Qipudata
San Francisco · v0.7.1
qipu data›San Francisco›Places›Golden Gate Bridge stiffening truss connections

Golden Gate Bridge stiffening truss connections

Named in the records1962

8 records of San Francisco tie this place, 1962: 0 decisions of the Board of Supervisors and 8 facts read from city reports. Open the full list, with filters for years, kind and outcome.

Kind
Named in the records
Records
8: 0 Board decisions, 8 facts from city reports
Years
1962

What the records say

All 8 records, in date order. The one-line summaries were written by a language model from the printed page; open the page to check the wording.

WhenWhat the record saysOutcomeSource
1962Golden Gate Bridge stiffening truss connections · finding: No fatigue advantage with higher strength steels at 2,000,000 or more cyclesfindingCity report: Report on proposed installation of rapid transit trains on Golden Gate Bridge
scanned page ↗
1962Golden Gate Bridge stiffening truss connections · finding: Fatigue resistance at 2,000,000 or more cycles corresponds to a stress fluctuation of approximately 20,000 psifindingCity report: Report on proposed installation of rapid transit trains on Golden Gate Bridge
scanned page ↗
1962Golden Gate Bridge stiffening truss connections · finding: Fatigue resistance at 100,000 cycles for silicon steel: total fluctuation approximately 30,000 to 35,000 psifindingCity report: Report on proposed installation of rapid transit trains on Golden Gate Bridge
scanned page ↗
1962Golden Gate Bridge stiffening truss connections · finding: Fluctuations corresponding to less than about 15,000 psi for any cycle would have no influence on endurancefindingCity report: Report on proposed installation of rapid transit trains on Golden Gate Bridge
scanned page ↗
1962Golden Gate Bridge stiffening truss connections · finding: Stress fluctuations above 40,000 psi would occur rarely, possibly not as often as several times per year (rapid transit loading estimate)findingCity report: Report on proposed installation of rapid transit trains on Golden Gate Bridge
scanned page ↗
1962Golden Gate Bridge stiffening truss connections · finding: Stress fluctuations of 25,000 to 30,000 psi might occur several times per month (rapid transit loading estimate)findingCity report: Report on proposed installation of rapid transit trains on Golden Gate Bridge
scanned page ↗
1962Golden Gate Bridge stiffening truss connections · finding: Stress fluctuations of 20,000 to 25,000 psi might occur about ten times per day (rapid transit loading estimate)findingCity report: Report on proposed installation of rapid transit trains on Golden Gate Bridge
scanned page ↗
1962Golden Gate Bridge stiffening truss connections · finding: Stress fluctuations of 10,000 to 20,000 psi might occur 100 to 200 times per day (rapid transit loading estimate)findingCity report: Report on proposed installation of rapid transit trains on Golden Gate Bridge
scanned page ↗

All 8 records, with filters · this place's data as JSON · release v0.7.1 · CC0 1.0