Heidelberg Hill
Named in the records1894–1995
8 records of San Francisco tie this place, 1894–1995: 0 decisions of the Board of Supervisors and 8 facts read from city reports. Open the full list, with filters for years, kind and outcome.
- Kind
- Named in the records
- Records
- 8: 0 Board decisions, 8 facts from city reports
- Years
- 1894–1995
What the records say
All 8 records, in date order. The one-line summaries were written by a language model from the printed page; open the page to check the wording.
| When | What the record says | Outcome | Source |
|---|---|---|---|
| 1894 | Heidelberg Hill · event: site of a beer garden in the 1894 Mid-winter Fair | event | City report: A Garden for the 21st century : the master plan for Strybing Arboretum & Botanical Gardens, Golden Gate Park, San Francisco, California scanned page ↗ |
| 1995 | Heidelberg Hill · recommendation: Bench and railroad-tie steps at top of hill to be expanded | recommendation | City report: A Garden for the 21st century : the master plan for Strybing Arboretum & Botanical Gardens, Golden Gate Park, San Francisco, California scanned page ↗ |
| 1995 | Heidelberg Hill · finding: West- and northwest-facing slopes need slope stabilization | finding | City report: A Garden for the 21st century : the master plan for Strybing Arboretum & Botanical Gardens, Golden Gate Park, San Francisco, California scanned page ↗ |
| 1995 | Heidelberg Hill ramping path · recommendation: Ramping path to include special erosion control efforts | recommendation | City report: A Garden for the 21st century : the master plan for Strybing Arboretum & Botanical Gardens, Golden Gate Park, San Francisco, California scanned page ↗ |
| 1995 | Heidelberg Hill Overlook · floor area sqft: 1,500 s.f. excluding pathways | project | City report: A Garden for the 21st century : the master plan for Strybing Arboretum & Botanical Gardens, Golden Gate Park, San Francisco, California scanned page ↗ |
| 1995 | Heidelberg Hill Overlook · proposes: ADA accessible spiral path 480 ft long, 6 ft wide, not exceeding 5% gradient, to paved overlook | project | City report: A Garden for the 21st century : the master plan for Strybing Arboretum & Botanical Gardens, Golden Gate Park, San Francisco, California scanned page ↗ |
| 1995 | Heidelberg Hill Overlook · proposes: replace existing wooden steps with permanent masonry steps and handrails | project | City report: A Garden for the 21st century : the master plan for Strybing Arboretum & Botanical Gardens, Golden Gate Park, San Francisco, California scanned page ↗ |
| 1995 | Heidelberg Hill Overlook · proposes: wind shelter with light frame and retractable fabric roof or arbor sections and vine screens | project | City report: A Garden for the 21st century : the master plan for Strybing Arboretum & Botanical Gardens, Golden Gate Park, San Francisco, California scanned page ↗ |
All 8 records, with filters · this place's data as JSON · release v0.7.1 · CC0 1.0