Qipudata
San Francisco · v0.7.1

All decisions

about 160 Board decisions about W. P. Fuller &, in date order. Each links to its printed page.

  • Payment from the Park Fund approved to W. P. Fuller & Co. for paints and oils for Park Commissioners.
    11 Sep 1906passedJournal 1906 ↗
  • Spring Valley Water and Standard Oil paid for Golden Gate Park
    6 Jan 1908outcome not readJournal 1908 ↗
  • Board awarded yearly supply contracts to many firms and corrected earlier clerical errors in previous award lists. linked by the name only, not checked
    27 Jul 1908passedJournal 1908, p. 704 ↗
  • Several suppliers released from yearly supply awards and clerical errors in earlier city supply awards corrected. linked by the name only, not checked
    27 Jul 1908passedJournal 1908, p. 703 ↗
  • City ochre supply contract moved to W. P. Fuller & Co
    26 Oct 1908passedJournal 1908, p. 968 ↗
  • City approved $7,926.65 in payments to suppliers and the Park Commissioners, including $6,000 for grading near the Presidio Extension park. linked by the name only, not checked
  • W. P. Fuller and Company's Bryant Street lease extended another year
    20 Jun 1910outcome not readJournal 1910, p. 635 ↗
  • Contracts for city institutions and departments for fiscal 1911-12 awarded to named firms and corporations. linked by the name only, not checked
  • Contracts for furnishing city supplies awarded to Roebling, Goldberg, Fuller and Telephone Electric Equipment firms. linked by the name only, not checked
  • Paint supplier W. P. Fuller & Company gave notice of a claim against Wiese & Sons for paint used at Denman School. linked by the name only, not checked
    6 Mar 1911referredJournal 1911 ↗
  • W. P. Fuller & Co. filed a $2,050 claim for glass supplied to build Denman School; the claim was referred to the Finance Committee. linked by the name only, not checked
    27 Mar 1911referredJournal 1911 ↗
  • W. P. Fuller and Company claims $251.98 for material used in building Grattan School; referred.
    13 Nov 1911referredJournal 1911 ↗
  • Board Public Works extended ninety-day deadlines for glazing and flooring contractors at San Francisco Hospital.
  • W. P. Fuller given ninety more days at San Francisco Hospital
    24 Jan 1912outcome not readJournal 1912, p. 70 ↗
  • Ten contractors were granted extra time to finish equipment work at San Francisco Hospital. linked by the name only, not checked
    22 Apr 1912outcome not readJournal 1912, p. 301 ↗
  • Board granted ten contractors extensions of time on construction of the San Francisco Hospital, and waived the printing fee. linked by the name only, not checked
    29 Apr 1912passedJournal 1912, p. 308 ↗
  • Resolution passed for printing authorizing payments to contractors and charities, including fire, hospital, school and water works claims.
    20 May 1912passed first readingJournal 1912, p. 392 ↗
  • Resolution 9446 authorizes a batch of city payments, including $22,809.63 to F. Rolandi for a North Point sewer, with the vote continuing on the next page. linked by the name only, not checked
    27 May 1912outcome not readJournal 1912, p. 424 ↗
  • Board awarded additional fiscal 1912-1913 supply and materials contracts to more than thirty firms. linked by the name only, not checked
    10 Sep 1912passedJournal 1912, p. 752 ↗
  • City paid contractors and suppliers from several funds for jail, hospital, school, park and water supply work. linked by the name only, not checked
    16 Sep 1912passedJournal 1912, p. 771 ↗
  • Resolution proposed to award fiscal 1913-1914 supply contracts for city institutions to ten named firms.
    1913outcome not readJournal 1913, p. 915 ↗
  • Mayor authorized to extend W. P. Fuller & Company's lease of the Children's Playground at Seventh and Bryant Streets for one year. linked by the name only, not checked
    9 Jun 1913passedJournal 1913, p. 596 ↗
  • W. P. Fuller & Co. was authorized a $1,474 final payment for painting Lowell High School. linked by the name only, not checked
    7 Jul 1913passed first readingJournal 1913, p. 722 ↗
  • $2,500 paid for the city's Fourth of July celebration linked by the name only, not checked
    14 Jul 1913outcome not readJournal 1913, p. 734 ↗
  • Board authorized payments from city funds to contractors, utilities, and orphanages; the resolution's list continues on the next page. linked by the name only, not checked
    28 Jul 1913outcome not readJournal 1913, p. 766 ↗
  • Mayor authorized to extend W. P. Fuller and Company's one-year lease on a children's playground at Eleventh and Bryant Streets. linked by the name only, not checked
    13 Apr 1914outcome not readJournal 1914, p. 367 ↗
  • J. Schussler & Co. allowed fifty horses on Harrison Street
    13 Oct 1914outcome not readJournal 1914, p. 1178 ↗
  • J. Schussler & Co. allowed fifty horses on Harrison Street
    20 Oct 1914outcome not readJournal 1914, p. 1216 ↗
  • Appropriations for City Hall, the main Library, Municipal Railway, street paving and sewer work were listed; the final vote is not printed here. linked by the name only, not checked
    10 May 1915outcome not readJournal 1915, p. 523 ↗
  • Proposed appropriations of $17,125 for City Hall hardware and $19,431 for glass work; the vote is not yet printed.
    17 May 1915outcome not readJournal 1915, p. 539 ↗
  • Neustadter Bros. and Martin-Camm paid for San Francisco Hospital supplies linked by the name only, not checked
    9 Aug 1915passed first readingJournal 1915, p. 905 ↗
  • Resolution 12032 authorizing matters was taken up for final passage; its outcome is printed on the next page.
    16 Aug 1915outcome not readJournal 1915, p. 918 ↗
  • Monson Bros. paid $12,879 for carpentry work at City Hall
    7 Sep 1915outcome not readJournal 1915, p. 988 ↗
  • Monson Bros. paid for carpentry and mill work at City Hall
    20 Sep 1915passedJournal 1915, p. 1021 ↗
  • Thirty payment claims to city suppliers, contractors and utilities were authorized for payment from various city funds. linked by the name only, not checked
  • The Board approved payment of 29 city claims, including Pacific Gas and Electric lighting and work on City Hall and San Francisco Hospital.
    22 Nov 1915passedJournal 1915, p. 1235 ↗
  • W. P. Fuller & Co. was granted a ninety-day extension to finish its City Hall glazing contract.
    29 Nov 1915passedJournal 1915, p. 1364 ↗
  • Authorizes payment of dozens of city bills for City Hall work, street repairs, Hetch Hetchy water and Municipal Railway supplies.
    6 Dec 1915outcome not readJournal 1915, p. 1394 ↗
  • Board began authorizing a list of expenditures from city funds; the amounts continue on the next page.
    13 Dec 1915outcome not readJournal 1915, p. 1413 ↗
  • Seven city payments for Municipal Railway power, City Hall, S. F. Hospital and Hetch Hetchy work were passed for printing.
    17 Jan 1916passed first readingJournal 1916, p. 79 ↗
  • The Board proposed extra City Hall work, including glass backing, carvings, counters and a ceiling light, with the rest continued on the next page.
    21 Feb 1916outcome not readJournal 1916, p. 187 ↗
  • W. P. Fuller & Co. granted 30 more days to finish its City Hall glass and glazing contract.
    21 Feb 1916passedJournal 1916, p. 191 ↗
  • Pacific Gas and Electric may use the Municipal Railway's underground conduit linked by the name only, not checked
    20 Mar 1916outcome not readJournal 1916, p. 272 ↗
  • Ten contractors were granted time extensions to finish City Hall construction work, on the unanimous recommendation of the Board of Public Works.
    20 Mar 1916passedJournal 1916, p. 272 ↗
  • $1,050 paid to the Whitcomb Estate for hospital rent
    24 Jul 1916outcome not readJournal 1916, p. 819 ↗
  • $4,565 paid to C. C. Morehouse for plastering City Hall linked by the name only, not checked
    28 Aug 1916passed first readingJournal 1916, p. 898 ↗
  • Board authorizes payments from city funds to many contractors and suppliers, including City Hall work and hospital supplies. linked by the name only, not checked
    11 Sep 1916outcome not readJournal 1916, p. 916 ↗
  • Karl Ehrhart paid $4,143.02 for the Oakdale Avenue sewers linked by the name only, not checked
    30 Oct 1916outcome not readJournal 1916, p. 1121 ↗
  • Karl Ehrhart paid $4,143.02 for the Oakdale Avenue sewers
    6 Nov 1916outcome not readJournal 1916, p. 1147 ↗
  • Board authorized payments to contractors for Twin Peaks Tunnel, Municipal Railways, Paul Revere School and hospital work; list continues.
    8 Jan 1917passed first readingJournal 1917, p. 31 ↗
  • Claims totalling $47,173.45 for libraries, water, Municipal Railway, parks and hospital were passed for printing.
    27 May 1918passed first readingJournal 1918, p. 427 ↗
  • Window glass contract amended, setting discounts for Habenicht & Howlett and W. P. Fuller & Co. linked by the name only, not checked
    24 Jun 1918passedJournal 1918, p. 546 ↗
  • Anderson and Ringrose paid $9,774.75 for building the Monroe School
    31 Mar 1919outcome not readJournal 1919, p. 212 ↗
  • Urgent city payment demands, including water, ice and fuel bills, were laid over one week on motion. linked by the name only, not checked
    9 Jun 1919continuedJournal 1919, p. 466 ↗
  • $37,499.85 paid to Pacific Gas and Electric for street lighting
    14 Jul 1919passedJournal 1919, p. 586 ↗
  • Anderson & Ringrose due $13,353.75 for building the Argonne School
    17 Nov 1919outcome not readJournal 1919, p. 935 ↗
  • Anderson & Ringrose paid $13,353.75 for building the Argonne School
    24 Nov 1919outcome not readJournal 1919, p. 1036 ↗
  • Spring Valley Water paid $10,983.31 for fire hydrant water
    5 Jan 1920outcome not readJournal 1920, p. 3 ↗
  • Spring Valley Water paid $10,983.31 for fire hydrant water
    12 Jan 1920passedJournal 1920, p. 52 ↗
  • Resolution authorizing thirteen payments from city funds for Hetch Hetchy, school, railway and jail supplies was passed for printing.
    22 Mar 1920passed first readingJournal 1920, p. 239 ↗
  • Pacific Gas & Electric paid $21,240.09 for Municipal Railway power
    29 Mar 1920passedJournal 1920, p. 256 ↗
  • Charles and Virginia Swift paid for land on Roosevelt Way
    13 Sep 1920outcome not readJournal 1920, p. 757 ↗
  • Resolution authorizing about thirty city payments for water, sewer, street and railway work, passed for printing.
    7 Aug 1922passed first readingJournal 1922 ↗
  • W. P. Fuller and Company allowed a garage on Beale Street linked by the name only, not checked
    27 Nov 1922outcome not readJournal 1922 ↗
  • W. P. Fuller and Company allowed a garage on Beale Street
    11 Dec 1922passedJournal 1922 ↗
  • W. P. Fuller & Company's supply price schedule is listed, with no vote or decision printed on this page.
    27 Aug 1923outcome not readJournal 1923, p. 948 ↗
  • W. P. Fuller & Company's supply price schedule is listed, with no vote or decision printed on this page. linked by the name only, not checked
    27 Aug 1923outcome not readJournal 1923, p. 948 ↗
  • Supply price list for W. P. Fuller & Co., no bond required, for 100-pound sacks and pound items. linked by the name only, not checked
    27 Aug 1923passedJournal 1923, p. 943 ↗
  • Board passed payment of claims to suppliers and contractors, including Hetch Hetchy, Municipal Railway and school construction.
    10 Mar 1924passedJournal 1924, p. 254 ↗
  • Resolution authorizing payments from the Water Construction Fund to several suppliers for Hetch Hetchy work was passed for printing. linked by the name only, not checked
    5 May 1924outcome not readJournal 1924, p. 503 ↗
  • Resolution proposed to authorize payment of further city claims from named accounts; outcome appears on the next page. linked by the name only, not checked
    19 May 1924outcome not readJournal 1924, p. 621 ↗
  • The Board authorized payments to Del Monte Meat Co. and General Electric Co. from the Water Construction Fund for Hetch Hetchy supplies. linked by the name only, not checked
    23 Jun 1924outcome not readJournal 1924, p. 743 ↗
  • Resolution authorizing payments to 32 claimants, including Spring Valley Water Company and Pacific Coast Steel, passed for printing. linked by the name only, not checked
    25 Aug 1924passed first readingJournal 1924, p. 988 ↗
  • Resolution authorizes payments to suppliers and contractors, mainly for Hetch Hetchy water construction, from the Water Construction Fund. linked by the name only, not checked
    15 Sep 1924outcome not readJournal 1924, p. 1041 ↗
  • Resolution authorizes payment of 39 claims to suppliers, contractors and utilities, including Hetch Hetchy and Municipal Railway costs. linked by the name only, not checked
    3 Nov 1924outcome not readJournal 1924, p. 1298 ↗
  • W. P. Fuller & Co. is paid $1,674.20 for glazing and lights at the Park Museum.
    3 Nov 1924outcome not readJournal 1924, p. 1310 ↗
  • Supervisor McLeran's resolution authorizing about 28 city payments, including library, school and police supplies, was passed for printing. linked by the name only, not checked
    12 Jan 1925passed first readingJournal 1925, p. 56 ↗
  • Roberts Manufacturing paid $1,396 for Public Library lighting fixtures linked by the name only, not checked
    19 Jan 1925outcome not readJournal 1925, p. 78 ↗
  • Resolution lists payments to contractors and suppliers for schools, Hetch Hetchy, Municipal Railways and other city work; passed for printing.
    10 Aug 1925outcome not readJournal 1925, p. 1161 ↗
  • Money set aside for sewers and the Harbor Emergency Hospital linked by the name only, not checked
    5 Oct 1925outcome not readJournal 1925, p. 1427 ↗
  • Resolution 24603 authorizes payments to Haskins & Sells, Spring Valley Water Co., American Brake Shoe and Standard Underground Cable for city work. linked by the name only, not checked
    13 Oct 1925outcome not readJournal 1925, p. 1447 ↗
  • City pays bills for side sewers, Hetch Hetchy and schools linked by the name only, not checked
  • $16,200 set aside to rebuild Fillmore Street between Chestnut and Bay linked by the name only, not checked
    23 Nov 1925outcome not readJournal 1925, p. 1612 ↗
  • Resolution No. 25023 authorizes payments of about twenty city claims for school construction, parks, water works and publicity. linked by the name only, not checked
    11 Jan 1926outcome not readJournal 1926, p. 46 ↗
  • Painters' supplies contracts for bronzing, glue, gold leaf and linseed awarded to Dan P. Maher Co., W. P. Fuller & Co., and Yates & Co.
    25 Jan 1926outcome not readJournal 1926, p. 144 ↗
  • Paint, lead, enamel and lamp black supply contracts awarded to National Lead Co., Dan P. Maher Co., W. P. Fuller & Co., and others.
    25 Jan 1926outcome not readJournal 1926, p. 144 ↗
  • Supervisor McSheehy's resolution authorising payments to contractors and suppliers for parks, schools, water and transit was passed for printing.
    29 Mar 1926passed first readingJournal 1926, p. 481 ↗
  • George McLeod paid $1,996 for the Lincoln Park balustrade linked by the name only, not checked
    5 Apr 1926outcome not readJournal 1926, p. 510 ↗
  • Board authorized payments to contractors and suppliers for parks, schools, and Fillmore Street track work, passed for printing. linked by the name only, not checked
    1 Jun 1926passed first readingJournal 1926, p. 928 ↗
  • Payments of 28 city claims, mainly for parks, schools, Hetch Hetchy and Municipal Railways, finally passed. linked by the name only, not checked
    14 Jun 1926passedJournal 1926, p. 1006 ↗
  • Resolution authorizing dozens of claim payments for parks, school construction, a tuberculosis sanitarium and Municipal Railway equipment, passed for printing. linked by the name only, not checked
    9 Aug 1926outcome not readJournal 1926, p. 1309 ↗
  • Board awarded city supply contracts for engineering, hardware, paint and lumber to named lowest bidders.
    23 Aug 1926outcome not readJournal 1926, p. 1357 ↗
  • Youdall and Clifford paid $49,162.50 for the Buena Vista Park tunnel linked by the name only, not checked
    23 Aug 1926outcome not readJournal 1926, p. 1330 ↗
  • Byron Jackson paid $11,759 for a pump in Golden Gate Park linked by the name only, not checked
    4 Oct 1926outcome not readJournal 1926, p. 1563 ↗
  • Resolution authorizing dozens of city payments to suppliers and contractors for Hetch Hetchy, schools, streets and hospitals, passed for printing.
    3 Jan 1927outcome not readJournal 1927, p. 11 ↗
  • Board sent a resolution authorizing payments to dozens of suppliers, contractors and claimants for libraries, schools, Muni and Hetch Hetchy, passed for printing.
    2 May 1927passed first readingJournal 1927, p. 737 ↗
  • Payments authorized to city suppliers and contractors for libraries, schools, transit, Hetch Hetchy works, fire and police needs. linked by the name only, not checked
    9 May 1927outcome not readJournal 1927, p. 762 ↗
  • Supervisor Badaracco presented a resolution to award a contract for hardware, paints and lumber.
    31 May 1927outcome not readJournal 1927, p. 1087 ↗
  • Payment of $739.50 to W. P. Fuller & Co. for white lead used in school repairs. linked by the name only, not checked
    1 Aug 1927outcome not readJournal 1927, p. 1424 ↗
  • City bills paid for playgrounds, golf balls and Third Street repairs linked by the name only, not checked
    8 Aug 1927outcome not readJournal 1927, p. 1471 ↗
  • A resolution authorizes payment of numbered claims for school, fire, park, tunnel and Municipal Railway work; the final vote is not printed here.
    7 Nov 1927outcome not readJournal 1927, p. 2144 ↗
  • W. P. Fuller & Co. is paid $798 for paint supplied to schools.
    21 Nov 1927passedJournal 1927, p. 2190 ↗
  • $4,960 paid for chairs for the Galileo High School linked by the name only, not checked
    3 Jan 1928outcome not readJournal 1928, p. 25 ↗
  • Payment of $749.10 approved to W. P. Fuller & Co. for paints for the Fire Department. linked by the name only, not checked
    16 Jan 1928passedJournal 1928, p. 79 ↗
  • City pays $4,960 for Galileo High School chairs linked by the name only, not checked
    16 Jan 1928passedJournal 1928, p. 64 ↗
  • W. P. Fuller & Co. claim of $749.10 for paints for the Fire Department listed for payment.
    23 Jan 1928outcome not readJournal 1928, p. 103 ↗
  • Contracts for linseed oil, putty, shellac, turpentine and lead awarded to five low bidders for January to April 1928.
    30 Jan 1928passedJournal 1928, p. 187 ↗
  • Paint, glass and painters' supplies contracts for 1928 awarded to ten low bidders, including Glidden and Maher.
    30 Jan 1928passedJournal 1928, p. 187 ↗
  • Battista Boeto paid for land taken for Bay Shore Boulevard linked by the name only, not checked
    6 Feb 1928outcome not readJournal 1928, p. 199 ↗
  • Bills paid for Engine House No. 18 and the Steinhart Aquarium linked by the name only, not checked
    14 Feb 1928outcome not readJournal 1928, p. 246 ↗
  • Board awarded supply contracts for linseed oil, shellac, turpentine and paints to the lowest bidders, including W. P. Fuller & Co.
    16 Apr 1928passedJournal 1928, p. 685 ↗
  • Resolution authorizes payments from city funds to utilities, contractors, the Market Street Railway and others; final vote is not printed on this page. linked by the name only, not checked
    30 Apr 1928outcome not readJournal 1928, p. 750 ↗
  • Land bought from S. Brizzolara for the Francisco School linked by the name only, not checked
    28 May 1928outcome not readJournal 1928, p. 1077 ↗
  • Bills paid for Hetch Hetchy explosives and the Tehama Street rebuild linked by the name only, not checked
    11 Jun 1928outcome not readJournal 1928, p. 1185 ↗
  • Payment of $1,128 to W. P. Fuller & Co. for paints supplied to the Fire Department.
    11 Jun 1928outcome not readJournal 1928, p. 1204 ↗
  • Payment of $1,128 to W. P. Fuller & Co. for paints for the Fire Department approved.
    18 Jun 1928passedJournal 1928, p. 1224 ↗
  • Contracts for linseed oil, shellac, turpentine and related supplies awarded to four low bidders.
  • Payment of $834.50 to W. P. Fuller & Co. for paint supplies for schools.
    15 Oct 1928outcome not readJournal 1928, p. 2248 ↗
  • Payment of $834.50 to W. P. Fuller & Co. for paint supplies for schools, listed for payment.
    22 Oct 1928outcome not readJournal 1928, p. 2278 ↗
  • Payment of $685.01 to W. P. Fuller & Co. for paints for schools was approved.
    19 Nov 1928passedJournal 1928, p. 2465 ↗
  • The Board's December 10, 1928 schedule approves 21 payments, including street, boulevard, school, concert and library claims.
    10 Dec 1928outcome not readJournal 1928, p. 2596 ↗
  • W. P. Fuller & Co. was paid for white lead in oil used in school buildings.
    17 Dec 1928outcome not readJournal 1928, p. 2640 ↗
  • Ten suppliers awarded annual 1929 contracts for paints, painters' supplies and glass, with bonds set for four of them.
    14 Jan 1929outcome not readJournal 1929, p. 82 ↗
  • W. P. Fuller & Co. was paid $884 for oil, lead and other supplies for school buildings.
    4 Mar 1929passedJournal 1929, p. 418 ↗
  • Payment of $884.00 to W. P. Fuller & Co. for oil and lead used in school buildings.
    11 Mar 1929outcome not readJournal 1929, p. 465 ↗
  • Resolution authorizes payments from city funds to many contractors and suppliers, including aqueduct tunnel and Alemany Boulevard work, passed for printing.
    18 Mar 1929outcome not readJournal 1929, p. 519 ↗
  • W. P. Fuller & Co. were claimed $818.19 for window glass for schools.
    25 Mar 1929outcome not readJournal 1929, p. 552 ↗
  • Four firms awarded contracts to supply linseed oil, shellac, turpentine, lead and putty for May to August 1929.
    15 Apr 1929passedJournal 1929, p. 724 ↗
  • Proposed resolution authorizes payment of dozens of supplier claims, including cement, gasoline, lumber, and San Francisco Hospital supplies.
    6 May 1929outcome not readJournal 1929, p. 896 ↗
  • Resolution authorizing road-fund payments to rock, oil, cement and other suppliers was passed for printing.
    6 May 1929passed first readingJournal 1929, p. 895 ↗
  • Finance Committee recommended a resolution authorizing listed amounts; its final vote appears on the next page.
    13 May 1929outcome not readJournal 1929, p. 919 ↗
  • Resolution authorizing city payments to suppliers, contractors and pension funds, including $15,000 to Healy-Tibbitts for Ocean Beach Esplanade work.
    24 Jun 1929outcome not readJournal 1929, p. 1274 ↗
  • Annual supply contracts for 1929-30 awarded to fourteen firms, covering milk, fuel, drugs and lamps.
    15 Jul 1929outcome not readJournal 1929, p. 1419 ↗
  • Board resolution proposed paying about 25 claims from city funds to suppliers, contractors and others, continued onto the next page.
    5 Aug 1929outcome not readJournal 1929, p. 1540 ↗
  • Resolution authorizing $22,110.54 in payments to 21 claimants from city funds was taken up for final passage.
    12 Aug 1929outcome not readJournal 1929 ↗
  • Contracts for linseed oil, shellac, turpentine, lead and paint supplies were awarded to three firms for late 1929.
    19 Aug 1929passedJournal 1929, p. 1647 ↗
  • Supply contracts for linseed oil, shellac, turpentine and paint materials for January to April 1930 are being awarded to lowest bidders.
    9 Dec 1929outcome not readJournal 1929, p. 2308 ↗
  • A proposed award of contract for paints, painters' supplies and glass continues on the next page. linked by the name only, not checked
    16 Dec 1929outcome not readJournal 1929, p. 2374 ↗
  • W. P. Fuller & Co. was paid $536 for oil and turpentine used in schools.
    28 Apr 1930passedJournal 1930, p. 1072 ↗
  • Hardware, castings and lumber supply contracts proposed for Tay-Holbrook, Dunham Carrigan & Hayden, and Rincon Foundry.
    12 May 1930outcome not readJournal 1930, p. 1205 ↗
  • Park Fund payments to firms for paint, pumps, utilities, food and supplies were passed for printing.
    23 Jun 1930passed first readingJournal 1930, p. 1570 ↗
  • Resolution authorizing park fund payments to nine suppliers, including PG&E and Kimball-Krogh Pump Co., listed for final passage.
    30 Jun 1930outcome not readJournal 1930, p. 1592 ↗
  • W. P. Fuller & Co. is listed for payment of $772.30 for paint supplied to schools. linked by the name only, not checked
    11 Aug 1930outcome not readJournal 1930, p. 1957 ↗
  • Contracts for linseed oil, shellac, turpentine, lead and putty awarded to National Lead, Sherwin-Williams and W. P. Fuller.
    18 Aug 1930passedJournal 1930, p. 1987 ↗
  • A $772.30 payment was approved to W. P. Fuller & Co. for paint supplied to schools.
    18 Aug 1930outcome not readJournal 1930, p. 1973 ↗
  • Payment of $565 to W. P. Fuller & Co. for lead and oil used in schools was listed.
    29 Sep 1930outcome not readJournal 1930, p. 2271 ↗
  • W. P. Fuller & Co. was paid $565 for lead and oil supplied to city schools.
    6 Oct 1930outcome not readJournal 1930, p. 2297 ↗
  • Resolution authorizes payment of about two dozen city claims for gasoline, cement, sewers, electricity and other services.
    20 Oct 1930outcome not readJournal 1930, p. 2376 ↗
  • Payment of $574 authorised to W. P. Fuller & Co. for oil and lead for school buildings. linked by the name only, not checked
    27 Oct 1930outcome not readJournal 1930, p. 2417 ↗
  • Payment of $1,063.13 to W. P. Fuller & Co. for lead and oil for school repairs is listed in the claims schedule. linked by the name only, not checked
    3 Nov 1930outcome not readJournal 1930, p. 2477 ↗
  • Claim of $1,063.13 listed for payment to W. P. Fuller & Co. for lead and oil for school repairs. linked by the name only, not checked
    12 Nov 1930outcome not readJournal 1930, p. 2541 ↗
  • Four firms, including W. P. Fuller & Co. and General Paint Corporation, were awarded city contracts for linseed oil, paint and related supplies.
  • Payment of $907.25 to W. P. Fuller & Co. for paints used in schools.
    3 Jan 1931outcome not readJournal 1931 ↗
  • Annual painters' supplies and glass contracts for 1931 awarded to eight firms, including Tyre Bros. and Dan P. Maher Paint.
    26 Jan 1931passedJournal 1931, p. 229 ↗
  • Claim of $676.50 to W. P. Fuller & Co. for oil and supplies used in school repairs, listed for payment.
    2 Feb 1931outcome not readJournal 1931, p. 277 ↗
  • Resolution 34052 authorizes payments to suppliers and contractors for streets, water pipe, school supplies and tax installments.
    9 Mar 1931outcome not readJournal 1931, p. 566 ↗
  • W. P. Fuller & Co. paid $533.75 for lead and oil used on school buildings.
    6 Apr 1931outcome not readJournal 1931, p. 748 ↗
  • W. P. Fuller & Co. is listed for payment of $701.75 for paint supplies for school buildings.
    20 Apr 1931outcome not readJournal 1931, p. 813 ↗
  • W. P. Fuller & Co., Dan P. Maher Paint Company and Sherwin-Williams Company were awarded city contracts for linseed oil, shellac and paint supplies.
    20 Apr 1931passedJournal 1931, p. 835 ↗
  • Annual city supplies contracts for 1931-1932 are being awarded to many named vendors, with the outcome continuing on the next page.
    6 Jul 1931outcome not readJournal 1931, p. 2380 ↗
  • W. P. Fuller & Co. was paid $1,413.58 for paints, oils and glass.
    10 Aug 1931outcome not readJournal 1931, p. 2595 ↗
  • Contracts for linseed oil, shellac, turpentine, lead and putty awarded to three paint companies for late 1931.
    24 Aug 1931passedJournal 1931, p. 2709 ↗
  • The Board awarded city supply contracts for linseed oil, shellac, turpentine and paint to four firms for early 1932.
    28 Dec 1931passedJournal 1931, p. 3559 ↗
  • Paint and painters' supplies contracts awarded to ten named firms for the 1932 calendar year.
    28 Dec 1931passedJournal 1931, p. 3561 ↗