Golden Gate Bridge tower

Named in the records1962–1990

73 records of San Francisco tie this place, 1962–1990: 1 decision of the Board of Supervisors and 72 facts read from city reports. Open the full list, with filters for years, kind and outcome.

Kind
Named in the records
Records
73: 1 Board decision, 72 facts from city reports
Years
1962–1990

What the records say

The 60 most telling of its 73 records, in date order: the ones an editor picked first, then the highest scored. The one-line summaries were written by a language model from the printed page; open the page to check the wording.

WhenWhat the record saysOutcomeSource
1962Golden Gate Bridge tower shafts · finding: calculated stresses exceed permissible values in about 400 ft of tower, including 80 ft to 300 ft above basefindingCity report: Report on proposed installation of rapid transit trains on Golden Gate Bridge
scanned page ↗
1962Golden Gate Bridge tower shafts · finding: silicon steel axial stress 20,200 psi calculated vs 18,000 psi permissible at about 80 ft below topfindingCity report: Report on proposed installation of rapid transit trains on Golden Gate Bridge
scanned page ↗
1962Golden Gate Bridge tower shafts · finding: excess of 2,200 psi over permissible stress at about 80 ft below topfindingCity report: Report on proposed installation of rapid transit trains on Golden Gate Bridge
scanned page ↗
1962Golden Gate Bridge tower shafts · finding: carbon steel axial and bending stress 20,400 psi calculated vs 18,000 psi permissible at about 300 ft below topfindingCity report: Report on proposed installation of rapid transit trains on Golden Gate Bridge
scanned page ↗
1962Golden Gate Bridge tower shafts · finding: excess of 2,400 psi over permissible stress at about 300 ft below topfindingCity report: Report on proposed installation of rapid transit trains on Golden Gate Bridge
scanned page ↗
1962Golden Gate Bridge tower shafts · other: originally specified maximum permissible axial stresses: 14,000 psi carbon steel, 18,000 psi silicon steelfindingCity report: Report on proposed installation of rapid transit trains on Golden Gate Bridge
scanned page ↗
1962Golden Gate Bridge tower shafts · other: average tested yield points 40,800 psi carbon steel and 52,400 psi silicon steelfindingCity report: Report on proposed installation of rapid transit trains on Golden Gate Bridge
scanned page ↗
1962Golden Gate Bridge tower shafts · finding: permissible values should not be exceeded when rapid transit is addedrecommendationCity report: Report on proposed installation of rapid transit trains on Golden Gate Bridge
scanned page ↗
1962Golden Gate Bridge tower shafts · finding: Gronquist concludes the towers will require no reinforcing for the addition of rapid transitfindingCity report: Report on proposed installation of rapid transit trains on Golden Gate Bridge
scanned page ↗
1962Golden Gate Bridge tower shafts · finding: Reinforcing of tower shafts to bring stresses within permissible limits would be impracticablefindingCity report: Report on proposed installation of rapid transit trains on Golden Gate Bridge
scanned page ↗
1962Golden Gate Bridge tower piers and anchorage blocks · finding: sufficient strength and stability to sustain additional rapid transit forcesfindingCity report: Report on proposed installation of rapid transit trains on Golden Gate Bridge
scanned page ↗
1962Golden Gate Bridge cables · finding: Greater angular changes of cables at tower saddles would require careful studyfindingCity report: Report on proposed installation of rapid transit trains on Golden Gate Bridge
scanned page ↗
1973Caltrans 1973 Earthquake Design Criteria for Bridges (applied to Golden Gate Bridge tower) · finding: spectra reduction factor of 4 used to account for plastic actionfindingCity report: Golden Gate Bridge seismic evaluation
scanned page ↗
1982-12-20Supervisor Molinari urged the Chief Administrative Officer to display a 1933 Golden Gate Bridge tower replica in City Hall's rotunda.passedBoard decision
scanned page ↗
1990Golden Gate Bridge tower bases · finding: Tower bases (particularly the tie-down assemblies) endangered by major earthquakefindingCity report: Golden Gate Bridge seismic evaluation
scanned page ↗
1990Golden Gate Bridge tower · finding: Maximum base moment from longitudinal earthquake 2,400,000 kip-ft, above the 900,000 kip-ft base moment capacity for initial rivet shear failurefindingCity report: Golden Gate Bridge seismic evaluation
scanned page ↗
1990Golden Gate Bridge tower shaft · finding: Maximum shear at top of tower shaft, just below the cable saddle, induced by longitudinal earthquakefindingCity report: Golden Gate Bridge seismic evaluation
scanned page ↗
1990Golden Gate Bridge tower · finding: Incremental nonlinear analyses were conducted to establish the degree of damage at the tower base under the maximum credible earthquake inputfindingCity report: Golden Gate Bridge seismic evaluation
scanned page ↗
1990Golden Gate Bridge tower · other: Displacement responses due to the upper level earthquake obtained by scaling the results by 60%findingCity report: Golden Gate Bridge seismic evaluation
scanned page ↗
1990Golden Gate Bridge tower base · finding: Rotational ductility demand at tower base about 4 under maximum credible earthquakefindingCity report: Golden Gate Bridge seismic evaluation
scanned page ↗
1990Golden Gate Bridge tower end-restraint · finding: tower end-restraint assumed by Baron cannot possibly be attainedfindingCity report: Golden Gate Bridge seismic evaluation
scanned page ↗
1990Golden Gate Bridge tower connections · finding: Connections between cable saddles and tops of towers may be vulnerablefindingCity report: Golden Gate Bridge seismic evaluation
scanned page ↗
1990Golden Gate Bridge tower base connections · recommendation: Tower base connections shall develop strength demand of the applied load in a ductile mannerrecommendationCity report: Golden Gate Bridge seismic evaluation
scanned page ↗
1990Golden Gate Bridge Tower/Pier connection · finding: shear capacity under uplift may be criticalfindingCity report: Golden Gate Bridge seismic evaluation
scanned page ↗
1990Golden Gate Bridge main bridge · other: Nonlinear local model of tower base and concrete pier connectionbuildingCity report: Golden Gate Bridge seismic evaluation
scanned page ↗
1990Golden Gate Bridge tower · other: Detailed local tower model with nonlinear filament model at basebuildingCity report: Golden Gate Bridge seismic evaluation
scanned page ↗
1990Golden Gate Bridge tower · other: Nonlinear tower model assesses tolerance of relative longitudinal ground movement between tower and anchoragebuildingCity report: Golden Gate Bridge seismic evaluation
scanned page ↗
1990Golden Gate Bridge main tower shaft · other: 96 hold-down steel angles riveted to tower shaft web platesbuildingCity report: Golden Gate Bridge seismic evaluation
scanned page ↗
1990Golden Gate Bridge main tower shaft · other: 78 steel dowels providing positive shear connectionbuildingCity report: Golden Gate Bridge seismic evaluation
scanned page ↗
1990Golden Gate Bridge main tower shaft · other: hold-down angles pre-stretched to 105 kip before rivetingbuildingCity report: Golden Gate Bridge seismic evaluation
scanned page ↗
1990Golden Gate Bridge tower base rivet connection · other: shear strength of 16 double-shear rivet connectionfindingCity report: Golden Gate Bridge seismic evaluation
scanned page ↗
1990Golden Gate Bridge stiffened tower web plate · other: buckling stress level of stiffened web plate (42 in. wide, 7/8 in. thick)findingCity report: Golden Gate Bridge seismic evaluation
scanned page ↗
1990Golden Gate Bridge hold-down steel angle group · other: yield strength of hold-down steel angle for each group of four anglesfindingCity report: Golden Gate Bridge seismic evaluation
scanned page ↗
1990Golden Gate Bridge tower base connection · other: constraint axial load of 70,870 kip (tower weight and vertical cable load)buildingCity report: Golden Gate Bridge seismic evaluation
scanned page ↗
1990Golden Gate Bridge tower base connection · other: initial elastic rotational stiffness Kz = 3,300,000,000 kip-ft/radmeasureCity report: Golden Gate Bridge seismic evaluation
scanned page ↗
1990Golden Gate Bridge tower base connection · other: initial elastic rotational stiffness Kx = 860,000,000 kip-ft/radmeasureCity report: Golden Gate Bridge seismic evaluation
scanned page ↗
1990Golden Gate Bridge tower base connection · finding: at base rotation of about 0.0003 rad, riveted hold-down connections sheared off and partial uplifting occurredfindingCity report: Golden Gate Bridge seismic evaluation
scanned page ↗
1990Golden Gate Bridge tower base connection · finding: average filament compressive stress reached buckling level at base rotation of about 22 x 10-4 rad, ductility factor about 7findingCity report: Golden Gate Bridge seismic evaluation
scanned page ↗
1990Golden Gate Bridge tower base connection · finding: yield moment at initial rivet shear failure Mzy = 900,000 kip-ftfindingCity report: Golden Gate Bridge seismic evaluation
scanned page ↗
1990Golden Gate Bridge tower base connection · finding: yield moment at initial rivet shear failure Mxy = 300,000 kip-ftfindingCity report: Golden Gate Bridge seismic evaluation
scanned page ↗
1990Golden Gate Bridge tower · other: measured modal damping 1.3% at period 1.332 sec, longitudinal mode 1measureCity report: Golden Gate Bridge seismic evaluation
scanned page ↗
1990Golden Gate Bridge tower · other: measured modal damping 2.2% at period 2.184 sec, transverse mode 1measureCity report: Golden Gate Bridge seismic evaluation
scanned page ↗
1990Golden Gate Bridge · other: Rigid-support response spectrum analysis; 100 modes included in the analysisfindingCity report: Golden Gate Bridge seismic evaluation
scanned page ↗
1990Golden Gate Bridge tower · finding: Highest mode natural period 1.2246 sec, which may be too long for some critical tower membersfindingCity report: Golden Gate Bridge seismic evaluation
scanned page ↗
1990Golden Gate Bridge tower shaft · finding: Longitudinal shear in tower shaft increases from 5,113 kip at about roadway level to 12,517 kip at the basefindingCity report: Golden Gate Bridge seismic evaluation
scanned page ↗
1990Golden Gate Bridge tower and side span · finding: More than 90% of longitudinal response caused by the 62nd mode, period 1.86 secfindingCity report: Golden Gate Bridge seismic evaluation
scanned page ↗
1990Golden Gate Bridge tower base shaft · other: base shaft dimension 54 ft by 33 ftbuildingCity report: Golden Gate Bridge seismic evaluation
scanned page ↗
1990Golden Gate Bridge tower concrete pier · other: concrete pier dimension 90 ft by 134 ftbuildingCity report: Golden Gate Bridge seismic evaluation
scanned page ↗
1990Golden Gate Bridge tower base connection · finding: rotational ductility factor of the base section about 7findingCity report: Golden Gate Bridge seismic evaluation
scanned page ↗
1990Golden Gate Bridge tower · other: Displacement responses due to the lower level event scaled by a scale factor of 25%findingCity report: Golden Gate Bridge seismic evaluation
scanned page ↗
1990Golden Gate Bridge tower longitudinal restraint (side span cable) · other: equivalent spring stiffness 15,700 kip/ftmeasureCity report: Golden Gate Bridge seismic evaluation
scanned page ↗
1990Golden Gate Bridge tower longitudinal restraint (main span cable) · other: equivalent spring stiffness 5200 kip/ftmeasureCity report: Golden Gate Bridge seismic evaluation
scanned page ↗
1990Golden Gate Bridge tower · finding: stress distributions at 25% and 60% of full displacement correspond to lower and upper level eventsfindingCity report: Golden Gate Bridge seismic evaluation
scanned page ↗
1990Golden Gate Bridge tower base · finding: Shear failure of riveted hold down connections first occurred at 26% of full displacement amplitudefindingCity report: Golden Gate Bridge seismic evaluation
scanned page ↗
1990Golden Gate Bridge tower base · finding: Rivets would fail in shear at normal tensile stress of 2.97 ksifindingCity report: Golden Gate Bridge seismic evaluation
scanned page ↗
1990Golden Gate Bridge tower base · finding: Maximum compressive stress in cells of the base 14.6 ksi at 26% displacementfindingCity report: Golden Gate Bridge seismic evaluation
scanned page ↗
1990Golden Gate Bridge tower base · finding: At 34% of displacement amplitude all rivet connections on southern side sheared offeventCity report: Golden Gate Bridge seismic evaluation
scanned page ↗
1990Golden Gate Bridge tower base · finding: About one third of the base section uplifted at 34% displacementeventCity report: Golden Gate Bridge seismic evaluation
scanned page ↗
1990Golden Gate Bridge tower base · finding: At 58% of displacement amplitude half of the base section upliftedeventCity report: Golden Gate Bridge seismic evaluation
scanned page ↗
1990Golden Gate Bridge tower base · finding: Maximum compressive stress in cell 23.8 ksi at 58% displacementfindingCity report: Golden Gate Bridge seismic evaluation
scanned page ↗

All 73 records, with filters · this place's data as JSON · release v0.7.1 · CC0 1.0