendors and claimants, including library book suppliers, Hetch Hetchy contractors, and Pacific Gas and Electric. linked by the name only, not checked
- Thirty city claims for library, water, street, school and other work approved for payment, passed on final reading. linked by the name only, not checked
- Board authorizes payments to dozens of suppliers and contractors for schools, water works, Muni and street improvements. linked by the name only, not checked
- Board authorizes payments totalling about $29,000 to thirteen city suppliers and claimants, including Hetch Hetchy and pumping plant work. linked by the name only, not checked
- Supervisor McLeran's resolution authorizing payments to many contractors and suppliers for police, water, schools and street work was passed for printing. linked by the name only, not checked
- C. Boccone paid for Montana Street land for Ocean View Playground linked by the name only, not checked
- Resolution on motion of Supervisor McLeran authorizing payments to contractors and suppliers for Hetch Hetchy work was passed for printing. linked by the name only, not checked
- Resolution authorizing city payments to many claimants for Hetch Hetchy, Municipal Railway, school and Kezar Stadium work; final vote continues next page. linked by the name only, not checked
- Resolution authorizes payments to contractors and suppliers for schools, Relief Home, Hetch Hetchy and other city works; final vote not on this page. linked by the name only, not checked
- Resolution 24175 on authorizations was up for final passage; its outcome appears on the next page. linked by the name only, not checked
- Payments to several contractors for Moccasin Power House and school construction work are proposed from bond funds. linked by the name only, not checked
- Eaton & Smith to be paid $3,784.15 for Hawes Street work linked by the name only, not checked
- Old Mission Portland Cement Co. was paid $1,794.02 for cement used in street repairs. linked by the name only, not checked
- Resolution 24373 authorizing listed amounts was up for final passage; its outcome is not printed on this page. linked by the name only, not checked
- Resolution authorizing payments to suppliers, contractors and a land seller from Hetch Hetchy, school and relief home funds was passed for printing. linked by the name only, not checked
- Authorizes many payments from city bond and general funds to contractors, suppliers and claimants for Hetch Hetchy, schools and buildings. linked by the name only, not checked
- Payments for school construction, Hetch Hetchy water works and park work were sent to print for authorization.
- Board authorized dozens of payments to contractors and suppliers for school buildings, a San Jose avenue bridge, and Hetch Hetchy works. linked by the name only, not checked
- Resolution proposed authorizing payments to many city contractors and suppliers for schools, Relief Home, Hetch Hetchy and street work; passed for printing. linked by the name only, not checked
- Board approved a batch of city payments on April 19, 1926, covering Hetch Hetchy works, street supplies, relief home supplies and widows' pensions. linked by the name only, not checked
- Board authorized about 38 routine city payments, mostly school construction and Relief Home work, for passage to print. linked by the name only, not checked
- Payments authorized to suppliers and contractors for schools, water, fire and sewer work; the vote continues on the next page. linked by the name only, not checked
- Municipal Construction Company gets $11,500 to improve Stanyan Street linked by the name only, not checked
- Board authorized payments from park, school and Hetch Hetchy bond funds to named contractors and suppliers, with the vote on the next page. linked by the name only, not checked
- Resolution authorizes dozens of payments to listed contractors and suppliers for schools, Hetch Hetchy, parks, libraries and transit. linked by the name only, not checked
- Proposed resolution authorizing payments to suppliers and contractors for Hetch Hetchy, school, park and health work.
- The Board authorizes payments from the Hetch Hetchy bond fund to suppliers of explosives, machinery, tires and food for construction. linked by the name only, not checked
- Chinatown playground finished, $1,200.19 in final payment
- Payments to suppliers and contractors for parks, schools, Municipal Railway and water mains were authorized; final vote is on the next page. linked by the name only, not checked
- Resolution authorizes payment of many city claims to contractors and suppliers, including Tubercular Sanitarium, Hetch Hetchy and school construction work. linked by the name only, not checked
- City pays plumbing and building bills for tuberculosis sanitarium linked by the name only, not checked
- Payment of $607.25 to Old Mission Portland Cement Co. for Hetch Hetchy cement was held over one week. linked by the name only, not checked
- Resolution authorizing about two dozen city payments to contractors and suppliers, including parks, schools, Hetch Hetchy and Municipal Railway, was passed for printing. linked by the name only, not checked
- Board authorizes payments to dozens of city suppliers and contractors from park, school, Hetch Hetchy, and Municipal Railway funds. linked by the name only, not checked