Major New Site
Named in the records1990–2010
368 records of San Francisco tie this place, 1990–2010: 0 decisions of the Board of Supervisors and 368 facts read from city reports. Open the full list, with filters for years, kind and outcome.
- Kind
- Named in the records
- Records
- 368: 0 Board decisions, 368 facts from city reports
- Years
- 1990–2010
What the records say
The 60 most telling of its 368 records, in date order: the ones an editor picked first, then the highest scored. The one-line summaries were written by a language model from the printed page; open the page to check the wording.
| When | What the record says | Outcome | Source |
|---|---|---|---|
| 1990 | [name withheld] at Mission Bay · finding: Elimination of existing pollution-generating activities at Mission Bay; surface runoff quality expected to improve; impact not significant | finding | City report: Draft EIR : long range development plan, University of California, San Francisco scanned page ↗ |
| 1994 | UCSF [name withheld], Mission Bay · finding: No sensitive plant or wildlife species are known to exist on the site | site | City report: Draft EIR : long range development plan, University of California, San Francisco scanned page ↗ |
| 1995 | UCSF Mission Bay Major New Site · other: Total projected daily vehicle trips by mode split (Table 12-6 total) | measure | City report: Draft EIR : long range development plan, University of California, San Francisco scanned page ↗ |
| 1995 | UCSF Mission Bay Major New Site visitors and vendors · other: Vendors/Service trips assumed 100% drive alone | measure | City report: Draft EIR : long range development plan, University of California, San Francisco scanned page ↗ |
| 1995 | [name withheld] · other: 0.4 percent increase over 1995 regional households | project | City report: Draft EIR : long range development plan, University of California, San Francisco scanned page ↗ |
| 1995 | UCSF [name withheld] at Mission Bay · other: Total LRDP water use approximately 0.58 mgd, an increase of 0.6 percent over 1995 annual use in San Francisco | finding | City report: Draft EIR : long range development plan, University of California, San Francisco scanned page ↗ |
| 1996 | Executive Park · units: 600 dwelling units | site | City report: Draft EIR : long range development plan, University of California, San Francisco scanned page ↗ |
| 1996 | Impact 12J1-5 construction solid waste · finding: Significant impact: construction waste could require substantial expansion of planned landfill capacity | finding | City report: Draft EIR : long range development plan, University of California, San Francisco scanned page ↗ |
| 1996 | [name withheld], Executive Park · floor area sqft: about 730,000 gsf net new space after demolition | site | City report: Draft EIR : long range development plan, University of California, San Francisco scanned page ↗ |
| 1996 | [name withheld], Executive Park office buildings · demolished: two of the three existing office buildings | action | City report: Draft EIR : long range development plan, University of California, San Francisco scanned page ↗ |
| 1996 | [name withheld] at Executive Park · demolished: two office buildings to be demolished at Executive Park | action | City report: Draft EIR : long range development plan, University of California, San Francisco scanned page ↗ |
| 1996 | Storm Water Pollution Prevention Plan (Mitigation Measure 12H1-1) · finding: reduces water quality and aquatic habitat impacts during construction of the [name withheld] to a less than significant level | finding | City report: Draft EIR : long range development plan, University of California, San Francisco scanned page ↗ |
| 1996 | UCSF [name withheld] [name withheld] · finding: Exposed to earthquake groundshaking that could damage buildings, possibly resulting in loss of life | finding | City report: Draft EIR : long range development plan, University of California, San Francisco scanned page ↗ |
| 1996 | [name withheld] at Mission Bay · finding: Part of Mission Bay is below six feet mean sea level and certain areas would be subject to flooding without mitigating site design | finding | City report: Draft EIR : long range development plan, University of California, San Francisco scanned page ↗ |
| 1996 | Impact 12H4-4 Tidal Flooding, [name withheld] at Mission Bay · finding: Tidal flooding impact is significant for the project | finding | City report: Draft EIR : long range development plan, University of California, San Francisco scanned page ↗ |
| 1996 | UCSF [name withheld], Mission Bay (tidal flooding) · finding: Facilities could be subject to tidal flooding due to low elevations and rising sea levels | finding | City report: Draft EIR : long range development plan, University of California, San Francisco scanned page ↗ |
| 1996 | Mission Bay Major New Site transit ridership · other: about 3,390 person-trips per day added to MUNI lines serving Mission Bay | finding | City report: Draft EIR : long range development plan, University of California, San Francisco scanned page ↗ |
| 1996 | Static ground failure (Impact 12G1-2) · finding: Less than significant with University Policy on Seismic Safety | finding | City report: Draft EIR : long range development plan, University of California, San Francisco scanned page ↗ |
| 1996 | Life safety hazard (Impact 12G1-4) · finding: Less than significant with University Policy on Seismic Safety | finding | City report: Draft EIR : long range development plan, University of California, San Francisco scanned page ↗ |
| 1996 | UCSF LRDP Brisbane Baylands/Executive Park major new site · other: Average weekday peak-hour parking demand of 5,518 spaces | finding | City report: Draft EIR : long range development plan, University of California, San Francisco scanned page ↗ |
| 1996 | [name withheld] at Mission Bay · other: Adds about 3,390 person-trips per day to MUNI lines serving Mission Bay | finding | City report: Draft EIR : long range development plan, University of California, San Francisco scanned page ↗ |
| 1996 | [name withheld] at Mission Bay · finding: Increase in MUNI ridership: less than significant impact | finding | City report: Draft EIR : long range development plan, University of California, San Francisco scanned page ↗ |
| 1996 | Mitigation Measure 12D1-2 · other: UCSF operates proposed boilers, emergency generators and cogeneration equipment per BAAQMD permit conditions; less than significant | measure | City report: Draft EIR : long range development plan, University of California, San Francisco scanned page ↗ |
| 1996 | Mitigation Measure 12D1-3 · finding: Less than significant; none required | finding | City report: Draft EIR : long range development plan, University of California, San Francisco scanned page ↗ |
| 1996 | Mission Bay major new site · finding: 9:00 pm 8-hour carbon monoxide standard currently exceeded under worst-case meteorology | finding | City report: Draft EIR : long range development plan, University of California, San Francisco scanned page ↗ |
| 1996 | Mission Bay major new site · finding: 9:00 pm 8-hour carbon monoxide standard currently exceeded under worst-case meteorology | finding | City report: Draft EIR : long range development plan, University of California, San Francisco scanned page ↗ |
| 1996 | Mission Bay Major New Site existing noise monitoring · other: Mid-afternoon average noise level 67 dBA at 80 feet from Third Street centerline | measure | City report: Draft EIR : long range development plan, University of California, San Francisco scanned page ↗ |
| 1996 | Impact 12J1-3 Schools ([name withheld]) · finding: Less than significant; would not increase enrollments beyond local school district capacity | finding | City report: Draft EIR : long range development plan, University of California, San Francisco scanned page ↗ |
| 1996 | Mitigation Measure 12J1-5 · recommendation: Less than significant with UCSF consultation and construction waste recycling plans required of contractors | recommendation | City report: Draft EIR : long range development plan, University of California, San Francisco scanned page ↗ |
| 1996 | Mission Bay Major New Site fire protection · other: Water supply and pressure adequate for next 15 years | finding | City report: Draft EIR : long range development plan, University of California, San Francisco scanned page ↗ |
| 1996 | Mission Bay Major New Site · other: Low-pressure domestic water at 1,000 gpm; high-pressure firefighting system at 10,000 gpm | finding | City report: Draft EIR : long range development plan, University of California, San Francisco scanned page ↗ |
| 1996 | Mission Bay Major New Site · other: Fire emergency and medical aid response impact would not be significant | finding | City report: Draft EIR : long range development plan, University of California, San Francisco scanned page ↗ |
| 1996 | Mission Bay Major New Site · other: SFFD can serve site within current capacity without additional resources | finding | City report: Draft EIR : long range development plan, University of California, San Francisco scanned page ↗ |
| 1996 | Mitigation Measure 12K1-3 · other: Less Than Significant; none required | measure | City report: Draft EIR : long range development plan, University of California, San Francisco scanned page ↗ |
| 1996 | Mitigation Measure 1214-2 · finding: Less Than Significant. None required. | finding | City report: Draft EIR : long range development plan, University of California, San Francisco scanned page ↗ |
| 1996 | Mission Bay Major New Site · finding: significant unavoidable air quality impact from vehicular traffic (NOx and PM10) | finding | City report: Draft EIR : long range development plan, University of California, San Francisco scanned page ↗ |
| 1996 | Reduced Project Alternative · floor area sqft: 925,000 gsf research campus, instead of 2.65 million gsf in the LRDP | alternative | City report: Draft EIR : long range development plan, University of California, San Francisco scanned page ↗ |
| 1996 | Executive Park (Brisbane Baylands/Executive Park Major New Site) · proposes: approximately one-third of the 2.65 million gsf space program located at Executive Park | alternative | City report: Draft EIR : long range development plan, University of California, San Francisco scanned page ↗ |
| 1996 | Executive Park Major New Site area · acreage: approximately 32 acres | site | City report: Draft EIR : long range development plan, University of California, San Francisco scanned page ↗ |
| 1996 | UCSF [name withheld] at Mission Bay · other: about 3,390 person-trips per day added to MUNI lines | finding | City report: Draft EIR : long range development plan, University of California, San Francisco scanned page ↗ |
| 1996 | Mission Bay Major New Site parking demand · other: peak demand for about 4,200 parking spaces | finding | City report: Draft EIR : long range development plan, University of California, San Francisco scanned page ↗ |
| 1996 | Executive Park Major New Site · finding: Would increase potential for fire emergency response in San Francisco; would not reduce city-wide response capacity | finding | City report: Draft EIR : long range development plan, University of California, San Francisco scanned page ↗ |
| 1996 | Mission Bay Major New Site · finding: Would increase potential for fire emergency and medical aid response; would not reduce city-wide response capacity | finding | City report: Draft EIR : long range development plan, University of California, San Francisco scanned page ↗ |
| 1996 | Executive Park Major New Site · finding: Water demand of approximately 0.13 mgd; not a substantial increase, served with existing supply | finding | City report: Draft EIR : long range development plan, University of California, San Francisco scanned page ↗ |
| 1996 | Executive Park Major New Site · finding: Approximately 0.12 mgd of wastewater generated, served by Southeast Water Pollution Control Plant | finding | City report: Draft EIR : long range development plan, University of California, San Francisco scanned page ↗ |
| 1996 | UCSF [name withheld], [name withheld] · finding: Impact 12GI-1, Seismic Groundshaking: less-than-significant after University Policy on Seismic Safety | finding | City report: Draft EIR : long range development plan, University of California, San Francisco scanned page ↗ |
| 1996 | Construction erosion (Impact 12G1-3) · finding: Erosion impacts reduced to less than significant with construction Storm Water Pollution Prevention Plan | finding | City report: Draft EIR : long range development plan, University of California, San Francisco scanned page ↗ |
| 1996 | Executive Park Major New Site · other: 35 percent of the total Brisbane Baylands/Executive Park Major New Site development | site | City report: Draft EIR : long range development plan, University of California, San Francisco scanned page ↗ |
| 1996 | Executive Park Major New Site · other: water demand of the Executive Park site | measure | City report: Draft EIR : long range development plan, University of California, San Francisco scanned page ↗ |
| 1996 | Executive Park Major New Site · finding: 0.19 percent increase over San Francisco citywide water consumption of 90 mgd | finding | City report: Draft EIR : long range development plan, University of California, San Francisco scanned page ↗ |
| 1996 | Executive Park Major New Site water supply · finding: Less Than Significant; none required | finding | City report: Draft EIR : long range development plan, University of California, San Francisco scanned page ↗ |
| 1996 | UCSF Mission Bay Major New Site parking · other: about 4,180 parking spaces | measure | City report: Draft EIR : long range development plan, University of California, San Francisco scanned page ↗ |
| 1996 | UCSF LRDP [name withheld] (Mission Bay) · finding: Hazardous chemical, radioactive and biohazardous materials use; less than significant with compliance with state, federal and local rules | finding | City report: Draft EIR : long range development plan, University of California, San Francisco scanned page ↗ |
| 1996 | UCSF LRDP [name withheld] (Mission Bay) · finding: Transportation of hazardous materials to, from and among UCSF facilities; less than significant with compliance with state, federal and UCSF policies | finding | City report: Draft EIR : long range development plan, University of California, San Francisco scanned page ↗ |
| 1996 | [name withheld] · alternative: Mission Bay as a potential [name withheld] | alternative | City report: Draft EIR : long range development plan, University of California, San Francisco scanned page ↗ |
| 1996 | [name withheld] · alternative: Mission Bay as alternative location; Executive Park uses would relocate to [name withheld] | alternative | City report: Draft EIR : long range development plan, University of California, San Francisco scanned page ↗ |
| 2010 | US 101 and I-280 V/C ratio deterioration (Mission Bay Major New Site) · finding: significant impact: v/c ratio deterioration on US 101 and I-280 corridors at LOS F | finding | City report: Draft EIR : long range development plan, University of California, San Francisco scanned page ↗ |
| 2010 | Cesar Chavez Street V/C ratio deterioration (Mission Bay Major New Site) · finding: LOS E deterioration west of Folsom Street, v/c ratio increase of 0.01 in am and pm peak hours | finding | City report: Draft EIR : long range development plan, University of California, San Francisco scanned page ↗ |
| 2010 | Cesar Chavez Street V/C ratio deterioration (Mission Bay Major New Site) · finding: LOS E deterioration west of Evans Avenue, v/c ratio increase of 0.02 in am peak hour | finding | City report: Draft EIR : long range development plan, University of California, San Francisco scanned page ↗ |
| 2010 | Bay Bridge traffic (Mission Bay Major New Site) · other: about 1,000 added daily trips to the Bay Bridge, no change in v/c ratio | finding | City report: Draft EIR : long range development plan, University of California, San Francisco scanned page ↗ |
All 368 records, with filters · this place's data as JSON · release v0.7.1 · CC0 1.0