  • $7,000 to Julius Heyman Company for redwood railway cross ties linked by the name only, not checked
    23 Sep 1912outcome not readJournal 1912, p. 824 ↗
  • A resolution authorizing expenditures from named accounts to named claimants was taken up; its outcome continues on the next page.
    20 Jan 1913outcome not readJournal 1913, p. 51 ↗
  • The Board authorized payments of $36,901.95 to Pacific Gas & Electric and $794.50 to the SF SPCA from the General Fund. linked by the name only, not checked
    14 Apr 1913outcome not readJournal 1913, p. 358 ↗
  • Newsom, Wold & Kohn paid $16,725 for Polytechnic High School linked by the name only, not checked
    15 Sep 1913outcome not readJournal 1913, p. 905 ↗
  • Newsom, Wold & Kohn paid $16,725 for Polytechnic High School linked by the name only, not checked
    29 Sep 1913passedJournal 1913, p. 926 ↗
  • The Board passed for printing a resolution authorizing payments to contractors for sewers, schools, a hospital, streets and supplies.
    6 Oct 1913passed first readingJournal 1913, p. 974 ↗
  • Carnahan & Mulford paid $6,150 for the Glenn Park School linked by the name only, not checked
    14 Oct 1913outcome not readJournal 1913, p. 996 ↗
  • $5,000 more set aside to appraise Spring Valley Water Company linked by the name only, not checked
    14 Oct 1913passed first readingJournal 1913, p. 1182 ↗
  • Payments to contractors, utilities and suppliers for City Hall, schools, fire and water work were finally approved from city funds.
    27 Oct 1913passedJournal 1913, p. 1083 ↗
  • McLean, Haggans & Aden paid $4,683.16 for the Islais Creek incinerator
    27 Oct 1913outcome not readJournal 1913, p. 1141 ↗
  • Board puts off deciding where Van Ness Avenue's streetcar poles go linked by the name only, not checked
    3 Nov 1913referredJournal 1913, p. 1160 ↗
  • Robinson Nugent paid $897.95 for repaving over side sewers
    25 Nov 1913outcome not readJournal 1913, p. 1199 ↗
  • Board passed for printing a resolution authorizing about two dozen city payments for rails, City Hall, a school, police and water.
    1914passed first readingJournal 1914, p. 364 ↗
  • Payments of about $150,000 in bond funds are authorized to rail, steel, sewer and City Hall contractors and suppliers.
    1914outcome not readJournal 1914, p. 496 ↗
  • A resolution proposed to set aside and appropriate funds for city expenditures; its amounts and outcome are not printed here. linked by the name only, not checked
    1914outcome not readJournal 1914, p. 448 ↗
  • Appropriates Municipal Railway bond money for steel rails, street car bodies, motors and other extension contracts.
    1914outcome not readJournal 1914, p. 9 ↗
  • Resolution authorizes payments from city funds to many contractors and suppliers for libraries, schools, fire, police, streets and transit.
    1914passed first readingJournal 1914, p. 519 ↗
  • Board set aside Municipal Railway bond money for steel rails, ties, car bodies, trucks and motors from named contractors.
    12 Jan 1914passedJournal 1914, p. 38 ↗
  • Authorization of certain expenditures proposed; the text continues on the next page. linked by the name only, not checked
    23 Mar 1914outcome not readJournal 1914, p. 303 ↗
  • Karl Ehrhart paid $2,304.38 for the sewer at Locksley Avenue
    23 Mar 1914outcome not readJournal 1914, p. 295 ↗
  • United States Steel Products paid $11,269.45 for streetcar rails
    30 Mar 1914outcome not readJournal 1914, p. 337 ↗
  • Claim payments for Municipal Railway rails, Marshall School construction and City Hall work were proposed for approval.
    13 Apr 1914outcome not readJournal 1914, p. 379 ↗
  • Resolution 10807 authorizes payments to railroad companies, U.S. Steel Products, and others from city bond funds.
    13 Apr 1914outcome not readJournal 1914 ↗
  • Board passed for printing a resolution authorizing payments to contractors and suppliers for railway, sewer and school construction.
    20 Apr 1914passed first readingJournal 1914, p. 404 ↗
  • United States Steel Products paid $21,208.41 for municipal railway rails
    27 Apr 1914outcome not readJournal 1914, p. 442 ↗
  • $55,959 to build Engine House No. 12 at Drumm and Commercial linked by the name only, not checked
    11 May 1914outcome not readJournal 1914, p. 465 ↗
  • Payments were authorized for library books, completion of the City Morgue, and Polytechnic High School heating work. linked by the name only, not checked
    25 May 1914outcome not readJournal 1914, p. 576 ↗
  • Authorization of street railway construction payments, including contract instalments, proposed and passed for printing.
    10 Aug 1914passed first readingJournal 1914, p. 893 ↗
  • Mahoney Bros. paid $33,906.82 for the Van Ness Avenue railway line linked by the name only, not checked
    17 Aug 1914passedJournal 1914, p. 908 ↗
  • Resolution authorizes General Fund payments to claimants, including $515.50 to Martin-Camm Co. for Tuberculosis Hospital supplies.
    5 Oct 1914outcome not readJournal 1914, p. 1140 ↗
  • Supervisor Jennings presented a resolution authorizing about 28 city claim payments to contractors, suppliers and charities; the list continues next page.
    1915outcome not readJournal 1915, p. 64 ↗
  • Utah Construction Co. paid $19,650.02 for the Hetch Hetchy dam road linked by the name only, not checked
    25 Jan 1915outcome not readJournal 1915, p. 98 ↗
  • Resolution 11572 authorizes a list of city expenditures to claimants; the vote continues on the next page. linked by the name only, not checked
    8 Mar 1915outcome not readJournal 1915, p. 301 ↗
  • Fourteen city expenditure claims, totalling about $35,000, were authorized and passed for printing, covering streets, water, schools and fire alarms.
    15 Mar 1915passed first readingJournal 1915, p. 286 ↗
  • Takes effect at once; Church Street rail materials taken up linked by the name only, not checked
    29 Nov 1915passedJournal 1915, p. 1252 ↗
  • Takes effect at once; Church Street rail materials taken up linked by the name only, not checked
    30 Nov 1915passedJournal 1915, p. 1383 ↗
  • Resolution authorizing payments from city bond funds to contractors and suppliers for City Hall, libraries, a hospital and water works was passed for printing.
    7 Feb 1916passed first readingJournal 1916, p. 159 ↗
  • Money set aside for Hetch Hetchy camps and City Hall furniture linked by the name only, not checked
    15 Feb 1916outcome not readJournal 1916, p. 180 ↗
  • United States Steel paid $36,138.27 for Church Street railway rails linked by the name only, not checked
    6 Mar 1916passedJournal 1916, p. 224 ↗
  • Supervisors appropriated $47,605 for Municipal Railway rails and plans along Market Street, from Kearny Street to Twin Peaks tunnel.
    29 Jan 1917outcome not readJournal 1917, p. 138 ↗
  • Board considered appropriations of set-aside funds for the Municipal Railway; the outcome continues on the next page.
    5 Feb 1917outcome not readJournal 1917, p. 147 ↗
  • $9,232 set aside for Municipal Railway track at Twin Peaks tunnel linked by the name only, not checked
    12 Mar 1917outcome not readJournal 1917, p. 308 ↗
  • $9,232 set aside for Municipal Railway track at Twin Peaks tunnel linked by the name only, not checked
    19 Mar 1917outcome not readJournal 1917, p. 325 ↗
  • Board authorizes payments on dozens of city claims for water, transit, hospital, school and street work.
    14 May 1917outcome not readJournal 1917, p. 589 ↗
  • Authorizes about thirty city payments to contractors, suppliers and pensioners for transit, hospital, school and water works. linked by the name only, not checked
    21 May 1917passedJournal 1917, p. 604 ↗
  • $37,540.88 paid to United States Steel Products for Municipal Railway rails
    30 Jul 1917outcome not readJournal 1917, p. 996 ↗
  • James M. Smith to build the Market Street line for $38,459.78 linked by the name only, not checked
    4 Sep 1917outcome not readJournal 1917, p. 1138 ↗
  • James M. Smith to build the Market Street line for $38,459.78
    12 Sep 1917outcome not readJournal 1917, p. 1165 ↗
  • Appropriations for steel rail, tie plates, tie rods and a Hetch Hetchy locomotive were passed for printing.
    31 Dec 1917passed first readingJournal 1917, p. 1528 ↗
  • Resolution authorizing payments to many contractors and claimants for water, hospital, transit and fire work was passed for printing.
    8 Apr 1918passed first readingJournal 1918, p. 289 ↗
  • Payments authorized to contractors and suppliers for Hetch Hetchy water, San Francisco Hospital, Municipal Railway and other city work.
    15 Apr 1918passedJournal 1918, p. 301 ↗
  • Payments to contractors and suppliers for hospital, streetcar, water and street work were passed for printing.
    10 Jun 1918passed first readingJournal 1918, p. 469 ↗
  • J. B. McSheehy paid $38,591.58 for the San Francisco Hospital wing
    17 Jun 1918passedJournal 1918, p. 492 ↗
  • Resolution proposed to authorize payments to contractors for Hetch Hetchy water, Municipal Railways and Monroe School work.
    9 Jun 1919outcome not readJournal 1919, p. 466 ↗
  • $10,500 first payment for the Laguna Honda station elevator linked by the name only, not checked
    16 Jun 1919outcome not readJournal 1919, p. 479 ↗
  • Resolution authorizing further Municipal Railway payments, including $3,750 to Healy-Tibbitts Construction for Union street line. linked by the name only, not checked
    21 Jul 1919outcome not readJournal 1919, p. 607 ↗
  • Resolution authorizing city payments to vendors, Spring Valley Water, and orphanages was passed for printing, with final adoption on the next page.
    25 Aug 1919outcome not readJournal 1919, p. 710 ↗
  • The Board approved payments of over $129,000 to suppliers, charities and city departments from several funds.
    3 Sep 1919passedJournal 1919, p. 726 ↗
  • Budget resolution sets aside funds for repairs to city buildings and payments to contractors for Holly Park Circle and Ocean avenue work.
    14 Oct 1919outcome not readJournal 1919, p. 845 ↗
  • The Board proposed $1,373.75 for general building repairs and $2,500 for Fire Department building repairs in October 1919.
    27 Oct 1919outcome not readJournal 1919, p. 677 ↗
  • Fay Improvement Co. paid $6,670.92 for finishing the Great Highway
    1 Jun 1920passed first readingJournal 1920, p. 461 ↗
  • Board authorizes another set of payments from city funds to named claimants; the list continues on the next page. linked by the name only, not checked
    14 Jun 1920outcome not readJournal 1920, p. 506 ↗
  • John Proctor's garage permit on Sacramento Street revoked
    28 Jun 1920passedJournal 1920, p. 563 ↗
  • Payments to four suppliers totalling $3,043.47 for Hetch Hetchy supplies await a final vote.
    6 Jul 1920outcome not readJournal 1920, p. 581 ↗
  • Payments totalling about $100,000 for school construction, streetcars, Hetch Hetchy supplies and orphanage care were passed.
    23 Aug 1920passedJournal 1920, p. 681 ↗
  • United States Steel Products Co. paid $8,623.73 for Hetch Hetchy rails
    9 Nov 1920outcome not readJournal 1920, p. 920 ↗
  • William P. Filmer paid for land for the Parkside School linked by the name only, not checked
    9 May 1921outcome not readJournal 1921, p. 346 ↗
  • Board authorized payments to dozens of suppliers and contractors, including Hetch Hetchy works and library book binding; vote continues on next page.
    16 May 1921outcome not readJournal 1921, p. 361 ↗
  • Henry C. Hagensen allowed a public garage on Valencia Street
    23 May 1921outcome not readJournal 1921, p. 443 ↗
  • Four suppliers are authorized to be paid for Hetch Hetchy equipment, drill steel, blankets and butter claims. linked by the name only, not checked
    6 Jun 1921outcome not readJournal 1921, p. 471 ↗
  • Resolution authorizes payment of about $50,000 in claims for Jefferson School, Municipal Railways and Hetch Hetchy, passed for printing.
    1 Aug 1921passed first readingJournal 1921, p. 669 ↗
  • $1,250 paid to Mabel Hein to settle an injury claim
    8 Aug 1921outcome not readJournal 1921, p. 685 ↗
  • City pays $1,250 to settle a Muni injury lawsuit linked by the name only, not checked
    15 Aug 1921passedJournal 1921, p. 692 ↗
  • Payments authorized to suppliers and contractors for Jefferson School and Hetch Hetchy work, pending final passage.
    22 Aug 1921outcome not readJournal 1921, p. 706 ↗
  • Resolution authorizes payment of seventeen routine city claims, including Hetch Hetchy supplies, school glazing and hospital groceries.
    6 Sep 1921outcome not readJournal 1921, p. 759 ↗
  • Board authorized payments to contractors and suppliers for Hetch Hetchy, Grant School, San Francisco Hospital and the Police Department.
    19 Sep 1921passedJournal 1921, p. 806 ↗
  • Resolution proposed to authorize payments from $896 to $16,825 to suppliers and contractors for transit, water and street work; passed for printing.
    28 Nov 1921passed first readingJournal 1921, p. 1001 ↗
  • Municipal Railway bills approved for payment to Market Street Railway
    5 Dec 1921outcome not readJournal 1921, p. 1010 ↗
  • Board proposed Municipal Railway fund payments for steel track, redwood ties and car house painting; a minority report disputes the single-bid steel contract. linked by the name only, not checked
    16 Jan 1922outcome not readJournal 1922 ↗
  • A minority report objects to awarding Contract No. 127 for steel rails to United States Steel Products Co., the only bidder.
    23 Jan 1922outcome not readJournal 1922 ↗
  • Proposed appropriations from the Municipal Railway fund for track material, redwood ties and painting a Geary Street car house.
    23 Jan 1922outcome not readJournal 1922 ↗
  • Steel rail contractor given thirty more days for Muni track
    27 Mar 1922passedJournal 1922 ↗
  • Resolution authorizing payments to city suppliers and contractors from various funds, including school and water bond accounts, passed for printing.
    27 Mar 1922passed first readingJournal 1922 ↗
  • Board authorizes dozens of city payments to suppliers, contractors and departments from various funds, including schools, hospitals and libraries. linked by the name only, not checked
    3 Apr 1922outcome not readJournal 1922 ↗
  • Board granted United States Steel Products Co. a 20-day extension to finish supplying Municipal Railway steel rails. linked by the name only, not checked
    8 May 1922passedJournal 1922 ↗
  • City bills paid, including $64,665 for steel rail joint plates
    12 Jun 1922passed first readingJournal 1922 ↗
  • Resolution authorizes payments to dozens of city suppliers and contractors for schools, parks, Municipal Railways and Hetch Hetchy.
    19 Jun 1922outcome not readJournal 1922 ↗
  • Board authorises payments to several claimants, including library book binding and school construction work.
    25 Sep 1922outcome not readJournal 1922 ↗
  • The Board authorized many payments to contractors and suppliers for school buildings, Municipal Railway, Hetch Hetchy water works, and fire facilities.
    9 Oct 1922passed first readingJournal 1922 ↗
  • Spring Valley Water Company paid $6,006.24 for Lake Merced links
    9 Oct 1922outcome not readJournal 1922 ↗
  • Spring Valley Water Company paid $6,006.24 for Lake Merced links
    23 Oct 1922outcome not readJournal 1922 ↗
  • A resolution authorizing eight payments to park and railway suppliers and utilities was passed for printing on motion of McLeran. linked by the name only, not checked
    30 Oct 1922passed first readingJournal 1922 ↗
  • City authorized payments from several funds to contractors and suppliers for school construction, Hetch Hetchy works and equipment.
    6 Nov 1922passed first readingJournal 1922 ↗
  • Taylor & Jackson paid $984.25 for the Lincoln Park shelter house
    15 Nov 1922outcome not readJournal 1922 ↗
  • Routine payments of 42 city bills to vendors, contractors and insurers, covering school, water, transit and hospital needs. linked by the name only, not checked
    20 Nov 1922passedJournal 1922 ↗
  • Quinn & Reilly paid $8,195.25 for the Emerson School linked by the name only, not checked
    11 Dec 1922outcome not readJournal 1922 ↗
  • Four steel firms submitted bids for 250 rolled steel car wheels for the Municipal Railway, referred to the Supplies Committee. linked by the name only, not checked
    15 Jan 1923referredJournal 1923, p. 38 ↗
  • Award of contract for 250 steel car wheels for Municipal Railway proposed to United States Steel Products Company.
    22 Jan 1923outcome not readJournal 1923, p. 88 ↗
  • Contract for 250 rolled steel car wheels for the Municipal Railway awarded to United States Steel Products Company at $37.75 each.
    29 Jan 1923passedJournal 1923, p. 108 ↗
  • City bills paid to Pacific Gas and Electric and Westinghouse
    23 Apr 1923passed first readingJournal 1923, p. 386 ↗
  • City bills paid to Pacific Gas and Electric and Westinghouse linked by the name only, not checked
    30 Apr 1923outcome not readJournal 1923, p. 412 ↗
  • $45,458.25 paid to Pacific Gas and Electric for July street lighting
    13 Aug 1923outcome not readJournal 1923, p. 864 ↗
  • United States Steel Products Company awarded $272,162 for Dumbarton Straits bridges linked by the name only, not checked
    27 Aug 1923outcome not readJournal 1923, p. 931 ↗
  • United States Steel Products Company awarded $272,162 for Dumbarton Straits bridges linked by the name only, not checked
    4 Sep 1923outcome not readJournal 1923, p. 967 ↗
  • Payments from city accounts authorized to dozens of suppliers and claimants for schools, water, parks and Municipal Railway. linked by the name only, not checked
    29 Oct 1923passed first readingJournal 1923, p. 1166 ↗
  • Conrad B. Sovig gets $18,890 to paint the city's bridges linked by the name only, not checked
    5 Nov 1923outcome not readJournal 1923, p. 1181 ↗
  • Payments authorized for school equipment, library books, Municipal Railway power, Hetch Hetchy supplies and other city claims; list continues. linked by the name only, not checked
    7 Apr 1924outcome not readJournal 1924, p. 334 ↗
  • United States Steel Products Company was paid $126,542.45 for steel bridge work carrying the water pipeline across Dumbarton straits. linked by the name only, not checked
    14 Apr 1924outcome not readJournal 1924, p. 390 ↗
  • Resolution authorizing payments from the Water Construction Fund to several suppliers for Hetch Hetchy work was passed for printing. linked by the name only, not checked
    5 May 1924outcome not readJournal 1924, p. 503 ↗
  • Resolution authorizes payment of many city claims, including street lighting, bridge contracts, hospital supplies and school paints, pending final adoption. linked by the name only, not checked
    12 May 1924outcome not readJournal 1924, p. 547 ↗
  • United States Steel Products Co. was paid $43,681.04 for track material for the Municipal Railways under Contract 136. linked by the name only, not checked
    19 May 1924passedJournal 1924, p. 623 ↗
  • Payments from the special school tax were authorized, including $654 to Dan P. Malic Co. for school building paints. linked by the name only, not checked
    19 May 1924outcome not readJournal 1924, p. 620 ↗
  • Supervisor McLeran's resolution authorizes payments from water and Municipal Railway funds to cement, oil, insurance and utility suppliers; passed for printing.
    22 Sep 1924passed first readingJournal 1924, p. 1128 ↗
  • Payments from water and Municipal Railway funds to cement, oil, lumber and power suppliers were put forward for final passage.
    29 Sep 1924outcome not readJournal 1924, p. 1154 ↗
  • McLeran moved a resolution authorizing about $270,000 in Hetch Hetchy water payments to contractors and suppliers, passed for printing. linked by the name only, not checked
    14 Oct 1924passed first readingJournal 1924, p. 1219 ↗
  • Board of Supervisors authorized payments from city funds to dozens of contractors and suppliers for water, schools, streets and transit. linked by the name only, not checked
    14 Oct 1924passedJournal 1924, p. 1206 ↗
  • The Board is authorizing payments from the Water Construction Fund to suppliers for Hetch Hetchy water works equipment and supplies. linked by the name only, not checked
    27 Oct 1924outcome not readJournal 1924, p. 1255 ↗
  • Resolution authorizing a long list of city payments to vendors and contractors from various funds, outcome continues on the next page.
    24 Nov 1924outcome not readJournal 1924, p. 1390 ↗
  • $12,776.19 paid for steel bridges across Dumbarton Straits linked by the name only, not checked
    29 Dec 1924passed first readingJournal 1924, p. 1542 ↗
  • Municipal Railway pays $3,500 to settle an injury claim linked by the name only, not checked
    12 Jan 1925passedJournal 1925, p. 45 ↗
  • Twenty payments from city funds were proposed for Hetch Hetchy water works, supplies, legal and engineering work, and a Lincoln Park boulevard job. linked by the name only, not checked
    26 Jan 1925passed first readingJournal 1925, p. 123 ↗
  • The Board moves to authorize Hetch Hetchy water construction fund payments to Del Monte Meat Co., M. M. O'Shaughnessy, Robert M. Searls and others. linked by the name only, not checked
    2 Feb 1925outcome not readJournal 1925, p. 152 ↗
  • $7,312.97 to improve Forty-eighth Avenue between Santiago and Taraval streets linked by the name only, not checked
    9 Feb 1925outcome not readJournal 1925, p. 198 ↗
  • $7,312.97 to improve Forty-eighth Avenue between Santiago and Taraval streets linked by the name only, not checked
    9 Feb 1925outcome not readJournal 1925, p. 198 ↗
  • Payments to suppliers and contractors for water, hospitals, schools and railway work are authorized, with the final vote on the next page.
    24 Feb 1925outcome not readJournal 1925, p. 232 ↗
  • Pending resolution would authorize payments to vendors and claimants, including library book suppliers, Hetch Hetchy contractors, and Pacific Gas and Electric. linked by the name only, not checked
    27 Apr 1925outcome not readJournal 1925, p. 570 ↗
  • Thirty city claims for library, water, street, school and other work approved for payment, passed on final reading. linked by the name only, not checked
    4 May 1925passedJournal 1925, p. 590 ↗
  • Jas. L. McLaughlin gets $318,250 to build the Lafayette School
    19 Oct 1925outcome not readJournal 1925, p. 1480 ↗
  • Resolution authorizing payment of 22 claims for libraries, schools, playgrounds, Hetch Hetchy and Municipal Railway work was passed for printing. linked by the name only, not checked
    19 Oct 1925passed first readingJournal 1925, p. 1478 ↗
  • Resolution authorizes payments to many claimants for library books, Hetch Hetchy work, playgrounds, hospitals and schools; final vote continues on next page. linked by the name only, not checked
    26 Oct 1925outcome not readJournal 1925, p. 1504 ↗
  • Civic Center paving by Reed & Reed set at $45,900 linked by the name only, not checked
    26 Oct 1925outcome not readJournal 1925, p. 1509 ↗
  • Barrett & Hilp paid $635 for alterations to the Beach Chalet linked by the name only, not checked
    18 Jan 1926passed first readingJournal 1926, p. 79 ↗
  • Healy-Tibbitts paid $144,452.14 for the Dumbarton Straits bridge foundations linked by the name only, not checked
    25 Jan 1926passedJournal 1926, p. 105 ↗
  • Supervisors propose authorizing payment of many city claims to utilities, contractors, and suppliers, including Municipal Railways power and hospital food. linked by the name only, not checked
    25 Jan 1926outcome not readJournal 1926, p. 111 ↗
  • United States Steel paid $26,651.13 for the Dumbarton Straits pipeline bridge linked by the name only, not checked
    1 Feb 1926outcome not readJournal 1926, p. 152 ↗
  • Capurro estate paid for nine parcels near Cayuga Avenue for schools linked by the name only, not checked
    5 Apr 1926outcome not readJournal 1926, p. 519 ↗
  • The Board finally passed a resolution authorizing about 27 payments to contractors and suppliers from city funds, mostly schools and Hetch Hetchy. linked by the name only, not checked
    12 Apr 1926passedJournal 1926, p. 540 ↗
  • Park fund payments to nine suppliers and claimants, including $2,360 for a Cadillac sedan, were passed for printing. linked by the name only, not checked
    28 Jun 1926passed first readingJournal 1926, p. 1103 ↗
  • Board authorizes payments to dozens of suppliers for parks, Hetch Hetchy, Municipal Railways, schools and Relief Home, 1926. linked by the name only, not checked
    6 Jul 1926outcome not readJournal 1926, p. 1141 ↗
  • Resolution authorizes dozens of payments to listed contractors and suppliers for schools, Hetch Hetchy, parks, libraries and transit. linked by the name only, not checked
    30 Aug 1926passedJournal 1926, p. 1368 ↗
  • A contract for track materials for the Municipal Railway was proposed; the vote continues on the next page.
    25 Oct 1926outcome not readJournal 1926, p. 1686 ↗
  • Payment to Emilia and Joseph Toboni for San Jose Avenue land linked by the name only, not checked
    29 Nov 1926outcome not readJournal 1926, p. 1853 ↗
  • O. Monson paid $17,362.50 for additions to Galileo High School linked by the name only, not checked
    6 Dec 1926outcome not readJournal 1926, p. 1889 ↗
  • Board authorizes payments to dozens of city suppliers and contractors from park, school, Hetch Hetchy, and Municipal Railway funds. linked by the name only, not checked
    25 Apr 1927outcome not readJournal 1927, p. 674 ↗
  • Board sent a resolution authorizing payments to dozens of suppliers, contractors and claimants for libraries, schools, Muni and Hetch Hetchy, passed for printing.
    2 May 1927passed first readingJournal 1927, p. 737 ↗
  • Payments authorized to city suppliers and contractors for libraries, schools, transit, Hetch Hetchy works, fire and police needs. linked by the name only, not checked
    9 May 1927outcome not readJournal 1927, p. 762 ↗
  • City bills paid for Hetch Hetchy tunnels, parks and streetcars linked by the name only, not checked
    25 Jul 1927passedJournal 1927, p. 1379 ↗
  • Payment of $1,557.41 to United States Steel Products Company for wire. linked by the name only, not checked
    1 Aug 1927outcome not readJournal 1927, p. 1424 ↗
  • Resolution authorises payments from park and Hetch Hetchy funds to suppliers and contractors, passed for printing on McSheehy's motion. linked by the name only, not checked
    26 Sep 1927outcome not readJournal 1927, p. 1823 ↗
  • Claims paid for park plants, playground sewer and Jerrold Avenue land linked by the name only, not checked
    2 Apr 1928outcome not readJournal 1928, p. 544 ↗
  • Finance Committee recommended authorizing payments for the United States Fleet reception, with the outcome continuing to the next page. linked by the name only, not checked
    14 May 1928outcome not readJournal 1928, p. 795 ↗
  • United States Steel Products Co. was paid $2,728.03 for copper cable.
    21 May 1928passedJournal 1928, p. 869 ↗
  • A resolution authorizing payments to suppliers and claimants, mostly for Hetch Hetchy construction, was passed for printing.
    8 Oct 1928passed first readingJournal 1928, p. 2216 ↗
  • Resolution proposes payments to seventeen claimants, including the California Academy of Sciences and Standard Oil Co.
    22 Oct 1928outcome not readJournal 1928, p. 2272 ↗
  • Bills paid for parks, schools and the Great Highway work
    4 Apr 1929passedJournal 1929, p. 600 ↗
  • Claim of $525 to United States Steel Products Co. for locomotive wheels for Hetch Hetchy construction listed for payment.
    3 Jun 1929outcome not readJournal 1929, p. 1123 ↗
  • Payment of $525 to United States Steel Products Co. for locomotive wheels on Hetch Hetchy construction was approved.
    10 Jun 1929passedJournal 1929, p. 1154 ↗
  • Board is considering an award of contract for 200 rolled steel car wheels to United States Steel Products Company.
    30 Sep 1929outcome not readJournal 1929, p. 1911 ↗
  • Payment of $588 to United States Steel Products Co. for railway track bolts and nuts is listed.
    7 Oct 1929outcome not readJournal 1929, p. 1945 ↗
  • United States Steel Products Co. paid $588 for railway track bolts and nuts.
    21 Oct 1929outcome not readJournal 1929, p. 2016 ↗
  • Board passed for printing a resolution authorizing bond-fund payments to contractors and suppliers for Hetch Hetchy water and aqueduct work.
    25 Nov 1929passed first readingJournal 1929, p. 2215 ↗
  • Hetch Hetchy construction claims from five suppliers, totaling $7,349.45 so far listed, were authorized for payment.
    9 Dec 1929outcome not readJournal 1929, p. 2267 ↗
  • A payment of $7,200.00 to United States Steel Products Company covers 200 steel car wheels for Municipal Railway.
    13 Jan 1930outcome not readJournal 1930, p. 127 ↗
  • A $7,200 claim pays United States Steel Products Company for 200 steel car wheels for the railway.
    20 Jan 1930outcome not readJournal 1930, p. 152 ↗
  • Resolution authorizes payment of many city claims from various funds, including Municipal Railway track material and an injury settlement.
    3 Feb 1930outcome not readJournal 1930, p. 248 ↗
  • Resolution authorizes payments to suppliers and contractors for Hetch Hetchy water supply work, including the San Miguel Reservoir land.
    10 Feb 1930outcome not readJournal 1930 ↗
  • Contract for 200 steel car wheels for the Municipal Railway awarded to United States Steel Products Company at $35.50 each.
    7 Apr 1930passedJournal 1930, p. 979 ↗
  • Award of contract for cast-iron pipe to United States Steel Products Company proposed; outcome continues on next page.
    7 Apr 1930outcome not readJournal 1930, p. 979 ↗
  • United States Steel Products Co. was paid $1,368 for steel car wheels for the Municipal Railways.
    28 Apr 1930passedJournal 1930, p. 1072 ↗
  • United States Steel Products Co. claim of $5,338.00 for steel railway crossings listed for payment.
    12 May 1930outcome not readJournal 1930, p. 1180 ↗
  • United States Steel Products Co. was paid $5,338.00 for steel railway crossings on the Municipal Railway. linked by the name only, not checked
    19 May 1930outcome not readJournal 1930, p. 1248 ↗
  • Resolution proposed authorizing thirteen payments to city claimants for library, museum, railway and highway work; passed for printing.
    16 Jun 1930passed first readingJournal 1930, p. 1530 ↗
  • A resolution on Finance Committee recommendation authorizes payments from named funds to named claimants; the list continues on the next page. linked by the name only, not checked