North Point Water Pollution Control Plant
Named in the records1974–2001
13 records of San Francisco tie this place, 1974–2001: 7 decisions of the Board of Supervisors and 6 facts read from city reports. Open the full list, with filters for years, kind and outcome.
- Kind
- Named in the records
- Records
- 13: 7 Board decisions, 6 facts from city reports
- Years
- 1974–2001
What the records say
All 13 records, in date order. The one-line summaries were written by a language model from the printed page; open the page to check the wording.
| When | What the record says | Outcome | Source |
|---|---|---|---|
| 1974 | North Point Transport Project · proposes: conveys untreated wastewater from North Point plant to Southeast plant | project | City report: Draft environmental impact report and statement : San Francisco wastewater master plan scanned page ↗ |
| 1976-06-21 | Proposed $4.6 million (≈ $27.2 million in 2026 dollars) upgrade to North Point sewage plant. | pending | Board decision scanned page ↗ |
| 1976-06-21 | Proposed $4.6 million (≈ $27.2 million in 2026 dollars) upgrade to North Point sewage plant. | pending | Board decision scanned page ↗ |
| 1976-06-28 | $4.6 million (≈ $27.2 million in 2026 dollars) for North Point sewage plant improvements approved | passed | Board decision scanned page ↗ |
| 1976-06-28 | $4.6 million (≈ $27.2 million in 2026 dollars) for North Point sewage plant improvements approved. | passed | Board decision scanned page ↗ |
| 1978-02-21 | Sewer bond money approved for North Point plant and outfalls | passed | Board decision scanned page ↗ |
| 1978-07-10 | Chlorine rail car lease approved for North Point wastewater plant | passed | Board decision scanned page ↗ |
| 1978-07-10 | Chlorine rail car lease approved for North Point wastewater plant | passed | Board decision scanned page ↗ |
| 1996 | North Point Water Pollution Control Plant · other: operating capacity 150 mgd PWWF | site | City report: Draft EIR : long range development plan, University of California, San Francisco scanned page ↗ |
| 1997 | Activity 5B4: Evaluate the Feasibility of Using the Existing Sludge Line · proposes: Evaluate and implement if appropriate use of the existing sludge line to convey nonpotable water to the North Point Plant | action | City report: San Francisco groundwater master plan : final scanned page ↗ |
| 1997 | North Point Water Pollution Control Plant sedimentation tanks · other: Six sedimentation tanks, each with a volume of 850,000 gallons | building | City report: San Francisco groundwater master plan : final scanned page ↗ |
| 1998 | North Point Water Pollution Control Plant · use: Operational in rainy weather for flows from northern part of study area | site | City report: Draft environmental impact statement/draft environmental impact report for the Third Street light rail project in the City and County of San Francisco scanned page ↗ |
| 2001 | SFPUC North Point Water Pollution Control Plant · proposes: increasing treatment capacity at North Point Water Pollution Control Plant | project | City report: Presidio Trust implementation plan : an updated plan for Area B of the Presidio of San Francisco : draft environmental impact statement scanned page ↗ |
All 13 records, with filters · this place's data as JSON · release v0.7.1 · CC0 1.0