Golden Gate Bridge Toll Plaza Area
Named in the records1982–1998
5 records of San Francisco tie this place, 1982–1998: 0 decisions of the Board of Supervisors and 5 facts read from city reports. Open the full list, with filters for years, kind and outcome.
- Kind
- Named in the records
- Records
- 5: 0 Board decisions, 5 facts from city reports
- Years
- 1982–1998
What the records say
All 5 records, in date order. The one-line summaries were written by a language model from the printed page; open the page to check the wording.
| When | What the record says | Outcome | Source |
|---|---|---|---|
| 1982 | Administration building · proposes: relocated to a different site | recommendation | City report: Golden Gate Bridge toll plaza masterplan study scanned page ↗ |
| 1982 | Administration Building Complex · other: to be relocated | building | City report: Golden Gate Bridge toll plaza masterplan study scanned page ↗ |
| 1982 | Computer Building · other: to be relocated | building | City report: Golden Gate Bridge toll plaza masterplan study scanned page ↗ |
| 1998 | Golden Gate Bridge toll plaza area planning · event: 13-month joint GGBHTD/GGNRA toll plaza planning period | event | City report: Golden Gate Bridge moveable median barrier : authorize conceptual approval for installation of Barrier Systems, Inc. one foot wide moveable median barrier scanned page ↗ |
| 1998 | Transfer Vehicle Storage and Maintenance Facility · other: design contingent on completing joint GGBHTD/GGNRA toll plaza planning and environmental report | building | City report: Golden Gate Bridge moveable median barrier : authorize conceptual approval for installation of Barrier Systems, Inc. one foot wide moveable median barrier scanned page ↗ |
All 5 records, with filters · this place's data as JSON · release v0.7.1 · CC0 1.0