253 records of San Francisco tie this place, 1915–2035: 41 decisions of the Board of Supervisors and 212 facts read from city reports. Open the full list, with filters for years, kind and outcome. See the page about Marina: what it is, who appears with it.
- Kind
- Neighbourhood
- Records
- 253: 41 Board decisions, 212 facts from city reports
- Years
- 1915–2035
What the records say
The 60 most telling of its 253 records, in date order: the ones an editor picked first, then the highest scored. The one-line summaries were written by a language model from the printed page; open the page to check the wording.
| When | What the record says | Outcome | Source |
|---|---|---|---|
| 1924-01-28 | $1,000 (≈ $19,704 in 2026 dollars) more set aside for building Marina boulevard | passed | Board decision scanned page ↗ |
| 1962-12-03 | Parks commission asked to reconsider the harbor restaurant | passed | Board decision scanned page ↗ |
| 1964-01-27 | $1.5 million (≈ $16.3 million in 2026 dollars) Marina yacht harbor expansion approved | passed | Board decision scanned page ↗ |
| 1967-04-03 | City buys Marina lots for a city parking site | passed | Board decision scanned page ↗ |
| 1971-02-16 | Staff asked to draft bond plan for Marina harbor work | passed | Board decision scanned page ↗ |
| 1972-08-28 | Extra breakwater for Marina harbor approved with federal engineers | passed | Board decision scanned page ↗ |
| 1975-10-14 | Go-ahead to seek $740,000 (≈ $4.6 million in 2026 dollars) state loan for Marina harbor upgrades | passed | Board decision scanned page ↗ |
| 1975-10-20 | $170,500 (≈ $1.1 million in 2026 dollars) approved to rebuild floats at Marina Yacht Harbor | passed | Board decision scanned page ↗ |
| 1976-06-14 | State loan to repair Marina boat harbor approved | passed | Board decision scanned page ↗ |
| 1978-04-24 | Federal deal on Marina sewer and tracks passed with changes | passed | Board decision scanned page ↗ |
| 1987 | South Beach Marina · built: completed, replacing old Matson Line piers | project | City report: A guide to City Hall, city & county of San Francisco scanned page ↗ |
| 1989 | Marina District water mains · finding: Many domestic system water mains in the Marina District were damaged from the earthquake | finding | City report: Final report Balboa and Francisco Reservoirs needs assessment scanned page ↗ |
| 1989 | San Francisco Marina District low-pressure gas system · other: Leak surveys not performed; system shut-in and replaced after [name withheld] earthquake | finding | City report: Riding out future quakes : pre-earthquake planning for post-earthquake transportation system recovery in the San Francisco Bay region scanned page ↗ |
| 1990 | Francisco Reservoir enlarged and raised · alternative: Raise Francisco Reservoir to overflow elevation of 172 feet to float on University Mound system | alternative | City report: Final report Balboa and Francisco Reservoirs needs assessment scanned page ↗ |
| 1990 | University Mound pressure zone - PRVs from Sunset or Lombard zone · alternative: Install pressure reducing valves at connections to the Marina District from Sunset pressure zone or Lombard Reservoir | alternative | City report: Final report Balboa and Francisco Reservoirs needs assessment scanned page ↗ |
| 1990 | Francisco Reservoir · other: Check valves installed to allow gravity refilling from University Mound zone during low demand periods | action | City report: Final report Balboa and Francisco Reservoirs needs assessment scanned page ↗ |
| 1990 | University Mound Reservoir · other: provides 3.3 days of reserve storage for the Marina District | site | City report: Final report Balboa and Francisco Reservoirs needs assessment scanned page ↗ |
| 1990 | Francisco Reservoir · alternative: if plumbed to serve the Marina alone, Francisco Reservoir provides 2.1 days storage in addition to University Mound's 3.3 days | alternative | City report: Final report Balboa and Francisco Reservoirs needs assessment scanned page ↗ |
| 1990 | Francisco Reservoir · finding: Marina District, formerly served by Francisco Reservoir, is now part of the University Mound pressure zone | finding | City report: Final report Balboa and Francisco Reservoirs needs assessment scanned page ↗ |
| 1990 | Stabilizing the Soil in the Marina District report · other: Report on stabilizing the soil in the Marina District, prepared by Department of Civil Engineering and Earthquake Engineering Research Center, UC Berkeley | project | City report: Report to the Board of Supervisors, city and county of San Francisco : review and analysis of the Deputy Mayor function in the Office of the Mayor scanned page ↗ |
| 1990 | Marina District · finding: inadequate pressures in the Marina District if Francisco Reservoir emptied | finding | City report: Final report Balboa and Francisco Reservoirs needs assessment scanned page ↗ |
| 1990 | Francisco Reservoir · other: Water surface fluctuation graph, 145 ft Francisco Reservoir serving Marina District under ultimate maximum day demand | measure | City report: Final report Balboa and Francisco Reservoirs needs assessment scanned page ↗ |
| 1990 | Francisco Reservoir · finding: Eliminates Marina District low pressure problems if raised to 145 ft elevation | finding | City report: Final report Balboa and Francisco Reservoirs needs assessment scanned page ↗ |
| 1990 | Francisco Reservoir · finding: Nearly all of Marina area has very low pressures at peak hour with existing system | finding | City report: Final report Balboa and Francisco Reservoirs needs assessment scanned page ↗ |
| 1990 | Francisco Reservoir · finding: Most Marina pressures raised above 30 psi with Francisco Reservoir | finding | City report: Final report Balboa and Francisco Reservoirs needs assessment scanned page ↗ |
| 1990 | Francisco Reservoir pressure zone modifications · cost usd: total about $755,000 | event | City report: Final report Balboa and Francisco Reservoirs needs assessment scanned page ↗ |
| 1990 | Francisco Reservoir · recommendation: Reconstruction of Francisco Reservoir with 5.8 MG storage and reservoir overflow at elevation 145 feet | recommendation | City report: Final report Balboa and Francisco Reservoirs needs assessment scanned page ↗ |
| 1990 | Francisco Reservoir pressure zone · finding: Addition of Francisco Reservoir at elevation 145 feet would eliminate low pressure in Marina District except under fire fighting demands | finding | City report: Final report Balboa and Francisco Reservoirs needs assessment scanned page ↗ |
| 1990 | Francisco Reservoir · finding: Some pressure would remain below the required minimum residual pressure during fire fighting demand | finding | City report: Final report Balboa and Francisco Reservoirs needs assessment scanned page ↗ |
| 1990 | Francisco Reservoir pressure zone · other: Ultimate maximum day water demand served by separate Francisco pressure zone, supplying only the Marina District | finding | City report: Final report Balboa and Francisco Reservoirs needs assessment scanned page ↗ |
| 1990 | Francisco Reservoir raising · other: additional 2.1 days of storage for the Marina District | finding | City report: Final report Balboa and Francisco Reservoirs needs assessment scanned page ↗ |
| 1990 | Francisco Reservoir · other: 5.8 MG reservoir serving new Marina District pressure zone | project | City report: Final report Balboa and Francisco Reservoirs needs assessment scanned page ↗ |
| 1990 | Francisco Reservoir · other: 5.4 days of emergency storage to the Marina | finding | City report: Final report Balboa and Francisco Reservoirs needs assessment scanned page ↗ |
| 1990 | Francisco Reservoir · finding: would add 2.1 days of local storage to meet Marina District demands | finding | City report: Final report Balboa and Francisco Reservoirs needs assessment scanned page ↗ |
| 1990 | Francisco Reservoir · finding: raised reservoir would supply additional 2.6 days of local emergency storage for Marina District, total 5.4-day reserve | finding | City report: Final report Balboa and Francisco Reservoirs needs assessment scanned page ↗ |
| 1991 | South Beach Marina · lead agency: Redevelopment Agency | project | City report: A guide to City Hall, city & county of San Francisco scanned page ↗ |
| 1991 | Marina rental units lost in earthquake · finding: All replacement units to be condominiums to repay loans | finding | City report: San Francisco's Loma Prieta experience : with an emphasis on state programs and policies and their implications for local recovery scanned page ↗ |
| 1991 | multi-family buildings in the Marina · units: 12 to 20 units per building | property_record | City report: San Francisco's Loma Prieta experience : with an emphasis on state programs and policies and their implications for local recovery scanned page ↗ |
| 1991 | Marina District municipal water supply system (MWSS) · other: inoperable in a magnitude 8.3 earthquake | finding | City report: Community safety element : summary background report scanned page ↗ |
| 1995-10-30 | Mayor Jordan vetoed the Board's approval of a liquor license at 2241 Chestnut Street, citing noise and congestion. | vetoed | Board decision scanned page ↗ |
| 1996 | Marina district housing loss after [name withheld] · other: most housing units lost were rental units | finding | City report: Community safety element : summary background report scanned page ↗ |
| 1997 | Marina District liquefaction, [name withheld] earthquake · other: Liquefaction occurred far beyond the estimated 45 km critical distance | event | City report: Riding out future quakes : pre-earthquake planning for post-earthquake transportation system recovery in the San Francisco Bay region scanned page ↗ |
| 1999-07-26 | Conditional use permit granted for 1880 Lombard Street after appeal, with conditions barring pharmacies from ground-floor retail spaces. | passed | Board decision scanned page ↗ |
| 2003-09-16 | Board approved an amended motion disapproving the Planning Commission's conditional use approval for 2026 Lombard Street. | passed | Board decision scanned page ↗ |
| 2005-07-12 | [name withheld] fees go up, including new rental charges | passed | Board decision scanned page ↗ |
| 2008-12-09 | Higher West Harbor boat berth rents | passed | Board decision scanned page ↗ |
| 2010-11-09 | Landmark designation of the Marina Branch Library at 1890 Chestnut Street passed first reading. | passed first reading | Board decision scanned page ↗ |
| 2012-06-12 | Marina boat slip fees and rules updated, including a flat daily rate | passed | Board decision scanned page ↗ |
| 2012-06-12 | $1 million (≈ $1.5 million in 2026 dollars) approved for 36 new boat slips at Marina | passed | Board decision scanned page ↗ |
| 2013-07-09 | City honours reopened Marina Yacht Harbor | passed | Board decision scanned page ↗ |
| 2014-07-22 | West Harbor boat slip fees rise yearly under new ordinance | passed | Board decision scanned page ↗ |
| 2035 | Francisco Reservoir · proposes: Use of Francisco Reservoir to increase Marina District Emergency Supply | measure | City report: Final report Balboa and Francisco Reservoirs needs assessment scanned page ↗ |
| 2035 | Francisco Reservoir · other: 5.8 MG Francisco Reservoir storage | site | City report: Final report Balboa and Francisco Reservoirs needs assessment scanned page ↗ |
| 1991 | Marina District multi-family units survey · units: over 350 units surveyed, 10% rented at very-low income before earthquake | property_record | City report: San Francisco's Loma Prieta experience : with an emphasis on state programs and policies and their implications for local recovery scanned page ↗ |
| 1990 | Marina District piping improvements · cost usd: at least $4.3 million reservoir cost; additional $0.8 million piping improvements | recommendation | City report: Final report Balboa and Francisco Reservoirs needs assessment scanned page ↗ |
| 1998 | Marina District liquefaction after [name withheld] earthquake · event: Liquefaction photographed in the Marina District after the [name withheld] earthquake | event | City report: On shaky ground. Supplement : a guide to assessing impacts of future earthquakes using ground shaking hazard maps for the San Francisco Bay Area scanned page ↗ |
| 1990 | Marina District fire · event: October 17, 1989 Marina fire resulting from the earthquake was served by connecting the fireboat Phoenix to a portable fire system | finding | City report: Final report Balboa and Francisco Reservoirs needs assessment scanned page ↗ |
| 1990 | Adopt a Senior program · event: Established following the October 17th earthquake; pairs seniors with neighborhood volunteers | event | City report: Getting things done : visions & goals for San Francisco : a two-year progress report scanned page ↗ |
| 1990 | Adopt a Senior program · other: Adopt-a-Senior program in the Marina following the October 17th earthquake | event | City report: Getting things done : visions & goals for San Francisco : a two-year progress report scanned page ↗ |
| 1990 | Marina District · finding: inadequate fire fighting storage; numerous water main breaks after October 1989 earthquake | finding | City report: Final report Balboa and Francisco Reservoirs needs assessment scanned page ↗ |