All 12 records, in date order. The one-line summaries were written by a language model from the printed page; open the page to check the wording.

WhenWhat the record saysOutcomeSource
1937Golden Gate Bridge suspension spans · other: 21,300 lbs. dead load in center span as completedbuildingCity report: Report on proposed installation of rapid transit trains on Golden Gate Bridge
scanned page ↗
1961Golden Gate Bridge center span · other: present dead load of center span 22,900 lbs. per ft.buildingCity report: Report on proposed installation of rapid transit trains on Golden Gate Bridge
scanned page ↗
1962Golden Gate Bridge center span · other: center span dead load with reserve would be 23,700 lbs. per ft.findingCity report: Report on proposed installation of rapid transit trains on Golden Gate Bridge
scanned page ↗
1962Golden Gate Bridge · other: total design dead load in the center span 25,700 lbs per ftfindingCity report: Report on proposed installation of rapid transit trains on Golden Gate Bridge
scanned page ↗
1962Golden Gate Bridge · other: original design dead load 21,000 lbs per ftfindingCity report: Report on proposed installation of rapid transit trains on Golden Gate Bridge
scanned page ↗
1962Golden Gate Bridge stiffening trusses · finding: Calculated stresses exceed permissible stresses in about 40% of all chord members in the center span under rapid transitfindingCity report: Report on proposed installation of rapid transit trains on Golden Gate Bridge
scanned page ↗
1962Golden Gate Bridge stiffening truss chords · other: Maximum calculated compression stress 29,300 lbs per sq in, 3,400 lbs per sq in above permissible valuefindingCity report: Report on proposed installation of rapid transit trains on Golden Gate Bridge
scanned page ↗
1962Golden Gate Bridge stiffening truss chords · finding: Maximum calculated tension stress 36,800 lbs per sq in, 4,800 lbs per sq in above allowable maximumfindingCity report: Report on proposed installation of rapid transit trains on Golden Gate Bridge
scanned page ↗
1962Golden Gate Bridge rapid transit loading · other: deflection at center of center span 19.3 ft (under combined loads at 110° F)findingCity report: Report on proposed installation of rapid transit trains on Golden Gate Bridge
scanned page ↗
1962Golden Gate Bridge navigation clearance · other: encroachment of up to about 9 ft on the 220 ft under-clearancefindingCity report: Report on proposed installation of rapid transit trains on Golden Gate Bridge
scanned page ↗
1962Golden Gate Bridge navigation clearance · recommendation: ruling needed from the present Department of the Army on encroachmentrecommendationCity report: Report on proposed installation of rapid transit trains on Golden Gate Bridge
scanned page ↗
1962Golden Gate Bridge rapid transit loading · other: deflection reported by [name withheld] and [name withheld]: 18.2 ftfindingCity report: Report on proposed installation of rapid transit trains on Golden Gate Bridge