26 Board decisions about URS, in date order. Each links to its printed page.

  • Airport gets $5.3M federal grant for runway studies; pending.
  • Airport runway study grant and contract still pending.
  • Proposed $19.7M contract change with URS Corporation for airport runway environmental studies was sent to committee.
    4 Mar 2003referredBoard minutes 2003 ↗
  • Proposed resolution would approve a contract modification with URS Corporation for airport runway environmental studies, up to $19,741,558; sent to Finance Committee.
    4 Mar 2003referredBoard minutes 2003 ↗
  • Proposed resolution would let the Public Utilities Commission sign a $12M engineering contract with URS Corporation for [name withheld] replacement.
  • Public Utilities Commission may pay URS Corporation up to $12,000,000 for engineering on the [name withheld] replacement.
  • Up to $12M for engineers on [name withheld]; not yet decided.
    9 Aug 2005pendingBoard minutes 2005 ↗
  • Public Utilities Commission may sign a $2,000,000 engineering services agreement with URS Corporation for [name withheld] replacement.
  • Resolution authorizing the General Manager to sign a professional engineering services agreement; outcome not yet shown.
    2008outcome not readBoard minutes 2008 ↗
  • Proposed $1.9 million increase to URS Corporation's engineering contract, bringing the total to $13.9 million; sent to Budget Committee.
    25 Mar 2008referredBoard minutes 2008 ↗
  • URS Corporation's professional engineering services agreement with the PUC was increased by $1.9M, to $13.9M total.
    15 Apr 2008passedBoard minutes 2008 ↗
  • URS Corporation given $1,900,000 more by the Public Utilities Commission
    15 Apr 2008outcome not readBoard minutes 2008 ↗
  • Public Utilities Commission engineering contract with URS Corporation increased by $9,689,663 to $24,000,000 and extended seven years.
  • The Public Utilities Commission's engineering contract with URS Corporation for [name withheld] rose by $9,689,663 to $24,000,000.
  • Proposed $3.9M increase to URS Corporation's engineering contract for the SFPUC New Irvington Tunnel; sent to committee.
  • $3.9M added to the URS Corporation engineering contract
    22 Sep 2009passedBoard minutes 2009 ↗
  • Two-year spending plans for social services fund; still pending.
  • Water dam engineering contract raised to $28.5 million; sent to committee.
  • Proposed: $4.5 million more for [name withheld] engineering firm.
  • [name withheld] engineering contract raised to $28.5 million
  • Extra $500,000 and a year for water tunnel engineering; not yet voted.
  • Water tunnel engineering contract raised $500,000, extended to 2016
  • Proposed $1 million more for New Irvington tunnel design work.
  • Irvington tunnel design contract raised $1 million; sent to committee.
  • Delta airport lease changed; rent about $74 million to 2021.
  • Water tunnel design contract raised by $1 million to $15.9 million