All decisions
about 260 Board decisions about Hetch Hetchy Dam, in date order. Each links to its printed page.
- Board repealed its earlier resolution abandoning the Hetch Hetchy reservoir application and asked the Mayor to represent it at rehearing.
- Resolution adopted urging the Secretary of the Interior to grant the city reservoir rights at Hetch Hetchy Valley and Lake Eleanor.
- Mayor authorized to urge the Interior Secretary to favourably decide the city's Hetch Hetchy reservoir site application.
- Proposed agreement to buy Elmer E. Smith's Tuolumne County lands for Hetch Hetchy reservoir sites was passed for printing.
- Payment of $573.65 for expenses of acquiring a Hetch Hetchy Valley water supply was passed for printing.
- The City agreed to buy inside lands in Hetch Hetchy Valley for $150,800, exchanging outside lands with the United States.
- Interior Secretary reinstates San Francisco's application for Hetch Hetchy reservoir rights inside Yosemite National Park.
- Marsden Manson was paid $573.65 for expenses of acquiring a Hetch-Hetchy Valley water supply, by Resolution 2153.
- Mayor is urged to press Congress to favor the city's application for reservoir sites in Hetch Hetchy Valley.
- City Engineer reports success on Hetch Hetchy and Lake Eleanor sites
- Proposed resolution would pay Elmer E. Smith $10,000 from the Surplus Fund for Hetch Hetchy Valley land; passed for printing.
- A $10,000 first installment for land near Hetch Hetchy Valley was passed for printing, pending a later vote.
- $49,500 set down to buy private land near Hetch Hetchy Valley
- Board approved a $10,000 first payment to Elmer E. Smith for Hetch Hetchy Valley reservoir lands.
- Board ratifies City Engineer Marsden Manson's petition for Lake Eleanor and Hetch Hetchy reservoir sites, accepting Interior Department conditions.
- Board appropriated $2,500 for surveys of reservoir sites and rights of way at Lake Eleanor and Hetch Hetchy Valley.
- Board approved $2,500 from the water supply budget for reservoir surveys at Hetch Hetchy Valley and Lake Eleanor.
- Board passed ordinance declaring a city-owned water supply needed, directing plans from Hetch Hetchy Valley and Lake Eleanor.
- City Attorney's opinion on legal steps to secure reservoir lands in Hetch Hetchy Valley was referred to the Streets, Sewers and Parks Committee.
- Resolution 2598 appropriated $1000 for Board of Public Works surveys in Hetch Hetchy Valley and Lake Eleanor.
- Board of Public Works sent plans and estimates for a municipal water supply from Hetch Hetchy Valley, which was filed.
- Ordinance for $750,000 Hetch Hetchy water reservoir works and bonded debt was deferred.
- Bonds proposed to buy private land at Hetch Hetchy Valley
- $1000 was proposed, for passage to printing, to continue Board of Public Works surveys at Lake Eleanor and Hetch Hetchy Valley.
- Board passed Resolution 2920 appropriating $1000 for Board of Public Works surveys in Hetch Hetchy Valley and Lake Eleanor.
- Giannini and Manson were authorized to go to Washington to secure Congress's approval of Hetch Hetchy reservoir sites.
- Ordinance passed finally authorizing the City's agreement to exchange outside lands for reservoir lands at Hetch Hetchy Valley.
- $1500 set aside for surveys of land lines at Lake Eleanor and Hetch Hetchy Valley adopted.
- A $1,500 appropriation for surveying land lines at Lake Eleanor and Hetch Hetchy Valley was proposed; its outcome is not on this page.
- Bill proposing $600,000 in bonds to buy Hetch Hetchy Valley lands and build water works was passed for printing.
- The Board passed $600,000 in water supply bonds to buy Hetch Hetchy Valley lands and build works.
- Congress urged to confirm the Hetch Hetchy reservoir grant
- The Board set aside $1,000 for costs of acquiring lands near Hetch Hetchy Valley and Lake Eleanor.
- Secretary Garfield's opinion granted San Francisco a right of way to dam Hetch Hetchy Valley for its water supply.
- Letter about buying Lizzie Covel's 160 acres in Hetch Hetchy Valley
- Resolution proposes $1,000 for Board of Public Works expenses in acquiring lands near Hetch Hetchy Valley and Lake Eleanor.
- The City Attorney's communication on acquiring Covel lands in Hetch Hetchy Valley was referred to the Public Utilities Committee.
- Elmer E. Smith was approved for $105,884.60, the third installment on Hetch Hetchy Valley lands for the city water supply.
- The Board accepted Lizzie B. Covel's offer to sell her half interest in Hetch Hetchy Valley land for $8,780.
- Lizzie B. Covel, as guardian, offered to sell Horatio G. Kellett's half interest in Hetch Hetchy Valley land for $8,780.60.
- The Board approved a final payment of $8,289.60 to Lizzie B. Covel for Hetch Hetchy Valley land.
- The Board authorized paying $8,789.60 to Lizzie B. Covel, as guardian, for Hetch Hetchy Valley land.
- The Board authorized $8289.60 to Lizzie B. Covel, the final payment for her half interest in Hetch Hetchy Valley land.
- A payment of $3789.60 to Lizzie B. Covel as guardian of Horatio G. Kellett, minor, for Hetch Hetchy Valley land was proposed.
- The Board authorized $105,884.60 to Elmer E. Smith, the third installment for Hetch Hetchy Valley lands bought for the city water supply.
- Tax agreement confirmed on Elmer E. Smith's Hetch Hetchy land
- $2,500 was set aside for the Board of Public Works to survey Lake Eleanor and Hetch Hetchy Valley for water supply.
- The Board finally passed $2500 from the Water Supply Fund for surveying at Lake Eleanor and Hetch Hetchy Valley.
- Resolution to spend $13,128.77 from the Water Supply Fund clearing Hetch Hetchy reservoir sites was passed for printing.
- The Board of Public Works asked for a $13,188.27 payment for timber on city lands in Hetch Hetchy Valley; referred to Finance Committee.
- Funding of $13,128.77 for clearing timber at Hetch Hetchy reservoir sites was introduced by Johnston and deferred; Pollok's accounting motion carried.
- Resolution adopted setting aside $13,128.77 from the Water Supply Fund to clear timber from Hetch Hetchy reservoir sites.
- Board of Public Works received $5,000 for surveying at Lake Eleanor and Hetch Hetchy Valley, adopted.
- Appropriation of $4,000 from the General Fund for water supply investigations and stream gauging in Hetch Hetchy Valley.
- Mayor's order continues the hearing on removing Hetch Hetchy Valley from the Garfield permit.
- The Board voted to proceed on its inspection trip to Hetch Hetchy Valley and Lake Eleanor, with the press invited.
- The Board of Public Works was proposed to receive $500 to continue work in Hetch Hetchy Valley.
- Board of Public Works recommends $2,500 for the City Engineer to continue work in Hetch Hetchy Valley; referred to committee.
- Board of Public Works recommends $3,500 for continued surveys in Hetch Hetchy Valley; sent to Finance Committee.
- Board of Public Works recommends $4,000 from the General Fund for continuing work in Hetch Hetchy Valley; referred to the Finance Committee.
- $5,000 was set aside for the City Attorney to prepare the case for retaining Hetch Hetchy Valley as a water source.
- Proposed resolution would send the City Attorney to Washington to seek changes to an order threatening the Hetch Hetchy reservoir site.
- The Board set aside $5000 from the Water Bond Fund for the City Attorney's case to keep Hetch Hetchy Valley as a water source.
- Public Works recommended $5,000 for contingent expenses on current work in Hetch Hetchy Valley.
- Resolution urging the President to dismiss the Interior Secretary's order against the city's Hetch Hetchy Valley reservoir permit was referred to committee.
- Proposed $15,000 from water bond proceeds for City Engineer's work at Hetch Hetchy Valley, passed for printing.
- Board passed $15,000 from water bond proceeds for City Engineer work at Hetch Hetchy Valley demanded by the Secretary of the Interior.
- Water supply expert John R. Freeman presented the city's case for using Hetch Hetchy Valley as a water source.
- Federal oral hearing on using Hetch Hetchy Valley for city water was set for November 25, 1912; sent to Public Utilities Committee.
- W. C. Hammatt's claim of $980.45 for surveying City property in Hetch Hetchy Valley was passed to print.
- Board approved $5,000 from the Water Construction Fund to send city officials to Washington over Hetch Hetchy Valley water supply.
- Board adopted the amended locations of Hetch Hetchy reservoir, dam site and aqueduct right of way in Tuolumne County.
- The Board adopted locations and authorized the Mayor to apply to federal authorities for the Hetch Hetchy reservoir and aqueduct.
- Mayor authorized to file maps and federal applications so San Francisco can obtain Hetch Hetchy Valley water supply rights.
- Supervisor Power's proposed resolution to contract with Pacific Telephone for Hetch Hetchy Valley service was referred to Public Works.
- Board of Public Works is directed to advertise for bids for an 8.5-mile road to Hetch Hetchy Dam.
- Board of Public Works directed to advertise bids for an eight and one-half mile road to the Hetch Hetchy Dam site.
- Clerk to obtain a Board of Public Works report on the Groveland to Hetch Hetchy telephone line and Oakdale avenue.
- Mayor authorized to file Hetch Hetchy maps with the Land Office
- Resolution adopting the location of a transportation road to Hetch Hetchy Dam was adopted, supporting the city's water supply.
- $151,499.50 set aside for the road to the Hetch Hetchy dam
- $151,499.50 set aside for the road to the Hetch Hetchy dam
- $151,499.50 set aside for the road to the Hetch Hetchy dam
- $151,499.50 set aside for the road to the Hetch Hetchy dam
- $151,499.50 set aside for the road to the Hetch Hetchy dam
- The Mayor was authorised to sign Forestry Service stipulations for a transportation road to the Hetch Hetchy dam site.
- The Board granted Utah Construction Company sixty more days to finish the Hog Ranch to Hetch Hetchy dam road.
- Location of the Transportation Road in Hetch Hetchy Valley was adopted to carry materials to the dam.
- Utah Construction Co. paid $19,650.02 for the Hetch Hetchy dam road
- Road to Hetch Hetchy Valley approved in principle
- Route adopted for the Hetch Hetchy transportation road
- Ordinance proposed to authorize clearing part of the Hetch Hetchy reservoir site by contract.
- Bill 3729 proposes clearing part of the Hetch Hetchy reservoir site under a Board of Public Works contract; outcome continues on next page.
- Road route for Hetch Hetchy dam materials formally set
- Specifications for hauling cement to the Hetch Hetchy dam site were approved, effective October 25, 1915.
- Board instructs the City Attorney to begin eminent domain proceedings for a railway right of way to the Hetch Hetchy dam site.
- A. J. Reeder was granted a ninety-day extension to finish clearing the Hetch Hetchy reservoir site, on Public Works' recommendation.
- Board adopted a 90-day extension for A. J. Reeder to finish clearing the Hetch Hetchy reservoir site.
- Board amends earlier resolution and orders City Attorney to condemn a right of way to Hetch Hetchy Valley dam site.
- Board proposes adopting the definite location of a transportation road from Hetch Hetchy Valley to Lake Eleanor.
- Board adopted a resolution instructing the Clerk to arrange visits by supervisors to Hetch Hetchy Valley.
- Board motion for a supervisors' inspection trip to Hetch Hetchy Valley on or about September 15 carried.
- Sonora Abstract and Title Company would exchange Dudley property with the U.S. Government to settle Hetch Hetchy timber charges; passed for printing.
- City Engineer recommended approving purchase of electric storage locomotives for Hetch Hetchy Valley; outcome not shown here.
- A proposed agreement with the United States exchanges Dudley land for timber rights in Hetch Hetchy Valley; outcome not shown.
- Resolution proposing an agreement with the United States to exchange Dudley property for timber in Hetch Hetchy Valley.
- Board clerk directed to arrange a supervisors' visit to the Hetch Hetchy Valley water project works.
- Supervisor McSheehy proposed that the City Engineer explain, before award, why the roughly $4,000,000 Hetch Hetchy dam contract should be let as one large contract.
- Supervisor Hynes moved to print Mayor Rolph's Hetch Hetchy Valley description as a pamphlet; motion carried.
- The Board of Public Works is asked to send costs and bids for the Hetch Hetchy Dam.
- Proposed $5.5M appropriation for Hetch Hetchy Dam construction by Utah Construction Company; outcome not printed on this page.
- The Board appropriated $5,500,000 from water bond funds to build the Hetch Hetchy dam under a Utah Construction Company contract.
- An award of the Hetch Hetchy Dam construction contract to Utah Construction Company is proposed; its outcome is not on this page.
- Utah Construction due $15,907.50 for work on the Hetch Hetchy dam
- Utah Construction paid $15,907.50 for work on the Hetch Hetchy dam
- City engineers report the Hetch Hetchy dam's cost is far higher than estimated, with the full dam costing at least $10,000,000.
- Board authorizes payments for school construction and the Hetch Hetchy dam; the vote is printed on the next page.
- Proposed appropriation of $271,600 from the 1910 Water Bond fund for Hetch Hetchy dam valves, awarded to William Cramp Sons.
- Board appropriated $271,600 from the Water Construction Fund for six-foot and three-foot valves for the Hetch Hetchy dam.
- Coffin Valve Company to supply Hetch Hetchy slide gates for $121,000
- Appropriated $121,000 from Water Construction Fund for slide gates at the Hetch Hetchy Dam outlet, awarded to Coffin Valve Company.
- Raisch Improvement Co. gets $36,072.50 to pave the Great Highway
- Utah Construction Co. paid $45,000 for work on Hetch Hetchy Dam
- Payment of $170,000 to Union Machine Company for Hetch Hetchy Dam slide gates was deferred without a new date.
- Appropriated $170,000 from the Water Construction Fund for slide gates for the Hetch Hetchy Dam outlet system.
- Public Utilities Committee recommended paying Utah Construction Company $50,000 for extra work at the Hetch Hetchy dam; a minority report opposed it.
- Board authorized payments to contractors and suppliers, including Utah Construction Co. for the Hetch Hetchy Dam, from city funds.
- Utah Construction paid $72,358.80 for work on the Hetch Hetchy dam
- Utah Construction paid $72,358.80 for work on the Hetch Hetchy dam
- P. H. Browne paid for land enlarging the James Lick School
- Payments to many claimants were passed for printing, including $64,578 to Utah Construction Co. for Hetch Hetchy Dam work.
- Utah Construction paid $34,795.05 for work on the Hetch Hetchy dam
- Nine city payments, including Hetch Hetchy dam and slide gate work, were passed for printing, totalling $68,391.95.
- Utah Construction paid $34,795.05 for work on the Hetch Hetchy dam
- Cramp & Sons granted extensions to deliver Hetch Hetchy dam outlet valves for Contract 68.
- William Cramp & Sons was paid $28,850, its eighth payment, for Hetch Hetchy Dam gates.
- Proposed appropriations for Hetch Hetchy dam valves, slide-gates and Ocean Beach Esplanade were referred to the Finance Committee.
- Funds set aside for Hetch Hetchy dam valves, slide gates, O'Shaughnessy's revolving fund and Ocean Beach Esplanade work.
- Payments from city funds to contractors, suppliers, and orphanages are authorized, including $263,633 to Utah Construction Co. for the Hetch Hetchy dam.
- The Board adopted under suspension of rules a ninety-day extension for Utah Construction Company to finish Hetch Hetchy dam Contract No. 61.
- Payments to dozens of city suppliers, contractors and institutions authorized, including Hetch Hetchy dam work and school construction.
- Resolution authorizes dozens of city payments to suppliers and contractors, including the Hetch Hetchy dam and school construction work.
- Board granted Utah Construction Company a ninety-day extension to finish the Hetch Hetchy dam contract.
- Payment of $239,863.61 authorized to Utah Construction Co. for Hetch Hetchy dam construction.
- Payments authorized from city funds to contractors and claimants for school building, Taraval transit line and Hetch Hetchy dam work.
- Utah Construction Company was granted a third ninety-day extension to finish the Hetch Hetchy dam contract, citing delays from water, cement and equipment problems.
- A resolution authorizes dozens of city payments to contractors and suppliers, including Hetch Hetchy dam and Municipal Railway work.
- An ordinance is proposed to release Utah Construction Company and its bondsmen from Hetch Hetchy dam bond liability.
- The Board granted the Utah Construction Company a ninety-day extension to finish its Hetch Hetchy dam contract.
- Board of Public Works may release Utah Construction Company's bonds on the Hetch Hetchy dam contract; bill passed for printing.
- Ordinance lets the city release Utah Construction Company's bonds on the Hetch Hetchy dam contract.
- Claims paid from water and school construction funds were passed for printing, including $334,588.41 to Utah Construction Co. for Hetch Hetchy dam.
- Utah Construction Co. was paid $347,881.34 for the thirty-fourth payment on the Hetch Hetchy Dam.
- Utah Construction Company granted a fourth ninety-day extension to finish its Hetch Hetchy dam contract.
- City accepts offer to sell a 10-acre Tuolumne County tract for $150 for the Hetch Hetchy reservoir.
- A 90-day extension was proposed for Utah Construction Company to finish the Hetch Hetchy dam contract, following Board of Public Works recommendation.
- Board passed for printing an authorization of payments to many claimants, including $114,617.18 to Utah Construction Co. for the Hetch Hetchy dam.
- Engineers' association proposed naming the completed Hetch Hetchy dam the O'Shaughnessy Dam; referred to the Public Utilities Committee.
- Payments totalling $123,077.99 authorized to suppliers and contractors, including $76,127.13 to Utah Construction Co. for Hetch Hetchy dam.
- Summary not public in this release
- Board names the Hetch Hetchy dam O'Shaughnessy Dam after City Engineer M. M. O'Shaughnessy.
- McSheehy's substitute withholding the $298,276 Hetch Hetchy dam final payment was referred to the Public Utilities Committee.
- Board sets aside $298,276.27 for final payment to Utah Construction Company for the Hetch Hetchy dam.
- Utah Construction Company is to receive $298,276.27, the final payment for the O'Shaughnessy Dam contract.
- Board ordered final $298,276.27 payment to Utah Construction Company for the Hetch Hetchy dam.
- $374,738.69 moved to the Hetch Hetchy dam construction account
- Resolution proposes acquiring rights of way for the Hetch Hetchy reservoir on Moccasin Creek in Tuolumne County.
- The Board adopted a resolution directing Public Works to place a plaque on O'Shaughnessy Dam thanking Senator Key Pittman for Hetch Hetchy.
- Motion refers Hetch Hetchy Valley road and trail obligations under the Raker Act to the Public Utilities Committee.
- Supervisor Shannon's motion carried, authorising the City Attorney to send the Interior Secretary a letter on Hetch Hetchy Valley roads and trails.
- Mary Lee Lawlor's offer to sell lots in Block 2895 for $1,000 for the San Miguel Reservoir was accepted.
- Resolution proposes approving trail locations along the north side of Hetch Hetchy reservoir, to be sent to the Secretary of the Interior.
- Proposed trail locations and drawings near Hetch Hetchy Reservoir came before the Board for approval.
- George W. Kneass Company was listed for $1,002.50 for a yawl and motor for the Hetch Hetchy reservoir.
- An ordinance trading city-owned land in Tuolumne County for other land needed for Hetch Hetchy Reservoir passed first reading.
- Board considers a resolution declaring public necessity to raise O'Shaughnessy Dam for more Hetch Hetchy water storage.
- Passed $3,500,000 Hetch Hetchy Dam bonds to increase O'Shaughnessy Dam height, subject to voter approval.
- Board proposes a November 7, 1933 special election on a $3.5M bond to raise O'Shaughnessy Dam for Hetch Hetchy water.
- Proposed ordinance calls a November 7, 1933 special election on a $3,500,000 bond to raise O'Shaughnessy Dam.
- Voters would decide on a $3.5 million bond to raise O'Shaughnessy Dam for the Hetch Hetchy water supply.
- Board adopted the canvass of votes on thirteen 1933 bond propositions, including Hetch Hetchy Dam and Sewer Bonds.
- Resolution issues $20.5M in voter-approved city bonds for water, Hetch Hetchy dam, sewers, high-pressure system and airport.
- Sealed bids to be opened December 4, 1933 for city water distribution, Hetch Hetchy dam, sewer and high pressure bonds.
- Board adopted leave for Utilities officials Byington and Cahill to visit Boulder Dam for O'Shaughnessy Dam plans.
- Public Utilities officials Byington and Cahill granted fifteen days' leave to visit Boulder Dam for O'Shaughnessy Dam plans.
- Voters authorized $3,500,000 in a recent bond election to raise O'Shaughnessy Dam by 85 feet.
- The Board adopted a resolution approving a federal loan and grant agreement for an addition to O'Shaughnessy (Hetch Hetchy) Dam.
- Finance Committee's resolution confirming a federal loan and grant agreement for an addition to Hetch Hetchy Dam was adopted.
- Proposed sale of $3,500,000 Hetch Hetchy Dam bonds to the United States Government under a federal agreement.
- Resolution 1463 would set wage rates and hours for the Hetch Hetchy Dam addition; its outcome continues on the next page.
- Board re-referred to the Finance Committee a proposed resolution setting Hetch Hetchy Dam addition wage rates.
- Public Utilities Commission seeks modified wage and eight-hour day rules for workers on the Hetch Hetchy Dam addition.
- Resolution directs the Clerk to advertise sale of $175,000 Hetch Hetchy Dam bonds and $58,000 sewer bonds.
- The city sold $233,000 of Hetch Hetchy Dam and sewer bonds to Bankamerica Company at par plus accrued interest.
- The Public Utilities Commission was given sixty more days to award the O'Shaughnessy Dam enlargement contract.
- The Mayor was authorized to seek a larger federal grant of $1,068,529.50 to raise O'Shaughnessy Dam; the resolution was adopted.
- Time to award the O'Shaughnessy Dam enlargement contract extended while federal grant talks continue.
- Board adopted resolution approving a $1,058,000 federal grant to raise the O'Shaughnessy Dam on the Tuolumne River.
- Notice of sale of $3,325,000 Hetch Hetchy Dam bonds approved, with sealed bids due April 29, 1935.
- Board offers $3,325,000 Hetch Hetchy Dam bonds for sale; bids were opened and referred to the Finance Committee for award.
- Sealed bids were received for purchase of City and County of San Francisco bonds for the Hetch Hetchy Dam.
- Board sold $3,325,000 Hetch Hetchy Dam bonds to the Halsey Stuart syndicate for $3,522,338.75 at 4 per cent.
- Supplemental appropriation ordinance for raising O'Shaughnessy Dam was introduced; its outcome appears on a later page.
- Supplemental appropriation ordinance for raising O'Shaughnessy Dam was introduced; its final vote appears on a later page.
- Funding of $637,840.89 to complete enlarging O'Shaughnessy Dam passed first reading, drawn from Hetch Hetchy surplus.
- Board finally passed a $637,840.89 supplemental appropriation from the Hetch Hetchy Dam Fund to finish enlarging O'Shaughnessy Dam.
- Supervisors agreed all members would inspect the Hetch Hetchy Dam during the President's anticipated visit.
- Board voted to invite Congressmen Welch and Havenner to the O'Shaughnessy Dam dedication as its guests.
- Judge St. Sure refused to reopen Transbay Construction Company's suit over O'Shaughnessy Dam and awarded the City $2,529 in costs.
- Proposed $121,100 from the Water Operating Fund to finish drum gates at O'Shaughnessy Dam, adding 20,000 acre feet of capacity.
- Public Utilities Commission spends $121,100 to finish drum gates at O'Shaughnessy Dam, adding reservoir capacity.
- Board passed on first reading a $1,980 appropriation for a Hetch Hetchy reservoir keeper position, abolishing a laborer post.
- Emergency declared to inspect O'Shaughnessy Dam outlets so water can run a new Canyon power plant at Early Intake.
- One reservoir keeper job at Hetch Hetchy cut
- Proposed ordinance would appropriate $10,017 so seven Hetch Hetchy reservoir keepers can work an extended week.
- City buys power to resell, and repairs O'Shaughnessy Dam switchboard
- $264,000 approved for Hetch Hetchy reservoir works.
- City asks for less water released from O'Shaughnessy Dam.
- City asks US to cut O'Shaughnessy Dam water release in drought.
- Supervisor Gonzalez asked Hetch Hetchy Water and Power to investigate reported leaks at the Hetch Hetchy dam and consider faucet filters.
- More time was proposed for awarding the O'Shaughnessy Dam septic system rehabilitation contract, sent to the Finance Committee.
- The Public Utilities Commission's time extension for the O'Shaughnessy Dam septic system contract was approved, retroactive to May 26, 1992.
- $1,000,000 for O'Shaughnessy Dam road repair sent to committee
- $1,000,000 proposed for O'Shaughnessy Dam road repair
- Hetch Hetchy restoration study sent to committee
- Resolution to join a public study of restoring Hetch Hetchy Valley was received and assigned to the Finance Committee.
- Study proposed on restoring the Hetch Hetchy Valley.
- Appeal of the Planning Commission's negative declaration for O'Shaughnessy Dam was continued to June 24, 2003.
- Motion to affirm the negative declaration for the O'Shaughnessy Dam discharge project was continued to June 24, 2003.
- Motion to reverse the negative declaration for the O'Shaughnessy Dam discharge project was continued to June 24, 2003.
- Board motion to reverse the negative declaration for the O'Shaughnessy Dam discharge project was continued to June 24, 2003.
- Appeal of a Planning Commission negative declaration for O'Shaughnessy Dam at Yosemite was continued to June 17, 2003.
- Proposal to reverse dam project's environmental approval delayed.
- Motion directing the Clerk to prepare findings reversing the O'Shaughnessy Dam negative declaration was continued to June 17.
- Motion to reverse the Planning Commission's negative declaration for the O'Shaughnessy Dam discharge project was continued to June 17.
- Board continued the appeal of the negative declaration for the O'Shaughnessy Dam project to June 17, 2003.
- Motion affirming the Planning Commission's negative declaration for the O'Shaughnessy Dam discharge project was continued to June 17, 2003.
- Supervisors continued to June 17 a motion to reverse the negative declaration for the O'Shaughnessy Dam discharge project.
- Dam approval reversal vote put off until June 17.
- Plan to write reasons for reversing dam approval delayed.
- Written findings to overturn dam clearance put off.
- Dam water-release project's environmental clearance put off.
- Bid to overturn dam project's environmental clearance put off.
- Sierra Club appeal over O'Shaughnessy Dam continued to June
- Dam water-release project's environmental clearance put off.
- Bid to overturn dam project's environmental clearance put off.
- Motion to affirm the negative declaration for the O'Shaughnessy Dam discharge project was continued to June 24, 2003.
- Sierra Club appeal over O'Shaughnessy Dam heard in public
- The Board approved a motion affirming the Planning Commission's negative declaration for the O'Shaughnessy Dam discharge modification project.
- Board tabled a motion directing the Clerk to prepare findings reversing the O'Shaughnessy Dam negative declaration.
- Environmental OK for dam water-release changes upheld.
- Supervisors tabled a motion to reverse the Planning Commission's negative declaration for the O'Shaughnessy Dam Discharge Modification Project.
- Restore Hetch Hetchy and the Sierra Club appealed the Planning Commission's approval of a negative declaration for O'Shaughnessy Dam; the Board heard the appeal.
- Board tabled a motion to reverse the Planning Commission's negative declaration for the O'Shaughnessy Dam discharge modification.
- Move to undo dam environmental OK put aside for now.
- City Attorney proposed a $1,700 settlement of the [name withheld] lawsuit over the Hetch Hetchy Valley study; sent to Rules Committee.
- Rules Committee recommends settling [name withheld] lawsuit for $1,700, with the city staying neutral on restoring Hetch Hetchy Valley.