Market Street Subway

Named in the records1918–1998

66 records of San Francisco tie this place, 1918–1998: 27 decisions of the Board of Supervisors and 39 facts read from city reports. Open the full list, with filters for years, kind and outcome.

Kind
Named in the records
Records
66: 27 Board decisions, 39 facts from city reports
Years
1918–1998

What the records say

The 60 most telling of its 66 records, in date order: the ones an editor picked first, then the highest scored. The one-line summaries were written by a language model from the printed page; open the page to check the wording.

WhenWhat the record saysOutcomeSource
1918-08-19The Board directed the City Engineer to prepare plans and cost estimates for a Market Street subway at Montgomery Street.passedBoard decision
scanned page ↗
1923-11-13Board asks the City Engineer to study a Market Street subway to ease traffic and report costs.passedBoard decision
scanned page ↗
1929-04-01Supervisor Shannon proposed asking the Board of Public Works for plans and costs of a Market Street subway; referred to committee.referredBoard decision
scanned page ↗
1929-04-08Supervisor Shannon proposed $50,000 (≈ $985,205 in 2026 dollars) for a City Engineer study of a Market Street subway.referredBoard decision
scanned page ↗
1936-12-14Board debates a $50,000 (≈ $1.2 million in 2026 dollars) appropriation for preliminary Market Street subway plans; Supervisor Uhl proposes adding a four-track study.otherBoard decision
scanned page ↗
1949-01-24Market Street subway and monorail plans added to the transit studymotionBoard decision
scanned page ↗
1950Market Street subway · recommendation: Market Street should have a subway connecting with the Twin Peaks tunnelrecommendationCity report: Transportation planning for San Francisco : a report on the planning procedure and planning and engineering techniques utilized in preparation of the San Francisco long-range circulation plan, 1946-1948
scanned page ↗
1950Market Street subway · other: long range city-wide mass transit plan including final determination of need for Market Street subwayprojectCity report: Transportation planning for San Francisco : a report on the planning procedure and planning and engineering techniques utilized in preparation of the San Francisco long-range circulation plan, 1946-1948
scanned page ↗
1954-06-01$45,000 (≈ $563,654 in 2026 dollars) sought to study a Market Street subwaypassedBoard decision
scanned page ↗
1954-06-07Market Street subway study money voted downrefusedBoard decision
scanned page ↗
1954-06-07$45,000 (≈ $563,654 in 2026 dollars) sought to study a Market Street subwaypassedBoard decision
scanned page ↗
1954-06-07Proposed $45,000 (≈ $563,654 in 2026 dollars) appropriation for Market Street subway studies and plans; debate continues on the next page.refusedBoard decision
scanned page ↗
1954-06-14Move to revive the Market Street subway study money debatedrefusedBoard decision
scanned page ↗
1962Market Street subway · approved: construction of Market Street subway for Municipal Railway streetcars authorized by 1962 BART electionprojectCity report: 5 year plan, 1977-1982 : issue paper 2 : Transit planning thought in San Francisco
scanned page ↗
1964-03-02Study asked on walkways from the planned Market Street subwaypassedBoard decision
scanned page ↗
1964-03-02Supervisor Boas's resolution seeking a study of pedestrian links to the proposed Market Street subway was sent to committee.referredBoard decision
scanned page ↗
1964-03-02Study of walkway links to Market Street subway sent to committee.pendingBoard decision
scanned page ↗
1965Market Street subway station entranceways · finding: Placement of entranceways not more than 28'6" from the existing property line is technically feasiblefindingCity report: Market Street development : an analysis
scanned page ↗
1965Market Street subway stations · finding: Mezzanines have not been designed to adequately facilitate future connections to private propertiesfindingCity report: Market Street development : an analysis
scanned page ↗
1965-03-15Supervisor Morrison proposed rejecting the Advisory Board's Plan 2A for the Market Street subway and further study of Plans 4A and 4B.refusedBoard decision
scanned page ↗
1965-03-15Supervisors sit as one committee to study Market Street subway planspassedBoard decision
scanned page ↗
1965-03-15Board sits as a whole to weigh Market Street subway planspassedBoard decision
scanned page ↗
1965-03-15Supervisors argue for cut-and-cover or tunnel for the Market Street subway; proposed, no final vote found.resolutionBoard decision
scanned page ↗
1965-03-15Market Street subway plan 2A postponed to a March 29 hearing.pendingBoard decision
scanned page ↗
1965-03-15Market Street subway plan 2A set for a March 29 full meeting.pendingBoard decision
scanned page ↗
1965-03-29Supervisor Blake proposed approving Market Street Subway Plan 2A as minimum official policy; discussion continues on this page.resolutionBoard decision
scanned page ↗
1965-03-29Move to study Market Street subway plans put up for tablingtabledBoard decision
scanned page ↗
1965-03-29Market Street subway Plan 2A put aside for now.pendingBoard decision
scanned page ↗
1965-03-29Market Street subway Plan 2A put aside for now.pendingBoard decision
scanned page ↗
1966Market Street subway station entrances · other: Station entrance longitudinal locations determined by Market Street Task Force and Consultants; two sets established, with and without federal aidfindingCity report: Street and sidewalk-widths and uses
scanned page ↗
1966Market Street subway · finding: the subway under Market Street offers great potentials for growthfindingCity report: Street and sidewalk-widths and uses
scanned page ↗
1976Market Street subway · other: BART and eventually Muni streetcars in subway beneath Market Street; street space will be preservedprojectCity report: Impacts of BART on visual quality : interim service findings /
scanned page ↗
1976Market Street subway construction · finding: nearly 30% of the length of Market Street from Civic Center to the Embarcadero has subway stations beneath itfindingCity report: Impacts of BART on the social environment : interim service findings /
scanned page ↗
1976Market Street Subway and Twin Peaks Tunnel · cost usd: 58,031,000.00 (total gross project cost)projectCity report: Transportation conditions and trends : background information for the transportation strategy and programs report
scanned page ↗
1976Market Street Subway and Twin Peaks Tunnel · cost usd: 57,506,000.00 (total net project cost)projectCity report: Transportation conditions and trends : background information for the transportation strategy and programs report
scanned page ↗
1976Market Street Subway and Twin Peaks Tunnel · cost usd: Removal of [name withheld]projectCity report: Transportation conditions and trends : background information for the transportation strategy and programs report
scanned page ↗
1976Market Street Subway and Twin Peaks Tunnel · cost usd: Contingencies for Market Street Subway, Twin Peaks Tunnel, [name withheld], Sutter Substation AreaprojectCity report: Transportation conditions and trends : background information for the transportation strategy and programs report
scanned page ↗
1977MUNI Metro · other: full service of all five streetcar lines into the Market Street subway, to be achieved after resolving listed issuesprojectCity report: 5 year plan, 1977-1982 : issue paper 1 : MUNI metro, issues and strategies
scanned page ↗
1977Market Street subway stations · other: four subway stations (Embarcadero, Montgomery, Powell, Civic Center) each include a separate MUNI platformsiteCity report: Environmental impacts of BART : the user's experience
scanned page ↗
1977MUNI platforms in Market Street subway stations · other: MUNI system not yet in operation; only effect on BART travelers is a longer vertical descent to the platformsiteCity report: Environmental impacts of BART : the user's experience
scanned page ↗
1977MUNI Market Street Subway (RAPTRAN simulation) · finding: LRV subway headways as short as 75 seconds feasible if Embarcadero bottleneck removedfindingCity report: 5 year plan, 1977-1982 : issue paper 1 : MUNI metro, issues and strategies
scanned page ↗
1977MUNI Metro subway schedule · recommendation: a 75-second headway schedule could realistically be maintainedrecommendationCity report: 5 year plan, 1977-1982 : issue paper 1 : MUNI metro, issues and strategies
scanned page ↗
1977Market Street Subway capacity · other: Subway capacity constrained by terminal capacity, not line capacityfindingCity report: 5 year plan, 1977-1982 : issue paper 1 : MUNI metro, issues and strategies
scanned page ↗
1977Market Street Subway · finding: trains could operate [name withheld] to Embarcadero at 90-second headways with same running times if Embarcadero congestion is ignoredfindingCity report: 5 year plan, 1977-1982 : issue paper 1 : MUNI metro, issues and strategies
scanned page ↗
1981-06-15A hearing was requested on bus access to Market Street Subway exits and weekend surface streetcar service, sent to committee.referredBoard decision
scanned page ↗
1986-06-09City and BART agreement sought on the Market Street subwaypassedBoard decision
scanned page ↗
1998[name withheld] (Build) Alternative · alternative: Initial Operating Segment via Market Street Subway, then New Central Subway via Stockton StreetalternativeCity report: Draft environmental impact statement/draft environmental impact report for the Third Street light rail project in the City and County of San Francisco
scanned page ↗
1998Segment 6 - King Street to the Market Street Subway · other: Segment 6 from King Street to the Market Street SubwayprojectCity report: Draft environmental impact statement/draft environmental impact report for the Third Street light rail project in the City and County of San Francisco
scanned page ↗
1998Market Street Subway emergency response · event: two to three emergency drills per yeareventCity report: Draft environmental impact statement/draft environmental impact report for the Third Street light rail project in the City and County of San Francisco
scanned page ↗
1998Market Street Subway · approved: Selected by the PTC as the initial phase; Central Subway is the ultimate projectactionCity report: Draft environmental impact statement/draft environmental impact report for the Third Street light rail project in the City and County of San Francisco
scanned page ↗
1998Light Rail Alternative - Initial Operating Segment · alternative: Alignment divided into six segmentsalternativeCity report: Draft environmental impact statement/draft environmental impact report for the Third Street light rail project in the City and County of San Francisco
scanned page ↗
1998Market Street subway light rail operations · finding: subway vibration not projected to exceed residential threshold beyond about 20 feet from track centerlinefindingCity report: Draft environmental impact statement/draft environmental impact report for the Third Street light rail project in the City and County of San Francisco
scanned page ↗
1998Third Street light rail line (IOS) · other: Operates in the Market Street Subway as part of MUNI Metro, interlined with J-Church trainsprojectCity report: Draft environmental impact statement/draft environmental impact report for the Third Street light rail project in the City and County of San Francisco
scanned page ↗
Market Street Subway · event: Construction begins on Market Street subwayeventCity report: San Francisco Bay Area Rapid Transit District chronology
scanned page ↗
1977Muni streetcar lines · finding: Five streetcar lines operating independently via the Market Street subway would require system redesign to a subway-surface type of operationfindingCity report: 5 year plan, 1977-1982 : issue paper 1 : MUNI metro, issues and strategies
scanned page ↗
1976Market Street subway and stations (BARTD capital program) · cost usd: $12 million to be spent on completing the Market Street subway and stationsprojectCity report: Transit development program for the San Francisco Bay Area
scanned page ↗
1998[name withheld] [name withheld] · finding: feasible to operate low floor light rail vehicles into the Market Street SubwayfindingCity report: Draft environmental impact statement/draft environmental impact report for the Third Street light rail project in the City and County of San Francisco
scanned page ↗
1965Market Street subway stations design proposals · event: presented to the Board of SupervisorseventCity report: Market Street development : an analysis
scanned page ↗
1978Market Street subway station cut-and-cover construction · event: May 1967 to February 1973eventCity report: Land use and urban development project : program-wide case studies
scanned page ↗
1977MUNI Metro · event: MUNI's new LRV streetcars begin operating in Market Street SubwayeventCity report: 5 year plan, 1977-1982 : issue paper 1 : MUNI metro, issues and strategies
scanned page ↗

All 66 records, with filters · this place's data as JSON · release v0.7.1 · CC0 1.0