Qipudata
San Francisco · v0.7.1
qipu data›San Francisco›Places›Golden Gate Bridge tower base

Golden Gate Bridge tower base

Named in the records1990

37 records of San Francisco tie this place, 1990: 0 decisions of the Board of Supervisors and 37 facts read from city reports. Open the full list, with filters for years, kind and outcome.

Kind
Named in the records
Records
37: 0 Board decisions, 37 facts from city reports
Years
1990

What the records say

All 37 records, in date order. The one-line summaries were written by a language model from the printed page; open the page to check the wording.

WhenWhat the record saysOutcomeSource
1990Golden Gate Bridge tower · finding: Maximum base moment from longitudinal earthquake 2,400,000 kip-ft, above the 900,000 kip-ft base moment capacity for initial rivet shear failurefindingCity report: Golden Gate Bridge seismic evaluation
scanned page ↗
1990Golden Gate Bridge tower · finding: Incremental nonlinear analyses were conducted to establish the degree of damage at the tower base under the maximum credible earthquake inputfindingCity report: Golden Gate Bridge seismic evaluation
scanned page ↗
1990Golden Gate Bridge tower base · finding: Rotational ductility demand at tower base about 4 under maximum credible earthquakefindingCity report: Golden Gate Bridge seismic evaluation
scanned page ↗
1990Golden Gate Bridge tower base connections · recommendation: Tower base connections shall develop strength demand of the applied load in a ductile mannerrecommendationCity report: Golden Gate Bridge seismic evaluation
scanned page ↗
1990Golden Gate Bridge main bridge · other: Nonlinear local model of tower base and concrete pier connectionbuildingCity report: Golden Gate Bridge seismic evaluation
scanned page ↗
1990Golden Gate Bridge tower · other: Detailed local tower model with nonlinear filament model at basebuildingCity report: Golden Gate Bridge seismic evaluation
scanned page ↗
1990Golden Gate Bridge main tower shaft · other: 96 hold-down steel angles riveted to tower shaft web platesbuildingCity report: Golden Gate Bridge seismic evaluation
scanned page ↗
1990Golden Gate Bridge main tower shaft · other: 78 steel dowels providing positive shear connectionbuildingCity report: Golden Gate Bridge seismic evaluation
scanned page ↗
1990Golden Gate Bridge main tower shaft · other: hold-down angles pre-stretched to 105 kip before rivetingbuildingCity report: Golden Gate Bridge seismic evaluation
scanned page ↗
1990Golden Gate Bridge tower base rivet connection · other: shear strength of 16 double-shear rivet connectionfindingCity report: Golden Gate Bridge seismic evaluation
scanned page ↗
1990Golden Gate Bridge stiffened tower web plate · other: buckling stress level of stiffened web plate (42 in. wide, 7/8 in. thick)findingCity report: Golden Gate Bridge seismic evaluation
scanned page ↗
1990Golden Gate Bridge hold-down steel angle group · other: yield strength of hold-down steel angle for each group of four anglesfindingCity report: Golden Gate Bridge seismic evaluation
scanned page ↗
1990Golden Gate Bridge tower base connection · other: constraint axial load of 70,870 kip (tower weight and vertical cable load)buildingCity report: Golden Gate Bridge seismic evaluation
scanned page ↗
1990Golden Gate Bridge tower base connection · other: initial elastic rotational stiffness Kz = 3,300,000,000 kip-ft/radmeasureCity report: Golden Gate Bridge seismic evaluation
scanned page ↗
1990Golden Gate Bridge tower base connection · other: initial elastic rotational stiffness Kx = 860,000,000 kip-ft/radmeasureCity report: Golden Gate Bridge seismic evaluation
scanned page ↗
1990Golden Gate Bridge tower base connection · finding: at base rotation of about 0.0003 rad, riveted hold-down connections sheared off and partial uplifting occurredfindingCity report: Golden Gate Bridge seismic evaluation
scanned page ↗
1990Golden Gate Bridge tower base connection · finding: average filament compressive stress reached buckling level at base rotation of about 22 x 10-4 rad, ductility factor about 7findingCity report: Golden Gate Bridge seismic evaluation
scanned page ↗
1990Golden Gate Bridge tower base connection · finding: yield moment at initial rivet shear failure Mzy = 900,000 kip-ftfindingCity report: Golden Gate Bridge seismic evaluation
scanned page ↗
1990Golden Gate Bridge tower base connection · finding: yield moment at initial rivet shear failure Mxy = 300,000 kip-ftfindingCity report: Golden Gate Bridge seismic evaluation
scanned page ↗
1990Golden Gate Bridge tower base shaft · other: base shaft dimension 54 ft by 33 ftbuildingCity report: Golden Gate Bridge seismic evaluation
scanned page ↗
1990Golden Gate Bridge tower concrete pier · other: concrete pier dimension 90 ft by 134 ftbuildingCity report: Golden Gate Bridge seismic evaluation
scanned page ↗
1990Golden Gate Bridge tower base connection · finding: rotational ductility factor of the base section about 7findingCity report: Golden Gate Bridge seismic evaluation
scanned page ↗
1990Golden Gate Bridge tower base · finding: Shear failure of riveted hold down connections first occurred at 26% of full displacement amplitudefindingCity report: Golden Gate Bridge seismic evaluation
scanned page ↗
1990Golden Gate Bridge tower base · finding: Rivets would fail in shear at normal tensile stress of 2.97 ksifindingCity report: Golden Gate Bridge seismic evaluation
scanned page ↗
1990Golden Gate Bridge tower base · finding: Maximum compressive stress in cells of the base 14.6 ksi at 26% displacementfindingCity report: Golden Gate Bridge seismic evaluation
scanned page ↗
1990Golden Gate Bridge tower base · finding: At 34% of displacement amplitude all rivet connections on southern side sheared offeventCity report: Golden Gate Bridge seismic evaluation
scanned page ↗
1990Golden Gate Bridge tower base · finding: About one third of the base section uplifted at 34% displacementeventCity report: Golden Gate Bridge seismic evaluation
scanned page ↗
1990Golden Gate Bridge tower base · finding: At 58% of displacement amplitude half of the base section upliftedeventCity report: Golden Gate Bridge seismic evaluation
scanned page ↗
1990Golden Gate Bridge tower base · finding: Maximum compressive stress in cell 23.8 ksi at 58% displacementfindingCity report: Golden Gate Bridge seismic evaluation
scanned page ↗
1990Golden Gate Bridge tower base · finding: Maximum stress at base at full displacement amplitude 33 ksi in compressionfindingCity report: Golden Gate Bridge seismic evaluation
scanned page ↗
1990Golden Gate Bridge tower base · finding: Maximum base moment in nonlinear structure about half of linear elastic predictionfindingCity report: Golden Gate Bridge seismic evaluation
scanned page ↗
1990Golden Gate Bridge tower base · other: boundary spring coefficients established from nonlinear base behavior, accounting for rivet shear failure and base plate upliftbuildingCity report: Golden Gate Bridge seismic evaluation
scanned page ↗
1990Golden Gate Bridge tower · finding: Maximum stress at the tower base is reduced to about half of the elastic stressfindingCity report: Golden Gate Bridge seismic evaluation
scanned page ↗
1990Golden Gate Bridge tower base (West Shaft) · finding: Rivet failed in shear or Base plate upliftedfindingCity report: Golden Gate Bridge seismic evaluation
scanned page ↗
1990Golden Gate Bridge tower (Baron report review) · finding: Baron incorrectly assigned infinite moment of inertia to the 32 ft high base section of the towerfindingCity report: Golden Gate Bridge seismic evaluation
scanned page ↗
1990Golden Gate Bridge tower (Baron report review) · finding: Baron's analysis assumes absolute fixity at tower bottom, giving a base moment of 3,916,650 ft. kipfindingCity report: Golden Gate Bridge seismic evaluation
scanned page ↗
1990Golden Gate Bridge tower base connection · finding: complete fixity at tower base is unrealistic because embedded angle connection has less moment capacity than assumedfindingCity report: Golden Gate Bridge seismic evaluation
scanned page ↗

All 37 records, with filters · this place's data as JSON · release v0.7.1 · CC0 1.0