  • Ordinance appropriating $18,250 for Redevelopment Agency salaries, services, supplies and equipment passed for second reading.
    29 Nov 1948passed first readingJournal 1948, p. 845 ↗
  • Redevelopment Agency requisition of $34,298.76 in advance funds approved for September to December 1951. linked by the name only, not checked
    27 Aug 1951passedJournal 1951, p. 809 ↗
  • The Redevelopment Agency's application for a $50,953.82 federal advance for planning in five project areas was approved.
    11 Feb 1952passedJournal 1952, p. 89 ↗
  • Requisition for $57,525 in advance funds from the Redevelopment Agency to the federal housing agency approved for September to December 1952.
    8 Sep 1952passedJournal 1952, p. 670 ↗
  • Redevelopment Agency's federal funds contract raised to $297,763 for slum clearance planning, excluding Diamond Heights Area B-1.
    27 Oct 1952passedJournal 1952, p. 791 ↗
  • Redevelopment Agency's requisition for $52,257.18 in advance funds for October to December 1952 approved.
    27 Oct 1952passedJournal 1952, p. 791 ↗
  • Approved a $103,418 federal advance to the Redevelopment Agency for Diamond Heights for January to June 1953.
    8 Dec 1952passedJournal 1952, p. 892 ↗
  • The city approved requisition No. 10, a $24,844 federal advance to the Redevelopment Agency for slum clearance planning, covering January to June 1953.
    8 Dec 1952passedJournal 1952, p. 891 ↗
  • Redevelopment Agency refund of $889.58 for salaries paid in error by the United States was passed for second reading.
    20 Apr 1953passed first readingJournal 1953, p. 306 ↗
  • Redevelopment Agency's federal loan and grant applications for Diamond Heights and Western Addition areas were approved.
    20 Apr 1953passedJournal 1953, p. 300 ↗
  • Redevelopment Agency's requisition for $18,789 in Diamond Heights project advance funds approved.
    21 Sep 1953passedJournal 1953, p. 785 ↗
  • Redevelopment Agency requisition of $18,916.25 in advance funds for Western Addition redevelopment was approved.
    8 Feb 1954passedJournal 1954, p. 125 ↗
  • Redevelopment Agency requisition of $15,454.26 in advance funds for Diamond Heights redevelopment was approved.
    8 Feb 1954passedJournal 1954, p. 125 ↗
  • Federal planning funds of $28,235.34 for Diamond Heights Project Area B-1 were approved.
    5 Apr 1954passedJournal 1954, p. 310 ↗
  • Federal planning funds of $37,002.06 for Western Addition Project Area A-1 were approved.
    5 Apr 1954passedJournal 1954, p. 310 ↗
  • Redevelopment Agency receives a $13,320 federal advance for Western Addition Redevelopment Project Area A-1.
    27 Sep 1954passedJournal 1954, p. 753 ↗
  • Redevelopment Agency receives a $2,500 federal advance for Diamond Heights Redevelopment Project Area B-1.
    27 Sep 1954passedJournal 1954, p. 753 ↗
  • Resolution approves an extra $70,350 federal advance to the Redevelopment Agency for planning the Western Addition project area.
    22 Nov 1954passedJournal 1954, p. 859 ↗
  • Resolution approves a $57,000 federal fund advance to the Redevelopment Agency for the Western Addition project area.
    22 Nov 1954passedJournal 1954, p. 859 ↗
  • Federal advance of $21,000 approved for the Redevelopment Agency's Diamond Heights project area B-1.
    22 Nov 1954passedJournal 1954, p. 858 ↗
  • Federal planning funds of $32,550 approved for the Redevelopment Agency's Diamond Heights project area B-1.
    22 Nov 1954passedJournal 1954, p. 858 ↗
  • Board approved an $18,600 federal advance to the Redevelopment Agency for the Diamond Heights project area.
    20 Dec 1954passedJournal 1954, p. 923 ↗
  • Requisition for $10,975 in redevelopment funds for Western Addition Area A-1 was sent back to committee.
    28 Feb 1955referredJournal 1955, p. 128 ↗
  • Requisition for $11,435 in redevelopment funds for Diamond Heights Project B-1 was sent back to committee.
    28 Feb 1955referredJournal 1955, p. 128 ↗
  • Redevelopment Agency advance of $10,975 for the Western Addition project area was approved.
    14 Mar 1955passedJournal 1955, p. 160 ↗
  • Redevelopment Agency advance of $11,435 for the Diamond Heights project area was approved.
    14 Mar 1955passedJournal 1955, p. 160 ↗
  • Redevelopment Agency requested $5,000 to plan the South Basin area; sent to Finance Committee. linked by the name only, not checked
    23 May 1955referredJournal 1955, p. 349 ↗
  • $5,000 for plans and services in the South Basin Redevelopment Area passed on first reading.
    13 Jun 1955passed first readingJournal 1955, p. 391 ↗
  • Board finally passed an ordinance appropriating $5,000 to the Redevelopment Agency for plans and services in the South Basin area.
    20 Jun 1955passedJournal 1955, p. 404 ↗
  • Board approved requisition No. 11 releasing a $58,635 federal advance to the Redevelopment Agency for the Diamond Heights project.
    29 Aug 1955passedJournal 1955, p. 624 ↗
  • Redevelopment Agency's advance contract for the Western Addition project was amended and approved by the Board.
    29 Aug 1955passedJournal 1955, p. 625 ↗
  • The Board accepted a $3,200 gift from [name withheld] to fund studies of South of Market areas for the Redevelopment Agency.
    10 Oct 1955passedJournal 1955, p. 713 ↗
  • Board approved a $7.7M federal loan and grant contract for the Diamond Heights redevelopment project area. linked by the name only, not checked
    6 Feb 1956passedJournal 1956, p. 70 ↗
  • $41,380 in additional federal advance funds approved for Western Addition redevelopment planning.
    23 Apr 1956passedJournal 1956, p. 229 ↗
  • The Redevelopment Agency's federal advance-of-funds contract for the Western Addition project area was amended, adopted 11 to 0.
    28 May 1956passedJournal 1956, p. 312 ↗
  • Adopted, a $16,691,025 loan and an $8,330,597 capital grant
    24 Dec 1956passedJournal 1956, p. 733 ↗
  • Redevelopment Agency given $37,500 to appraise Redevelopment Area E, the Wholesale Produce Area; passed for second reading.
    17 Jun 1957passed first readingJournal 1957, p. 419 ↗
  • $300,658 of plans and surveys adopted for the Embarcadero waterfront district
    17 Jun 1957passedJournal 1957, p. 419 ↗
  • Board granted the Redevelopment Agency use of its chambers on August 12, 1958 for a public hearing on Area E-1.
    14 Jul 1958passedJournal 1958, p. 459 ↗
  • City would convey property and pay the Redevelopment Agency $1,497,915.07 in exchange for land needed for Geary Expressway and Webster Street widening.
    6 Jun 1960passed first readingJournal 1960, p. 349 ↗
  • City pays Redevelopment Agency $1.5 million in land swap for Geary widening
    13 Jun 1960passedJournal 1960, p. 365 ↗
  • Western Addition A-2 surveys and plans approved, with $477,000 applied for
    30 Jan 1961passedJournal 1961, p. 43 ↗
  • [name withheld] buys San Diego Avenue land for $200
    6 Feb 1961passedJournal 1961, p. 52 ↗
  • City swaps land with redevelopment agency for Geary Expressway, pays $793,526
    28 Feb 1961passedJournal 1961, p. 60 ↗
  • Up to $230,000 city money for South of Market surveys; outcome unclear.
    11 Dec 1961outcome not readJournal 1961, p. 609 ↗
  • Gjoa ship repair contract deadline pushed to February 2 linked by the name only, not checked
    8 Jan 1962passedJournal 1962, p. 21 ↗
  • City buys land for Western Addition recreation center
    15 Jan 1962passedJournal 1962, p. 22 ↗
  • City buys $74,578 land for Raphael Weill School linked by the name only, not checked
    15 Oct 1962passedJournal 1962, p. 529 ↗
  • Taxes cancelled on land bought for redevelopment
    24 Dec 1962passedJournal 1962, p. 633 ↗
  • Board passed an ordinance appropriating $10,622.10 to pay a street improvement assessment in the Diamond Heights redevelopment project area.
    4 Feb 1963passedJournal 1963 ↗
  • Funding of $14,964 for the Redevelopment Agency to apply for federal money to study renewal along the rapid transit corridor was referred to Finance Committee.
    27 May 1963referredJournal 1963, p. 262 ↗
  • Money to plan Rapid Transit Corridor renewal, pending final vote.
    3 Jun 1963pendingJournal 1963, p. 267 ↗
  • Ordinance finally passed, appropriating $14,964 to the Redevelopment Agency to apply for funds for a neighbourhood renewal plan.
    10 Jun 1963passedJournal 1963, p. 280 ↗
  • [name withheld] paid $8,240 in a Geneva Avenue land trade
    27 Jan 1964passed first readingJournal 1964, p. 43 ↗
  • City buys Diamond Heights lot for playground for $300,605
    23 Mar 1964passedJournal 1964 ↗
  • Tinney asked the City Attorney to draft legislation funding $100,000 for non-profit moderate-priced housing and senior housing. linked by the name only, not checked
    13 Apr 1964outcome not readJournal 1964, p. 251 ↗
  • State money accepted for children's day care
  • The Redevelopment Agency's $100,000 advance request for Western Addition Project Area No. 2 was approved.
    17 Aug 1964passedJournal 1964, p. 597 ↗
  • Federal funds advance for Western Addition redevelopment; no vote shown.
    23 Nov 1964outcome not readJournal 1964, p. 806 ↗
  • Property taxes on Embarcadero-area land cancelled after $415.42 payment linked by the name only, not checked
    14 Jun 1965passedJournal 1965, p. 338 ↗
  • Appropriates $5,000 to the Redevelopment Agency for costs of disposing of the old Hall of Justice; passed for second reading.
    28 Jun 1965passed first readingJournal 1965, p. 379 ↗
  • Hospital auxiliary may set up vending machines at San Francisco General linked by the name only, not checked
    6 Jul 1965passedJournal 1965, p. 385 ↗
  • $123,907.29 paid for land to widen Washington and Drumm Streets
    14 Mar 1966passedJournal 1966, p. 174 ↗
  • Diamond Heights school land purchase for $143,059 voted down
    13 Jun 1966rejectedJournal 1966, p. 436 ↗
  • Item sent back to committee; subject not in this record
    13 Jun 1966pendingJournal 1966, p. 436 ↗
  • Mayor asks Board to reconsider Diamond Heights school land purchase.
    20 Jun 1966pendingJournal 1966 ↗
  • Diamond Heights high school land purchase approved on second vote
    27 Jun 1966passedJournal 1966, p. 462 ↗
  • Matching budget change for Muni pay; not yet final. linked by the name only, not checked
    15 Aug 1966pendingJournal 1966, p. 576 ↗
  • $44,789.40 paid for land to widen Jackson Street linked by the name only, not checked
    15 Aug 1966passedJournal 1966, p. 574 ↗
  • Old Harbor Police Station sold to city development agency for $36,000
    22 Aug 1966passedJournal 1966, p. 589 ↗
  • An adoption vote with no subject on this page
    22 Aug 1966passedJournal 1966, p. 594 ↗
  • Sale of old Hall of Justice site sent to committee.
    16 Jan 1967pendingJournal 1967, p. 44 ↗
  • Old Hall of Justice site to be sold to developer for $850,000
    23 Jan 1967passedJournal 1967, p. 64 ↗
  • A $200,000 appropriation for local special assistance and relocation services was amended on the floor; final passage is not yet recorded.
    29 Jan 1968outcome not readJournal 1968, p. 67 ↗
  • $200,000 for special housing help and moving services
    5 Feb 1968passedJournal 1968 ↗
  • A second reading refused, with no subject on this page. linked by the name only, not checked
    4 Mar 1968refusedJournal 1968, p. 167 ↗
  • Purchase of land from the Redevelopment Agency for $108,353.82 for a Muni turn-around in Ferry Park was temporarily postponed. linked by the name only, not checked
    4 Mar 1968outcome not readJournal 1968, p. 164 ↗
  • $62,756.38 paid to widen Drumm and Washington Streets linked by the name only, not checked
    10 Jun 1968passedJournal 1968, p. 495 ↗
  • Port emergency purchase rule up to $200 moves toward final approval.
    20 Jan 1969pendingJournal 1969, p. 58 ↗
  • Two-hour parking limit set on Estero Avenue between Lunado and Alviso linked by the name only, not checked
    27 Jan 1969passedJournal 1969, p. 71 ↗
  • Webster Street land sold to the Redevelopment Agency for $206,250 linked by the name only, not checked
    7 Jul 1969passed first readingJournal 1969, p. 605 ↗
  • Webster Street land sold to the Redevelopment Agency for $206,250 linked by the name only, not checked
    14 Jul 1969passedJournal 1969 ↗
  • Finance Committee recommended authorizing sale of certain Department of Public Health and department property.
    2 Mar 1970outcome not readJournal 1970, p. 128 ↗
  • City asked to plan affordable housing at old Regal Brewery site
    16 Mar 1970passedJournal 1970, p. 177 ↗
  • The Board passed on first reading an ordinance appropriating $815,700 to several departments and rescinding $768,300 in earlier funds. linked by the name only, not checked
    14 Dec 1970passed first readingJournal 1970, p. 973 ↗
  • Board proposed buying a $24,000 property from the Redevelopment Agency for a new street between Tehama and Clementina Streets. linked by the name only, not checked
    1 Jun 1971outcome not readJournal 1971, p. 403 ↗
  • Plan to buy Hunters Point site for child care; outcome not shown.
    19 Jun 1972outcome not readJournal 1972, p. 512 ↗
  • Hunters Point school money deal held up for later vote.
    3 Jul 1972pendingJournal 1972, p. 580 ↗
  • Diamond Heights lot sale to redevelopment agency approved linked by the name only, not checked
    11 Sep 1972passedJournal 1972, p. 807 ↗
  • School district land in Diamond Heights sold to redevelopment agency linked by the name only, not checked
    11 Sep 1972passedJournal 1972, p. 802 ↗
  • $353,185 paid the Redevelopment Agency to widen Webster Street
    5 Mar 1973passedJournal 1973, p. 191 ↗
  • City departments get $140,330 for operations and equipment
    18 Jun 1973passedJournal 1973, p. 565 ↗
  • Plan to transfer old Southern Police Station for $130,000.
    1 Oct 1973outcome not readJournal 1973, p. 951 ↗
  • Old Southern Police Station handed to redevelopment agency for $130,000
    9 Oct 1973passedJournal 1973, p. 984 ↗
  • Proposed: $143,200 in unused project funds cancelled
    18 Aug 1975outcome not readJournal 1975, p. 906 ↗
  • Some city building project funds cancelled
    25 Aug 1975passedJournal 1975, p. 943 ↗
  • Land from Redevelopment Agency for Fillmore power substation; vote not shown.
    7 Jun 1976outcome not readJournal 1976, p. 539 ↗
  • $3,800,000 to move from India Basin to the Hunters Point project
    13 Sep 1976passedJournal 1976, p. 1008 ↗
  • $193,600 paid for open space on Billy Goat Hill
    7 Mar 1977passedJournal 1977, p. 189 ↗
  • Sublease at 939 Ellis Street extended for community development offices linked by the name only, not checked
    21 Mar 1977outcome not readJournal 1977, p. 232 ↗
  • City approved buying land for Galvez Playfield, $105,200
    31 May 1977passedJournal 1977, p. 476 ↗
  • Measure passed; subject not in this record
  • 1978 federal neighborhood grant and housing plan.
    31 Oct 1977outcome not readPrinted page 1977, p. 1052 ↗
  • Money for a Western Addition community facility approved linked by the name only, not checked
    19 Mar 1979passedJournal 1979, p. 321 ↗
  • 939 Ellis Street subleased for the Mayor's community development office
    28 Apr 1980passedJournal 1980, p. 441 ↗
  • Leases renewed with Glide Foundation and Self-Help for the Elderly
    31 Jan 1983outcome not readJournal 1983 ↗
  • Passed on first reading: Lot 4 in Assessor's Block 4713 would be conveyed to the Redevelopment Agency for $1 in Hunters Point.
    28 Feb 1983passed first readingJournal 1983 ↗
  • City to sell land at Thirteenth Street and South Van Ness
    7 Mar 1983passedJournal 1983 ↗
  • Social Services accepted [name withheld] and FEMA grants of $6.1M to shelter and feed homeless people, passing money to the Redevelopment Agency.
    1 Oct 1990passedJournal 1990 ↗
  • Ordinance approving a first amendment to the Moscone Convention Center project lease and Redevelopment Agency bond refunding passed for second reading as amended.
    13 Jan 1992passed first readingJournal 1992 ↗
  • A $1,000,000 transfer of Community Development Block Grant funds to the Redevelopment Agency for 24th Street revitalization was referred to the Finance Committee.
    27 Apr 1992referredJournal 1992 ↗
  • Resolution approving a $1,000,000 bond acceptance and $1,000,000 block grant transfer for the 24th Street program was adopted.
    4 May 1992passedJournal 1992 ↗
  • Proposed amendment raises the tax-increment limit for Western Addition Area A-2 from $65.3M to $190.3M; hearing set August 3, 1992.
    22 Jun 1992outcome not readJournal 1992 ↗
  • Redevelopment Agency's 1992-93 budget and up to $65M in bonds approved, with the budget due back to the Board by September 1, 1992.
    27 Jul 1992passedJournal 1992 ↗
  • Redevelopment plan amendment for Western Addition A-2 passed for second reading, raising the limit on tax increment funds.
    3 Aug 1992passed first readingJournal 1992 ↗
  • Redevelopment plan amendments for the Western Addition Project Area A-2 are proposed by the Redevelopment Agency; the final vote continues on the next page.
    10 Aug 1992outcome not readJournal 1992 ↗
  • Permit proposed for the Redevelopment Agency to build a median island and irrigation crossing on Mission Street between Third and Fourth; sent to City Services Committee.
    24 Aug 1992referredJournal 1992 ↗
  • Redevelopment Agency asks to build footbridge columns on Howard Street
    24 Aug 1992referredJournal 1992 ↗
  • Redevelopment Agency allowed a median island on Mission Street
    21 Sep 1992passedJournal 1992 ↗
  • The Redevelopment Agency's $9.6M interim budget for fiscal 1994-95 was adopted.
    27 Jun 1994passedJournal 1994 ↗
  • Redevelopment Agency's plan amendment for Western Addition A-2 extends its term to 2009 and raises its tax cap; passed first reading.
    26 Sep 1994passed first readingJournal 1994 ↗
  • Board passed extension of the Western Addition A-2 redevelopment plan to 2009, raising tax increment ceiling to $270 million.
    3 Oct 1994passedJournal 1994 ↗
  • Verba Buena Center redevelopment plan amended to extend eminent domain to 2006 and raise tax increment cap to $600 million; referred to committee.
    11 Oct 1994referredJournal 1994 ↗
  • A hearing was held on proposed amendments to the Verba Buena Center redevelopment plan, including higher tax increment limits and extended eminent domain time.
    14 Nov 1994outcome not readJournal 1994 ↗
  • Ordinance amending the Verba Buena Center redevelopment plan passed for second reading, raising tax increment to $600 million.
    14 Nov 1994passed first readingJournal 1994 ↗
  • Redevelopment Agency's 1995-96 budget and bond issue up to $16M was referred to the Budget Committee. linked by the name only, not checked
    5 Jun 1995referredJournal 1995 ↗
  • Redevelopment Agency budget amendment allowing up to $265,000 in tax allocation bonds and $17,225 appropriation was referred to committee.
    6 Nov 1995referredJournal 1995 ↗
  • Redevelopment Agency interim budget for fiscal 1996-97 was referred to the Budget Committee.
    3 Jun 1996referredJournal 1996 ↗
  • Sale of city land at Steuart and Spear Streets adopted
    24 Mar 1997passedJournal 1997 ↗
  • Interim budget of the Redevelopment Agency for fiscal year 1997-98 was referred to the Finance Committee.
    9 Jun 1997referredJournal 1997 ↗
  • Proposed tax allocation pledge with the Redevelopment Agency for Mission Bay South, up to $450M bonds, was continued to October 26, 1998.
    1998continuedJournal 1998 ↗
  • Proposed tax allocation pledge with the Redevelopment Agency for Mission Bay North, up to $190M bonds, was continued to October 26, 1998.
    1998continuedJournal 1998 ↗
  • Proposed revocable permission for the Redevelopment Agency to build sidewalk improvements on Fillmore Street was referred to committee.
  • Redevelopment Agency to redo Fillmore Street sidewalks and lighting
    21 Aug 2000outcome not readBoard minutes 2000, p. 916 ↗
  • Redevelopment Agency was granted revocable permission to build sidewalk improvements on Fillmore Street between Post Street and Golden Gate Avenue.
  • Board continued a resolution selling part of Jessie Street for $3.1M to the Redevelopment Agency for the [name withheld] site project.
  • Adds $16.5 million to redevelopment agency's budget. linked by the name only, not checked
  • Proposed budget increase of up to $16.5M for the Redevelopment Agency's 2001-02 fiscal year, sent to Budget Committee.
    17 Jun 2002referredBoard minutes 2002 ↗
  • Redevelopment Agency budget raised by up to $16.5 million.
  • The Redevelopment Agency's fiscal 2001-02 budget was increased by up to $16.5M across all redevelopment project areas.
  • New Mission Bay Branch Library to be bought on 4th Street
    2 Oct 2002outcome not readBoard minutes 2002, p. 36 ↗
  • New Mission Bay Branch Library to be bought on 4th Street
    2 Oct 2002outcome not readBoard minutes 2002, p. 04 ↗
  • Proposed Redevelopment Agency budget increase of up to $43,100,000 and bonds for Yerba Buena Center, sent to Finance Committee.
    25 Nov 2002referredBoard minutes 2002 ↗
  • Redevelopment Agency budget increase of up to $43.1M and tax allocation bonds for Yerba Buena was sent to Finance Committee.
  • City sells two Turk and Fillmore lots for affordable housing.
    22 Apr 2003passedBoard minutes 2003 ↗
  • Spear Street land sale to the Redevelopment Agency sent to committee linked by the name only, not checked
    29 Apr 2003outcome not readBoard minutes 2003 ↗
  • City to sell its Spear Street lot for $10M
    21 May 2003outcome not readBoard minutes 2003 ↗
  • City sold a lot on Spear Street between Folsom and Howard Streets to the Redevelopment Agency for $10,034,140.
  • Land on Spear Street sold to the Redevelopment Agency linked by the name only, not checked
  • Public hearing scheduled August 12, 2003 on a 65-year ground lease of Redevelopment Agency land at 820 O'Farrell Street to Jordan Housing Corporation.
    8 Jul 2003outcome not readBoard minutes 2003, p. 778 ↗
  • Redevelopment Agency's 2003-2004 budget and up to $61 million in bonds were approved.
  • Ground lease of Redevelopment Agency land at 820 O'Farrell Street to Jordan Housing Corporation for low-income housing set for hearing August 12.
    8 Jul 2003outcome not readBoard minutes 2003, p. 775 ↗
  • Public hearing set for August 12, 2003 on leasing Redevelopment Agency land at 820 O'Farrell Street to Jordan Housing Corporation.
    8 Jul 2003outcome not readBoard minutes 2003, p. 778 ↗
  • Hearing held on proposed ground lease of 820 O'Farrell Street from the Redevelopment Agency to Jordan Housing Corporation for low-income housing.
    12 Aug 2003outcome not readBoard minutes 2003, p. 894 ↗
  • Resolution 538-03 approved a 65-year ground lease at 820 O'Farrell Street to Jordan Housing Corporation for affordable housing.
  • Broadway and Sansome site to be sold for affordable housing, $1.5M linked by the name only, not checked
    2 May 2006passed first readingBoard minutes 2006 ↗
  • Broadway and Sansome site sold for affordable housing, $1.5M
    9 May 2006passedBoard minutes 2006 ↗
  • Redevelopment Agency budget and up to $125.8M in bonds, plus $463,000 in General Fund loans, referred to committee.
  • Bonds for park projects sent to the budget committee
    5 Jun 2007referredBoard minutes 2007 ↗
  • Redevelopment budget and $125.8 million bonds put off to July 17.
  • Redevelopment Agency's 2007-2008 budget and $125.8M in bonds continued to July 17, 2007.
    10 Jul 2007continuedBoard minutes 2007, p. 40 ↗
  • Redevelopment budget and $128 million bonds approved.
    17 Jul 2007passedBoard minutes 2007 ↗
  • Redevelopment Agency's 2007-2008 budget and up to $128.3 million in bonds were adopted, with loans for Visitacion Valley and Bayview planning.
    17 Jul 2007passedBoard minutes 2007 ↗
  • Hearing requested on the Redevelopment Agency's $25,021,079 state funding application for Hunters Point Shipyard construction; sent to Budget and Finance Committee.
  • Proposed amendment would let the Redevelopment Agency spend up to $22,401,050 on affordable housing activities.
  • Rules Committee filed the Redevelopment Agency's $25,021,079 application for state funds for the Hunters Point Shipyard project.
    2008outcome not readBoard minutes 2008 ↗
  • Redevelopment Agency budget amended to spend up to $22,401,050 on affordable housing across all project areas.
  • Hearing on the Redevelopment Agency's $25.0M state Proposition 1C application for Hunters Point Shipyard construction was sent to Rules Committee.
    7 Aug 2008referredBoard minutes 2008 ↗
  • Redevelopment Agency budget amended to pay $28.7M to the education fund and add federal grant and AIDS housing funds.
  • Redevelopment $28 million bond approval put off to March 23.
  • Industrial lots near Bayshore rezoned for light production use
  • Public hearing held on the Arelious Walker Drive stairway money
  • $61,500 sought for the Arelious Walker Drive stairway in Bayview
    2011outcome not readBoard minutes 2011, p. 291 ↗
  • Ocean Avenue land sold to the Redevelopment Agency for $4.1M
    1 Feb 2011outcome not readBoard minutes 2011, p. 97 ↗
  • City land near Ocean and Phelan Avenues to be sold
    8 Mar 2011outcome not readBoard minutes 2011, p. 196 ↗
  • $61,500 for the Arelious Walker Drive stairway heard in public
    26 Apr 2011outcome not readBoard minutes 2011, p. 4 ↗
  • Redevelopment agency budget with up to $84 million bonds proposed.
    12 Jul 2011outcome not readBoard minutes 2011, p. 638 ↗