de Young Museum site
Named in the records1906–2002
71 records of San Francisco tie this place, 1906–2002: 0 decisions of the Board of Supervisors and 71 facts read from city reports. Open the full list, with filters for years, kind and outcome.
- Kind
- Named in the records
- Records
- 71: 0 Board decisions, 71 facts from city reports
- Years
- 1906–2002
What the records say
The 60 most telling of its 71 records, in date order: the ones an editor picked first, then the highest scored. The one-line summaries were written by a language model from the printed page; open the page to check the wording.
| When | What the record says | Outcome | Source |
|---|---|---|---|
| 1906 | M.[name withheld] site (Broadway @ Waterfront) · finding: fill largely predates the 1906 earthquake and consists mostly of clean sands | finding | City report: M.H. deYoung Memorial Museum site selection study scanned page ↗ |
| 1997 | De Young Museum site option near Port area · finding: Port Commission key to approval; historic district may involve Landmarks Board | finding | City report: M.H. deYoung Memorial Museum site selection study scanned page ↗ |
| 1997 | New de Young Museum site, first alternative (unnamed on page) · finding: Good site to build on: well drained soil, direct truck access, open cut excavation, low water table | site | City report: M.H. deYoung Memorial Museum site selection study scanned page ↗ |
| 1997 | New de Young Museum site, second alternative (unnamed on page) · finding: Fair site to build on: contaminated soil, thin layer of bay mud, downtown restrictions on deliveries and noise | site | City report: M.H. deYoung Memorial Museum site selection study scanned page ↗ |
| 1997 | New de Young Museum site, third alternative (unnamed on page) · finding: Difficult site to build on: contaminated soil, thick layer of bay mud, downtown restrictions on deliveries and noise, cross lot bracing, high water table | site | City report: M.H. deYoung Memorial Museum site selection study scanned page ↗ |
| 1997 | New De Young Museum site restudy · finding: With rail station, up to six months for asbestos abatement, demolition, and removal of contaminated soil; without rail station, up to eight months | finding | City report: M.H. deYoung Memorial Museum site selection study scanned page ↗ |
| 1997 | New De Young Museum site restudy · finding: Redevelopment could gain jurisdiction; otherwise city-owned land needs standard approvals | finding | City report: M.H. deYoung Memorial Museum site selection study scanned page ↗ |
| 1997 | M.[name withheld] site (Broadway @ Waterfront) · finding: groundmotion expected to be high in a major earthquake | finding | City report: M.H. deYoung Memorial Museum site selection study scanned page ↗ |
| 1997 | New de Young Museum site restudy · finding: Closest site to BART, ferry, and Muni Metro stations | finding | City report: M.H. deYoung Memorial Museum site selection study scanned page ↗ |
| 1997 | New de Young Museum site selection restudy · alternative: Old Federal Building in the Civic Center | alternative | City report: M.H. deYoung Memorial Museum site selection study scanned page ↗ |
| 1997 | New de Young Museum site restudy · finding: Only four local, no regional transit lines nearby; limited parking supply | finding | City report: M.H. deYoung Memorial Museum site selection study scanned page ↗ |
| 1997 | New de Young Museum site restudy · finding: Long walk from most transit; limited parking nearby | finding | City report: M.H. deYoung Memorial Museum site selection study scanned page ↗ |
| 1997 | New de Young Museum site restudy · finding: Best local, regional bus access; good parking supply | finding | City report: M.H. deYoung Memorial Museum site selection study scanned page ↗ |
| 1997 | New de Young Museum site restudy · finding: Good ambient light; trees at north, moming fog banks | finding | City report: M.H. deYoung Memorial Museum site selection study scanned page ↗ |
| 1997 | New de Young Museum site restudy · finding: Historic site; natural setting; diversity of park users; building design limitations | finding | City report: M.H. deYoung Memorial Museum site selection study scanned page ↗ |
| 1997 | New de Young Museum site restudy · finding: Highly compatible physical setting; highly incompatible functional setting | finding | City report: M.H. deYoung Memorial Museum site selection study scanned page ↗ |
| 1997 | New de Young Museum site restudy · finding: Sculpture garden could abut museum in park-like setting; sporadic wind and glare | finding | City report: M.H. deYoung Memorial Museum site selection study scanned page ↗ |
| 1997 | New de Young Museum site restudy · finding: Good southern exposure; existing and potential surrounding skyscrapers | finding | City report: M.H. deYoung Memorial Museum site selection study scanned page ↗ |
| 1997 | New de Young Museum site restudy · finding: Limited direct sunlight in winter; open to east | finding | City report: M.H. deYoung Memorial Museum site selection study scanned page ↗ |
| 1997 | New de Young Museum site, second alternative (unnamed on page) · finding: Adequate services and nearby steam; liquefaction risk; potential relocations; abandoned pump station | site | City report: M.H. deYoung Memorial Museum site selection study scanned page ↗ |
| 1997 | New de Young Museum site, third alternative (unnamed on page) · other: Lands on seawall parcel to the north could be used for parking; other outparcels may become available | site | City report: M.H. deYoung Memorial Museum site selection study scanned page ↗ |
| 1997 | New de Young Museum site selection restudy · alternative: Existing de Young Museum site in Golden Gate Park | alternative | City report: M.H. deYoung Memorial Museum site selection study scanned page ↗ |
| 1997 | New de Young Museum site selection restudy · alternative: Letterman Hospital site in the Presidio | alternative | City report: M.H. deYoung Memorial Museum site selection study scanned page ↗ |
| 1997 | New de Young Museum site selection restudy · alternative: Transbay District sites | alternative | City report: M.H. deYoung Memorial Museum site selection study scanned page ↗ |
| 1997 | New de Young Museum site selection restudy · alternative: Ferry Building | alternative | City report: M.H. deYoung Memorial Museum site selection study scanned page ↗ |
| 1997 | New de Young Museum site selection restudy · alternative: Mid-Embarcadero Blocks 202 and 203 | alternative | City report: M.H. deYoung Memorial Museum site selection study scanned page ↗ |
| 1997 | New de Young Museum site selection restudy · alternative: Site at the terminus of Broadway at the Embarcadero | alternative | City report: M.H. deYoung Memorial Museum site selection study scanned page ↗ |
| 1997 | New de Young Museum site selection restudy · finding: Seven sites or site groups determined to be preliminary feasible | finding | City report: M.H. deYoung Memorial Museum site selection study scanned page ↗ |
| 1997 | New de Young Museum site alternative (not named on this page) · cost usd: $3,000,000 below grade with station; $4,900,000 below grade without station | alternative | City report: M.H. deYoung Memorial Museum site selection study scanned page ↗ |
| 1997 | New de Young Museum site alternative (not named on this page) · cost usd: $4,600,000 below grade and $100,000 in existing structures | alternative | City report: M.H. deYoung Memorial Museum site selection study scanned page ↗ |
| 1997 | New de Young Museum site alternative (not named on this page) · cost usd: $100,000 below grade and $2,500,000 in existing structures | alternative | City report: M.H. deYoung Memorial Museum site selection study scanned page ↗ |
| 1997 | New de Young Museum site alternative (not named on this page) · finding: 1/3 mile from Station 13; direct travel path | finding | City report: M.H. deYoung Memorial Museum site selection study scanned page ↗ |
| 1997 | New de Young Museum site alternative (not named on this page) · finding: 1/2 mile from northeast station; could encounter congestion | finding | City report: M.H. deYoung Memorial Museum site selection study scanned page ↗ |
| 1997 | New de Young Museum site alternative (not named on this page) · finding: Excellent security enhanced by adjacent sites and private personnel | finding | City report: M.H. deYoung Memorial Museum site selection study scanned page ↗ |
| 1997 | New de Young Museum site alternative (not named on this page) · finding: Private loading facility; arterial approach from all directions | finding | City report: M.H. deYoung Memorial Museum site selection study scanned page ↗ |
| 1997 | New de Young Museum site alternative (not named on this page) · finding: 2/3 mi. from Station 31; uncongested travel path | finding | City report: M.H. deYoung Memorial Museum site selection study scanned page ↗ |
| 1997 | New De Young Museum site restudy · cost usd: best case zero, worst case $20.6 million | finding | City report: M.H. deYoung Memorial Museum site selection study scanned page ↗ |
| 1997 | de [name withheld] site selection - Golden Gate Park site · finding: All four sites are served by adequate utilities to provide fully operational electrical, fire protection, and life safety systems | finding | City report: M.H. deYoung Memorial Museum site selection study scanned page ↗ |
| 1997 | de [name withheld] site selection evaluation · other: 45 evaluation criteria used to compare alternative sites | project | City report: M.H. deYoung Memorial Museum site selection study scanned page ↗ |
| 1997 | de [name withheld] site selection evaluation · other: 150 measures (factors) listed to gain insight into each site | project | City report: M.H. deYoung Memorial Museum site selection study scanned page ↗ |
| 1997 | New de Young Museum site restudy · finding: Pleasant tranquil setting; near [name withheld] area and Walton Square Park | finding | City report: M.H. deYoung Memorial Museum site selection study scanned page ↗ |
| 1997 | de [name withheld] · proposes: 150,000 s.f. footprint | measure | City report: M.H. deYoung Memorial Museum site selection study scanned page ↗ |
| 1997 | de [name withheld] · floor area sqft: Total Museum Program 255,750 sq ft | building | City report: M.H. deYoung Memorial Museum site selection study scanned page ↗ |
| 1997 | de [name withheld] · floor area sqft: Total Building Area 601,000 sq ft | building | City report: M.H. deYoung Memorial Museum site selection study scanned page ↗ |
| 1997 | de [name withheld] parking · floor area sqft: Level 2 parking 150,000 s.f. 425 cars | building | City report: M.H. deYoung Memorial Museum site selection study scanned page ↗ |
| 1997 | de [name withheld] basement program · floor area sqft: 104,750 sf (gross), includes 75 cars | building | City report: M.H. deYoung Memorial Museum site selection study scanned page ↗ |
| 1997 | M.[name withheld] site (Broadway @ Waterfront) · other: Two existing one- and two-story buildings presently exist on the site | building | City report: M.H. deYoung Memorial Museum site selection study scanned page ↗ |
| 1997 | M.[name withheld] site (Broadway @ Waterfront) · other: Embarcadero Freeway ramp structure traversed the site; abandoned pile and pile cap foundations remain underground | site | City report: M.H. deYoung Memorial Museum site selection study scanned page ↗ |
| 1997 | M.[name withheld] site (Broadway @ Waterfront) · finding: upper portions of the fill may contain regulated (contaminated) materials | finding | City report: M.H. deYoung Memorial Museum site selection study scanned page ↗ |
| 1997 | M.[name withheld] site (Broadway @ Waterfront) · finding: site is outside the Alquist-Priolo Special Studies Zone; ground rupture potential is low | finding | City report: M.H. deYoung Memorial Museum site selection study scanned page ↗ |
| 1997 | M.[name withheld] site (Broadway @ Waterfront) · finding: potential for compaction settlement and liquefaction of the fill is high | finding | City report: M.H. deYoung Memorial Museum site selection study scanned page ↗ |
| 1997-05-16 | New de Young Museum site · finding: Horizontal ground motion accelerations expected at site in major earthquake range 0.35-0.6g | finding | City report: M.H. deYoung Memorial Museum site selection study scanned page ↗ |
| 1997-05-16 | New de Young Museum site restudy · finding: No constraints other than possible height limits affect construction of above-ground structures; mid-rise may be needed due to small site footprint | finding | City report: M.H. deYoung Memorial Museum site selection study scanned page ↗ |
| 1997-05-16 | New de Young Museum site · finding: Conventional building horizontal accelerations expected to exceed 1.0g at third floor and above | finding | City report: M.H. deYoung Memorial Museum site selection study scanned page ↗ |
| 1997-05-16 | New de Young Museum · recommendation: Higher floors not used for art storage and display, or supplemental damping or seismic isolator bearings at ground level | recommendation | City report: M.H. deYoung Memorial Museum site selection study scanned page ↗ |
| 1997-05-16 | New de Young Museum site restudy · finding: Expected horizontal accelerations 0.35-0.55g at first floor, 0.75-0.9g at second floor, greater than 1.25g at third floor and higher | finding | City report: M.H. deYoung Memorial Museum site selection study scanned page ↗ |
| 1997-05-16 | New de Young Museum site restudy · recommendation: Higher levels should not be used for art storage or display, or use structural response modification (isolation and/or supplemental damping) if taller than two stories | recommendation | City report: M.H. deYoung Memorial Museum site selection study scanned page ↗ |
| 1997-05-16 | New de Young Museum site restudy · finding: Dewatering with wellpoints is not an option on this site due to potential settlement of adjacent improvements | finding | City report: M.H. deYoung Memorial Museum site selection study scanned page ↗ |
| 1997-05-16 | New de Young Museum site restudy · recommendation: Tiebacks cannot be used for shoring; excavation must be braced | recommendation | City report: M.H. deYoung Memorial Museum site selection study scanned page ↗ |
| 2002 | de [name withheld] site selection study · other: Projection horizon of five years from now, when construction of the new museum building is expected to commence | project | City report: M.H. deYoung Memorial Museum site selection study scanned page ↗ |
All 71 records, with filters · this place's data as JSON · release v0.7.1 · CC0 1.0