  • Finance Committee recommended a $40,794 Parking Authority appropriation, amended to $38,794 after cutting an automobile purchase. linked by the name only, not checked
    7 Nov 1949outcome not readJournal 1949, p. 913 ↗
  • Parking Authority budget appropriation was cut from $40,794 to $33,964 by amendment, with the final vote on the next page.
    14 Nov 1949outcome not readJournal 1949, p. 929 ↗
  • $1,250 would pay for a traffic survey near Market Street
    16 Apr 1951passed first readingJournal 1951, p. 352 ↗
  • A substitute ordinance for $1,250 for a Parking Authority traffic survey in the Central Market area passed for second reading.
    23 Apr 1951passed first readingJournal 1951, p. 364 ↗
  • $1,250 parking survey near central Market Street approved
    7 May 1951passedJournal 1951, p. 422 ↗
  • Parking Authority granted $1,100 from the emergency reserve to send officials to Washington to appeal a materials denial for the St. Mary's Square garage.
    4 Jun 1951passedJournal 1951, p. 589 ↗
  • Ordinance appropriating $500 to the Parking Authority for a traffic and parking demand study in North Beach passed.
  • $22,500 voted for plans for the St. Mary's Square garage
    31 Mar 1952passedJournal 1952, p. 242 ↗
  • Supervisor McCarty's $1,100 supplemental appropriation for Parking Authority parking studies in the Central Market Area was referred to Finance Committee. linked by the name only, not checked
    8 Sep 1953referredJournal 1953, p. 760 ↗
  • Controller asked that the $450 parking study appropriation return to the Finance Committee, and it was sent back.
    8 Sep 1953referredJournal 1953, p. 753 ↗
  • $1,100 proposed for more study of Market Street parking
    21 Sep 1953passed first readingJournal 1953, p. 786 ↗
  • $1,100 approved for more Market Street parking study
    28 Sep 1953passedJournal 1953, p. 799 ↗
  • Parking Authority appropriated $35,000 to buy off-street parking sites at Lakeside Village, finally passed.
    28 Nov 1955passedJournal 1955, p. 797 ↗
  • An adoption vote with no subject on this page
    25 Jun 1956passed first readingJournal 1956, p. 375 ↗
  • Parking Authority ordinance appropriating $463 to buy an electric mimeograph machine passed for second reading.
    25 Nov 1957passed first readingJournal 1957, p. 787 ↗
  • The Board appropriated $463 for the Parking Authority to buy an electric mimeograph machine.
    2 Dec 1957passedJournal 1957, p. 799 ↗
  • The Parking Authority's proposed $2.15M appropriation for a Sutter-Stockton parking site passed first reading and was deleted from the Ellis-O'Farrell garage funds.
    13 Jan 1958passed first readingJournal 1958, p. 20 ↗
  • $10,000 finally passed for Parking Authority survey of neighborhood shopping districts' parking needs.
    29 Dec 1958passedJournal 1958, p. 815 ↗
  • Money for off-street parking in neighbourhood shopping areas linked by the name only, not checked
    20 Jun 1960passedJournal 1960, p. 381 ↗
  • Parking Authority money for neighborhood shopping parking approved
    24 Oct 1960passedJournal 1960, p. 24 ↗
  • Supervisors passed an ordinance appropriating $400,000 to the Parking Authority for off-street parking in neighborhood shopping districts.
    10 Jul 1961passedJournal 1961, p. 354 ↗
  • Probe ordered into elderly people committed to state mental hospitals linked by the name only, not checked
    10 Jul 1961passedJournal 1961, p. 337 ↗
  • Five police motorcycle traffic jobs sent for final vote. linked by the name only, not checked
    11 Sep 1962pendingJournal 1962, p. 482 ↗
  • Bids for viewing machines at Christmas Tree Point approved
    17 Sep 1962passedJournal 1962, p. 491 ↗
  • De Young museum wing expansion and art sale moves to final vote.
    17 Jun 1963pendingJournal 1963, p. 292 ↗
  • Holy Virgin Community property at 872 Fulton Street adopted linked by the name only, not checked
    26 Oct 1964passedJournal 1964, p. 762 ↗
  • Eureka Valley parking lot lights funded for one year
    2 Nov 1964passedJournal 1964 ↗
  • Time limit waived so Masonic hall group can claim permit-fee refund
    7 Jun 1965passedJournal 1965, p. 326 ↗
  • City pays [name withheld] $24,000 to widen Bosworth Street
    8 Nov 1965passedJournal 1965 ↗
  • $44,000 for a North Beach garage split off for separate vote
    14 Feb 1967outcome not readJournal 1967, p. 108 ↗
  • $44,000 for North Beach public parking facility approved
    20 Feb 1967passedJournal 1967, p. 121 ↗
  • About $979,000 for city department spending linked by the name only, not checked
    19 Jun 1967passedJournal 1967 ↗
  • An appropriation of $841,695 for a North Beach public parking facility was referred to the Finance Committee.
    3 Jul 1967referredJournal 1967, p. 576 ↗
  • Proposed $841,695 appropriation for a public parking facility in North Beach passed for second reading.
    10 Jul 1967passed first readingJournal 1967, p. 582 ↗
  • North Beach public parking garage moves toward final approval.
    10 Jul 1967pendingJournal 1967, p. 583 ↗
  • North Beach public parking garage approved; $841,695 to build it
    17 Jul 1967passedJournal 1967, p. 597 ↗
  • An ordinance appropriating $18,981 for Parking Authority functions through fiscal year 1967-68 was referred to the Finance Committee. linked by the name only, not checked
    16 Oct 1967referredJournal 1967, p. 828 ↗
  • Parking Authority staff pay rules proposed; vote not shown here.
    30 Oct 1967outcome not readJournal 1967, p. 859 ↗
  • Parking Authority funding for rest of year
    6 Nov 1967passedJournal 1967, p. 872 ↗
  • $255,000 Polk Street parking facility still awaiting final vote.
    19 Aug 1968pendingJournal 1968, p. 684 ↗
  • $255,000 voted to build public parking in the Polk Street district
    3 Sep 1968outcome not readJournal 1968, p. 695 ↗
  • Proposal for $120,000 to buy land and build shopping-district parking.
    24 Sep 1973outcome not readJournal 1973, p. 929 ↗
  • Proposal for $120,000 to buy land and build shopping-district parking.
    1 Oct 1973outcome not readJournal 1973, p. 944 ↗
  • Parking Authority contract money; no vote shown here.
    9 Jun 1975outcome not readJournal 1975, p. 603 ↗
  • $62,000 sought for parking bays in the Outer Irving district
    28 Jul 1975passed first readingJournal 1975, p. 828 ↗
  • $62,000 sought for parking bays in the Outer Irving district
    4 Aug 1975passedJournal 1975, p. 851 ↗
  • $20,000 for Embarcadero garage moves toward final vote.
    5 Jan 1976pendingJournal 1976, p. 20 ↗
  • $3,170 sought for lane work at Portsmouth Square Garage linked by the name only, not checked
    11 Apr 1977passed first readingJournal 1977, p. 315 ↗
  • $3,170 sought for lane work at Portsmouth Square Garage linked by the name only, not checked
    18 Apr 1977passedJournal 1977, p. 335 ↗
  • Parking Authority buys 5,600 new parking meters for $448,000 linked by the name only, not checked
  • $700 for Parking Authority contracts and travel approved linked by the name only, not checked
    22 May 1978passedJournal 1978, p. 621 ↗
  • $258 voted to restripe parking lots on Ocean Avenue linked by the name only, not checked
    30 May 1978referredJournal 1978, p. 673 ↗
  • $495 more paid to Social Security for Parking Authority staff linked by the name only, not checked
    30 May 1978passedJournal 1978, p. 651 ↗
  • Neighborhood shopping district design money advanced; final vote pending. linked by the name only, not checked
    7 Aug 1978pendingJournal 1978, p. 947 ↗
  • Parking facility study at George Peabody School site advanced; final vote pending. linked by the name only, not checked
    7 Aug 1978pendingJournal 1978, p. 948 ↗
  • Parking Authority shifts $300 from salaries to printing and postage
    16 Apr 1979passedJournal 1979 ↗
  • Parking Authority out-of-town travel money awaits final vote.
    2 Jul 1979pendingJournal 1979, p. 811 ↗
  • Proposed $7,208 for Parking Authority facility upkeep.
    11 Sep 1979pendingJournal 1979, p. 1098 ↗
  • $743,625 parking meter money sent back to committee. linked by the name only, not checked
    24 Sep 1979pendingJournal 1979, p. 1155 ↗
  • $10,000 for parking authority legal costs passed first vote. linked by the name only, not checked
    24 Sep 1979pendingJournal 1979, p. 1157 ↗
  • $10,000 for Parking Authority lawsuit costs linked by the name only, not checked
  • Board passed on second reading a $20,000 appropriation to the Parking Authority for professional special services. linked by the name only, not checked
    24 Mar 1980passed first readingJournal 1980, p. 310 ↗
  • Parking Authority $20,000 appropriation for professional special services was continued to April 7, 1980. linked by the name only, not checked
    31 Mar 1980continuedJournal 1980, p. 337 ↗
  • Board passed for second reading a $438,230 appropriation for the Parking Authority to buy land for a Performing Arts Garage site.
    8 Sep 1980passed first readingJournal 1980, p. 961 ↗
  • Parking Authority funding of $320,000 for the Moscone Center Garage project passed for second reading. linked by the name only, not checked
    15 Sep 1980passed first readingJournal 1980, p. 996 ↗
  • Board passed an ordinance appropriating $320,000 from the Parking Authority for the Moscone Center Garage project. linked by the name only, not checked
    22 Sep 1980passedJournal 1980, p. 1014 ↗
  • A $25,000 appropriation for Parking Authority professional services passed on first reading. linked by the name only, not checked
    20 Oct 1980passed first readingJournal 1980, p. 1116 ↗
  • Parking Authority appropriation of $43,800 to double deck the Marina Parking Facility passed for second reading.
    27 Oct 1980passed first readingJournal 1980, p. 1141 ↗
  • $120,000 proposed to double-deck the Mission Bartlett Parking Plaza linked by the name only, not checked
    3 Nov 1980passed first readingJournal 1980, p. 1165 ↗
  • $120,000 proposed to double-deck the Mission Bartlett Parking Plaza linked by the name only, not checked
    10 Nov 1980passedJournal 1980, p. 1183 ↗
  • Board passed a $2,225,000 appropriation for Parking Authority off-street parking for fiscal year 1980-81.
    11 May 1981passedJournal 1981, p. 466 ↗
  • Board passed a $149,549 appropriation for Parking Authority capital projects. linked by the name only, not checked
    11 May 1981passedJournal 1981, p. 466 ↗
  • Board passed on second reading $65,480 for Parking Authority capital projects, with funds held pending a feasibility report. linked by the name only, not checked
    18 May 1981passed first readingJournal 1981, p. 494 ↗
  • Ordinance adding $150 to the Parking Authority revolving fund passed on first reading.
    28 Sep 1981passed first readingJournal 1981 ↗
  • Ordinance appropriating $200,000 to Parking Authority capital projects was continued to October 19, 1981. linked by the name only, not checked
    5 Oct 1981continuedJournal 1981 ↗
  • Board continued File 101-81-25, a $200,000 appropriation for the Parking Authority, after debate on housing delays. linked by the name only, not checked
    5 Oct 1981continuedJournal 1981 ↗
  • Ordinance appropriating $200,000 for Parking Authority capital projects passed for second reading.
    26 Oct 1981passed first readingJournal 1981 ↗
  • A $16,000 appropriation for maintenance of the Geary Mall public parking garage was sent to the Finance Committee.
    15 Mar 1982referredJournal 1982 ↗
  • $1,368,000 sought for Candlestick Park recreation projects
    12 Apr 1982passed first readingJournal 1982 ↗
  • Parking Authority appropriation of $7,500 for [name withheld] services passed for second reading.
    12 Apr 1982passed first readingJournal 1982 ↗
  • Ordinance appropriating $95,095 for the Performing Arts Garage budget passed for second reading.
    3 May 1982passed first readingJournal 1982 ↗
  • Appropriates $95,095 to the Parking Authority for the Performing Arts Garage project budget.
    10 May 1982passedJournal 1982 ↗
  • The Parking Authority's $2,560.80 appropriation for fees and fringe benefits passed on first reading.
    20 Sep 1982passed first readingJournal 1982 ↗
  • $15,000 for professional and special services at the Parking Authority, sponsored by Supervisor Molinari, passed on first reading.
    20 Sep 1982passed first readingJournal 1982 ↗
  • An ordinance proposed to appropriate $272,000 to the Parking Authority budget for the Performing Arts Garage.
    20 Sep 1982outcome not readJournal 1982 ↗
  • The Parking Authority received $2,560.80 for fees, compensation and benefits; the ordinance was finally passed.
    27 Sep 1982passedJournal 1982 ↗
  • Proposed $694,250 appropriation for Parking Authority capital projects, passed for second reading. linked by the name only, not checked
    27 Sep 1982passed first readingJournal 1982 ↗
  • Parking Authority capital projects appropriation of $694,250 was finally passed.
    4 Oct 1982passedJournal 1982 ↗
  • Old Yerba Buena school yard to be leased for parking
    18 Oct 1982passedJournal 1982 ↗
  • A $9,003 Parking Authority budget for the parking meter program passed first reading.
    18 Oct 1982passed first readingJournal 1982 ↗
  • $9,003 appropriated to the Parking Authority for its parking meter program, finally passed.
    25 Oct 1982passedJournal 1982 ↗
  • $20,000 appropriated to convert the Yerba Buena School play yard into public parking, finally passed.
    25 Oct 1982passedJournal 1982 ↗
  • Parking Authority appropriation of $7,300 for Public Works engineering services passed for second reading.
    22 Nov 1982passed first readingJournal 1982 ↗
  • Board adopted motion releasing $51,100 held in reserve to the Parking Authority for the Performing Arts Garage.
    10 Jan 1983passedJournal 1983 ↗
  • Ordinance appropriating $23,105.60 for Parking Authority payments to the Tax Collector passed on first reading.
    14 Mar 1983passed first readingJournal 1983 ↗
  • Supervisors adopted a resolution releasing $42,900 held in reserve to the Parking Authority for the [name withheld] garage.
    22 Mar 1983passedJournal 1983 ↗
  • Ordinance adding $250 to the Parking Authority revolving fund passed for second reading; the vote is on the next page.
    4 Apr 1983passed first readingJournal 1983 ↗
  • Parking Authority cash revolving fund proposed to increase to $500; passed for second reading.
    4 Apr 1983passed first readingJournal 1983 ↗
  • Parking Authority cash revolving fund increased to $500, finally passed.
    11 Apr 1983passedJournal 1983 ↗
  • $250,000 proposed for the Mission-Bartlett parking plaza
    31 May 1983passed first readingJournal 1983 ↗
  • The Board passed on first reading a $150,000 appropriation to the Parking Authority for the Performing Arts Center Garage budget.
    6 Sep 1983passed first readingJournal 1983 ↗
  • Parking Authority receives $150,000 for the Performing Arts Center Garage project budget, finally passed.
    12 Sep 1983passedJournal 1983 ↗
  • Parking Authority budget changed by rescinding and appropriating $24,044 for salaries of one created and one abolished position; passed for second reading.
    12 Dec 1983passed first readingJournal 1983 ↗
  • Parking Authority salary funds are shifted by $24,044, creating one position and abolishing another; ordinance passed.
    19 Dec 1983passedJournal 1983 ↗
  • Board passed on first reading an ordinance appropriating $216,000 for commercial store space at the Performing Arts Garage.
    3 Jan 1984passed first readingJournal 1984 ↗
  • Appropriates $216,000 for Parking Authority commercial store space at the Performing Arts Garage, finally passed. linked by the name only, not checked
    9 Jan 1984passedJournal 1984 ↗
  • Supervisors passed on second reading $240,087 for the Parking Authority to buy parking meters.
    21 Feb 1984passed first readingJournal 1984 ↗
  • Ordinance appropriates $240,087 for the Parking Authority to buy parking meters, finally passed.
    27 Feb 1984passedJournal 1984 ↗
  • Parking Authority gets a $274,000 appropriation for its parking meter program budget; passed finally.
    19 Mar 1984passedJournal 1984 ↗
  • Parking Authority ordinance appropriating $20,000 for [name withheld] services of other departments passed for second reading.
    23 Apr 1984passed first readingJournal 1984 ↗
  • The Board finally passed an ordinance appropriating $610,000 to the Parking Authority for the Sixteenth and Hoff parking facility.
    30 Apr 1984passedJournal 1984 ↗
  • Ordinance passed providing $20,000 to the Parking Authority for [name withheld] services from another department.
    30 Apr 1984passedJournal 1984 ↗
  • Parking Authority's $112,500 capital budget for the 16th and Hoff public parking facility passed second reading.
    17 Sep 1984passed first readingJournal 1984 ↗
  • Parking Authority received $112,500 for the 16th and Hoff Public Parking Facility capital budget, finally passed.
    24 Sep 1984passedJournal 1984 ↗
  • A proposed $126,500 appropriation for commercial store space at the Performing Arts Garage passed for second reading on the Controller's request.
    15 Oct 1984passed first readingJournal 1984 ↗
  • Board of Supervisors passed an ordinance appropriating $18,493 to the Parking Authority for electricity and other department services.
    28 Jan 1985passedJournal 1985 ↗
  • Ordinance appropriating $15,795 to the Parking Authority for property rental and telephone services passed first reading.
    19 Feb 1985passed first readingJournal 1985 ↗
  • Parking Authority granted $15,795 for property rental, telephone and other contractual services, finally passed.
    25 Feb 1985passedJournal 1985 ↗
  • Controller's $36,655 appropriation for Parking Authority meter coin cans passed for second reading.
    25 Mar 1985passed first readingJournal 1985 ↗
  • Parking Authority's $36,655 appropriation to buy parking meter coin cans was finally passed.
    1 Apr 1985passedJournal 1985 ↗
  • $195,000 for repairs to the Vallejo Street Garage
    17 Jun 1985passed first readingJournal 1985 ↗
  • Sewer to be enlarged on 12th Avenue between Kirkham and Lawton
    12 Nov 1985passedJournal 1985, p. 1423 ↗
  • Ordinance appropriating $324,619 to the Parking Authority for the Performing Arts Garage capital project passed for second reading.
    2 Dec 1985passed first readingJournal 1985, p. 1500 ↗
  • Money for the Performing Arts Garage capital budget was refused final passage, and a vote to rescind it followed.
    9 Dec 1985outcome not readJournal 1985 ↗
  • Supervisors passed on first reading $1,586,021 for the Parking Authority to buy parking meters and supplies.
    12 May 1986passed first readingJournal 1986 ↗
  • The Parking Authority appropriation of $1,586,021 to buy parking meters and supplies was finally passed.
    19 May 1986passedJournal 1986, p. 501 ↗
  • $2.2M for land for a garage at Polk and Bush Streets
    19 May 1986passed first readingJournal 1986, p. 510 ↗
  • $3.7M sought for the Lombard Street Garage project
    16 Jun 1986passedJournal 1986 ↗
  • Parking Authority's $960,000 capital budget for parking stalls at the Mission-Coleridge Project was finally passed.
    14 Jul 1986passedJournal 1986, p. 1009 ↗
  • $3.7M sought for the Lombard Street Garage linked by the name only, not checked
    11 Aug 1986passed first readingJournal 1986 ↗
  • An ordinance appropriating $350,000 to the Parking Authority for a Neighborhood Angle Program passed second reading.
    11 Jan 1988passed first readingJournal 1988, p. 29 ↗
  • Board finally passed a $415,213 appropriation to convert existing parking meters, sponsored by the Parking Authority.
    18 Jul 1988passedJournal 1988, p. 893 ↗
  • Passed for second reading: an $850,000 Parking Authority loan to repair the Japan Center Garage.
    5 Dec 1988passed first readingJournal 1988, p. 1430 ↗
  • Parking Authority granted an $850,000 loan to repair the Japan Center Garage; ordinance finally passed.
    12 Dec 1988passedJournal 1988, p. 1461 ↗
  • Parking Authority funding of $112,200 for the Diamond Market Parking Facility passed for second reading.
    3 Jan 1989passed first readingJournal 1989 ↗
  • Parking Authority funding of $112,200 for the Diamond Market Parking Facility was finally passed.
    9 Jan 1989passedJournal 1989, p. 43 ↗
  • Amended ordinance proposes $36,911 for Proposition D traffic and parking commission work and one Parking Authority position.
    6 Feb 1989outcome not readJournal 1989 ↗
  • Parking Authority budget of $500,000 for the Polk-Bush Garage, with $350,000 on reserve, passed for second reading.
    13 Mar 1989passed first readingJournal 1989 ↗
  • Parking Authority's $500,000 Polk-Bush Garage budget was finally passed, with $350,000 placed on reserve.
    20 Mar 1989passedJournal 1989, p. 244 ↗
  • The Board passed on second reading a $5M appropriation for a Chinatown parking project, with $4.45M placed on reserve.
    22 May 1989passed first readingJournal 1989 ↗
  • Parking Authority's Chinatown parking project received a capital appropriation and was finally passed.
    30 May 1989passedJournal 1989 ↗
  • Parking Authority's Upper Fillmore project received $3.5 million in capital funds, with $3.15 million placed on reserve, and was finally passed.
    30 May 1989passedJournal 1989 ↗
  • Supervisor Walker requested a hearing on releasing $30,060 in reserved funds for the Parking Meter Program; referred to Finance Committee.
    22 Jan 1990referredJournal 1990, p. 83 ↗
  • A $4,218,400 appropriation for the Polk-Bush Garage was referred to the Finance Committee for a June 6 hearing.
    29 May 1990referredJournal 1990 ↗
  • Supervisors passed on first reading $4,218,400 for the Polk-Bush Garage capital project, placed in reserve, sponsored by Supervisor Walker.
    11 Jun 1990passed first readingJournal 1990, p. 597 ↗
  • Parking Authority asked to accept a $140,000 gift from three downtown parking companies to fund a garage marketing study.
  • Housing and Neighborhood Services Committee recommended accepting a $140,000 gift from three parking corporations to fund a garage marketing study.
    1999outcome not readBoard minutes 1999, p. 1 ↗
  • Parking Authority may accept a $140,000 gift from three downtown parking companies to fund a garage marketing study.
  • Parking Authority proposed accepting a $140,000 gift from three parking corporations to fund a garage marketing study.
    1999outcome not readBoard minutes 1999 ↗
  • Real Estate Department lease of Moscone Center Garage space at 247-249 Third Street to Azad H. Nejad approved.
  • Real Estate Department lease of Moscone Center Garage space to Azad Nejad at $2,250 monthly was referred to committee.
  • Lease for mail and internet shop in Moscone garage proposed linked by the name only, not checked
    18 Jan 2000pendingBoard minutes 2000 ↗
  • Azad Nejad leases a mail shop at the Moscone Center Garage
    9 Feb 2000outcome not readBoard minutes 2000 ↗
  • Garage shop lease for a copy and mail center advances.
    9 Feb 2000pendingBoard minutes 2000 ↗
  • Garage shop space leased to a mail and internet business.
    14 Feb 2000passedBoard minutes 2000 ↗