Mission Bay planning area
Named in the records1990–1997
27 records of San Francisco tie this place, 1990–1997: 0 decisions of the Board of Supervisors and 27 facts read from city reports. Open the full list, with filters for years, kind and outcome.
- Kind
- Named in the records
- Records
- 27: 0 Board decisions, 27 facts from city reports
- Years
- 1990–1997
What the records say
All 27 records, in date order. The one-line summaries were written by a language model from the printed page; open the page to check the wording.
| When | What the record says | Outcome | Source |
|---|---|---|---|
| 150 | Mission Bay site · other: several feet of total and differential settlement since filling began, more expected | event | City report: Draft EIR : long range development plan, University of California, San Francisco scanned page ↗ |
| 1990 | Mission Bay planning area · finding: well-designed buildings expected to sustain slight to severe damage but not collapse | finding | City report: Draft EIR : long range development plan, University of California, San Francisco scanned page ↗ |
| 1990 | Mission Bay planning area · other: artificially filled former tidal inlet with unengineered fill up to 200 feet deep | site | City report: Draft EIR : long range development plan, University of California, San Francisco scanned page ↗ |
| 1990 | Mission Bay planning area · other: one- to two-story structures on spread footings or stiffened slabs where settlement is not excessive | finding | City report: Draft EIR : long range development plan, University of California, San Francisco scanned page ↗ |
| 1990 | Mission Bay planning area · other: two- to five-story structures on compensating foundations floating on engineered fill | finding | City report: Draft EIR : long range development plan, University of California, San Francisco scanned page ↗ |
| 1990 | Mission Bay planning area · other: piles driven to stable material for structures more than five stories or settlement over six inches | finding | City report: Draft EIR : long range development plan, University of California, San Francisco scanned page ↗ |
| 1996 | Mission Bay Mitigation Monitoring Program · recommendation: Section 15 geo-seismic measures K1 through K23 | measure | City report: Draft EIR : long range development plan, University of California, San Francisco scanned page ↗ |
| 1996 | Mission Bay groundwater · finding: groundwater is brackish and appeared to be contaminated with sewage | finding | City report: Draft EIR : long range development plan, University of California, San Francisco scanned page ↗ |
| 1996 | Mission Bay groundwater · finding: Groundwater is brackish and appeared to be contaminated with sewage | finding | City report: Draft EIR : long range development plan, University of California, San Francisco scanned page ↗ |
| 1996 | Mission Bay planning area · finding: as much as 57 feet of unengineered fill over 20 to 120 feet of Bay Mud | finding | City report: Draft EIR : long range development plan, University of California, San Francisco scanned page ↗ |
| 1996 | Mission Bay planning area · other: as much as 57 feet of unengineered fill overlying 20 to 120 feet of Bay Mud | finding | City report: Draft EIR : long range development plan, University of California, San Francisco scanned page ↗ |
| 1996 | Mission Bay planning area foundations · recommendation: piles needed for structures more than 5 stories high | recommendation | City report: Draft EIR : long range development plan, University of California, San Francisco scanned page ↗ |
| 1996 | Mission Bay planning area foundations · recommendation: 1- to 2-story structures on spread footings or stiffened slabs | recommendation | City report: Draft EIR : long range development plan, University of California, San Francisco scanned page ↗ |
| 1996 | Mission Bay planning area mitigation · recommendation: basements constructed above the water table, eliminating dewatering | recommendation | City report: Draft EIR : long range development plan, University of California, San Francisco scanned page ↗ |
| 1996 | Mission Bay planning area emergency measures · recommendation: requiring a mass care facility in the Mission Bay planning area | recommendation | City report: Draft EIR : long range development plan, University of California, San Francisco scanned page ↗ |
| 1996 | Mission Bay Mitigation Monitoring Program · other: Measure K1 mandates a comprehensive site-specific geotechnical study for all structures three stories high or higher | measure | City report: Draft EIR : long range development plan, University of California, San Francisco scanned page ↗ |
| 1996 | [name withheld] at Mission Bay · finding: Neither CNDDB nor the Mission Bay FEIR identified sensitive habitat or sensitive species within the Mission Bay planning area | finding | City report: Draft EIR : long range development plan, University of California, San Francisco scanned page ↗ |
| 1996 | Mission Bay planning area · finding: greatest liquefaction and subsidence risk north of [name withheld] | finding | City report: Draft EIR : long range development plan, University of California, San Francisco scanned page ↗ |
| 1996 | Mission Bay planning area · finding: lateral spreading risk greatest within several hundred feet of [name withheld] | finding | City report: Draft EIR : long range development plan, University of California, San Francisco scanned page ↗ |
| 1996 | Mission Bay Mitigation Monitoring Program · event: geo-seismic measures incorporated as requirements for any development | event | City report: Draft EIR : long range development plan, University of California, San Francisco scanned page ↗ |
| 1997 | Mission Bay FEIR Addendum No. 2 · event: Office of Environmental Review published FEIR Addendum No. 2, File No. 96.684E | event | City report: San Francisco general plan : amendments to the general plan : adopted between September 1988 and July 1997 scanned page ↗ |
| 1996 | Mission Bay planning area EIR · event: certified August 1990 | event | City report: Draft EIR : long range development plan, University of California, San Francisco scanned page ↗ |
| 1995 | Mission Bay Development Agreement · event: Proposed Development Agreement released for public review | event | City report: Amendments to the master plan adopted between September 1988 and March 1995 scanned page ↗ |
| 1997 | Mission Bay Plan · proposes: Mission Bay Plan, a Specific Plan added to the Master Plan for the Project area | project | City report: San Francisco general plan : amendments to the general plan : adopted between September 1988 and July 1997 scanned page ↗ |
| 1997 | Mission Bay Plan · approved: Planning Commission approved the Mission Bay Plan and related amendments | event | City report: San Francisco general plan : amendments to the general plan : adopted between September 1988 and July 1997 scanned page ↗ |
| 1996 | Mission Bay planning area · finding: as much as another 6 inches of total settlement | finding | City report: Draft EIR : long range development plan, University of California, San Francisco scanned page ↗ |
| 1996 | Mission Bay planning area · other: settlement of as much as another 6 inches expected during the next 30 years | finding | City report: Draft EIR : long range development plan, University of California, San Francisco scanned page ↗ |
All 27 records, with filters · this place's data as JSON · release v0.7.1 · CC0 1.0