  • City approved revised federal planning request for Verba Buena renewal
    13 Oct 1964passedJournal 1964 ↗
  • Notice of a public hearing on the proposed Verba Buena Center Redevelopment Plan, Area D-1, was referred to Rules Committee.
    13 Dec 1965referredJournal 1965, p. 727 ↗
  • Decision postponed to February 21; subject not in this record
    14 Feb 1966pendingJournal 1966 ↗
  • Hearing on the Yerba Buena Center redevelopment plan was continued to February 21, 1966, after supporters spoke in favor.
    14 Feb 1966continuedJournal 1966, p. 96 ↗
  • Board heard testimony on the Verba Buena Center redevelopment plan and voted to strike testimony from proponents not available for cross-examination.
    21 Feb 1966pendingJournal 1966, p. 114 ↗
  • The Board's public hearing on the Verba Buena Center redevelopment plan was continued.
    21 Feb 1966continuedJournal 1966, p. 113 ↗
  • Public hearing opened on the proposed Verba Buena Center redevelopment plan; supporters spoke, and opposition has not yet been heard.
    21 Feb 1966outcome not readJournal 1966, p. 110 ↗
  • Yerba Buena Center redevelopment plan, Area D-1, taken up; supervisors sought relocation appeals, elderly housing and a University of California campus.
    7 Mar 1966outcome not readJournal 1966, p. 149 ↗
  • Public hearing on the Yerba Buena Center redevelopment plan concluded after opponents' testimony and closing statements.
    7 Mar 1966outcome not readJournal 1966, p. 149 ↗
  • The public hearing on the Yerba Buena Center redevelopment plan concluded after opponents and supporters gave testimony.
    7 Mar 1966passedJournal 1966, p. 148 ↗
  • The Redevelopment Agency submitted a proposed supplemental agreement with the City on the Yerba Buena Center plan; consideration was continued.
    14 Mar 1966continuedJournal 1966, p. 169 ↗
  • Redevelopment plan for Yerba Buena Center Project Area D-1 passed for second reading.
    28 Mar 1966passed first readingJournal 1966, p. 215 ↗
  • Yerba Buena Center redevelopment plan put off for now.
    28 Mar 1966pendingJournal 1966, p. 211 ↗
  • The Board approved a cooperation agreement between the City and the Redevelopment Agency for Yerba Buena Center Project Area D-1.
    28 Mar 1966passedJournal 1966, p. 217 ↗
  • Yerba Buena Center cooperation agreement put off for now.
    28 Mar 1966pendingJournal 1966, p. 211 ↗
  • Consideration of the supplemental agreement between the City and the Redevelopment Agency for Yerba Buena Center was continued one week.
    4 Apr 1966continuedJournal 1966, p. 232 ↗
  • Yerba Buena redevelopment plan put off to April 18.
    11 Apr 1966pendingJournal 1966, p. 249 ↗
  • Redevelopment plan for the Verba Buena Center Project Area D-1 was taken up; its outcome is not shown on this page.
    18 Apr 1966pendingJournal 1966 ↗
  • A supplemental agreement between the City and the Redevelopment Agency for the Verba Buena project area was adopted.
    25 Apr 1966passedJournal 1966, p. 288 ↗
  • Board passed the Yerba Buena Center redevelopment plan for Project Area D-1, with building use and height changes, 9 to 2.
    25 Apr 1966passedJournal 1966, p. 287 ↗
  • Mission Street urban renewal study sent to committee
    15 Jun 1966passedJournal 1966, p. 419 ↗
  • Board cancelled taxes on property the Redevelopment Agency acquired in the Verba Buena Center Redevelopment Project Area D-1.
    5 May 1969passedJournal 1969, p. 367 ↗
  • Hotel-unit need finding approved; Yerba Buena Center part dropped
    27 Jul 1970passedJournal 1970, p. 610 ↗
  • City settles two lawsuits, paying $250 and $650
    1 Mar 1971passedJournal 1971, p. 129 ↗
  • Plan to borrow $118 million for Yerba Buena Center sent to committee.
    14 Jun 1971pendingJournal 1971, p. 443 ↗
  • Consideration of transient housing units in the Verba Buena Center redevelopment area was continued one week.
    12 Jul 1971continuedJournal 1971, p. 504 ↗
  • Public hearing held on a proposed amendment to the Yerba Buena Center redevelopment plan to allow a hotel.
    12 Jul 1971outcome not readJournal 1971 ↗
  • Yerba Buena redevelopment plan change; outcome not shown.
    12 Jul 1971continuedJournal 1971, p. 504 ↗
  • Yerba Buena plan change allowing hotels passed first step, not final.
    19 Jul 1971pendingJournal 1971, p. 517 ↗
  • Need for temporary housing for Yerba Buena displaced people declared.
    19 Jul 1971passedJournal 1971 ↗
  • Proposed resolution backing housing standards and priorities for Yerba Buena Center relocatees; amendments still pending.
    26 Jul 1971passedJournal 1971, p. 544 ↗
  • Communication seeking review of Yerba Buena Center convention center, sports arena and garage proposals was referred to committee.
    28 Feb 1972referredJournal 1972, p. 166 ↗
  • The Yerba Buena Center redevelopment area resolution, removing lands outside Project Area D-1, was adopted.
    27 Mar 1972passedJournal 1972, p. 252 ↗
  • Motion to delay Yerba Buena sewer-line financing voted down
    27 Mar 1972rejectedJournal 1972, p. 240 ↗
  • Money deal for Yerba Buena Center public facilities finally approved.
    3 Apr 1972passedJournal 1972, p. 267 ↗
  • Supervisors Feinstein and Kopp proposed amending Yerba Buena Center redevelopment financing to avoid the ad valorem tax; referred to Finance Committee.
    3 Apr 1972referredJournal 1972, p. 282 ↗
  • Ordinance funding $2.7M relocation of the Howard Street sewer in Yerba Buena Center passed finally.
    10 Jul 1972passedJournal 1972, p. 593 ↗
  • Board extended to August 21, 1972 the deadline for awarding a Public Works sewer relocation contract in Yerba Buena Center.
    17 Jul 1972passedJournal 1972, p. 608 ↗
  • Yerba Buena Center promotion funds delay sought; vote not shown
    31 Jul 1972outcome not readJournal 1972, p. 653 ↗
  • Yerba Buena Center brochure, model and printing money approved
    31 Jul 1972passedJournal 1972, p. 653 ↗
  • An ordinance proposed to appropriate $230,000 for the Water Department to relocate and realign water mains in Yerba Buena Center.
    21 Aug 1972outcome not readJournal 1972, p. 727 ↗
  • Yerba Buena Center water-pipe move cleared first step; not final.
    21 Aug 1972pendingJournal 1972, p. 728 ↗
  • City approves $230,000 to move water pipes in Yerba Buena Center
    28 Aug 1972passedJournal 1972, p. 743 ↗
  • Intent to give up underground rights under Howard Street declared
    2 Oct 1972passedJournal 1972, p. 876 ↗
  • Board asks city officials to study shifting hotel room tax money from Yerba Buena Center to other recipients.
    16 Oct 1972outcome not readJournal 1972, p. 919 ↗
  • Space under Howard Street closed for good at Yerba Buena Center
    30 Oct 1972passedJournal 1972 ↗
  • Public hearing on Yerba Buena Center settlement set for April 23
    16 Apr 1973passedJournal 1973 ↗
  • Yerba Buena Center settlement, with up to 300 homes, sent to committee.
    23 Apr 1973pendingJournal 1973 ↗
  • Policy for low-income homes in Yerba Buena Center sent to committee.
    23 Apr 1973pendingJournal 1973 ↗
  • Subject only here; outcome not shown in this entry.
    23 Apr 1973passedJournal 1973, p. 385 ↗
  • Board adopted resolution 324-73 consenting to a joint hearing on amending the Yerba Buena Center redevelopment plan.
    7 May 1973passedJournal 1973, p. 434 ↗
  • Yerba Buena Center redevelopment plan changes put off until July.
    11 Jun 1973pendingJournal 1973, p. 538 ↗
  • Amendments to the Yerba Buena Center redevelopment plan were continued by the Board until July 23, 1973.
    11 Jun 1973continuedJournal 1973, p. 538 ↗
  • Board continued the Yerba Buena Center redevelopment plan amendment ordinance to August 27, 1973.
    23 Jul 1973continuedJournal 1973 ↗
  • Ordinance amending the Yerba Buena Center redevelopment plan, Project Area D-1, continued to October 1, 1973.
    27 Aug 1973continuedJournal 1973, p. 827 ↗
  • Hearing on Yerba Buena Center environmental review moved to [name withheld] 11
    27 Aug 1973passedJournal 1973 ↗
  • Yerba Buena Center redevelopment plan set for a hearing on September 11.
    4 Sep 1973pendingJournal 1973, p. 865 ↗
  • Yerba Buena Center plan passed first vote, amended; final vote still pending.
    11 Sep 1973pendingJournal 1973, p. 871 ↗
  • The Board held a public hearing on the final environmental impact report for proposed Yerba Buena Center redevelopment plan amendments.
    11 Sep 1973outcome not readJournal 1973 ↗
  • Board sat as Committee of the Whole to hear public testimony on the Yerba Buena Center D-1 redevelopment plan report.
    11 Sep 1973pendingJournal 1973 ↗
  • Approval of Yerba Buena Center redevelopment plan and its environmental report.
    11 Sep 1973passed first readingJournal 1973, p. 871 ↗
  • Yerba Buena Center redevelopment plan and public facilities approved.
    17 Sep 1973passedJournal 1973, p. 900 ↗
  • The Board and Redevelopment Agency held a joint public hearing on proposed amendments to the Yerba Buena Center redevelopment plan.
    1 Oct 1973passedJournal 1973 ↗
  • Supervisor Feinstein asked the Board to fund a San Francisco Coalition affirmative action program for Yerba Buena Center; referred to Finance Committee.
    9 Oct 1973referredJournal 1973, p. 992 ↗
  • Board finally passed an ordinance amending the Yerba Buena Center redevelopment plan for Project Area D-1.
    9 Oct 1973passedJournal 1973, p. 982 ↗
  • Sewer under Howard Street rerouted around Yerba Buena Center
  • Sewage rerouted from Howard Street around the Yerba Buena Center
    1974outcome not readPrinted page 1974, p. 27 ↗
  • Sewage rerouted from Howard Street around the Yerba Buena Center
    1974outcome not readPrinted page 1974, p. 27 ↗
  • Yerba Buena Center admin money held 90 days; not final.
    24 Jun 1974pendingJournal 1974, p. 685 ↗
  • Yerba Buena Center admin money held 90 days; not final.
    24 Jun 1974pendingJournal 1974, p. 685 ↗
  • Yerba Buena Center admin money held 90 days; not final.
    24 Jun 1974pendingJournal 1974, p. 685 ↗
  • Yerba Buena Center funding vote put off to July 8.
    1 Jul 1974pendingJournal 1974, p. 707 ↗
  • Money for Yerba Buena Center running costs put off to August.
    8 Jul 1974pendingJournal 1974 ↗
  • Money for Yerba Buena Center running costs put off to August.
    8 Jul 1974pendingJournal 1974 ↗
  • Money for Yerba Buena Center running costs put off to August.
    8 Jul 1974pendingJournal 1974 ↗
  • Money for Yerba Buena Center admin costs put off.
    5 Aug 1974pendingJournal 1974, p. 842 ↗
  • $223,000 for Yerba Buena Center costs held until September.
    19 Aug 1974pendingJournal 1974, p. 884 ↗
  • $223,000 for Yerba Buena Center costs considered.
    19 Aug 1974outcome not readJournal 1974, p. 884 ↗
  • Yerba Buena Center office money put off to later
    10 Sep 1974pendingJournal 1974 ↗
  • Yerba Buena Center's $223,000 in running costs put off.
    23 Sep 1974pendingJournal 1974, p. 1013 ↗
  • $223,000 for Yerba Buena Center office costs; put off.
    7 Oct 1974pendingJournal 1974, p. 1076 ↗
  • Motion to delay Yerba Buena Center money vote proposed.
    28 Oct 1974outcome not readJournal 1974, p. 1148 ↗
  • $223,000 for Yerba Buena Center admin costs
    28 Oct 1974passedJournal 1974, p. 1148 ↗
  • Delay on Yerba Buena Center money vote voted down
    28 Oct 1974rejectedJournal 1974, p. 1148 ↗
  • Parking limits set for Yerba Buena Center; special parking zone created
    23 Dec 1974passedJournal 1974, p. 1326 ↗
  • Closing proposed for part of Stevenson Street at Yerba Buena Center
    6 Jan 1975passedJournal 1975, p. 10 ↗
  • Plan to close some streets in Verba Buena Center approved
    6 Jan 1975passedJournal 1975, p. 9 ↗
  • Deadline extension for Yerba Buena Center construction contract proposed.
    27 Jan 1975passedJournal 1975, p. 67 ↗
  • Parts of Howard and Mission Streets closed at Yerba Buena Center
    3 Feb 1975passedJournal 1975, p. 97 ↗
  • Part of Stevenson Street closed for good at Yerba Buena Center
    3 Feb 1975passedJournal 1975, p. 98 ↗
  • Closing proposed for part of Tehama Street at Yerba Buena Center
    3 Mar 1975passedJournal 1975, p. 187 ↗
  • Proposed freeze on new parking lots near Yerba Buena Center.
    17 Mar 1975pendingJournal 1975, p. 253 ↗
  • Resolution 248-75 adopted, finding certain buildings and improvements benefit the Yerba Buena Center redevelopment project area.
    24 Mar 1975passedJournal 1975, p. 276 ↗
  • Part of Tehama Street closed for Yerba Buena redevelopment
    31 Mar 1975passedJournal 1975, p. 297 ↗
  • Proposed deal on repaying Yerba Buena Center tax money.
    31 Mar 1975outcome not readJournal 1975, p. 298 ↗
  • Labor leaders press for a start on Yerba Buena Center
    14 Apr 1975outcome not readJournal 1975 ↗
  • Three supervisors named to negotiate on Yerba Buena Center dispute
    14 Apr 1975passedJournal 1975, p. 361 ↗
  • Yerba Buena arbitration settlement sent to Finance Committee.
    21 Apr 1975pendingJournal 1975, p. 383 ↗
  • Settlement deal on Yerba Buena Center facilities approved
    28 Apr 1975passedJournal 1975, p. 418 ↗
  • The Board adopted an amended settlement agreement on affirmative action jobs for the Yerba Buena Center project, with the San Francisco Coalition overseeing recruitment.
    28 Apr 1975passedJournal 1975, p. 420 ↗
  • Yerba Buena Center settlement vote put off to May 12.
    9 May 1975pendingJournal 1975, p. 441 ↗
  • Consideration of a Yerba Buena Center arbitration dismissal and settlement ordinance was continued to May 27, 1975.
    19 May 1975continuedJournal 1975, p. 501 ↗
  • Yerba Buena Center lawsuit settlement put off to May 27.
    19 May 1975pendingJournal 1975, p. 501 ↗
  • Yerba Buena Center settlement delayed; vote pushed to May 26.
    21 May 1975pendingJournal 1975, p. 533 ↗
  • Motion to shelve Yerba Buena Center settlement; result not shown here.
    27 May 1975outcome not readJournal 1975, p. 543 ↗
  • Feinstein proposed an ordinance to rescind the financing agreement for Yerba Buena Center; it was sent to committee.
    27 May 1975referredJournal 1975, p. 562 ↗
  • Yerba Buena Center arbitration settlement; result not shown here.
    27 May 1975outcome not readJournal 1975, p. 543 ↗
  • Request for hearings on future development of the Yerba Buena Center site was referred to committee; text continues on next page.
    27 May 1975outcome not readJournal 1975, p. 561 ↗
  • Yerba Buena Center settlement shelved; no final decision yet.
    27 May 1975pendingJournal 1975, p. 543 ↗
  • Proposed policy declaration on a new convention center in Yerba Buena Center was continued to July 14, 1975.
    30 Jun 1975continuedJournal 1975, p. 711 ↗
  • Proposed Yerba Buena convention center question still pending.
    14 Jul 1975pendingJournal 1975, p. 761 ↗
  • A proposed policy on building a new convention center in Yerba Buena Center was sent back to committee by eight votes to two.
    14 Jul 1975referredJournal 1975, p. 766 ↗
  • Hearings requested on low-income housing for the elderly in the Yerba Buena Center redevelopment area; referred to committee.
    15 Dec 1975referredJournal 1975, p. 1324 ↗
  • Board asked the Registrar of Voters to wait for a Yerba Buena Center bond policy statement before its vote.
    16 Aug 1976passedJournal 1976, p. 881 ↗
  • Yerba Buena redevelopment plan changes still pending.
    16 Aug 1976pendingJournal 1976 ↗
  • Public hearing held on changes to Yerba Buena redevelopment plan.
    7 Sep 1976passedJournal 1976, p. 956 ↗
  • Ordinance amending the Yerba Buena Center redevelopment plan passed for second reading, with a motion to continue refused.
    7 Sep 1976passed first readingJournal 1976, p. 957 ↗
  • Yerba Buena Center redevelopment plan amended and passed into law.
    13 Sep 1976passedJournal 1976, p. 1002 ↗
  • The Board continued to August 1, 1977 a hearing on amending the Yerba Buena Center redevelopment plan to allow senior housing on one block.
    25 Jul 1977continuedPrinted page 1977, p. 716 ↗
  • The Board continued to August 1, 1977 an ordinance amending the Yerba Buena Center redevelopment plan to allow senior housing.
    25 Jul 1977continuedPrinted page 1977, p. 716 ↗
  • Yerba Buena Center redevelopment plan change put off to August.
  • Yerba Buena plan change for older adults' housing proposed; first vote only.
  • Yerba Buena Center redevelopment plan changed
  • Yerba Buena Center redevelopment plan changed.
  • Air rights above and below four downtown streets given up.
  • Budget Analyst asked about parking lot deals in Yerba Buena Center
    6 Mar 1978outcome not readJournal 1978, p. 264 ↗
  • Hearings requested on the Yerba Buena Center parcel designated for an apparel mart; referred to Planning, Housing and Development Committee.
    3 Jul 1978referredJournal 1978, p. 827 ↗
  • $8.8 million for Yerba Buena public facilities advanced, not final.
    3 Jul 1978pendingJournal 1978, p. 815 ↗
  • Air space over Howard Street given up for Yerba Buena Center
    10 Jul 1978passedJournal 1978 ↗
  • Air space over Howard Street given up for Yerba Buena Center
    10 Jul 1978outcome not readJournal 1978 ↗
  • $8.8 million for public facilities at Yerba Buena Center
    10 Jul 1978passedJournal 1978, p. 840 ↗
  • Builder may use four streets in Yerba Buena Center during construction
  • Public Works gets more time to award Yerba Buena Center contracts
    20 Nov 1978passedJournal 1978, p. 1395 ↗
  • Yerba Buena Center redevelopment hearing put off to August 6.
    30 Jul 1979pendingJournal 1979, p. 911 ↗
  • Part of Hunt Street and Masset Place closed for redevelopment
    6 Aug 1979passedJournal 1979, p. 943 ↗
  • Joint Board and Redevelopment Agency hearing opened on proposed amendments to the Yerba Buena Center redevelopment plan; outcome continues next page.
    6 Aug 1979outcome not readJournal 1979 ↗
  • Supervisor Gonzales's hearing on 343 subsidized Yerba Buena Center apartments was referred to Planning, Housing and Development Committee.
    5 Nov 1979referredJournal 1979, p. 1319 ↗
  • Final environmental report certified for the Verba Buena Center project area; project to proceed with mitigation.
    15 Sep 1980passedJournal 1980, p. 996 ↗
  • Supervisor Kopp asked the Redevelopment Agency for proposals, resumes and minutes on the Yerba Buena Center developer selection.
    14 Oct 1980outcome not readJournal 1980, p. 1104 ↗
  • Supervisor Kopp asked for hearings on the Redevelopment Agency's rejection of San Francisco firms for the Yerba Buena Center project; referred to committee.
    14 Oct 1980referredJournal 1980, p. 1103 ↗
  • Board extended to August 6, 1983 the deadline for recording the vacation of Masset Place and part of Hunt Street, adopted.
    27 Jul 1981passedJournal 1981, p. 678 ↗
  • Supervisors asked a committee to consider renaming part of Third Street in Yerba Buena Center after [name withheld].
    13 Oct 1981referredJournal 1981 ↗
  • Board and Redevelopment Agency held a public hearing on amendments to the Yerba Buena Center redevelopment plan; Agency approved them.
    26 Oct 1981outcome not readJournal 1981 ↗
  • The Board passed on first reading an ordinance expanding the Yerba Buena Center redevelopment area, adding downtown retail and housing.
    26 Oct 1981passed first readingJournal 1981 ↗
  • Board considered a resolution adopting an environmental report supplement for Yerba Buena Center amendments; a motion to amend it failed.
    26 Oct 1981outcome not readJournal 1981 ↗
  • A joint public hearing was held on proposed amendments to the Yerba Buena Center redevelopment project area, with the Agency urging adoption.
    26 Oct 1981outcome not readJournal 1981 ↗
  • Ordinance expanding the Yerba Buena Center redevelopment project area to add a parcel, retail and housing was finally passed.
    2 Nov 1981passedJournal 1981 ↗
  • Molinari proposed naming a street in the Yerba Buena Center area after [name withheld]; referred to Public Works Committee.
    7 Jun 1982referredJournal 1982 ↗
  • A transfer of up to $2 million in community development funds from Western Addition A-2 to Yerba Buena Center was referred to the Finance Committee.
    14 Jun 1982referredJournal 1982 ↗
  • Board adopted a resolution moving up to $2 million in Community Development funds from Western Addition A-2 to Yerba Buena Center redevelopment.
    6 Jul 1982passedJournal 1982 ↗
  • A rehearing on renaming part of Third Street near Yerba Buena Center was referred to the Public Works Committee.
    22 Nov 1982referredJournal 1982 ↗
  • Supervisor Kennedy referred a proposal to name part of Third Street in Yerba Buena Center after [name withheld] to Police and Fire for comment.
    22 Nov 1982referredJournal 1982 ↗
  • Proposed Redevelopment Agency bonds of up to $29M for Yerba Buena Center projects were referred to the Finance Committee.
    25 Apr 1983referredJournal 1983 ↗
  • Mayor authorized to sign a closeout agreement with the Redevelopment Agency and HUD settling the Yerba Buena Center program.
    25 Jul 1983passedJournal 1983 ↗
  • Vacation of Masset Place and part of Hunt Street in Yerba Buena Center was approved, extending the deed recording deadline.
    1 Aug 1983passedJournal 1983 ↗
  • Supervisor Walker's resolution on total construction of Yerba Buena Center was amended, then its consideration was continued.
    26 Nov 1984continuedJournal 1984 ↗
  • Public Works rescinded a 1975 order vacating parts of Howard and Mission Streets in Yerba Buena; adopted.
    26 Nov 1984passedJournal 1984 ↗
  • Proposed amendment would expand the purposes of $29,000,000 Redevelopment Agency bonds for Yerba Buena Center.
    26 Nov 1984outcome not readJournal 1984 ↗
  • Walker moved adoption of a resolution urging total construction of Yerba Buena Center; outcome not printed here.
    26 Nov 1984outcome not readJournal 1984 ↗
  • Yerba Buena Center streets to be closed for good
    7 Jan 1985passed first readingJournal 1985 ↗
  • Street vacation in the Yerba Buena Center Redevelopment Project Area passed for second reading as amended.
    14 Jan 1985passed first readingJournal 1985 ↗
  • Yerba Buena Center streets to be closed for good
    22 Jan 1985passedJournal 1985 ↗
  • Ordinance approving a first lease amendment and a CB-3 surface lease for Verba Buena Center with YBC Associates passed for second reading.
    16 Sep 1985passed first readingJournal 1985 ↗
  • Proposed lease amendment and surface lease for Verba Buena Center with YBC Associates and the Redevelopment Agency passed for second reading.
    16 Sep 1985passed first readingJournal 1985 ↗
  • City and Redevelopment Agency approve a lease at Verba Buena Center with YBC Associates; Mayor later disapproved.
    23 Sep 1985passedJournal 1985, p. 1241 ↗
  • Passed final the tax increment and debt limits for the Yerba Buena Center redevelopment plan.
  • Molinari urges the Redevelopment Agency to establish a child care center in Yerba Buena Center; referred to committee.
    13 Jul 1987referredJournal 1987, p. 812 ↗
  • The Board adopted a resolution urging the Redevelopment Agency to set up a childcare center in Verba Buena Center.
    26 Oct 1987passedJournal 1987 ↗
  • Proposed resolution declaring intent to vacate subsurface street areas in the Yerba Buena Center redevelopment area.
    1 Feb 1988referredJournal 1988 ↗
  • Hearing set on closing underground streets at Yerba Buena Center
    8 Feb 1988outcome not readJournal 1988 ↗
  • Hearing set on closing underground streets at Yerba Buena Center
    16 Feb 1988passedJournal 1988, p. 184 ↗
  • Supervisor Molinari's proposed second project lease amendment and first CB-3 surface lease amendment for Yerba Buena Center were referred to Finance Committee.
    22 Feb 1988referredJournal 1988, p. 223 ↗
  • Ordinance sending hotel tax money to low-income housing outside Yerba Buena Center passed for second reading.
    22 Feb 1988passed first readingJournal 1988, p. 212 ↗
  • Ordinance passed directing hotel tax money to low-income housing outside the Yerba Buena Center redevelopment area.
    29 Feb 1988passedJournal 1988, p. 243 ↗
  • Underground street space at Yerba Buena Center closed for good
    14 Mar 1988passed first readingJournal 1988, p. 354 ↗
  • Lease amendments for Verba Buena Center and the Moscone Convention Center expansion passed for second reading.
    21 Mar 1988passed first readingJournal 1988, p. 382 ↗
  • Underground street space at Yerba Buena Center closed for good
    21 Mar 1988passedJournal 1988, p. 379 ↗
  • Board resolution certifies final environmental impact reports for the Verba Buena Center area, needed for the Moscone Convention Center expansion.
    21 Mar 1988outcome not readJournal 1988, p. 380 ↗
  • Ordinance approving a second amendment to a project lease for Verba Buena Center was passed on final reading.
    28 Mar 1988passedJournal 1988 ↗
  • Supervisors tabled a proposal to merge the Yerba Buena Center redevelopment project area D-1 into a larger project.
    22 Aug 1988tabledJournal 1988, p. 1096 ↗
  • Ordinance setting dates to remove overhead wires in Underground District 295 in the Yerba Buena Center area passed first reading as amended.
    28 Nov 1988passed first readingJournal 1988 ↗
  • Ordinance passed setting dates to remove overhead utility wires in Underground District 295, Yerba Buena Center.
  • Redevelopment Agency approved issuing up to $16.8M in refunding bonds for the Yerba Buena Center project; adopted.
    18 Jun 1990passedJournal 1990, p. 627 ↗
  • Redevelopment Agency bonds up to $60M for Yerba Buena Center public improvements were referred to Finance Committee.
    16 Jul 1990referredJournal 1990 ↗
  • Redevelopment Agency bonds of up to $75M for infrastructure in the Yerba Buena Center project area were adopted.
    20 Aug 1990passedJournal 1990 ↗
  • Redevelopment Agency proposed $30,000,000 in revenue bonds for public improvements in Yerba Buena Center; referred to Finance Committee.
    25 Feb 1991referredJournal 1991 ↗
  • Redevelopment Agency approved up to $30 million in revenue bonds for public improvements in Yerba Buena Center.
    8 Apr 1991passedJournal 1991 ↗
  • Underground street areas at Yerba Buena Center to be closed
    8 Jun 1992referredJournal 1992 ↗
  • Underground street areas at Yerba Buena Center to be closed
    8 Jun 1992referredJournal 1992 ↗
  • Underground street space at Yerba Buena Center given up
    8 Sep 1992passed first readingJournal 1992 ↗
  • Underground street space at Yerba Buena Center given up
    14 Sep 1992passedJournal 1992 ↗
  • Yerba Buena Center project area merger sent to a joint hearing
    15 Nov 1993referredJournal 1993 ↗
  • Redevelopment Agency's ordinance merging the Yerba Buena Center project into a larger redevelopment project was continued to December 20, 1993.
    13 Dec 1993continuedJournal 1993 ↗
  • Yerba Buena Center proposed for a redevelopment merger
    13 Dec 1993outcome not readJournal 1993 ↗
  • Yerba Buena Center redevelopment plan to be merged with others
    20 Dec 1993outcome not readJournal 1993 ↗
  • Proposal to merge the Yerba Buena Center redevelopment project into a larger merged project was tabled.
    20 Dec 1993tabledJournal 1993 ↗
  • Environmental findings for the Verba Buena Center redevelopment plan amendment were referred back to committee for a November 14 report.
    11 Oct 1994referredJournal 1994 ↗
  • Verba Buena Center redevelopment plan amended to extend eminent domain to 2006 and raise tax increment cap to $600 million; referred to committee.
    11 Oct 1994referredJournal 1994 ↗
  • Resolution 999-94 adopting environmental findings for the Verba Buena Center redevelopment plan amendment was adopted by the Redevelopment Agency.
    14 Nov 1994passedJournal 1994 ↗
  • A hearing was held on proposed amendments to the Verba Buena Center redevelopment plan, including higher tax increment limits and extended eminent domain time.
    14 Nov 1994outcome not readJournal 1994 ↗
  • Ordinance amending the Verba Buena Center redevelopment plan passed for second reading, raising tax increment to $600 million.
    14 Nov 1994passed first readingJournal 1994 ↗
  • Board passed an ordinance amending the Verba Buena Center redevelopment plan, raising the tax increment limit to $500 million and extending deadlines.
    21 Nov 1994passedJournal 1994 ↗
  • Proposed Addendum No. 3 to the Yerba Buena Center environmental report was referred to the Board for a public hearing.
    13 Jan 1997referredJournal 1997 ↗
  • Supervisor Yaki proposed adding residential use and density to east block 1 of the Yerba Buena Center redevelopment area; referred to the Board.
    13 Jan 1997referredJournal 1997 ↗
  • The Redevelopment Agency asked the Board to schedule a January 21 hearing on adding housing to Yerba Buena Center.
    13 Jan 1997referredJournal 1997 ↗
  • Public hearing held on amending the Yerba Buena Center redevelopment plan to allow residential use; the Committee reported without recommendation.
    21 Jan 1997outcome not readJournal 1997 ↗
  • Board adopted an addendum to the Yerba Buena Center environmental report for a proposed redevelopment plan amendment.
    21 Jan 1997passedJournal 1997 ↗
  • Ordinance passed for second reading to allow residential use and higher density on east block 1 in Yerba Buena Center.
    21 Jan 1997passed first readingJournal 1997 ↗
  • Ordinance amending the Yerba Buena Center redevelopment plan to allow residential use and higher density on east block 1, finally passed.
    27 Jan 1997passedJournal 1997 ↗
  • Zoning map change for the Yerba Buena Center redevelopment amendment site was referred to the Transportation and Land Use Committee under the 30-day rule.
  • A general plan amendment for part of Yerba Buena Center, Assessor's Block 3705, was assigned to the Transportation and Land Use Committee.
  • Ordinance to add the [name withheld] site block to the Yerba Buena Center redevelopment area was received and referred to the Board of Supervisors.
  • Hearing scheduled on a proposed expansion of the Verba Buena Center redevelopment area to add land near Mission Street.
    10 Jul 2000outcome not readBoard minutes 2000, p. 765 ↗
  • Supervisor Yaki proposed expanding the Yerba Buena Center redevelopment project area to add a city block between Market and Fifth Streets.
  • Supervisor Yaki proposed amending the zoning map for a block between Market and Fifth Streets for the Yerba Buena Center redevelopment plan.
  • Proposed general plan amendment adding Assessor's Block 3705 land to the Yerba Buena Center redevelopment plan was continued to September 18, 2000.
    28 Aug 2000continuedBoard minutes 2000, p. 938 ↗
  • Closing Jessie Street for the [name withheld] site put off
    28 Aug 2000continuedBoard minutes 2000, p. 946 ↗
  • Hearing on expanding the Yerba Buena Center redevelopment area to add [name withheld] site land was continued to September 18, 2000.
    28 Aug 2000continuedBoard minutes 2000, p. 945 ↗
  • Proposed ordinance to add a Market-Fourth-Mission-Fifth block portion to the Yerba Buena Center redevelopment area was continued on first reading to September 18, 2000.
    28 Aug 2000continuedBoard minutes 2000, p. 945 ↗
  • Hearing on expanding the Yerba Buena Center redevelopment area to add [name withheld] site land was continued to September 18, 2000.
    28 Aug 2000continuedBoard minutes 2000, p. 945 ↗
  • Hearing on closing part of Jessie Street for good put off
    18 Sep 2000continuedBoard minutes 2000, p. 981 ↗
  • Supervisors continued the ordinance amending the General Plan for a Verba Buena Center block to September 25, 2000.
    18 Sep 2000continuedBoard minutes 2000, p. 976 ↗
  • The Board continued the hearing on adding land at Mission and Fourth-Fifth Streets to the Yerba Buena Center redevelopment plan until September 25, 2000.
    18 Sep 2000continuedBoard minutes 2000, p. 980 ↗
  • Hearing on adding the [name withheld] site to the Yerba Buena Center redevelopment plan was continued to September 25, 2000.
    18 Sep 2000continuedBoard minutes 2000, p. 980 ↗
  • Supervisors continued on first reading an ordinance amending the General Plan for Verba Buena Center redevelopment land near Fourth and Mission Streets.
    18 Sep 2000continuedBoard minutes 2000, p. 976 ↗
  • Supervisor Yaki's ordinance to expand the Yerba Buena Center redevelopment area by adding [name withheld] site land was continued to September 25.
    18 Sep 2000continuedBoard minutes 2000, p. 981 ↗
  • Public hearing held on proposed amendment expanding the Yerba Buena Center redevelopment project area to include the [name withheld] site block.
    25 Sep 2000outcome not readBoard minutes 2000, p. 1015 ↗
  • Zoning map change for a Yerba Buena block between Market, Fourth, Mission and Fifth Streets was amended; final vote pending.
  • Zoning map change for the Yerba Buena Center block bounded by Market, Fourth, Mission and Fifth Streets was amended; final vote not printed.
    25 Sep 2000amendedBoard minutes 2000 ↗
  • General Plan change for the Fifth and Mission block amended
    25 Sep 2000passed first readingBoard minutes 2000 ↗
  • Board passed on first reading an amendment adding the [name withheld] site block to the Verba Buena Center redevelopment project area.
    2 Oct 2000passed first readingBoard minutes 2000, p. 1040 ↗
  • Ordinance proposed to expand the Yerba Buena Center redevelopment area to a block bounded by Market, Fourth, Mission and Fifth Streets; passed on first reading.
    2 Oct 2000passed first readingBoard minutes 2000, p. 1040 ↗
  • Ordinance passed expanding the Yerba Buena Center redevelopment project area to add land bounded by Market, Fourth, Mission and Fifth Streets.
  • Resolution adopted approving a tax increment pledge agreement for the [name withheld] site in the Yerba Buena Center project area.
  • Redevelopment area at Fifth and Mission to be expanded
  • Proposed Downtown Plan change letting landmark transferable development rights move from Yerba Buena Center to C-3-O districts was sent to committee.
  • Proposed Planning Code change allowing landmark transferable development rights from Yerba Buena Center to C-3-O districts was sent to committee.
  • Proposed General Plan change letting historic landmark development rights move to C-3-O districts from the Yerba Buena Center area; sent to committee.
  • Proposed Redevelopment Agency budget increase of up to $43,100,000 and bonds for Yerba Buena Center, sent to Finance Committee.
    25 Nov 2002referredBoard minutes 2002 ↗
  • Proposed ordinance would let historic buildings in the Yerba Buena Center project area transfer unused development rights to C-3 districts; passed first reading.
    4 Feb 2003passed first readingBoard minutes 2003 ↗
  • Ordinance passed allowing development rights to transfer from historic buildings in the Yerba Buena Center redevelopment area to C-3-O districts.
  • Ordinance allows transferring development rights from historic landmarks in the Verba Buena Center area to C-3-0 districts.
    11 Feb 2003passedBoard minutes 2003 ↗
  • Resolution proposed to commend the San Francisco International Arts Festival 2003 and Verba Buena Center for the Arts; referred to Board.
  • Resolution adopted commending the San Francisco International Arts Festival 2003 and Verba Buena Center for the Arts.
  • Ordinance extending the Verba Buena Center Redevelopment Plan's time limit by one year, passed as final.
    4 Jan 2005passedBoard minutes 2005 ↗
  • Ordinance extending the Yerba Buena Center redevelopment plan by one year passed on first reading.
    24 Nov 2009passed first readingBoard minutes 2009, p. 8 ↗
  • Ordinance extends the Verba Buena Center redevelopment plan by one year, excluding the [name withheld] site, and keeps low-income housing funding.
    8 Dec 2009passedBoard minutes 2009 ↗
  • Liquor license for arts center at 701 Mission Street approved
  • Mexican Museum and tower at 706 Mission Street sent to committee
  • Ordinance creating Yerba Buena Center special use district at 706 Mission Street and raising its height from 400 to 480 feet passed.
  • Hearing sought on censorship at Yerba Buena Center for the Arts